1Ossberger, HU 2010, Balaton, 17.03.2010
Maintenance procedures on Vienna‘s metro & tram
Markus OssbergerHead of Business UnitStrategic Planning & Organisation , Wiener Linien GmbH & Co KG
2
2Ossberger, HU 2010, Balaton, 17.03.2010
Organisational structure of maintenance process
legal constraints
organisational framework
scheduled activities
problems & solutions
EisbG :SMS §39c
3
3Ossberger, HU 2010, Balaton, 17.03.2010
Legal Framework
� Austrian Railways Act� Decrees, prescriptions� Notification for construction and operation of railway
infrastructure� General rules� technical prescriptions (of operator)
Legal constraints
Organisational framework
Scheduled activities
Problems & solutions
4
4Ossberger, HU 2010, Balaton, 17.03.2010
Legal conditions:Austrian Railways Act (EisbG)
§ 19a continuous monitoring
§ 40 railway engineering special fieldsRequired for continuous monitoring of railway infrastructure⇒⇒⇒⇒
� Railway undertakings without a certified safety management system due to§ 39c, have to undergo a routine periodic examination , stating that railway infrastructureis fulfilling the prescriptive values of the Austrian railway act (EisbG) (due to 31.12.2008for enterprises existing prior to April 1st, 2002)
� Examination is done by notified bodies, civil engineers,engineering offices and selected persons due to § 40 EisbG (with certain limitations)
==> national technical prescriptions remain vitally imp ortant !!!!
5
5Ossberger, HU 2010, Balaton, 17.03.2010
Notification -Database
Main problem:localization / reference points
More than 1000 notifications
More than 4000 documents
> 80.000 pages
> 1000 maps
…
6
6Ossberger, HU 2010, Balaton, 17.03.2010
Track database
Task:
1. complete digitalisation of
urban rail network [CUBAL]
2. automated actualization of
reference data [NetScan]
3. all-embracing coverage of
infrastructure data
7
7Ossberger, HU 2010, Balaton, 17.03.2010
Track database
detail vs. overview
1. Technical control has to be
possible as well as
2. Economical design, planning
and control
8
8Ossberger, HU 2010, Balaton, 17.03.2010
Activities of the operator
� Quality management� Activity scheme „track construction & maintenance“
Legal constraints
Organisational framework
Scheduled activities
Problems & solutions
9
9Ossberger, HU 2010, Balaton, 17.03.2010
Structure of maintenance process
Maintenance
(scheduled) Preventive
maintenance
Correctivemaintenance
Inspection Servicing
RenewalInspection (technical monitoring)
measures to detect and assess the state of technical devices in the system(detect, assess, analyse, react)
Servicingmeasures to maintain the current technicalstandard of devices in the system
10
10Ossberger, HU 2010, Balaton, 17.03.2010
Problems & Solutions
Research & Development
Legal constraints
Organisational framework
Scheduled activities
Problems & solutions
11
11Ossberger, HU 2010, Balaton, 17.03.2010
Metro Network:
Commuter railway: ÖBB61 km line length = 186 km track length82 stationsvmedium = 31,3 km/h684 vehicles
Network Overview
12
12Ossberger, HU 2010, Balaton, 17.03.2010
Tram network
31 lines231 km line length =445 km track length
1135 stations
vmedium = 15,2 km/h
901 vehicles
600 Volt DC
Database: April 2006
Network Overview
13
13Ossberger, HU 2010, Balaton, 17.03.2010
Data survey:
Measurement cars
Network monitoring
Track geometry13 Mio. /640 Mio datapackages
Transverse profile points750 Mio. / 3 Mrd.
•Continuous measurement of the tramnetwork [ca. 5000 km/a]
•Continuous measurement of themetro network [6 times/year, ca. 1000 km/a]
14
14Ossberger, HU 2010, Balaton, 17.03.2010
P
DC
A
plan
docheck
act
Maintenance Circle
15
15Ossberger, HU 2010, Balaton, 17.03.2010
Theory & practice: documentationof measurement runs
Legal constraints
Organisational framework
Scheduled activities
Problems & solutions
Measurement CarServer
Request for measurement car
Quarterly schedule
Calibration schedule
Calibrated?
Depot reports eventual additional car passenger
Prepare meas. run
Calibration
Measurement runpossible?
Perform Run
Finish Run
Save data on meas. car server
Control measurements
Track Errors and Defects?
Switch to process: Servicing
yes
no
yes
no
yes Measurement runarchive
no
16
16Ossberger, HU 2010, Balaton, 17.03.2010
Theory & practice: documentationof measurement runs (2)
17
17Ossberger, HU 2010, Balaton, 17.03.2010
Practice: documentation of measurement runs
18
18Ossberger, HU 2010, Balaton, 17.03.2010
Example:Ballast Tamping
19
19Ossberger, HU 2010, Balaton, 17.03.2010
Example: inspection of technicalprescriptions
z.B.: due to §17 StrabVO 1999 (decree): Meas. run of 26.8.2008
20
20Ossberger, HU 2010, Balaton, 17.03.2010
Example: inspection of technicalprescriptions
z.B.: due to §17 StrabVO 1999 (decree): Meas. run of 17.12.2003
21
21Ossberger, HU 2010, Balaton, 17.03.2010
Measure due to qualitymanagement system: tamping
Legal constraints
Organisational framework
Scheduled activities
Problems & solutions