Yangon Urban Transport Master Plan of the Project for Comprehensive Urban Transport Plan of
the Greater Yangon (YUTRA)
Major Findings on Yangon Urban Transport and Short-Term Actions
May 14, 2014Mr. Takashi Shoyama
JICA Project Team
Jointly hosted by the Ministry of Rail Transportationwith Japan International Cooperation Agency (JICA)
1
Contents
I. YUTRA IntroductionII. Key Findings of YUTRA SurveysIII. Transport Demand ForecastIV. Proposed Short-term Actions
2
I. YUTRA Introduction
YUTRA traffic survey (meeting in the field)3
Objectives
To prepare a comprehensive urban transport plan of the Greater Yangon: long term plan until 2035, mid-term plan until 2025, and short-term action plan until 2018;
To conduct Pre-Feasibility Study for Construction of New ThaketaBridge;
Implementation of 8-mile Intersection Improvement; and
Technology transfer to Myanmar counterparts through the Project
4
Project Schedule
5
Transport/Traffic Surveys Conducted in YUTRA
Intersection Survey
Traffic Count Survey
Screen Line Survey
Parking Survey
Ferry Passenger Count Survey
Railway Passenger OD Interview Survey
Bus Passenger OD Interview Survey
Cordon Line Survey
Truck OD Interview Survey
Travel Speed Survey
6
II. Key Findings of YUTRA Surveys
7
No. of Trips of Yangon Residents Mode
Number of Person Trips
(000/day)Walk 4,778Bicycle 1,472Motorcycle 471Car 441Van 89Taxi 502Sc / Co Bus 604Passenger Truck 391Small-Bus 378Large-Bus 1,856Pick-up 64Medium-Truck 14Large-Truck 6Trailer 5Railway 71Water Ferry 160Others 13
Total 11,313
No. of Person- Trips of Greater Yangon
11.3 million/day (total) or
6.5 million/day (excluding walk)
0
1,000
2,000
3,000
4,000
5,000
6,000
Trip: travel activity of a person with a single purpose, e.g. commuting
8
Trip Rate (average number of trips per person per day)
Modal Share
Excluding walk trips
Male Female Total
All Trips 2.199 1.904 2.042
Excluding Walking 1.472 0.923 1.179
In most of Asian cities, the trip rate ranges from 2.0 to 2.5. The rate of Yangon is on the low side. The present mobility of Yangon people is not high.
9
Trip Makers’ Opinion on Selected Transport Policy MattersQuestion:Do you think the current limitation on the use of motorcycle in Yangon should be continued? (Yes/ No/ Don’t know)
10
III. Transport Demand Forecast
11
Demand Forecast Methodology
The travel demand model for YUTRA is developed for the assessment of strategic transport development options.
It is a four stage model:
YCDC (33 Township) 130Special Areas 4Rest of Yangon Region 33Other Regions (External) 20Total (Zones) 187
1. Trip-end model
2. Distribution model
3. Modal split
4. Traffic assignment
12
Socio-economic Framework
2013 2018 2025 2035
Primary 58 58 58 58
Secondary 219 263 350 562
Tertiary 2,263 2,601 3,214 4,470 Workers
Total Workers 2,540 2,921 3,622 5,089
Student at Residence 1,164 1,303 1,532 1,938
Others 2,013 2,212 2,462 2,685
Night-time Population
('000)
Total Night-time Population 5,716 6,437 7,615 9,712
Primary 58 58 58 58
Secondary 244 289 378 595
Tertiary 2,263 2,610 3,242 4,547 Employment
Total Employment 2,565 2,956 3,678 5,200
Student at School places 1,164 1,303 1,532 1,938
Others 2,013 2,212 2,462 2,685
Day-time Population
('000)
Total Day-time Population 5,741 6,472 7,672 9,823
Household Income ('000 Kyat/month) 240.6 340.5 522.2 954.7
Household Car Ownership Ratio (%) 11.6 16.8 23.2 32.3
13
Assignment – Current Situation
V/C: Volume/ Capacity Ratio. If this ratio is over 1.0, the congestion is serious.
14
Summary Growth in Travel Demand ('000)Description 2013 2018 2025 2035
Walk 4,778 5,238 6,072 7,403
Bicycle 1,472 1,661 1,981 2,704
Mechanised 4,935 5,862 7,185 9,477
% mechanised 44.1 45.9 47.2 48.4
Total Trips 11,185 12,761 15,238 19,584Population 5,716 6,437 7,616 9,712
Trip Rate 1.96 1.98 2.00 2.02
About 1.8 times in 2035
Future Travel Demand – Summary of Growth in Person Trips
1515
Future Travel Demand 2035 – Do-nothing
16
IV. Proposed Short-term Actions
(1) BRT - Network Recommended
(2) Traffic Management- Parking issue
- Intersection improvement
(3) Institutional Reform
17
(1) BRT - Network Recommended- To maintain the current 60% of public transport modal share
18
BRT Project Stages
Project Evaluation
No.1. BRT 1A:i. Dagon Ayeyar Highway –Dagon Thiri Garden lineii. Daningon Jct - CBD
No.2. BRT 1B:i. Aungmingalar Bus T – CBDii. YGN Airport – Hledan Jct
No.3. BRT 2A:i. Myaynigone Jct –
Thingangyun SanpyaMarket
ii. East Dagon – CBD
No.4. BRT 2B:i. Thingangyun Yoma Bank –
Kyaikkhouk Pagoda
19
Movie
20
(2) Traffic Management
1. On-street parking and illegal parking2. Insufficient traffic signal operation3. Improper boarding and alighting
behavior of bus passengers 4. Deteriorated road pavement 5. Flooding of road way 6. Schools, hospitals, shopping centers,
etc. that attract many people without enough parking space
7. Busy roadside activities and encroachment area )
8. Road works9. Large volume of trucks and other large
vehicles mixed with other traffic
Major Causes of Traffic Congestion
21
In front of Shopping Center
Parking Problems Motorcar users have no choice but to park on-street causing traffic congestion, since number of off-street parking is limited.
22
Effectiveness of Parking Control – from 2013 simulationWith On-road Parking
(Current Situation) Without On-road Parking
Improvement of about 6-7 km/h
in CBD23
Proposed Traffic Management Projects
1. Yangon CBD Traffic Congestion Mitigation Project
2. Major Roads Traffic Congestion Mitigation Project
3. Capacity Development on Traffic Planning and Management
4. Yangon Parking Development Project (Master Plan)
5. Yangon Parking Development Project (Construction)
6. Yangon Traffic Safety Five-Year Program
24
Pilot Project implemented at 8-mile Intersection
8-mile Intersection
Pyay Rd Pyay RdAM Peak PM Peak9:00-10:00 16:00-17:00
Kabar Aye Pagoda Rd Kabar Aye Pagoda Rd
Kyaik Wine Pagoda Rd Kyaik Wine Pagoda Rd
Pyay Rd Pyay Rd
14%
58%
28%
69%
11%
63%
27%
18% 10%
17% 16%
11% 16%
43%
14%
72%
35%39% 55%
35%
51%
11%
57%
32%
High left-turn ratio
2525
Improvement Measures
Lead-lag phase with left turn actuation
New lane assignment
Advanced signal controller
Video vehicle detector
Time-of-day control to meet varying traffic demand
Two sets of lantern for each movement
26
Movie
27
(3) Institutional ReformEstablishment of Yangon Urban Transport Authority (YUTA)- proposed
About 50 staff in totalResponsible for:
- Planning
- Management
- Budgeting
- Monitoring, etc.
of urban transport projects
28
Establishment of BRT Management Agency
Responsible for
- planning and managing the BRT network,
- and is primarily responsible for customer service delivery.
29
THANK YOU