7
https://manchester.gov.uk/consultations Manchester to Chorlton Walking and Cycleway --- Area 3 Manchester Road and Barlow Moor Road (from Seymour Grove to Sandy Lane) Have your say on proposals to improve walking and cycling links in your area.

Manchester to Chorlton Walking and Cycleway --- Area 3

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

https://manchester.gov.uk/consultations#GMGreenCity#GMGreenCity

Manchester to Chorlton Walking and Cycleway --- Area 3Manchester Road and Barlow Moor Road (from Seymour Grove to Sandy Lane) Have your say on proposals to improve walking and cycling links in your area.

2 3

New cycling and walking links in your areaIn 2018, we carried out a consultation with residents and businesses in Chorlton and Chorlton Park about proposed features to improve walking and cycling.

The aim of the scheme is to: – Increase walking and cycling – Make walking and cycling safer – Reduce the number of short journeys by car – Improve people’s health through walking and

cycling – Boost the local economy by making the district

centre more pleasant and reducing traffic.

More than 1,800 comments were received, and the majority of people who responded supported the scheme as a whole.

Because of the scale of the scheme, it was broken down into areas. This follow-up consultation is about Area 3, which covers Manchester Road and Barlow Moor Road (from Seymour Grove to Wilbraham Road) and down to Sandy Lane. (In the consultation around Area 4, which covers Barlow Moor Road (Sandy Lane to Hardy Lane), people were broadly happy with the proposals, and this section has already progressed to the final design. See www.manchester.gov.uk/improvements for more information.)

In the original consultation, a number of issues were raised around Area 3, including:

– Rat-running through residential streets, and the safety of schoolchildren using them

– Congestion at the ‘four banks’ junction – Making cycling safer over the Metrolink bridge – Parking being displaced onto side streets – Availability of free parking – Public realm and pavement quality – Concerns over banning right turns at the

junction with Wilbraham Road. – Traffic signals at the junction of St Werburgh’s

Road and Wilbraham Road.

What you said... Things that people asked for in Area 3 included:

– Improvements to public realm – Speed-calming around schools and on routes

that children take to school – Traffic signals on Buckingham Road – Improvements to prevent rat-running on many

roads, particularly where junction closures potentially make this more likely, including Egerton Road (North and South) Oswald Road, Corkland Road, Sandy Lane and Albany Road.

What we’’,’re doing...

We reviewed all the comments received, and following extensive discussions with local Councillors, changes have been made to the proposed measures. These included:

– Improving public realm as part of the work, eg. better pavement quality

– Putting speed tables in and narrowing crossing distances at junctions to reduce traffic speed

– Improving major junction layouts to make crossing easier and safer and improve traffic flow

– Removing ‘Copenhagen style’ bus stops, and instead providing bus stop bypasses where possible

– Reviewing concerns around rerouting of traffic due to proposed banned movements at junctions. Traffic modelling of the wider area has been carried out to inform the impact of rerouting traffic

– Reviewing proposed banned movements at signal-controlled junctions to consider the impacts on the adjacent road network. Where possible, these impacts will be eliminated or mitigated by providing traffic-management measures on the impacted roads

– The proposed banned left turn travelling towards the city centre from Wilbraham Road onto Barlow Moor Road at the ‘four banks’ junction was removed from the plans

– The proposed banned right turn travelling towards Stretford from Barlow Moor Road onto Wilbraham Road was also removed

Manley ParkPrimarySchool

St JohnVianney School

St Hilda’s CEPrimary School

St John’s RCPrimary School

Oswald RoadPrimary School

Bus Station

ChorltonHigh School

Chorlton ParkPrimary School

FirswoodMetrolink

St Werburgh’sRoad Metrolink

Barlow Moor RoadMetrolink

ChorltonMetrolink

WARW

ICK ROAD SOUTH

UPPER CHORLT

ON ROAD

BARLOW

M

OO

R

RO

AD

MAN

CH

ESTE

R

RO

AD

SEY MO

UR

GR

OV

E

BRANTINGHAM ROAD

CLARENDON ROAD

RYE BANK RD

KENSINGTON RD

CLARIDGE RD

CHELT’M RD

LONGFORD ROAD

OSW

ALD

RD

EGERTON ROAD SOUTH

EGER

TON

RO

AD

NO

RTH

NELL LAN

E

CUNDIFF RDST W

ERB

UR

GH

’S RO

AD

HIGH LANE

EDGE LANE

BEECH ROAD

SANDY LANE

CLAUDE ROAD

HARDY LANE

KINGS ROAD

WILBRAHAM ROAD

NICOLAS ROAD

Silverwood Ave.

Chestnut Ave.

Woodside Rd

Chorlton Park

CLARENDON RD WEST

BU

CKIN

GH

AM

RO

AD

N

For details of Areas 1, 2 and 4, visit www.manchester.gov.uk/improvements

Section 1

Section 2

Section 3

Section 4

Section 5

Section 6

Section 7

TCB

SEYMOUR GROVE

UPPER CHORLTON ROAD

WO

ODSIDE

ROAD

BUSSTOP

BUS STOP

CLARENDON

ROAD

WEST

MANCHESTER ROAD

BUCKI

NGHAMROAD

4 5

One issue that was raised several times and which we are very aware of is parking. We looked at a number of options, but the car park in this area is privately owned so cannot be made free, and loading bays are an essential requirement for businesses. Parking spaces have been retained wherever possible. Enforcement to deter pavement parking will continue.

We now have designs for the measures we think will help to address issues in the area and make walking and cycling easier and safer. To support the new cycle lanes and changes to signal-controlled junctions, we are proposing to stop some movements at junctions (which should address concerns raised about displaced traffic) and introduce a number of measures on side streets.

Section 1 Seymour Grove to Metrolink Bridge 1. Revised junction layout at Seymour Grove, including cycle routes

This becomes a Cyclops junction, similar to the one already in place at Royce Road. The plan shows new on-road and segregated cycle lanes that bypass bus stops and parking bays. The road will be narrowed at junctions with side roads, and raised

tables will be included to slow traffic, reduce crossing distance and make it easier to cross on foot. Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 1:– Seymour Grove to Sandy Lane

Section 2 New one-way system at the junction of Manchester Road, Clarendon Road West and Buckingham Road

This includes new on-road and segregated cycle lanes, which will bypass bus stops where possible. The road will be narrowed at junctions with side roads, and raised tables will be included to slow traffic, reduce crossing distance and make it easier

to cross on foot. Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 2:– Manchester Road, Clarendon Road West and Buckingham Road

N

N

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

BUSSTOP MANCHESTER ROAD

CHEL

TENH

AMRO

AD

KENS

ING

TON

ROAD

BUS STOP

CLA

RID

GE

RO

AD

RAN

SFIE

LDR

OAD

MANCHESTER ROAD

TOU

CAN

CR

OSSIN

G

LAN

E

50

OSW

ALD

BUSSTOP

CLA

RID

GE

MANCHESTER ROAD

LON

GFO

RD

RO

AD

BRAN

TIN

GH

AMR

OAD

ROAD

NICOLA

S

LONGFORD R

OAD

MANCHESTER ROAD

ROAD

6 7

Section 3 Manchester Road from the junction with Cheltenham Road to the junction with Claridge Road

Plans for this area include new on-road and segregated cycle lanes that bypass bus stops and parking/loading bays. The road will be narrowed at junctions with side roads, and raised tables will be included to slow traffic, reduce crossing distance and make it easier to cross on foot. The crossing

near Ransfield Road will be upgraded to a toucan crossing (allowing cyclists and pedestrians to cross at the same time). Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 3a:– Manchester Road from the junction with Cheltenham Road to the junction with Claridge Road

Section 3b:– Manchester Road from the junction with Cheltenham Road to the junction with Claridge Road

Section 4 Manchester Road from the junction with Claridge Road to the junction with Nicolas Road

Proposed improvements include new on-road and segregated cycle lanes that bypass bus stops and parking/loading bays. The road will be narrowed at the junction with side roads to slow traffic, reduce crossing distance and improve safety. A new ‘puffin’

pedestrian crossing will be installed, instead of pedestrian refuge in the vicinity of Warwick Road. Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 4a:– Manchester Road from the junction with Claridge Road to the junction with Nicolas Road

Section 4b:– Manchester Road from the junction with Claridge Road to the junction with Nicolas Road

NN

NN

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

BUS STOP

CLA

RID

GE

RO

AD

RAN

SFIE

LDR

OAD

MANCHESTER ROAD

TOU

CAN

CR

OSSIN

G

N

Shared space

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

Shelter

80 70

BUSSTOP

BUS STOP

BARLOW MOOR ROADMANCHESTER ROAD

WA

RW

ICK

R

OA

D

SE

LBO

RN

ER

OA

D

NICOLA

S

ROAD N

WIL

BRAH

AMRO

AD

WIL

BRAH

AMRO

AD

BARLOW MOOR ROAD

MANCHESTER ROAD

SILV

ER

WO

OD

AV

EN

UE

BARLOW MOOR ROAD

NAPIER

RO

AD

GR

OBY R

OAD

SILVERW

OO

DAVEN

UE

NEED

HAM

AVENU

E

CH

ES

TNU

T A

VE

NU

E

EU

NE

VA

KA

O

EU

NE

VA

ELP

AM

CR

ANBO

UR

NE R

OAD

8 9

Section 5 Barlow Moor Road from the junction with Nicolas Road to the junction with Silverwood Avenue

We have revised the junction layout at Wilbraham Road to make it safer and easier for pedestrians and cyclists to cross, and there would be revised signal timings (ie. a Cyclops junction, similar to the one already in place at Royce Road). Some traffic movements have been changed and some retained (eg. ‘no right turn’ into Wilbraham Road when travelling northbound on Barlow Moor Road (except

buses). New on-road and segregated cycle lanes are proposed, which will bypass bus stops and parking bays. The road is narrowed at the junction with side roads to slow traffic, reduce crossing distance and improve safety. Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 5a:– Barlow Moor Road from the junction with Nicolas Road to the junction with Silverwood Avenue

Section 5b:– Barlow Moor Road from the junction with Nicolas Road to the junction with Silverwood Avenue

Section 6 Barlow Moor Road, from the junction with Silverwood Avenue to the junction with Chestnut Avenue

New on-road and segregated cycle lanes will bypass bus stops and parking/loading bays. The road will be narrowed at junctions with side roads, and raised tables will be included to slow traffic,

reduce crossing distance and make it easier to cross on foot. Mixed wildflower planting featuring environmentally friendly drainage will improve the look and feel of the area.

Section 6a:– Barlow Moor Road, from the junction with Silverwood Avenue to the junction with Chestnut Avenue

Section 6b:– Barlow Moor Road, from the junction with Silverwood Avenue to the junction with Chestnut Avenue

NN

NN

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface

10 11

Section 7 Barlow Moor Road from Chestnut Avenue to the Bus Station

The junction layout at Sandy Lane has been revised to include upgraded pedestrian crossings and cycle-crossing facilities, creating a Cyclops junction, similar to the one already in place at Royce Road. Vehicles will be prohibited from turning right into

Sandy Lane from Barlow Moor Road and also turning left out of Sandy Lane into Barlow Moor Road. Measures are being put in place to prevent rat-running in the Sandy Lane area. The proposed ‘no right turn’ into St Annes Road has been removed.

In addition to the measures above, a number of other changes are being suggested to support the scheme and prevent ‘rat-running’ around closures etc.

These include: – Placing a filter (to allow walking and cycling but

not traffic) at the junction of Longford Road with Manchester Road

– Placing a filter (to allow walking and cycling but not traffic) on a section of Sandy Lane to reduce vehicle volumes for non-residents

– A filter (to allow walking and cycling but not traffic) on sections of Hartington Road, Torbay Road, Dartmouth Road and Dawlish Road to reduce vehicle volumes for non-residents

– Placing a filter (to allow walking and cycling but not traffic) on Keppel Road, Brundretts Road and Egerton Road South.

– Additional junction speed tables either end of Fairhaven Avenue.

– Measures to slow traffic on Albany Road / Brantingham Road, Brundretts Road and Corkland Road.

– Proposed Cyclops style junction at St. Werburghs Road / Wilbraham Road (subject to modelling).

– We are considering some measures to slow traffic on Egerton Road North and Oswald Road.

– Additional junction protection markings to remove parking at the following junctions:

Sandy Lane / Fairhaven Avenue junction St. Anne’s Road / Fairhaven Avenue junction Sandy Lane / Limley Grove junction Sandy Lane / Park Brow Close junction Sandy Lane / Nell Lane / St. Werburgh’s Road.

– Measures to reduce the speed of traffic in front of Chorlton Park Primary School.

– Any mitigating measures would be installed on a trial basis, and would be adjusted in the light of feedback and monitoring of any issues.

Section 7:– Barlow Moor Road from Chestnut Avenue to the Bus Station

N Have your say Please let us know what you think of these proposals by 14 January 2021. You can do this by visiting manchester.gov.uk/consultations If you have a specific query or concern, you can email the project team at [email protected]

Key Proposed kerb line

Parking bays

Pavements

Cycle lane (on road) green surface course

Rain garden soft landscaping

No waiting

Cycle segregation kerb

Crossing

Controlled crossing

Private access/driveway

Raised surface