20
Managing the Natura 2000 network: state of play, challenges and opportunities

Managing the Natura 2000 network: state of play, challenges and opportunities

Embed Size (px)

Citation preview

Managing the Natura 2000 network:

state of play, challenges and opportunities

Natura 2000: Europe's areas of high biodiversity value

• 26 400 sites• 986 000 km²• 18 % EU land• ~4 % EU seas• Largest co-ordinated PA network• Almost complete on land• Some additional work for marine

Current status of Natura 2000

covers 18% of land area and ca. 4% of marine area of the EU Member States, in 26 400 sites (Birds and Habitats Directive)

terrestrial part of the network now almost complete, still many additional sites required at sea

increasing focus over time on site management and financing of Natura 2000, and on further enhanced collaboration with land owners & users

Monitoring & Reporting

First Member State assessments done for 2001-2006

2009 EU composite report or ‘Health Check’ showed Only 17% deemed to be in favourable conservation status Grasslands, wetlands & coastal habitats most under

pressure

The job is far from done!

New reporting cycle underway – MS to submit national reports in 2013

28%

17%

37%

18%

17%

30%31%

22%

Other monitoring tools: • e.g. EU common birds Index in Europe

population index (1980 = 100)

• European Red Lists

EU biodiversity strategy to 2020« Our life insurance, our natural capital »

A 2050 VISIONEuropean Union biodiversity and the ecosystem services it provides – its natural

capital – are protected, valued and appropriately restored…

A 2020 HEADLINE TARGET

Halt the loss of biodiversity and ecosystem services in the EU and restore them insofar as feasible, and step up the EU's contribution to averting global biodiversity loss

EU Biodiversity Strategy Target 1: Nature Conservation

Objective: halt deterioration in status of all species and habitats covered by EU nature legislation and achieve a significant and measurable improvement in their status by 2020

Actions

Complete the establishment of the Natura 2000 network and ensure good management

Ensure adequate financing of Natura 2000 sites

Increase stakeholder awareness and involvement and improve enforcement

Improve and streamline monitoring and reporting

Future Management of Natura 2000 (Article 4.4 and 6.1)

• SCI SAC (6 year deadline overdue)

• Define Conservation Objectives

• Establish Conservation Measures

• Develop Management Plans, Legal, statutory or contractual arrangements

• Full stakeholder engagement

• New biogeographical Seminars on management/restoration

Sectoral specific guidelines andArticle 6 of Habitats Directive

Aims at providing guidance on how economic activities can be reconciled with Natura 2000 requirements + good practices

Prepared with the assistance of Working Group (Member States, sectors and NGOs)

Key issues:

Importance of sectors in the EUKnowledge of risk factorsValue of Strategic planningAppropriate assessment of plans/projects

according to Art. 6 of the Habitats Directive; mitigation; alternatives; compensation

Strategy for financing Natura 2000

• Article 8 of the Habitats Directive – legal basis for EU co-financing;

• Prioritised Action Frameworks (PAFs);• Integration approach;• Communication on financing N2000 in

2004 and SWD in 2011.

Prioritised Action Frameworks (PAFs) – tool to assess needs and priorities;

PAFs objectives:• Strengthen strategic planning;• Identify priorities for Natura 2000 management;• Improve awareness about socio-economic benefits from Natura 2000;• Identify and assess forms of funding for Natura 2000.• PAFs received from 22 MS; other expected

Proposed format for Prioritised Action Frameworks (PAFs)

A. Introductory overview of Natura 2000 network for territory;

B. Status of the habitats and species;

C. Legal and administrative provisions for protection and management of Natura 2000;

D. Current experience with use of EU financial instruments;

E. Current estimate of financial needs for management of Natura 2000 for territory;

F. Strategic conservation priorities for Natura 2000 for 2014-2020;

G. Description of key measures to achieve priorities;

H. Monitoring, evaluation and updating.

Support for the Member States

Contract to improve uptake of funds for Natura 2000:

updated guide (2nd half 2013)

toolkit:

introduction + check lists (already available)

on-line communication platform

examples of good integration

seminars in the MS (2nd half 2013 – 1st half 2014)

20

http://ec.europa.eu/environment/nature/index_en.htm

For more information, please consult: