14

Maine Department of Transportation Department of Transportation 1/29/2016 ... Quantity and Description Units Item ID Proposal ... STEEL H-BEAM PILES 89 LBS/FT,

Embed Size (px)

Citation preview

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0010 201.23

REMOVING SINGLE TREE TOP ONLY EA

1.000

_________._____

_________._____

0020 201.24

REMOVING STUMP EA

1.000

_________._____

0030 202.19

REMOVING EXISTING BRIDGE _________._____LUMP SUM LUMP SUM

_________._____

0040 202.202

REMOVING PAVEMENT SURFACE SY

310.000

_________._____

_________._____

0050 203.20

COMMON EXCAVATION CY

400.000

_________._____

_________._____

0060 203.24

COMMON BORROW CY

10.000

_________._____

_________._____

0070 203.25

GRANULAR BORROW CY

270.000

_________._____

_________._____

0080 206.082

STRUCTURAL EARTH EXCAVATION -MAJOR STRUCTURES

CY

310.000

_________._____

_________._____

0090 304.10

AGGREGATE SUBBASE COURSE -GRAVEL

CY

300.000

_________._____

_________._____

0100 403.208

HOT MIX ASPHALT 12.5 MM HMASURFACE

T

100.000

_________._____

_________._____

0110 403.209

HOT MIX ASPHALT 9.5 MM(SIDEWALKS, DRIVES, INCIDENTALS)

T

40.000

_________._____

_________._____

0120 403.211

HOT MIX ASPHALT (SHIMMING) T

10.000

_________._____

Proposal Schedule of Items Page 1 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0130 403.213

HOT MIX ASPHALT 12.5 MM BASE T

190.000

_________._____

_________._____

0140 409.15

BITUMINOUS TACK COAT - APPLIED G

57.000

_________._____

_________._____

0150 501.231

DYNAMIC LOADING TEST EA

2.000

_________._____

_________._____

0160 501.50

STEEL H-BEAM PILES 89 LBS/FT,DELIVERED

LF

172.000

_________._____

_________._____

0170 501.501

STEEL H-BEAM PILES 89 LBS/FT, INPLACE

LF

172.000

_________._____

_________._____

0180 501.903

PILE TIPS - ROCK INJECTOR POINT EA

8.000

_________._____

0190 501.92

PILE DRIVING EQUIPMENTMOBILIZATION

_________._____LUMP SUM LUMP SUM

0200 502.219

STRUCTURAL CONCRETE,ABUTMENTS AND RETAINING WALLS

_________._____LUMP SUM LUMP SUM

0210 502.261

STRUCTURAL CONCRETE ROADWAY& SIDEWALK SLAB ON CONCRETEBRIDGE

_________._____LUMP SUM LUMP SUM

0220 502.31

STRUCTURAL CONCRETEAPPROACH SLABS

_________._____LUMP SUM LUMP SUM

0230 502.49

STRUCTURAL CONCRETE CURBSAND SIDEWALKS

_________._____LUMP SUM LUMP SUM

Proposal Schedule of Items Page 2 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0240 503.12

REINFORCING STEEL, FABRICATEDAND DELIVERED

LB

12,200.000

_________._____

_________._____

0250 503.13

REINFORCING STEEL, PLACING LB

12,200.000

_________._____

_________._____

0260 503.14

EPOXY-COATED REINFORCINGSTEEL, FABRICATED ANDDELIVERED

LB

4,616.000

_________._____

_________._____

0270 503.15

EPOXY-COATED REINFORCINGSTEEL, PLACING

LB

4,616.000

_________._____

0280 503.171

MECHANICAL / WELDED SPLICE _________._____LUMP SUM LUMP SUM

0290 507.0821

STEEL BRIDGE RAILING, 3 BAR _________._____LUMP SUM LUMP SUM

0300 507.0831

STEEL BRIDGE RAILING, 4 BAR _________._____LUMP SUM LUMP SUM

0310 508.14

HIGH PERFORMANCEWATERPROOFING MEMBRANE

_________._____LUMP SUM LUMP SUM

0320 511.07

COFFERDAM: ABUTMENT NO. 2 _________._____LUMP SUM LUMP SUM

0330 511.07

COFFERDAM: ABUTMENT NO. 1 _________._____LUMP SUM LUMP SUM

0340 512.081

FRENCH DRAINS _________._____LUMP SUM LUMP SUM

_________._____

0350 514.06

CURING BOX FOR CONCRETECYLINDERS

EA

1.000

_________._____

Proposal Schedule of Items Page 3 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

0360 515.21

PROTECTIVE COATING FORCONCRETE SURFACES

_________._____LUMP SUM LUMP SUM

0370 524.301

TEMPORARY STRUCTURALSUPPORT

_________._____LUMP SUM LUMP SUM

0380 526.301

TEMPORARY CONCRETE BARRIERTYPE I

_________._____LUMP SUM LUMP SUM

_________._____

0390 526.34

PERMANENT CONCRETETRANSITION BARRIER

EA

4.000

_________._____

_________._____

0400 527.34

WORK ZONE CRASH CUSHIONS UN

4.000

_________._____

0410 535.60

PRESTRESSED STRUCTURALCONCRETE SLAB

_________._____LUMP SUM LUMP SUM

_________._____

0420 603.159

12 INCH CULVERT PIPE OPTION III LF

200.000

_________._____

_________._____

0430 604.092

CATCH BASIN TYPE B1-C EA

3.000

_________._____

_________._____

0440 604.18

ADJUSTING MANHOLE OR CATCHBASIN TO GRADE

EA

1.000

_________._____

_________._____

0450 604.244

CATCH BASIN TYPE F4 EA

2.000

_________._____

_________._____

0460 605.11

12 INCH UNDERDRAIN TYPE C LF

100.000

_________._____

_________._____

0470 606.1721

BRIDGE TRANSITION - TYPE 1 EA

3.000

_________._____

Proposal Schedule of Items Page 4 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0480 606.231

GUARDRAIL TYPE 3C - 15 FOOTRADIUS AND LESS

LF

50.000

_________._____

_________._____

0490 606.265

TERMINAL END - SINGLE RAIL -GALVANIZED STEEL

EA

3.000

_________._____

_________._____

0500 606.353

REFLECTORIZED FLEXIBLEGUARDRAIL MARKER

EA

8.000

_________._____

_________._____

0510 606.79

GUARDRAIL 350 FLARED TERMINAL EA

1.000

_________._____

_________._____

0520 608.45

CONSTRUCTION SIDEWALK SY

80.000

_________._____

_________._____

0530 609.31

CURB TYPE 3 LF

312.000

_________._____

_________._____

0540 609.38

RESET CURB TYPE 1 LF

20.000

_________._____

_________._____

0550 610.08

PLAIN RIPRAP CY

330.000

_________._____

_________._____

0560 610.18

STONE DITCH PROTECTION CY

11.000

_________._____

_________._____

0570 613.319

EROSION CONTROL BLANKET SY

30.000

_________._____

_________._____

0580 615.07

LOAM CY

10.000

_________._____

_________._____

0590 618.14

SEEDING METHOD NUMBER 2 UN

2.000

_________._____

Proposal Schedule of Items Page 5 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0600 619.1201

MULCH - PLAN QUANTITY UN

2.000

_________._____

_________._____

0610 619.1401

EROSION CONTROL MIX - PLANQUANTITY

CY

20.000

_________._____

_________._____

0620 620.58

EROSION CONTROL GEOTEXTILE SY

440.000

_________._____

_________._____

0625 627.55

12" TEMPORARY PAVEMENT TAPE,WHITE

LF

48.000

_________._____

_________._____

0630 627.733

4" WHITE OR YELLOW PAINTEDPAVEMENT MARKING LINE

LF

1,240.000

_________._____

0640 627.76

TEMPORARY PAVEMENT MARKINGLINE, WHITE OR YELLOW

_________._____LUMP SUM LUMP SUM

_________._____

0650 627.77

REMOVING PAVEMENT MARKINGS SF

415.000

_________._____

_________._____

0660 629.05

HAND LABOR, STRAIGHT TIME HR

40.000

_________._____

_________._____

0670 631.12

ALL PURPOSE EXCAVATOR(INCLUDING OPERATOR)

HR

40.000

_________._____

_________._____

0680 631.15

ROLLER, EARTH AND BASE COURSE(INCLUDING OPERATOR )

HR

20.000

_________._____

_________._____

0690 631.172

TRUCK - LARGE (INCLUDINGOPERATOR)

HR

20.000

_________._____

Proposal Schedule of Items Page 6 of 7

Maine Department of Transportation

1/29/2016

Proposal ID: 020480.00 Project(s): 020480.00

1 INITIAL GROUPSECTION:

Alt Set ID: Alt Mbr ID:

Contractor:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber Dollars Cents Dollars Cents

_________._____

0700 639.19

FIELD OFFICE TYPE B EA

1.000

_________._____

0710 643.72

TEMPORARY TRAFFIC SIGNAL _________._____LUMP SUM LUMP SUM

_________._____

0720 652.312

TYPE III BARRICADE EA

4.000

_________._____

_________._____

0730 652.33

DRUM EA

40.000

_________._____

_________._____

0740 652.34

CONE EA

80.000

_________._____

_________._____

0750 652.35

CONSTRUCTION SIGNS SF

200.000

_________._____

0760 652.361

MAINTENANCE OF TRAFFICCONTROL DEVICES

_________._____LUMP SUM LUMP SUM

_________._____

0770 652.38

FLAGGER HR

250.000

_________._____

_________._____

0780 652.41

PORTABLE CHANGEABLE MESSAGESIGN

EA

3.000

_________._____

0790 656.75

TEMPORARY SOIL EROSION ANDWATER POLLUTION CONTROL

_________._____LUMP SUM LUMP SUM

0800 659.10

MOBILIZATION _________._____LUMP SUM LUMP SUM

Section: 1 _________._____Total:

Total Bid: _________._____

Proposal Schedule of Items Page 7 of 7

Clinton

WIN 020480.00

February 1, 2016

Page 1 of 2

SPECIAL PROVISION

SECTION 627

REMOVABLE PAVEMENT MARKING TAPE

Description

This work shall consist of furnishing, installing, maintaining and removing removable pavement

marking tape in accordance with these specifications, the plans or as directed by the Resident.

The tape can be white, yellow or black in color.

Construction

Preformed removable pavement marking tape shall be applied at locations shown on the traffic

control plans by mechanical or manual methods. Mechanical applications shall be suitable for all

markings. Manual applications shall normally be used for transverse lines, symbols and legends.

Follow manufacturer’s recommendations for equipment operation and maintenance, and product

applications.

Black line masking tape shall be wider than the colored line it is intended to mask.

Preformed pavement marking tape shall be stored and applied as directed by the manufacturer.

The Contractor shall provide a copy of the manufacturer's storage and application

recommendations and the manufacturer’s certificate of compliance to the Resident upon delivery

of the material to the project. The certificate shall include the process, batch, or lot number(s)

and corresponding date(s) of manufacture.

Materials

Material shall be delivered to the project in original containers. Each container shall be clearly

marked to indicate the color of the material, a specific description of the contents, and the

process batch or lot numbers.

Material found to be discolored or damaged in any way or material manufactured more than one

year prior to installation shall not be used.

A. Temporary Pavement Line Tape. The Contractor shall use a product from the

Department’s qualified products list. Use a primer only if recommended by the manufacturer.

B. Removable Black Line Masking Tape. The Contractor shall use a product from the

Department’s qualified products list.

Method of Measurement

Retroreflective temporary pavement marking lines will be measured by the linear foot.

Clinton

WIN 020480.00

February 1, 2016

Page 2 of 2

Basis of Payment

The accepted quantities of temporary pavement tape will be paid for at the contract unit price per

linear foot. Payment shall be full compensation for furnishing, installing, maintaining, removal

and all incidentals necessary to complete the work.

Pay item Pay Unit

627.51 6 Inch Temporary Pavement Tape, Yellow or White Linear Foot

627.55 12" Temporary Pavement Tape, White Linear Foot

627.57 12 Inch Removable Black Line Masking Tape Linear Foot

$wkgroup$ Division: Filename:$file$Username:Date:$date$ $user$

DESIGN-DETAILED

BYDATE PROJ. MANAGER SH

EE

T N

UM

BE

R

FIELD CHANGES

REVISIONS 1

REVISIONS 2

REVISIONS 3

REVISIONS 4

CHECKED-REVIEWED OFDESIGN2-DETAILED2

DESIGN3-DETAILED3

WIN

BRIDGE PLANS

DEPARTMENT OF TRANSPORTATION

STATE OF MAINE

DATE

SIGNATURE

P.E. NUMBER

ESTIMATED QUANTITIES

STP-2048(000) 27

20480.00

CAIN BRIDGE

TWELVE MILE BROOK

CLINTONKENNEBEC COUNTY

BRIDGE NO. 2117

_____

_____

_____

_____ _____

D. SULLIVAN

L. KRUSINSKI

JUN 2014

______

M. WIGHT

T. WHITE

W. ROHMAN _____

J. HASBROUCK

DEC 2015 B. REEVESW. ROHMAN

1

1Updated QuantitiesJAN 2016

_____

2

2

2Added Item # 627.55JAN 2016

GE

NE

RA

L C

ON

ST

RU

CT

ION

NO

TE

S

Contr

acto

r d

oes n

ot

have p

ersonnel

on s

ite.

w

hen

th

e

Access t

o t

he f

ire h

ydrant

at

approxim

ate

ly S

ta.

15+

41.0

0 s

hall

no

t b

e b

lock

ed

2

2.

Pla

n w

ill

be c

on

sid

ered

in

cid

en

tal

to t

he b

rid

ge r

em

ov

al

pay

ite

m.

fo

r a

ll w

ork

necessary

fo

r d

ev

elo

pin

g,

su

bm

itti

ng

an

d f

inali

zin

g t

he D

em

oli

tio

n

the B

rid

ge D

em

oli

tio

n P

lan

fo

r a

pp

ro

pria

ten

ess a

nd

co

mp

lete

ness.

Pay

men

t

the b

rid

ge s

hall

be u

nd

erta

ken

by

th

e C

on

tracto

r u

nti

l M

ain

eD

OT

has r

ev

iew

ed

mate

ria

ls i

nclu

ded

in

th

e e

xis

tin

g b

rid

ge.

No

wo

rk

rela

ted

to

th

e r

em

ov

al

of

outl

ine t

he m

eth

ods a

nd e

quip

ment

to b

e u

sed t

o r

em

ove a

nd d

ispose o

f a

ll

least

10

bu

sin

ess d

ay

s p

rio

r t

o t

he s

tart

of d

em

oli

tio

n w

ork

. T

he p

lan

sh

all

21. T

he C

ontr

acto

r s

hall

subm

it a

Brid

ge D

em

oli

tion P

lan t

o t

he R

esid

ent

at

C

om

pensation.

w

ith S

tandard S

pecif

icati

ons S

ecti

on 1

09.7

, E

quit

able

Adju

stm

ents

to

L

um

p S

um

pay

ite

ms,

pric

e a

dju

stm

en

ts w

ill

be m

ad

e i

n a

cco

rd

an

ce

c

. I

f a

desig

n c

han

ge r

esu

lts i

n c

han

ges t

o e

stim

ated

qu

an

tities f

or

f

or a

Lum

p S

um

pay i

tem

, th

ose r

equir

em

ents

wil

l be f

oll

ow

ed.

b

. I

f o

ther C

ontr

act

Docum

ents

specif

icall

y a

llow

a c

hange i

n p

aym

ent

S

pecif

icati

ons S

ecti

on 1

09.2

, E

lim

inati

on o

f I

tem

s, w

ill

take p

recedence.

a

. I

f a

Lum

p S

um

pay i

tem

is e

lim

inate

d, th

e r

equir

em

ents

of S

tandard

qu

an

titi

es,

ex

cep

t as f

oll

ow

s:

actu

al

fin

al

quanti

ties a

re d

ifferent

from

the M

ain

eD

OT

provid

ed e

sti

mate

d

am

ou

nt,

wit

h n

o a

dd

itio

n o

r r

ed

ucti

on

in

pay

men

t to

th

e C

on

tracto

r i

f t

he

pu

rp

oses o

nly

. L

um

p S

um

pay

ite

ms w

ill

be p

aid

fo

r a

t th

e C

on

tract

Bid

are e

sti

mate

d q

uan

titi

es a

nd

are p

ro

vid

ed

by

Main

eD

OT

fo

r i

nfo

rm

ati

on

al

20

. Q

uan

titi

es i

nclu

ded

fo

r p

ay

ite

ms m

easu

red

an

d p

aid

fo

r b

y L

um

p S

um

the b

orin

g l

ocati

on

s.

Data

provid

ed m

ay n

ot

be r

epresenta

tive o

f t

he s

ubsurface c

ondit

ions b

etw

een

factu

al

and i

nte

rpreti

ve s

ubsurface i

nform

ati

on c

oll

ecte

d a

t dis

crete

locati

ons.

geote

chnic

al

inform

ati

on. T

he b

orin

g l

ogs c

onta

ined i

n t

he p

lan s

et

present

Bid

ders’ o

r C

on

tracto

r’s i

nte

rp

reta

tio

ns o

f,

or c

on

clu

sio

ns d

raw

n f

ro

m,

the

co

nd

itio

ns a

t th

e c

on

str

ucti

on

sit

e.

Main

eD

OT

wil

l n

ot

be r

esp

on

sib

le f

or t

he

inform

ati

on o

r i

nte

rpreta

tions w

ill

be r

epresenta

tive o

f a

ctu

al

subsurface

the u

se o

f t

he B

idders a

nd t

he C

ontr

acto

r. N

o a

ssurance i

s g

iven t

hat

the

19. G

eote

chnic

al

inform

ati

on f

urnis

hed o

r r

eferred t

o i

n t

his

pla

n s

et

is f

or

web a

ddress.

MA

IN

E,

So

ils R

ep

ort

No

. 2

01

5-2

0,

Ju

ly 3

0,

20

15

may

be a

ccessed

at

the M

ain

eD

OT

the R

epla

cem

ent

of :

CA

IN

BR

ID

GE

OV

ER

TW

EL

VE

MIL

E B

RO

OK

, C

LIN

TO

N,

18

. T

he p

ro

ject

geo

tech

nic

al

rep

ort

titl

ed

: G

EO

TE

CH

NIC

AL

DE

SIG

N R

EP

OR

T f

or

rep

resen

tati

ve o

f a

ctu

al

co

nd

itio

ns a

t th

e t

ime o

f c

on

str

ucti

on.

is g

iven

th

at

the i

nfo

rm

ati

on

or t

he c

on

clu

sio

ns o

f t

he r

ep

ort

wil

l b

e

inte

rpreta

tion o

f t

he i

nform

ati

on o

bta

ined f

or t

he s

ubje

ct

sit

e. N

o a

ssurance

Main

eD

OT

web a

ddress.

The h

ydrolo

gic

report

is b

ased o

n M

ain

eD

OT

’s

17. T

he h

ydrolo

gic

report

of t

he b

rid

ge s

ite m

ay b

e a

ccessed a

t th

e

to

th

e b

rid

ge d

urin

g i

ts l

ife s

pan

.

any c

onstr

ucti

on f

ield

changes o

r a

ny a

lterati

ons w

hic

h m

ay h

ave b

een m

ade

fo

r t

he c

on

str

ucti

on

of t

he b

rid

ge.

It

is v

ery

un

lik

ely

th

at

the p

lan

s w

ill

sh

ow

address. T

he p

lans a

re r

eproducti

ons o

f t

he o

rig

inal

draw

ings a

s p

repared

16

. T

he e

xis

tin

g b

rid

ge p

lan

s m

ay

be a

ccessed

at

the M

ain

eD

OT

web

: h

ttp

://w

ww

.main

e.g

ov

/md

ot/

co

ntr

acto

rs/

web a

ddress

Main

eD

OT

15. P

roje

ct

inform

ati

on r

eferred t

o b

elo

w m

ay b

e a

ccessed a

t th

e f

oll

ow

ing

ES

TIM

AT

ED

QU

AN

TIT

IE

S

IT

EM

NO

.Q

UA

NT

ITY

DE

SC

RIP

TIO

NU

NIT

(4

90

CY

)

b

ack

walls o

n t

he b

ack

sid

e.

T

op

of a

bu

tmen

t b

ack

wall

s a

nd

to

on

e f

oo

t b

elo

w t

he t

op

of

A

ll e

xposed s

urfaces o

f C

oncrete

Transit

ion B

arrie

rs,

F

ascias d

ow

n t

o t

he d

rip n

otch,

A

ll e

xposed s

urfaces o

f c

oncrete c

urbs a

nd s

idew

alks,

areas:

14. P

rote

cti

ve C

oati

ng f

or C

oncrete

Surfaces s

hall

be a

ppli

ed t

o t

he f

oll

ow

ing

Contr

act

item

s.

wil

l cause c

onti

nual

erosio

n. P

aym

ent

wil

l be m

ade u

nder t

he a

ppropria

te

afte

r p

avin

g a

nd s

hould

er w

ork i

s c

om

ple

ted, w

here i

t is

apparent

that

runoff

and o

ther g

utt

ers l

ined w

ith S

tone D

itch P

rote

cti

on s

hall

be c

onstr

ucte

d

13

. E

xte

nd

ed

-u

se E

ro

sio

n C

on

tro

l B

lan

ket,

seed

ed

gu

tters,

rip

rap

do

wn

sp

ou

ts,

co

ncu

rren

tly

wit

h t

he p

lacem

en

t o

f e

ach

secti

on

of b

eam

gu

ard

rail

.

12. A

n N

CH

RP

350 c

om

pli

ant

guardrail

end t

reatm

ent

shall

be i

nsta

lled

sid

eslo

pes a

long t

he t

op o

f t

he r

iprap a

nd b

ehin

d t

he w

ingw

all

s.

11

. P

lace a

24

-in

. w

ide s

trip

of T

em

po

rary

Ero

sio

n C

on

tro

l B

lan

ket

on

th

e

mad

e u

nd

er I

tem

No

. 6

19

.14

01

, E

ro

sio

n C

on

tro

l M

ix.

acco

rd

an

ce w

ith

Sta

nd

ard

Sp

ecif

icati

on

s S

ecti

on

61

9,

Mu

lch

. P

ay

men

t w

ill

be

receiv

ing

lo

am

an

d s

eed

as d

irecte

d b

y t

he R

esid

en

t.

Pla

cem

en

t sh

all

be i

n

10. E

rosio

n C

ontr

ol

Mix

may b

e s

ubsti

tute

d i

n t

hose a

reas n

orm

all

y

dir

ecte

d b

y t

he R

esid

en

t.

9.

Pla

ce l

oam

2 i

nch

es d

eep

on

all

new

or r

eco

nstr

ucte

d s

ideslo

pes o

r a

s

at

EL

.11

0.5

’–.

8. C

onstr

uct

the r

iprap s

helf

at

Abutm

ent

No. 1 a

t E

L. 112.0

’– a

nd A

butm

ent

No. 2

7.

Pla

ce r

iprap

on

sid

eslo

pes u

p t

o E

L.

11

0.5

’–

.

Mate

ria

l fo

r U

nd

erw

ate

r B

ack

fil

l.

shall

be G

ranula

r B

orrow

meeti

ng t

he r

equir

em

ents

of S

ubsecti

on 7

03.1

9,

6. A

ll e

mbankm

ent

mate

ria

l, e

xcept

as o

therw

ise s

how

n, pla

ced b

elo

w E

L. 107.0

6

eq

uip

men

t ren

tal

item

s.

of n

ew

su

bb

ase 6

in

ch

es o

r l

ess t

hic

k w

ill

be m

ad

e u

nd

er a

pp

ro

pria

te

grubbin

g,

shapin

g,

dit

chin

g,

and c

om

pacti

ng t

he e

xis

ting s

ubbase a

nd l

ayers

subgrade l

ine s

how

n o

n t

he p

lans, paym

ent

for r

em

ovin

g e

xis

ting p

avem

ent,

5. I

n a

reas w

here t

he R

esid

ent

dir

ects

the C

ontr

acto

r n

ot

to e

xcavate

to t

he

su

itab

le a

s d

ete

rm

ined

by

th

e R

esid

en

t.

4. D

o n

ot

excavate

for A

ggregate

Subbase C

ourse w

here e

xis

ting m

ate

ria

l is

oth

erw

ise n

ote

d.

3.

All

uti

lity

facil

itie

s s

hall

be a

dju

ste

d b

y t

he r

esp

ecti

ve u

tili

ties u

nle

ss

wil

l be c

onsid

ered i

ncid

enta

l to

Contr

act

item

s.

lim

its w

ill

be e

sta

bli

sh

ed

in

th

e f

ield

by

th

e R

esid

en

t.

Pay

men

t fo

r c

learin

g

2.

Th

e c

learin

g l

imit

s a

s s

ho

wn

on

th

e p

lan

s a

re a

pp

ro

xim

ate

. T

he e

xact

of W

ay M

ap.

1.

Fo

r e

asem

en

ts,

co

nstr

ucti

on

lim

its a

nd

rig

ht

of w

ay

lin

es,

refer t

o R

igh

t

(110 C

Y)

(5

0 C

Y)

(2

2 C

Y)

(21

CY

)

(240 S

Y)

(8

0 L

F)

(1

60

SY

)

(8

0 L

F)

(120 C

Y)

(180 C

D)

ES

TIM

AT

ED

QU

AN

TIT

IE

S

IT

EM

NO

.Q

UA

NT

ITY

DE

SC

RIP

TIO

NU

NIT

65

9.1

0

656.7

5

MO

BIL

IZA

TIO

N

TE

MP

OR

AR

Y S

OIL

ER

OS

ION

AN

D W

AT

ER

PO

LL

UT

ION

CO

NT

RO

L

11

LS

LS

(5

2 L

F)

(5

2 L

F)

(9

0 E

A)

65

2.4

1

652.3

8

65

2.3

61

652.3

5

652.3

4

652.3

3

65

2.3

12

64

3.7

2

63

9.1

9

631.1

72

631.1

5

631.1

2

629.0

5

627.7

7

627.7

6

627.7

33

627.5

5

620.5

8

619.1

401

61

9.1

20

1

61

8.1

4

61

5.0

7

613.3

19

61

0.1

8

61

0.0

8

60

9.3

8

60

9.3

1

60

8.4

5

606.7

9

606.3

53

60

6.2

65

606.2

31

60

6.1

72

1

60

5.1

1

60

4.2

44

60

4.1

8

60

4.0

92

603.1

59

53

5.6

0

52

7.3

4

526.3

4

52

6.3

01

52

4.3

01

515.2

1

514.0

6

512.0

81

51

1.0

7

51

1.0

7

508.1

4

50

7.0

83

1

507.0

821

503.1

71

50

3.1

5

50

3.1

4

503.1

3

50

3.1

2

502.4

9

50

2.3

1

502.2

61

50

2.2

19

501.9

2

50

1.9

03

501.5

01

501.5

0

501.2

31

40

9.1

5

40

3.2

13

40

3.2

11

40

3.2

09

40

3.2

08

304.1

0

20

6.0

82

203.2

5

203.2

4

203.2

0

20

2.2

02

202.1

9

201.2

4

201.2

3

PO

RT

AB

LE

CH

AN

GE

AB

LE

ME

SS

AG

E S

IGN

FL

AG

GE

R

MA

INT

EN

AN

CE

OF

TR

AF

FIC

CO

NT

RO

L D

EV

ICE

S

CO

NS

TR

UC

TIO

N S

IGN

S

CO

NE

DR

UM

TY

PE

III

BA

RR

ICA

DE

TE

MP

OR

AR

Y T

RA

FF

IC S

IGN

AL

FIE

LD

OF

FIC

E T

YP

E B

TR

UC

K -

LA

RG

E (

INC

LU

DIN

G O

PE

RA

TO

R)

RO

LL

ER

, E

AR

TH

AN

D B

AS

E C

OU

RS

E (

INC

LU

DIN

G O

PE

RA

TO

R )

AL

L P

UR

PO

SE

EX

CA

VA

TO

R (

INC

LU

DIN

G O

PE

RA

TO

R)

HA

ND

LA

BO

R, S

TR

AIG

HT

TIM

E

RE

MO

VIN

G P

AV

EM

EN

T M

AR

KIN

GS

TE

MP

OR

AR

Y P

AV

EM

EN

T M

AR

KIN

G L

INE

, W

HIT

E O

R Y

EL

LO

W

4" W

HIT

E O

R Y

EL

LO

W P

AIN

TE

D P

AV

EM

EN

T M

AR

KIN

G L

INE

12

" T

EM

PO

RA

RY

PA

VE

ME

NT

TA

PE

, W

HIT

E

ER

OS

ION

CO

NT

RO

L G

EO

TE

XT

ILE

ER

OS

ION

CO

NT

RO

L M

IX

MU

LC

H

SE

ED

ING

ME

TH

OD

NU

MB

ER

2

LO

AM

ER

OS

ION

CO

NT

RO

L B

LA

NK

ET

ST

ON

E D

ITC

H P

RO

TE

CT

ION

PL

AIN

RIP

RA

P

RE

SE

T C

UR

B T

YP

E 1

CU

RB

TY

PE

3

CO

NS

TR

UC

T S

IDE

WA

LK

GU

AR

DR

AIL

350 F

LA

RE

D T

ER

MIN

AL

RE

FL

EC

TO

RIZ

ED

FL

EX

IBL

E G

UA

RD

RA

IL M

AR

KE

R

TE

RM

INA

L E

ND

- S

ING

LE

RA

IL -

GA

LV

AN

IZE

D S

TE

EL

GU

AR

DR

AIL

TY

PE

3C

- 1

5 F

OO

T R

AD

IUS

AN

D L

ES

S

BR

IDG

E T

RA

NS

ITIO

N -

TY

PE

1

12

IN

CH

UN

DE

RD

RA

IN T

YP

E C

CA

TC

H B

AS

IN T

YP

E F

4

AD

JU

ST

ING

MA

NH

OL

E O

R C

AT

CH

BA

SIN

TO

GR

AD

E

CA

TC

H B

AS

IN T

YP

E B

1-C

12 I

NC

H C

UL

VE

RT

PIP

E O

PT

ION

III

PR

ES

TR

ES

SE

D S

TR

UC

TU

RA

L C

ON

CR

ET

E S

LA

B

WO

RK

ZO

NE

CR

AS

H C

US

HIO

NS

PE

RM

AN

EN

T C

ON

CR

ET

E T

RA

NS

ITIO

N B

AR

RIE

R

TE

MP

OR

AR

Y C

ON

CR

ET

E B

AR

RIE

R T

YP

E I

TE

MP

OR

AR

Y S

TR

UC

TU

RA

L S

UP

PO

RT

PR

OT

EC

TIV

E C

OA

TIN

G F

OR

CO

NC

RE

TE

SU

RF

AC

ES

CU

RIN

G B

OX

FO

R C

ON

CR

ET

E C

YL

IND

ER

S

FR

EN

CH

DR

AIN

S

CO

FF

ER

DA

M:

AB

UT

ME

NT

No

. 2

CO

FF

ER

DA

M:

AB

UT

ME

NT

No

. 1

HIG

H P

ER

FO

RM

AN

CE

WA

TE

RP

RO

OF

ING

ME

MB

RA

NE

ST

EE

L B

RID

GE

RA

ILIN

G,

4 B

AR

ST

EE

L B

RID

GE

RA

ILIN

G,

3 B

AR

ME

CH

AN

ICA

L /

WE

LD

ED

SP

LIC

E

EP

OX

Y-C

OA

TE

D R

EIN

FO

RC

ING

ST

EE

L, P

LA

CIN

G

EP

OX

Y-C

OA

TE

D R

EIN

FO

RC

ING

ST

EE

L,

FA

BR

ICA

TE

D A

ND

DE

LIV

ER

ED

RE

INF

OR

CIN

G S

TE

EL

, P

LA

CIN

G

RE

INF

OR

CIN

G S

TE

EL

, F

AB

RIC

AT

ED

AN

D D

EL

IVE

RE

D

ST

RU

CT

UR

AL

CO

NC

RE

TE

CU

RB

S A

ND

SID

EW

AL

KS

ST

RU

CT

UR

AL

CO

NC

RE

TE

AP

PR

OA

CH

SL

AB

S

ST

RU

CT

UR

AL

CO

NC

RE

TE

RO

AD

WA

Y &

SID

EW

AL

K S

LA

B O

N C

ON

CR

ET

E B

RID

GE

ST

RU

CT

UR

AL

CO

NC

RE

TE

, A

BU

TM

EN

TS

AN

D R

ET

AIN

ING

WA

LL

S

PIL

E D

RIV

ING

EQ

UIP

ME

NT

MO

BIL

IZA

TIO

N

PIL

E T

IPS

- R

OC

K I

NJE

CT

OR

PO

INT

ST

EE

L H

-BE

AM

PIL

ES

89

LB

S/F

T,

IN P

LA

CE

ST

EE

L H

-BE

AM

PIL

ES

89 L

BS

/FT

, D

EL

IVE

RE

D

DY

NA

MIC

LO

AD

ING

TE

ST

BIT

UM

INO

US

TA

CK

CO

AT

- A

PP

LIE

D

HO

T M

IX A

SP

HA

LT

12

.5 M

M B

AS

E

HO

T M

IX A

SP

HA

LT

(S

HIM

MIN

G)

HO

T M

IX A

SP

HA

LT

9.5

MM

(S

IDE

WA

LK

S, D

RIV

ES

, IN

CID

EN

TA

LS

) IN

CID

EN

TA

LS

)

HO

T M

IX A

SP

HA

LT

12.5

MM

HM

A S

UR

FA

CE

AG

GR

EG

AT

E S

UB

BA

SE

CO

UR

SE

- G

RA

VE

L

ST

RU

CT

UR

AL

EA

RT

H E

XC

AV

AT

ION

- M

AJO

R S

TR

UC

TU

RE

S

GR

AN

UL

AR

BO

RR

OW

CO

MM

ON

BO

RR

OW

CO

MM

ON

EX

CA

VA

TIO

N

RE

MO

VIN

G P

AV

EM

EN

T S

UR

FA

CE

RE

MO

VIN

G E

XIS

TIN

G B

RID

GE

RE

MO

VIN

G S

TU

MP

RE

MO

VIN

G S

ING

LE

TR

EE

TO

P O

NL

Y

3

25

0

1

20

0

80

40411

20

20

40

40

41

5

1

1240

440

48

202210

3011

33

0

20

312

80

35183503

100

213

20

0

14411111111111

4616

4616

12

20

0

12

20

0

111118

172

172

257

19

0

10

40

100

30

0

310

27

0

10

40

0

310

111

EA

HR

LS

SF

EA

EA

EA

LS

EA

HR

HR

HR

HR

SF

LS

LF

SY

LF

CY

UN

UN

CY

SY

CY

CY

LF

LF

SY

SF

EA

EA

EA

LF

EA

LF

EA

EA

EA

LF

LS

UN

EA

LS

LS

LS

EA

LS

LS

LS

LS

LS

LS

LS

LB

LB

LB

LB

LS

LS

LS

LS

LS

EA

LF

LF

EAGTTTTCY

CY

CY

CY

CY

SY

LS

EA

EA

DESIGN-DETAILED

BYDATE PROJ. MANAGER SH

EE

T N

UM

BE

R

FIELD CHANGES

REVISIONS 1

REVISIONS 2

REVISIONS 3

REVISIONS 4

CHECKED-REVIEWED

$wkgroup$ Division: Filename:$file$Username:Date:$date$ $user$

OFDESIGN2-DETAILED2

DESIGN3-DETAILED3

WIN

BRIDGE PLANS

STATE OF MAINE

DEPARTMENT OF TRANSPORTATION

DATE

SIGNATURE

P.E. NUMBERSTP-2048(000) 27

20480.00

CAIN BRIDGE

TWELVE MILE BROOK

CLINTONKENNEBEC COUNTY

BRIDGE NO. 2117

_____

_____

_____

_____

_____

_____

_____ _____

J. HASBROUCKD. SULLIVAN

L. KRUSINSKIT. WHITE

W. ROHMAN

JUN 2014

______

M. WIGHT

ABUTMENT No. 1 DETAILS

_____

DEC 2015 B. REEVESW. ROHMAN

1Changed bar number to BJAN 2016

15

1’-0"

9"

1’-0"

1’-0"

AB

UT

ME

NT

No. 1 R

EIN

FO

RC

ING

ST

EE

L E

LE

VA

TIO

N

Sta

ge N

o. 2

Sta

ge N

o. 1

9"

B B

A A

9"

C

C

Flo

w

9"

Joint

Co

nstr

ucti

on

Joint

Co

nstr

ucti

on

11 ~ A750 N.F. @ 9"

10 ~ A851 F.F. @ 9"

Joint

Co

nstr

ucti

on

10 ~ A850 F.F. @ 9"

11 ~ A700 N.F. @ 9"

at

Sta

. 14+

15.0

0

É W

ork

ing

/Co

nstr

ucti

on

Lin

e

11 ~ A852 @ 9"

11 ~ A702 F.F. @ 9"4 ~ A853 @ 9"

1 ~

A8

00

F.F

.1 ~

A801 F

.F.

2 ~

A5

54

(1

E.F

.)

Sp

lice (

Ty

p.)

Mech

an

ical

/ W

eld

ed

Fil

ler (

Ty

p.)

�" P

reform

ed J

oint

F.F. @ 4�"

20 ~ A701

@ E

q.

Sp

.

3 ~

A509 N

.F.

(2

~ A

50

8 E

.F.)

4 ~

A508 @

12"

(2

~ E

.F.

@ 7

�")

4 ~

A513

@ 1

2" E

.F.

2 e

a.~

A5

10

th

ru

A5

12

2 ~

A553 @

Eq. S

p. 11 ~ A553 @ 9"

(1~

E.F

.)

2~

A410

(7

~ E

.F.

@ 1

2")

14 ~

A508

4�"

9 ~ A456, @ 12"

3 Eq. Sp. Sets of

(Typ. 3 Piles)

4 ~ A456, @ 12"

3 Eq. Sp. Sets of

4 ~ A553 @ 9" Max.

A714 @ 9" Max. E.F.

2 ~ ea. A712 thru

29

~ A

55

2 F

.F.,

29

~ A

45

2 F

.F.

@ 1

2"

(1~

E.F

.)

2 ~

A4

09

29

~ A

50

8,

N.F

. @

12

"

11

1’-0"

1’-0"

1’-0"

AB

UT

ME

NT

No

. 1

WIN

GW

AL

L R

EIN

FO

RC

ING

ST

EE

L E

LE

VA

TIO

N

9"

9"9"

2 ~

A4

55

E.F

.

14

~ A

45

4 @

12

"

8 ~ A550 @ 9"

6 ~

A4

02

@ 1

2" (

3 ~

E.F

.)

10

~ A

40

3 @

12

" (

5 ~

E.F

.)

10

~ A

40

4 @

12

" (

5 ~

E.F

.)

1 ~

A5

09

F.F

.@

12

"N

.F.

3 ~

A509

15 ~ A453 @ 9" Max.

9"

(2 ~ E.F.)

4 ~ A711 @ 9"

4 ~ A711 @ 9" Max. F.F.

4 ~ A551 @ 9" Max. N.F.

1 ea. ~ A703 thru A710 @ 9" F.F.

1 ea. ~ A500 thru A507 @ 9" N.F.

DD

É C

on

str

ucti

on

É W

ork

ing

Lin

e

É Brg. Abut. No. 1

AB

UT

ME

NT

No. 1 R

EIN

FO

RC

ING

ST

EE

L P

LA

N

Sta

ge N

o. 2

Sta

ge N

o. 1

Flo

w

A453

A551

A550

A705

A8

52

A702

A8

51

A750

A8

53

Constr

ucti

on J

oin

tA

70

0

A452

A8

50

A701

A5

53

Ab

utm

en

t N

o.

2 D

eta

ils

See D

ET

AIL

A i

n

Sp

lice (

Ty

p.)

Mech

an

ical

/ W

eld

ed

A552

4 ~

A553 B

tm. @

12"

82 ~

A553 (

41 ~

Top @

12" a

nd 4

1 ~

Btm

. @

12")

Eq

. S

p.

= E

qu

all

y S

paced

E.F

. =

Each

Face

F.F

. =

Far F

ace

N.F

. =

Near F

ace

LE

GE

ND

$wkgroup$ Division: Filename:$file$Username:Date:$date$ $user$Q

TY

.L

EN

GT

HT

YP

EA

BC

DE

FG

HO

RL

OC

AT

ION

BE

NT

BA

RS

MA

RK

MA

RK

QT

Y.

LE

NG

TH

LO

CA

TIO

NM

AR

KQ

TY

.L

EN

GT

HL

OC

AT

ION

ST

RA

IG

HT

BA

RS

MA

RK

QT

Y.

LE

NG

TH

LO

CA

TIO

NM

AR

KQ

TY

.L

EN

GT

HL

OC

AT

ION

QT

Y.

LE

NG

TH

TY

PE

AB

CD

EF

GH

OR

LO

CA

TIO

NM

AR

K

GE

NE

RA

L N

OT

ES

TY

PE

- B

EN

DIN

G D

IA

GR

AM

S

DE

B

CC

CC

CC

E1

D1

D1

FE

2 e

tc.

D3 e

tc.

C

B

A

R

AFE

D

B

B

CA

F

E

D

B

A

D

C

GA

B

C

D

E

G

R A

C

A

B

DC

EF

B

O

1

2

BB

AC

1

1R

ACB

A

C

D G

B A

C

D

E

A

B

C

D

G

AB

C

D

E

1

1

BA

C

DG

A

BC

E

D

CG

FD

AE

RR

11

B

LW

M

SB

SL

SH

HB

SJ

EP

SC

JC

BP

RP

A

AV

TC

O

H

H

OO

O

H

H

E

O

H

B

C

H

H

2.

1.

DESIGN-DETAILED

BYDATE PROJ. MANAGER SH

EE

T N

UM

BE

R

FIELD CHANGES

REVISIONS 1

REVISIONS 2

REVISIONS 3

REVISIONS 4

CHECKED-REVIEWED OFDESIGN2-DETAILED2

DESIGN3-DETAILED3

WIN

BRIDGE PLANS

DEPARTMENT OF TRANSPORTATION

STATE OF MAINE

DATE

SIGNATURE

P.E. NUMBER

STEEL SCHEDULE

REINFORCING

sh

all

be b

ased

on

crank b

ars a

s s

chedule

on t

he p

lans.

bar s

ize a

s t

he c

rank b

ar. P

aym

ent

in e

ither c

ase

str

aig

ht

bars (

one t

op a

nd o

ne b

ott

om

) o

f t

he s

am

e

Each c

rank b

ar, T

ype B

, m

ay b

e r

epla

ced b

y t

wo (

2)

M

ark "

S650" =

bar s

ize #

6

M

ark "

P805" =

bar s

ize #

8

M

ark

"A

50

2" =

bar s

ize #

5

mark

in

dic

ate

th

e s

ize o

fth

e b

ar:

Th

e f

irst

two

dig

its f

oll

ow

ing

th

e l

ett

er(s) o

f t

he

Rein

forc

ing B

ar:

AS

TM

A615/A

615M

, G

rade 6

0

AC

I S

tan

dard

31

5 a

nd

AC

I S

tan

dard

31

8.

reco

mm

en

dati

on

s o

f t

he c

urren

t rev

isio

n o

f

Ben

din

g d

eta

ils a

nd

ho

ok

s s

hall

co

nfo

rm

to

th

e

All

dim

en

sio

ns a

re o

ut-

to-o

ut

of b

ar.

STP-2048(000) 27

20480.00

CAIN BRIDGE

TWELVE MILE BROOK

CLINTONKENNEBEC COUNTY

BRIDGE NO. 2117

_____

_____

_____

_____

_____ _____

J. HASBROUCKD. SULLIVAN

L. KRUSINSKIT. WHITE

W. ROHMAN

JUN 2014

______

M. WIGHT

_____

AB

UT

ME

NT

No

. 1

RE

INF

OR

CIN

G S

TE

EL

- B

LA

CK

SU

PE

RS

TR

UC

TU

RE

RE

INF

OR

CIN

G S

TE

EL

- E

PO

XY

CO

AT

ED

AB

UT

ME

NT

No

. 2

AB

UT

ME

NT

No

. 1

RE

INF

OR

CIN

G S

TE

EL

- B

LA

CK

AB

UT

ME

NT

No

. 2

SU

PE

RS

TR

UC

TU

RE

RE

INF

OR

CIN

G S

TE

EL

- E

PO

XY

CO

AT

ED

C500

SW

50

0

S502

S501

S500

614

42

42

52

31’-

10"

31’-

10"

17

’-9

"

19’-

8"

31’-

10"

Longit

udin

al

Longit

udin

al

Tran

sv

erse

Tran

sv

erse

Longit

udin

al

S5

50

63

8’-

10’

SC

1’-

1"

6’-3

"1

’-1

"0’-6"

6’-

4"

Sid

ew

alk

Tra

nsv

ers

e

DEC 2015 B. REEVESW. ROHMAN

B8

53

B8

52

B8

51

B8

50

B7

51

B7

50

B5

53

B5

52

B5

51

B5

50

B456

B455

B454

B4

53

B452

A8

53

A8

52

A8

51

A8

50

A7

50

A554

A553

A552

A551

A550

A456

A455

A454

A453

A452

SJ

MLLLLSLLLCVSSLSJ

MLLLVSLLLLCVSL

SLL

2’-8

"

3’-4

"

3’-4

"

1’-

2"

1’-

2"

1’-

6"

1’-

6"

1’-

10

"

1’-

10

"

2’-8

"

3’-8

"

1’-

6"

1’-

6"

2’-8

"

3’-4

"

3’-4"

1’-

2"

1’-

6"

1’-

6"

1’-

10

"

1’-

10

"

2’-8

"

3’-8

"

1’-

6"

1’-

6"

1’-

10

"

6’-3

"

1’-

6"

2’-9

"

3’-8

"

1’-

6"

1’-

10

"

6’-2

"

3’-4

"

1’-

6"

15

’-2

"

3’-8

"

1’-

6"

1’-

6"

3’-6

"

11

’-1

0"

1’-

6"

3’-6

"

0’-8

"

2’-

10"

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Upstr

eam

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Upstr

eam

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Upstr

eam

Vert

., T

op

& B

ott

om

Ab

utm

en

t

Vert

., A

pp

roach

Sla

b B

um

p-o

ut

Hori

zonta

l W

ing W

all

Hori

zonta

l W

ing W

all

Hook a

round P

ile T

ops

Bo

tto

m o

f W

ing

Wall

To

p o

f W

ing

Wall

Hori

zonta

l., E

nd o

f W

ing W

all

Vert

., A

nchor

for

Appro

ach S

lab

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Hori

zonta

l A

butm

ent

Upstr

eam

Hori

zonta

l A

butm

ent

Dow

nstr

eam

Top o

f P

arapet

Vert

. T

op &

Btm

of

Abut

& H

orz

Sid

e

Vert

., A

pp

roach

Sla

b B

um

p-o

ut

Hori

zonta

l W

ing W

all

Hori

zonta

l W

ing W

all

Hook a

round P

ile T

ops

Bo

tto

m o

f W

ing

Wall

To

p o

f W

ing

Wall

Ho

rizo

nta

l.,

En

d o

f W

ing

Wall

Vert

., A

nchor

for

Appro

ach S

lab

3’-8

"

15’-

7"

12

’-6

"

20

’-0

"

22

’-0

"

6’-

11

"

12’-

8"

3’-0

"

0’-6"

1’-

6"

3’-6"

15’-

7"

12

’-7

"

20

’-0

"

6’-

11

"

16’-

8"

3’-0

"

0’-6"

1’-

6"

2.4

8’

6.4

1’

2.4

79

1.4

9’

6.3

75’

12’-

0"

13’-

2"

18

’-1

1"

15’-

10"

21’-

2"

23

’-2

"

5’-8"

8’-5"

14

’-6

"

4’-

10"

3’-8

"

14

’-7

"

8’-0

"

3’-8

"

3’-0

"

12’-

0"

13’-

2"

19’-

0"

16’-

0"

21’-

2"

4’-0

"

5’-8"

8’-5"

18’-

6"

4’-

10"

3’-8

"

18’-

0"

8’-0

"

3’-8

"

3’-0

"

2’-6

"

3’-6"

2’-8

"

0’-6"

0’-8

"

0’-8

"

2’-6

"

3’-6"

2’-8

"

0’-6"

0’-8

"

0’-8

"

B803

B802

B801

B800

B7

04

B7

03

B7

02

B7

01

B7

00

B5

05

B5

04

B5

03

B5

02

B5

01

B5

00

B405

B404

B403

B4

02

A801

A800

A714

A713

A712

A711

A710

A709

A708

A707

A706

A705

A704

A703

A702

A701

A700

A5

13

A5

12

A5

11

A5

10

A5

09

A5

08

A5

07

A5

06

A5

05

A5

04

A5

03

A5

02

A5

01

A5

00

A410

A4

09

A4

04

A4

03

A4

02

1110

10444416

20

4744442216

161122281111111111

2011

4222747111111112210

106

20

’-0

"

22

’-0

"

7’-

8"

12’-

8"

10’-

10"

8’-

7"

6’-3"

3’-

11

"

12’-

8"

10’-

0"

7’-

8"

10’-

10"

8’-

7"

6’-3"

3’-

11

"

19

’-1

1"

21

’-1

1"

4’-

6"

7’-2

"

20

’-0

"

23’-9"

1’-

9"

3’-4"

3’-8

"

16’-

8"

15

’-8

"

14’-

0"

12

’-6

"

10’-

10"

9’-2

"

7’-

7"

6’-0"

4’-

4"

7’-

7"

14

’-4

"

23

’-9

"

10’-

2"

9’-8"

9’-2

"

8’-8

"

10’-

0"

7’-

6"

15

’-8

"

14’-

0"

12

’-6

"

10’-

10"

9’-2

"

7’-

7"

6’-0"

4’-

4"

23’-9"

20

’-0

"

4’-0"

6’-

4"

7’-

9"

Ho

riz

. F

.F.

Ho

riz

. F

.F.

Ho

riz

. F

.F.

Ho

riz

. F

.F.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Verti

cal

Verti

cal

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Hori

zonta

l B

ott

om

Hori

zonta

l B

ott

om

Win

g W

all

Vert

ical

Win

g W

all

Vert

ical

Ho

riz

. F

.F.

Ho

riz

. F

.F.

Para

pet

Ho

riz.

To

p

Para

pet

Ho

riz.

To

p

Para

pet

Ho

riz.

To

p

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Win

g W

all

Ho

riz.

F.F

.

Abut

Hori

z. F

.F.

Abut.

Horz

. F

.F.

Ab

ut.

Ho

rz N

.F.

Parapet

Verti

cal

Parapet

Verti

cal

Parapet

Verti

cal

Parapet

Verti

cal

Verti

cal

Verti

cal

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Win

g W

all

Ho

riz.

N.F

.

Hori

zonta

l

Hori

zonta

l

Win

gw

all

Win

gw

all

Win

gw

all

Update QuantitiesJAN 2016

Added Reinforcing SteelJAN 2016

822

10

1011

11

88

29816

48420

28

29411

10

1011

2

103

294863214

15

29

24

1

2

1

2

1