MAINTENANCE SCHEDULE MANUAL FOR

MULTI PURPOSE TAMPING MACHINE UNIMAT-SPLIT HEAD MFI

Report no. TM-196

March -2016

RESEARCH DESIGNS & STANDARDS ORGANISATION

LUCKNOW- 226 011

Page 3: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016

PREFACE

Maintenance of On-Track Machines is a challenging task. Maintenance of these machines is being done by Zonal Railways with the assistance of local trade available, zonal track machine workshops, CPOH / Allahabad and RDSO / Lucknow. With experience over the years, the railway engineers have developed adequate expertise in the maintenance of these machines. However, in absence of approved maintenance instructions, different maintenance practices have come into vogue. Therefore, it has become imperative to have a uniform maintenance standard throughout the Indian Railways.

This Maintenance Schedule manual for UNIMAT-SPLIT HEAD MFI has been prepared on the basis of Maintenance instruction given by OEM and suggestions received from different railways. The suggestion and feedback from field has been taken and incorporated in this these maintenance schedules. Suggestion/instruction given by OEM time to time also followed in addition to this manual. The manual is prepared for those items which is required day to day maintenance. Apart from these instruction if any part of machine fails/breakdown that shall be attended immediately by the railway. The oiling and greasing shall be done of every moving part where as required in addition to manual depending on discretion of machine in charge. Some time machine modified/altered on the basis of experience or OEM suggestion that shall be also undertaken in the maintenance practice.

While every care has been taken to make the maintenance schedules quite exhaustive, there is always scope for further improvement. Suggestions from the railways in this regard will be welcome and may be sent to the undersigned for future improvement.

(Anil Choudhary)

Director/Track Machine March -2016 RDSO/Lucknow-226011.

Page 4: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016

Maintenance Schedule for UNIMAT-SPLIT HEAD MFI

1. Schedule I Daily

One hour In the Track Machine Siding

2. Schedule II 50 Engine hrs.

Two hrs. -do-

3. Schedule III 100 Engine hrs.

One day -do-

4. Schedule IV 200 Engine hrs.

Two days -do-

5. Schedule V 1000 Engine hrs.

7 days In Satellite Depot/Zonal Workshop

6. Schedule VI 2000 Engine hrs.

21 days In Zonal Workshop

7. Schedule VII 6000 Engine hrs.

1st POH-60 days, 2nd POH-75 days

In CPOH Workshop

Page 5: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 1 of 14

SR.NO. ITEM SCH.I Daily

SCH.II 50HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000HRS.

SCH.VII 6000 HRS.

1. Engine KTA-1150L I. Check coolant level of radiator and top up,

as required. √ √ x x x x x

II. Check level of engine oil & top up, as required. √ √ x x x x x III. Check fuel level & top up, if required. √ √ x x x x x IV. Check the leakage from fuel pump, injectors, fuel

supply and return pipes and do needful. √ √ x x x x x

V. Check the leakage from hoses, water pump seal etc. and do the needful.

√ √ x x x x x

VI. Check oil level of compressor, if applicable. √ √ x x x x x VII. Check the physical condition of V belt and do the

Needful. √ √ x x x x x

VIII. Check air cleaner filter choking indicator. √ √ x x x x x IX. Clean the engine & premises. √ √ x x x x x X. Check engine oil pressure on load after two hours

working √ √ x x x x x

XI. Record the maximum engine temperature of the day’s work.

√ √ x x x x x

XII. Drain water from air receiver after day’s work. √ √ x x x x x XIII. Drain sediment from Fuel tanks/Fuel Filter

/Water Separator. √ √ x x x x x

XIV. Check charging ammeter of batteries (it should be +ve) √ √ √ √ √ √ √ XV. Check battery terminal and connection for tightness. x √ √ √ √ √ √

XVI. Apply petroleum jelly on battery terminal. x √ √ √ √ √ √ XVII. Check injector pipes for any rubbing and do needful x √ √ √ √ √ √

XVIII. Clean the water separator. x √ √ √ √ √ √ XIX. Open and clean dust collector/pan, if applicable. x √ √ √ √ √ √ XX. Top up air oiler if required. x √ √ √ √ √ √

XXI. Check water temperature safety device. x x √ √ √ √ √ XXII. Clean the water separator x x √ √ √ √ √

XXIII. Check lube oil pressure safety device. x x √ √ √ √ √

Page 6: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 2 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XXIV. Grease radiator fan drive x x √ √ √ √ √ XXV. Check the throttle control linkages. x x √ √ √ √ √

XXVI. Examine the mounting bolts of engine. x x √ √ √ √ √ XXVII. Change lube oil (engine). x x x √* √* √* √*

XXVIII. Change lub oil filter. x x x √* √* √* √* XXIX. Change pre filter element (Diesel). x x x √* √* √* √* XXX. Change secondary filter element. x x x √* √* √* √*

XXXI. Check fuel tank breather. x x x √* √* √* √* XXXII. Clean outer air cleaner element.( Cleaned after

every 250hrs or on dirt indication) x x x √ √ √ √

XXXIII. Check corrosion Resistor Coolant. x x x √* √* √* √* XXXIV. Check Coolant additive concentrate x x x √* √* √* √* XXXV. Clean the centrifuge. x x x √* √* √* √*

XXXVI. Check tappet clearance and adjust if required. x x x √ √ √ √ XXXVII. Clean crank case air breather. x x x √ √ √ √

XXXVIII. Check and change radiator hoses, if required. x x x √ √ √ √ XXXIX. Check specific gravity of battery electrolyte. x x x √ √ √ √

XL. Check coupling disc of injection pump. x x x √ √ √ √ XLI. Clean the compressor breather. x x x √ √ √ √

XLII. Change foundation bolts of compressor, if applicable. x x x √ √ √ √ XLIII. Change compressor filter, if applicable. x x x √** √** √** √** XLIV. Clean diesel tank with lint free cloth. x x x x √ √ √ XLV. Check the RPM of engine radiator fan and do the

needful. x x x x √ √ √

XLVI. Change the oil of air compressor. x x x x √ √ √ XLVII. Change inner air cleaner element. x x x x √** √** √**

XLVIII. Change outer air cleaner element. x x x x √** √** √** XLIX. Overhaul air compressor, if applicable. x x x x √ √ √

*Done after every 300 Engine hours ** Done after every 500 Engine hours

Page 7: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 3 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

L. Overhaul self starter. x x x x √ √ √ LI. Overhaul alternator I x x x x √ √ √

LII. Overhaul alternator II. x x x x √ √ √ LIII. Check engine timing. x x x x √ √ √ LIV. Change batteries, as applicable. x x x x √ √ √ LV. Overhaul the injectors. x x x x √ √ √

LVI. Overhaul the fuel injection pump x x x x √ √ √ LVII. Clean the engine radiator. x x x x x √ √

LVIII. Top overhaul or replace the engine on condition basis. x x x x x √ √ LIX. Check bearing and shaft of radiator fan drive and do

needful. x x x x x √ √

LX. Change the engine mounting pads x x x x x √ √ LXI. Overhaul water pump. x x x x x √ √

LXII. Overhaul the radiator fan drive assembly. x x x x x x √ LXIII. Check engine damper for any damage. x x x x x x √ LXIV. Check the RPM of engine radiator fan, if less than the

rated RPM, take corrective measures. x x x x x x √

LXV. Clean inner side of diesel tank. x x x x x x √ LXVI. Clean/Replace cooling coil. x x x x x x √

Note: final decision for maintenance of engine may be followed as per OEM guide lines of engine manual. Maintenance of engine shall be exercise as per advice by OEM time to time

Page 8: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 4 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

2. Power Transmission and ZF gear box

I. Check ZF pressure at idle and rated at 2100 RPM. √ √ x x x x x II. Record the maximum temperature of hydraulic fluid

during the day's work. √ √ x x x x x

III. Check the oil leakage from all gear boxes and do the needful.

√ √ x x x x x

IV. Grease king pin pivot of driving & idle bogies. x √ √ √ √ √ √ V. Grease axle gear box flange cover of driving bogie. x √ √ √ √ √ √

VI. Check oil level of intermediate drive shaft. x √ √ √ √ √ √ VII. Check oil level of axle gear box. x √ √ √ √ √ √

VIII. Check oil level of cardan shaft power divider/power distribution.

x √ √ √ √ √ √

IX. Check the tightness of cardon shaft bolts. x √ √ √ √ √ √ X. Lubricate all dirt repelled with grease(shell Alvania

RL-2). x √ √ √ √ √ √

XI. Check oil level of ZF gear box (at 1000 rpm), and top up after stopping engine if required.

x √ √ √ √ √ √

XII. Visual check of oil leakage and level of all gear boxes.

x √ √ √ √ √ √

XIII. Grease all brake linkages. x √ √ √ √ √ √ XIV. Grease hand brake gear. x √ √ √ √ √ √ XV. Check oil level of intermediate drive shaft. x √ √ √ √ √ √

XVI. Check oil level of axle gear box. x √ √ √ √ √ √ XVII. Grease king pin pivot, torque arm pivot and gear

box flange cover of driving & idle bogies x x √ √ √ √ √

XVIII. Check brake lining and brake block play. x x √ √ √ √ √

Page 9: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 5 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XIX. Greasing the cardon shafts. x x √ √ √ √ √ XX. Inspect distributor gear box cover through

inspection window. x x √ √ √ √ √

XXI. Visual and physical inspection of wheel shall be done at a frequency of once in a year or after every 1000 engine running hours whichever is earlier

x x x x √ √ √

XXII. Ultrasonic testing of axles of machine shall be done between 40,000 to 45,000 kms of running engine hours or three years, whichever is earlier.

x x x x √ √ √

3. TAMPING UNITS

I. Check & top up oil in all banks for lubrication of main pin bearing (55mm pin). In glass indicator while working.

√ √ x x x x x

II. Check locking and unlocking of tamping units. √ √ x x x x x III. Change worn out tamping tools(20% maximum

wear on area basis) √ √ x x x x x

IV. Check tightness of tamping tools. √ √ x x x x x V. Check for any unusual sound from tamping units &

hydraulic pumps. √ √ x x x x x

VI. Clean the tamping bank √ √ x x x x x VII. Check and tighten shoe plate bolts of guide

column. x √ √ √ √ √ √

VIII. Check and tighten squeezing cylinder cover plate bolts.

x √ √ √ √ √ √

IX. Check tamping banks locking cylinder bracket. x √ √ √ √ √ √ X. Grease hinge of tamping unit up/down cylinder x √ √ √ √ √ √

XI. Grease crank pin. x √ √ √ √ √ √ XII. Check tamping unit cylinder holding bracket bolts for

tightness (LHS). x √ √ √ √ √ √

Page 10: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 6 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XIII. Check tamping unit cylinder holding bracket bolts for tightness (RHS).

x √ √ √ √ √ √

XIV. Check the nuts of 55 mm and 35 mm pin for tightness (LHS).

x √ √ √ √ √ √

XV. Check the nuts of 55 mm and 35 mm pin for tightness (RHS).

x √ √ √ √ √ √

XVI. Check tamping unit locking device (LHS). x √ √ √ √ √ √ XVII. Check tamping unit locking device (RHS) . x √ √ √ √ √ √

XVIII. Check calibration of tamping unit depth. x x x √ √ √ √ XIX. Overhaul/replace tamping unit, if required. x x x x √ √ √ XX. Overhaul/Replace tamping units.

x x x x x x √

Note :All movable parts other than not mentioned in this schedule to be lubricated with grease/ oil 4. TRACK LIFTING & LINING UNIT

I. Check locking device of lifting and lining unit.. √ √ x x x x x II. Inspect clamp roller locking bracket bolts for tightness. x √ √ √ √ √ √

III. Examine the clamp roller for wear and free movement and do the needful.

x √ √ √ √ √ √

IV. Grease lining cylinder pivots. x √ √ √ √ √ √ V. Grease lifting unit guide columns. x √ √ √ √ √ √

VI. Grease rail clamp pivot pins. x √ √ √ √ √ √ VII. Grease roller clamp housing. x √ √ √ √ √ √

VIII. Grease locking device pivots. x √ √ √ √ √ √ IX. Lubricate the track lifting cylinder pivots with lube oil. x √ √ √ √ √ √ X. Lubricate the clamp carrier pivots with oil. x √ √ √ √ √ √

XI. Check feeler rollers of middle trolley for play. x x √ √ √ √ √ XII. Check clearance of lifting roller disc below the rail head

in lowered condition. x x √ √ √ √ √

Page 11: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 7 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XIII. Check guide rod of transducers for bends and tightness of bolts.

x x √ √ √ √ √

XIV. Check nuts & bolts of measuring devices for tightness. x x √ √ √ √ √

XV. Grease pendulum bridge pivots. x x x √ √ √ √

XVI. Check calibration of lining. x x x √ √ √ √ XVII. Check calibration of cross level. x x x √ √ √ √

XVIII. Check height transducer carrier rod, for wear or damage. x x x √ √ √ √ XIX. Check transducer fittings for measuring and lining trollies x x x √ √ √ √ XX. Check bearing play and clamp bolt and change if

necessary. x x x √* √* √* √*

XXI. Check wires of all transducers and do needful. x x x x √ √ √ XXII. Calibrate the sensing equipments. x x x x √ √ √

XXIII. Overhaul/ replace the lifting unit, if required. x x x x √ √ √ XXIV. Provide missing thimbles. x x x x x √ √ XXV. Overhaul/Replace the lifting units. x x x x x x √

XXVI. Overhaul lifting/lining cylinders. 5. Hydraulic

I. Check and top up hydraulic oil tank. √ √ x x x x x II. Record the maximum temperature of hydraulic fluid

during the day's work. √ √ x x x x x

III. Check the leakage from hydraulic hoses and do needful.

√ √ x x x x x

IV. Change return line filter element. x x x √* √ √ √ V. Change gear oil of hydraulic drive reduction gear box. x x x √* √ √ √

VI. Change oil of satellite axle gear box. x x x √* √ √ √ VII. Change oil of intermediate drive shaft. x x x √* √ √ √

VIII. Change oil of axle gear boxes and funk gear box. x x x √* √ √ √ IX. Change proportional valve filter element. x x x √* √ √ √

Page 12: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 8 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

X. Change servo valve filter element. x x x √* √ √ √ XI. Change filter of axial piston pump. x x x √* √* √* √*

XII. Change suction filters. x x x √* √* √* √* XIII. Check all pressure controls for rated settings. x x x √ √ √ √ XIV. Clean hydraulic oil through 10 micron porta filter. x x x √ √ √ √

XV. Change oil of distribution gear box. x x x √* √ √ √

XVI. Send sample of hydraulic oil for physical & chemical test. x x x x √ √ √ XVII. Clean the hydraulic reservoir and fill laboratory

tested/new oil as required. x x x x √ √ √

XVIII. Replace the hydraulic hoses which are damaged by external abrasion.

x x x x x √ √

XIX. Provide the missing clamps x x x x x √ √ XX. Check the hydraulic motors for proper function and do

the needful. x x x x x √ √

XXI. Check the D.C. valves for leakage and do needful. x x x x x √ √ XXII. Replace the seals of all hydraulic cylinders along with

gland bushes /piston. x x x x x √ √

* To be done after every 500 engine hours. XXIII. Change all hydraulic pumps and motors. x x x x x x √ XXIV. Overhaul/Replace all hydraulic cylinders. x x x x x x √ XXV. Replace all hydraulic hoses. x x x x x x √

XXVI. Clean the hydraulic tank, inside to be painted with approved quality of paint.

x x x x x x √

XXVII. Fill new oil after replacing return line and suction filters. x x x x x x √ XXVIII. Replace all pressure filters, proportional valve and servo

valve filters. x x x x x x √

XXIX. Clean hydraulic oil cooler. x x x x x x √ XXX. Check the hydraulic accumulators and recharge, if

required x x x x x x √

Page 13: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 9 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XXXI. Change all the direct acting and pilot operated D.C. valves.

x x x x x x √

XXXII. Proportional valves and servo valves may be got calibrated.

x x x x x x √

XXXIII. Change all the pressure control valves. x x x x x x √ XXXIV. Replace all the stop cocks and flow control valves. x x x x x x √ XXXV. Flush the complete system. x x x x x x √

XXXVI. Overhaul all pressure controls and replace their kits, if required.

x x x x x x √

6. PNEUMATIC I. Check air brake pressure at locking position. √ √ x x x x x

II. Check pneumatic system for any air leakage. √ √ x x x x x III. Top up the air oiler. √ √ x x x x x IV. Clean cooling coil. x x x √ √ √ √ V. Check air unloader for proper functioning. x x x √ √ √ √

VI. Clean the air reservoir. x x x x √ √ √ VII. Overhaul the air unloader. x x x x √ √ √

VIII. Overhaul water separator and air oiler. x x x x x √ √ IX. Change all Hydraulic pumps and motors only on need

basis. x x x x x x √

X. Replace all Hydraulic cylinders on condition basis. x x x x x x √ XI. Replace all hydraulic hoses. x x x x x x √

XII. Fill new oil after replacing return line and suction filters. x x x x x x √ XIII. Replace all pressure filters, proportional valve, servo

valve and return line filters. x x x x x x √

XIV. Clean Hydraulic oil cooler. If it is blocked more than 20% during service or badly Leaking, then replace it.

x x x x x x √

Page 14: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 10 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XV. Change all the direct acting and pilot operated directional valves. only on need basis

x x x x x x √

XVI. Proportional valves and servo valves may be got calibrated from the Manufacturer on their recommendation, these may be condemned and provide the new valves

x x x x x x √

XVII. Change all the pressure control valves. only on need basis

x x x x x x √

XVIII. Replace the seals of all hydraulic cylinders along with gland bushes /piston and hone the cylinder barrel, if required

x x x x x x √

XIX. Change pneumatic pipes leading to brake cylinders. x x x x x √ √ XX. Overhaul all pneumatic valves and change

the unserviceable ones. x x x x x √ √

XXI. Change the seals of all pneumatic cylinders. x x x x x √ √ XXII. Change the seals of brake cylinders x x x x x √ √

XXIII. Change Granulate cartridge after 2 years. x x x x x x √ XXIV. Replace air unloader. x x x x x x √ XXV. Test air tanks for rated pressure. x x x x x x √

XXVI. Replace water separator and air oiler. x x x x x x √ XXVII. Change all pneumatic hoses. x x x x x x √

XXVIII. Change all pneumatic valves. x x x x x x √ XXIX. Change brake cylinders seal x x x x x x √ XXX. Change all pneumatic cylinders. x x x x x x √

7. MECHANICAL I. Grease all lining roller pins. √ √ x x x x x

II. Grease all guide rollers of satellite. √ √ x x x x x III. Check locking device of satellite. √ √ x x x x x IV. Check tightness of bolts of satellite axle support

cylinder. √ √ x x x x x

V. Check torque support of satellite. √ √ x x x x x

Page 15: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 11 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

VI. Apply lube oil on bush bearing. √ √ x x x x x VII. Check universal joints for play and replace, if required. x x √ √ √ √ √

VIII. Grease all brake linkages. x x √ √ √ √ √ IX. Check levelling cord tensioning arrangement. x √ √ √ √ √ √ X. Check oil level of all gear boxes and fill up-to the mark,

if required. x √ √ √ √ √ √

XI. Grease flange covers of gear boxes. x √ √ √ √ √ √

XII. Check foundation bolts of brake cylinders. x √ √ √ √ √ √ XIII. Check foundation bolts of brake cylinder. x x √ √ √ √ √ XIV. Grease bogie turning pin. x x √ √ √ √ √ XV. Check the condition of brake shoes, replace if required. x x √ √ √ √ √

XVI. Check function of satellite axle support cylinder. x x √ √ √ √ √ XVII. Check the condition of brake shoes and change, if

required. x x √ √ √ √ √

XVIII. Grease all cardon shafts. x x √ √ √ √ √ XIX. Inspect all cardon shafts for any crack. x x x √ √ √ √ XX. Grease torque arm pivot. x x x √ √ √ √

XXI. Grease hand brake gear. x x x √ √ √ √ XXII. Check allen bolts of clapper bracket distance piece for

tightness. x x x √ √ √ √

XXIII. Check shock absorbers and do needful. x x x √ √ √ √ XXIV. Check bearings of all axles and grease them. x x x x √ √ √

XXV. Check meggy springs and replace, if required. x x x x √ √ √

XXVI. Check bearings of trolley wheel and grease them. x x x x √ √ √

XXVII. Change the brake shoes. x x x x √ √ √

XXVIII. Grease Draw and Buffing gear at both ends. x x x x √ √ √

XXIX. Check grease filling of Parking brake and do as required.

x x x x √ √ √

Page 16: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 12 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XXX. Replace the missing and defective hand tools. x x x x x √ √

XXXI. Overhaul the trolleys, wheels & feeler rollers. x x x x x x √

XXXII. Strengthen machine frame where cracks have developed.

x x x x x x √

XXXIII. Check the wheels for tyre defects, reprofile or replace. x x x x x x √

XXXIV. Check the axle bearings and grease them. x x x x x x √

XXXV. Overhaul all the gear boxes except ZF gear box. x x x x x x √

XXXVI. Replace the shaft coupling and holding nuts & bolts. x x x x x x √

XXXVII. Overhaul the driving and idle bogies and replace the defective parts.

x x x x x x √

XXXVIII. Check the satellite rollers or replace them, if required. x x x x x x √

XXXIX. Complete machine may be painted with approved paint. x x x x x x √

XL. Check the bogie coil springs and replace, if broken. x x x x x x √

XLI. Change all the brake shoes. x x x x x x √ 8. ELECTRICAL

I. Clean alternator and check connections. x √ √ √ √ √ √ II. Check all limit switches. x √ √ √ √ √ √

III. Check gap between chord wire and carrier of lining transducer.

x √ √ √ √ √ √

IV. Clean the depth transducers for free movement of chord wire carrier.

x √ √ √ √ √ √

V. Check electrolyte level of batteries. x √ √ √ √ √ √ VI. Check function of horns x √ √ √ √ √ √

VII. Check all lights and do needful. x x √ √ √ √ √ VIII. Replace defective switches and potentiometers. x x x x x √ √

IX. Repair or replace the defective PCBs. x x x x x x √ X. Replace the limit switches. x x x x x x √

Page 17: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 13 of 14

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

XI. Replace defective indicative instruments. x x x x x x √

XII. Overhaul the pendulums. x x x x x x √ XIII. Overhaul all the transducers. x x x x x x √ XIV. Get insulation test of main cables and replace the

defective ones. x x x x x x √

XV. Overhaul the panel boxes. x x x x x x √ XVI. Defective switches and indicative lights may be replaced. x x x x x x √

XVII. Check the LED of all the solenoids. x x x x x x √

XVIII. Check the calibration of digital potentiometers and replace the defective ones.

x x x x x x √

XIX. Calibrate the machine for lifting and alignment. x x x x x x √ XX. Replace the missing or defective lights. x x x x x x √

XXI. Grease torque arm pivots of driving bogie and satellite. x √ √ √ √ √ √ XXII. Grease link rods. x √ √ √ √ √ √

XXIII. Adjust the clearance of all brake shoes. x √ √ √ √ √ √ XXIV. Check brake linkage and oil the pivots. x √ √ √ √ √ √

9. GENERAL I. Check for any unusual sound from tamping units, gear

boxes, engine & hydraulic pumps. √ √ x x x x x

II. Check all spares & tools for emergency as per Annexure - I.

√ √ x x x x x

III. Check all the functions of machine before block working. √ √ x x x x x IV. Clean the complete machine x √ √ √ √ √ √ V. Thoroughly clean all panel boxes. x x x x x √ √

VI. Check the function of all assemblies after IOH. x x x x x √ √ VII. Test the machine for one week near the workshop,

before it is put for work in regular section. x x x x x √ √

VIII. Strengthen the machine frame, where cracks have developed on condition Basis

x x x x x x √

Page 18: MAINTENANCE SCHEDULE MANUAL FOR - Indian Railways

Revised maintenance schedule of Unimat spilit head MFI), march 2016 Page 14 of 14

Note: Final decision for repairing/replacement of each unit/parts to be decided after joint inspection with machine in charge and CPOH in charge. Maintenance shall be exercise as per advice by OEM time to time.

SR. NO.

ITEM SCH.I Daily

SCH.II 50 HRS.

SCH.III 100 HRS.

SCH.IV 200 HRS.

SCH.V 1000 HRS.

SCH.VI 2000 HRS.

SCH.VII 6000 HRS.

IX. Replace the missing and defective hand tools. x x x x x x √ X. Check the function of all assemblies x x x x x x √

XI. Test the machine for one week before it is put for work in regular section

x x x x x x √

XII. .Check the expiry of fire extinguisher./ may be done on regular basis.

x x x x x x √

XIII. Check the expiry of first Aid box. x x x x x x √ XIV. Overhaul the A.C. unit. x x x x x x √