WORKING PROCEDURE &
FUNCTION OF MCO
7/28/2019 Mco Working New
3/25
OBJECTIVES OF M.C.O.
Different types of materials / stores / items are
required to be procured for production of
PRODUCTS their accessories, Maintenance
Sections, and Offices etc.
The job of Material Control Office (MCO) is toascertain the exact requirement with correct
specifications, sizes and quality as specified.
7/28/2019 Mco Working New
4/25
PRE REQUISITES
Advance regarding receipts of extract or Centraldemand. IFD from P& P and Project Office.
OFBS current year Production Program AND SIZE
DETAIL accepted by the factory.
Estimates from R&E Section formanufacture ofempty components. packing assembly etc.
Requisitions from user sections for indirect items and
ad hoc requirements.
Spot estimates/drafts received from sections.
7/28/2019 Mco Working New
5/25
MCO:FUNCTIONS (summarized)
Planning of direct & indirect materials/stores asper production program and then to raise SHIS
individually for each type of material / store.
To find out the genuineness of ad hoc
requirements of production shops, maintenance
sections, offices.
To ascertain correctness of specifications, sizes,
types, quality etc To ascertain the mode of purchase i.e.
placement of IFD/Indents or through trade.
7/28/2019 Mco Working New
6/25
Contd
To evolve a scientific inventory control procedure
by classifying the materials into A, B, C & X, Y, Z
types depending upon annual usage value of
the material and stock value of the material
and suggesting proper procurement plans foreach class.
Maintaining the up-to-date and accurate stocks
and dues position, Monitoring of stock items to
get the supply of correct material at correct time.
7/28/2019 Mco Working New
7/25
Contd Preparing periodical reports regarding pending
orders requiring follow-up. Preparing periodical reports indicating surplus
and different items.
Preparing periodical reports about items where
stock is below a certain minimum level.
To work out the material requirements everysix month indicating the availability of alternateitems, thus enabling the factory to explore thefeasibility of utilizing available alternatematerial.
Assessing the repercussions of a changedprogramme on material stock.
7/28/2019 Mco Working New
8/25
Contd
Reviewing all items for non moving, slow moving
and dead stocks.
To prepare a mutual aid list highlighting the high
value items and circulating them to all sisters
Ordnance Fys., Inspectorates and otherdepartments as prescribed for quick disposal of
surplus materials.
Budgetary estimate for Direct & Indirect
materials / Stores along with expected receiptsand issues (IFD + Trade Firms etc.) and project
the same to OFB (Fin. Sec.) for fund allotment.
7/28/2019 Mco Working New
9/25
Contd
To scrutinize the tender documents at the time of
preliminary selection for the items, especially
technical side.
Supply order is to be examined before placement on
the firm for the correctness of the item, supply
schedule, advance sample requirement etc.
Audit reply pertaining to demand is to be dealt with.
Liasioning with Vetting Cell, Planning Office, Design
Office, Provision Office, Production Section, LocalAccounts Office (specially ledger section), Computer
Section and Stores.
.
7/28/2019 Mco Working New
10/25
After receipt of the material, the user section is to
be intimated the position of arrival of the item and
its drawl is also monitored through material
warrants/ SWOD and in few cases Demand Note
also being cleared by MCO before drawl from
stock.
7/28/2019 Mco Working New
11/25
REPORTS
MAS
A CATEGORY ITEMS
SM/NM LIST(1/3 YEARS)
ORDINARY INDIGENOUS ITEMS (6 MONTH)
IMPORTED ITEMS (12 MONTHS NSP ITEMS)
STOCK PILE ITEMS (9 MONTHS SP PERMITTED)
7/28/2019 Mco Working New
12/25
WORKING OUT REQUIREMENTS
Normally provisioning should be made on the basis ofrequirement as assessed with reference to firm demands
from the services and other indenters.
As regard items of imported origin, indents may be placedunto 12 months in advance of the period of utilization
which will be 12 months i.e. for a requirement unto 24
months less stock & dues against firm demands.
As regard difficult indigenous items, indents may be placed
up to 06 months in advance of the period of utilization
which will be 12 months i.e. for a requirement unto 18
months less stock & dues against firm demands.
7/28/2019 Mco Working New
13/25
For ordinary indigenous items, indents may be placed up
to 06 months in advance of the period of utilization which
will be 12 months i.e. for a requirement up to 18 monthsless stock & dues against firm demand.
Provision for general purpose stores and maintenance
stores which are not required directly against production
will normally be made on the basis of the monthly
average consumption of the preceding 24 months.
Stock pile of non-perishable imported materials shall
build up to 9 months requirements and of difficult
indigenous materials up to 4 months requirement.
7/28/2019 Mco Working New
14/25
The optimum level of stock to be held by factory at any time
in respect of imported stores, the difficult indigenous itemsand ordinary indigenous items may be as follows:
a) Imported items :12 months requirement
for non stock pile items, :6 months requirement(exclusive of stock pile wherever authorized).
b) Difficult indigenous items :03 months requirement
(exclusive of stock pile, wherever authorized).
c) Ordinary indigenous items :6 months requirement.
7/28/2019 Mco Working New
15/25
FLOW CHART OF MCO
7/28/2019 Mco Working New
16/25
MP SHEET VIS A VIS SHIS
A)Computerized Material Planning Sheets
These are generated by factory EDP/MCO section giving
the position as on First May and First November of the
year. They show requirements, availability and deficiency
on their basesand also stock and dues of each materiel.For this purpose the following -details are required:-
Dues position of S.O, Contracts and Indents etc.
Stores transaction documents like demand Note, return
Note, Receipt voucher, Issue voucher etc. Production Programme reporting proforma (PPRP)
Wanting bills of materials as projected in PPRP.
7/28/2019 Mco Working New
17/25
B) Store Holders Inability Sheet:
In such cases where MP sheet not received, this is
prepared by MCO giving details similar to MP Sheet. This
also shows last supplier and likely suppliers.
Based on the data from Bill of materials, MCO prepares a
document showing the net requirement of any item for a
particular period taking into consideration the stocks,
semis & dues, called the Store Holders Inability Sheet
(SHIS).
7/28/2019 Mco Working New
18/25
REQUIREMENT WORK-OUT
Total requirement say 1090 kg. Stock on the date of SHIS say 210 kgs.
Dues against old SOs say 33 kgs.
Net requirement 1090-(210+33) = 847 kgs.
Rounded off to the nearest figure 850 kgs.
So the SHIS shall be prepared for 850 kgs. Further information required to be given in the SHIS.
Last Paid Rate (LPR).
Last source of supply (LSS).
Last Order Details.
Special remarks, if any.
Delivery Requirements.
Basis of SHIS.
Budget Code.
Extracts No.
Nomenclature, L.F No, Specification No.
7/28/2019 Mco Working New
19/25
SIH
Factories are permitted to hold SIH inventory as :
Group of Factories Over-all SIH Inventory Level
AV 6 Months
OEF 3 Months
Others 4 Months
7/28/2019 Mco Working New
20/25
Contd
(a) OF Board approval should be obtained for making anywithdrawal from stockpile.
(b) Stockpile is permissible only in respect of 'imported'
and difficult to procure indigenous stores, the
maximum limit for each category being 6 months' and
3 months' requirement respectively, unless specifically
authorised for higher levels.
(c) The withdrawal from stockpile will be first transferred
to Stock Ledger and issued on Demand Notes.
7/28/2019 Mco Working New
21/25
PROVISIONING PERIOD
The total provisioning period normally varies from 18 to24 months depending on
I) Whether the item is a direct material used in
production or indirect material for maintenance/generalpurpose use and
II) Whether the item is imported or indigenous.
The provisioning period consists of two parts viz.
(i) lead-time and
(ii) the period of utilisation.
7/28/2019 Mco Working New
22/25
a) The lead time is intended to cover all actions up to
materialization of supplies i.e. assessment of netrequirement, procurement consisting of tender action,
tender decision, placement of orders and delivery period
required by the supplier.
b) Period of utilisation is the production period during
which the entire ordered quantity will be utilised for
meeting the production target after full drawl of stock and
supplies received against dues at the time of provisioning
action. The period of utilisation covers a period of 12months.
7/28/2019 Mco Working New
23/25
DETERMINATION OF REQUIREMENT
Gross requirement of direct material will be worked
out based on product estimate and quantity to be
produced during the year.
Good dues and stock will be subtracted from the
gross requirement to work out net requirement for
procurement.
If the end product is being phased out before next
procurement cycle, WIP should also be subtracted from
the gross requirement.
Requirement of indirect material normally will be
worked out based on average consumption during past
24 months.
7/28/2019 Mco Working New