62
Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4 th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 January 10, 2019 NOTICE TO ALL CONTRACTORS: Proposal #16: 3760-00-70 CTH H; CTH KR to Braun Rd CTH KR to Braun Rd CTH H Racine County Letting of January 15, 2019 This is Addendum No. 02, which provides for the following: Special Provisions: Revised Special Provisions Article No. Description 5 Prosecution and Progress -Interim Completion Date Schedule of Items: Revised Bid Item Quantities Bid Item Item Description Unit Old Quantity Revised Quantity Proposal Total 520.8000 Concrete Collars for Pipe Each 4 2 6 522.1018 Apron Endwalls for Culvert Pipe Reinforced Concrete 18-Inch Each 2 1 3 608.0315 Storm Sewer Pipe Reinforced Concrete Class III 15-Inch LF 4014 -170 3844 608.0412 Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch LF 307 10 317 608.0415 Storm Sewer Pipe Reinforced Concrete Class IV 15-Inch LF 2459 -913 1546 611.0535 Manhole Covers Type J-Special Each 2 4 6 611.0642 Inlet Covers Type MS Each 4 6 10 611.2004 Manhole 4-FT Diameter Each 33 -2 31 611.2005 Manhole 5-FT Diameter Each 27 3 30 611.2006 Manhole 6-FT Diameter Each 7 2 9 611.3902 Inlets Median 2 Grate Each 1 4 5

Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation

Version 02-2017 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

January 10, 2019

NOTICE TO ALL CONTRACTORS: Proposal #16: 3760-00-70

CTH H; CTH KR to Braun Rd CTH KR to Braun Rd CTH H Racine County

Letting of January 15, 2019 This is Addendum No. 02, which provides for the following: Special Provisions:

Revised Special Provisions Article

No. Description

5 Prosecution and Progress -Interim Completion Date Schedule of Items:

Revised Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

520.8000 Concrete Collars for Pipe Each 4 2 6

522.1018 Apron Endwalls for Culvert Pipe Reinforced Concrete 18-Inch

Each 2 1 3

608.0315 Storm Sewer Pipe Reinforced Concrete Class III 15-Inch

LF 4014 -170 3844

608.0412 Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch

LF 307 10 317

608.0415 Storm Sewer Pipe Reinforced Concrete Class IV 15-Inch

LF 2459 -913 1546

611.0535 Manhole Covers Type J-Special Each 2 4 6 611.0642 Inlet Covers Type MS Each 4 6 10 611.2004 Manhole 4-FT Diameter Each 33 -2 31 611.2005 Manhole 5-FT Diameter Each 27 3 30 611.2006 Manhole 6-FT Diameter Each 7 2 9 611.3902 Inlets Median 2 Grate Each 1 4 5

Page 2: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Added Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

204.0220 Removing Inlets Each 0 1 1

522.1024 Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch

Each 0 1 1

522.2624 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 24x38-Inch

Each 0 1 1

608.0418 Storm Sewer Reinforced Concrete Class IV 18-Inch

LF 0 120 120

608.0424 Storm Sewer Reinforced Concrete Class IV 24-Inch

LF 0 639 639

608.0515 Storm Sewer Reinforced Concrete Class V 15-Inch

LF 0 124 124

608.2424 Storm Sewer Reinforced Concrete Horizontal Elliptical Class HE-IV 24x38-Inch

LF 0 279 279

611.0636 Inlet Covers Type HM-S Each 0 6 6 611.2007 Manholes 7-FT Diameter Each 0 2 2 611.3003 Inlets 3-FT Diameter Each 0 1 1 611.3004 Inlets 4-FT Diameter Each 0 39 39

Deleted Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

SPV.0105.003 Control of Water Project 3760-00-70 LS 1 -1 0 Plan Sheets:

Revised Plan Sheets Plan

Sheet Plan Sheet Title (brief description of changes to sheet)

117 Storm Sewer (Structure size updated) 119 Storm Sewer (Structure type updated) 127 Storm Sewer (Structure type updated) 135 Storm Sewer (Pipe class updated, updated invert elevations) 137 Storm Sewer (Structure type updated) 138 Storm Sewer (Pipe length updated) 321 Miscellaneous Quantities (Added Removing Inlets) 334-361

Miscellaneous Quantities (Updated pipe and inlet size, structure type, and pipe length)

394 Miscellaneous Quantities (Removal of qty for Control of Water Project 3760-00-70; Item SPV.0105.003)

Added Plan Sheets

Plan Sheet

Plan Sheet Title (brief description of why sheet was added)

32A Construction Details (Added Haul Routes) 136A Storm Sewer Plan and Profile (Additional Profiles added for Pond G)

Page 3: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.

Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

Page 4: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

ADDENDUM NO. 02

3760-00-70

January 10, 2019

Special Provisions 5. Prosecution and Progress. Replace entire section titled Interim Completion of work June 15, 2019: Completion of Eastbound Paving on west leg of Braun Road at CTH H Intersection with the following:

Interim Completion of work June 15, 2019: Completion of Eastbound Paving on west leg of Braun Road at CTH H Intersection If the contractor fails to complete all work required to open Braun Road eastbound pavement to full access to west of the CTH H intersection as shown in traffic control plans prior to 12:01 AM June 16, 2019, the department will assess the contractor $2,500 in interim liquidated damages for each calendar day contract work remains incomplete beyond 12:01 AM June 16, 2019. An entire calendar day will be charged for any period of time within a calendar day that the road remains closed beyond 12:01 AM.

Schedule of Items Attached, dated January 10, 2019, are the revised Schedule of Items Pages 1 – 20. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 117, 119, 127, 135, 137, 138, 321, 334 – 361, and 394. Added: 32A and 136A

END OF ADDENDUM

Page 5: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Added Sheet 32A January 10, 2019
Page 6: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 117 January 10, 2019
Page 7: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 119 January 10, 2019
Page 8: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 127 January 10, 2019
Page 9: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 135 January 10, 2019
Page 10: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Added Sheet 136A January 10, 2019
Page 11: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 137 January 10, 2019
Page 12: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 138 January 10, 2019
Page 13: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 321 January 10, 2019
Page 14: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 334 January 10, 2019
Page 15: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 335 January 10, 2019
Page 16: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 336 January 10, 2019
Page 17: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 337 January 10, 2019
Page 18: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 338 January 10, 2019
Page 19: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 339 January 10, 2019
Page 20: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 340 January 10, 2019
Page 21: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

r

ST

OR

M S

EW

ER

PIP

ES

608.

0336

60

8.03

60

608.

0412

60

8.04

15

608.

0418

60

8.04

24

608.

0515

60

8.05

30

608.

0536

60

8.24

24

STO

RM S

l:Wffi

STO

RM S

l:Wffi

STO

RM S

l:Wffi

STO

RMSB'VER

ST

ORM

SEW

ER

STO

RM S

EWER

ST

ORM

SEW

ER

STO

RM Se/VER

STORM

SEWER

STO

RM SEW

ER

PFE

PFE

APE

A

PE

APE

PFE

PFE

PFE

A

PE

PFE

-

RBNF

ORCED

RB

NFO

RCED

RENF

ORCB)

RE

INFO

RCB)

RBNF

ORCED

RB

NFO

RCED

RBNF

ORCED

RE

INFO

RCB)

RENF

ORCB)

OD

NCREJE

ODNCREJE

ODNCRETE

OD

NCREJE

ODNCRETE

OD

NCREJE

ODNCRETE

ODNCRETE

ODNCREJE

3

INVERT

D

ISa-t

CLA

SS Il

l CL

ASS

Ill

CLA

SS IV

CL

ASS

IV

CLA

SS IV

CL

ASS

IV

CLA

SSY

CL

ASS

Y

CLA

SSY

3

EL

EV

ELEV

36

-NCH

60

-NCH

12

-INa-t

15

-INa-t

18

-INa-t

24

-NCH

15

-NCH

30

-NCH

36

-INa-t

RBNF

ORCED

HO

RIZO

NTA

L EL

LIPTICA

L CL

ASS

HE

-IV

24X3

8-NC

H

STR

STR

FT

FT

SLO

PE\..

LF

LF

LF

LF

LF

LF

LF

LF

LF

STA

GE

1 -

802H

'l+85

80

2HN+

85

717.

50

717.

18

2.13

%

803H

'/+72

80

3HN+

73

718.

19

717.

70

1.32

%

EW9

806

719.

82

719.

57

0.45

%

56

806

806C

71

9.49

71

9.25

0.

48%

50

80

6C

806F

71

9.25

71

9.21

0.

40%

10

80

6F

8061

71

9.21

71

9.09

0.

46%

26

80

61

832A

71

9.09

71

8.65

0.

51%

86

80

6Q

806J

71

9.74

71

9.60

0.

45%

31

80

6J

806

719.

60

719.

49

0.42

%

26

806M

80

6K

719.

36

719.

32

0.40

%

10

806K

80

6F

719.

32

719.

21

0.44

%

25

806L

80

61

719.

20

719.

09

0.44

%

25

807

807A

71

8.90

71

8.71

0.

33%

nr-

....--::--

807A

-93

5A

718.

71

718.

00

0.37

%

200

808D

80

8 72

0.80

72

0.56

0.

48%

50

80

8 80

8A

720.

56

720.

49

0.47

%

808A

80

8B

720.

49

720.

37

0.46

%

808B

93

6A

718.

65

718.

00

0.50

%

829T"'

EW3

71

1.94

71

1.48

0.

29%

15

7 80

3H'/+

74

804H

N+16

71

9.85

71

7.80

4.

46%

ST

AG

E 1

SU3T

OTA

LS

157

258

295

100

---------

STA

GE

2 910A

91

0C

713.

62

713.

18

1.00

%

910F

91

0G

719.

88

719.

72

0.30

%

56

910G

91

0H

716.

74

716.

64

0.50

%

910H

91

0N

716.

64

716.

60

0.50

%

910K

91

0N

716.

70

716.

60

0.50

%

910L

91

0M

719.

79

719.

77

0.30

%

12

910M

91

0N

719.

77

719.

61

0.30

%

58

910N

91

00

716.

60

716.

38

0.50

%

910P

91

0Q

719.

42

719.

26

0.30

%

58

910Q

91

0R

713.

24

712.

86

0.50

%

-r-o

IN-STREA

M WOR<

MARa-t

1 -

JLIIE

1

. -ao

7A REMJV

ED IN

STA

GE

3, PFE

LBG-IA

l'OODNCREIE

OOLLA

RA

DDED

PR

OJ

EC

T N

O:

37

60

-00

-70

IH

WY

:C

TH

H

ICO

UN

TY

: R

AC

INE

IM

ISC

EL

LA

NE

OU

S Q

UA

NT

ITIE

S

ISH

EE

T:

34

1 F

ILE

NA

ME

: \P

W\t1\c

ds\

03

02

01_

mq

.pp

l P

LO

T D

AT

E:

1/9/

20

19

3:1

5:2

6 P

M

PLO

T B

Y:

HN

TB

Co

rp

PLO

T N

AM

E:

03

02

01_

mq

9

PLO

T S

CA

LE

: 1 :1

LF

dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 341 January 10, 2019
Page 22: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 342 January 10, 2019
Page 23: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 343 January 10, 2019
Page 24: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 344 January 10, 2019
Page 25: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 345 January 10, 2019
Page 26: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 346 January 10, 2019
Page 27: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 347 January 10, 2019
Page 28: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 348 January 10, 2019
Page 29: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 349 January 10, 2019
Page 30: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 350 January 10, 2019
Page 31: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 351 January 10, 2019
Page 32: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 352 January 10, 2019
Page 33: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 353 January 10, 2019
Page 34: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 354 January 10, 2019
Page 35: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 355 January 10, 2019
Page 36: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 356 January 10, 2019
Page 37: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 357 January 10, 2019
Page 38: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 358 January 10, 2019
Page 39: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 359 January 10, 2019
Page 40: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 360 January 10, 2019
Page 41: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 361 January 10, 2019
Page 42: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems
dotmpc
Text Box
Addendum No. 02 ID 3760-00-70 Revised Sheet 394 January 10, 2019
Page 43: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0002 108.4400

CPM Progress Schedule EACH

1.000

_________._____ _________._____

0004 201.0105

Clearing STA

37.000

_________._____ _________._____

0006 201.0120

Clearing ID

12.000

_________._____ _________._____

0008 201.0205

Grubbing STA

37.000

_________._____ _________._____

0010 201.0220

Grubbing ID

12.000

_________._____ _________._____

0012 203.0100

Removing Small Pipe Culverts EACH

29.000

_________._____ _________._____

0014 204.0115

Removing Asphaltic Surface Butt Joints SY

382.000

_________._____ _________._____

0016 204.0150

Removing Curb & Gutter LF

763.000

_________._____ _________._____

0018 204.0165

Removing Guardrail LF

243.000

_________._____ _________._____

0020 204.0170

Removing Fence LF

178.000

_________._____ _________._____

0022 204.0265

Abandoning Wells EACH

5.000

_________._____ _________._____

0024 204.0270

Abandoning Culvert Pipes EACH

1.000

_________._____ _________._____

0026 204.0280

Sealing Pipes EACH

4.000

_________._____ _________._____

0028 204.9090.S

Removing (item description) 001.Underdrain

LF

225.000

_________._____ _________._____

0030 204.9090.S

Removing (item description) 002. DrainTile

LF

750.000

_________._____ _________._____

Proposal Schedule of Items Page 1 of 20

Page 44: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0032 204.9105.S

Removing (item description) 001.Removing Lamparek Creek CrossCulvert

LUMP SUM _________._____LS

0034 204.9180.S

Removing (item description) 001. Riprap SY

85.000

_________._____ _________._____

0036 205.0100

Excavation Common CY

105,956.000

_________._____ _________._____

0038 213.0100

Finishing Roadway (project) 001. 3760-00-70

EACH

1.000

_________._____ _________._____

0040 305.0110

Base Aggregate Dense 3/4-Inch TON

1,225.000

_________._____ _________._____

0042 305.0120

Base Aggregate Dense 1 1/4-Inch TON

57,091.000

_________._____ _________._____

0044 311.0110

Breaker Run TON

64,094.000

_________._____ _________._____

0046 415.0100

Concrete Pavement 10-Inch SY

49,380.000

_________._____ _________._____

0050 415.4100

Concrete Pavement Joint Filling SY

54,868.000

_________._____ _________._____

0052 415.5110.S

Concrete Pavement Joint Layout LS

1.000

_________._____ _________._____

0054 416.0620

Drilled Dowel Bars EACH

122.000

_________._____ _________._____

0056 450.4000

HMA Cold Weather Paving TON

4,836.000

_________._____ _________._____

0058 455.0605

Tack Coat GAL

751.000

_________._____ _________._____

1.00000

0060 460.2000

Incentive Density HMA Pavement DOL

3,042.000

3,042.00

0062 460.6223

HMA Pavement 3 MT 58-28 S TON

2,491.000

_________._____ _________._____

0064 460.6224

HMA Pavement 4 MT 58-28 S TON

1,311.000

_________._____ _________._____

Proposal Schedule of Items Page 2 of 20

Page 45: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0066 465.0125

Asphaltic Surface Temporary TON

5,202.000

_________._____ _________._____

0068 495.1000.S

Cold patch TON

300.000

_________._____ _________._____

0070 520.2012

Culvert Pipe Temporary 12-Inch LF

60.000

_________._____ _________._____

0072 520.8000

Concrete Collars for Pipe EACH

6.000

_________._____ _________._____

0074 522.0112

Culvert Pipe Reinforced Concrete ClassIII 12-Inch

LF

46.000

_________._____ _________._____

0076 522.0418

Culvert Pipe Reinforced Concrete ClassIV 18-Inch

LF

80.000

_________._____ _________._____

0078 522.1012

Apron Endwalls for Culvert PipeReinforced Concrete 12-Inch

EACH

1.000

_________._____ _________._____

0080 522.1015

Apron Endwalls for Culvert PipeReinforced Concrete 15-Inch

EACH

4.000

_________._____ _________._____

0082 522.1018

Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch

EACH

3.000

_________._____ _________._____

0084 522.1060

Apron Endwalls for Culvert PipeReinforced Concrete 60-Inch

EACH

1.000

_________._____ _________._____

0086 524.0618

Apron Endwalls for Culvert PipeSalvaged 18-Inch

EACH

2.000

_________._____ _________._____

0088 601.0409

Concrete Curb & Gutter 30-Inch Type A LF

23,340.000

_________._____ _________._____

0090 601.0411

Concrete Curb & Gutter 30-Inch Type D LF

32.000

_________._____ _________._____

0092 601.0555

Concrete Curb & Gutter 6-Inch Sloped36-Inch Type A

LF

5,952.000

_________._____ _________._____

0094 602.0410

Concrete Sidewalk 5-Inch SF

46,714.000

_________._____ _________._____

Proposal Schedule of Items Page 3 of 20

Page 46: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0096 602.0505

Curb Ramp Detectable Warning FieldYellow

SF

1,120.000

_________._____ _________._____

0098 602.0605

Curb Ramp Detectable Warning FieldRadial Yellow

SF

78.000

_________._____ _________._____

0100 603.8000

Concrete Barrier Temporary PrecastDelivered

LF

144.000

_________._____ _________._____

0102 603.8125

Concrete Barrier Temporary PrecastInstalled

LF

144.000

_________._____ _________._____

0104 606.0200

Riprap Medium CY

21.000

_________._____ _________._____

0106 606.0300

Riprap Heavy CY

15.000

_________._____ _________._____

0108 608.0312

Storm Sewer Pipe Reinforced ConcreteClass III 12-Inch

LF

480.000

_________._____ _________._____

0110 608.0315

Storm Sewer Pipe Reinforced ConcreteClass III 15-Inch

LF

3,844.000

_________._____ _________._____

0112 608.0318

Storm Sewer Pipe Reinforced ConcreteClass III 18-Inch

LF

1,765.000

_________._____ _________._____

0114 608.0324

Storm Sewer Pipe Reinforced ConcreteClass III 24-Inch

LF

2,893.000

_________._____ _________._____

0116 608.0336

Storm Sewer Pipe Reinforced ConcreteClass III 36-Inch

LF

26.000

_________._____ _________._____

0118 608.0360

Storm Sewer Pipe Reinforced ConcreteClass III 60-Inch

LF

200.000

_________._____ _________._____

0120 608.0412

Storm Sewer Pipe Reinforced ConcreteClass IV 12-Inch

LF

317.000

_________._____ _________._____

Proposal Schedule of Items Page 4 of 20

Page 47: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0122 608.0415

Storm Sewer Pipe Reinforced ConcreteClass IV 15-Inch

LF

1,546.000

_________._____ _________._____

0124 608.0530

Storm Sewer Pipe Reinforced ConcreteClass V 30-Inch

LF

29.000

_________._____ _________._____

0126 608.0536

Storm Sewer Pipe Reinforced ConcreteClass V 36-Inch

LF

41.000

_________._____ _________._____

0128 611.0530

Manhole Covers Type J EACH

2.000

_________._____ _________._____

0130 611.0535

Manhole Covers Type J-Special EACH

6.000

_________._____ _________._____

0132 611.0606

Inlet Covers Type B EACH

1.000

_________._____ _________._____

0134 611.0624

Inlet Covers Type H EACH

155.000

_________._____ _________._____

0136 611.0627

Inlet Covers Type HM EACH

25.000

_________._____ _________._____

0138 611.0639

Inlet Covers Type H-S EACH

20.000

_________._____ _________._____

0140 611.0642

Inlet Covers Type MS EACH

10.000

_________._____ _________._____

0142 611.0654

Inlet Covers Type V EACH

6.000

_________._____ _________._____

0144 611.2004

Manholes 4-FT Diameter EACH

31.000

_________._____ _________._____

0146 611.2005

Manholes 5-FT Diameter EACH

30.000

_________._____ _________._____

0148 611.2006

Manholes 6-FT Diameter EACH

9.000

_________._____ _________._____

0150 611.3220

Inlets 2x2-FT EACH

6.000

_________._____ _________._____

0152 611.3230

Inlets 2x3-FT EACH

101.000

_________._____ _________._____

Proposal Schedule of Items Page 5 of 20

Page 48: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0154 611.3902

Inlets Median 2 Grate EACH

5.000

_________._____ _________._____

0156 611.8115

Adjusting Inlet Covers EACH

6.000

_________._____ _________._____

0158 611.8120.S

Cover Plates Temporary EACH

10.000

_________._____ _________._____

0160 611.9800.S

Pipe Grates EACH

4.000

_________._____ _________._____

0162 612.0212

Pipe Underdrain Unperforated 12-Inch LF

1,500.000

_________._____ _________._____

0164 612.0902.S

Insulation Board Polystyrene (inch) 001.4-Inch

SY

136.000

_________._____ _________._____

0166 614.0905

Crash Cushions Temporary EACH

2.000

_________._____ _________._____

0168 616.0700.S

Fence Safety LF

1,500.000

_________._____ _________._____

0170 619.1000

Mobilization EACH

1.000

_________._____ _________._____

0172 620.0100

Concrete Corrugated Median SF

4,324.000

_________._____ _________._____

0174 620.0300

Concrete Median Sloped Nose SF

3,216.000

_________._____ _________._____

0176 623.0200

Dust Control Surface Treatment SY

126,525.000

_________._____ _________._____

0178 624.0100

Water MGAL

4,846.000

_________._____ _________._____

0180 628.1104

Erosion Bales EACH

142.000

_________._____ _________._____

0182 628.1504

Silt Fence LF

28,119.000

_________._____ _________._____

0184 628.1520

Silt Fence Maintenance LF

28,700.000

_________._____ _________._____

Proposal Schedule of Items Page 6 of 20

Page 49: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0186 628.1905

Mobilizations Erosion Control EACH

10.000

_________._____ _________._____

0188 628.1910

Mobilizations Emergency Erosion Control EACH

6.000

_________._____ _________._____

0190 628.2008

Erosion Mat Urban Class I Type B SY

136,854.000

_________._____ _________._____

0192 628.6510

Soil Stabilizer Type B ACRE

0.600

_________._____ _________._____

0194 628.7005

Inlet Protection Type A EACH

216.000

_________._____ _________._____

0196 628.7010

Inlet Protection Type B EACH

11.000

_________._____ _________._____

0198 628.7020

Inlet Protection Type D EACH

210.000

_________._____ _________._____

0200 628.7504

Temporary Ditch Checks LF

142.000

_________._____ _________._____

0202 628.7555

Culvert Pipe Checks EACH

10.000

_________._____ _________._____

0204 628.7560

Tracking Pads EACH

10.000

_________._____ _________._____

0206 628.7570

Rock Bags EACH

60.000

_________._____ _________._____

0208 629.0205

Fertilizer Type A CWT

3.200

_________._____ _________._____

0210 629.0210

Fertilizer Type B CWT

90.100

_________._____ _________._____

0212 630.0140

Seeding Mixture No. 40 LB

2,454.000

_________._____ _________._____

0214 630.0200

Seeding Temporary LB

2,688.000

_________._____ _________._____

0216 633.5200

Markers Culvert End EACH

4.000

_________._____ _________._____

0218 634.0618

Posts Wood 4x6-Inch X 18-FT EACH

118.000

_________._____ _________._____

Proposal Schedule of Items Page 7 of 20

Page 50: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0220 637.0620

Sign Flags Permanent Type II EACH

20.000

_________._____ _________._____

0222 637.2210

Signs Type II Reflective H SF

711.700

_________._____ _________._____

0224 637.2215

Signs Type II Reflective H Folding SF

212.100

_________._____ _________._____

0226 637.2230

Signs Type II Reflective F SF

203.000

_________._____ _________._____

0228 638.2102

Moving Signs Type II EACH

3.000

_________._____ _________._____

0230 638.2602

Removing Signs Type II EACH

42.000

_________._____ _________._____

0232 638.3000

Removing Small Sign Supports EACH

39.000

_________._____ _________._____

0234 638.4000

Moving Small Sign Supports EACH

6.000

_________._____ _________._____

0236 640.1303.S

Pond Liner Clay CY

2,700.000

_________._____ _________._____

0238 643.0300

Traffic Control Drums DAY

99,932.000

_________._____ _________._____

0240 643.0310.S

Temporary Portable Rumble Strips LS

1.000

_________._____ _________._____

0242 643.0420

Traffic Control Barricades Type III DAY

12,465.000

_________._____ _________._____

0244 643.0705

Traffic Control Warning Lights Type A DAY

24,930.000

_________._____ _________._____

0246 643.0715

Traffic Control Warning Lights Type C DAY

13,273.000

_________._____ _________._____

0248 643.0800

Traffic Control Arrow Boards DAY

306.000

_________._____ _________._____

0250 643.0900

Traffic Control Signs DAY

33,741.000

_________._____ _________._____

0252 643.0920

Traffic Control Covering Signs Type II EACH

45.000

_________._____ _________._____

Proposal Schedule of Items Page 8 of 20

Page 51: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0254 643.1000

Traffic Control Signs Fixed Message SF

194.000

_________._____ _________._____

0256 643.1050

Traffic Control Signs PCMS DAY

320.000

_________._____ _________._____

0258 643.5000

Traffic Control EACH

1.000

_________._____ _________._____

0260 645.0120

Geotextile Type HR SY

287.000

_________._____ _________._____

0262 645.0220

Geogrid Type SR SY

12,359.000

_________._____ _________._____

0264 646.1005

Marking Line Paint 4-Inch LF

415.000

_________._____ _________._____

0266 646.1020

Marking Line Epoxy 4-Inch LF

11,648.000

_________._____ _________._____

0268 646.1545

Marking Line Grooved Wet Ref ContrastEpoxy 4-Inch

LF

309.000

_________._____ _________._____

0270 646.3020

Marking Line Epoxy 8-Inch LF

732.000

_________._____ _________._____

0272 646.3545

Marking Line Grooved Wet Ref ContrastEpoxy 8-Inch

LF

1,208.000

_________._____ _________._____

0274 646.5020

Marking Arrow Epoxy EACH

40.000

_________._____ _________._____

0276 646.5120

Marking Word Epoxy EACH

19.000

_________._____ _________._____

0278 646.6120

Marking Stop Line Epoxy 18-Inch LF

565.000

_________._____ _________._____

0280 646.6220

Marking Yield Line Epoxy 18-Inch EACH

61.000

_________._____ _________._____

0282 646.7120

Marking Diagonal Epoxy 12-Inch LF

685.000

_________._____ _________._____

0284 646.7420

Marking Crosswalk Epoxy TransverseLine 6-Inch

LF

2,950.000

_________._____ _________._____

Proposal Schedule of Items Page 9 of 20

Page 52: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0286 646.8120

Marking Curb Epoxy LF

182.000

_________._____ _________._____

0288 646.8220

Marking Island Nose Epoxy EACH

14.000

_________._____ _________._____

0290 646.9000

Marking Removal Line 4-Inch LF

19,979.000

_________._____ _________._____

0292 646.9100

Marking Removal Line 8-Inch LF

683.000

_________._____ _________._____

0294 646.9200

Marking Removal Line Wide LF

139.000

_________._____ _________._____

0296 649.0105

Temporary Marking Line Paint 4-Inch LF

4,439.000

_________._____ _________._____

0298 649.0150

Temporary Marking Line RemovableTape 4-Inch

LF

41,352.000

_________._____ _________._____

0300 649.0155

Temporary Marking Line RemovableContrast Tape 4-Inch

LF

24,023.000

_________._____ _________._____

0302 649.0250

Temporary Marking Line RemovableTape 8-Inch

LF

1,012.000

_________._____ _________._____

0304 649.0255

Temporary Marking Line RemovableContrast Tape 8-Inch

LF

5,887.000

_________._____ _________._____

0306 649.0505

Temporary Marking Arrow Paint EACH

36.000

_________._____ _________._____

0308 649.0605

Temporary Marking Word Paint EACH

4.000

_________._____ _________._____

0310 649.0850

Temporary Marking Stop LineRemovable Tape 18-Inch

LF

447.000

_________._____ _________._____

0312 649.0960

Temporary Marking Removable MaskOut Tape 6-Inch

LF

2,807.000

_________._____ _________._____

0314 649.0970

Temporary Marking Removable MaskOut Tape 10-Inch

LF

528.000

_________._____ _________._____

Proposal Schedule of Items Page 10 of 20

Page 53: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0316 652.0225

Conduit Rigid Nonmetallic Schedule 402-Inch

LF

6,615.000

_________._____ _________._____

0318 652.0235

Conduit Rigid Nonmetallic Schedule 403-Inch

LF

8,181.000

_________._____ _________._____

0320 652.0700.S

Install Conduit into Existing Item EACH

2.000

_________._____ _________._____

0322 652.0800

Conduit Loop Detector LF

5,000.000

_________._____ _________._____

0324 653.0135

Pull Boxes Steel 24x36-Inch EACH

38.000

_________._____ _________._____

0326 653.0140

Pull Boxes Steel 24x42-Inch EACH

54.000

_________._____ _________._____

0328 654.0101

Concrete Bases Type 1 EACH

21.000

_________._____ _________._____

0330 654.0102

Concrete Bases Type 2 EACH

11.000

_________._____ _________._____

0332 654.0105

Concrete Bases Type 5 EACH

27.000

_________._____ _________._____

0334 654.0110

Concrete Bases Type 10 EACH

8.000

_________._____ _________._____

0338 654.0217

Concrete Control Cabinet Bases Type 9Special

EACH

3.000

_________._____ _________._____

0340 654.0230

Concrete Control Cabinet Bases TypeL30

EACH

2.000

_________._____ _________._____

0342 654.1130

Concrete Bases Camera Pole 30-FT EACH

1.000

_________._____ _________._____

0344 655.0210

Cable Traffic Signal 3-14 AWG LF

4,900.000

_________._____ _________._____

0346 655.0230

Cable Traffic Signal 5-14 AWG LF

2,713.000

_________._____ _________._____

0348 655.0240

Cable Traffic Signal 7-14 AWG LF

8,120.000

_________._____ _________._____

Proposal Schedule of Items Page 11 of 20

Page 54: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0350 655.0260

Cable Traffic Signal 12-14 AWG LF

7,407.000

_________._____ _________._____

0352 655.0320

Cable Type UF 2-10 AWG Grounded LF

3,877.000

_________._____ _________._____

0354 655.0510

Electrical Wire Traffic Signals 12 AWG LF

6,871.000

_________._____ _________._____

0356 655.0515

Electrical Wire Traffic Signals 10 AWG LF

11,240.000

_________._____ _________._____

0358 655.0610

Electrical Wire Lighting 12 AWG LF

2,916.000

_________._____ _________._____

0360 655.0700

Loop Detector Lead In Cable LF

16,185.000

_________._____ _________._____

0362 655.0800

Loop Detector Wire LF

17,666.000

_________._____ _________._____

0364 655.0900

Traffic Signal EVP Detector Cable LF

4,900.000

_________._____ _________._____

0366 656.0200

Electrical Service Meter BreakerPedestal (location) 001. CCTV-51-0230

LUMP SUM _________._____LS

0368 656.0200

Electrical Service Meter BreakerPedestal (location) 301. CTH KR & CTHH

LUMP SUM _________._____LS

0370 656.0200

Electrical Service Meter BreakerPedestal (location) 302. CTH H & AccessFC6/Access E5A

LUMP SUM _________._____LS

0372 656.0200

Electrical Service Meter BreakerPedestal (location) 303. CTH H & BraunRoad

LUMP SUM _________._____LS

0374 656.0500

Electrical Service Breaker DisconnectBox (location) 002. CCTV-51-0230

LUMP SUM _________._____LS

0376 657.0100

Pedestal Bases EACH

21.000

_________._____ _________._____

Proposal Schedule of Items Page 12 of 20

Page 55: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0378 657.0255

Transformer Bases Breakaway 11 1/2-Inch Bolt Circle

EACH

38.000

_________._____ _________._____

0380 657.0310

Poles Type 3 EACH

11.000

_________._____ _________._____

0382 657.0405

Traffic Signal Standards Aluminum 3.5-FT

EACH

1.000

_________._____ _________._____

0384 657.0420

Traffic Signal Standards Aluminum 13-FT EACH

1.000

_________._____ _________._____

0386 657.0425

Traffic Signal Standards Aluminum 15-FT EACH

16.000

_________._____ _________._____

0388 657.0430

Traffic Signal Standards Aluminum 10-FT EACH

4.000

_________._____ _________._____

0390 657.0609

Luminaire Arms Single Member 4-InchClamp 6-FT

EACH

20.000

_________._____ _________._____

0392 658.0173

Traffic Signal Face 3S 12-Inch EACH

43.000

_________._____ _________._____

0394 658.0174

Traffic Signal Face 4S 12-Inch EACH

29.000

_________._____ _________._____

0396 658.0416

Pedestrian Signal Face 16-Inch EACH

24.000

_________._____ _________._____

0398 658.0500

Pedestrian Push Buttons EACH

33.000

_________._____ _________._____

0400 658.5069

Signal Mounting Hardware (location)301. CTH KR & CTH H

LUMP SUM _________._____LS

0402 658.5069

Signal Mounting Hardware (location)302. Access FC6/Access E5A

LUMP SUM _________._____LS

0404 658.5069

Signal Mounting Hardware (location)303. CTH H & Braun Road

LUMP SUM _________._____LS

0406 659.1125

Luminaires Utility LED C EACH

24.000

_________._____ _________._____

Proposal Schedule of Items Page 13 of 20

Page 56: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0408 661.0200

Temporary Traffic Signals forIntersections (location) 301. CTH KR &CTH H

LUMP SUM _________._____LS

0410 661.0200

Temporary Traffic Signals forIntersections (location) 303. CTH H &Braun Road

LUMP SUM _________._____LS

0412 661.0300

Generators DAY

2.000

_________._____ _________._____

0414 670.0100

Field System Integrator LUMP SUM _________._____LS

0416 670.0100

Field System Integrator 301. CTH HTraffic Signals

LUMP SUM _________._____LS

0418 670.0200

ITS Documentation LUMP SUM _________._____LS

0420 671.0122

Conduit HDPE 2-Duct 2-Inch LF

6,480.000

_________._____ _________._____

0422 673.0105

Communication Vault Type 1 EACH

10.000

_________._____ _________._____

0424 673.0200

Tracer Wire Marker Posts EACH

10.000

_________._____ _________._____

0426 673.0225.S

Install Pole Mounted Cabinet EACH

1.000

_________._____ _________._____

0428 677.0130

Install Camera Pole 30-FT EACH

1.000

_________._____ _________._____

0430 677.0200

Install Camera Assembly EACH

3.000

_________._____ _________._____

0432 678.0400

Fiber Optic Termination EACH

6.000

_________._____ _________._____

0434 678.0600

Install Ethernet Switches EACH

1.000

_________._____ _________._____

0436 690.0150

Sawing Asphalt LF

8,961.000

_________._____ _________._____

Proposal Schedule of Items Page 14 of 20

Page 57: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1.00000

0438 715.0415

Incentive Strength Concrete Pavement DOL

4,115.000

4,115.00

1.00000

0440 740.0440

Incentive IRI Ride DOL

9,000.000

9,000.00

0442 SPV.0035

Special 001. Roadway Embankment CY

134,931.000

_________._____ _________._____

0444 SPV.0035

Special 002. EBS Excavation CY

24,250.000

_________._____ _________._____

0446 SPV.0035

Special 003. EBS Backfill CY

24,250.000

_________._____ _________._____

0448 SPV.0060

Special 002. Temporary Stone DitchChecks

EACH

40.000

_________._____ _________._____

0450 SPV.0060

Special 003. Sand Bags EACH

50.000

_________._____ _________._____

0452 SPV.0060

Special 004. Temporary Sediment Traps EACH

6.000

_________._____ _________._____

0454 SPV.0060

Special 005. Erosion Control Filter Bags EACH

5.000

_________._____ _________._____

0456 SPV.0060

Special 006. Connect Drain Tile EACH

10.000

_________._____ _________._____

0458 SPV.0060

Special 007. Pond G Outlet Storm SewerStructure

EACH

1.000

_________._____ _________._____

0460 SPV.0060

Special 008. Mobilization EmergencyPavement Repair

EACH

8.000

_________._____ _________._____

0462 SPV.0060

Special 010. Section Corner Monuments EACH

2.000

_________._____ _________._____

0464 SPV.0060

Special 011. Manhole 9-FT Diameter EACH

2.000

_________._____ _________._____

0466 SPV.0060

Special 013. Slip-In Check Valve for 30"Inside Diameter Pipe

EACH

1.000

_________._____ _________._____

Proposal Schedule of Items Page 15 of 20

Page 58: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0468 SPV.0060

Special 014. Slip-In Check Valve for 36"Inside Diameter Pipe

EACH

1.000

_________._____ _________._____

0470 SPV.0060

Special 200. Install Wireless Modem EACH

1.000

_________._____ _________._____

0472 SPV.0060

Special 201. Ground Rod EACH

1.000

_________._____ _________._____

0474 SPV.0060

Special 309. Covering Traffic SignalHead

EACH

1.000

_________._____ _________._____

0476 SPV.0060

Special 309. Install Poles Type 9 EACH

7.000

_________._____ _________._____

0478 SPV.0060

Special 310. Install Poles Type 10 EACH

1.000

_________._____ _________._____

0484 SPV.0060

Special 325. Install Monotube Arms 25-FT

EACH

1.000

_________._____ _________._____

0486 SPV.0060

Special 330. Install Monotube Arms 30-FT

EACH

7.000

_________._____ _________._____

0488 SPV.0060

Special 340. Install Monotube Arms 40-FT

EACH

1.000

_________._____ _________._____

0490 SPV.0060

Special 345. Install Monotube Arms 45-FT

EACH

4.000

_________._____ _________._____

0492 SPV.0060

Special 360. Install Luminaire Arms Steel15-FT

EACH

4.000

_________._____ _________._____

0494 SPV.0075

Special 001. Pavement Cleanup Project3760-00-70

HRS

310.000

_________._____ _________._____

0496 SPV.0090

Special 001. Heavy Duty Silt Fence LF

310.000

_________._____ _________._____

0498 SPV.0090

Special 002. Pipe Underdrain 6-InchSpecial

LF

905.000

_________._____ _________._____

Proposal Schedule of Items Page 16 of 20

Page 59: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0500 SPV.0090

Special 003. Marking Contrast Epoxy 4-Inch Special

LF

7,774.000

_________._____ _________._____

0502 SPV.0090

Special 004. Marking Contrast Epoxy 8-Inch Special

LF

6,731.000

_________._____ _________._____

0504 SPV.0105

Special 001. Survey Project LUMP SUM _________._____LS

0506 SPV.0105

Special 002. ATC Thermal Backfill LUMP SUM _________._____LS

0510 SPV.0105

Special 301. Transport and Install StateFurnished Traffic Signal Cabinet CTH KR& CTH H

LUMP SUM _________._____LS

0512 SPV.0105

Special 302. Transport & Install StateFurnished Traffic Signal Cabinet CTH H& FC6/E5A

LUMP SUM _________._____LS

0514 SPV.0105

Special 303. Transport and Install StateFurnished Traffic Signal Cabinet CTH H& Braun

LUMP SUM _________._____LS

0516 SPV.0105

Special 304. Transport and Install StateFurnished Radar Detection System CTHKR & CTH H

LUMP SUM _________._____LS

0518 SPV.0105

Special 305. Transport & Install StateFurnished Radar Detection System CTHH & FC6/E5A

LUMP SUM _________._____LS

0520 SPV.0105

Special 306. Transport and Install StateFurnished Radar Detection System CTHH & Braun

LUMP SUM _________._____LS

0522 SPV.0105

Special 307. Trnsprt & Ins. State Furn.EVP Detector Hds w/ ConfirmationBeacons KR/H

LUMP SUM _________._____LS

0524 SPV.0105

Special 308. Trnsprt & Ins. State Furn.EVP Detector Hds w/ ConfirmationBeacons FC6/E5A

LUMP SUM _________._____LS

Proposal Schedule of Items Page 17 of 20

Page 60: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0526 SPV.0105

Special 309. Trnsprt & Ins. State Furn.EVP Detector Hds w/ ConfirmationBeacons H/Braun

LUMP SUM _________._____LS

0528 SPV.0105

Special 310. Transport Traffic Signal andIntersection Lighting Materials CTH KR &CTH H

LUMP SUM _________._____LS

0530 SPV.0105

Special 311. Transport Traffic Signal &Intersection Lighting Materials CTH H &FC6/E5A

LUMP SUM _________._____LS

0532 SPV.0105

Special 312. Transport Traffic Signal andIntersection Lighting Materials CTH H &Braun

LUMP SUM _________._____LS

0534 SPV.0105

Special 313. Temporary EVP SystemCTH KR & CTH H

LUMP SUM _________._____LS

0536 SPV.0105

Special 315. Temporary EVP SystemCTH H & Braun Road

LUMP SUM _________._____LS

0538 SPV.0105

Special 316. TemporaryRadar/Microwave Vehicle DetectionSystem CTH KR & CTH H

LUMP SUM _________._____LS

0540 SPV.0105

Special 318. TemporaryRadar/Microwave Vehicle DetectionSystem CTH H & Braun Road

LUMP SUM _________._____LS

0542 SPV.0170

Special 001. Removal and Disposal ofInvasive Plant Species

STA

5.000

_________._____ _________._____

0544 SPV.0180

Special 001. Topsoil Special SY

136,854.000

_________._____ _________._____

0546 415.1100

Concrete Pavement HES 10-Inch SY

5,488.000

_________._____ _________._____

0548 611.0430

Reconstructing Inlets EACH

8.000

_________._____ _________._____

Proposal Schedule of Items Page 18 of 20

Page 61: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0550 611.8110

Adjusting Manhole Covers EACH

1.000

_________._____ _________._____

0552 SPV.0060

Special 302. Concrete Bases Type 10Special

EACH

5.000

_________._____ _________._____

0554 SPV.0060

Special 314. Install Poles Type 9S EACH

3.000

_________._____ _________._____

0556 SPV.0060

Special 315. Install Poles Type 10S EACH

2.000

_________._____ _________._____

0558 204.0220

Removing Inlets EACH

1.000

_________._____ _________._____

0560 522.1024

Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch

EACH

1.000

_________._____ _________._____

0562 522.2624

Apron Endwalls for Culvert PipeReinforced Concrete Horizontal Elliptical24x38-Inch

EACH

1.000

_________._____ _________._____

0564 608.0418

Storm Sewer Pipe Reinforced ConcreteClass IV 18-Inch

LF

120.000

_________._____ _________._____

0566 608.0424

Storm Sewer Pipe Reinforced ConcreteClass IV 24-Inch

LF

639.000

_________._____ _________._____

0568 608.0515

Storm Sewer Pipe Reinforced ConcreteClass V 15-Inch

LF

124.000

_________._____ _________._____

0570 608.2424

Storm Sewer Pipe Reinforced ConcreteHorizontal Elliptical Class HE-IV 24x38-Inch

LF

279.000

_________._____ _________._____

0572 611.0636

Inlet Covers Type HM-S EACH

6.000

_________._____ _________._____

0574 611.2007

Manholes 7-FT Diameter EACH

2.000

_________._____ _________._____

0576 611.3003

Inlets 3-FT Diameter EACH

1.000

_________._____ _________._____

Proposal Schedule of Items Page 19 of 20

Page 62: Wisconsin Department of Transportation€¦ · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems

Wisconsin Department of Transportation 01/10/2019 08:53:39

Proposal ID: 20190115016 Project(s): 3760-00-70

Federal ID(s): N/A

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0578 611.3004

Inlets 4-FT Diameter EACH

39.000

_________._____ _________._____

Section: 0001 _________._____Total:

Total Bid: _________._____

Proposal Schedule of Items Page 20 of 20