Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
MEESEVA
CERTIFICATE OF CULTIVATION
MEESEVA USER MANUAL
FOR
CERTIFICATE OF CULTIVATION
Contents
Procedure for Processing the Request at Department End:
Procedure for Processing the Request at FDO End:
Procedure for Processing the Request at JD End:
Procedure for Processing the Request at Collector End:
Procedure for Processing the Request at ADF End:
List of Tables
Table 1: Service Information at Glance
List of Figures
Figure 1: Certificate of Cultivation link under Application Processing
Figure 2: FDO processing window in Certification of Cultivation Application Requests screen
Figure 3: Request selection in FDO processing window
Figure 4: Request Details page of FDO
Figure 5: Update Culture Details screen
Figure 6: Documents uploaded by FDO
Figure 7: Recommended by FDO ................................
Figure 8: Acknowledgment for Forwarded Application
Figure 9: Certificate of Cultivation link under Application Processing at JD Login
Figure 10: JD processing window in Certification of Cultivation Application Requests screen
Figure 11: Request selection in JD processing window
Figure 12: Request Details page of JD
Figure 13: Documents uploaded by JD
Procedure for Processing the Request at Department End: - ................................................................
Procedure for Processing the Request at FDO End: - ................................................................
Procedure for Processing the Request at JD End: -................................................................
Processing the Request at Collector End: - ................................................................
Procedure for Processing the Request at ADF End: - ................................................................
Table 1: Service Information at Glance ................................................................................................
Figure 1: Certificate of Cultivation link under Application Processing ................................
Figure 2: FDO processing window in Certification of Cultivation Application Requests screen
Figure 3: Request selection in FDO processing window ................................................................
igure 4: Request Details page of FDO ................................................................................................
Figure 5: Update Culture Details screen ................................................................................................
Figure 6: Documents uploaded by FDO ................................................................................................
................................................................................................
for Forwarded Application ................................................................
Figure 9: Certificate of Cultivation link under Application Processing at JD Login ................................
Figure 10: JD processing window in Certification of Cultivation Application Requests screen
Figure 11: Request selection in JD processing window ................................................................
Figure 12: Request Details page of JD ................................................................................................
ments uploaded by JD ................................................................................................
...................................... 4
................................................... 4
....................................................... 8
.......................................... 12
.................................................. 16
......................................... 4
......................................................... 4
Figure 2: FDO processing window in Certification of Cultivation Application Requests screen ................... 5
............................................... 5
......................................... 6
....................................... 7
........................................ 7
.................................................. 7
................................................ 8
....................................... 8
Figure 10: JD processing window in Certification of Cultivation Application Requests screen .................... 9
................................................ 9
......................................... 10
....................................... 11
Figure 14: Recommended by JD ................................
Figure 15: Acknowledgment for Forwarded Application
Figure 16: Certificate of Cultivation link under Application Processing at Collector Login
Figure 17: Collector processing window in Certi
Figure 18: Request selection in Collector processing window
Figure 19: Request Details page of Collector
Figure 20: Recommended to ADF by Collector
Figure 21: Acknowledgment for Forwarded Application
Figure 22: Certificate of Cultivation link under Application Processing at ADF Login
Figure 23: ADF processing window in Certifi
Figure 24: Request selection in ADF processing window
Figure 25: Request Details page of ADF
Figure 26: Approved by ADF ................................
Figure 27: Certificate ................................
................................................................................................
Figure 15: Acknowledgment for Forwarded Application ................................................................
Certificate of Cultivation link under Application Processing at Collector Login
Figure 17: Collector processing window in Certification of Cultivation Application Requests screen
Figure 18: Request selection in Collector processing window ................................................................
Figure 19: Request Details page of Collector ..............................................................................................
Figure 20: Recommended to ADF by Collector ...........................................................................................
Figure 21: Acknowledgment for Forwarded Application ................................................................
igure 22: Certificate of Cultivation link under Application Processing at ADF Login ................................
Figure 23: ADF processing window in Certification of Cultivation Application Requests screen
Figure 24: Request selection in ADF processing window ................................................................
Figure 25: Request Details page of ADF ................................................................................................
................................................................................................
................................................................................................................................
................................................. 11
............................................ 12
Certificate of Cultivation link under Application Processing at Collector Login ........................ 12
fication of Cultivation Application Requests screen ....... 13
................................... 13
.............................. 14
........................... 15
............................................ 15
................................ 16
cation of Cultivation Application Requests screen ............... 16
........................................... 17
...................................... 18
....................................................... 19
................................... 20
Certificate of Cultivation
Category Type B
Service Charges NA
Challan Amount NA
User Charges INR 25
Documents Required 1.
2.
3.
SLA 15 Working days
Table
Note: The asterisk (*) denotes mandatory requirement of documents.
Procedure for Processing
Procedure for Processing the Request at
1. Select “Certificate of Cultivation
figure 1.
Figure 1: Certificate of Cultivation link under Application
Certificate of Cultivation
INR 25/-
1. MeeSeva Application Form*
2. Aadhaar Card*
3. Land Documents (If any)
Working days
Table 1: Service Information at Glance
) denotes mandatory requirement of documents.
Procedure for Processing the Request at Department End: -
Procedure for Processing the Request at FDO End: -
Certificate of Cultivation” from Application Processing. It has been depicted in
Certificate of Cultivation link under Application Processing
It has been depicted in
Processing
2. After selection of “Certification of Cultivation
Select from Date, to Date, Status, and click on Get Detail
Figure 2: FDO processing window i
3. Select the Request which has to be processed
Figure 3: Request selection in FDO processing window
Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status, and click on Get Details Button as depicted in figure 2
FDO processing window in Certification of Cultivation Application Requests screen
Select the Request which has to be processed as depicted in figure 3.
Request selection in FDO processing window
” link, processing window will be displayed.
s Button as depicted in figure 2.
n Certification of Cultivation Application Requests screen
4. After selection of the request, request detail
figure 4.
Figure
After selection of the request, request details page will be displayed as depicted
Figure 4: Request Details page of FDO
depicted in below
5. If any culture data (i.e. Culture Period, Culture Starting Month and Culture Starting Year)
is not entered correctly at kiosk level
5.
Figure
6. Upload Mandal Level Committee approval and Land photo as depicted in below figure
Figure
7. Enter FDO Remarks and select action either Forward to JD or Rejected (Here, I am
selecting Forward to JC) and click on Submit Button as depicted in below figure
Figure
If any culture data (i.e. Culture Period, Culture Starting Month and Culture Starting Year)
is not entered correctly at kiosk level, FDO update the fields as depicted in below
Figure 5: Update Culture Details screen
Upload Mandal Level Committee approval and Land photo as depicted in below figure
Figure 6: Documents uploaded by FDO
Enter FDO Remarks and select action either Forward to JD or Rejected (Here, I am
selecting Forward to JC) and click on Submit Button as depicted in below figure
Figure 7: Recommended by FDO
If any culture data (i.e. Culture Period, Culture Starting Month and Culture Starting Year)
depicted in below figure
Upload Mandal Level Committee approval and Land photo as depicted in below figure 6.
Enter FDO Remarks and select action either Forward to JD or Rejected (Here, I am
selecting Forward to JC) and click on Submit Button as depicted in below figure 7.
8. Once click on Submit Button as acknowledgment message like “Application Forwarded
to JD” displayed as depicted in below figure
Figure 8: Acknowledgment for Forwarded Application
Note: If rejected also message displayed like “Application rejected
Procedure for Processing the Request at
9. Select “Certificate of Cultivation
figure 9.
Figure 9: Certificate of Cultivation link under Application Processing
Button as acknowledgment message like “Application Forwarded
to JD” displayed as depicted in below figure 8.
: Acknowledgment for Forwarded Application
Note: If rejected also message displayed like “Application rejected by FDO”.
Procedure for Processing the Request at JD End: -
Select “Certificate of Cultivation” from Application Processing. It has been depicted in
Certificate of Cultivation link under Application Processing at JD Login
Button as acknowledgment message like “Application Forwarded
It has been depicted in
at JD Login
10. After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status
Application only), and click on Get Detail
Figure 10: JD processing window in Certification of Cultivation Application Requests screen
11. Select the Request which has to be processed
Figure 11:
After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status (Here I am selecting only Forwarded by FDO
, and click on Get Details Button as depicted in figure 10
JD processing window in Certification of Cultivation Application Requests screen
Select the Request which has to be processed as depicted in figure 11.
: Request selection in JD processing window
After selection of “Certification of Cultivation” link, processing window will be displayed.
(Here I am selecting only Forwarded by FDO
10.
JD processing window in Certification of Cultivation Application Requests screen
12. After selection of the request, request details page will be displayed
figure 12.
Figure
After selection of the request, request details page will be displayed as depicted in below
Figure 12: Request Details page of JD
depicted in below
13. Upload District Level Committee approval as depicted in below fi
Figure
14. Enter JD Remarks and select action either Forward to
selecting Forward to Collector
14.
Fig
Level Committee approval as depicted in below figure 13
Figure 13: Documents uploaded by JD
Remarks and select action either Forward to Collector or Rejected (H
ollector) and click on Submit Button as depicted in below figure
Figure 14: Recommended by JD
13.
or Rejected (Here, I am
) and click on Submit Button as depicted in below figure
15. Once click on Submit Button as acknowledgment message like “Application Forwarded
to Collector” displayed as depicted in below figure
Figure 15: Acknowledgment for Forwarded
Note: If rejected also message displayed like
Procedure for Processing the Request at
16. Select “Certificate of Cultivation
figure 16.
Figure 16: Certificate of Cultivation link under Application Processing at
Once click on Submit Button as acknowledgment message like “Application Forwarded
” displayed as depicted in below figure 15.
Acknowledgment for Forwarded Application
Note: If rejected also message displayed like “Application rejected by JD”.
Procedure for Processing the Request at Collector End: -
Select “Certificate of Cultivation” from Application Processing. It has been depicted in
Certificate of Cultivation link under Application Processing at Collector
Once click on Submit Button as acknowledgment message like “Application Forwarded
It has been depicted in
Collector Login
17. After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status
only), and click on Get Detail
Figure 17: Collector processing window in Certification of Cultivation Application Requests
18. Select the Request which has
Figure 18: Request selection in
After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status (Here I am selecting only Forwarded by JD Application
, and click on Get Details Button as depicted in figure 17.
processing window in Certification of Cultivation Application Requests
screen
Select the Request which has to be processed as depicted in figure 18.
Request selection in Collector processing window
After selection of “Certification of Cultivation” link, processing window will be displayed.
ng only Forwarded by JD Application
processing window in Certification of Cultivation Application Requests
19. After selection of the request, request details page will be displayed
figure 19.
Figure
After selection of the request, request details page will be displayed as depicted in below
Figure 19: Request Details page of Collector
depicted in below
20. Enter Collector Remarks and select action either Forward to Collector or Rejected (Here,
I am selecting Recommended to ADF
figure 20.
Figure 20
21. Once click on Submit Button as acknowledgment message like “Application Forwarded
to Collector” displayed as depicted in below figure
Figure 21: Acknowledgment for Forwarded
Note: If rejected also message displayed like
Remarks and select action either Forward to Collector or Rejected (Here,
Recommended to ADF) and click on Submit Button as depicted in below
20: Recommended to ADF by Collector
Once click on Submit Button as acknowledgment message like “Application Forwarded
to Collector” displayed as depicted in below figure 21.
Acknowledgment for Forwarded Application
Note: If rejected also message displayed like “Application rejected by Collector”.
Remarks and select action either Forward to Collector or Rejected (Here,
) and click on Submit Button as depicted in below
Once click on Submit Button as acknowledgment message like “Application Forwarded
”.
Procedure for Processing the Request at
22. Select “Certificate of Cultivation
figure 22.
Figure 22: Certificate of Cultivation link under Application Processing at
23. After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status
and click on Get Details Button as depicted in figure
Figure 23: ADF processing window in Certification of Cultivation Application Requests screen
Procedure for Processing the Request at ADF End: -
Select “Certificate of Cultivation” from Application Processing. It has been depicted in
Certificate of Cultivation link under Application Processing at ADF
After selection of “Certification of Cultivation” link, processing window will be displayed.
Select from Date, to Date, Status (Here I am selecting only Recommended by Collector)
s Button as depicted in figure 23.
processing window in Certification of Cultivation Application Requests screen
It has been depicted in
Certificate of Cultivation link under Application Processing at ADF Login
After selection of “Certification of Cultivation” link, processing window will be displayed.
ly Recommended by Collector),
processing window in Certification of Cultivation Application Requests screen
24. Select the Request which has to be processed
Figure 24: Request selection in
Select the Request which has to be processed as depicted in figure 24.
Request selection in ADF processing window
25. After selection of the request, request details page will be displayed
figure 25.
Figure
After selection of the request, request details page will be displayed as depicted in below
Figure 25: Request Details page of ADF
depicted in below
26. Enter ADF Remarks and select action
depicted in below figure 2
Remarks and select action as Approved and click on Submit Button as
depicted in below figure 26.
Figure 26: Approved by ADF
and click on Submit Button as
27. After clicking on “Sign” button “
is generated as depicted in following figure
After clicking on “Sign” button “Certificate of Cultivation Service Approved Certificate”
as depicted in following figure 27.
Figure 27: Certificate
roved Certificate”