53
Marina Bay Sands Sky Park Cantilever VC Cheong

Marina Bay Sands - Sky Park Cantilever

Embed Size (px)

Citation preview

Page 1: Marina Bay Sands - Sky Park Cantilever

Marina Bay Sands Sky Park Cantilever

VC Cheong

Page 2: Marina Bay Sands - Sky Park Cantilever

51 Marina Bay Sands Integrated Resort 2007 - 2010

Page 3: Marina Bay Sands - Sky Park Cantilever

52

Esplanade

Marina Bay

Marina Bay Sands

Merlion

Page 4: Marina Bay Sands - Sky Park Cantilever

53 Overall View

Skypark

Steel Roof Event Plaza

Crystal

Pavilion

Promenade - Retail

Page 5: Marina Bay Sands - Sky Park Cantilever

54 Project Organization

Marina Bay Sands (MBS)

Moshe Safdie Associates (MSA) / Aedas

Arup

C&S/Traffic

Parson

Brinckerhoff

(MEP)

Arup

Facade

Arup

Acoustic

Arup Site

Supervision

Arup

Fire

Arup

Security

Page 6: Marina Bay Sands - Sky Park Cantilever

55

Scope Demarcation Between Offices

Advanced Contracts (Singapore)

Conceptual & Schematic Design (Boston/New York/Hong Kong)

Design Development (Hong Kong/Singapore)

Tender Documentation (Hong Kong/Singapore)

Detailed Design (Hong Kong/Singapore)

Authority Submission (Singapore)

Construction Documentation (Hong Kong/Singapore)

Site Supervision (Singapore)

Page 7: Marina Bay Sands - Sky Park Cantilever

56 Arup Offices

Hong Kong

Singapore

Sydney

London

Shenzhen

Manila

Melbourne

Brisbane

Boston

New York

New York

Singapore

Hong Kong

Sydney

London

Melbourne

Boston

Brisbane

Shenzhen

Manila

Newcastle

Newcastle

Involved for Skypark Design

Page 8: Marina Bay Sands - Sky Park Cantilever

57 Project Communication Chart

Design and Construction Stage

Coordination

with MSA

Lead by AEDAS

• Museum Steelwork (schematic design)

• Risk and Security

• Podium Steel Roof

• Hotel Towers

• Foundation

Site Supervision

• Acoustic, Façade

and Fire

• Sky park

•Podium Concrete Structure

• Museum Steel works (detail design)

• Infrastructure

Arup HK in Singapore

• Project Management

• Podium coordination

• Geotechnical works

Coordination with MSA

Lead by AEDAS

• Traffic

ARUP

MELBOURNE

AEDAS EXECUTIVE

ARCHITECT

MSA CONCEPTUAL

ARCHITECT

MBS CLIENT

ARUP

HK/SHZ

ARUP

SINGAPORE

ARUP

Brisbane

ARUP

SYDNEY

ARUP

NEWCASTLE Dynamics Studies on

SkyPark Peer Review on

SkyPark Design

ARUP

LONDON

ARUP

NEW YORK

ARUP

BOSTON

••Podium

•Museum

Page 9: Marina Bay Sands - Sky Park Cantilever

58

SkyPark Engineering Facts

Skypark length 340 m

Steelwork tonnage 7,700 tons (permanent) &

4,400 tons (temporary)

Cantilever length 65 m

Cantilever weight 3,500 tons

Lifting of cantilever structure 13 weeks

Page 10: Marina Bay Sands - Sky Park Cantilever

59

Cantilever Structural Design Movement & Dynamics

Tight Construction Programme Lifting Methodology

MBS – SkyPark Cantilever

Design Challenges

Page 11: Marina Bay Sands - Sky Park Cantilever

60 Design Challenges

Cantilever Structural Design

Page 12: Marina Bay Sands - Sky Park Cantilever

61 Structural Layout at L56

65m Cantilever

MJ MJ MJ MJ

Truss Truss

Box Girder

4.6

5m

/ 6.1

5m

10m

Steel Frame with columns at 10mc/c columns at 10mc/c

Steel Frame with

4.6

5m

/ 6.1

5m

TOWER 1 TOWER 2 TOWER 3

Page 13: Marina Bay Sands - Sky Park Cantilever

62 Cantilever Section – Design Evolution

SCHEME 1 --- SPACE TRUSS

CONSTRUCTED FROM I-SECTIONS

SCHEME 2 ---RAISED LANDSCAPE

DECK ALTERNATIVE

SCHEME 3 --- BOX GIRDERS WITH

CROSS BEAM

SCHEME 4 --- PT Box Girder (Final Scheme)

Page 14: Marina Bay Sands - Sky Park Cantilever

63 Cantilever Section

Plan

Elev.

4m wide x 3.55m ~10m deep box girder

1.25m/ 1.75m

dp. transverse

plate girder at

4.2m c/c

175/ 225mm

thk.

composite

deck slab

4m wide x 3.55m ~10m deep box girder

Column

support

Page 15: Marina Bay Sands - Sky Park Cantilever

64 Fabrication & Erection of Steel Frames

Page 16: Marina Bay Sands - Sky Park Cantilever

65 Rendering of V & W Columns

Page 17: Marina Bay Sands - Sky Park Cantilever

66 Design Challenges

Movement & Dynamics

Page 18: Marina Bay Sands - Sky Park Cantilever

67 Movement Joint

Gravity : 150mm (Irreversible)

Wind: +/- 250mm (Reversible)

Seismic: +/- 600mm (Reversible)

Maximum Anticipated Movement

Sufficient “travelling

distance” during

seismic event

HOTEL

TOWER

Page 19: Marina Bay Sands - Sky Park Cantilever

68 Movement Joints (Bearings)

Page 20: Marina Bay Sands - Sky Park Cantilever

69

Bending of Cantilever with Tower Sway Torsional Mode

First Bending Mode Second Bending Mode

Purpose of Dynamic Studies

Page 21: Marina Bay Sands - Sky Park Cantilever

70

4No 15T TMDs

(PRELIMINARY

SCHEME)

1No 5T TMD (Final

Scheme)

Tuned Mass Damper

Page 22: Marina Bay Sands - Sky Park Cantilever

71 Tuned Mass Damper

5T Tuned

Mass

Damper

Page 23: Marina Bay Sands - Sky Park Cantilever

72 Dynamic Studies – In situ Testing

Page 24: Marina Bay Sands - Sky Park Cantilever

73

Almost 150 people

participated jumping test at

tip of the cantilever

2010.05.26

Page 25: Marina Bay Sands - Sky Park Cantilever

74

Page 26: Marina Bay Sands - Sky Park Cantilever

75 Key Findings

Measured Mode 1: Predicted Mode 1:

Predicted Mode 3: Measured Mode 3:

Page 27: Marina Bay Sands - Sky Park Cantilever

76 76 Crowd Management

Viewing Platform

Maximum capacity of 600

people for general use.

Dancing activities are not

recommended

Outdoor Restaurant Terrace

Limit to 470 people for

general dancing with

restricted access to all viewing

platform

Indoor Restaurant

Limit to 345 people for

general dancing with

restricted access to all viewing

platform

Page 28: Marina Bay Sands - Sky Park Cantilever

77 Design Challenges

Construction Methods

Page 29: Marina Bay Sands - Sky Park Cantilever

78 Installation at L55/56/57 & Roofing

Assembly at Level 1

Heavy lifting to L55

Page 30: Marina Bay Sands - Sky Park Cantilever

79 Lifting of Bridge Trusses

Page 31: Marina Bay Sands - Sky Park Cantilever

80 Lifting of Bridge Trusses

Page 32: Marina Bay Sands - Sky Park Cantilever

81 Bridge Trusses being slided into position

Page 33: Marina Bay Sands - Sky Park Cantilever

82 Lifting of Bridge Trusses

Page 34: Marina Bay Sands - Sky Park Cantilever

83 Lifting Gantries for Cantilever Backspan

Page 35: Marina Bay Sands - Sky Park Cantilever

84 Lifting of Cantilever Backspan

Page 36: Marina Bay Sands - Sky Park Cantilever

85 Lifting of Cantilever Backspan

Page 37: Marina Bay Sands - Sky Park Cantilever

86 Lifting of Cantilever Backspan

Page 38: Marina Bay Sands - Sky Park Cantilever

87 Lifting of Cantilever Segments

Page 39: Marina Bay Sands - Sky Park Cantilever

88 Lifting of Cantilever Segments

Page 40: Marina Bay Sands - Sky Park Cantilever

89 Lifting of Cantilever Segments

Page 41: Marina Bay Sands - Sky Park Cantilever

90 Lifting of Cantilever Segments

Page 42: Marina Bay Sands - Sky Park Cantilever

91 Lifting of Cantilever Segments

Page 43: Marina Bay Sands - Sky Park Cantilever

92 Lifting of Cantilever Segments

Page 44: Marina Bay Sands - Sky Park Cantilever

93

skypark

Overview of SkyPark

Page 45: Marina Bay Sands - Sky Park Cantilever

94 Fabrication of Box Girders

Page 46: Marina Bay Sands - Sky Park Cantilever

95 Backspan with 10m deep section

Page 47: Marina Bay Sands - Sky Park Cantilever

96 Lifting - In Action

Segment 5 (24th December 2009)

Page 48: Marina Bay Sands - Sky Park Cantilever
Page 49: Marina Bay Sands - Sky Park Cantilever
Page 50: Marina Bay Sands - Sky Park Cantilever

99 Design Challenges

Challenge Against Time

Page 51: Marina Bay Sands - Sky Park Cantilever

100 Tight Construction Programme and Collaboration with Arup Offices

Page 52: Marina Bay Sands - Sky Park Cantilever

101 101

What Values have been brought to Arup?

Successful Cross Regional Collaboration Irrespective of Cultural Differences

Skills and Experience Sharing among Offices and Staff

Created Good Bonding and Networking Between Offices/Staff

Enhanced Arup’s Reputation and Business Opportunities

Enriched Arup’s Portfolio of World-class Iconic Projects

Page 53: Marina Bay Sands - Sky Park Cantilever

102 Marina Bay Sands Integrated Resort 2007 - 2010

Thank You