MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies
Page 2: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies
Page 3: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

INDEX Detailed Project Report under Rajiv Awas Yojana

S.No. Detailed of Activity Page No.

1. City Profile. A Survey of city and its slum abadies. 1-13 2. Executive Summary 15-18 3. Project Contributions ( Physical + Financial) 19-24 4. Category wise detail of Housing & Upgradation and beneficiary

share 25-26

5. Component wise summary 27-28 6. Slum wise Financial detail 29-30 7. Certificate & Undertaking 31-48 8. Summary Sheet No. -1 – Existing Housing 49-50 9. Summary Sheet No. -2 – Proposed Housing 51-52

10. Summary Sheet No. -3 – Basic Infrastructure 53-54 11. Summary Sheet No. -4 - Existing Social Infrastructure 55-56 12. Summary Sheet No. -6 - Category wise break-up of beneficiaries 57-58 13. Summary Sheet No. -8- Livelihood Detail 59-60 14. Checklist of DPR 61-64 15. Administrative and Technical Checklist 65-72 16. Community Participation 73-74 17. Satellite Google Map of New Anand Nagar 75-78 18. Slum Photographs : New Anand Nagar : Beneficiary list,

estimate, livelihood, economic survey, Map 79-90

19. Kot Sadiq : Community Participation, Beneficiary list, estimate, economic survey, livelihood ,map

91-110 20. Chohkan Kalan : Community Participation, Beneficiary list,

estimate, economic survey, livelihood, Map 111-128

21. Amarjit Nagar Basti Peer daad : Beneficiary list, estimate, economic survey, livelihood, Map

129-138 22. Rasila Nagar & New Rasila Nagar : Community Participation ,

Beneficiary list, economic survey, livelihood, Map 139-148

23. Jaimal Nagar : Beneficiary list, economic survey, livelihood ,Map 149-154 24. New Suraj Ganj- Bhargo Camp : Beneficiary list, economic

survey, livelihood ,Map 155-160

25. Abadpura- W.No. 55 : Community Participation , Beneficiary list, estimate, economic survey, livelihood, Map

161-174 26. Vill. Dhilwan : Beneficiary list, estimate, economic survey,

livelihood, Map 175-188

27. Design of New Dwelling Unit, Elevation , x-section 189-192 28. New Dwelling Unit estimate 193-202 29. Design of Toilet, elevation, x-section 203-206 30. Estimates for the const. of New Toilets and bathrooms 207-212 31. Design of Kitchen & estimate 213-220 32. Design of CC street/pavement 221-222 33. Analysis of L-type drain 223-224 34. Analysis of earth filling, Malba removal 225-228 35. Analysis of Sewerage pipe, sewer line 229-230 36. Analysis of rate for Door & Window 231-232 37. Analysis of lying sewer with RCC pipe 233-234 38. Analysis of road gully chamber 235-236 39. House Res. No. 59 dated 17.12.2012 237-240 40. Self declaration 241-244 41. Authorization Letter 245

Page 4: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

CITY PROFILE: A SURVEY OF CITY

AND ITS SLUMS

1

Page 5: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

CHAPTER - 1: C ITY PROFILE – A SURVEY OF C ITY AND ITS SLUMS

1.1 General

Jalandhar, previously known as Jullundur, is an ancient city in Jalandhar District in the state of Punjab, India. It was the capital of Trigarttas (people living in the "land between three rivers": Ravi, Beas and Sutlej) in the times of Mahabharata war. It has an urban population of above seven lakhs, and another million live in the rural areas adjoining the city. The city is well known for its production of sports equipment, leather goods and rubber goods, auto parts. Many major leather manufacturers are based there who supply a variety of leather products ranging from garments to tool bags around the world. Many major sports equipment manufacturers are based there. In sports goods, some the world's most well known line for football, cricket, and hockey equipment are made in Jalandhar. Major sports giants such as Adidas, Reebok, Dunns, and Mitre outsource from Jalandhar.

1.2 Geography

Jalandhar is located at 31.33° N 75.58° E. It has a n average elevation of 229 metres (751 feet). The city is located at 375 Kms from Delhi, and about 90 Kms from Amritsar.

1.3 Climate

Jalandhar gets very dry and hot in summers lasting from April to July. Monsoon Rains start around early to mid July and last through August and end in September. It becomes quite cold in Dec-January.

3

Page 6: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

1.4 Language

The spoken language in Jalandhar is Punjabi being the mother tongue of Punjabi people. The Jalandhar falls in Doaba region, comprising the districts Jalandhar, Hoshiarpur and Kapurthala. Doaba region is sided by the rivers Beas and Sutlej. The dialect of this region is called Doaba by the linguistics.

1.5 Connectivity

Jalandhar is well connected by roads & trains, including a Shatabdi train from Delhi to Amritsar via Jalandhar.

1.6 Demographics

As of 2011 India census, Jalandhar had a population of 8,73,725. Males constitute 53% of the population and females 47%. Jalandhar has an average literacy rate of 77.2%, and female literacy is 72%. In Jalandhar, 9.7% of the population is under 6 years of age.

1.7 Urban Population

Urban population in Punjab has reached ten million in the year 2011, with two cities - Amritsar and Ludhiana - figuring in the million plus cities. It is expected that Jalandhar will also have a million plus population by 2021. Despite having the highest per capita income in the country, one fourth of the urban population in Punjab resides in slums. Moreover, the growth rate of urban population in the past three decades has been lesser than the national average, while the growth of urban population was not evenly spread in the state. The existing studies indicate that emergence of slums in Punjab is essentially the product of demographic growth in the cities, inability to meet the housing demand and the existing urban land policies which prohibit the access of the poor to the urban land market. The decadal growth rate of urbanization in Punjab has been lagging behind the national average. While the national decadal growth rate has been 36.19 per cent during the years 1981-91, the rate of growth in Punjab has been 29.06 per cent. Similarly, the decadal growth rate of urban population in the preceding two decades has also been lesser than the national average. The 10 Class I towns (those with population above one lakh) account for nearly 55 per cent of the total urban population.

Jalandhar ranks high in the rate of urbanization and has the density of population at 668 persons per square km, as per the 2011 census. The reason for this is growing industrialization However, these very towns which are acting as magnets for industrialization are also centres of pollution and growth of slums. The suspended particulate matter in industrial zones of Ludhiana, Mandi Gobindgarh, Amritsar, Jalandhar and Batala rank very high and Mandi Gobindgarh has been identified by as suffering from high pollution levels. “Due to significant number and variety of industries operating in the city there has been an influx of people from the neighboring towns / villages to work in these industries and this has led to setting up of slums in the city.

5

Page 7: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

Some of the industries which are located in the city are indicated below:

1.8 Industries

Sports Goods Industry Industry Jalandhar has the nucleus of sports goods industry in Punjab and has about 90% of the total sports goods units of the State. The product manufactured relates to all traditional products like foot-ball, cricket bats, hockey and cricket balls, hockey sticks, tennis badminton and squash rackets, balls, soft leather goods, shuttle cocks etc. This industry being labour intensive despite inadequate capital and technology, has reached a stage where it is reckoned as a major cottage industry providing direct employment to about 10000 workers. Most of India's sports goods produced here are exported to the United Kingdom, The United States of America, Germany, France and Australia. Rough estimates suggest that today Jalandhar has more than one hundred major industries and about 20,000 small-scale industries. Jalandhar is the biggest manufacturer of leather tool pouches and aprons with major American and European customers buying from factories in Jalandhar. It is also famous for its surgical tools industry. Jalandhar also has the biggest printing industry in India some of the major publishing and advertising companies have their main offices in Jalandhar. Jalandhar is also quite known for its electrical goods industry. Manufacturers of Switchgears and Electrical are located in Jalandhar and have been producing world-class electrical switchgears for over three decades. The city is the media and mass communication hub of the region having the regional headquarters of the national television and radio channels. Hand Tools Industry Jalandhar is known for the manufacturing of Hand Tools like Spanner set, screw driver, nose pliers etc. 50 units are engaged in the manufacturing of hand tools giving employment to 8000 people. Auto Parts Industry The city is known for the manufacturing of good quality of auto parts. There are 300 units engaged in the manufacturing of auto parts providing direct employment to 4500 people. Several units are supplying auto parts to the original manufacturers of automobiles. Rubber Goods Industry Jalandhar has many manufacturing units of rubber goods items like V-shape chappals, V-Belts, Scooter / Cycle tyres and rubber rolls. There are 625 units giving direct employment to 6500 persons.

7

Page 8: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

Surgical Instruments Surgical Instruments units are labour intensive units. There are 275 units in Jalandhar providing employment to 2500 persons. Tanning Industry Jalandhar is known for manufacture of shoes and a number of allied units. At present, there are a large number of tanning units providing employment to a major section of the scheduled caste and other weaker sections.

1.9 Slums in Jalandhar

According to a recent survey there are 97 slums in the city as indicated in the city map below. A slum wise status of no. of households, civic facilities such as water supply, sewerage, storm water drainage, street lights, road etc. are given in the Table below: According to the above details 2.2 lacs of population i.e. nearly 26% of the city population lives in slums. It practically coincides with the State average of urban population living in slums in Jalandhar. Nearly 34318 households are living in there 97 slums.

9

Page 9: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

11

Page 10: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

S.No State Town Location Name

1. Punjab U.A. Jalandhar UA 2. Punjab Town Jalandhar Cantt. (CB)

Population Details

S.No State Location Name No of Households Persons Males Females 1. Punjab Jalandhar UA 174,145 873,725 463,975 409,750

Slum Under RAY:

1. New Anand Nagar 2. Kot Sadiq 3. Chohkan Kalan 4. Amarjit Nagar, Basti Peer Daad 5. Rasila Nagar & New Rasila Nagar 6. Jaimal Nagar 7. New Suraj Ganj & Bhargo Camp 8. Abadpura 9. Vill Dhilwan

13

Page 11: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

15

Page 12: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

EXECUTIVE SUMMARY

Project Details

State Punjab

City/ Town Jalandhar

District Jalandhar

Project Title Rajiv Awas Yojna

Project Cost (in lacs) Rs. 1259.65 Lacs

Central Share (in lacs) Rs.616.01 Lacs

State Share (in lacs) Rs. 274.03 Lacs.

ULB Share (in lacs) Rs. 276.90 lacs

Beneficiary contribution per dwelling unit 92.71Lacs.

Infrastructure cost per dwelling unit 1.018 lacs

Infrastructure cost per Acre

SOR Adopted PWD CSR -2011

17

Page 13: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Project Contributions (Physical + Financial) (Rs. In lacs)

Category Component Sub – Component Physical Components (Length/ Nos)

Unit Cost (Rs. in lacs)

Project Cost (Rs. in lacs)

GOI Share (Rs. in lacs)

State Govt. Share (Rs. in lacs)

Comments Description of specifications and details of capacity if any

Housing 50% 20%

1 New D.U 286 2.71 775.06 387.53 155.01

2 Upgradation

Kitchen Toilet Toilet and kitchen

19 32 105

0.446 0.63 1.076

8.47

20.16

112.98

4.24

10.08

56.49

1.69

4.03

22.60 Total for Housing 442 916.67 458.34 183.33 Infrastructure Physical Infrastructure

ELSR / GLSR / UGR Pipeline Pumping Station

Pump sets Rain Water Harvesting Pits

Sump

1 Water Supply

Tube wells Digestor

Effluent Treatment Chamber

Pipeline 0.583 Km 45.45 26.50 13.258 5.30

2 Sewerage

Septic Tank - - - - - 3 Storm Water Drains Drains 12.152 3.28 39.87 19.93 7.97

Culverts Pavements 7.33 30.67 224.81 112.40 44.96 Plantation Roads

4 Roads & Culverts

Restoration Lamp Posts 5 Street Lighting Supply Lines

19

Page 14: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Category Component Sub – Component Physical Components (Length/ Nos)

Unit Cost (Rs. in lacs)

Project Cost (Rs. in lacs)

GOI Share (Rs. in lacs)

State Govt. Share (Rs. in lacs)

Comments Description of specifications and details of capacity if any

Transfomer

6 Solid Waste Management Dustbin 7 Common Spaces Stair case, Lobby

Retaining Wall 8 Compound Wall Compound wall

9 Miscellaneous Miscellaneous

Total for Physical Infrastructure 291.18 145.59 58.23 Social Infrastructure (to be detailed out in terms of area)

10 Community Centres Community Centre 11 Site Development Site Development 12 Informal Education Centre Informal Education

Centre

13 Livelihood Centre Livelihood Centre

14 Animal Pen Animal Pen

15 Rickshaw Shed Rickshaw Shed

16 Informal Sector Market Informal Sector Market

17 Primary Health Centre Primary Health Centre

18 Anganwadi Anganwadi Any Other Fire Fighting arrangements

Old Age Homes

Ration Shop

Transit Tenement’s

19 Miscellaneous

Community Toilet

20 Development of parks Parks

21

Page 15: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Total for Social Infrastructure

Others 1 O & M Charge@2%- 24.16

2 DPR Prep. , IEC etc. 3.00

3 Capacity Building +Social oudit +TPM@2% 24.64

Total for Others 51.8 Grand Total 1259.65

Signature of the ULB Level Competent Technical Officer Name & Designation: Address: Fax No: Telephone No. Mobile No: E-mail:

Signature of the CEO/Commissioner of ULB/ Implementing Agency Name & Designation: w

Signature of the State Level Competent Technical Officer Name & Designation: Address: Fax No: Telephone No. Mobile No: E-mail:

Signature of the State Level Nodal Officer

Name & Designation:

23

Page 16: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

CATEGORY WISE DETAIL OF HOUSING & UPGRADATION AND B ENEFICIARY SHARE

Dwelling Unit Kitchen Toilet Kitchen & Toilet Both

Sr.No. Name of Slum

Gen. SC Gen SC Gen SC Gen SC

Total

1. New Anand Nagar

- 3 - 2 - 6 - 4 15

2. Kot Sadiq - 102 - 5 - 4 - 8 119 3. Chohkan Kalan 6 70 - - - - - - 76 4. Amarjit Nagar

Basti Peer Daad 1 5 - - - - - 2 08

5. Rasila Nagar & New Rasila Nagar

1 21 - - - 08 - 06 36

6. Jaimal Nagar 11 2 - - - - - - 13 7. New Suraj

Ganj, Bhargo Camp

- 14 - - - - - 2 16

8. Abadpura ward No. 55

- 45 01 - - - 02 48

9. Village Dhilwan - 5 - 11 - 14 - 81 111

Total 19 267 19 32 105 442

Cost per unit (Rs. In Lacs)

2.71 2.71 - 0.446 - 0.63 - 1.076 -

Amount (Rs. In Lacs)

51.49 723.57 - 8.47 - 20.16 - 112.98 916.67

Beneficiary Share

(Rs. In Lacs)

6.18 72.36 - 0.85 - 2.02 - 11.30 92.71

Total Beneficiary Share (Rs. In

Lacs)

92.71

Total Cost (Rs. In Lacs)

916.67

25

Page 17: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

COMPONENT-WISE SUMMARY

Scheme Component

Qty Unit Rate(Rs. In Lacs/Unit

Project Cost

Central Share50%

StateGovt Share20%

ULB Beneficiaries Share

A.HOUSING 1 Housing

(NewDU) 286 No: 2.71 775.06 387.53 155.01 153.98 78.54

2 Housing (Kitchen)

19 0.446 8.47 4.235 1.69 1.69 0.85

3 Housing (Toilet) 32 0.63 20.16 10.08 4.03 4.028 2.02 4 Kitchen& Toilet 105 1.076 112.98 56.49 22.6 22.59 11.30 Sub Total(A) 1714

442 916.67 458.335 183.33 182.29 92.70

B. INFRASTRUCTURE B.1 UTILITY INFRASTRUCTU

RE

1 Drain 12.15 Km. 3.28 39.870 19.935 7.97 11.96 2 Road & Street 7.33 Km. 30.67 224.810 112.40 44.96 67.44 3 Sewerge 0.583 Km. 45.45 26.500 13.25 5.30 7.95 Sub Total (B.1) 291.180 145.59 58.24 87.35

B.2 SOCIAL INFRASTRUCTURE 1 NILL Nil 0 0 0 0 Sub Total(B.2)

291.18 145.59 58.23 87.35 0

Sub Total(B) (B)(B.1+B.2)

1207.85 603.93 241.56 269.64 92.70

Sub Total(A+B)

C. OPERATION & Mainteanance cost

1 O&M cost for Maintence of Assets Created Five Years @2%

24.16 12.08 12.08 0 0

Sub Total(A+B+C)

1232.01 616.01 253.65 269.66 92.70

D.Other COST

1 DPR Preparation, Project Management,Supervision & Quality Control

3.0 0 3.0 0 0

2 Capacity Building,Community Mobilizaction ,Social Audit & TPIM @2%

24.64 0 24.64 0 0

Sub Total (D) 27.64 0 27.64 0 0

Grand Total (A+B+C+D)

1259.65 616.01 281.29 269.66 92.70

27

Page 18: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

SLUM WISE FINANCIAL DETAIL Sr.No. Name of Slum Nos. of

Beneficiary

Housing

Component

(A)

Cost. in Lacs

Infrastruct

ure

Component

(B)

Cost. in

Lacs

Component

Total A+B

1 New Anand Nagar 15 Nos 17.10 44.63 61.73

2 Kot. Sadiq 119 Nos 289.78 45.24 335.02

3 Chokan Kalan 76 Nos 205.96 77.33 283.29

4 Amarjit Nagar 8 Nos 18.41 56.72 75.13

5 Rasila Nagar &

New Rasila Nagar

36 Nos 71.12 - 71.12

6 Jaimal Nagar 13 Nos 35.23 - 35.23

7 New Suraj Ganj

Bhargo Camp

16 Nos 40.09 - 40.09

8 Abadpura 48 Nos 124.55 67.26 191.81

9 Vill. Dhilwan 111 Nos 114.43 - 114.43

Total 916.67 291.18 1207.85

29

Page 19: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Annexure - D UNDERTAKING

(To be signed by ULB and SLNA)

Name of the Project: Rajeev Awas Yojna, Jalandhar Project Cost : Rs 1259.65 lacs

1. Title of the project land is clear and under the possession of the Urban Local Body/State Government/Beneficiary.

2. Land use is residential i.e. in conformity with the Town Planning norms. & the land is free from all encumbrances.

3. The estimates have been prepared as per applicable departmental SOR along with current cost index (if required) certified by competent authority. The estimates have been signed by the competent Engineer of the ULB and State. The quantity and estimate calculations as included in the DPR conform to the proposed design / plan with due adequacy & correctness of design.

4. Certified that all statutory approvals (such as Environmental clearance , Firefighting, Town Planning approval, etc.) as applicable have been obtained from the competent authorities and project components have been designed in line with the applicable Municipal Byelaws.

5. This is to certify that necessary measures will be taken by the Urban Local Body for safeguarding the spaces from further encroachment. The organized green spaces/play grounds/public open spaces shown in the layout plan of the slums shall be developed/maintained by the ULB.

6. That the houses not taken up in the project are pucca in nature, i.e. structurally sound with safe foundation & RCC roof and adequate natural lighting & ventilation having individual toilet and individual tap water supply connection.

7. Slums covered under the scheme shall be de-notified after implementation of all development works and construction of new houses.

8. Allotment of dwelling space shall be made in the name of the wife or in the joint name of wife & husband of the identified beneficiary.

9. Whole slum approach has been adopted while formulating the slum development plan. All Katcha (Temporary) and semi pucca (Semi permanent) houses have been addressed and taken up for reconstruction/ up-gradation. It is ensured that all the basic infrastructure facilities i.e. water supply; sewerage, roads, drains, solid waste management, electrification, etc. have been provided. Other social infrastructure facilities like health, education and other community facilities have been adequately provided / converged with existing schemes.

10. Beneficiaries have given their consent for implementation of the project as proposed in the DPR. All the Beneficiaries have confirmed their willingness to contribute their financial contribution for the Dwelling Units as proposed in the DPR.

11. The beneficiary contribution proposed is minimum 12%( Gen Category)/10% (SC/ST/BC/OBC, PH & Other weaker sections) of Dwelling unit cost. In case of higher contribution it is certified that the EMI burden (bank/soft loan) does not exceed 25% of monthly income of beneficiary household.

12. The project will be implemented in 18 months from the date of sanction from Govt. of India.

13. All procurement shall be done through a transparent Bidding Process in conformity with guidelines of the State Govt.

14. Required basic infrastructure (water supply, sewerage, roads, drains, solid waste management, electrification) are provided at site through integration with city level network / independent system and in line with master plan.

31

Page 20: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

15. Although comprehensive infrastructure facility within the slum area, covering all the slum dwellers has been proposed in the DPR, however if any part/component is left uncovered that will taken up by the ULB from its own resources and no further demand of funds will be placed with MoHUPA, Govt. of India, for this purpose.

16. Operation and Maintenance of the assets created (housing and infrastructure) shall be done by ULB through involvement of beneficiaries/RWA.

17. ULB shall ensure adequate health and education facilities after assessing the existing facilities in the nearby area of the slum. ULB shall also provide social security to the beneficiaries through ongoing schemes of State/Central Government.

18. ULB undertakes to extend all necessary support in terms of manpower, machineries etc. for smooth operation of all the social infrastructure facilities proposed under the scheme including health & educational facilities as applicable.

19. The structural safety aspects of the buildings and infrastructure components proposed in the project have been ensured by designing the as per the requirements of National Building Code and relevant IS Codes and Manuals.

20. Undertake to constitute a beneficiary committee, which would supervise construction at various levels; foundation, basement, lintel, roof, completion, occupation etc. & undertake social audit of the site after completion of the project. It is also undertaken to ensure quality control systems-both internal and external, so that the constructions are undertaken with utmost quality.

21. Any escalation in the project cost would be borne by State Govt./ ULB.

Signature of the State Level Nodal Officer

Name & Designation:

Address:

Fax No:

Telephone No.

Mobile No:

E-mail:

Signature of the CEO/Commissioner of ULB/ Implementing Agency

Name & Designation:

Address:

Fax No:

Telephone No.

Mobile No:

E-mail:

33

Page 21: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Rajiv Awas Yojna (RAY) at Jalandhar (9 No. slums), Distt. Jalandhar, Punjab

CERTIFICATE

1. It is certified that 9 No. slums namely New Anand Nagar, Kot Sadiq, Chohkan Kalan,

Amarjit Nagar Basti Peer daad, Rasila Nagar & New Rasila Nagar, Jaimal Nagar, New

Suraj Ganj-Bhargo Camp, Abadpura-W.No.55, Vill. Dhilwan proposed to be developed in

the Ray proposal are not notified slums. The identified localities are having slum like

conditions and the units proposed for upgradation / construction in these slums are more

than 08 in number in each cluster. It is further informed that 2 No. IHSDP Schemes at

Jalandhar are already sanctioned in the year 2007-08 as detail given below:

No. of

Slums

No. of

Dwelling

Units

Cost of

Dwelling

Units

Cost of

Infrastructure

Provisions

Project

Cost

GOI Share

Sanctioned

State

Share

11 1627 986.43 248.67 1235.10 715.25 519.85

11 2311 1868.00 994.26 3005.38 1839.68 1165.69

It is confirmed that the new dwelling units, new kitchen, new toilets proposed in the

present proposal under Rajiv Awas Yojna Scheme have not been considered earlier in the

previous project and also there is no over lapping of funds for this project from any other

previous sanctioned GOI scheme.

2. It is certified that only the draft Master Plan for Jalandhar has been prepared. As regards

the land use and density as per Master Plan, it is informed and confirmed that the

proposed area in the present proposal is maintained on ‘ as and where basis’. Present

proposal envisaging construction of 286 No. new houses, 19 No. new kitchens, 32 No.

new toilets and 105 No. Kitchens & toilet both is proposed on the land owned by

beneficiaries. The ownership of the title shall be confirmed by the ULB at the time of

release of funds by verification of survey / khasra No. It is also certified that Enactment of

State legislation for assigning property rights to the slum dwellers is under consideration in

the State of Punjab. Govt. of India will be suitably informed about the same after the

legislation.

3. Regarding Slum Free City Plan of Action, it is certified that the same has not been

prepared as the detailed total station survey has not been carried out. The agency for

carrying out the survey have however been identified. Govt. of India will be suitably

informed about the same after the preparation of SFCPoA.

4. The survey has been carried out on whole slum basis where details about the

beneficiaries existing dwelling units have been collected. The average household income

of these slums is approx less than Rs 1 lac P.A. The consent of beneficiaries for

contribution of beneficiary share and regarding acceptability to upgradation/construction of

unit shall be obtained.

5. Suitable road width shall be maintained for movement of fire tenders in these areas.

Moreover, fire hydrants shall be provided at appropriate distance by Punjab Water Supply

and Sewerage Board for ensuring avoiding any untoward incident.

6. The 9 No. slums identified for pilot project of RAY were prioritised after a preliminary

survey of the similar areas in the town and were selected based on deficiency in housing,

basic infrastructure and social infrastructure.

35

Page 22: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

7. MC Jalandhar has carried out preliminary survey for identification of beneficiares’ in the

nine slums namely mentioned in the detailed project report, however, detailed survey shall

be carried out at the time of total station survey.

8. Regarding operation & maintenance, it is informed that the project assets are

overwhelmingly civil. The maintenance of houses will be undertaken by the owners. The

infrastructure work shall be maintained by ULB i.e. M.C.Jalandhar.

9. It is certified that

i) Pucca houses, which have not been considered in the DPR are safe for

habitation with adequate natural lighting and ventilation, wet core area &

individual toilets.

ii) The Architectural/Structural drawings and estimates are duly verified and

certified.

iii) The quantity and estimate calculations as indicated in the DPR conform to the

proposed design / plan with due adequacy & correctness of deign.

iv) The signatories on drawings / estimates are Competent Authorities as per

State PWD Code / TP regulations / State Govt. rules.

v) For ensuring structural safety aspects of the buildings in the project, the same

has been designed as per the requirements of National Building Code.

vi) A notified slum covered in DPR has been proposed to be de-notified after

implementation of the project.

10. The MC Jalandhar proposes to carry out the infrastructure & housing through contractual

agency after following due procedures.

Assistant Commissioner (T)

M.C.Jalandhar

Dated:

37

Page 23: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

RAY Pilot Project at Jalandhar ,District Jalandhar,Punjab .

1. The total land area of Jalandhar is 167 Sq.Km. The area under slums is 28.11 Sq.Km. The area under slums in present scheme is 4.35Sq.Km. The total slum population 208000 and population covered in this project 17005 souls.

2. Slum Free City plan of Action has not been prepared as the detailed total station survey has not been carried out. The agency for carrying out the survey have however been identified. Govt. of India will be suitably informed about the same after the preparation of SFCPoA.

3. Municipal Corporation Jalandhar has submitted a project for in-situ construction of 286 No. new Dwelling Units, 19 No. new Kitchens, 32 No. New Toilets & 105 No. Kitchen & Toilet in 9 Slums of Jalandhar. In addition physical infrastructure with respect to roads / pavements and drains has been proposed. The beneficiaries have been indicated has having ownership of the land where construction / up-gradation in to be carried out. The duration of the project is 18 months. The construction and up- gradation of houses shall be carried out by MCJ itself. The estimates are based on Punjab PWD CSR 2011-12

4. The 9 No. Slums in the Municipal boundary and identified for pilot project of RAY were prioritized after a preliminary survey of the similar areas in the town and were selected based on deficiency in housing, basic infrastructure and social infrastructure. No slum resident will need to be moved to any other site. The clusters have medium density. Location of these clusters in a fast growing locality would encourage mainstreaming the slum-dwellers into citywide network.

5. SLSC meeting for IHSDP held under the Chairmanship of Principal Secretary, Local Govt. of Punjab on 17/12/2012 wherein the agenda for RAY Scheme was also taken up. However, constitution of SLSC is in process.

6. Regarding details of Provisions of Property Right to slum dwellers in States Legislation, it is informed that the dwelling units proposed for construction/ up- gradation are on the land owned by beneficiaries. Although beneficiary wise details are not available but these will be confirmed from survey/khasra No./title document before release of any funds. MC shall ensure at the time of release of funds that the legal entitlement is transferred in the name of the female head of the household or in the joint name of the male head of the household and his wife. The beneficiaries will be counseled for this provision. The dwelling unit so provided shall not be transferable by sub- lease, sale, gift, mortgage or any other manner whatsoever except by the inheritance for a period of 20 years from the date of completion of the construction of said dwelling unit.

7. The layout plans for these slum areas showing houses proposed to be undertaken for the construction and up-gradation have been prepared. However, as the detailed plan table survey has been carried out, to the scale layout plan showing pucca houses, slum boundary, adjoining areas has been prepared.

8. The draft Master Plan for Jalandhar has been prepared. As regards the land use and density as per master plan, it has informed and confirmed that the proposed area in the present proposal will be maintained on as and where basis.

9. Regarding details of tie-up of beneficiaries contribution through own saving, Bank Loan, ISHUP etc it is informed that every slum dweller is being persuaded by the community organizer of the ward and by the Social Development Specialist of State Level Technical Cell (SLTC) to open the recurring deposit account with the bank as early as possible. The MC will pursue with bank and FIs for lending to these BPL, EWS and low income households.

10. State Govt. has been kept as minimum 20% of the infrastructure development. 11. Regarding community participation in formulation and implementation of the proposal it is

informed that Community participation is envisaged at various stages of physical / socio-economic survey, planning and designing, operation and maintenance. The process of community mobilization was initiated by Jalandhar Municipal Corporation by repeated field visit to understand the community, its livelihood pattern, dynamics of local Community. The officials of ULB held discussion with community on 7-8th November, 2012 & 17-18th December 2012 and identified their needs and concerns. Subsequently local Corporation or was also approached for his involvement and briefed about RAY's participatory process and various surveys needed for the project. The team explained the community members about the process of slum in-situ development under RAY. The community participants were advised of their responsibility of meeting their part of housing cost, to prove their credit worthiness in the eyes of Banks.

12. Agency has informed that preliminary survey was carried out based on which the list of slum dwellers was finalized. The physical infrastructure was identified on the basis of deficiency in the services in the area.

39

Page 24: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

13. Regarding Stages where community will be involved during implementation of project it is

informed that a road map for social auditing involving a lead NGO and community members has also been proposed. The scope of social audit will cover 1) Quality of construction, 2) Effectiveness of basic service provided, 3) Satisfaction of targeted beneficiaries. For repair and maintenance of assets, a two tier formal structure has been proposed involving the community.

14. MC Jalandhar has adopted whole slum approach for in-situ development of this project. The project has been conceptualized keeping in view the deficiency in housing, basic infrastructure and social infrastructure. A detail door to door survey was carried out where the inhabitants were involved for identifying the deficiency in housing requirement. The specific requirement of either kitchen, or toilet or both kitchens a toilet was identified so that after construction of this specific requirement, the particular house becomes a habitable dwelling unit with two rooms, kitchen, bath and WC. Similarly requirement of infrastructure was also assessed. Accordingly the needs of individual slum were tabulated to conceptualize the proposal in the whole slum. After implementation of proposed development work and construction on new houses, kitchen and toilets, the slums covered in the scheme shall be de-notified.

15. The majority of slum dwellers are factory labour however they are not involved in any kind of secondary labour activities. Credit enhancement programme which envisages each beneficiary to open a recurring bank account (maturity period-30 months) in which they will deposit Res.500/- every month. The maturity amount at the end of 30 months shall give them credit worthiness to the banks which will benefit them to raise loan for their share to the project.

16. The site wise land use has been indicated on the layout plans. 17. Possibility of landslides, floods etc. in not there due to location of slums being in plain non

flood prone region. 18. Since the proposal in for in-situ development, no innovative techniques are proposed in

contraction. However, this aspect would be taken care later while finalizing the overall area development plan, involving local NGO/ community participation.

Assistant Commissioner (T)

M.C.Jalandhar

Dated:

41

Page 25: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Rajiv Awas Yojna (RAY) at 9 No. Slums (Jalandhar)

Certificate

It is hereby certified that:

1. The Water Supply to these slums namely New Anand Nagar, Kot Sadiq, Chohkan Kalan,

Amarjit Nagar Basti Peer daad, Rasila Nagar & New Rasila Nagar, Jaimal Nagar, New

Suraj Ganj-Bhargo Camp, Abadpura-W.No.55, Vill. Dhilwan in the town of Jalandhar has

already been completed and each beneficiary has its own water supply connection.

2. Sewerage is not part of the present proposal except in New Anand Nagar, sewerage

system in Kot Sadiq, Chohkan Kalan, Amarjit Nagar Basti Peer daad, Rasila Nagar & New

Rasila Nagar, Jaimal Nagar, New Suraj Ganj-Bhargo Camp, Abadpura-W.No.55, Vill.

Dhilwan in the town of Jalandhar has since been laid under UIDSSMT scheme Phase I &

II and other developmental schems of the city. All the dwelling units falling under the said

slums shall be provided with individual sewer connection by MC and the disposal of sewer

has already been connected with the main sewer.

Assistant Commissioner (T)

M.C. Jalandhar

Dated:

43

Page 26: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Rajiv Awas Yojna (RAY) at 9No. Slums (Jalandhar)

Undertaking

This is to undertake that construction of dwelling slums namely New Anand Nagar,

Kot Sadiq, Chohkan Kalan, Amarjit Nagar Basti Peer daad, Rasila Nagar & New Rasila Nagar,

Jaimal Nagar, New Suraj Ganj-Bhargo Camp, Abadpura-W.No.55, Vill. Dhilwan shall be as

under:

1) The plot area for construction of new dwelling unit would be of atleast of 9 sq.mt. and

having a carpet area of minimum of 25.50sq.mt. and atleast 6sq.mt. of area for toilet and

atleast 8 sq.mt. area for kitchen and atleast 15 sq.mt. for bath kitchen and toilet.

2) The unit where addition of either toilet or kitchen or both is proposed, shall have minimum

carpet area of 25.50sq.mt. and will become a complete dwelling unit comprises of two

rooms, kitchen, bath and WC.

Assistant Commissioner (T)

M.C. Jalandhar

Dated:

45

Page 27: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Rajiv Awas Yojna (RAY) at 9No. Slums (Jalandhar)

Undertaking

1. As per prevailing practice Solid Waste is being colleted and disposed of by the

employees of Municipal Corporation, Jalandhar itself.

2. Water supply and Sewerage charges are being charged as per the prevailing rates

from all the households as under:

a) Upto 125 Sqyd. no charges = no charges

b) 125sqyd. to 250sqyd. @ Rs. 105/- per month for water supply

@ Rs. 105/- per month for Sewerage

c) 250sqyd. to 500 Sqyd. @ Rs. 135/- per month for Water Supply

@ Rs. 135/- per month for Sewerage

Assistant Commissioner (T)

M.C. Jalandhar

Dated:

47

Page 28: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 1

Existing Housing

S.No Name of slums Ward No.

Household Population Katcha Houses

Semi Pucca Houses

Pucca Houses

Total Houses

1 New Anand Nagar 1 68 300 3 12 53 68

2 Kot Sadiq 58 621 3710 102 17 502 621 3 Chohkan Kalan 9 280 1700 76 204 280 4 Amarjit Nagar Basti Peer Daad 42 161 805 6 2 153 161

5 Rasila Nagar & New Rasila Nagar

46 597 2780 22 14 561 597

6 Jaimal Singh Nagar 13 524 2620 13 511 524

7 New Suraj Ganj 51 401 1890 14 2 385 401 8 Abadpura 55 257 1620 45 3 209 257 9 Village Dhilwan 11 316 1580 5 106 205 316 Total 3225 17005 286 156 2783 3225

49

Page 29: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 2

Proposed Housing

S.No Name of slums

Ward No.

New DU No.

Cost (In lacs)

Kitchen No.

Cost (In

Lacs)

Toilet No.

Cost (In

Lacs)

Kitchen & Toilet

Cost (In Lacs)

Total No. of Units

Total Cost (In

Lacs) 1 New Anand

Nagar 1 3 8.13 2 0.892 6 3.78 4 4.3 15 17.10

2 Kot Sadiq 58 102 276.42 5 2.23 4 2.52 8 8.61 119 289.78 3 Chohkan

Kalan 9 76 205.96 76 205.96

4 Amarjit Nagar Basti Peer Daad

42 6 16.26 2 2.15 8 18.41

5 Rasila Nagar & New Rasila Nagar

46 22 59.62 8 5.04 6 6.46 36 71.12

6 Jaimal Singh Nagar

13 13 35.23 13 35.23

7 New Suraj Ganj

51 14 37.94

2 2.15 16 40.09

8 Abadpura 55 45 121.95 1 0.446 2 2.15 48 124.55 9 Village

Dhilwan 11 5 13.55 11 4.91 14 8.82 81 87.16 111 114.44

Total 286 775.06 19 8.478 32 20.16 105 112.98 442 916.67

51

Page 30: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 3

Basic Infrastructure

Water Supply Sewerage Roads Drains Street Lights Parks SWM Total Cost

S.No Name of Slum Ward No.

Quantity Cost Quantity (In Km)

Cost (In

Lacs)

Quantity (In Km)

Cost (In

Lacs)

Quantity (In Km)

Cost (In

Lacs)

No. Cost No. Cost No. Cost

1 New Anand Nagar 1 0.583 26.5 0.53 15.11 0.92 3.02 44.63

2 Kot Sadiq 58 1.476 35.56 2.95 9.68 45.24 3 Chohkan Kalan 9 2.317 64.8 3.82 12.53 77.33

4 Amarjit Nagar Basti Peer Daad

42 1.177 49.47 2.21 7.25 56.72

5 Rasila Nagar & New Rasila Nagar

46

6 Jaimal Singh Nagar 13

7 New Suraj Ganj 51

8 Abadpura 55 1.83 59.87 2.252 7.39 67.26 9 Village Dhilwan

11

Total 0.583 26.5 7.33 224.81 12.15 39.87 291.18

53

Page 31: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 4 Existing Social Infrastructure

S.No Name of slums Ward No.

School No.

Anganwari No.

Health Centre

No.

Hospital No.

Community Centre

No.

Informal Market

No.

Gurudwara/Mandir

1 New Anand Nagar 1 …. …. …. …. …. 16 ….

2 Kot Sadiq 58 2 3 1 …. …. 30 3 3 Chohkan Kalan 9 1 …. 1 …. …. 19 2 4 Amarjit Nagar

Basti Peer Daad 42 1 …. …. …. …. 5 ….

5 Rasila Nagar & New Rasila Nagar

46 …. …. …. …. …. 38 ….

6 Jaimal Singh Nagar 13 2 …. …. …. …. 53

4 7 New Suraj Ganj 51 …. …. …. …. …. 18 1 8 Abadpura 55 1 …. …. 1 6 1 9 Village Dhilwan 11 …. …. 1 …. …. 5 2

55

Page 32: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 6

Category wise break-up of beneficiaries S.No Name of slums Ward

No. General SC ST PH Others Total

1 New Anand Nagar 1 …. 15 …. ….. ….. 15

2 Kot Sadiq 58 …. 119 …. …. …. 119 3 Chohkan Kalan 9 …. 70 …. …. 6 76 4 Amarjit Nagar Basti Peer

Daad 42 …. 7 …. …. 1 8

5 Rasila Nagar & New Rasila Nagar

46 1 35 … … …. 36

6 Jaimal Singh Nagar 13 …. 2 …. …. 11 13

7 New Suraj Ganj 51 …. 16 …. …. …. 16 8 Abadpura 55 …. 48 …. …. …. 48 9 Village Dhilwan 11 …. 111 …. …. …. 111

Total 1 423 18 442

57

Page 33: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Summary Sheet 8 Livelihood Detail

S.No Name of slums

Ward No.

Occupation No. Occupation No. Occupation No. Occupation No. Occupation No. Occupation No.

1 New Anand Nagar

1 Rickshaw Puller

Labour 10 Fac. Worker Pvt. Job 5 Housemate Others

2 Kot Sadiq 58 Rickshaw Puller

24 Labour 27 Fac. Worker 68 Pvt. Job Housemate Others

3 Chohkan Kalan

9 Rickshaw Puller

16 Labour 11 Fac. Worker 43 Pvt. Job Housemate Others 6

4 Amarjit Nagar Basti Peer Daad

42 Rickshaw Puller

Labour 3 Fac. Worker Pvt. Job 1 Housemate Others 4

5 Rasila Nagar & New Rasila Nagar

46 Rickshaw Puller

Labour 36 Fac. Worker Pvt. Job Housemate Others

6 Jaimal Singh Nagar

13 Rickshaw Puller

4 Labour 3 Fac. Worker 6 Pvt. Job Housemate Others

7 New Suraj Ganj

51 Rickshaw Puller 9

Labour 7 Fac. Worker

Pvt. Job

Housemate

Others

8 Abadpura 55 Rickshaw

Puller 42

Labour 6 Fac. Worker

Pvt. Job

Housemate

Others

… 9 Village

Dhilwan 11

Rickshaw Puller 46

Labour 38 Fac. Worker

27

Pvt. Job

Housemate

Others

59

Page 34: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Annexure - B

CHECKLIST OF DPR S. No. Item Remarks

1. Has the State adopted policy toward conferring land tenure right to slum dwellers? No 2. Are beneficiaries covered under this DPR provided with tenure rights? No 3. State PoA prepared and approved by CSMC? No 4. State Slum Policy prepared and adopted? No 5. Slum Free City Plan prepared? No 6. Slum Free City Plan Accepted by SLNA? No 7. Does a valid City Master Plan exist? Yes 8. Was any CDP prepared for the city? No 9. Is it a JNNURM city/town? No 10. Is there a City Sanitation Plan (CSP) prepared for your city? No 11. If answer to above question no. 10 is yes, is the DPR prepared keeping CSP in

view? N/A

12. Is there a Disaster Management Plan (DMP) available for the City / Town? No 13. If answer to above question no. 12 is yes, is the DPR prepared keeping City DMP in

view and DMP for slums included in the DPR? N/A

14. If answer to above question no. 12 is no, is a DMP for the slums included in the DPR?

No

15. Are City GIS Maps prepared? No 16. Final List of Slums (with census data) after de-notification prepared? No 17. Process of prioritization of Slums completed with public consultation? Yes 18. Tenability assessment of priority slums carried out using environmental

sustainability, disaster-proneness, public health and safety hazard etc.? Yes

19. Slum level GIS Maps of priority slums prepared? No 20. Socio-economic survey of slums completed using NBO format, engaging

community? No

21. Environmental sustainability studies for priority slums carried out? No 22. Are slums proposed for improvement / relocation located in tenable location?

Yes/No

23. For each slum, deficiency of infrastructure analyzed with community consultation? Yes 24. Are all slums provided and/or connected with existing city-wide network? Yes 25. If answer to above question is no, have you ensured city-wide connectivity in the

DPR? N/A

26. Have you identified all beneficiaries in each of the prioritized slums? Yes 27. Are beneficiaries covered under this DPR provided with Tenure rights ? No 28. Has the whole slum approach been taken up while formulating the DPR? Yes 29. Have you carried out micro-planning of slums under this DPR with community

participation? No

30. Is the implementation authority identified with State Govt. approval? Yes 31. Have you prepared detailed cost estimate with current State Schedule of Rate? Yes 32. If answer to above question is no, have you provided sufficient details to ensure

realistic cost estimate in the DPR? N/A

33. Is the cost sharing among State and ULB formally agreed? Yes 34. Have you provided sufficient basis for beneficiary contribution? Yes 35. Have you provided sufficient justification for programme implementation? Yes 36. Whether Undertaking (Signed by ULB/STATE) is annexed? Yes

61

Page 35: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Annexure – C

ADMINISTRATIVE AND TECHNICAL CHECKLIST S. No. Description Remarks 1. Name of Project Rajiv Awas Yojna 2. Name of the State Punjab 3. Name of the City Jalandhar 4. Nodal Agency PMIDC 5. Implementing agency Municipal Corporation

Jalandhar 6. a) Whether Slum Free City Plan (SFCP) has been prepared and

forwarded to the MoHUPA, if no, indicate status No

7. b) If yes whether the Slum Free City Plan (SFCP) has been approved by MoHUPA?

No

8. a. Whether State has adopted policy towards conferring land tenure rights to Slum Dwellers, if No is the legislation for the above in process, indicate the status

Yes

b. Indicate tenure rights proposed to slum beneficiaries 10Years Stay 9. Whether MOA for reforms has been signed with the MoHUPA No 10. Whether Socio-economic survey conducted. Yes 11. Whether livelihood survey conducted Yes 12. Whether the DPR has been forwarded by the designated Nodal

Agency? Yes

13. Whether State Level Sanctioning and Monitoring Committee (SLSMC) has been Constituted?

Yes

14. Whether DPR has been approved by the SLSMC? 15. Whether elected Local Body is in Place? Yes 16. Total Urban Population of the City 17. Total Slum Population of the City 18. Is DPR in accordance with the priority indicated in SFCP? 19. Is the DPR for in situ development? Yes 20. a. Is the DPR for relocation? No

b. Distance of proposed site from original site

21. Whether whole slum approach adopted, indicate status of housing conditions in terms of kuchha and pucca houses viz-a-viz proposed units slum wise

Yes

22. Whether target beneficiaries have been identified by bio-metric or UID and list enclosed in DPR

Yes

23. Whether stack holders consent has been obtained for relocation, financial contribution and accepting flats at upper floors if allotted

Yes

24. Project Cost (Rs in lacs) • Housing + Infrastructure • Contingency • Escalation • Departmental charges • Any other • Total

1259.65 No No No No

25. State share (Rs in lacs) • Beneficiary contribution • Agency’s own funds • Loan from HFI/Banks • State’s grant • MP/MLALAD funds • Any other

92.71 Lacs. 269.64 Lacs 274.03 Lacs

26. Indicates tie-ups for beneficiaries contributions Yes 27. Central share (Rs in lacs) 616.01 Lac 28. i) Project Duration

ii) Date of commencement / completion 18 Months

29. Whether Slums covered are notified or non-notified Both 30. a Whether Project land is in possession of Implementing Agency and

is free from any encroachments and encumbrance if not, indicate status regarding acquiring of land supported with documentary evidence

Falls in MCJ Limit

63

Page 36: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

b Indicate area of project site and land cost On MCJ Limit 31. No. of DUs - New

Upgradation 286 156

32. Floor area of a DU 25.5 Sqm 33. Density (DU/hectare) 34. Whether proposed density adheres to the Master Plan of the area? 35. i) The land use of the proposed site as per the Master plan N.A 36. ii) If not residential, then necessary approvals for change of land

use have been taken? N.A

37. Coverage area • Built-up area of houses • Roads/Pavements • Open spaces • Community facilities • Any other

Area Percentage

38. Whether statutory approvals from various local bodies have been taken, such as • TCPO • Municipality • Fire Department • Pollution Control Board • Min. of Environment • Coastal Regulatory Authority etc.

No Yes No No No No

39. Whether Fire safety measures have been adopted? Yes 40. Indicate Green Technologies or any cost effective technologies

adopted in the project No

41. Whether building plans, layout plans, master plans etc. are enclosed or not?

Yes

42. Use of Disaster resistant technology. Details thereof. 43. Schedule of Rates adopted (Year) N.C.S.R,(2011) 44. Water Supply

i) Expenditure involved ii) Whether municipal water supply available in vicinity? If no,

type of water supply system proposed? iii) Whether there is provision for Rain water harvesting? iv) Whether slum water supply line is integrated with city level

line, indicate length of pipeline (offsite) & Project Cost

Nil Yes No N.A.

45. Sewerage i) Expenditure involved ii) Whether municipal sewer line available in vicinity? If no, type

of sewerage system proposed? iii) Whether slum sewerage line is integrated with city level line,

indicate length of pipeline (offsite) & Project Cost

26.50 Lac Yes 0.583

46. Roads/Pavements i) Expenditure involved ii) Whether connectivity with the main peripheral road exists or

not? If not, is it proposed in the DPR? iii) Whether any approach road (offsite) proposed indicate length

and cost

224.81Lac Yes No

47. Storm Water Drainage i) Expenditure involved ii) Whether connectivity with the primary/secondary drains exists

or not? If not, is it proposed in the DPR? iii) Whether slum storm water drainage line is integrated with city

level line, indicate length of pipeline (offsite) & Project Cost

39.87 Lac Yes 12.15 Km 39.87 Lac

48. Parks and Open spaces i) Expenditure involved item-wise

No

49. Electrification i) Expenditure involved

No

50. Solid Waste Disposal i) Expenditure involved ii) Distance from Landfill iii) Whether there is provision for waste recycling and

segregation?

No

67

Page 37: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Signature of the State Level Nodal Officer

Name & Designation:

Address:

Fax No:

Telephone No.

Mobile No:

E-mail:

Signature of the CEO/Commissioner of ULB/ Implementing Agency

Name & Designation: Sh. Vinay Bublani, Commissioner

Address: Municipal Corporation Jalandhar

Fax No:

Telephone No. 0181-2227015

Mobile No: 098147-00098

E-mail:

51. Whether there is provisioning for convergence of the Central and State Government Schemes in the following sectors in the DPR: i) Health ii) Education iii) Social Security Including accidental and medical

insurance, old age pension, old age homes etc.

No

52. Health Care facilities i) Whether proposed within the site ii) If not, does it exist in the vicinity iii) If in the vicinity, distance from the site iv) Expenditure involved v) Methodology adopted for convergence

No Yes 0.5 km to 10 km Nil

53. Educational facilities i) Whether proposed within the site ii) If not, does it exist in the vicinity iii) If in the vicinity, distance from the site iv) Expenditure involved v) Methodology adopted for convergence

No Yes 0.5 Km. to 1.00 Km. Nil

54. Social Security i) Details of social security provisions available like medical

insurance, pension schemes etc. ii) Expenditure involved, item-wise iii) Methodology adopted for convergence

No

55. Provision of other civic amenities (if any) Mentioned in DPR 56. Environmental Benefits of the Project Mentioned in DPR 57. Whether a separate provisioning for upkeep and maintenance of

public assets to be created through this project has been made?

58. Project Implementing Mechanism • Institutional Framework. • Institutional Capacity. • PPP Model, if any

Mentioned in DPR

59. Indicate if any project components are on PPP basis No 60. Whether the area /beneficiaries covered under DPR had previously

benefited in any Central /State Government Scheme? (if so, details thereof)

No

61. Ist the DPR in Accordance with the RAY guidelines? Yes 62. Any other information relevant to the DPR No 63. List of Documents attached with DPR. Yes

71

Page 38: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

COMMUNITY PARICIPATION FOR IMPLEMENTATION OF RAJIV AWAS YOJANA

Rasila Nagar & New Rasila Nagar

Chohkan Kalan Kot Sadiq

Abadpura

73

Page 39: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

75

Page 40: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

79

Page 41: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR

Name of Slum:- New Anand Nagar Name of ACE:- Sh. Bhart Bushan Ward No:-01 Name of J.E:- Sh.Rajesh balla

S.No.

Name & Address of Beneficiary

Name of Father/Husband/Wife

Proof of Residence Stay Minimum 10 Years

Category New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

Occupation

Self Decleration By Beneficiary

1 Jasvinder Singh

S/o Pritam singh

P.S.E.B C Yes D Yes

2 Sucha Singh S/o Shingara Singh

P.S.E.B A Yes A Yes

3 Prem Masih S/o Barkat Masih

Agreement

C Yes D Yes

4 Usha Rani W/o Bal kishan Ration Card

C Yes D Yes

5 Tirath Kaur W/o Harbjan Lal

P.S.E.Bill

C Yes A Yes

6 Balwinder Kaur

W/o Karnail Singh

Ration Card

D Yes A Yes

7 Kulwinder Kaur

S/o Major singh Ration Card

D Yes A Yes

8 Bholi W/o Charanjit Singh

Ration Card

D Yes B Yes

9 Charnjit virdi S/o S/o Tulsi Ram

Ration Card

B Yes D Yes

10 Nasib Kaur W/o Gurbachan Dass

Ration Card

C Yes D Yes

11 Jasbir Kaur W/o Davinder singh

I.D.Card D Yes B Yes

12 Mahavir Kaur W/o Charanjeet singh

Ration Card

C Yes B Yes

13 Parsinni W/o Pritam Dass

Ration Card

B Yes B Yes

14 Harbans kaur W/o Shiv Ram Ration Card

A Yes B Yes

15 Tirath Kaur W/o Amarjit Singh

Agreement

A Yes B Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C

81

Page 42: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Const. of road/street in slum abadi at New Anand Nagar.

Part-I Sr.No.

Item No. Details of item

Measurement Quantity

Rate NSP Amount

1 4.1+5.2 Earth work with loading unloading i/c carriage upto lead 16 Km. for good earth/removal of malba.

_____

2 8.19 Dismantling of brick flooring from different streets.

362'x11' =3982 Sft. 52'-9"x8' = 422 sft. 51'x4' = 204 sft. 385'x11' = 4232 sft. 8843 sft. or 822 sqm

822 sqm.

10.06 per

sqm.

15% 9509

3 10.6 (b) CC 1:8:16 with 40mm gauge stone aggreegate.

362'x9'-4" =3377.46 sft. 39'x6'-10" =266.37 sft. 51'x2'-4" =118.83 sft. 176'x16'-4" =2874.08 sft. 213'x16'-4" = 3478.29 sft. 385'x9'-4" = 3592.05 sft. (406'+104.8')x5'=2553.3 sft 16260.38 x1/4=4065 cft.or 115 cum

115 cum

1438.55 per cum

18% 195211

10.12 CC 1:2:4 with stone ballast or shingle.

16260.38x5/12=67643 cft. Or188.67 cum 188.67 cum

2799.75 per Cum.

18% 623310

10.46+10.47

Extra for using batch type concrete mixer and viberator

188.67 cum

113.76+ 22.75= 136.51

15% 29618

4

10.73 Extra for carriage for RMC/Batch mixed concrete with transit mixer beyond 1 Km

Avg. lead 10 Km beyond 1 Km 188.67 cum

14.22x 10= 142.2

15% 30853

Extra carriage of material. Stone Ballast for 1:8:16

115x1.00 115 cum

340.48 per Cum.

39155

Fine sand for 1:8:16

115x0.50 57.5 cum

202.68 per cum.

11654

4 5.2

Crusher for 1:2:4

188.67x0.90 169.8 cum

316.07 per cum.

53669

Coarse sand for 1:2:4

188.67x0.45 84.90 cum

384.20 per cum.

32619

5 24.59(a) Fibre board expansion joints for 5" depth. (Expansion joints at the distance of 10')

3244.04 Rft. or 989 Rmt. 989 Rmt.

50.37 per Rmt.

12% 55793

83

Page 43: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

6 Deduction of cost of useful material from Item no.1

822 sqm.@575 bricks per sqm=47263x60=28359 brick 100

28359 Bricks

3.00 each

(-)85077

7 3.12 d Brick Bats. 47263x9"x4.5"x3"x0.283x40/100=37.62 cum 37.62 cum

307.5 per cum

35% (-)15617

Total (Part-I)

980697

Part-II

1 Analysis Laying Sewerage with RCC pipes NP2 with const. of manhole chamber.

Street(A+B+C+D+E+F+G) (362'+52'-9"+51'+176'+213'+548'+510.66) =1913.41 Rft.

1913.41 Rft.

1385 per Rft.

2650073

2 Analysis Const. of L-type drain complete i/c tega, bund, concrete base and CC 1:2:4

Street(A+B+C+D+E+F+G) (401.75+411.91+102+316+426+770+590.66) =3018.32 Rft,

3018.32 Rft.

100 per rft.

301832

3 Analysis Const. of road gully chamber complete size 2'x1'x2'.1"

Street(A+B+C)=12 Nos. D=6 Nos. E=2 Nos. F =10 Nos. G=3 Nos. 33 Nos.

33Nos. 2424 each

79992

4 29.94(a) Road gully chambers connections to existing sewer

33 Nos. 146.92/- 30% 6303

5 Analysis P/Laying SW pipe 6"(8' average)

Street (A+B+C)=12x6=72 Rft. D=6x10=60 Rft. E=2x10=20 Rft. F=10x6=60 Rft, G=3x10=30 Rft. 242 Rft.

242 Rft. 115.60 per rft.

27975

6 Analysis Raising of manhole cover with frame.

___________ 295.50 each

3066175

Total (Part-II)

3482277

Grand Total I+II=4462974/-

Detail of abstract

1. Laying of sewerage for 0.58 Km.=26.50 Lac 2. Const. of drains for 0.92 Km. =3.02 Lac 3. Const. of streets for 0.53 Km. =15.11 Lac 44.63 Lac

85

Page 44: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: New Anand Nagar W.No.01 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 10 10 4001-6000 05 05 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: New Anand Nagar W.No.01 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

04 04

LABOUR 06 06 FACTORY WORKERS

PVT. JOB 05 05 HOUSE MAID

OTHERS

87

Page 45: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

89

Page 46: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

1. Regarding community participation in formulation and implementation of the proposal it is informed that Community participation is envisaged at various stages of physical / socio-economic survey, planning and designing, operation and maintenance. The process of community mobilization was initiated by Jalandhar Municipal Corporation by repeated field visit to understand the community, its livelihood pattern, dynamics of local Community. The officials of ULB held discussion with community on 7-8th November, 2012 & 17-18th December 2012 and identified their needs and concerns. Subsequently area councilor was also approached for his involvement and briefed about RAY's participatory process and various surveys needed for the project. The team explained the community members about the process of slum in-situ development under RAY. The community participants were advised of their responsibility of meeting their part of housing cost, to prove their credit worthiness in the eyes of Banks. 2. Regarding Stages where community will be involved during implementation of project it is informed that a road map for social auditing involving a lead NGO and community members has also been proposed. The scope of social audit will cover 1) Quality of construction, 2) Effectiveness of basic service provided, 3) Satisfaction of targeted beneficiaries. For repair and maintenance of assets, a two tier formal structure has been proposed involving the community.

COMMUNITY PARICIPATION FOR IMPLEMENTATION OF RAJIV AWAS YOJANA

Slum name - Kot Sadiq

91

Page 47: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR

Name of Slum:- Kot Sadiq Name of ACE:- Indermohan Singh Ward No:-58 Name of J.E.:- Uday Kumar Khurana

Category New Dwelling

Unit (A) Kitchen (B) Toilet(C)

Toilet+Kitchen(D)

Sr. No.

Name of Beneficiary Address & Phone no.

Name of Father/Husb

and/Wife

Residence Proof

Year of Stay

Minimum 10years)

A B C D

S.C. Yes/No

• Occupation

Self Decleration

By Beneficiary

1. Ashok Kumar

Sarwan Ram Electricity Bill

A Yes A Yes

2. Pritam Singh Faqir Chand Ration Card

A Yes B Yes

3. Mahinder Kaur

Rattan Singh Ration Card

A Yes A Yes

4. Jagjivan Ram Ramji Das Voter Card

A Yes B Yes

5. Parkasho Arjun Dass Voter Card

A Yes A Yes

6. Sadhu Ram Preet Ram Ration Card

C Yes B Yes

7. Chhindo Teju Ram Voter Card

D Yes B Yes

8. Joginder Pal Jeet Ram Ration Card

A Yes C Yes

9. Geeta Rani Manohar Lal Voter Card

A Yes A Yes

10. Lachhman Dass

Labhu Ram Voter Card

A Yes C Yes

11. Chhino Preetam Dass

Voter Card

A Yes B Yes

12. Ram Kishan Chinta Ram Voter Card

A Yes A Yes

13. Mulakh Raj Parkash Ram Ration Card

A Yes C Yes

14. Satya Hazara Ram Electricity Bill

A Yes C Yes

15. Guljari Ram Dalip Chand Voter Card

A Yes C Yes

16. Joginder Pal Puran Chand Voter Card

A Yes A Yes

17. Jeeto Sant Ram Voter Card

A Yes B Yes

18. Debo Dev Raj Voter Card

A Yes A Yes

19. Yashpal Hukam Chand

Ration Card

A Yes C Yes

20. Mangi Ram Dharam Lal Voter Card

A Yes A Yes

21. Gurnam Swarna Ram Ration Card

A Yes C Yes

22. Sangara Ram Tulsi Ram Voter Card

A Yes A Yes

23. Gurmeet Ram

Munshi Ram Voter Card

A Yes C Yes

24. Chhino Shiv Lal Voter Card

A Yes C Yes

25. Ram Lubhaya

Tulsi Ram Voter Card

A Yes A Yes

93

Page 48: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

26. Gurmeet Kaur

Bachan Lal Voter Card

D Yes C Yes

27. Husan Lal Faqir Chand Ration Card

A Yes A Yes

28. Sant Ram Dhanna Ram Voter Card

A Yes A Yes

29. Sunil Kumar Gurbakhsh Rai

Ration Card

A Yes A Yes

30. Manjit Kaur Sohan Lal Voter Card

A Yes B Yes

31. Som Nath Joginder Pal Voter Card

A Yes C Yes

32. Naresh Kumar

Joginder Pal Voter Card

A Yes A Yes

33. Nanak Chand Joginder pal Passport A Yes C Yes 34. Samitra Devi Chaman Lal Voter

Card A Yes C Yes

35. Bhajno Gurmej Lal Voter Card

A Yes A Yes

36. Surinder Pal Fakeer Chand

Voter Card

A Yes C Yes

37. Balveer Kaur Ram Pal Voter Card

A Yes C Yes

38. Manjit Kumar

Joginder Pal Ration Card

A Yes A Yes

39. Bhajno Bakshi Ram Ration Card

A Yes A Yes

40. Ashwani Kumar

Bakshi Ram Ration Card

A Yes A Yes

41. Harjinder Singh

Bachan Singh

Voter Card

A Yes C Yes

42. Nirmal Singh Bachan Singh

Voter Card

A Yes A Yes

43. Charanjit Singh

Bachan Singh

Ration Card

A Yes B Yes

44. Ramji Sunder Ram Voter Card

A Yes C Yes

45. Ram Saroop Nanak Chand

Ration Card

A Yes C Yes

46. Sarabjit Singh

Harbans Singh

Ration Card

A Yes A Yes

47. Toshi Jagdish Lal Voter Card

A Yes C Yes

48. Jagdish Lal Ram Parkash Sale Deed A Yes C Yes 49. Surinder Pal Tarsem Lal Voter

Card A Yes C Yes

50. Jagir Kaur Tarsem Singh

Electricity Bill

A Yes B Yes

51. Kamaljit Krishan Lal Voter Card

A Yes A Yes

52. Chhindo Bakhshi Ram

Voter Card

A Yes C Yes

53. Gian Chand Banta Ram Voter Card

A Yes B Yes

54. Harwinder Kaur

Sumitar Lal Passport A Yes C Yes

55. Gian Kaur Piara Lal Voter Card

A Yes C Yes

56. Gurdev Kaur Gurdev Kumar

Voter Card

D Yes A Yes

95

97

Page 49: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

57. Mahinder Pal Pal Ram Voter Card

C Yes B Yes

58. Gurbaksh Kaur

Sarwan Lal Passport A Yes C Yes

59. Neelam Devi Dev Raj Ration Card

A Yes C Yes

60. Mahinga Ram

Kishan Lal Sale Deed A Yes A Yes

61. Ramesh Kumar

Satpal Yellow Card

A Yes B Yes

62. Kamla Devi Raghu Nath Ration Card

A Yes C Yes

63. Surinder Pal Gurmit Chand

Electricity Bill

A Yes A Yes

64. Simbo Resham Lal Passport A Yes B Yes 65. Nirmala Sheetal Ram Ration

Card A Yes C Yes

66. Kashmiro Des Raj Ration Card

A Yes B Yes

67. Sukhdev Raj Darshan Ram

Electricity Bill

A Yes C Yes

68. Kamaljeet Kaur

Sardari Lal Ration Card

A Yes C Yes

69. Raj Hari Pal Voter Card

A Yes B Yes

70. Kewal Lal

Gurdev Ram Passport A Yes C Yes

71. Om Parkash Kabal Ram Ration Card

D Yes C Yes

72. Harjinder singh

Karam Singh Passport A Yes B Yes

73. Vijay Kumar Roop Lal Sale Deed D Yes C Yes 74. Ram

Lubhaya Harbilas Voter

Card B Yes C Yes

75. Krishna Devi Sikander Lal Voter Card

A Yes B Yes

76. Paramjit Singh

Malgar Singh

S.C Certificate

A Yes C Yes

77. Kashmiri Lal Udo Ram Passport A Yes C Yes 78. Harblass Kabal Ram Passport A Yes B Yes 79. Surinder

Kumar Girdhari Lal Voter

Card A Yes C Yes

80. Ashok Kumar

Dev Raj Ration Card

A Yes C Yes

81. Bhupinder Pal

Harbans Lal Driving Lic.

A Yes C Yes

82. Sunita Vijay Pal Singh

Voter Card

A Yes B Yes

83. Bimla Rani Sodhi Ram Ration Card

A Yes C Yes

84. Paramjit Kaur

Sukhwinder Lal

Voter Card

A Yes C Yes

85. Asha Rani Ram Gopal Passport A Yes B Yes 86. Raj Kumar Daulat Ram Voter

Card D Yes C Yes

87. Shinder Pal Sant Ram Voter Card

A Yes C Yes

88. Balbeer Chand

Charan Dass Voter Card

A Yes B Yes

89. Ashok Kumar

Karam Chand

Voter Card

B Yes C Yes

90. Baldev Raj Puran Chand Ration Card

A Yes C Yes

91. Nirmal Kumar

Dev Raj Voter Card

A Yes B Yes

Page 50: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

92. Kashmeero Dharam pal Voter

Card A Yes C Yes

93. Sunita Rani Jagdish Lal Voter Card

A Yes B Yes

94. Charno Dev Raj Voter Card

A Yes C Yes

95. Ashu Vidhi Chand Voter Card

A Yes B Yes

96. Bimla Devi

Raj Kumar Passport A Yes C Yes

97. Satnam Ram Lal Voter Card

A Yes C Yes

98. Satya Devi Des Raj Voter Card

A Yes B Yes

99. Ashwani Kumar

Dev Raj Voter Card

A Yes C Yes

100. Debo Dev Raj Voter Card

A Yes C Yes

101. Gian Chand Chanu Ram Voter Card

A Yes B Yes

102. Bhagat Ram Harnam Das Voter Card

B Yes C Yes

103. Ramji Dass Kartara Ram Elc.Bill B Yes C Yes 104. Madan Lal Gurdial

Chand Voter Card

A Yes C Yes

105. Prem Chand Gurdial Chand

Voter Card

A Yes C Yes

106. Ram Lubhaya

Nasib Chand Voter Card

A Yes B Yes

107. Rani Joginder Pal Elc.Bill A Yes C Yes 108. Hans Raj Pritam Das Ration

Card A Yes C Yes

109. Satnam Singh

Kartar Singh Voter Card

A Yes C Yes

110. Avatar Chand

Ganga Ram Sale Dead A Yes C Yes

111. Chain Ram Mangat Ram Passport D Yes C Yes 112. Rakesh

Kumar Raj Kumar Attorney C Yes C Yes

113. Lamber Ram Bhag Ram Voter Card

B Yes C Yes

114. Gurdip Ram Nama Ram Voter Card

C Yes C Yes

115. Bhajno Tarsem Lal Voter Card

A Yes C Yes

116. Magho Ram (mast Colony)

Madho Ram Electricity Bill

A Yes C Yes

117. Husan Lal (mast Colony)

Piara Lal Voter Card

D Yes C Yes

118. Sat Narayan (mast Colony)

Ramji Dass Voter Card

A Yes C Yes

119. Bimla Devi Ram Kishan Ration Card

A Yes C Yes

Total 102 5 4 8

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C

99

Page 51: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Const. of road/streets in slum Abadi at Kot Sadiq

Part-I Sr.No.

Item No. Details of item Measurement Quantity Rate NSP Amount

1 4.1+5.2 Earth work with loading unloading i/c carriage upto lead 16 Km. for good earth/removal of malba.

Street A 313x6' =1878 B 785x11.5' =9028 C 520x11' = 5720 D 131x11' = 1441 E 107x10' = 1070 F 480x6.5' = 3120 G 300x12' = 3600 H 100x10' = 1000 I 230x5' = 1150 J 160x5' = 800 K 270x10 =2700 M 200x22.5'=4500 N 300x20' =6000 O 390x15.33'=5979 P 150x18' = 2700 Q 90x34.5' = 3105 R 55x5' = 275 S 260x22' =5720 Total 4841 59786 59786x7"+8" =32284.44 cft. 2

914.31 cum

303.45 per cum

i/c NSP

277449

2 10.6 (b) CC 1:8:16 with 40mm gauge stone aggreegate.

Total area =59786 less area of the L-ype drain=2x4841= 17118 42068 sft. So quantity of 1:8:16 42068x3"=10516.98 cft.

297.84 cum

1438.55 per cum

18% 505592

10.12 CC 1:2:4 with stone ballast or shingle.

42068x5/12=17528.33 cft. 496.41 cum.

2799.75 per Cum.

18% 1640001

10.46+10.47

Extra for using batch type concrete mixer and viberator

496.41 cum.

113.76+ 22.75= 136.51

15% 77930

3

10.73 Extra for carriage for RMC/Batch mixed concrete with transit mixer beyond 1 Km

Avg. lead 10 Km beyond 1 Km 496.41 cum.

14.22x 10= 142.2

15% 81178

Extra carriage of material. Stone Ballast for 1:8:16

297.84x1.00 297.84 cum

340.48 per Cum.

101409

Fine sand for 1:8:16

297.84x0.50 148.92 cum

202.68 per cum.

30183

4 5.2

Crusher for 1:2:4 496.41x0.90 446.76 cum

316.07 per cum.

141210

Coarse sand for 1:2:4

496.41x0.45 223.38 384.20 per cum.

85780

5 24.59(a) Fibre board expansion joints for 5" depth. (Expansion joints at the distance of 10')

4841/3.28 =1475.91 Rmt. 42068/200x15 Rmt. =3155.10 Rmt. 4631.01 Rmt. 12.50x4.03= Rs. 50.37

4631.01 Rmt.

50.37 per Rmt.

12% 261256

Total (Part-I)

3201988

103

Page 52: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Part-II

1 Analysis Const. of L-type drain complete i/c tega, bund, concrete base and CC 1:2:4

2x4841 9682 rft. 100 per rft.

968200

2 Analysis Const. of road gully chamber complete size 2'x1'x2'.1"

97 Nos. 2424 each 235128

3 29.94(a) Road gully chambers connections to existing sewer

97 Nos. 146.92/- 30% 18527

4 Analysis P/Laying SW pipe 6"(8' average)

776 rft. 115.60 per rft.

89706

5 Analysis Raising of manhole cover with frame.

35 Nos. 295.50 each

10342

Total (Part-II)

1321903

Grand Total I+II=Rs.4523891/-

Assistant Commissioner-

Technical

105

Page 53: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Kot Sadiq ward No.58 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 51 51 4001-6000 68 68 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Kot Sadiq ward No.58 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

24 24

LABOUR 27 27 FACTORY WORKERS

68 68

PVT. JOB HOUSE MAID

OTHERS

107

Page 54: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

109

Page 55: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

1. Regarding community participation in formulation and implementation of the proposal it is informed that Community participation is envisaged at various stages of physical / socio-economic survey, planning and designing, operation and maintenance. The process of community mobilization was initiated by Jalandhar Municipal Corporation by repeated field visit to understand the community, its livelihood pattern, dynamics of local Community. The officials of ULB held discussion with community on 7-8th November, 2012 & 17-18th December 2012 and identified their needs and concerns. Subsequently area councilor was also approached for his involvement and briefed about RAY's participatory process and various surveys needed for the project. The team explained the community members about the process of slum in-situ development under RAY. The community participants were advised of their responsibility of meeting their part of housing cost, to prove their credit worthiness in the eyes of Banks. 2. Regarding Stages where community will be involved during implementation of project it is informed that a road map for social auditing involving a lead NGO and community members has also been proposed. The scope of social audit will cover 1) Quality of construction, 2) Effectiveness of basic service provided, 3) Satisfaction of targeted beneficiaries. For repair and maintenance of assets, a two tier formal structure has been proposed involving the community.

COMMUNITY PARICIPATION FOR IMPLEMENTATION OF RAJIV AWAS YOJANA

Slum name – Chohkan Kalan

111

Page 56: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR

Name of Slum:- Chohak Kalan Name of ACE:-Sh. Kuldeep Sharma Ward No:-09 Name of J.E:- Sh. Gurandass S.No. Name & Address

of Beneficiary Name of

Father/Husband/Wife

Proof of

Residence Stay Minimum 10 Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

Occupation

Self Decleration By Benefic

iary

A B C D 1. Paramjit Sh. Roshan

Lal Ration Card

A Yes A Yes

2. Lamber Singh Sh. Jagat Singh

--Do-- A Yes A Yes

3. Prabhi Devi Late. Pala Ram

--Do-- A Yes C Yes

4. Mohinder Pal Sh. Channa Ram

--Do-- A Yes C Yes

5. Baldev Singh Sh. Sai Ram --Do-- A Yes B Yes

6. Surinder Kaur Sh. Malkit Singh

--Do-- A Yes A Yes

7. Rakesh Kumar Sh. Gurdass Ram

--Do-- A Yes C Yes

8. Davinder Kumar Sh. Gurdass Ram

--Do-- A Yes C Yes

9. Surinder Kumar Sh. Gurdass Ram

--Do-- A Yes A Yes

10. Satya Devi W/o Sh. Ranjit Singh

--Do-- A Yes C Yes

11. Jatinder Kumar Sh. Rashem Lal

--Do-- A Yes C Yes

12. Sheetal Dass Sh. Pritam Dass

--Do-- A Yes C Yes

13. Harbans Lal Sh. Pritam Dass

--Do-- A Yes A Yes

14. Surinder Pal Sh. Pritam Dass

--Do-- A Yes B Yes

15. Chino W/o. Sh. Pritam Dass

Voter Card

A Yes C Yes

16. Veena Kumari W/o. Harmesh Lal

Ration Card

A Yes A Yes

17. Gurdeep Kaur Late. Sh. Rashem Lal

Voter Card

A Yes C Yes

18. Makhan Lal Sh. Daulat Ram

Ration Card

A Yes B Yes

19. Sukh Dayal --Do-- A Yes C Yes

20. Hari Chand --Do-- A Yes A Yes

21. Saroj Rani Sh. Shingra Ram

--Do-- A Yes C Yes

22. Jarnail Ram Sh. Kartra Ram

Ration Card

A Yes C Yes

23. Suroop Lal Sh. Kartra ram

Ration Card

A Yes B Yes

24. Darshan Dayal Sh.Mahnga ram

Voter Card

A Yes C Yes

25. Gurbax Kaur W/o. Sh. Manohar Lal

Pass Port

A Yes C Yes

26. Manjit Rani W/o. Sh. Sat Pal

Ration Card

A Yes C Yes

27. Mohinder Pal Sh. Ram Aasra

Electricity Bill

A Yes B Yes

28. Bishmi Sh. Ram Aasra

Ration Card

A Yes A Yes

113

Page 57: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

29. Puspa Rani W/o. Sh. Sat Pal

--Do-- A Yes C Yes

30. Mandeep Singh S/o Sh. Paramjit Singh

--Do-- A Yes C Yes

31. Smt. Mohinder Kaur W/o. Sh. Shingra

Ram

Voter Card

A No B Yes

32. Charanjit Singh Sh. Ram Singh

--Do-- A Yes C Yes

33. Nirmal Kaur W/o Sh. Soma Singh

--Do-- A Yes A Yes

34. Jasbir Kaur Late Sh. Gurmail Lal

--Do-- A Yes B Yes

35. Charan Kaur Late Sh. Jagiri Ram

--Do-- A Yes C Yes

36. Surinder Pal Sh. Dass Ram

--Do-- A Yes C Yes

37. Harbhajan Lal Sh. Savarna Ram

--Do-- A Yes B Yes

38. Gurmej Kaur Sh. Das Ram

Electricity Bill

A Yes A Yes

39. Kundan Kaur Sh. Harpal Singh

Ration Card

A Yes C Yes

40. Baldev Raj Sh. Kartra Ram

--Do-- A Yes B Yes

41. Jaspal Singh Sh. Bhadar Singh

--Do-- A Yes C Yes

42. Santosh Lal Sh. Faqir Chand

--Do-- A Yes B Yes

43. Joginder Singh Sh. Karam Singh

Voter Card

A No C Yes

44. Gurcharan Singh Sh. Karam Singh

--Do-- A No B Yes

45. Jaswinder Kaur Sh. Khusi Ram

--Do-- A Yes E Yes

46. Puspa Rani Sh. Tarsem Lal

--Do-- A Yes A Yes

47. Pritam pal Singh Sh. Milkhi Ram

Ration Card

A Yes C Yes

48. Swarn Kaur Sh. Puran Chand

--Do-- A Yes C Yes

49. Dharam Pal Sh. Rakha Ram

--Do-- A Yes C Yes

50. Garib Dass Sh. Santa Ram

--Do-- A Yes A Yes

51. Jagdish Pal Sh. Sarvarna Ram

--Do-- A Yes C Yes

52. Paramjit Kaur W/o Sh. Om Parkash

--Do-- A Yes C Yes

53. Tarsem Lal Sh. Kartra Chand

--Do-- A Yes C Yes

54. Ram Kishan Late Sh. Channu

Ram

--Do-- A Yes A Yes

55. Sheela Rani Sh. Hajit Lal --Do-- A Yes C Yes 56. Mohinder Kaur Sh. Dharam

Chand --Do-- A Yes C Yes

57. Savran Kaur W/o Sh. Garib Dass

--Do-- A Yes E Yes

58. Gurdeep Kaur Late Sh. Daulat Ram

--Do-- A Yes C Yes

59. Narinder Pal Sh. Thakur Dass

--Do-- A Yes A Yes

60. Ram Pal Sh. Bhag Ram

--Do-- A Yes C Yes

61. Nirmla Devi Sh. Baabu Ram

--Do-- A Yes C Yes

62. Roop Lal Sh. Pyara Ram

--Do-- A Yes E Yes

63. Ramesh Kumar Sh. Garib Dass

--Do-- A Yes C Yes

115

Page 58: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

64. Gurvinder Kaur Sh. Balbir Singh

--Do-- A No A Yes

65. Amarjit Lal Sh. Bishmber

Lal

--Do-- A Yes C Yes

66. Des Raj Sh. Bishmber

Lal

--Do-- A Yes C Yes

67. Amarjit Kaur W/o Sh. Yashpal

--Do-- A Yes C Yes

68. Manjit Singh Sh. Piara Singh

--Do-- A No A Yes

69. Baksho W/o Sh. Jeet Ram

--Do-- A No C Yes

70. Joginder Pal Sh. Kabul Ram

--Do-- A Yes E Yes

71. Smt. Balvinder Kaur W/o Sh. Madan Lal

Ration Card

A Yes C Yes

72. Sh. Vijay Kumar S/o Sh. Parkash Chand

Ration Card

A Yes C Yes

73. Tilak Raj Sh. Bishem Chand

--Do-- A Yes C Yes

74. Jasbir Kaur Sh. Kasmiri Lal

--Do-- A Yes E Yes

75. Jasbir Singh Sh. Harbans Singh

Voter Card

A Yes C Yes

76. Harbans Singh Sh. Mohan Singh

Ration Card

A Yes E Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C A.C.(T) A.C.E J.E

117

Page 59: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Const. of road/street at slum Abadi village Chohkan Kalan.

Sr.No.

Item No.

Details of item Measurement Quantity

Rate NSP

Amount

4.1+5.2

Earth work with loading unloading i/c carriage upto lead 16 Km. for good earth/removal of malba.

Main road 60'x35+30 =1800 sft. 2 Main road 362'x11+22 =5973 sft. 2 81'x28+14 =1701 sft 2 Street 1050x11' =11550 Street 1000x10 ' =10000 Street 470x21 =9870 Street 270x17 =4590 Street 747x22+30 =1942 Street 300x17 =5100 Street 310'x9+13 =3410 2 Street 61'x4' =244 Street 218x15+8 =2398 2 Street 30x10 = 300 Street 35x6 = 210 Street 110'x21+18 =2145 2 Street 28'x22 =616

1

Street 60'x11+8 =570 2 Street 55x11'=605 Street 50x5'=250 Street 94x4'=376 Street 17x5'=85 Street 33x4'=132 Street 55x5'=275

Street 48'x6=228 Street 11x6=66 Street 45x7=315 Street 90x5=450 Street 17x5=85 Street 37x5= 185 Street 27x11=297 Street 70x17=1190 Street 18x11=198 Street 13x5=65 Street 70x6+5=385 2 Street 22x5=110 Street 34x4=136 Street 36x6=216 Street 42x5=210 Street 40x5=200 Street 37x5=185

Street 110x4=440 Street 92x5=460 Street 62x5=310 Street 22x5=110 Street 85x35=2975 Street 80x7=560 Street 11x10=110 Street 40x5=200 Street 47x22=1034 Street 90x10=900 Street 70x5=350 Street 68x7=476 Street 110x7=770 Street 131x20=2620 Street 385x12= 4620 Total Area 1,02,585 sft so quantity of earth work 102581x4"+6"+8"+1' = 63856 cft 4

1807 cum

303.45 per cum

548334

121

Page 60: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

2 10.6 (b)

CC 1:8:16 with 40mm gauge stone aggreegate.

Total area =102581 less area of the L-ype drain=12530x1'-10"= 22804 79776 sft. So quantity of 1:8:16 79776x3"=19944 cft.

565 cum

1438.55 per cum

18%

959081

10.12 CC 1:2:4 with stone ballast or shingle.

79776x5/12=33240 cft 942 cum

2799.75 per Cum.

18%

3112090

10.46+10.4

7

Extra for using batch type concrete mixer and viberator

942 cum

113.76+ 22.75= 136.51

15%

147881

3

10.73 Extra for carriage for RMC/Batch mixed concrete with transit mixer beyond 1 Km

Avg. lead 10 Km beyond 1 Km 942 cum

14.22x 10= 142.2

15%

154045

Extra carriage of material. Stone Ballast for 1:8:16

565x1.00 565 cum

340.48 per Cum.

192371

Fine sand for 1:8:16

565x0.50=283 cum 283 cum

202.68 per cum.

57358

4 5.2

Crusher for 1:2:4 942x0.90 848 cum

316.07 per cum.

268027

Coarse sand for 1:2:4

942x0.45 423.9 384.00 per cum.

162777

5 24.59(a)

Fibre board expansion joints for 5" depth.(Expansion joints at the distance of 10' )

12530 Rft/10=1253x15=18795 Rft 5730.10 Rmt.

50.37 per mtr.

12%

323264

Total (Part-I)

5925228

Part-II 1 Analy

sis Const. of L-type drain complete i/c tega, bund, concrete base and CC 1:2:4

12530 rft.

100 per rft.

1253000

2 Analysis

Const. of road gully chamber complete size 2'x1'x2'.1"

150 Nos.

2424 each

363600

3 29.94(a)

Road gully chambers connections to existing sewer

150 Nos.

146.92/-

30%

28649

4 Analysis

P/Laying SW pipe 6"(8' average)

1200 rft.

115.60 per rft.

138720

5 Analysis

Raising of manhole cover with frame.

80 Nos.

295.50 each

23640

Total (Part-II)

1807609

Grand Total I+II=7732837/-

Assistant Commissioner-

Technical

123

Page 61: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Chohak Kalan Ward No. 9 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 27 06 33 4001-6000 43 43 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Chohak Kalan Ward No. 9 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

16 16

LABOUR 11 11 FACTORY WORKERS

43 43

PVT. JOB HOUSE MAID

OTHERS 06 06

125

Page 62: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

127

Page 63: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR Name of Slum:- Amar Jeet Nagar, Basti Peer Dad Name of ACE:- Sh. Harjinder Pal Ward No:-42 Name of J.E:- Sh. Parwinder Singh Sodhi

S.No.

Name & Address of Beneficiary

Name of Father/Husband/

Wife

Proof of Residence

Stay Minimum 10

Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet + Kitchen [D]

S.C.Yes/No

Occupation

Self Decleration By Benefici

ary

A B C D 1 Major Singh S/o Dilbagh Singh Ration Card

/Registry - - - D Yes E Yes

2 Krishna W/o Bihari Lal Ration Card /Registry

A - - - Yes D Yes

3 Jarnail Singh

S/o Ishar Das Ration Card /Registry

A - - - No E Yes

4 Manjeet Singh

S/o Balwant Singh Ration Card (1-5-98)/Registry

A - - - Yes A Yes

5 Darshan Lal S/o Bhagat Ram Ration Card( 1-5-98 )Registry

A - - - Yes E Yes

6 Satpal S/o Boota Ram Registry A - - - Yes A Yes 7 Moti Ram S/o Karam Chand Ration Card

/Registry - - - D Yes A Yes

8 Kuldeep Singh

S/o Joga Singh Ration Card /Registry 1992

A - - - Yes E Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C A.C.(T) A.C.E J.E

129

Page 64: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Const. of road/street in slum Abadi at Amarjeet Nagar Clony ward no. 42.

Sr.No.

Item No.

Details of item Measurement Quantity

Rate NSP

Amt

1 4.1+5.2 Earth work with loading unloading i/c carriage upto lead 16 Km. for good earth/removal of malba.

Street A 675' 8" x 19' 8"+19' 7"+ 19' 2" =13157.45 3 Street B 694' x 19' 8" +20' = 13762.02 2 Street C 691' 2" x 20'+19' 8"+19' 9"= 13689.67 3 Street D 445'x19' 7"+ 19' 9"= 8750.93 2 Street E 447'x 19' 6"+19' 9" = 8772.38 2 Street F 449'4" x20'+19'10"+ 19' 7" =8898.23 3 Street G 462' x 17'9"+15' 7"+ 9' 3" = 6338.64 3 Total Area 73369.32 Say 73370 sft 73370x 3"+6"+8"+10" =40903 cft 4 OR 1159 cum

1159 303.45 i/c NSP

351699

2 10.6 (b) CC 1:8:16 with 40mm gauge stone aggreegate.

Total area = 73370 less area of the L-ype drain= 7248x1'-10"=13265 60105 sft. So quantity of 1:8:16 60105x3"=15025 cft.

426 cum

1438.55 per cum

18%

723130

10.12 CC 1:2:4 with stone ballast or shingle.

60105x5/12=25043 cft 709 cum

2799.75 per Cum.

18%

2342326

10.46+10.47

Extra for using batch type concrete mixer and viberator

709 cum

113.76+ 22.75= 136.51

15%

111303

3

10.73 Extra for carriage for RMC/Batch mixed concrete with transit mixer beyond 1 Km

Avg. lead 10 Km beyond 1 Km 709 cum

14.22x 10= 142.2

15%

115942

Extra carriage of material. Stone Ballast for 1:8:16

426x1.00=426 426 cum

340.48 per Cum.

145044

Fine sand for 1:8:16

426x0.50=213 cum 213 cum

202.68 per cum.

43170

4 5.2

Crusher for 1:2:4 709x0.90=638 cum 638 cum

316.07 per cum.

201652

Coarse sand for 1:2:4

709x0.45=319 cum 319 384.20 per cum.

122560

Fibre board expansion joints for 5" depth. (Expansion joints at the distance of 10' )

12530 Rft/10=1253x15=18795 Rft 5730.10 Rmt.

50.37 per mtr.

12%

323264 5 24.59(a)

Fibre board expansion joints for 5" depth. (Expansion joints at the distance of 10' )

3864'+3864'x19' 9"= 11495 Rft. 10

3504 Rmt.

50.37 per mtr.

12%

197676

Total (Part-I)

4677766

131

Page 65: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Part-II

1 Analysis

Const. of L-type drain complete i/c tega, bund, concrete base and CC 1:2:4

2x3864' - 480'= 7248' 7248 rft.

100 per rft.

724800

2 Analysis

Const. of road gully chamber complete size 2'x1'x2'.1"

65 Nos. 2424 each

157560

3 29.94(a) Road gully chambers connections to existing sewer

65 Nos. 146.92/- 30%

12415

4 Analysis

P/Laying SW pipe 6"(8' average)

780 rft. 115.60 per rft.

90168

5 Analysis

Raising of manhole cover with frame.

30 Nos. 295.50 each

8850

Total (Part-II)

993793

Grand Total I+II=56,71,559/-

133

Page 66: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Amar Jeet Nagar Colony Basti Peer Dad Ward No. 42 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 03 01 04 4001-6000 04 04 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Amar Jeet Nagar Colony Basti Peer Dad Ward No. 42 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

03 03

LABOUR FACTORY WORKERS

PVT. JOB 01 01 HOUSE MAID

OTHERS 03 01 04

135

Page 67: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

137

Page 68: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

1. Regarding community participation in formulation and implementation of the proposal it is informed that Community participation is envisaged at various stages of physical / socio-economic survey, planning and designing, operation and maintenance. The process of community mobilization was initiated by Jalandhar Municipal Corporation by repeated field visit to understand the community, its livelihood pattern, dynamics of local Community. The officials of ULB held discussion with community on 7-8th November, 2012 & 17-18th December 2012 and identified their needs and concerns. Subsequently area councilor was also approached for his involvement and briefed about RAY's participatory process and various surveys needed for the project. The team explained the community members about the process of slum in-situ development under RAY. The community participants were advised of their responsibility of meeting their part of housing cost, to prove their credit worthiness in the eyes of Banks. 2. Regarding Stages where community will be involved during implementation of project it is informed that a road map for social auditing involving a lead NGO and community members has also been proposed. The scope of social audit will cover 1) Quality of construction, 2) Effectiveness of basic service provided, 3) Satisfaction of targeted beneficiaries. For repair and maintenance of assets, a two tier formal structure has been proposed involving the community.

COMMUNITY PARICIPATION FOR IMPLEMENTATION OF RAJIV AWAS YOJANA

Slum name – Rasila Nagar and New Rasila Nagar

139

Page 69: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR Name of Slum:- Rasila Nagar And New Rasila Nagar Name of ACE:-S. Indermohan Singh Ward No:-46 Name of J.E:- Sh. Brij Lal

S.No.

Name & Address of Beneficiary

Name of Father/Husband/Wife

Proof of Residence Stay Minimu

m 10 Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

Occupation

Self Decleration By Bene

ficiary

A B C D 1. Smt. Asha

Rani W/o Sh. Jeet Ram

Electricity Bill

C Yes C Yes

2. Smt. Sunita Rani

W/o Sh. Ashok Kumar

Ration Card

D Yes C Yes

3. Sh. Vijay Kumar

Sh. Anant Ram

--Do-- A Yes B Yes

4. Sh. Chander Pal

Sh. Shankar --Do-- C Yes B Yes

5. Sh. Tarsem Lal

Sh. Amar Nath

--Do-- A Yes C Yes

6. Sh. Milki Ram

Sh. Nanak Chand

--Do-- A Yes B Yes

7. Sh. Ajit Singh Sh. Jagat Ram

--Do-- A Yes C Yes

8. Sh. Ashok Kumar

Sh. Milkhi --Do-- A Yes E Yes

9. Sh. Pawan Kumar

Sh. Bihari --Do-- A Yes C Yes

10. Sh. Madan Lal

Sh. Kali Dass

--Do-- A Yes B Yes

11. Sh. Raj Kumar

Sh. Shonku --Do-- C Yes A Yes

12. Smt. Kamla Devi

W/o Sh. Ramesh

--Do-- A Yes B Yes

13. Sh. Surjit Kumar

Sh. Harbans Singh

Electricity Bill

A Yes C Yes

14. Sh. Ajit Singh Sh. Takhad Singh

Ration Card

A Yes B Yes

15. Sh. Tarsem Lal

Sh. Roop Lal

--Do-- A Yes A Yes

16. Smt. Rajni W/o Sh. Anand

--Do-- D Yes B Yes

17. Sh. Ramesh Kumar

Sh. Harnam --Do-- C Yes A Yes

18. Sh. Charanjit Sh. Sharfu Electricity Bill

D Yes A Yes

19. Sh. Jaswant Singh

Sh. Behari Lal

Ration Card

D Yes C Yes

20. Sh. Jethu Ram Sh. Ram Lakha

--Do-- C Yes B Yes

21. Sh. Mangal Dass

Sh. Boota Ram

--Do-- D Yes A Yes

22. Sh. Surinder Singh

Sh. Niranjan Singh

Mukhtayar

Namma

A Yes B Yes

23. Sh. Bunty Lal Sh. Pyara Lal

Ration Card

D Yes A Yes

24. Sh. Om Parkash

Sh. Manga Ram

--Do-- C Yes B Yes

25. Sh. Yashpal Sh. Milkhi Ram

--Do-- A Yes A Yes

141

Page 70: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

26. Sh. Pawan Kumar

Sh. Rattan Lal

--Do-- A Yes C Yes

27. Sh. Ajit Singh Sh. Jagat Ram

--Do-- C Yes B Yes

28. Sh. Girdhari Sh. Sardari Lal

--Do-- A Yes A Yes

29. Sh. Pritam Sh. Gurdass --Do-- C Yes B Yes 30. Sh. Surjit

Singh Sh. Kehar Singh

--Do-- A No B Yes

31. Sh. Tarsem Lal

Sh. Sardari Lal

--Do-- A Yes C Yes

32. Sh. Balbir Dass

Sh. Gian Chand

--Do-- A Yes B Yes

33. Sh. Ramesh Lal

Sh. Labhu Ram

--Do-- A Yes C Yes

34. Sh. Chander Pal

Sh. Shanker --Do-- A Yes B Yes

35. Sh. Sat Pal Sh. Babu Ram

--Do-- A Yes B Yes

36. Sh. Ashok Kumar

Sh. Vakil Chand

--Do-- A Yes C Yes

Total 22 8 6

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C A.C.(T) A.C.E J.E

143

Page 71: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Rasila Nagar and New Rasila Nagar Ward No.46 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 - - - - - - - 2001-4000 - 04 - - - - 04 4001-6000 - 16 - - - - 16 6001-8333 01 15 - - - - 16

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Rasila Nagar and New Rasila Nagar Ward No.46 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

- - - - - - - LABOUR 01 35 - - - - 36 FACTORY WORKERS

- - - - - - - PVT. JOB - - - - - - - HOUSE MAID

- - - - - - - OTHERS - - - - - - -

145

Page 72: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

147

Page 73: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR Name of Abdi Jaimal Nagar Name of ACE :- Sh. Ashwani Chowdhary Ward No:-. 08 Name of J.E :- Sh. Ravinder Kumar S.No.

Name & Address of Beneficiary

Name of Father/Husb

and/Wife

Proof of Residenc

e Stay Minimu

m 10 Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

Occupation

Self Declerati

on By Beneficia

ry

A B C D 1 Mohan Singh H/o Gian kaur 14,

Ration Card

A No A Yes

2 Satnam Singh H/oAsha Rani 14 Ration Card

A No C Yes

3 Inder jeet Singh

H/o Parminder Kaur

14 Ration Card

A No A Yes

4 Varindar Kumar

H/o Seema Rani

14 Ration Card

A No C Yes

5 Satish Kumar H/o Sunita Rani

14 Ration Card

A No A Yes

6 Suraj Kumar H/o Arti Rani 14 Ration Card

A No B Yes

7 Surinder Kumar

H/o Anita 14 Ration Card

A No C Yes

8 Ashwani Kumar

H/o Manju Rani

14 Ration Card

A No C Yes

9 Vipan Kumar H/o Kusam Devi

14 Ration Card

A No C Yes

10 Jaswinder Kaur

H/o Sukhvir Singh

14 Ration Card

A No B Yes

11 Bakhshish Singh

H/o Harbhajan Kaur

14 Ration Card

A No C Yes

12 Surinder Kaur W/o Des Raj 14 Ration Card

A Yes B Yes

13 Kashmira Ram

H/o Shila Rani

14 Ration Card

A Yes A Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C

149

Page 74: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Jaimal Nagar ward No. 08 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 02 08 10 4001-6000 03 03 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Jaimal Nagar ward No. 08 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

02 02 04

LABOUR 03 03 FACTORY WORKERS

06 06

PVT. JOB HOUSE MAID

OTHERS

151

Page 75: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

153

Page 76: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR

Name of Aabdi:- New Suraj Ganj Bhargo Camp Name of ACE:- Sh.Rajnish Dogra Ward No:-.51 Name of J.E:- Sh. Ramesh Bhagat S.No.

Name & Address of Beneficiary

Name of Father/Husb

and/Wife

Proof of Residence

Stay Minimum 10 Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

Occupation

Self Decleration

By Beneficiary

A B C D

1 Kamlesh Rani

W/o Madan Lal

Ration Card

D Yes B Yes

2 Banarsi Dass S/o Manohar Lal

Votar Card A Yes B Yes

3 Natha Ram S/o Bihari Lal Ration Card

A yes A Yes

4 Anju W/o Rakesh Kumar

--Do-- A Yes B Yes

5 Om Parkesh S/o Ishar Dass --Do-- A Yes A Yes 6 Koshalia

Devi W/o Sadhu Ram

--Do-- A Yes A Yes

7 Bachan Lal S/o Ashwar --Do-- A Yes A Yes 8 Rattan Lal S/o Chaman

Lal --Do-- A Yes B Yes

9 Mohindar Pal

S/o Munshi Ram

Elect. Bill A Yes A Yes

10 Kishna Devi W/o Mangal Dass

Ration Card

A Yes A Yes

11 Yash Pal S/o Chur Ram --Do-- A Yes A Yes 12 Mela Davi W/o Om

Oarkesh --Do-- D Yes A Yes

13 Daya Wanti W/o Gian Chand

--Do-- A Yes B Yes

14 Santosh Kumar

S/o Sain Dass --Do-- A Yes B Yes

15 Sh. Balwant Rai

S/o Sh. Nanak Chand

--Do-- A Yes A Yes

16 Sh. Ram Lubhaya

S/o Sh. Bihari Lal

--Do-- A Yes B Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C

155

Page 77: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: New Suraj Ganj Bhargo Camp ward No. 51 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 09 09 4001-6000 07 07 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: New Suraj Ganj Bhargo Camp ward No.51 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

09 09

LABOUR 07 07 FACTORY WORKERS

PVT. JOB HOUSE MAID

OTHERS

157

Page 78: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

159

Page 79: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

1. Regarding community participation in formulation and implementation of the proposal it is informed that Community participation is envisaged at various stages of physical / socio-economic survey, planning and designing, operation and maintenance. The process of community mobilization was initiated by Jalandhar Municipal Corporation by repeated field visit to understand the community, its livelihood pattern, dynamics of local Community. The officials of ULB held discussion with community on 7-8th November, 2012 & 17-18th December 2012 and identified their needs and concerns. Subsequently area councilor was also approached for his involvement and briefed about RAY's participatory process and various surveys needed for the project. The team explained the community members about the process of slum in-situ development under RAY. The community participants were advised of their responsibility of meeting their part of housing cost, to prove their credit worthiness in the eyes of Banks. 2. Regarding Stages where community will be involved during implementation of project it is informed that a road map for social auditing involving a lead NGO and community members has also been proposed. The scope of social audit will cover 1) Quality of construction, 2) Effectiveness of basic service provided, 3) Satisfaction of targeted beneficiaries. For repair and maintenance of assets, a two tier formal structure has been proposed involving the community.

COMMUNITY PARICIPATION FOR IMPLEMENTATION OF RAJIV AWAS YOJANA Slum name - Abadpura

161

Page 80: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR Name of Slum:- Abadpura Name of ACE:-Sh. Rahul Dhawan Ward No:-55 Name of J.E:- Sh. Ram Pal S.No. Name &

Address of Beneficiary

Name of Father/Husb

and/Wife

Proof of Residence

Stay Minimum 10 Years

Category

New Dwelling Unit [ A] Kitchen [B] Toilet [C] Toilet+Kitchen [D]

S.C.Yes/No

• Occupation

Self Decleration By

Beneficiary

A B C D 1. Baro Ram Bhula Ram Ration

Card A S.C B Yes

2. Daljit Kumar Jagan Nath Ration Card

A S.C A Yes

3. Ram Lal Sukh Ram Ration Card

A S.C A Yes

4. Chaman Lal Gurbachna Ram

Ration Card

A S.C B Yes

5. Yog Raj Gurbachna Ram

Ration Card

A S.C A Yes

6. Deepak Kumar

Gian Chand S.C. Certificate

A S.C A Yes

7. Shanti Sagar Mohan Lal Ration Card

A S.C B Yes

8. Dalip Singh Rulia Ram Ration Card

A S.C A Yes

9. Ram Pal Mahi

Tulsi Ram Voter Card B S.C B Yes

10. Sukhdev Raj Kalo Ram Ration Card

A S.C B Yes

11. Shanti Karam Chand

Ration Card

A S.C A Yes

12. Kamaljit Chaman Lal Passport A S.C A Yes 13. Bishambhar

Das Sadhu Ram Ration

Card A S.C A Yes

14. Pairey Gian Chand Ration Card

A S.C A Yes

15. Rakesh Kumar

Sadhu Ram Ration Card

A S.C A Yes

16. Girdhari Lal Chaman Lal Ration Card

A S.C A Yes

17. Gulzar Chand

Rulda Ram Ration Card

D S.C D Yes

18. Gurbaksh Kaur

Harbhajan Lal

Ration Card

A S.C A Yes

19. Vidaya Tarsem Lal Ration Card

D S.C D Yes

20. Charanjit Ram Chand Ration Card

A S.C A Yes

21. Gurmail Ram Ram Chand Ration Card

A S.C A Yes

22. Ram Asara Sunder Ram Voter Card A S.C A Yes 23. Hem Raj Gurdev Ram S.C.

Certificate A S.C A Yes

24. Dhanna Ram Karam Chand

Ration Card

A S.C A Yes

25. Mansa Ram Pakhar Ram Ration Card

A S.C A Yes

26. Ram Ji Das Parkash Ram Ration Card

A S.C A Yes

27. Swarn Kaur Karnail Singh

Ration Card

A S.C A Yes

28. Satya Devi Gurdita Ration Card

A S.C A Yes

29. Parkash Chand Jassal

Karam Chand

Ration Card

A S.C A Yes

163

Page 81: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

30. Des Raj Sadhu Ram Ration Card

A S.C A Yes

31. Naurian Ram Sarwan Kumar

Ration Card

A S.C A Yes

32. Dhanti Sadhu Ram Voter Card A S.C A Yes 33. Khazan

Chand Gurbachna Ram

Ration Card

A S.C A Yes

34. Surinder Kaur

Shiv Das Ration Card

A S.C A Yes

35. Lajwanti Sohan Lal Ration Card

A S.C A Yes

36. Kewal Krishan

Sulkha Ram Ration Card

A S.C A Yes

37. Sohan Lal Nasib Chand Ration Card

A S.C A Yes

38. Das Ram Meehmal Ration Card

A S.C A Yes

39. Mahinder Pal Daulat Ram Ration Card

A S.C A Yes

40. Hardeep Singh

Sohan Singh Ration Card

A S.C A Yes

41. Paramjit Som Nath Ration Card

A S.C A Yes

42. Gurmit Kaur Pritam Das Ration Card

A S.C A Yes

43. Boota Ram Munshi Ram Ration Card

A S.C A Yes

44. Tarsem Lal Rakha Ram Ration Card

A S.C A Yes

45. Parmjit Daulat Ram Ration Card

A S.C A Yes

46. Hem Raj Mansa Ram S.C. Certificate

A S.C A Yes

47. Dev Raj Mahinder Pal Ration Card

A S.C A Yes

48. Parkash Kaur Saroop Lal Ration Card

A S.C A Yes

• Rickshaw Poller: A Pvt. Job : D Labour : B Others : E Factory Worker : C

165

Page 82: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Const. of road/street in slum Abadi at Abadpura.

Part-I Sr

Item No.

Details of item Measurement Quantity

Rate NSP Amount in Rs.

1 8.16 Dismatling of old cement conc.with conc.base

64148.5sft 5959.3sqm

5959.3 38.58 15% 264396

2 4.1+5.2 Earth work in excavation i/c loading unloading and carriage up to16 km for good earth/removal of malba.

A)88'x6'-4"=557.0" B)274'x15'-0"=4110.0" C)467'x15'-0"=7005.0" D)86'x5'-10"=501.38" E) 159'x5'-3"=834.7" F) 78'x4'-9"=370.5" G) 80'x4'-0"=320.0" H) 120'x4'-0"=480.0" I)120'x4'-0"=480.0" J) 360'x15'-0"=5400.0" K) 110'x18'-0"=1980.0" L)100'x4'-0"=400.0" M)150'x4'-0"=600.0" N) 220'x7'-0"=1540.0" O) 890'x20'-0"=17800.0" P)460'x16'-0"=7360.0" Q)240'x10'-0"=2400.0" R) 180'x10'-0"=1800.0" S) 110'x9'-3"=1017.5" T) 65'x6'-0"=390.0" U) 237'x20'-0"=4740.0" V) 100'x9'-0"=900.0" W) 110'x9'-0"=990.0" X) 195'x7'-0"=1365.0" Total 64148.5 i/e 64148.5x0'5"=26621.6Cft

753.3

303.45 per cum

i/c NSP

228589

3 10.6 (b) CC 1:8:16 with 40mm gauge stone aggreegate.

64148.5x0'3"=16037.1cft or 453.8 cum

453.8cum

1438.55 per cum

18% 770320

10.12 CC 1:2:4 with stone ballast or shingle.

64148.5x0'5"=26621.6cft or 753.4cum

753.4 cum

2799.75 per Cum.

18% 2489011

10.46+10.47

Extra for using batch type concrete mixer and viberator

753.4 753.4 Cum

113.76+ 22.75= 136.51

15% 118273

4

10.73 Extra for carriage for RMC/Batch mixed concrete with transit mixer beyond 1 Km

Avg. lead 10Km. Beyond 1 Km.

753.4 cum

14.22x 10= 142.2

15% 123203

Extra carriage of material. Stone Ballast for 1:8:16

453.8x1.0=453.8 453.8 cum

340.48 per Cum.

154510

Fine sand for 1:8:16 453.8x.5=226.9 226.9 cum

202.68 per cum.

45988

Crusher for 1:2:4 753.4x.9=678.06 678.06 cum

316.07 per cum.

214314

5 5.2

Course sand for 1:2:4 753.4x.45=339.03 339.03 cum

384.20 per cum

130255

6 24.59(a) Fibre board expansion joints for 5" depth.(Expansion joints at the distance of 10' )

8000.0rft or 2439.0rmt 2439 50.37 per mtr.

12% 137595

Total (Part-I)

4676454

167

Page 83: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Part-II 1 Analysis Const. of L-type

drain complete i/c tega, bund, concrete base and CC 1:2:4

7390 7390 100 per rft.

739000

2 Analysis Const. of road gully chamber complete size 2'x1'x2'.1"

229 nos. 229 2424 each

555096

3 CSR Road gully chambers connections to existing sewer

229 nos. 229 146.92/-

30% 43739

4 Analysis P/Laying SW pipe 6"(8' average)

3664nos. 3664 115.60 per rft.

423558

a) CC 1:8:16 with brick Ballast 40mm gauge.(for laying sewerage)

3464 @ Rs. 1.35 cft. Per rft.=4676.4 Cft.

132.34 1570.22 per cum.

18% 245207 5 10.6(a)

b) Extra carriage charges of sand.

132.34 cum @ 0.5 per cum.

66.17 202.68 per cum.

13411

6 Analysis Raising of manhole cover with frame.

100 1 no. 295.50 each

29550

Total (Part-II)

2049561

Grand Total I+II=Rs.6726015/-

Assistant Commissioner-Technical

169

Page 84: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Amar Jeet Nagar Colony Basti Peer Dad Ward No. 42 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 03 04 07 4001-6000 01 01 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Amar Jeet Nagar Colony Basti Peer Dad Ward No. 42 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

LABOUR 03 03 FACTORY WORKERS

PVT. JOB 01 01 HOUSE MAID

OTHERS 04 04

171

Page 85: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

173

Page 86: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

MUNICIPAL CORPORATION JALANDHAR Name of Slum: - Vill.Dhilwan Name of ACE:- Sh. Rajnesh Dogra Ward No:-11 Name of J.E:- S.Karam Singh

S.No

.

Name &

Address of

Beneficiary

Name of

Father/Husband/

Wife

Proof of

Residence

Stay

Minimum

10 Years

Category

New Dwelling Unit [

A]

Kitchen

[B]

Toilet

[C]

Toilet+Kitchen

[D]

S.C.

Yes/

No

Occupa

tion

Self

Decler

ation

By

Benefi

ciary

1 Shanti Davi Sh.Late Pakha

Ram

Rashan

Card

D Yes A

2 Monika W/o Kulwinder

Kumar

-Do- D Do B

3 Bhagan Kaur W/O Jagat Ram -Do- B Do A

4 Preeti W/o Late guljar

Ram

-Do- D Do C

5 Baksho W/o Amar Chand -Do- D Do B

6 Parminder Kaur W/o Sh.Ashok

Kumar

-Do- D Do C

7 Sunita Kumari W/o Sh.Ashok

Kumar

-Do- D Do A

8 Surinder kuar W/o kasmiri Lal -Do- D Do C

9 Kamlesh

Kumari

w/o Harmesh Lal -Do- D Do B

10 Narinder Kaur W/o manohar lal -Do- D Do A

11 Nirmla Davi W/o Vijay Kumar -Do- C Do C

12 Joginder kuar W/o Joginder Pal -Do- D Do C

13 Sital Kaur W/o Kirshan Lal -Do- C Do B

14 Neelam W/o Late

Surinder Pal

-Do- D Do A

15 Bimla W/o Late Hari

Ram

-Do- D Do C

16 Balwinder Kaur W/o Narinder

Kaur

-Do- D Do B

17 Raj Kumari W/o Sukhwinder

Lal

-Do- D Do B

18 Surinder Kaur W/o Binder

Kumar

-Do- D Do A

19 Shimbo W/o Gurmail

Chand

-Do- D Do B

175

Page 87: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

20 Shanto W/o Manohar lal -Do- B Do C

21 Narinder Kaur W/o rakesh

Kumar

-Do- B Do A

22 Satya W/o Manohar Lal -Do- D Do A

23 Simar Kaur W/o veer Chand -Do- D Do B

24 Debo W/o sat Pal -Do- D Do A

25 Manjeet Kaur W/o Joginder Pal -Do- D Do A

26 Joginder Kaur W/o harbans Lal -Do- D Do A

27 Simro W/o Jagiri Lal -Do- D Do A

28 Jasbir Kaur W/o Satnam -Do- D Do B

29 Pardeep Kaur W/o Lachman

Dass

-Do- D Do A

30 Kamla Davi W/o Late manjit

Lal

-Do- D Do C

31 Swarni W/o Late chaman

Lal

-Do- D Do A

32 Kamaljit W/o Jaspal -Do- D Do A

33 Laxmi W/o Jaginder pal -Do- D Do B

34 Gurpreet W/o Kasmiri Lal -Do- D Do C

35 Surinder Kaur W/o Gurnam Lal -Do- D Do A

36 Kashmir Kaur W/o Hind Pal -Do- D Do A

37 Sukhwindr

Kaur

W/o Malkit lal -Do- D Do B

38 Vidya W/o Late Ram

Kishan

-Do- D Do A

39 Saroj Rani W/o Parmjit -Do- D Do B `

40 Amar Chand S/o Nasib Chand -Do- D Do A

41 Gian Kaur Mangal Dass -Do- B Do A

42 Kushalya W/o Late Raj Pal -Do- B Do C

43 Parmjit W/o Lal Chand -Do- C Do C

44 Rajvinder Kaur W/o darmveer -Do- C Do A

45 Lakhvir Kaur W/o Gurjinder

Pal

-Do- D Do A

46 Surjit Kaur W/o Tirth Ram -Do- B Do B

47 Balbir Kaur W/o gurmail Lal -Do- B Do A

48 Kamlesh Rani W/o Niika Ram -Do- C Do C

49 Kirshma W/o Kewal

kieshan

-Do- D Do B

50 Pawan Davi W/o Late Mohan

Lal

-Do- D Do A

51 Satya Davi W/o Sohan lal

-Do- B Do A

177

Page 88: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

52 Raj Rani W/o Kundan Lal -Do- D Do A

53 Mohinder Kaur W/o Kishan

Chand

-Do- D Do A

54 Gurmito W/o Late buta

Ram

-Do- D Do A

55 Parkasho W/o Bakshi Ram -Do- D Do A

56 Jyoti W/o Hans raj -Do- C Do A

57 Kulwant Kaur W/o Des raj -Do- D Do A

58 Surinder Kaur W/o Rakesh

Kumar

-Do- D Do C

59 Asha Rani W/o Ravi Kumar -Do- D Do B

60 Raj Kumari W/o Parmjit -Do- D Do A

61 Parminder Kaur W/o Jasvinder Lal -Do- D Do C

62 Sarbjit Kaur W/o Arvinder lal -Do- B Do A

63 Komal W/o Jaspal -Do- D Do B

64 Kulvinder Kaur Gurdip lal -Do- D ` Do A

65 Dalvir Kaur Dev Raj -Do- C Do B

66 Nirmala Davi Sohan Lal -Do- D Do A

67 Lajya Davi W/o Bihari Lal -Do- D Do B

68 Raj Rani W/o Narinder

Kumar

-Do- C Do C

69 Beero W/o Ram Lubya -Do- C Do A

70 Asha Rani W/o Rakesh

kumar

-Do- D Do C

71 Asha Rani W/o Surjit Kumar -Do- C Do A

72 Raj Kumari W/o Bishan daas -Do- B Do A

73 Parmjeet Kaur W/o Roshan Lal -Do- D Do B

74 Rashem Kaur W/o Late sohan

Lal

-Do- D Do C

75 Kanta Davi W/o lahori Ram -Do- D Do A

76 Malkit Kaur W/o Mohinder

Singh

-Do- D Do A

77 Kamlesh W/o Rashpal -Do- A Do B

78 Jasvir Kaur W/o Rajbeer -Do- C Do B

79 Rani W/o Gurmit Lal -Do- D Do A

80 Raj Rani W/o Dharm Pal -Do- D Do A

81 Rashem Kaur W/o Gian Chand -Do- D Do B

82 Parmjit Kaur W/o Rashpal -Do- D Do C

83 Shindo W/o Satnam Lal -Do- B Do A

84 Inderjeet W/o Kashmiri Lal -Do- D Do B

85 Lachaman kaur W/o Sadhu Singh

-Do- A Do C

179

Page 89: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

86 Kulwinder Kaur W/o Pargat Singh -Do- A Do A

87 Rani W/o Malkit Lal -Do- D Do B

88 Gajo W/o Amarjit -Do- C Do A

89 Veena W/o Kamljit -Do- D Do C

90 Vidya Rani W/o Mohan lal -Do- D Do A

91 Giano W/o Late Parkash

Ram

-Do- D Do B

92 Parmjit Kaur W/o Late Balbir

Chand

-Do- D Do C

93 Bimla davi W/o raj Kumar -Do- D Do C

94 Raj Kumari W/o Manohar -Do- C Do B

95 Babli W/o Balbir Ram -Do- D Do B

96 Meena W/o Surinder -Do- C Do C

97 Rashem Kaur W/o ram Kumar -Do- D Do C

98 Piari W/o Late ramesh

Lal

-Do- D Do B

99 Asha Rani W/o Bhagat Ram -Do- D Do B

100 Rani Roop lal -Do- D Do C

101 Jagir Kaur W/o Parkash Ram -Do- A Do B

102 Baksho Late Ram Dass -Do- D Do B

103 Piari W/o Late Mohan

Lal

-Do- D Do C

104 Gurdev Kaur W/o Late

Harbilas

-Do- D Do B

105 Baksho Rani W/o Joginder Pal -Do- D Do B

106 Parmjit W/o Rohan Lal -Do- D Do B

107 Jaswinder W/o Mohinder

Lal

-Do- D Do B

108 Roshan Kaur W/o Amarjit -Do- A Do C

109 Kulwinder W/o Hussan Lal -Do- D Do B

110 Piari W/o sawan Ram -Do- D Do B

111 Manjit W/o Surinder Pal -Do- D Do B

• Rickshaw Puller : A Pvt. Job : D Labour : B Others : E Factory Worker : C

181

Page 90: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ECONOMIC SURVEY (SLUM WISE) Name of slum: Dhilwan Ward No. 11 INCOME PER MONTH

GEN SC ST BC PH OTHERS TOTAL

< 2000 2001-4000 84 84 4001-6000 27 27 6001-8333

LIVLIHOOD SURVEY (SLUM WISE) Name of slum: Dhilwan Ward No. 11 OCCUPATION GEN SC ST BC PH OTHERS TOTAL RICKSHAW PULLER

46 46

LABOUR 38 38 FACTORY WORKERS

27 27

PVT. JOB HOUSE MAID

OTHERS

185

Page 91: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

187

Page 92: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

189

Page 93: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

191

Page 94: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Estimate for the const. of New dwelling unit comple te

Unit 286 Nos.

Detail for the lengths of walls of the unit For carpet area=25.5 sqm

For 9"th walls (A+C) 2 (18'-7.5")=37'.25 (B+D)2 (18'-6") = 37'-00 74'-25 Rft For 4-1/2" th walls E =8'.06 (F+G) 2x10'.56=21'.12 (H+I) 2x4'-6.75"=9'.12 (J+K) = 9'.75 L =7'.94 55.99, Say Rft 56.00

Sr. No.

Item No. Detail of item Measurement

Quantity Rate NSP Amount

1 6.6

E/W in excavation in ordinary soils in trenches.

for 9" th walls 74.250x2'.9"x2'.10" = 577.85 Cft. For 4-1/2" th walls 56.00x2'.0"x1'.10" = 204.96 cft. 782.81 cft.

22.15 cumx2

86 6334.9

0 66.28

per cum. 12% 470262.43

2 10.6(a

)

Laying CC 1:8:16 in bed with 40mm gauge BB.

for 9" th walls 74.250x2'.9"x1/3 = 68.06 Cft. For 4-1/2" th walls 56.00x2'.0"x1/3" = 37.33 cft. Under CC flooring cover from item no. 11 274.48 Sft x 1/3' = 91.49 Cft. For laying SW pipe 100mm i/d=50 rft @ 1 Cft Per rft =50.00 cft. Total 246.88 Cft.

6.99 cumx2

86 1999.1

4

1570.22 cum 18% 3704125.7

3 11.5 Laying Ist class bw laid in CM (1:6) in F+P

For 9" th walls Ist step 74.250x2'.3"x6" = 83.53Cft iind step 74.250x1'.10-1/2"x6"=67.94 cft iiird step 74.250x1'.6"x6" = 55.68 cft ivth step 74.250x1'-1'1/2"x6" =41.76 cft. Vth step 74.250x9"x1' = 55.69 cft For 4-1/2" th walls Ist step 56.00x1'.6"x6" = 42.00 cft IInd step 56.00x1-1'-1/2"x6" = 31.50 cft IIIrd step 56.00x9"x1' = 42.00 cft 420.10 cft

11.89 cumx2

86 3400.5

4

2412.63 per cum 35% 11075731

4 10.3

4.0 cm th DPC in c.c. 1:2:4 with 2 coats of bituman 20/30 penetration @ 1.65 kg/sqm laid hot and sanded properly.

For 9" th walls 74.250'x9" = 55.69 sft For 4-12" th walls 56.00'x4-1/2" = 21.00 sft 76.69 sft DD area of door opening Door 1x4'x9" =3.00 sft. Door 3x3'x4.5" = 3.37 sft. Door 2x2'-6"x4.5" = 1.87 sft Net quantity= 68.45 sft.

6.36 sqmx2

86 1818.9

6

202.79/- sqm 18% 435262.94

193

Page 95: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

5 11.6 Laying Ist Class b.w. laid in c.m. (1:6) in super structure

For 9” th walls 74.250'x9”x10’=556.88 Cft For 4-1/2” th walls 56.00 x4-1/2”x10’= 210.00 Cft Parapets 2( 19’-3"+18’-7.5”)x4-1/2”x9”=21.30 Cft Pillar 1x9”x9”x12’ = 6.75 Cft For supports to kitchen slabs 3x2'x9"x2-1/2"=11.25 Cft =806.18 Cft D/D Doors 1x4'x9"x6’.6” = 19.50 Cft Doors 3x3’.0”x4-1/2”x6’.6” = 14.62 Cft Door 2x2-1/5x4-1/2”x6’.6” = 12.19 Cft W 2x4’x9”x4’.0” = 24.00 Cft W 2x4’-1/2"x4’.6” = 3.00 Cft W 2'.9"x4-1/2"x4" = 4.12 Cft V 2x2’x9”x1’ = 3.00 Cft V 5x2’x4-1/2”x1’ = 3.75 Cft Almira openings 5x3'x4-1/2"x4' = 22.50 Cft 2x4x4-1/2"x4' = 12.00 Cft Back wall 7' 4.1/2"+3' 9"x4-1/2"x4' = 16.69 Cft D/D Beam area for item no.6 = 38.11 Cft 632.70 Cft

17.90 cumx2

86 5119.4

0

2595.23 per cum

35% 17936128

6 10.22 R.C.C. beam over doors+windows in M-25 with cement @ 425/Kg/Cum batch mixed excl. Steel& shuttering

D 1x5’x9"x8” = 2.47 Cft D 2x4x4-1/2”x8” = 1.98 Cft D 2x3’.6”x4-1/2”x8” = 1.73 Cft W 2x5’x9'x8” = 4.95 Cft W 1x4x4-1/2"x8" = 0.99 Cft W 1x3x4-1/2"x8" = 0.74 Cft For Almiras 7x5'x9"x8" = 17.32 Cft Sun Shades 18'.9"x1'.6"x2-1/2" = 5.76 Cft 8'.4-1/2"x1'x2-1/2"= 1.72 Cft 1'.9"x1'.3"x2'-1/2" = 0.45 Cft 38.11 Cft

1.08 cumx286 308.88

3737.28/- cum

18% 1362157.8

7 10.22+10.4

6

R.C.C. slab in C.C. (1:2:4) in M-25 with cement @ 25/Kg/Cum Batch mixer shall be used exct. Steel and shuttering i/c needle vibrator

19'.3"x19'-4-1/2"x4-1/2” = 139.86 Cft D/D balcony 7’.4-1/2"x3’.9”x4-1/2” (-) = 10.37 Cft 129.49 Cft

3.66 cumx2

86 1046.7

6 3737.28/- cum 18% 4616201.1

195

Page 96: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

8 10.22

R.C.C. shelves in M-25 for kitchen excl. Steel & shuttering i/c batch mixer & vibrator

(9'x2'x1/4’) = 4.50 Cft (2'x2'x1/4") = 1.00 Cft For Almiras 5x4'x9"x2" = 2.50 Cft 2x5'x9"x2" = 1.25 Cft 9.25 Cft

0.26 cumx2

86 74.36

3737.28/- cum

18%

327926.85

9 18.17

Cold twisted bars (F.e-415 grade IS-1786-1685 for steel) reinforcement i/c bending, jointing and placing properly

Item No. 6 R.C.C. beams 1.08 Cum @ 100 Kg/ Cum = 108Kg Item No.7 R.C.C. slab 3.66 Cum @ 80 Kg/Cum = 293 Kg Item No. 8 R.C.C. shelves 0.26 Cum @ 60 Kg/Cum = 16.00 Kg 417.00 Kg

417.00 Kgx286 119262

4983.14 16% 6893871.2

10

9.6 9.8 9.8

Centering and shuttering item no.6 item no. 7 item no. 8

1.08 cum @ 8 sqm/cum = 8.64 sqm 3.66 Cum @ 8.25 Sqm/Cum = 30.19 sqm 0.26 Cum @ 18.50 Sqm/Cum = 4.81sqm 43.64 sqm.

43.64 Sqm.x2

86 12481 151.12/

- sqm 15% 2169048 Bed Room 10'x10' = 100.00 Sft Drg. Room 8'.8"x7'.6"= 65.00 Sft K 8'.9"x4'= 35.00 Sft B 4'x5' = 20.00 Sft T 4'x4' = 16.00 Sft

11 14.5 Laying 25mm thick CC (1:2:4)

flooring.

Passage 3'.6"x4'.4" = 15.15 Sft 7'x3' = 21.00 Sft = = 274.48 Sft

25.50 sqmx2

86 7293

94.59/- sqm.

15% 793321.6

12 14.10

7(c)

P&F glass strips 3 MM th in flooring 25MM wide

Bed Room 3x10’ = 30.00 Rft 3x10' = 30.00 Rft D. Room 3x7'.6" = 22.50 Rft 3x8'.8" = 25.98 Rft Kitchen 2x4' = 8.00 Rft Passage 2x3' = 6.00 Rft B & T 2x4' = 08.00 Rft 130.48 Rft

39.78 Mx286 11377

14.07/- m 25% 200092.98

(ii) For Light Points.

14 Nosx28

6 4004

723.13 each 5% 3040183.1

I(b) For fan points.

2 Nosx28

6 572

1186.88 each. 5% 712840.12

13 33.01

P+F electricity conn. With recessed conduit wiring system (iv) For 3 pin 6 Amp wall socket.

5 Nos.x2

86 1430

615.84 each 5% 924683.76

12.5 MM thick C.P. (1:4) under side the ceiling

B.R. 10'x10' = 100.00 Sft D.R 8'.8"x7'.6" = 64.95 Sft Parapet 2 (19'.3"+19.4-1/2')x2'.3" = 173.81 Sft Kitchen 8'.9x4' = 35.00 Sft T 4x4' = 16.00 Sft Bathroom 5x4' = 20.00 Sft Passage 4'.4"x3'.6" = 15.15 Sft

14 15.45

3'.6"x3' = 10.50 Sft Total 435.41 Sft

40.44 sqmx2

86 11565.

84

84.18/- sqm. 15% 1119654.3

197

Page 97: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Front 19'.3"x10'.6" = 202.12 B.R. 2(10'+10')10' = 400.00 D.R 2( 8'.8"+7'.6")10' = 323.20 (17'.6")10' = 175.00 K (8'.9"+4'+4'-4-1/2") 10' = 171.25 9'.9"x10' = 97.50 Bath 2(4'+5')10' = 180.00 T 2(4'+4') 10' = 160.00 B. Wall (7'.4-1/2'+3.9"+7'.4-1/2") 11' = 203.50 1912.57 D 2x2'x3'x6'.6" = 78.00 Sft Window 2x2'x2'.6"x6'.6" = 65.00 Sft Window 2x2x4'x4' = 64.00 Sft Window 2x2'x4' = 16.00 Sft Window 2x2'.9"x4" = 22.00 Sft Door 2(2x2'.6"x2'.6") = 65.00 Sft = 1550.57

15 15.9 12.5 MM thick C.P. (1:4) to walls of Unit

Window 2x2'x4' = 16.00 Sft Window 2x2'.9"x4" = 22.00 Sft Door 2(2x2'.6"x2'.6") = 65.00 Sft = 1550.57

144.04 Sqmx2

86 41195.

44

71.74/- sqm.

15% 3398665

16 16.3 White washing in three coats

Item no. 14+15- (40.44+144.04)= 184.48 Sqm

184.48 Sqmx2

86 52761.

28 7.27/- sqm. 15% 441110.68

17

17.8+17.32+17.2

3

P& F kail wood doors consists of kail wood plankings in frame work and 4 MM thick 3 ply wood with necessary fittings

W 2x4’x4’ = 32.00 Sft D 1x4’x6’.6” = 26.00Sft D 2x3’x6’.6” = 39.50 Sft D 2x2’.6”x6’.6” = 32.50 Sft W 1x2'x4' = 8.00 Sft W 2'.9"x4' = 11.00 Sft 149.00 Sft

149.00 sft.x28

6 42614

176/- sft. 7500064

18 16.17+16.1

8(a)

Painting to doors and windows with synthetic enamel paint in 2 coats i/c priming coat with ordinary paint

Area from Item No. (17) 2x149 x0.0929 Sqm

27.68 Sqmx2

86 7916.4

8

55.17/- 15% 502265.03

199

Page 98: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

19. 30.1

P&F in position china ware Indian type water closet Suit , Hindustan Make (580 MM) as per specifictions 1 Nos

1 Nosx28

6

2964.61/- 35%

1144635.9

20 29.63(

a)

P&F S.W.pipes in trenches 100MM i/d for making connection to water closet suit and others L/S Provision 50'

15.24 mx286 4358.6

4

164.31/- 30% 931018

21 28.33

P&F GM ferulle , drilling and tapping G.I.pipe 20MM i/d heavy type (leader make/unique)

1 No.x286

552.36/- 30% 205367.44

22 28.36

(b)

P&F and L, testing, G.I. pipe (B-Class) in trenchesn i/c specials (Jindal Make) 20MM i/d 30’

9.15 mx286

2616.90

134.13/- 25% 438755.99

23 28.34

(a)

P & L, jointing and fixing G.I. pipe (B-Class) i/side Bld. i/d coat of specials (Jindal Make) 15mm i/a 80'

24.39 mx286

6975.54

151.56/- 25% 1321516.05

24 29.94 Making conn. With existing sewer.

1 No.x286

146.92/- each. 30% 54624.85

25 13.13

Tile terracing complete in all respects

18'.6"x18'-7-1/2" = 344.56 Sft D.D. 3'.9"x7'-4-1/2" = 27.65 Sft 316.91 Sft

29.44 sqm.x28

6 8419.84

369.23/- sqm 35% 4196957.65

201

Page 99: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Extra carriage Charges on some items

Item No. 2 CC 1:8:16 6.99 Cum Sand @ 0.50 Cum/Cum = 3.49 Cum Item Nos. 3+5 Brick Work (1:5) 11.89+17.90= 29.75 Cum Sand @ 0.40 Cum/Cum = 11.92 Cum Item Nos. (6,7,8) RCC Items 1.08+3.66+0.26 Cum = 5.00 Cum Item No. 11 CC Flooring 274.48 Sftx1/12’x0.0283 = 0.64 Cum Item No.4 DPC 68.45 Sftx1-1/2”x0.0283 = 0.24 Cum 5.88 Cum. Sand @ Rs. 0.45/- cum = 2.65 cum. Crusher 10mm to 12mm (g) @ 0.90 Cum/Cum = 5.29 Cum Item Nos. 14+15 CP (1:4) 40.44+144.04 Sqm = 184.48 Sqm Sand @ 0.016 Cum/Sqm = 2.95 Cum = 21.01 Cum Crusher 10mm to 12mm (g)

21.01 cum.x28

6

6008.86

202.68/- cum

1217875.74

26 5.2

5.29 cum.x286 1512.94

316.07/- cum

478194.94

Total 77506000

Say Rs. 775.06 Lacs

Page 100: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

203

Page 101: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

205

Page 102: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Estimates for the construction of new toilets and bathrooms

Unit 32 Sets Sr. No.

Item No.

Detail of item Measurement Quantity Rate NSP Amount

1 6.6 E/w in exc. in ordinary soil in trenches

(9'-9"+9'-9" + 4'-10 1/2 "+ 4'-10") 34.1'x2'.6"x2'x0.0283 =4.83 cum x 32=154.56Cum

154.56 cum 66.28 12% 11474

2 10.6 Laying CC 1:8:16 in bed with 40 mm brick ballast

34.1x2.6x6" = 42.65 cft 1x5x4.6x1/3=7.5 1x4x4.6"x1/3=6.00 =56.15 cft or 1.59 cum x 32= 50.88Cum

50.88 cum 1570.22 18% 94273

3 11.5 1st class brick work in (1:5) c.m.

1st step 1x34.1x1.6x6"= 25.59 cft 2nd step 1x34.1x13 ½ "x6"= 19.19 cft 3rd step 1x34.1x9"x2'= 51.18 cft Total 95.96 cft. Or 2.72 cum x 32=87.04Cum

87.04Cum 2458.48 per cum

35% 288881

4 10.3 DPC 2.5 mm thick in CC (1:2:4) with two coat of bitumen 20/30 penetration @ 1.65 kg/ per sqm

(34.1-5)x9"-0.0929= 2.03 sqm x 32= 64.96 Cum

64.96 cum 166.35 18% 12751

5 11.6 1st class brick work laid in cement mortar 1:5 in s. structure

34'-1"x4 ½ "x7'-3"= 92.76 cft 2(10'-1 ½ "+5'-3")x4 ½ "x9" = 8.65 cft 4x1 ½ "x4 ½ "x9" = 1.69 cft Total 103.10 cft D/d for door 2x2 ½ x4 ½ "x6 ½ '= 12.19 cft Vent. 2'x1'x4 ½ "x1'= 10.75 cft. Beam 2x3.3"x4 1/2 "x 8" =1.60 cft. Net Total =88.56 cft or 2.50 cum x 32= 80.00Cum

80 cum 2668.08 35% 288153

6 10.22

R.C.C. beam over slap in m -25 with cement concrete hand mixed in cc 1:2:4 including batch mixer and vibrate

2x3'.3"x4 ½ "x8"x0.0283 0.05 cum x 32= 1.6Cum

1.6 cum 3737.28 18% 7056

207

Page 103: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

7 10.22

R.CC in C.C. (1:2:4)- M-25 with cement concrete i/c batch mixer and vibrator @ 425 kg/per cum

10'-1 ½ "x5'x3"x4 ½ "= 19.93 cft 2x4'x1'-6"x 4 ½ " = 4.50 cft Or 0.69 per cum x 32= 22.08 Cum

22.08 cum 3737.28 per cum

18% 97373

8 18.17

cold twisted bars f-415 grade 15+ 786-1685 P./L in position

Item 6 beam 0.05 cum @ 100 kg/cum = 5kg Item 7 slave 0.69 cum @ 80 kg/cum= 55.20 kg Total 60.20 kg x 32= 1926.40 Kg.

1926.40 Kg 4983.14 per qtl.

16% 111354

9 Centering and shuttering

Item No.6 beam No.6 cum @ 8 sqm/cum=0.40 sqm x 32= 12.08 Sqm Item No. 7 0.69 cum @ 8.25 qm, 5.69 sqm x 32= 182.08 Sqm

12.08 sqm 182.08 sqm

139.8 151.12

15% 15%

2057 31643

10 13.13

Tile terracing complete

9'-4"x4'-6"= 42.19 sft 2x3'x"x1'-2"= 7.54 sft Total =49.73 sft or 4.62 sqm x 32=147.84Sqm

147.84 sqm.

369.23 35% 73692

11 14.5 Laying CC (1:2:4) in 25mm th CC flooring

To Bath 1x4'x4'-6"= 22.5 sft D. opening 1x2 ½ x 4 ½ "= 0.94 sft To toilet 1x4'x4'-6"= 18.00 sft Door 1x2 ½ x 4 ½ "= 0.94 sft Total 42.38 sft or 3.94 sqm x 32= 126.08 Sqm

126.08 sqm.

94.59 sqm

15% 13714

12 15.45

12.5 mm th. C.P. in cm (1:4) and under side the ceiling

Bath 5x4'-6"= 22.5 sft T- 4x4'=6"= 18.00 sft 4x1'-6"= 6.00 Total 46.50 sft or 4.32 sqm x 32=138.24 Sqm

138.24 sqm.

84.18 sqm

15% 13383

13 15.9 12.5 mm th. 90 to wdh in C.M. (1:4)

1.5 Bath 2(5'+4'.6")x8= 152 sft 2(10'+ +5.3")x10'= 307.50 sft Toilet 2(4'+4'-6")x8= 136.00 Total 595.0 sqm or 49 sqm x 32= 1568 Sqm

1568 sqm. 84.10 per sqm

15% 151649

14 Analyis

P/f kail wood door chowkat of kail wood, i/c frame work + 4 mm th, 3 ply fixed on with necessary fitting

D. 2x2 ½ x 6 ½ = 23.5 sft Sides 2x6 ½ x4"= 4.29 sft 2x2'x4"= 1.32 sft Total 38.11 sft x 32= 1219.52Sft

1219.52 sft. 176/- sft - 214635

15 16.3 White washing three coats

Item No. 12+19= 53.32 sqm x 32=1706.24Sqm

1706.24 sqm.

7.27 sqm 15% 14265

16 Painting 2 coats with synthetic enamel paint i/c priming coat new wood work

Door 2x2 ½ x 6 ½ =65.00 sft Side 2x6 ½ x5"= 5.33 2x2'x5"=1.64 sft Total =71.97 sft Or 6.695 Sqm x 32= 214.24Sqm

214.24 sqm.

15.59+39.58=55.17 sqm

15% 13592

209

Page 104: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

17 33.01

P/f electricity fitting i/c conduit wiring pipe system

For light point 3 Nos. in side and out side x 32=96Nos.

96 Nos. 723.13 each

5% 72891

18 18. 1st class brick work in C.M. for (1:4) vanti.

2x1'x1'x0.0928=0.18 sqm x 32= 5.76Sqm

5.76 sqm 369.23 35% 2871

19.

P/f in position china Indian type w/c suit sized 580 mm i/c pear of china ware foot rest.

1 No. x 32= 32 Nos. 32 Nos. 2964.61 each

35% 128071

20 29.63(a)

P/f S.W. pips in trances 100 mm dia

40' or 12.19 m x 32= 412.80 sqm.

412.80 sqm.

164.31/- m

30% 88175

21 28.33

P. ferrule cutting and tapping c.i. pipe 20 mm th. Ferule heavy duty

1 No. x 32=32Nos. 32Nos. 552.36 each

30% 22578

22 28.34(a)

Providing and Laying 15 mm th. G.I. pipe B-type i/c cost of labour i/s bld.

15 mm dia or 25.42 m x 32= 813.44 M

813.44 M 151.66 25% 154208

23 28.36

P/f laying jointing testing G.I. pipe in (B-type) i/c all respects

20 mm i/d provision 4o ft. or 12.19 m x 32= 390.08 M

390.08 M 134.13/- m

25% 65401

24 29.94

Making connection with existing sewer

1 No. x 32= 32 Nos. 32 Nos. 146.92 each

30% 6112

25 5.2 Extra carriage on items i.e. item No. 2 CC (1:8:16)

1.59 qm @ 0.5 per cum 0.79 cum Item No.3+5 b/w (1:5) 5.22cum @ 0.40= 2.09 cum Item No. 4+6+7+11 R.C.C. 0.08+0.05+0.69+0.15= 0.97 cum @ 0.45 = 0.44 cum Item No. 10to12 C.P. 1:4 0.88 cum 12+13 53.32 sqm @ 0.016 cum/ per sqm = 0.85 cum Total 4.17 cum x 32= 133.44Cum Crasher 10 to 12 Mm (g) = 0.88 cum x 32=28.16Cum

133.44 Cum. 28.16 cum

202.68/- 316.07 per cum

- 27045 8900

Total

Rs. 2016841

Total Cost of 32 Nos. of Toilets = Rs. 20.17 Lacs

211

Page 105: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

213

Page 106: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rates for the const. of new kitchen (7'-3"x5'x9' size)

Unit 1 No. Unit Nos. 19 Sr. No.

Item No.

Detail of item

Measurement Quantity Rate NSP Amount

1 6.6 E/w in exc. in ordinary soil in trenches

2(7'-7 ½ " + 5'-4 ½ ") = 26'x2'-6"x2'x0.0283= 3.68 cumx19

69.92 cum

66.28 per cum

12% 5190

2 10.6 (a) Laying CC 1:8:16 in bed with 40 mm brick ballast

1x26x2'-6"x6"= 32.50 cft For flooring 1x7.3x5x4"= 11.96 cft Total 44.46 cft Or 1.26 cum x19

23.94 1570.20 per cum

18% 44356

3 11.5 1st class brick work in (1:5) c.m.

1st step 1x26'x1'-6"x6"= 19.50 cft 2nd step 1x26'x13 ½ 'x6"= 14.62 cft 3rd step 1x26'x9"x1'6"= 29.25 cft Supports to kitchen slab : 2x2'x9"x2'-6"= 7.50 cft Total 70.87 cft or 2 cumx19=38.00 cum

38.00 cum

2485.48 cum

35% 127505

4 10.3 DPC 2.5 mm thick in CC (1:2:4) with to coat of bitumen @ 1.65 kg/ per sqm

26'-3) = 23'x9"x0.929= 1.60 sqm x 19=30.40 sqm.

30.40 sqm.

166.35 sqm

18% 5967

5 11.6 1st class brick work laid in cement mortar 1:5 in s. structure

2(8'+5') x 4 ½ x 8'-6"= 82.87 cft For parpet 2x(8'+5')x 4 ½ "x 9'= 7.31 cft Total 90.18 cft D/d door 1x3'x 4 ½ x7'= (-) 7.87 cft 1x3x4 ½ x3'= (-) 3.37 cft R.C.C. beam 1x8'x 4 ½ x8"= (-) 1.98 cft Total 76.96 cft Or 2.18 cum x 19=41.42 cum

41.42 cum

2668.08 cum

35% 149191

6 11.53 1st dan brick jail in c.m. (1:4) for window opening.

1x3x4 ½" x3'= 9 cft Or 0.31 sqm x19= 5.89Sqm

5.89 sqm.

369.23 sqm

35% 2935

7 10.22 R.C.C. beam over door + window in M-25

1x8'x4 ½ x8"= 1.98 cft Or 0.06 cum x 19= 1.14Cum

1.14 cum

3737.28 cum

18% 5027

215

Page 107: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

8 10.22 R.C.C. slab in M-25 excl. steel and shuttering with Cement @ 425 kg cum in C.C. (1:2L4) i/c brick mixed & needle vibrator

1x8x5'.9"x4 ½ = 17.25 cft Or 0.49 cum x 19= 9.31Cum

9.31 cum

3737.28 cum

18% 41057

9 10.22 R.C.C. sheve in M-25 exd. steel and shuttering in i/c batch mixed

7.9"x2'.3"x1/4'= 4.35 cft 3'.3"x2'.3"x ¼ = 1.83 cft Total 6.18 cft Or 0.17 cum x 19=3.23Cum

3.23 cum.

3711.12 cum

18% 14144

10 18.17 Cold twisted bars Fe-415 grade 15-1786-1685 for steel in reinforcement i/c bending, placing etc,

For item No. 7 R.C.C. beam 0.06 cum@ 100 kg/cum= 6 kg For item No. 8 R.C.C. slab 0.49 cum @ 80 kg/cum = 39.20kg For item No. 9 R.C.C. shehle 0.17 cum @ 60 kg/cum= 10.20kg Total 55.40 kg x 19= 1052.60 kg

1052.60 Kg.

Rs. 4983.1

4 16% 60845

11 9.6 9.8

Centering and shuttering

For item No.7 R.C.C. beam 0.06 cum @ 8 sqm/cum 0.48 sqm x 19= 9.12Sqm For item No. 8 R.C.C. slab 0.49 cum @ 8.25 sqm /cum@ Rs. 4.04 sqm x 19= 76.76Sqm For item No. 9 R.C.C. 0.17 cum @ Rs. 18.50 sqm per cum 3.14 sqm x 19= 59.66Sqm

9.12 sqm.

76.76 sqm.

59.66 sqm.

Rs. 139.80 per m Rs.

151/12'

Rs. 150 per sqm'

15%

15%

15%

1466

13340

10291

12 13.13 Tile terracing complete as per specification

1x7'.3"x5'x0.0929= 3.37 sqm x 19= 64.03Sqm

64.03 sqm.

369.23 sqm

35% 31916

13 14.5 laying C.C. (1:2:4) in 25 mm th C.C. flooring

Flooring 1x7'.3"x5'= 36.25 sft D. opening 1x3'x 4 ½ = 1.13 sft Total 37.285 sft Or 3.47 sqm x19= 65.93Sqm

65.93 sqm.

94.59 sqm

15% 7171

14 15.45 12.5 mm th c.p. in C.M. (1:4) under side of ceiling

1x7'-3"x5'x0.0929= 3.37sqm x 19= 64.03 Sqm

64.03 sqm.

84.10 sqm

15% 6192

Page 108: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

15 15.9 12.5 mm th c.p. to walls in c.m. (1:4)

I/ side 2x(7.3"+5') 9'= 220.50 sft E/side 2(8'+5'.9")x10'= 275.00 sft Parapets 2(8'+5'-9")1'-6"= 41.25 sft Front of kitchen 1(5'-3"+3') 4"= 2.75 sft To kitchen 2(s'+9"+2') 2'-6"= 23.75 sft Total 566.22 sft D.D. 2x3x7'= (-)42.00 sft 524.22 sft Or 48.70 sqm x 19= 925.30Sqm

925.30 sqm.

84.10 sqm

15%

89490

16 17.8+17.32+17.23

P/f kail wood doors consist of kail wood plakings in frame work and 4 mm th 3 ply with necessary fitting without chowkat

1x3'x7'=215 sft 1x7x4"=2.31 Total 23.31 sft x 19=442.89Sft

442.89 sft.

Rs.176/ sft

--- 77948

17 16.3 White wash three coats

Area from item M.S. (14+15) 3.37+48.70 = 52.07 sqm x 19= 989.33Sqm

989.33 sqm.

Rs.7.27 sqm

15% 8271

18 16.17+16.18(a

) Painting to door with synthetic enamel point 2 coats i/c priming coat With ordinary paint

2x3'x7'= 42.00 sft. Side support 1x7x4"= 2.31 sft Side support 1x2'x5" = 0.66 Total 44.97 sft Or 4.18 sqm x 19= 79.42Sqm

79.42 sqm.

15.59+39.58=55.17

15% 5038

19. 33.01 P/f electricity Connection to the building by recessed Conduit pipe wiring system

ii) For light point 2Nos x 19= 38Nos. i (b) for fan point 1 No. x 19= 19 Nos. iv) for 3 pin 6 amp. Wall socket 2 Nos. x 19= 38 Nos.

38 Nos.

19 Nos.

38 Nos.

723.13 each

1186.88 each

6151.89 sqm

5%

5%

5%

28852

22550

233731

20 28.34 (a)

Providing and Laying 15 mm th. G.I. pipe B-type i/c cost of labour i/s bld.

26.87 m x 19= 510.53m 510.53 m

151.56/- m

25% 96720

217

Page 109: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

21 5.2 Extra carriage on some item i.e.

Item No. 2 C.C. (1:8:16) 1.26 cum sand @ 0.50 cum /cum =0.63cum Item No. 3+5 B.W.(1:5) 2+2.18= 4.18 cum sand @ 0.40 cum/cum =1.67 cum Item No. 4 D.P.C.(1:2:4) 1.60sqm =0.04 cum sand @ 0.45 cum/ per cum 0.02 cum R.C.C. crasher 0.90 cum /cum =0.04cum Item No. 7+8+9 (0.06+0.49+0.17)=0.72 cum sand @ o.45 cum/ cum = 0.32 cum Crusher @ of 0.90 cum /cum =0.65 cum Item No. 12 tile terracing 3.37 sqm sand @ 0.0049 cum /sqm = 0.02 cum Item No. 13 C. C. flooring 37.38 sft of 0.09 cum sand @ 0.45 cum/cum =0.04 cum Crusher @ 0.09 cum/cum = 0.08 cum

67.03 cum

13.87 cum.

202.68 per cum

316.07 per cum.

13585

4383.00

Total 847412

Total Cost of 19 Nos. of Kitchens = Rs. 8.47 Lacs

219

Page 110: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

221

Page 111: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of L-type drain

Sr.No. Item No.

Details of item Measurement Quantity Rate NSP Amount

1 10.6(b) Laying C.Conc. 1:8:16 with 40mm gauge stone ballast using mech. Mixer.

1x100'x1'-10"x1/4'=45.75 Cft. 1x100'x5/6'x1/6 '=13.28 cft. 59.03 Cft.

1.67 cum 1.67 cum.

1438.55

48 18%

15%

2834.8

92.18

2 29.12 3" thick tega with Ist class BB work in CM 1:5.

100 Rft. 30.47 Rmt.

57.62 35% 2370.17

3 29.2 4.5" thick Bundh with Ist class BB in CM 1:5

100'x9"=75 Sft. 6.97 Sqm.

277.76 35% 2613.58

4 10.12 Laying C.Conc. (1:2:4)

100x5/6x1/6=13.28 Cft. 0.376 Cum.

2799.75 cum

18% 1242.19

5 Extra carriage of sand:

1:8:16=1.67x50%=0.83 cum. 1:2:4=0.376x45%=0.16 cum. 0.99 cum

0.99 cum.

20.68 200.65

5.2

Extra carriage of stone ballast and crusher.

1:8:16=1.67x1.0=1.67 cum 1:2:4 (crusher) 0.376x0.90=0.338

1.67 cum. 0.338 cum

(401.57-61.09)

=340.48 (401.57-

85.50) =316.07

568.6

106.83

Total 10029

Rate per Rft.=10029/100 =100.29

Say Rs. 100/- per Rft.

223

Page 112: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rate for earth filling with good earth with lead 16 km by mech. means.

Unit = 1 cum. Sr. No.

Item No.

Details of item Measurement Quantity Rate NSP Amount

1 4.1 A loading and unloading

15.22+4.90=20.12 15% 23.14-i

2 5.2(i) Carriage 1 km to 5 km. 6 to 10km 11 to 16 km.

11.25 per km. 7.50 per km.

142.50 56.25 45.00

243.75

15%

280.31-ii

Total Add (i) + (ii) Rate per cum Rs. 303.45

303.45

225

Page 113: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rate for excavation of earth and removal of malba with lead 14 km by mech.

means.

Unit = 1 cum. Sr.No. Item

No. Details of item Measurement Quantity Rate NSP Amount

1 4.1 A loading and unloading

15.22+4.90=20.12 15% 23.14-i

2 5.2(i) Carriage 1 km to 5 km. 6 to 10km 11 to 14 km.

11.25 per km. 7.50 per km.

142.50 56.25 30.00

228.75

15%

263.06-ii

Add (i) + (ii) Rate per cum Rs. 286.20

286.2

227

Page 114: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rate for laying 6 of SW pipe sewer line

Unit =24' length

Sr. No.

Item No.

Details of item Measurement Quantity Rate NSP Amount

1 6.6 E/W in excavation. 24'x2'-0"x2'-6"=120 Cft.

3.39 cum.

66.28 per cum

12% 224.68 26.96

2 6.6 Providing, lowering, cutting and jointing SW pipe complete in all respects as per CSR.

7.31 Mtr. 266.65 30% 1941.90 582.57

Total 2776.1 Rate per

Rft.=2776.11/24=115.67

Say Rs. 115.60/- per Rft.

Connection with existing sewer line @ 146.92/- each+30%=Rs. 191/- each

229

Page 115: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rate for wooden doors and windows (kailwood)

Unit =7'x3'=21 Sft.

Sr. No.

Item No.

Details of item Measurement Quantity Rate NSP Amount

1 17.8(g) Kailwood planks rebated both sides 12.5mm thick for frame work to door.

2x7'x4" =4.62 Sft. 5x2'-4"x4" =3.84 Sft. Sides 1x7'x4"=2.31 Sft. 1x2'x4" =0.66 Sft. 11.43 Sft.

1.06 Sqm.

1075.76 per

Sqm.

15%

1140.31 171.04

2 17.32(e) P/F ply wood to frame 4mm thick with nails.

2x3'x7'x0.092 3.900 Sqm.

413.25 per sqm.

15% 1612.41 241.86

3 17.23(ii) P/F aluminum fittings to doors complete.

2x3'x7'x0.092 3.90 Sqm.

125.25 10% 488.48 48.85

Total 3703 Rate per

Rft.=3702.95/21=176.00

231

Page 116: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of rates for laying sewerage with RCC pipes NPII 600mm id and const. of manhole

chambers 150x180x120cm deep

Unit = 1000 length.

Sr.No. Item No.

Details of item Measurement Quantity Rate NSP Amount

1 29.4(A) Excavation of trench in streets for laying of sewerage for depth not exceeding 3m below ground level. i) For all classes of soil except rocky for lay. R.C.C. pipes. NP-II ii) For manhole chambers

1000'x3'-6"x8' Av. x 0.0283 11x8'x7'x6'x0.0283

792 cum. 104.59 cum. 896.59 cum.

209.41 per cum.

12%

210285

2 10.4 Lime concrete (16:24:100) 0.16 cum lime, 0.24 cum surkhi, one cum brick ballasts 30mm(g) in bed.

1000'x3'-6"x1'-3"x0.0283

124.00 cum.

1731.73 per cum.

18% 253386

3 29.69 Providing lowering, jointing and cutting of plain and reinforced c.c. spigot and socketted pipes and specials with rubber rings ISI, marked as per IS code IS 458-2003 (B) N.P.-II (K) 600mm i/d pipes as per limiting gradient to give velocity about 1.4m/sec with gradient 1 in 200 and discharge in 19 Cum./min.

1000' 305/- m 1630.75/- m

30% 646593

4 29.84 Const. of brick masonary manhole chambers in CM (1:5), RCC top slab in (1:2:4) CC and CC (1:4:8) mix in foundations, inside plastering 12mm thick with CM (1:3) finishing with floating coat of neat cement and making benchings in CC (1:2:4) finished with a floating coat of neat cement, PVC steps i/e FRCC covers & Frames (light duty) 455x610mm i/d complete as per standard design. (d) Inside size 150x180 cmx120cm deep.

11 Nos. 19219.68/- 30% 274840

Total 1174819 or Rs. 1385/- Rft.

233

Page 117: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

Analysis of road gully chamber 2'x1'x2'-1" size

Unit =Each

Sr. No.

Item No.

Details of item Measurement Quantity Rate NSP Amount

1 6.6 E/w in excavation 1x4'x3x2'-6"=30 cft 0.849 cum

66.28 12% 63

2 10.6 a

Laying CC 1:8:16 with stone ballas 40 mm gauge.

1x4x3'x0'-4"= 3.96 cft 0.11 cum 1439 18% 186.72

3 11.5 1st class BB work 1:5 Less for 6" dia SW Pipe

2x3'-4"x0'-9"x2-3"= 11.23 cft. 2'x0'-10"x0'-9"x2'-3" = 2.80 cft 14.03 cft 3.14x5"x5"x0'-9" = (-) 0.40 cft 13.63 cft.

0.38 cum 2485 35% 1295

4 14.6 CC topping 1:2:4 40 mm thick

1'x1-10"x0'-10"= 1.52 Sft 0.14 sqm 135.5 15% 21.81

5 14.4 Floating coat Quantity as per item no. 4 0.14 sqm 18.43 15% 2.96 6 15.7 12.5mm thick

cement plaster 1:2. Deduct area of 8" dia pipe.

2x1'-10"x2'=7.32 2x0'-10"x2'=3.32 10.64 Sft. 3.14x5"x5"=(-) 0.54 10.10 Sft.

0.93 sqm 107.2 15% 115.61

7 15.18 Cement rendering on plaster 1mm thick.

Quantity as per item no. 1 0.93 sqm 29.13 15% 31.15

8 NS Providing and laying road gully cover and frame set.

675

9 10.12 Copping of road gully. CC1:2:4

2x2'-3"x4"x2"=0.23 Cft 2x1'-3"x4"x2"=0.13 Cft. 0.36 cft.

0.010 cum

2800 18% 33

Total 2424.3 Say Rs. 2424/-

each.

235

Page 118: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

wsk BzL 59

ftPkL^ okiht ntk; :'iBk Bro fBrw, ibzXo dI hdUd ftZu bkr{ eoB pko/.

pRojYkt dw kul qKmInw ru: 4320.31 l`K gfVQnk B'N ;jkfJe efwPBo (seBheh)^phHn?AvHnko fi; Bkb tXhe efwPBo (seBheh)^phHn?AvHnko

B/ ;fjwsh j;skyo ehs/ jB fe Gkos ;oeko d/ wfjewk wekB T[;koh ns/ Pfjoh vlO v`K-2 Sihrw ivc v`K-2AbwdIAw ivKy rih rhy grIb lokW vwsqy mkwn ,guslKwnw rsoeI Aqy hor jrUrI syvwvw ijvy ik sVkW, nwlIAw, strIt lweIt, sIvryz Aqy vwtr splweI Awid Aqy hor muFlIAw syvwvw dyx vwsqy rwjIv Avws Xojnw bxweI geI hY [srkwr duAwrw jwrI hdwieqw Anuswr ieh Xojnw pMjwb dy v`K-2 Sihrw ivKy vI lwgU kIqI jwxI hY [ies Xojnw dIAw mojUdw hdwieqw Anuswr ngr ingm jlMDr dy v`K-2 vwrfW dIAw AbwdIAw dw srvy krvwieAw igAw hY [ mojUdw hdwieqw Anuswr v`K-2 kwlonIAw ivKy jo grIb lok ipCly 10 swl qo rih rhy hn Aqy ijnw dy pirvwr dI ku`l Awmdn ru: 1.00l`K jw 1.00 l`K qo G`t hY ,auhnw pirvwrw nMU hI ies Xojnw ADIn Swiml kIqw jwxw hY [ies skIm ADIn ngr ingm vlo 36 v`K-2 AwbwdIAw dw srvy krvwieAw igAw hY Aqy Xojnw dIAw mojUdw hdwieqw Anuswr k`ul 1733 lwB pwqrW/lwB pwqrIAw dI snwKq kIqI geI hy [iehnW lwB pwqrw nMU ies skIm dIAw hdwieqw Anuswr loVIdIAw shUlqw ijvy ik loV Anuswr pUrw ifvYilMg XUint, rsoeI Aqy pKwnw smyq, rsoeI, pKwnw, jw rsoeI Aqy pKwnw Awid bxw ky jw bxwaux vwsqy iv`qI shwieqw id`qI jwxI hY [ies qo ielwvw kuJ AbwdIAw ivKy sVkW ,nwlIAw, glIAw sIvryz Aqy vwtr splweI Aqy strIt lweIt Aqy hor jrUrI syvwvw id`qIAw jwxIAw hn[ijs dw vyrvw hyT ilKy Anuswr hY[ DETAL OF SLUM ABADIESAND FACILITIES TO BE PROVIDED UNDER RAJIV AVAAS YOJNA AS UNDER.

S. No

Name of Abadi W.No New Dwelling Unit (A)

Kitchen (B)

Toilet (C)

Toilet + Kitchen

(D)

Total Infrastructure (Roads & Drains

etc) Rough Cost

Estimate (In Lacs)

1. New Anand Nagar 01 03 02 06 04 15 16.53 2. Guru Nanak Nagar 47 30 - - 02 32 48.31 3. Kot Sadiq 58 102 05 04 08 119 50.85 4. New Dashmesh

Nagar 59 26 - - 01 27 -

5. Sant Nagar, Mangu Basti

49 27 - - 02 29 -

6. Tej Mohan Singh Nagar

49 14 - - - 14 -

7. Chohkan Kalan 09 76 01 - - 77 119.90 8. Mann Singh Nagar 09 07 - - - 07 134.24 9. Vill. Dhilwan 11 05 12 15 80 112 - 10. Balmik Colony 10 02 - - 11 13 - 11. Ladhewali 10 32 05 01 64 102 - 12. New Beant Nagar 10 04 01 02 09 16 - 13. Amrik Nagar 17 38 - 02 02 42 - 14. Amarjit Nagar,

Basti Peer Dad 42 06 - - 02 08 72.53

15. Basti Guzan 44 67 - - - 67 - 16. Gurshant Nagar 46 08 - - 1 09 23.00 17. Moh. Lasoori,

Basti Danishmandan

46 70 - - - 70 -

18. Shiva Ji Nagar & New Shiva Ji Nagar

46 66 01 - - 67 66.65

19. Basti Danishmanda 46 96 - - - 96 - 20. Rasila Nagar &

New Rasila Nagar 46 36 - - - 36 -

237

Page 119: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

21. Moh. Kot Basti Sheikh

48 36 - - - 36 -

22. Sant Pura 05 31 - - 01 32 - 23. Bhagat Pura 05 10 01 - - 11 - 24. Jaimal Nagar 08 13 - - - 13 - 25. Vill. Reru 03 89 - - 07 96 - 26. Bhargo Camp 50 16 - - 01 17 - 27. New Suraj Ganj,

Bhargo Camp 51 15 - 01 16 -

28. Bhargo Camp 52 48 - - 04 52 - 29. Abadpura 53 14 - - 02 16 - 30. Boota Mandi

54 50 - - - 50 -

31. Vill. Khurla Khingra

60 108 - - - 108 59.73

32. Abadpura 55 45 - - - 45 56.07 33. Mithapur 57 26 - - - 26 - 34. Lohar Nangal 56 45 - - - 45 - 35. Garha 32 87 04 06 25 122 - 36. Garha-I 33 51 11 03 25 90 - Total 1399 43 39 252 1733 647.81

ABSTRACT OF COST S.No. Name of Unit No. of Units Rate per Unit

(In Lacs) Amount Rs.

(In Lacs) 1 New Dwelling Unit (A) 1399 2.40 3357.60 2 Kitchen (B) 43 0.446 19.18 3 Toilet+Bath 39 0.63 24.57 4 Kitchen+Toliet 252 1.076 271.15 A Total 3672.50

(B) Infrastructure (Roads and Drains) Rough Cost Estimate Rs. 647.81 Lacs Total of A+ B Rs. 4320.31 Lacs auprokq Anuswr v`K-2 slm AwbdIAw ivKy rih rhy grIb lokw nMU loVIdIAw shulqw ijvy ik ifvYilMg XUint,rsoeI.pKwnw Awid bxw ky jw bxwaux vwsqy iv`qI shwieqw Aqy hor muFlIAw syvwvw ijvy ik sVkW, nwlIAw, Awid bxwaux vwsqy iqAwr kIqy gey rP kwst qKmIinAw Anuswr kRmvwr k`ul ru: 3672.50l`K Aqy 647.81 l`K kul ru: 4320.31 l`K Awaux dw Anumwn hY [ mojUdw Xojnw dIAw hdwieqw Anuswr ienPrw str`kcr ijvy ik sVkW nwlIAw Aqy hor mu`FlIAw shwieqw dyx vwsqy Bwrq srkwr Aqy pMjwb srkwr vlo 50-50 % PMfz muheIAw krvwey jwxgy[ pUrw ifvYilMg XUint rsoeI,pKwnw Awid bxwaux vwsqy auprokq Krcy dw 50% Bwrq srkwr vlo 20% pMjwb srkwr vlo Aqy Arbn lokl bofI vlo 30%(18%XU.AY l bI.Aqy 12% lwBpwqr jrnl kYtwgrI Aqy 20% XU.Ayl.bI. Aqy 10% AnsUicq jwqI )lwB pwqr syAr id`qw jwxw hY [ ies leI auprokq Anuswr rwjIv Avws Xojnw ngr ingm jlM Dr ivKy lwgU krn vwsqy ngr ingm hwaUs dI pRvwngI loVIdI hy [jykr auc AiDkwrI sihmq hox qw rwjIv Avws Xojnw nMU lwgU krn vwsqy loVIdI pRvwngI pRwp q krn leI ieh kys ng r ingm hwaUs nMU pRvw ngI vwsqy Byjx dI ikrpwlqw kIqI jwvy[efw;aBo ih B/ fwsh 10H12H12 okjhA wkwbk jkT{; ftu ftukoB fjs ;fjwsh j;skyo ehs/ jB.

wkB:'r w/no ih d/ j[ew a fwsh 10H12H2012 okjhA wkwbk jkT{; ftu ftuko tNKdo/$c?;b/ fjZs g/; j?.

c?;bkL gqtkB j?.

;jh$^ w/no

17H12H2012

239

Page 120: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

SELF DECLARATION

I…………………………..S/o W/o of……….Address……………………………………………

…………………. Solemnly declare that I promise to pay an amount 10% / 12% of the total estimated

cost and also abide by guidelines/policies under Rajiv Awaas Youjna of Govt. of India. If under any

circumstances I will not pay the said amount with in stipulated period then I may be disqualified as

beneficiary of this scheme. I also solemnly declare that my annual income from all sources in less than Rs.

1.00 lac.

Verified Deponent Area Councillor

PHOTOGRAPH

241

Page 121: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

243

Page 122: MCJ Final DPR- RAY Project - mcjalandharINDEX Detailed Project Report under Rajiv Awas Yojana S.No. Detailed of Activity Page No. 1. City Profile. A Survey of city and its slum abadies

RAJIV AWAS YOJANA

Municipal Corporation Jalandhar

ORDER

I Vinay Bublani, PCS,Commissioner,Municipal Corporation ,Jalandhar to authorize Sh.Chaman

Lal, Assistant Commissioner (T) B&R as project Co-ordinator for the RAJIV AWAS YOJNA SCHEME

of Government of India .He is authorized to sign all the document ,Estimates and Dewings,undertaking

Certificates as required as per the State PWD code and as per Town Planning nons.

(Vinay Bublani) PCS

Commissioner, Municipal Corporation,

Jalandhar

245