June 20, 2013
Marymount University Ballston CenterRedevelopment
SPRC #1
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Team
Owners:
Academic Office Architect:
Residential Architect:
Land Use Council:
Civil Engineer:
Landscape Architect:
Traffic Consultant:
Marymount University
Gensler
The Shooshan Company
SK&I Design Group
Walsh, Colucci, Lubeley, Emrich & Walsh, PC
Bowman Consulting
Studio 39
Wells & Associates
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Agenda
01. Overview
02. Site Context
03. Early Massing Studies
04. Project Design Overview
05. Questions + Answers
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
01. Overview
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
• Zoning History
• Existing Zoning: C-O-2.5 allows up to 12 Stories Office and 16 Stories Residential
• Surrounding Zoning: Ballston C-O-A, 950 Glebe, and C-O-2.5
• Existing GLUP Designation: “Medium” Office-Apt-Hotel
• Subject to Ballston Sector Plan Recommendations
• Filed on Dec 14, 2012 Request for 165,000 sf of Office & Educational use (9 Stories: Including 3 Floors for future growth) and 272 Residential units, 252,000 SF (15 Stories)
• Request bonus density of 25% and .25 FAR for ADUs and LEED Gold
• Request bonus density equivalent to Marymount academic uses of approx. 110,000 sf for Community Benefits
• Marymount Academic Program Requirement - 110,000 SF at move-in.
• In discussions with county for proffer conditions of community benefits.
Development Program + Assumptions
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
02. SiteContext
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Diagram: Regional Context of Ballston VirginiaNot to Scale
I-66
FAIRFAX DRIVE Ballston Metro
GLEBE R
OA
D
Ballston Common Shopping Center
WILSON BLVD
Arlington Elementary
School
Washington-Lee High School
Bluemont Junction Trail
Welburn Square
Ballston Beaver Pond
Location: Ballston, VirginiaCounty: Arlington
Lot Size:
C-0-2.5 “Commercial Office Building, Hotel, and Apartment District
Current Zoning:
90,437 Square Feet (2.076 Acres)
Site Plan: Arlington 4.1 Process
FAR: 2.5 FAR for Commercial115 apartments units / acre180 hotel units / acre
Height Limit: Twelve (12) stories for officeSixteen (16) stories for apartment and hotel
Bonuses: LEED @ Gold: .35 FARAffordable Dwelling Units: .25 FAR
Ballston Sector Plan:
Transition from the high density, mixed use to the east of Glebe Road to the low density residential neighborhoods to the west. Plan recommends the existing zoning and a mixture of office, residential and public use.
Zoning Map:
N
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Diagram: Project Location AnalysisNot to Scale
Gateway Site at Major Entry Point to Arlington from I-66
Site could be seen as the Western Anchor of the Rosslyn-Ballston Corridor
Prominent Location at Corner of one of Arlington’s busiest intersections
Wide streets result in Good Light and Views to all sides of the Site
Excellent Connections to Orange Line Metro, Major Roadways and the Bluemont and Custis Bike Trails
Site Opportunities
Site Constraints:
Vehicular Access is only practical from One Side - North Wakefield Street
Glebe Road is hard to cross at this point and Retail has been less successful west of Glebe
Existing Grade at Building Pad is slightly lower than Glebe Road Elevation
Mature Street Trees on Fairfax Drive
Site is close to Residential Neighborhoods
WEST
EAST
METRO STATION
VIEW
VIEW
VIEW
FROMI-66
TO I -66 WEST
FAIRFAX DRIVE
GLE
BE R
OA
D
1000 NORTH GLEBE ROAD
BALLSTON COMMON MALL
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Site Analysis: Views
Diagrams: Site View AnalysisNot to Scale
Gateway
Views from the Site
Primary Views to the Site
Building Site
Urban View
Distant View
* Distant View
Urban View
4321
8765
4
5
3
8
71
6
2
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
03. Early Massing Studies
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Site Analysis: Mitre @ Corner
Diagrams: Corner Site AnalysisNot to Scale
Site Analysis: Hierarchy @ CornerSite Analysis: Quirk Mitre @ Corner
Residence
Marymount and Office
Building Entrance
Building Arcade to Entrance
Residence
Office
Building Entrance
Building Arcade to Entrance
Marymount
Residence
Office
Marymount
Building Entrance
Building Arcade to Entrance
N N N
01. 02. 03.
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Proposal Concepts: Phasing Options for Marymount University and Residential CornerNot to Scale
The Shooshan Company + Marymount University July 9, 2012
•The northern wing of the building has a lower roof elevation that relates to the neighboring office building to the north and creates the opportunity for a green roof, outdoor pool, or terrace as an additional amenity for the residents. •The unit mix is based on 1 bed, 2 bed and 2 bed + den units in a proportion typical for multi-family developments in the area. We would recommend an area allowance for the for the residential spaces of 880-square-feet/unit.
FAIRFAX DRIVE
N. GLEBE ROAD
MARYMOUNTUNIVERSITY
RETAIL
LOADING
GARAGE
STUDENT ENTRANCE
COURT
RESIDENTIAL ENTRANCE
PROPOSED CONCEPTS : SCENARIO ONE(b)
The Shooshan Company + Marymount University July 9, 2012
PROPOSED CONCEPTS : SCENARIO TWO(b)
FAIRFAX DRIVE
N. GLEBE ROAD
MARYMOUNT UNIVERSITY
OFFICE
RETAIL / OFFICE
LOADING
GARAGE
STUDENT ENTRANCE
OFFICE ENTRANCE
COURT
MARYMOUNTFLOORS 1 -5 @ 20,000 SF
OFFICEFLOORS 2 -12 @ 30,200 SF
The Shooshan Company + Marymount University July 9, 2012
OFFICEFLOORS 4 - 12 @ 26,800 SF
PROPOSED CONCEPTS : SCENARIO TWO(a)
FAIRFAX DRIVE
N. GLEBE ROAD
MARYMOUNTUNIVERSITY
OFFICE
RETAIL / OFFICE
LOADING
GARAGE
STUDENT ENTRANCE
OFFICE ENTRANCE
COURT
MARYMOUNTFLOORS 2 & 3 @ 40,000 SF
OFFICELOBBY ATRIUM
01. 02. 03.
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
04. Project Design Overview
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Aerial Perspectives: Building Massing and Layout
1: View of Buildings from the Southeast
N. Gleb
e Roa
d
Fairfax Drive
**All
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Site Plan: Building Massing and LayoutNot to Scale
N
Nor
th W
akefi
eld
N. G
lebe Road
Fairfax Drive
RESIDENTIAL ENTRY
MARYMOUNT ENTRY
OFFICE ENTRY
LOADING
LOADING
GARAGE
GARAGE ENTRYRESIDENTIAL
ACADEMIC OFFICE
N. G
lebe Road
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Site Plan: Building Ground Floors and LayoutNot to Scale
N. G
lebe Road
Fairfax Drive
Nor
th W
akefi
eld
N
GARAGE
LOADING
LOADING
GARAGE ENTRY
RESIDENTIAL ENTRY
MARYMOUNT ENTRY
OFFICE ENTRY
Site Plan
Nor
th W
akefi
eld
N. G
lebe Road
Fairfax Drive
RESIDENTIAL ENTRY
MARYMOUNT ENTRY
OFFICE ENTRY
LOADING
LOADING
GARAGE
GARAGE ENTRYRESIDENTIAL
ACADEMIC OFFICE
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Ground Floor: Academic Office BuildingNot to Scale
Site Plan
**All
Nor
th W
akefi
eld
N. G
lebe Road
Fairfax Drive
RESIDENTIAL ENTRY
MARYMOUNT ENTRY
OFFICE ENTRY
LOADING
LOADING
GARAGE
GARAGE ENTRYRESIDENTIAL
ACADEMIC OFFICE
PARKINGGARAGE
RAMPAUDITORIUM
MARYMOUNTUNIVERSITY
LOBBY
LOADING SERVICE
FOODSERVICE
OFFICELOBBY
MARYMOUNTPROGRAM
SPACE
Nor
th W
akefi
eld
Fairfax Drive
N
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Perspective: View from Intersection of Fairfax Drive and North Glebe Road
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Detailed Perspective: Academic Office
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Rendered Image of Academic Office: Detail View
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
View of Residential Building
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
**All
Residential: Building and Courtyard View
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
Perspective: View of the Courtyard
Marymount UniversityBallston Center
Marymount UniversityThe Shooshan Company
Avison Young
09.7308.000
Thank You!
MARYMOUNT UNIVERSITY BALLSTON CENTER 20 June 2013 SPRC #1
05. Questions + Answers