Managing Construction Managing Construction Claims” Calvey Consulting, LLC 8473 Settlers Passage Cleveland, OH 44141 440-740-1132

Managing Construction Claims

Embed Size (px)

Citation preview

  • Managing ConstructionManaging Construction Claims

    Calvey Consulting, LLC8473 Settlers PassageCleveland, OH 44141

    440-740-1132

  • Managing Construction ClaimsManaging Construction Claims

    Why are Claims are disputed.Why are Claims are disputed.What is Typical ClaimWhat does a Consultant use to develop aWhat does a Consultant use to develop a Claim.What are the Key ComponentsWhat are the Key Components. What are Accepted Methods of Analysis

    Calvey Consulting, LLC 440-740-1132

  • h i l i i dWhy are Construction Claims Disputed ?The Issues are complex.The Issues are complex.The Claims are loosely documented.Breakdown in communicationBreakdown in communication.There is an honest difference in opinion. No budget dollarsNo budget dollars.

    Calvey Consulting, LLC 440-740-1132

  • What is a Typical Construction Claim?

    Claimant Multi Prime ContractorClaimant Multi Prime ContractorMoneyTimeTimeSource of the Dispute Third Party No Exact AccountingNo Exact Accounting

    Calvey Consulting, LLC 440-740-1132

  • What does a Claims Consultantuse to develop his analysis?

    ContractContractProject SchedulesPay ApplicationsPay ApplicationsCertified PayrollsProject Meeting noteProject Meeting noteDaily Logs

    Calvey Consulting, LLC 440-740-1132

  • What are the Key Components of a Typical Contractors Claim?

    The Planned ScheduleThe Planned Schedule The Actual SchedulePredecessor DelayPredecessor DelayImpact on the ContractorQuantify the DamagesQuantify the Damages

    Calvey Consulting, LLC 440-740-1132

  • Methods of Delay AnalysisTi I A l iTime Impact Analysis

    Impacted As PlannedImpacted As PlannedAdjusted As BuiltWindowsWindowsConstructive Acceleration

    Calvey Consulting, LLC 440-740-1132

  • Calculating Damages

    Extension of General ConditionsExtension of General ConditionsExtension of Home Office OverheadEscalationEscalationLoss of Productivity

    Calvey Consulting, LLC 440-740-1132

  • AACE - Purpose of Recommended Practice

    Identify Lost Productivity EstimatingIdentify Lost Productivity Estimating MethodologiesRank Order the MethodologiesgDefine and Discuss Each MethodologyIdentify Selected Studies Applicable to EachIdentify Selected Studies Applicable to Each Methodology

    Calvey Consulting, LLC 440-740-1132

  • Methods of Estimating Lost ProductivityMethods of Estimating Lost Productivity

    Project Specific StudiesProject Specific StudiesProject Comparison StudiesSpecialty Industry StudiesSpecialty Industry StudiesGeneral Industry StudiesCost BasisCost Basis

    Calvey Consulting, LLC 440-740-1132

  • What is Productivity?What is Productivity?

    Productivity =Productivity Output (units completed)

    Input (work or equipment hours)Input (work or equipment hours)

    Productivity Factor =Productivity Factor = Actual ProductivityBaseline or PlannedBaseline or Planned

    Productivity

    Calvey Consulting, LLC 440-740-1132

  • Common Causes of Lost ProductivityCommon Causes of Lost Productivity

    Acceleration (directed or constructive)Acceleration (directed or constructive)Crowding of labor or stacking of tradesOver manningOver manningLearning CurveExcessive overtimeExcessive overtimeAdverse or unusually severe weatherDilution of SupervisionDilution of Supervision

    Calvey Consulting, LLC 440-740-1132

  • Common Causes of Lost ProductivityCommon Causes of Lost Productivity

    Changes, ripple impact, cumulative impact ofChanges, ripple impact, cumulative impact of multiple changes and rework Defective engineering, recycle and/or reworkg g, yAbsenteeism and the missing man syndromeCraft turnoverCraft turnoverMaterial, tools and equipment shortagesSite or work area access restrictionsSite or work area access restrictions

    Calvey Consulting, LLC 440-740-1132

  • Project Specific StudiesProject Specific Studies

    Measured Miles StudyMeasured Miles StudyEarned Value AnalysisWork Sampling MethodWork Sampling MethodCraftsmen Questionnaire Sampling Method

    H l i i ?How long is it?

    Calvey Consulting, LLC 440-740-1132

  • Measured Mile Physical UnitsMeasured Mile Physical Units

    Measured Mile10 Miles of pipe installed 1,000 manhours

    100 manhours/mileImpact4 Miles of pipe installed 640 manhours

    /160 manhours/mileLoss of Productivity

    60 manhours/mile60 manhours/milex4 miles

    240 manhours

    Calvey Consulting, LLC 440-740-1132

    240 manhours

  • Earned Value AnalysisEarned Value Analysis

    Measured Mile70% Labor Complete 1,000 manhours

    14.3 manhours/1%Impact30% Labor Complete 640 manhours

    / %21.3 manhours/1%Loss of Productivity

    7 manhours/1%7 manhours/1%30%

    240 manhours

    Calvey Consulting, LLC 440-740-1132

    240 manhours

  • Project Specific StudiesProject Specific Studies

    Measured Miles StudyMeasured Miles StudyEarned Value AnalysisWork Sampling MethodWork Sampling MethodCraftsmen Questionnaire Sampling Method

    H l i i ?How long is it?

    Calvey Consulting, LLC 440-740-1132

  • Project Comparison StudiesProject Comparison Studies

    Comparable Work StudyComparable Work StudyComparable Project Study

    Calvey Consulting, LLC 440-740-1132

  • Specialty Industry StudiesSpecialty Industry Studies

    AccelerationAccelerationChanges, Cumulative Impact and ReworkLearning CurveLearning CurveOvertime and Shift WorkProject CharacteristicsProject CharacteristicsProject ManagementWeatherWeather

    Calvey Consulting, LLC 440-740-1132

  • Specialty Industry StudiesSpecialty Industry Studies

    Selected StudiesSelected Studies

    Weather Impact on ProductivityWeather Impact on Productivity

    Overtime Impact on Productivity

    Calvey Consulting, LLC 440-740-1132

  • Weather Impact on ProductivityWeather Impact on Productivity

    120

    100

    120

    60

    80

    f

    f

    i

    c

    i

    e

    n

    c

    y

    20

    40%

    E

    f

    0

    20

    -20 -10 0 10 20 30 40 50 60 70 80 90 100

    Eff ti T t (F)

    Calvey Consulting, LLC 440-740-1132

    Effective Temperature (F)

  • Weather Impact on Productivity (NECA Studies)

    Temperature (effective) ImpactTemperature (effective) Impact

    Eff ti T t R FEfficiency

    Effective Temperature Range F%

    +40 to 80 100

    -20 to +20 20 95

    80 to 100 85 - 60

    Calvey Consulting, LLC 440-740-1132

  • Weather Impact on ProductivityWeather Impact on Productivity

    Daily Log Documentationy gFrequency (AM, Noon, PM)TemperatureWindPrecipitation (rain, snow, sleet)E i H iditExcessive Humidity

    Historic DataNational Oceanic & Atmospheric AdminNational Oceanic & Atmospheric Admin. (NOAA) National Climatic Data Center

    Calvey Consulting, LLC 440-740-1132

  • Overtime Industry StudiesOvertime Industry Studies

    Bureau Labor Statistics 1947 (Mfg.)Bureau Labor Statistics 1947 (Mfg.)Business Roundtable 1980

    10 year study of P&G plant projects10 year study of P&G plant projectsNational Electrical Contractors Assn.

    1969 (rev 1989)1969 (rev. 1989)Construction Industry Institute 1988

    7 projects all crafts7 projects, all craftsCost Engineering Composite - 2004

    Calvey Consulting, LLC 440-740-1132

  • Overtime Impact on ProductivityOvertime Impact on ProductivityNECA Study

    90

    100

    e

    60

    70

    80

    r

    o

    d

    u

    c

    t

    i

    v

    40

    50

    60

    %

    P

    r

    301 2 3 4 5 6 7 8 9 10 11 12

    Weeks

    Calvey Consulting, LLC 440-740-1132

    Weeks

  • Overtime Impact on ProductivityOvertime Impact on Productivity

    Days hours per day Productivity Range2 wks to 12 wks

    5 - 10s 95 % to 70 %

    6 - 10s 91 % to 62 %

    5 - 12s 85 % to 52 %6 - 12s 75 % to 45 %

    7 - 12s 70 % to 40 %

    Calvey Consulting, LLC 440-740-1132

  • General Industry StudiesGeneral Industry Studies

    U.S. Army Corps of Engineers ModificationU.S. Army Corps of Engineers Modification Impact Evaluation GuideMechanical Contractors Association of AmericaNational Electrical Contractors AssociationEstimating Guides

    Calvey Consulting, LLC 440-740-1132

  • General Industry StudiesGeneral Industry Studies

    MCAAMCAA16 FactorsRange of LossRange of Loss

    NECA25 Factors Checklist25 Factors ChecklistNormal Difficult Most Difficult

    US Army Corps of EngineersUS Army Corps of EngineersNumber of FactorsNo Longer Published

    Calvey Consulting, LLC 440-740-1132

    o o ge ub s ed

  • Cost BasisCost Basis

    Total Unit Cost MethodTotal Unit Cost MethodModified Total Labor Cost MethodTotal Labor Cost MethodTotal Labor Cost Method

    Calvey Consulting, LLC 440-740-1132

  • Measured MileMeasured Mile

    MEASUREDMILE40,000

    Actual Production

    32,668

    MEASUREDMILE

    30,000

    e

    r

    P

    e

    r

    c

    e

    n

    t

    20,000

    M

    a

    n

    h

    o

    u

    r

    s

    p

    e

    60% Complete: 14,762 Manhours

    -

    10,000

    Calvey Consulting, LLC 440-740-1132

    -

    1

    0

    %

    2

    0

    %

    3

    0

    %

    4

    0

    %

    5

    0

    %

    6

    0

    %

    7

    0

    %

    8

    0

    %

    9

    0

    %

    1

    0

    0

    %

    Percent based on Foundation Concrete

  • Court Case (A) Clark Concrete Contractors, I 99 1 BCA 30 280 [1]Inc., 99-1 BCA 30,280 [1]

    [The Government] is correct in asserting that the work [ ] gperformed during the periods compared by [the Contractor] was not identical in each period. We would be surprised to learn that work performed inwould be surprised to learn that work performed in periods being compared is ever identical on a construction project, however. And it need not be; the

    f f ffascertainment of damages for labor inefficiency is not susceptible to absolute exactness. (Citation omitted). We will accept a comparison if it is between kinds of p pwork which are reasonably alike, such that the approximations it involves will be meaningful.

    Calvey Consulting, LLC 440-740-1132