CENTRAL PARK WEST WEST 87TH STREET WEST 88TH STREET CENTRAL PARK ENGINEERING & ARCHITECTURE, DPC TEL. (212) 675-8844 / FAX (212) 691-7972 159 WEST 25TH STREET NEW YORK, NY 10001 BUILDING INFORMATION BLOCK: 1201 LOT: 29 MAP: 5D ZONING DISTRICT: R10A LANDMARK: YES SITE PLAN LIMITED PENTHOUSE ALTERATIONS, ACCESS DOOR RELOCATION 271 CENTRAL PARK WEST NEW YORK, NY DOCKET #: 19-19956 UPPER WEST SIDE/CENTRAL PARK WEST HISTORIC DISTRICT LANDMARK PRESERVATION COMMISSION SEPTEMBER 4, 2018 PUBLIC HEARING N CENTRAL PARK WEST COLUMBUS AVENUE 12B 100' 75.5' 271 CENTRAL PARK WEST 87TH STREET WEST 88TH STREET 700 FEET TO LAKE SITE PLAN & EXISTING BUILDING PHOTO M170504 LPC-01 SITE PLAN 1 SCALE: 1/16" = 1'-0" N 271 CENTRAL PARK WEST 13-STORY MASONRY BLOCK: 1201 LOT: 29 7 WEST 87TH STREET 5-STORY MASONRY 275 CENTRAL PARK WEST 19-STORY MASONRY AREA OF WORK PHOTO 1 - UPPER WEST SIDE/CENTRAL PARK WEST HISTORIC DISTRICT MAP. 271 CENTRAL PARK WEST IS SHOWN IN RED.

LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

CEN

TRAL

PAR

K W

EST

WEST 87TH STREET

WEST 88TH STREET

CEN

TRAL

PAR

K

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SITE PLAN & EXISTING BUILDINGPHOTO

M170504

LPC-01

SITE PLAN1 SCALE: 1/16" = 1'-0"

N

271 CENTRAL PARK WEST13-STORY MASONRYBLOCK: 1201 LOT: 29

7 WEST 87TH STREET5-STORY MASONRY

275 CENTRAL PARK WEST19-STORY MASONRY

AREA OFWORK

PHOTO 1 - UPPER WEST SIDE/CENTRAL PARK WEST HISTORIC DISTRICT MAP. 271 CENTRAL PARK WEST IS SHOWN IN RED.

Page 2: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXISTING BUILDING PHOTOS

M170504

LPC-02

PHOTO 3 - CURRENT PHOTO OF THE PROPERTY SHOWING THE SOUTH (WEST 87TH STREET) FACING PRIMARY ELEVATION.NOTE: EXISTING SERVICE ELEVATOR BULKHEAD IS NOT VISIBLE.

PHOTO 2 - CURRENT PHOTO OF THE PROPERTY SHOWING THE EAST (CENTRAL PARK WEST) FACING PRIMARY ELEVATION.NOTE: EXISTING SERVICE ELEVATOR BULKHEAD IS NOT VISIBLE.

Page 3: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

CEN

TRAL

PAR

K W

EST

WEST 87TH STREET

WEST 88TH STREET

CEN

TRAL

PAR

K

2A 2C

WEST DRIVE

2B

1A

1B

3A

3B

16'-8" 52'-5" 20'-0"89'-1"

CENTRAL PARK WEST1B1A

D001

NEW SKYLIGHTASSEMBLY

EXG WATERTANK TOREMAIN

ELEVATORBULKHEADTO REMAIN

NEWDOOR

NEW MASONRYWALL W/ FACEBRICK

NEW ROOF

NEW WALL W/ METAL CLADDING

2A

16'-8" 52'-5" 20'-0"89'-1"

• • • • ••• •••••••••

WEST DRIVECENTRAL PARK WEST

CENTRAL PARK

NEW PASSENGER ELEVATOR BULKHEAD &STANDPIPE VALVE ENCLOSURE CLEARSTHE SIGHT LINES FROM THE STREET LEVEL.THE NEW BULKHEADS ARE SLIGHTLYVISIBLE FROM THE WEST DRIVE ASDIRECTED BY LPC.

6'-0"2B 2C

D001

NEW ROOF

NEW WALL W/ METAL CLADDING

15'-4" 30'-0" 15'-4"60'-11"

WEST 87TH STREET3A3B

D002

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SIGHT LINE STUDY

M170504

LPC-03SIGHT LINE ELEVATION: NORTH2 SCALE: 1/32" = 1'-0"

SITE PLAN4 SCALE: 1/32" = 1'-0"

SIGHT LINE ELEVATION: NORTHWEST1 SCALE: 1/32" = 1'-0"

SIGHT LINE ELEVATION: WEST3 SCALE: 1/32" = 1'-0"

N

Page 4: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SIGHT LINE STUDYPHOTOGRAPHS

M170504

LPC-04

PHOTO 4 - FACING SOUTH-WEST LEVEL ALONG WEST 87TH/ STREET SHOWING THE EXISTING CONDITIONS AT THE PENTHOUSE ROOF. PHOTO 5 - FACING SOUTH-WEST ALONG WEST 87TH/ STREET SHOWING THE MOCK-UP CONSTRUCTED FOR ONE (1) OF TWO (2) OF THE PROPOSED BULKHEADS AT THE PENTHOUSE ROOF.

PHOTO 6 - FACING NORTH ALONG CENTRAL PARK WEST SHOWING THE EXISTING CONDITIONS AT THE PENTHOUSE ROOF. PHOTO 7 - FACING NORTH ALONG CENTRAL PARK WEST SHOWING THE MOCK-UP CONSTRUCTED FOR ONE (1) OF TWO (2) OF THE PROPOSED BULKHEADS AT THE PENTHOUSE ROOF.

Page 5: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SIGHT LINE STUDYPHOTOGRAPHS

M170504

LPC-05

PHOTO 8 - FACING NORTHWEST ALONG THE ROOF LEVEL SHOWING THE PROPOSED MOCKUPS. PHOTO 9 - FACING NORTH ALONG THE ROOF LEVEL SHOWING THE PROPOSED ELEVATOR BULKHEAD MOCKUP. THE RED OUTLINE DEPICTS THE CURRENT ACCESS DOOR TO THE PASSENGERELEVATOR MACHINE ROOM. THIS ACCESS DOOR IS CURRENTLY IN THE PENTHOUSE APARTMENT AND WOULD BE RELOCATED TO THE PROPOSED ELEVATOR BULKHEAD.

LOCATION OF BULKHEADMOCKUPS

PHOTO 10 - FACING NORTHWEST ALONG WEST DRIVE IN CENTRAL PARK SHOWING THE EXISTING CONDITIONS. PHOTO 11 - FACING WEST ALONG WEST DRIVE IN CENTRAL PARK SHOWING THE VISIBILITY OF THE CONSTRUCTED MOCK-UPS ALONG THE PENTHOUSE ROOF LEVEL.

Page 6: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SIGHT LINE STUDYPHOTOGRAPHS

M170504

LPC-06

PHOTO 12 - FACING WEST ALONG A FOOT PATH IN CENTRAL PARK. PHOTO 13 - ZOOMED IN FACING WEST ALONG A FOOT PATH IN CENTRAL PARK.

PHOTO 14 - FACING WEST ALONG THE SOUND END OF THE JACQUELINE KENNEDY ONASSIS RESERVOIR IN CENTRAL PARK PHOTO 15 - ZOOMED IN FACING WEST ALONG THE SOUND END OF THE JACQUELINE KENNEDY ONASSIS RESERVOIR IN CENTRAL PARK

Page 7: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

SIGHT LINE STUDYPHOTOGRAPHS

M170504

LPC-07

PHOTO 16- FACING SOUTH ALONG THE ROOF LEVEL SHOWING THE SIMILAR ELEVATOR BULKHEADS AT NEIGHBORING BUILDING 267 CENTRAL PARK WEST PHOTO 17-FACING WEST ALONG WEST DRIVE IN CENTRAL PARK SHOWING THE VISIBILITY OF THE ELEVATOR BULKHEADS AT NEIGHBORING BUILDING 267 CENTRAL PARK WEST

Page 8: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

W D

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

W D

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

WEST 87TH STREET

CEN

TRAL

PAR

K W

EST

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

W D

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

W D

EXG ELEVATOREQUIP TO REMAIN

EXG MILLWORKDOOR TO REMAIN

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

REMOVE EXGACCESS DOOR

EXG O.S. & Y. STANDPIPE CONTROLVALVE TO BE REMOVED.

CONTRACTOR TO VIF EXISTENCE OFOTHER STANDPIPE VALVES/CHECK

VALVES

EXG METALGRATINGPLATFORM TOREMAIN

WEST 87TH STREET

CEN

TRAL

PAR

K W

EST

EXG ELEVATOREQUIP TO REMAIN

EXG ACCESS PANEL @ CLG TO BECLOSED

EXG STANDPIPE DOWN FROM ROOFTANK ABOVE CLG TO REMAIN

NEW STANDPIPE SECTION TOCONNECT TO EXG

EXG METALGRATINGPLATFORM TOREMAIN

EXG MILLWORKDOOR TO REMAIN

REPLACE EXGACCESS DOORW/ NEW RATEDWALL ASSEMBLY

A

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXISTING/REMOVAL &PROPOSED PLAN: PENTHOUSE

M170504

LPC-08

1LPC-08

1LPC-11

5LPC-13

7LPC-14

3LPC-12

EXISTING/REMOVAL PLAN: PENTHOUSE1 SCALE: 1/4" = 1'-0"

EXISTING/REMOVAL KEY PLAN: PENTHOUSE2 SCALE: 1/16" = 1'-0"

3LPC-08

2LPC-11

6LPC-13

8LPC-14

4LPC-12

CONSTRUCTION PLAN: PENTHOUSE3 SCALE: 1/4" = 1'-0"

CONSTRUCTION KEY PLAN: PENTHOUSE4 SCALE: 1/16" = 1'-0"

Page 9: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

D002

PENTHOUSE ROOF

SERVICE ELEVATORBULKHEAD

5'-11

"

3'-0"

NEW METAL GRATINGPLATFORM

D001

EXG ELEVATOR EQUIPBELOW TO REMAIN

NEW WALL W/ METALCLADDING

6"3'-

0"2'-

5"

6'-0"

9'-8"

B

5'-8"2'-8"

B

3'-0"

3"

C

C

3'-0"3'-3"6'-6"

4'-8"

B

C

RELOCATE EXG STANDPIPE VALVEFROM PENTHOUSE LEVEL TO

PENTHOUSE ROOF

MAXIMIZE CEILING HEIGHT

NEW WALL W/ METAL CLADDING

NEW DOOR

NEW DOOR

NEW METAL LADDER

C

4'-6"

6'-9"

13'-9"

D002

PENTHOUSE ROOF

TERRACE

TERRACE

SERVICE ELEVATORBULKHEAD

5'-11

"

3'-0"

NEW METAL GRATINGPLATFORM

D001

EXG ELEVATOR EQUIPBELOW TO REMAIN

NEW WALL W/ METALCLADDING

6"3'-

0"2'-

5"

6'-0"

9'-8"

B

5'-8"2'-8"

B

3'-0"

3"

C

C

3'-0"3'-3"6'-6"

4'-8"

B

C

RELOCATE EXG STANDPIPE VALVEFROM PENTHOUSE LEVEL TO

PENTHOUSE ROOF

MAXIMIZE CEILING HEIGHT

NEW WALL W/ METAL CLADDING

NEW DOOR

NEW DOOR

NEW METAL LADDER

C

4'-6"

6'-9"

13'-9"

WEST 87TH STREET

CEN

TRAL

PAR

K W

EST

TERRACE

TERRACE

PENTHOUSE ROOF

SERVICE ELEVATORBULKHEAD

REMOVE EXG SKYLIGHT

6'-0"

7'-2"

5'-0"

2'-11

"

RELOCATE EXG STANDPIPE VALVEFROM PENTHOUSE LEVEL TO

PENTHOUSE ROOF

WEST 87TH STREET

CEN

TRAL

PAR

K W

EST

PENTHOUSE ROOF

SERVICE ELEVATORBULKHEAD

REMOVE EXG SKYLIGHT

6'-0"

7'-2"

5'-0"2'-

11"

RELOCATE EXG STANDPIPE VALVEFROM PENTHOUSE LEVEL TO

PENTHOUSE ROOF

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXISTING/REMOVAL &CONSTRUCTION PLAN:PENTHOUSE ROOF

M170504

LPC-09

3LPC-09

5LPC-15

7LPC-15

6LPC-15

8LPC-15

CONSTRUCTION PLAN: PENTHOUSE ROOF3 SCALE: 1/4" = 1'-0"

CONSTRUCTION KEY PLAN: PENTHOUSE ROOF4 SCALE: 1/16" = 1'-0"

1LPC-04

1LPC-15

3LPC-15

2LPC-15

4LPC-15

EXG/REMOVAL PLAN: PENTHOUSE ROOF1 SCALE: 1/4" = 1'-0"

EXISTING/REMOVAL KEY PLAN: PENTHOUSE ROOF2 SCALE: 1/16" = 1'-0"

1LPC-11

5LPC-13

7LPC-14

3LPC-12

2LPC-11

6LPC-13

8LPC-14

4LPC-12

5LPC-16

7LPC-16

6LPC-16

8LPC-16

1LPC-16

3LPC-16

2LPC-16

4LPC-16

Page 10: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

WEST 87TH STREET WEST 88TH STREET271 CENTRAL PARK WEST 275 CENTRAL PARK WEST 279 CENTRAL PARK WEST262 CENTRAL PARK WEST

CENTRAL PARK WEST

••••••••••••••••••••••••

••••••••••••••••

••••••••••••••••••

••••••••••••••••

NEW SKYLIGHT ASSEMBLY

EXG SERVICE ELEVATORBULKHEAD TO REMAIN

NEW MASONRY WALL W/ FACE BRICK

NEW ROOF

NEW WALL W/ METAL CLADDING

D002NEW DOOR

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

PROPOSED BLOCK ELEVATION

M170504

LPC-10PROPOSED BLOCK ELEVATION1 SCALE: 1/16" = 1'-0"

Page 11: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

REMOVE EXGSKYLIGHTASSEMBLY

EXG WATERTANK TOREMAIN

EXG SERVICEELEVATORBULKHEADTO REMAIN

PENTHOUSE ROOF LEVEL

PENTHOUSE

D001

NEW SKYLIGHTASSEMBLY

EXG WATERTANK TOREMAIN

EXG SERVICEELEVATORBULKHEADTO REMAIN

NEWDOOR

NEW MASONRYWALL W/ FACEBRICK

NEW ROOF

NEW WALL W/ METAL CLADDING

PENTHOUSE ROOF LEVEL

PENTHOUSE

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXg/REMOVALS & PROPOSEDEXTERIOR ELEVATION: NORTH

M170504

LPC-11

EXISTING EXTERIOR ELEVATION: NORTH1 SCALE: 1/4" = 1'-0"

PROPOSED EXTERIOR ELEVATION: NORTH2 SCALE: 1/4" = 1'-0"

Page 12: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

NEW SKYLIGHT ASSEMBLY

EXG SERVICE ELEVATORBULKHEAD TO REMAIN

NEW MASONRY WALL W/ FACE BRICK

NEW ROOF

NEW WALL W/ METAL CLADDING

D002NEW DOOR

PENTHOUSE ROOF LEVEL

PENTHOUSE

REMOVE EXGSKYLIGHT ASSEMBLY

EXG WATERTANK TOREMAIN

EXG SERVICEELEVATORBULKHEADTO REMAIN

PENTHOUSE ROOF LEVEL

PENTHOUSE

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXG/REMOVALS & PROPOSEDEXTERIOR ELEVATION: WEST

M170504

LPC-12PROPOSED EXTERIOR ELEVATION: WEST4 SCALE: 1/4" = 1'-0"

EXISTING EXTERIOR ELEVATION: WEST3 SCALE: 1/4" = 1'-0"

Page 13: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

EXG WATER TANKTO REMAIN

NEW ROOF

NEW WALL W/ METALCLADDING

EXG SERVICE ELEVATORBULKHEAD TO REMAIN

NEW SKYLIGHTASSEMBLY

PENTHOUSE ROOF LEVEL

PENTHOUSE

NEW MASONRY WALLW/ FACE BRICK

EXG WATERTANK TOREMAIN

EXG SERVICEELEVATORBULKHEADTO REMAIN

REMOVE EXGSKYLIGHTASSEMBLY

PENTHOUSE ROOF LEVEL

PENTHOUSE

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXG/REMOVALS & PROPOSEDEXTERIOR ELEVATION: SOUTH

M170504

LPC-13PROPOSED EXTERIOR ELEVATION: SOUTH6 SCALE: 1/4" = 1'-0"

EXISTING EXTERIOR ELEVATION: SOUTH5 SCALE: 1/4" = 1'-0"

Page 14: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

EXG WATERTANK TOREMAIN

EXG SERVICEELEVATORBULKHEADTO REMAIN

PENTHOUSE ROOF LEVEL

PENTHOUSE

EXG WATER TANKTO REMAIN

NEW ROOF

NEW WALL W/ METALCLADDING

PENTHOUSE ROOF LEVEL

PENTHOUSE

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXG/REMOVALS & PROPOSED:EXTERIOR ELEVATION: EAST

M170504

LPC-14

EXISTING EXTERIOR ELEVATION: EAST7 SCALE: 1/4" = 1'-0"

PROPOSED EXTERIOR ELEVATION: EAST8 SCALE: 1/4" = 1'-0"

Page 15: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

REMOVE EXG SKYLIGHTASSEMBLY

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

EXG WALL TO REMAIN

6'-6"

PENTHOUSE

3'-8"

PENTHOUSE ROOF LEVEL

PENTHOUSE

EXG METAL GRATINGPLATFORM TO REMAIN

REMOVE EXG ACCESSDOOR

EXG MILLWORK DOORTO REMAIN

REMOVE SKYLIGHTASSEMBLY

4'-8"

2'-8" 2'-0"

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

EXG WALL TO REMAIN

REMOVE EXG SKYLIGHTASSEMBLY

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

REMOVE EXG SKYLIGHTASSEMBLY

REMOVE EXG ACCESS DOOR

EXG MILLWORK DOORTO REMAIN

EXG WALL TO REMAIN

NEW METAL GRATINGPLATFORM

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

NEW LADDER

NEW MASONRY WALLW/ FACE BRICK

NEW SKYLIGHT ASSEMBLY

NEW CURB (6" MIN)

NEW HOIST BEAM (W 8x10)

NEW DOOR

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

EXG WALL TO REMAIN

NEW LADDER

NEW MASONRY WALLW/ FACE BRICK

NEW SKYLIGHT ASSEMBLY

NEW HOIST BEAM (W 8x10)

EXG METAL GRATINGPLATFORM TO REMAIN

REPLACE EXG ACCESS DOORW/ NEW RATED WALL ASSEMBLY

NEW METAL GRATINGPLATFORM

NEW LADDER

EXG MILLWORK DOORTO REMAIN

NEW DOOR

NEW SKYLIGHT ASSEMBLY

4'-8"

2'-8"

NEW MASONRY WALLW/ FACE BRICK

EXG ELEVATOR EQUIPTO REMAIN

NEW CURB (6" MIN)

NEW HOIST BEAM (W 8x10)

EXG METAL GRATINGPLATFORM TO REMAIN

EXG ELEVATOR EQUIPTO REMAIN

EXG WALL TO REMAIN

NEW METAL GRATINGPLATFORM

3'-6"

6'-6"

NEW LADDER

NEW MASONRY WALLW/ FACE BRICK

NEW SKYLIGHT ASSEMBLY

8'-0"10

'-91 2"

3'-0"

PENTHOUSE ROOF LEVEL

PENTHOUSE

NEW HOIST BEAM (W 8x10)

2'-91 2"

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXISTING & PROPOSEDPASSENGER ELEVATORBULKHEAD SECTIONS

M170504

LPC-15

EXG PASSENGER ELEVATOR SECTION: NORTH1 SCALE: 1/4" = 1'-0"EXG PASSENGER ELEVATOR SECTION: EAST2 SCALE: 1/4" = 1'-0"

EXG PASSENGER ELEVATOR SECTION: SOUTH3 SCALE: 1/4" = 1'-0"EXG PASSENGER ELEVATOR SECTION: WEST4 SCALE: 1/4" = 1'-0"

PROPOSED PASSENGER ELEVATORBULKHEAD: NORTH5 SCALE: 1/4" = 1'-0"

PROPOSED PASSENGER ELEVATORBULKHEAD: EAST6 SCALE: 1/4" = 1'-0"

PROPOSED PASSENGER ELEVATORBULKHEAD: SOUTH7 SCALE: 1/4" = 1'-0"

PROPOSED PASSENGER ELEVATORBULKHEAD: WEST8 SCALE: 1/4" = 1'-0"

Page 16: LPC-01Sep 18, 2018  · 271 central park west 13-story masonry block: 1201 lot: 29 7 west 87th street 5-story masonry 275 central park west 19-story masonry area of work photo 1 -

6'-7"

EXG WATER TANKTO REMAIN

PENTHOUSE ROOF LEVEL

EXG STANDPIPETO REMAIN

EXG BEAMS TO REMAIN

EXG WATER TANKTO REMAIN

EXG STANDPIPETO REMAIN

EXG BEAMS TO REMAIN

EXG WATER TANKTO REMAIN

EXG STANDPIPETO REMAIN

EXG BEAMS TO REMAIN

EXG WATER TANKTO REMAIN

EXG STANDPIPETO REMAIN

EXG BEAMS TO REMAIN

NEW WALL W/ METALCLADDING

EXG WATER TANKTO REMAIN

RELOCATE EXGSTANDPIPE VALVEFROM PENTHOUSE LEVELTO PENTHOUSE ROOFREFER TO STANDPIPEDRAWINGS

EXG BEAMS TO REMAIN

NEW ROOF

EXG WATER TANKTO REMAIN

RELOCATE EXGSTANDPIPE VALVEFROM PENTHOUSE LEVELTO PENTHOUSE ROOFREFER TO STANDPIPEDRAWINGS

EXG BEAMS TO REMAIN

NEW WALL W/ METALCLADDING

NEW ROOF

NEW DOORNEW WALL W/ METALCLADDING

EXG WATER TANKTO REMAIN

RELOCATE EXGSTANDPIPE VALVEFROM PENTHOUSE LEVELTO PENTHOUSE ROOFREFER TO STANDPIPEDRAWINGS

EXG BEAMS TO REMAIN

NEW ROOF

6'-7"

NEW WALL W/ METALCLADDING

NEW DOOR

6'-0"

6'-4"

PENTHOUSE ROOF LEVEL

EXG WATER TANKTO REMAIN

RELOCATE EXGSTANDPIPE VALVEFROM PENTHOUSE LEVELTO PENTHOUSE ROOFREFER TO STANDPIPEDRAWINGS

EXG BEAMS TO REMAIN

NEW ROOF

ENGINEERING & ARCHITECTURE, DPC

TEL. (212) 675-8844 / FAX (212) 691-7972

159 WEST 25TH STREETNEW YORK, NY 10001

BUILDING INFORMATION

BLOCK: 1201

LOT: 29

MAP: 5D

ZONING DISTRICT: R10A

LANDMARK: YES

SITE PLAN

LIMITED PENTHOUSE ALTERATIONS,ACCESS DOOR RELOCATION

271 CENTRAL PARK WESTNEW YORK, NYDOCKET #: 19-19956

UPPER WEST SIDE/CENTRALPARK WEST HISTORIC DISTRICT

LANDMARK PRESERVATIONCOMMISSIONSEPTEMBER 4, 2018PUBLIC HEARING

N

CEN

TRAL

PAR

K W

EST

CO

LUM

BUS A

VENU

E

12B

100'

75.5

'27

1

CEN

TRAL

PAR

K

WEST 87TH STREET

WEST 88TH STREET

700 FEETTO LAKE

EXISTING & PROPOSEDSTANDPIPE VALVE ENCLOSURESECTIONS

M170504

LPC-16

EXG STANDPIPE: NORTH1 SCALE: 1/4" = 1'-0"EXG STANDPIPE: EAST2 SCALE: 1/4" = 1'-0"

EXG STANDPIPE: SOUTH3 SCALE: 1/4" = 1'-0"EXG STANDPIPE: WEST4 SCALE: 1/4" = 1'-0"

PROPOSED STANDPIPE: NORTH5 SCALE: 1/4" = 1'-0"PROPOSED STANDPIPE: EAST6 SCALE: 1/4" = 1'-0"

PROPOSED STANDPIPE: SOUTH7 SCALE: 1/4" = 1'-0"PROPOSED STANDPIPE: WEST8 SCALE: 1/4" = 1'-0"