    WORKING PROCEDURE &

    FUNCTION OF MCO

  • 7/28/2019 Mco Working New

    3/25

    OBJECTIVES OF M.C.O.

    Different types of materials / stores / items are

    required to be procured for production of

    PRODUCTS their accessories, Maintenance

    Sections, and Offices etc.

    The job of Material Control Office (MCO) is toascertain the exact requirement with correct

    specifications, sizes and quality as specified.

  • 7/28/2019 Mco Working New

    4/25

    PRE REQUISITES

    Advance regarding receipts of extract or Centraldemand. IFD from P& P and Project Office.

    OFBS current year Production Program AND SIZE

    DETAIL accepted by the factory.

    Estimates from R&E Section formanufacture ofempty components. packing assembly etc.

    Requisitions from user sections for indirect items and

    ad hoc requirements.

    Spot estimates/drafts received from sections.

  • 7/28/2019 Mco Working New

    5/25

    MCO:FUNCTIONS (summarized)

    Planning of direct & indirect materials/stores asper production program and then to raise SHIS

    individually for each type of material / store.

    To find out the genuineness of ad hoc

    requirements of production shops, maintenance

    sections, offices.

    To ascertain correctness of specifications, sizes,

    types, quality etc To ascertain the mode of purchase i.e.

    placement of IFD/Indents or through trade.

  • 7/28/2019 Mco Working New

    6/25

    Contd

    To evolve a scientific inventory control procedure

    by classifying the materials into A, B, C & X, Y, Z

    types depending upon annual usage value of

    the material and stock value of the material

    and suggesting proper procurement plans foreach class.

    Maintaining the up-to-date and accurate stocks

    and dues position, Monitoring of stock items to

    get the supply of correct material at correct time.

  • 7/28/2019 Mco Working New

    7/25

    Contd Preparing periodical reports regarding pending

    orders requiring follow-up. Preparing periodical reports indicating surplus

    and different items.

    Preparing periodical reports about items where

    stock is below a certain minimum level.

    To work out the material requirements everysix month indicating the availability of alternateitems, thus enabling the factory to explore thefeasibility of utilizing available alternatematerial.

    Assessing the repercussions of a changedprogramme on material stock.

  • 7/28/2019 Mco Working New

    8/25

    Contd

    Reviewing all items for non moving, slow moving

    and dead stocks.

    To prepare a mutual aid list highlighting the high

    value items and circulating them to all sisters

    Ordnance Fys., Inspectorates and otherdepartments as prescribed for quick disposal of

    surplus materials.

    Budgetary estimate for Direct & Indirect

    materials / Stores along with expected receiptsand issues (IFD + Trade Firms etc.) and project

    the same to OFB (Fin. Sec.) for fund allotment.

  • 7/28/2019 Mco Working New

    9/25

    Contd

    To scrutinize the tender documents at the time of

    preliminary selection for the items, especially

    technical side.

    Supply order is to be examined before placement on

    the firm for the correctness of the item, supply

    schedule, advance sample requirement etc.

    Audit reply pertaining to demand is to be dealt with.

    Liasioning with Vetting Cell, Planning Office, Design

    Office, Provision Office, Production Section, LocalAccounts Office (specially ledger section), Computer

    Section and Stores.

    .

  • 7/28/2019 Mco Working New

    10/25

    After receipt of the material, the user section is to

    be intimated the position of arrival of the item and

    its drawl is also monitored through material

    warrants/ SWOD and in few cases Demand Note

    also being cleared by MCO before drawl from

    stock.

  • 7/28/2019 Mco Working New

    11/25

    REPORTS

    MAS

    A CATEGORY ITEMS

    SM/NM LIST(1/3 YEARS)

    ORDINARY INDIGENOUS ITEMS (6 MONTH)

    IMPORTED ITEMS (12 MONTHS NSP ITEMS)

    STOCK PILE ITEMS (9 MONTHS SP PERMITTED)

  • 7/28/2019 Mco Working New

    12/25

    WORKING OUT REQUIREMENTS

    Normally provisioning should be made on the basis ofrequirement as assessed with reference to firm demands

    from the services and other indenters.

    As regard items of imported origin, indents may be placedunto 12 months in advance of the period of utilization

    which will be 12 months i.e. for a requirement unto 24

    months less stock & dues against firm demands.

    As regard difficult indigenous items, indents may be placed

    up to 06 months in advance of the period of utilization

    which will be 12 months i.e. for a requirement unto 18

    months less stock & dues against firm demands.

  • 7/28/2019 Mco Working New

    13/25

    For ordinary indigenous items, indents may be placed up

    to 06 months in advance of the period of utilization which

    will be 12 months i.e. for a requirement up to 18 monthsless stock & dues against firm demand.

    Provision for general purpose stores and maintenance

    stores which are not required directly against production

    will normally be made on the basis of the monthly

    average consumption of the preceding 24 months.

    Stock pile of non-perishable imported materials shall

    build up to 9 months requirements and of difficult

    indigenous materials up to 4 months requirement.

  • 7/28/2019 Mco Working New

    14/25

    The optimum level of stock to be held by factory at any time

    in respect of imported stores, the difficult indigenous itemsand ordinary indigenous items may be as follows:

    a) Imported items :12 months requirement

    for non stock pile items, :6 months requirement(exclusive of stock pile wherever authorized).

    b) Difficult indigenous items :03 months requirement

    (exclusive of stock pile, wherever authorized).

    c) Ordinary indigenous items :6 months requirement.

  • 7/28/2019 Mco Working New

    15/25

    FLOW CHART OF MCO

  • 7/28/2019 Mco Working New

    16/25

    MP SHEET VIS A VIS SHIS

    A)Computerized Material Planning Sheets

    These are generated by factory EDP/MCO section giving

    the position as on First May and First November of the

    year. They show requirements, availability and deficiency

    on their basesand also stock and dues of each materiel.For this purpose the following -details are required:-

    Dues position of S.O, Contracts and Indents etc.

    Stores transaction documents like demand Note, return

    Note, Receipt voucher, Issue voucher etc. Production Programme reporting proforma (PPRP)

    Wanting bills of materials as projected in PPRP.

  • 7/28/2019 Mco Working New

    17/25

    B) Store Holders Inability Sheet:

    In such cases where MP sheet not received, this is

    prepared by MCO giving details similar to MP Sheet. This

    also shows last supplier and likely suppliers.

    Based on the data from Bill of materials, MCO prepares a

    document showing the net requirement of any item for a

    particular period taking into consideration the stocks,

    semis & dues, called the Store Holders Inability Sheet

    (SHIS).

  • 7/28/2019 Mco Working New

    18/25

    REQUIREMENT WORK-OUT

    Total requirement say 1090 kg. Stock on the date of SHIS say 210 kgs.

    Dues against old SOs say 33 kgs.

    Net requirement 1090-(210+33) = 847 kgs.

    Rounded off to the nearest figure 850 kgs.

    So the SHIS shall be prepared for 850 kgs. Further information required to be given in the SHIS.

    Last Paid Rate (LPR).

    Last source of supply (LSS).

    Last Order Details.

    Special remarks, if any.

    Delivery Requirements.

    Basis of SHIS.

    Budget Code.

    Extracts No.

    Nomenclature, L.F No, Specification No.

  • 7/28/2019 Mco Working New

    19/25

    SIH

    Factories are permitted to hold SIH inventory as :

    Group of Factories Over-all SIH Inventory Level

    AV 6 Months

    OEF 3 Months

    Others 4 Months

  • 7/28/2019 Mco Working New

    20/25

    Contd

    (a) OF Board approval should be obtained for making anywithdrawal from stockpile.

    (b) Stockpile is permissible only in respect of 'imported'

    and difficult to procure indigenous stores, the

    maximum limit for each category being 6 months' and

    3 months' requirement respectively, unless specifically

    authorised for higher levels.

    (c) The withdrawal from stockpile will be first transferred

    to Stock Ledger and issued on Demand Notes.

  • 7/28/2019 Mco Working New

    21/25

    PROVISIONING PERIOD

    The total provisioning period normally varies from 18 to24 months depending on

    I) Whether the item is a direct material used in

    production or indirect material for maintenance/generalpurpose use and

    II) Whether the item is imported or indigenous.

    The provisioning period consists of two parts viz.

    (i) lead-time and

    (ii) the period of utilisation.

  • 7/28/2019 Mco Working New

    22/25

    a) The lead time is intended to cover all actions up to

    materialization of supplies i.e. assessment of netrequirement, procurement consisting of tender action,

    tender decision, placement of orders and delivery period

    required by the supplier.

    b) Period of utilisation is the production period during

    which the entire ordered quantity will be utilised for

    meeting the production target after full drawl of stock and

    supplies received against dues at the time of provisioning

    action. The period of utilisation covers a period of 12months.

  • 7/28/2019 Mco Working New

    23/25

    DETERMINATION OF REQUIREMENT

    Gross requirement of direct material will be worked

    out based on product estimate and quantity to be

    produced during the year.

    Good dues and stock will be subtracted from the

    gross requirement to work out net requirement for

    procurement.

    If the end product is being phased out before next

    procurement cycle, WIP should also be subtracted from

    the gross requirement.

    Requirement of indirect material normally will be

    worked out based on average consumption during past

    24 months.