Upload
vuongminh
View
234
Download
9
Embed Size (px)
Citation preview
1
LMR & LTE: A Multi-Network ArchitectureConvergence and Migration / Overlap
2
Converging Elements
• P25 specifies several service areas:• Voice – PTT Mission Support and Mission Critical• Mobility and Registration Services• Security Services• Supplementary Services • Data Bearer Services
• Which of these P25 Service areas do you use most?• The “Killer LTE App” is MCPTT Voice, our focus
3
MCPTT requires Convergence between Network + Application
Availability and
Resiliency
HighCapacity
LMR Interoperability
Priority & Preemption
End-to-End Security
Network Application
Availability and
Resiliency
HighCapacity
LMR Interoperability
Priority & Preemption
End-to-End Security
4
Availability and Resiliency
Network Application
• Coverage • Extended coverage (COW,
IOPS, WiFi, Satellite)• Core Network Resiliency
• High Availability• Multi-site resiliency
5
High Capacity
Network Application
• Capacity - Carrier Aggregation• eMBMS capability
• RAN Aware Service delivery• Multicast support• Dynamic elastic scalability
6
Priority & Preemption Control
Network Application
• Prioritization of traffic for Mission Critical users with QoS
• Preemption of resources for Mission Critical users
• Application driven QoS, Priority and preemption
• Situational Awareness Engine• Incident Management System
7
End-to-End Security
Network Application
• Network hardened for security • 3GPP Driven Authentication• Operational Security
• Application authentication & End-to-end encryption
• FIPS 140-2 level 1• Intrusion protection
8
LMR Interoperability
Network Application
• Connectivity to Enterprise LMR Radio networks
• Interoperability with LMR Radio Networks
• Protocol & Data Management harmonization
9
The Migration Has Begun
2017 – 2018 2019 – 20202016 – 2017
Mission Support
MC
PTT
Softw
are
& N
etw
ork
Cap
abilit
ies
Use
Cas
es
Mission Critical
10
Migration and Overlap
# of Subscribers
Broadband PTT Subscribers
P25Subscribers
MCPTT User Deployments
Time
Migration from P25 to MCPTT
MCPTT Trials Begin
Expanding P25via BBPTT Users
12
Summary
• Convergence• Integration of technologies, processes and people
• Migration• Actual Implementation of Interoperability and training
• Overlap• Driven by how long migration takes, maturity of processes and technology
13
Thank you
kodiakptt.com