    JRJZJRJZJRJZJRJZ----V05PV05PV05PV05P

    Power-Steering Fluid Filling Machine

    Operating Instruction

    JINAN CJIERUI ELECTRIC CO.,LTD. OF CHINAAdress:No.56 General Road in Jinan, Shandong province Post Code:250108

    Tel: 0531-88266622 General Phone

    Fax: 0531-88772200 0531-81206707

    E-mail: [email protected] Web Site: www.cjierui.com

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    2/40

    JRJZ vacuum filling instruction page 2

    Company Introduction

    JINAN JIERUI ELECTRIC CO., LTD. OF CHINA, that is JINAN

    CJIERUI ELECTRIC CO., LTD, which integrates design and development,

    manufacture, installation and sales services as one. This manufacture has higher

    competitive in intelligence professional electromechanical equipment in China.

    Also it is certified high-tech enterprises in Shandong Province.

    JINAN JIERUI ELECTRIC CO., LTD. was established in October 1995

    and its register fund was one million yuan; JINAN CJIERUI ELECTRIC CO.,

    LTD. was established in June, 2003 and its register fund was five million yuan.

    The enterprise is located No.56 in General Road of Jinan city and covers 8700

    . In 2010 the company's income of annual sales was more than 80 million

    yuan, with an annual taxes was more than 6 million yuan, and fixed assets was

    50 million yuan, and current assets was over 38 million; The company has

    maintained a 40% average annual growth since it was founded.

    At present, the numbers of employees are 156 persons, 53 technical

    engineers who have rich experience in the application of vacuum technology,

    automatic control, gas and liquid transmission technology, electro-hydraulic

    integration technology and other fields professionals. CJIERUI ELECTRIC

    CO., LTD. establishes expedite communication and business contacts with

    well-known domestic and foreign enterprises and institutions such as the U.S.

    GRACO. Germany BURKERT, LEYBOLD, WILO, Britain SPIRAX likelihood,

    Sweden ORION, Shandong University, Harbin Institute of Electrical and

    Mechanical College, Tianjin Industrial University of Technology and so on.

    From 1999 to 2001, JIERUI ELECTRIC CO., LTD. made the first

    completely automatic power steering vacuum filling machine of China

    proprietary intellectual property rights with China First Automobile Group and

    the Chinese Automobile Research institute, which supplied prologue of the

    automobile assembly line to high, fine, excellent on mechanical and electrical

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    3/40

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    4/40

    JRJZ vacuum filling instruction page 4

    JIERUI Products Brief

    Standard Products

    JRJZ-V series Vacuum Filling products

    JRBJ series Intelligence Industrial Identification products

    JRBJ series Intelligence Industrial Gelatinizing products

    JRJZ-N series Quantitative Filling products

    JRJZ-S Concentrated Fluid Transportation system

    JRJZ-H series Lubricant Coating system

    JRJL series Hermetic Leak Detectors

    JR-XX series information gathering of production lines,

    monitoring system.

    Non-standard products

    Industrial non-standard equipment, engineering and construction solutions

    consulting, design, production, services on site

    Automobile assembly line specialized non-standard work, clamp, and

    automation solutions

    Various production lines specialized non-standard equipment, automation

    solutions

    Various production lines used to retrofit, manufacture and sale solutions in

    China with imported equipment

    Special Notice: CJIERUI, JIERUI ELECTRIC, JIERUI etc. relating

    brand, mark, trademark are CJIERUIS register brand, its property and

    ownership governed by CJIERUI ELECTRIC CO., LTD., and protected by the

    relevant laws and regulations.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    5/40

    JRJZ vacuum filling instruction page 5

    CJIERUI Sales Services Introduction

    CJIERUI ELECTRIC CO., LTD. not only provides high-class products, but

    also provides top-notch service for customers from various levels; during

    pre-market, performance, sale provides elaborate technical services and

    meticulous, effective, comprehensive communication with customers to ensure

    that manufacturers of products are to customers and themselves satisfaction. As

    for sold products, we grant whatever is requested and reply whatever is asked

    and overall track, in order to pursuit dual-perfect of products quality and

    technical services.

    Service Concept

    Sincerity, specialty, prompt, careful

    Service support

    After-sales service department directly is responsible for customers and the

    general manager, with implementing Initial Consultation system to ensure that

    the service got an effective response;

    Perfect services database, the maturity clients, equipment archives, digital and

    network management, which effectively coordinate the relevant departments,

    and to ensure timely and accuracy;

    InInInIn Nationwide distribute after-sales service Office and to ensure service

    response timely and efficiency;

    The 24-hour direct dial service hotline and complaint hotline, inspect and

    supervise services to ensure customers satisfaction

    Serviceteam

    Make a good use of talents and establish a high standard, high quality, efficient

    service team, and use a full service system;

    Specialty engineers president over replying technical problems from

    customers.

    The leader, technical deputy and professional maintenance staff of the

    company regularly or irregularly visit customers;

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    6/40

    JRJZ vacuum filling instruction page 6

    We set permanent office in FAW (Changchun), DFAC (Shiyan), Chongqing,

    Suzhou, etc. area, specialty personnel are responsible for after sales service.

    Service promise

    All the sold equipments are used for warranty within one year and lifetime

    maintenance.

    We can guide installation on-site according to the needs of its customers and

    ensure the correct installation of equipment;

    To ensure that users have qualified personnel to operate and maintain with

    systematic operation training.

    Receipt of a notice should be given treatment response within one hour.

    Service personnel serve on-site with the average area 12-hour and special area

    within 24 hours

    Make a customer archives to provide regular visit.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    7/40

    JRJZ vacuum filling instruction page 7

    Introduction of other area agencies

    Office in China First Automobile Group

    Address: FAW factory No. 665, 38 blocks

    Tel: 0431-5986108 13944179631

    Office in DFAC Group

    Address: Dongfeng Group office, Shiyan city

    Tel: 0719-8264988 13617195365

    Office in Chongqing

    Office in Suzhou

    Office in Tianjin

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    8/40

    JRJZ vacuum filling instruction page 8

    Caution before using

    Safety Note

    Misuse Equipment hazardous:

    The equipment used exclusively for professional use and avoid misusing of

    equipment.

    Please read carefully manual equipment instructions and all components

    instructions, warning etc before using.

    No moving or changing equipments.

    All the equipment parameters are set before leaving factory, and

    non-professionals avoid amending.

    Before changing parameters, please record original parameters.

    Check and maintain the equipments daily, and replace the worn components

    immediately.

    Fire and Explosion hazardous

    The equipment is the three-phase 4-wire 380V AC power equipment, which

    should be grounded line before using, solidly and reliably connect to the safety

    standards protection grounded line after electricity switched on. No smoking in the working area.

    Keep well ventilation of equipments.

    If accidents occur, please immediately shut down, until maintain equipment

    to normal before the boot.

    Spraying hazardous

    1. Avoid any part of the body close the pipeline system components during

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    9/40

    JRJZ vacuum filling instruction page 9

    operations and maintenance.

    2. Do not use hands and any other part of the body to prevent the leakage.

    3. Please carefully check equipment pipeline and connecting whether to be

    normal, when you find the worn parts and replace them immediately. When

    maintaining equipments, you must keep the pressure relief.

    Personal Safety

    1. Working uniform: Workers must wear protective uniform, do not

    wear earrings, bracelets, necklace and other jewelry ornaments!

    2. Protective gloves: Workers must wear protective gloves to prevent

    danger.

    3. Protective glasses: Workers must wear protective glasses to protect

    their eyes from harming!

    4. Safety boots: Workers are required to wear protective boots!

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    10/40

    JRJZ vacuum filling instruction page 10

    JRJZ-V05P Power-Steering fluid filling machine

    Operating Instruction

    CONTENTS

    1 Equipment Overview------------------------------------------------------------------------------------1

    1.1THE INTERNAL PIPELINE: ---------------------------------------------------------------------------- 1

    1.2ELECTRIC CONTROL SYSTEM -----------------------------------------------------------------------3

    1.3PNEUMATIC CONTROL UNIT------------------------------------------------------------------------5

    1.4FILLING GUN AND MOVING PIPE: ------------------------------------------------------------------- 5

    2 Principal of Working ------------------------------------------------------------------------------------ 6

    3 Main Technical Index ----------------------------------------------------------------------------------- 7

    4 Vacuum Filling Equipment Operation Process ------------------------------------------------------ 7

    4.1PREPARATION-----------------------------------------------------------------------------------------8

    4.2EVACUATION -----------------------------------------------------------------------------------------8

    4.3CONSTANT PRESSURE,LEAKAGE CHECK ----------------------------------------------------------8

    4.4RE-EVACUATION -------------------------------------------------------------------------------------9

    4.5FILLING PROCESS ------------------------------------------------------------------------------------9

    4.6SUCTION PROCESS -----------------------------------------------------------------------------------9

    4.7 COMPLETE ------------------------------------------------------------------------------------------9

    4.8SUCTION AGAINST DROP ----------------------------------------------------------------------------9

    4.9SYSTEM SUPPLY --------------------------------------------------------------------------------------9

    5. Operating-------------------------------------------------------------------------------------------------9

    5.1START/STOP OPERATING SYSTEM ------------------------------------------------------------------9

    5.2SYSTEM PARAMETERS SET ----------------------------------------------------------------------- 10

    5.3VACUUM FILLING OPERATION-------------------------------------------------------------------- 13

    5.4SYSTEM MONITOR --------------------------------------------------------------------------------- 16

    5.5MANUAL DEBUGGING----------------------------------------------------------------------------- 17

    5.6DATE QUERY FUNCTION -------------------------------------------------------------------------- 18

    5.7WARNING RELATING OPERATIONS --------------------------------------------------------------- 19

    6 Faults and Remedy ------------------------------------------------------------------------------------ 20

    7 Maintenance and Repair ------------------------------------------------------------------------------ 237.1SYSTEM MAINTENANCE DAILY ------------------------------------------------------------------ 23

    7.2SYSTEM REPAIR : ----------------------------------------------------------------------------------- 26

    Annex one------------------------------------------------------------------------------------------------- 27

    Key part list ----------------------------------------------------------------------------------------------- 29

    Spare list--------------------------------------------------------------------------------------------------- 30

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    11/40

    JRJZ vacuum filling instruction page 1

    1.1.1.1. Equipment Overview

    JRJZ-V05P Power-steering fluid

    vacuum filling machine is JINAN

    CJIERUI ELECTRIC CO., LTD

    catering for the needs of auto

    Power-steering fluid in production

    Line, which has designed and

    manufactured a new type of

    mechanical-electrical integration,

    special vacuum quantitative filling

    equipment.

    Fig 1.1.1

    JRJZ V05P Power-Steering fluid vacuum filling machine can synchronous detect

    power steering fluid pipeline system pressure reliably and deals with statistics about

    the filling volume, vacuum and pressure data parameters when filling powering

    steering oil. It provides reliable quality assurance for production management andperformance testing.

    The general overview of JRJZ V05P Power-Steering fluid vacuum filling

    machine is shown as fig 1.1.1, including tube pipe, electric control system,

    Pneumatic control system, filling gun and moving system etc.

    1.1.1.1.1111The internal pipeline:The internal pipeline:The internal pipeline:The internal pipeline:

    The internal pipeline and components of the equipment as shown in Figure 1.1.3,

    internal piping system consists of vacuum tube fill pipe, suction pipe and fluid tube

    and so on. The symbol of pipelines indicated in Figure 1.1.2.

    Vacuum pipeline

    Exhaust pipes

    Compressed air

    Fluid Pipeline

    Suction line

    Fig 1.1.2

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    12/40

    JRJZ vacuum filling instruction page 2

    1) Vacuum systemmainly is used for vacuuming with imported vacuum pump in

    shortest time, which consists of vacuum pump, vacuum tank, water and air

    separated tank, vacuum sensor, vacuum pressure gauge , The control and

    adjustment valves with visual position control. Use SV25B pump as vacuum

    pump to complete system vacuuming.

    2) Filling System: system filled using constant-current electric gear pump and

    shorten fluctuations time in the pipeline system under pressure and can more

    accurately reflect filling pressure. Regulating pressure by fluid regulate valve.

    Mainly consists of the storage tank, filling pump, regulator valve, flow meter,

    filters, pressure sensor, pressure gauges, the control and adjustment valves with

    visual position control.

    3) Supply System: Two road parallel pipeline supplies, automatic switching, flow

    switches control barrels and make judgment more quickly. While use of time for

    two determinants. Mainly consists of supply pump, flow switch, filters, the

    control and adjustment valves with visual position control.

    4) The suction system: the main function is used for adjusting level and suckingresidual liquid pipeline to the reservoir, and control pressure in the tank through

    pressure switch and use vacuum pump to make a negative pressure in the

    reservoir and using pressure gap suck liquid to fuel tank. Mainly consists of The

    control and adjustment valves with visual position control.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    13/40

    JRJZ vacuum filling instruction page 3

    Fig 1.1.31.2 Electric control system

    Mainly consists of control panel and switch board.

    1.2.1.Control panel

    JRJZ V05P Power-Steering fluid vacuum filling machine operating system

    consists of information system and switch/indicator control panel, color LCD display

    and panel indicator etc., there is a three-colors indicator at the top of cabinet.

    System control panel consists of switch control panel and switch indicator

    panel.(fig 1.2.1 ).

    Vacuum pump

    Filling pump

    Supply pump

    Storage tank

    Flow switch

    Flow meter Fluid Valve

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    14/40

    JRJZ vacuum filling instruction page 4

    Fig 1.2.1 switch /indicator control panel

    When vacuum filling equipment is running and instructed by indicator light in

    addition to color LCD display relevant data to ensure that operators in remote monitor

    the state of filling.

    Switches control panel is composed ofEmergency stopPower onwith

    lightPower stopManual/AutoStartStopSupplyReset.

    Switching indicator panels is composed of ReadyFirst vacuumVacuum

    leakPost vacuumFillingSuctionOver.

    Type selection button is composed of High lowType 1Type 2Type

    3Type 4Type 5.1.2.2. Electric board

    It is the main electric control circuit. There are PLC, A/D module, minitype

    breakers, motor protection switch, mini-type relay, contacters, switch power and

    connection ends etc inside the electric cabinet. PLC can make operation for system

    logic, to control the action of each component and ensure the normal working of

    system. The A/D module shall translate the analogue of transducers (vacuum, pressure)

    into digital and transport them to PLC,PLC shall make compare according to all

    parameters and programs in the system, thereby, to control the filling system and

    vacuum sestem; The mini-type breaker can be used for manual switch during

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    15/40

    JRJZ vacuum filling instruction page 5

    maintenance and commissioning ,and the overcurrent protection for each loop during

    normal running; The motor protection switch mainly is used for the overcurrent and

    undervoltage for each pump motor; The mini-type relay can complete the logistic

    enforcement assisting the touchers.

    1.31.31.31.3Pneumatic Control Unit

    1.3.1 the main function of the device provides an effective source of compressed air,

    after compressed air comes into the equipment, firstly gas processing unit (triplet)

    filter, lubrication etc., then gas sources will be available to provide to the aerodynamic

    components, the sol valve control through PLC to achieve pneumatic control functions.

    As shown in Figure 1.3.1, Mainly consists of : Service unit with shut-off valve for

    pressure regulation, filter and water Separator, the discreteness of solenoid

    valves, valve block, and bypass;

    Fig 1.3.1

    1.41.41.41.4Filling gun and moving pipe:

    The following features:

    A. Gun and the main pipeline joints connecting rapid routing and coated with

    plastic covers.

    B. The gun head is designed with anti-leak, after filling finish; there is no leakage

    when plucking gun head.

    C. Gun is set with start and stop button and indicator lighters. The green button

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    16/40

    JRJZ vacuum filling instruction page 6

    means start and the red button means stop.

    D. Gun head cooperated with oil tank are connected with pneumatic clamping

    type.

    E. Filling oil gun is seated the right part of equipment for operators use, which is

    made from aluminum (not including handle), the part of easy-worn connected with

    oil tank is considered intension, durability and corrosive resistance.

    F. Gun head cooperated with the oil tank, oil tank mouth is without deformation

    or injury, and the body without interference.

    G. The moving pipe is hanged by moving arm, facilitating the operation .

    2222 Principal of Working

    JRJZ-V05P Power-Steering fluid vacuum filling machine is composed of fluid

    control, pneumatic control and electric control three parts: Fluid control mainly

    real-time check and quantitative controls fluid filling and system vacuum pressure;

    pneumatic control part mainly finishes the fluid valve supplying pilot gas and controls

    filling gun clamping; electrical control system mainly finishes system process control

    and testing, also deal with process parameters data, preservation, the system running

    monitoring, data display and failure alarm, etc.

    JRJZ series common vacuum filling equipment working principle is based filled

    system with vacuum check, vacuum filling, and suction of filling line and purification

    etc. process technology integration of intelligent control. And complete vacuum, check

    and fill process with higher operating rhythms.

    Vacuum process of JRJZ V05P Power-Steering fluid vacuum filling machine,including low vacuum and then high vacuum stage; while suction process, including

    suction, ventilation, etc. several stages. Filling process of quantitative vacuum filling

    equipment consists of preparation, vacuuming and leakage detection, re-evacuation,

    filling, suction and completing, etc. several sequential process.

    Refer to system diagram, see the attached figure.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    17/40

    JRJZ vacuum filling instruction page 7

    3 Main Technical Index1)Technical Parameters

    system vacuum value (filling gun mouth): 2mbar

    Filling speed : 115L/min adjustable( free speed of opened container).

    filling pressure: 1-4 bar adjustable

    filling accuracy: level height2mm

    Filling cycle : 120s/vehicle

    Equipment shape dimensions: lengthwidthheight:17008001800mm

    2)working environment

    gas source: 5-7bar

    power: Three-phase 380V10% 50Hz

    environment temperature: -545

    Environment humidity: 95%

    Noise 72dB

    4444 Vacuum Filling Equipment Operation ProcessThe process of Vacuum Filling Equipment consists of preparation, evacuation,

    leakage check, re-evacuation, filling process, suction and complete .

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    18/40

    JRJZ vacuum filling instruction page 8

    4.14.14.14.1 Preparation

    After power on, then system shall enter into working state.

    4.24.24.24.2 Evacuation

    When first evacuation, vacuum pump M1 runs, vacuum pressure holding valve

    V501 and gun vacuum valve V522 opens, a few seconds later, vacuum sensor V504.1

    opens, until preset time.

    4.34.34.34.3 Constant pressure, leakage check

    No process content

    1 Preparation Electrified equipment with self-check enter preparation

    2

    Gun automatic

    clamping Press the green button on the gun, seal complete

    3 EvacuationBig leakage checking

    If failure to withdraw from filling cycle, sound and light alarm

    4

    Constant

    pressure, leakage

    check

    Small leakage checking

    If failure to withdraw from filling cycle, sound and light alarm

    5 Re-evacuation Gun head reach the lowest vacuum 2mbar

    6 Pressure fillingConstant pressure filling, pressure, flow and time triple control. If

    failure to withdraw from filling cycle, sound and light alarm

    7 Keep pressure Make the filling pressure constant to ensure fill up

    8 Suction process Inflatable, and suction to complete level treatment

    9 Filling complete State initialization, sound and light alarm

    10Pneumatic

    loosenedpress red button on the gun and unclamp

    11Manual

    extraction gunsSuction and anti-leakage

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    19/40

    JRJZ vacuum filling instruction page 9

    After first evacuation, vacuum pressure holding valve V501 closes, system

    begins leakage checking, until preset time.

    4.4 Re-evacuation

    Generally, system enters into re-evacuation process after leakage checking, and

    opens vacuum pressure holding valve V501 again. The re-evacuation is to repeat

    evacuation process, until preset time.

    4.5 Filling process

    When filling, filling pump M2 runs, and gun filing valve V521 and filling valve

    V502 act, meantimes, tank breath valve V507 acts to accelerate filling process, until

    preset pressure.

    4.6 Suction process

    After filling, the oil in pipeline shall be sucked back into tank. During this

    process, tank vacuum valve V512 acts and tank shall be vacuumized by vacuum pump,

    meantimes, suction valve V521 and blowing valve V509 acts, until preset time.

    4.7 Complete

    After suction, the whole filling process ends, system shall give indication signal

    for s few seconds.

    4.8 Suction against drop

    Then, press stop button, tank vacuum valve V512 shall act again to suction

    against drop until preset time or after gun returns into its house. The suction against

    time can be set on man-machine interface.

    4.9 System supply

    Auto supply mode, supply valve V510 or V511 acts to supply oil into tank.

    5. Operating

    5.1 Start/stop Operating System

    5.1.1 Power On:

    Connect with the main powerunder the control panel of the JRJZ-V05P

    Power-Steering fluid vacuum filling machine ; Push the power onbutton in the

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    20/40

    JRJZ vacuum filling instruction page 10

    control panel The indication light shines and the touch screen enters the original

    interface(fig 5.1.1)

    Fig5.1.1 system original interface

    5.1.25.1.25.1.25.1.2 Power off Operation: Shut off the compressed air supply valve in the mechanics

    cabinet.

    5.2 System Parameters Set

    System parameters set is completed on the touch screen.

    5.2.1 Selection of Working Mode

    Switch the manual / automaticswitch to manual location on the control panel,

    system enters manual mode; If switching the switch to automatic location, the system

    enters automatic work mode.

    5.2.25.2.25.2.25.2.2 Operating Parameters Set

    NNNNoticeoticeoticeotice This element must be operated by professional operator or authorized

    personals of our company, no other personnel changes at will!

    1Technic Parameters Set

    In figure 5.1.1 window, press "Parameter set" System accesses (Figure 5.2.1),

    after inputting the process password (system default password 1), press ENT andsystem firstly enters current parameter set interface (Figure 5.2.2), in which you can

    set parameters as fig 5.2.2 shown.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    21/40

    JRJZ vacuum filling instruction page 11

    Fig 5.2.1 password input

    Fig 5.2.2 current parameter set

    List 5.2.1

    No. Parameter name unit Meaning Set value

    1 Rough vacuum time SThe time to check whether there is big

    leakage in vacuum pipe and break pipe.

    2 Rough vacuum value MbarThe vacuum limit value for rough

    vacuum process

    3 Fine vacuum time S The time to check whether there issmall leakage in vacuum pipe and break

    pipe.

    4 Fine vacuum value mbarThe vacuum limit value for farther

    vacuum process

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    22/40

    JRJZ vacuum filling instruction page 12

    5Vacuum leakage

    checking time SVacuum leakage checking time

    6Vacuum checking

    valuembar

    Checking whether there is small

    leakage

    7 Re-evacuation time S Time time for second vacuum process

    8 Filling pressure Bar The pressure value for full filling

    9 Filling volume L The max filling volume

    10 Filling tolerance L The filling volume range

    11The shortest filling

    times The shortest filling time

    12 Max time S The longest filling time

    13 Pressure keep time SPressure keep time after filling to

    ensure filling full.

    14 Suction time S Time of suction process

    15 Barrel empty time S The time to check barrel empty.

    16Suction against drop

    timeS

    Suction against drop time after taking

    gun form filling point.

    2System parameter set

    The system parameter is the measure parameter to ensure the system filling

    precision.Input system parameter password (system default password 1) in the

    interface shown as fig 5.2.1, press ENT key and system enters system parameter set

    interface (fig 5.2.3). user can modify the measure parameter, also can set new

    password.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    23/40

    JRJZ vacuum filling instruction page 13

    Fig 5.2.3 system parameter set interface

    AAAAttention: the system parameters have been set right,ttention: the system parameters have been set right,ttention: the system parameters have been set right,ttention: the system parameters have been set right, do not change them withoutdo not change them withoutdo not change them withoutdo not change them without

    professional person.professional person.professional person.professional person.

    5.35.35.35.3Vacuum Filling Operation

    5.3.1Automatic Filling

    1First, switchmanual / automaticswitch to the automatic position on the panel,

    filling equipment enters preparation state, preparation indicator lights on. .

    2On the monitor interface, select needed vehicle type.

    3Take the gun from bracket and point to the filled pot, push the green FILLING

    button on the top of the gun or press the remote control locking button, the three

    claws in the gun clamps the lip of the pot and the entire vacuum filling cycle

    starts as follow. The indication lamps will indicate the each process; the whole

    cycle is going on automatically without person.

    ReadyFirst vacuumVacuum leakPost vacuumFillingSuctionOver

    4Filling completed, press the stop button, claws loosened, and system back suction

    against drop until the suction preset time or gun back into the gun bracket.

    5Filling gun back into the gun bracket.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    24/40

    JRJZ vacuum filling instruction page 14

    5.3.25.3.25.3.25.3.2Manual Filling

    Firstswitch the manual/automaticswitch to the manual position ,the system

    enters to the manual work mode, the preparation indicator lights on..

    Step execution

    Each time pressing the filling button, system shall enter into ReadyFirst vacuum

    Vacuum leakPost vacuum FillingSuctionOver step by step. You can get the

    changing and result of each parameter during every process, to make the fault judge

    more easy and full. Generally, in normal produce line, for user we do not recommend

    this mode.

    NNNNote:ote:ote:ote:

    a) System shall sync-output fault alarm with the indicator on panel when fault.

    b) With automatic mode filling, if pressfilling stop key on the gun or the stop

    button on the operation panel, system stops current operation, and then return the

    initial state.

    c) During filling process, operators can observe the current fill volume, the current

    pressure and current va0cuum degree by system monitor interface. Detailed

    monitoring interface see 5.4.

    d) Any filling state, users can adjust filling pressure by the filling pipeline regulating

    valve RF1 to regulate the speed of the filling.

    5.3.35.3.35.3.35.3.3Supply fluid to tank by hand

    1First, switch manual / automatic switch to the manual position on the panel,

    filling equipment enters manual state.

    2Pressmanual supplybutton on the panel, supply indicator lights are on, supply

    fluid valve open, the system begins supplying oil to the storage tank from. to fill the

    required level, again press on the panelmanual supplybutton, and stop supplying.

    Note:Note:Note:Note: DuringDuringDuringDuring manualmanualmanualmanual supplysupplysupplysupply,,,, untiluntiluntiluntil systemsystemsystemsystem setsetsetset thethethethe highhighhighhigh level,level,level,level, you need notyou need notyou need notyou need not presspresspresspress

    manualmanualmanualmanual supplysupplysupplysupplybuttonbuttonbuttonbutton , the system will automatically stop, the system will automatically stop, the system will automatically stop, the system will automatically stop susususupplying.pplying.pplying.pplying.

    5.3.45.3.45.3.45.3.4Automatically supply fluid to tank

    System monitors the level of the fluid in the storage tank by the fluid level switch.

    When the storage tank level reaches the low level, system will automatically open the

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    25/40

    JRJZ vacuum filling instruction page 15

    valve V510or V511to supply, when reach to high level, the system automatically stop

    supplying, supply valve closed.

    5.3.55.3.55.3.55.3.5 State Indicator Instructions

    Three-color Lamps indicator

    1) A red warning light constant on indicated system with malfunction, when checking

    generally electricity or equipment preparation state. This warning, system does not

    start filling operations. Mainly in the following circumstances lit :

    A. Gas source is smaller than set the smallest pressure, which is to protect

    pneumatic valve dependable motion.

    B. The Trip situation of filling pump, vacuum pump motor protector.C. The liquid level is too low or too high.

    2) A red warning light frequent flashes indicates filling process with failure, in this

    case, you can choose complete mandatory or restoration re-operation. Mainly in

    the following circumstances:

    A. Filling time exceeds longest filling time set.

    B. When evacuation, do not vacuum the largest leak vacuum degree in set time,the system reckons there is big leakage.

    C. During leakage check, find leakage greater than the set.

    D. When filling, the pipe-distance exceed journey.

    3) A yellow light constant on shows system with problem, need to solve with manual

    intervention, mainly in the following circumstances:

    A. Filters plug, regardless of supply filters or filling filters

    B. When complete filling, the actual filling volume is less than the preset least

    filling volume.

    C. When the edge of oil drum empty.

    2) The green light is on expressed filling, extinguishing indicates completing.

    Sound warning : the following two situations :

    A. After filling completed, the buzzer will call a period of time to remind the

    operator complete filling. 1HZ frequency, time out or press the "stop" button

    on the gun to stop.

    B. System with malfunction, with a red light for state instructions, buzzer

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    26/40

    JRJZ vacuum filling instruction page 16

    frequency 5HZ, until troubleshooting or by pressing the "alarm reset" button.

    5.45.45.45.4 System Monitor

    Systems with real-time monitoring function, users can fully understand equipment

    current work state by this picture.

    Touch "system monitor in the initial interface 5.1.1, you can access to the main

    monitor window of system (Figure 5.4.1), also, you can access this window by

    touching system monitor on any window. The operators can observe the current

    filling volume, the current cycle time, the current pressure and the current vacuum

    value and the current parameters of the changes by this interface etc.

    Fig 5.4.1 system monitor interface

    On system monitor interface, press next page button, to enter pipeline monitor

    interface, shown as fig 5.4.2. ON this interface, you can observe current filling state,

    filling pressure and vacuum degree expressly.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    27/40

    JRJZ vacuum filling instruction page 17

    Fig 5.4.2 pipeline monitor interface

    The warm interface can appear automatically for any fault of equipment. On the

    monitor interface, press warm button, system can also access warm information

    interface, in which interface, user can find warm time and fault content.

    Fig 5.4.3 warm information interface

    5.55.55.55.5 Manual Debugging

    The function reserves the use of super administrator. During the system adjusting

    or failure checking, divorcing from any PLC mode control, easy to operate and judge

    the valve operation more directly on the man-machine interface. But professionalpersonnel are needed to complete, otherwise you can not properly handled the valve

    interlocked relationship and brought the unexpected failure. This function absolutely is

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    28/40

    JRJZ vacuum filling instruction page 18

    used cautiously.

    In 5.1.1 window after input manual debugging password,(system default

    password 1)) press the ENT key, the system enters manually debugging window

    (Figure 5.5.1), users can manually debugging in this window, "the manual debugging"

    functions for system service/ maintenance, an online debugging functions of the main

    system components individually, or a combination check.

    Fig 5.5.1 manual debugging window

    5.65.65.65.6 Date Query Function

    Data query function is about statistics about the total filling volume and time of

    filling, users can access this function window for data inquiries.

    5.6.1 In any interface, select "Data Query", the system accesses data query interface(fig 5.6.1). in this interface, you can query the last time of filling time, vacuum value,

    filling quantity and the whole process time.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    29/40

    JRJZ vacuum filling instruction page 19

    Fig 5.6.1 data query window

    5.5.5.5.7777Warning Relating Operations

    1During systems operation, before operators carry out the next phase of the

    operation or change the setting, must complete ongoing operation, or will result

    in system disorder or system failures.

    2 In all touch-screen interfaces "return" buttons are return the initial interface.

    3In case of emergencies, you can beat emergency stop on the panel,

    equipment stop.

    Unless an emergency situation, you can not pressemergency stop button,

    frequently use emergency stop button to stop power would affect some

    components of life, even damage some electrical components.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    30/40

    JRJZ vacuum filling instruction page 20

    6666 Faults and Remedy

    The system has fault diagnosis and alarm instructions function. In any working

    state, failure, the alarm buzzers ring with failure, while red indicator light on of the top

    three-color, the operator can query the current buzz content on the screen, the specific

    alarm Table see 6.1.

    When alarm interface appears, pressalarm reseton the panel to cancel

    alarm ,users can handle relating alarm by alarm picture. If fault does not be removed in

    time, alarm interface shall trip again after one minute(can be set)

    Table 6.1 detailed alarm items and treatment

    alarm content reason treatment

    level too low alarmLevel switches or supplypump may be damaged

    1check level switch

    2adjust infusion pump and filter

    level too high alarmlevel switch may be

    damaged or infusion speed

    too fast

    1check level switch

    2adjust throttle valve of infusion

    pressure shortage

    alarm

    pressure switch may be

    damaged or Under voltage

    gas supply circuit

    1check pressure switch

    2Check pressure of the gas supply loopwhether to be enough

    filling pump alarm

    load may be too large or

    system power failure1protective switch current set whether tobe too small

    2check system load whether to be too

    large

    3 check system distribution electricity

    circuit

    vacuum pump alarm

    load may be too large or

    system power failure1protective switch current set whether to

    be too small2check system load whether to be too

    large

    3 check system distribution electricitycircuit

    big leakage alarm

    Seal system not well, filling

    head unclamp, pipeline

    leakage, or large leakage

    check parameter set too

    small

    1remove filling head and clamp

    2check system pipeline whether to be leak

    3adjust large leakage parameters

    small leakage alarm

    pipeline with small leakage

    or small leakage parameters

    set too small

    1choose compel filling or cancel filling

    2check system pipeline

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    31/40

    JRJZ vacuum filling instruction page 21

    3 adjust system small leakage checkparameters

    drum empty alarmfilter damage

    pipeline unsmooth

    1check filter

    2check clean pipeline

    filter alarmfilter damage

    pipeline unsmooth

    1check filter

    2check clean pipeline

    filling overtime alarm

    set filling volume too

    large

    filling pipeline leak

    1 check set filling volume and

    filling protective

    2check and maintain pipelie

    Note: any of the foregoing alarm, according to the screen prompts for the

    corresponding inspection and operation. If that does not succeed, please contact with

    the manufacturers.

    Equipment Common Faults and Remedy:

    Vacuum failure (large leakage and small leakage alarm).

    1)Seal damage, check seal loop of gun muzzle whether to damage or not, if

    damaged, replace new seal loop;

    2)vacuum pump failure, initiate vacuum pump, check vacuum pump whether to

    normally operate or not, if normally operated, block gunpoint by hand and

    directly vacuum, and then observe vacuum gauge whether it is below 20mbar

    or not, if not reach, denoting that pipeline is leaking or vacuum pump

    performance decline.

    3)Car assembly loops or oil drum leaks, if such testing can vacuum below 20mar,

    denoting circuit assembly or oil drum leaks;

    Press filling without action.

    1) Check gas source on site and observe triplet of the equipment to have

    compressed air or not.

    2) Press the button to observe input dot of the PLC corresponding button

    whether it is light, if not light denoting button damage.

    3) If light on to observe input dot of the PLC corresponding button whether it

    is light, if not light denoting PLC or the internal process with problem.

    4) Observation stop button corresponding PLC lights and whether it is

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    32/40

    JRJZ vacuum filling instruction page 22

    lighting, lighting denoting button damage.

    5) After obviating power issues, observe output dot corresponding fluid valve

    whether to correctly open or not, if not open, pull out the windpipe to

    check whether ventilate or not, ventilation denoting fluid valve damage;

    6) Not ventilating, measure the corresponding sol valve whether to have 24V

    power input or not, if no inputting, denoting PLC solenoid valve

    connecting line with problem. If inputting, and solenoid valve without

    action, denoting solenoid valve with failure. When you can remove the

    windpipe, repeatedly open and close solenoid valve by the manual button,

    to see whether to resume normally or not, if ineffective, denoting solenoid

    valve damage;

    Filling process without vacuuming

    1) Observe this process whether to activate the vacuum air pump or not, if not

    starting, check whether contactor Pick-up and whether the thermal

    protection switch is Takeoff;

    2) Pump starts normally, observe vacuum valve of this process whether toopen or not, if not opening, connect 2.6

    3) Valve open normally without filling, showing that the pneumatic control

    valve of filling gun did not open, and check the corresponding sol valve

    whether it is normal, if work normally, when press corresponding sol valve

    manual switch a minute then loose and repeated operation, then observe

    whether to fill normally or not.

    During filling process, evacuation without filling

    1) Observe this process whether to activate the filling pump or not, if not

    starting, check whether contactor is Pick-up and whether the thermal

    protection switch is Takeoff;

    2) Pump starts normally, and observe filling valve of this process whether to

    open or not, if not opening, connect 2.6.Valve open normally without

    filling, showing that the pneumatic control valve of filling gun did not

    open, and check the corresponding sol valve whether it is normal or not, if

    work normally, when press corresponding sol valve manual switch a

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    33/40

    JRJZ vacuum filling instruction page 23

    minute then loose and repeated operation, then observe whether to fill

    normally or not.

    Filling Inadequate

    1) During vacuum observations, vacuum instrumentation shows whether to reach

    20mbar around or not, if not reaching, denoting vacuum failure, refer to 1.

    2) If not evacuation, observe set value of pressure display gauge or "filling

    pressure stable time" and "suction time of PLC parameters set value whether

    to be changed or not, if altered, revises original setting values.

    3) If no changed, observe pressure gauge pressure of filling pipeline whether is

    above the two kilograms during filling, if not, gently shake regulating valve to

    reach above two kilograms of pressure and adjust pressure until filling pressure

    satisfied;

    Level Failure (Level too low, Level too high alarm)

    1) If level below lowest limit, firstly observe liquid pipelines whether to have power

    steering fluid or not.

    2) Pipeline has no problem, observe four level reference point of the PLC whether it isnormal, if not normal, denoting Level Meter or connectors with problem, test

    connections and troubleshooting Level Meter

    3) If input point is correct to observe whether the fluid valve open, if not openning,

    connect 2.6)

    4) If level is above level higher limitobserve four level reference point of the PLC

    whether it is normal, if not normal, denoting Level Meter or connectors withproblem, test connections and troubleshooting Level Meter

    5) If output point is normal to observe whether the fluid valve is opened, if openning,

    connect 2.6)

    7777 Maintenance and Repair

    7.17.17.17.1 System Maintenance Daily

    System Pipeline Maintenance: check equipment pipelines daily and tie-in whether

    to leak or not, and ensure that equipment is clean and tidy. Carrying out

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    34/40

    JRJZ vacuum filling instruction page 24

    maintenance every three months with cleaning dust and check whether pipeline

    and circuit are normal.

    Vacuum Pump Maintenance:

    1) Check vacuum oil daily, if necessary you must check oil volume and top up it.

    Suggestion: you should always keep oil level be in the middle of oil level observing

    window.

    2) Change vacuum oil immediately and you must replace vacuum pump oil in follow

    circumstances during using equipment.

    a)The equipment has been used more than three-five month.

    b)Observe that oil color becomes darkle, deep and dirty.c)The viscidity of oil becomes thick or rare.

    d)The oil has become compound of oil and water.

    e)There are mass solid deposits.

    f) The system cant reach the normal vacuum value.

    g)The equipment has already filled more than 5000 vehicles.

    Tool required: Allen key 8mmOil changing must be done with a switched off and still warm pump.

    Open the oil drain plug and let run out the used oil into an appropriate container.

    Refasten the oil drain plug when oil runs slower, start up the pump briefly (10

    sec. max) and switch off immediately. Reopen the oil drain plug and drain the

    rest of the oil. Before refastening the oil drain plug, inspect the O-ring and if

    necessary replace it. Open the oil fill plug and pour in clean oil; refasten the oil

    fill plug.

    Cleaning the filter:

    A wire-mesh filter is located in the intake port of the pump to act as a dirt trap for

    impurities. It should be kept clean in order to avoid reduction of the pumping speed.

    For this purpose, remove the dirt trap from the intake port and rinse it in a suitable

    vessel using a solvent. Then thoroughly dry it with compressed air. If the dirt trap is

    defective, replace it. The cleaning intervals depend on requirements.

    1) If the limit pressure of pump is affected because any air or fluid melted into oil,

    you can run pump for 30min to exhaust under the condition of gas ballast valve

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    35/40

    JRJZ vacuum filling instruction page 25

    opened and inlet closed.

    2) If vacuum pump has been set aside for one year, the oil must be replaced

    before it is used again.

    3) The open times of pump cant exceed six to avoid motor over loading.

    4) The vacuum pump oil must be LEYBOLD oil. The damaged due to other oil

    doesnt be included in warranty.

    System checks vacuum value and flux parameters every half year and makes

    them optimization.

    You should keep fingers clean, slightly touch and press, forbid touching with

    finger nail during using of various operation keyboards equipped in the

    equipment system (especially LCD touching screen keyboard).

    Electric Maintenance: regularly inspect whether connection terminal line

    loosens and whether the relay contacts badly and every valve plug contacts

    badly in order to ensure signal reliably input and output.

    Maintaining Filter: Check whether supply filter and filling pipe filter are

    blocked every month and clean filter sieve. Filter should be rinsed andchanged when system fault for filter is blocked during normally using.

    Filling gun maintenance: Seal ring of filling nozzle is easy-damageable and

    you should check regularly every month. If damaged you should replace it

    immediately.

    Moving system maintenance: you should regularly fill the lubricant oil for

    mobile arm parts every year..

    Maintenance of gas disposal unit

    1) Oil level of oil tank should keep between upper limit and lower limit, if

    shortage you should supply oil immediately. Use viscosity 2.5~7E lubricant

    and 22 engineer oil is recommended.

    2) Filter adopted with manually drainage device should advert to drain and keep

    level below level sign, at least drain once every shift.

    The equipment should be deposited in the circumstance of room temperature

    and good ventilation to avoid rain or exposing in sun. Please keep equipment

    upright for transportation or storage.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    36/40

    JRJZ vacuum filling instruction page 26

    Ensure that power supply and gas source are switched off you can carry out

    various maintenance.

    7.2 System repair :

    Fluid control circuit maintenance: every fluid valve can open by manual in the

    fluid control circuit, during maintenance if you want to operate a valve, you

    can press white point in the sol valve by manual, and check and maintain the

    relevant pipelines, you can operate sol valve by manual only on the power off

    conditions.

    Electric loop maintenance: Total system logic controls are in the PLC control,

    after checking trapezium and knowing the logic relation, and then observe

    each input and output state in the PLC to confirm interior logic with failure

    or exterior connector and valve or its perform components problem. During

    maintenance process you can refer to system theory chart and electric control

    chart.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    37/40

    JRJZ vacuum filling instruction page 27

    Annex one

    Two conjoined / triple-use (compressed air source processor) instruction (for

    reference only difference between models)

    Installation

    1Blow the pipeline by compressed air before installation.

    2Triplet required install vertical, and water cup and oil cup are adown, but

    pressure relief valve knob install up or adown.

    3Arrowhead direction refers to air compress direction, pay attention to it when

    installation.

    Environment

    1Avoid exposure in the sun

    2As a result of water cup and oil cup are made from creosote; Avoid using in

    circumstances containing the following chemistry: compound oil, thinner,

    chloroethylene, kerosene, acid or aroma hydrocarbon.

    Operation

    1The filter should advert to release water with drainage manually, level not

    exceed level symbol, at least set water once every number of runs

    2When adjusting pressure, firstly pull the knob, right rotate with pressure

    ascending and left rotate with pressure descending, and then push the knob and

    clock on the adjusted pressure.

    3The oil level of oil tank should keep between upper limit and lower limit, oil

    deficiency, supply oil prompt. use mucosity 2.57E lubricate, we commend

    use number 22 steamer oil.

    4The minimum air flux in the normally operating should content the minimum

    flux request of oil tank.

    5Cup and cup removed should be operated without pressure.

    1Clutch shield cover by hands, press orientation device and rotate right or

    left 45 by thumb, make the arrowhead of orientation device versus the

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    38/40

    JRJZ vacuum filling instruction page 28

    arrowhead of valve and pull adown to remove.

    2Some models can directly tweak down.

    6Oil tank can fill oil with stop gas or non stop gas, fill oil step as follows:

    1Usually directly fill by opening oil stuff.

    2Some model: a. open the block of oil tank and dropt air of cup b. tweak

    down oil cupc. add the cup proper oild. tweak up oil cupe. tweak

    up stuff.

    Maintenance:

    Abstersion of cup and sieve should choose litmusless scour, after washing with

    rinsing and cool.

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    39/40

    JRJZ vacuum filling instruction page 29

    Key part list

    No. Name Type Manufacturer

    1 Vane vacuum pump SV25BGermany

    LEYBOLD

    2 Vacuum sensor PTX610 DRUCK

    3 Pressure sensor A-10 Germany WIKA

    4 Flow sensor OV-10

    5 Fluid valve TYPE2000 G1/2Germany

    BURKERT

    6 Fluid valve E290 ASCO

    7 Filling pump TOP-2MY400-210HBM Japan NIPPON

    8 Supply pump TOP-2MY400-220HBM Japan NIPPON

    9 PLC 1766-L32BWA AB

    10 Extend module 1762-IQ16 AB

    11 A/D module 1762-OW16 AB

    12 Touch screen 2711P-T6C20A AB

    13 Sol valve VQZ115-5G-C6 Japan SMC

    14Air processing unit

    (Triplet )AC30-03 Japan SMC

    15 Pressure gauge 0-1.6MPa Shanghai China

    16 Electric components SCHNEIDER

    17 Flow switch FB21-020GK BANNA

    18 Level switch steel Beijing china

    19 Ripple pipe jacket AD42.5 Germany FLEX

    20 Fluid filter G1/2 Haideke

    21 Storage tank 50L cjierui

    22 Cabinet J812C-01 china

    23 Moving arm JR010 cjierui

  • 8/12/2019 Manual Maq Llenado Aceite Hidraulico

    40/40

    JRJZ vacuum filling instruction page 30

    24 Air-condition LA-03B Leibo

    25 Filling gun J812C-03 cjierui

    26 Balancer 1.5-3Kg Aotu

    Spare list

    No. Name Type Manufacturer Mark

    1 Button on panel XB2B SCHNEIDER

    2 Button on gun 49112red greem American ICW

    3Fluid valve

    TYPE2000BURKERT

    4 Sol valve VQZ11155G-C6 SMC

    5 Seal hoop KF25 LEYBOLD

    6 Oil of vacuum pump GS77 LEYBOLD

    7 seal J782A-03.01-07 cjierui