16
LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

Embed Size (px)

Citation preview

Page 1: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

LMG Secretariat

Endorsements Pilot 2010

John Hobbs (IUA)

Chris Buer (LIIBA)

Page 2: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

2

Agenda

•Pilot approach & timetable

•Market commitment

•Benefits

•Plan & next steps

Page 3: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

3

Mission

All contract changes in the London market, irrespective of complexity, submitted and agreed electronically using ACORD messaging (two-way electronic messaging).

This does not preclude negotiation, whether face to face or otherwise, where appropriate or desired.

Page 4: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

4

Timetable

• Bilateral live electronic transaction of endorsements now and ongoing

• Finalise project scoping and confirm broker and insurer commitment completed end Jan

2010

• Implementation of ACORD 2009.1 19th February 2010

• Review market readiness and confirm commencement of pilot 17th May 2010

• Latest technical readiness date 1 June 2010

• Business scenario testing to end August 2010

• Latest operational readiness date 1 September 2010

• Anticipated commencement of full market participation 1 January

2011

Page 5: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

5

Process validation

•Build on eMRCE work

–Same standard

–Better technology

–Wider market commitment

•Joint Hull & Cargo Committees working group

•Workshop input

•Pilot feedback

•Aim of the pilot is to demonstrate a ‘fit for purpose’ process that can deliver benefit

Page 6: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

6

15 Major Brokers have signed up to the Pilot

Broker commitment

Page 7: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

7

100% of Managing Agents

have signed up to the Pilot.

Managing agent commitment

Page 8: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

8

24 IUA members by 2011, 17 part of the endorsement pilot

IUA Carrier commitment

Page 9: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

9

• Reduced face-to-face for non-complex endorsements = spend underwriting time with broker more productively

• Earlier availability of risk information and documents = a more considered underwriting decision

• Earlier visibility of endorsements for follower agreement parties

• Reduced scanning / photocopying volumes

• Greater flexibility over workload = better time management and more efficient use of supporting staff

UNDERWRITERS

Page 10: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

10

• Simple and non-premium endorsements agreed electronically = no need for a broker visit

• Simultaneous distribution of endorsements to following agreement parties

• Simultaneous distribution of notifications (listings) to other carriers

• Agreed turnaround time from underwriters

• Reduced production and movement of paper

• Reduced box wait time - use of data and electronic documents means no carrier re-keying or scanning of paper

• Improved auditability and compliance

• Potential for improved tracking of agreement progress

BROKERS

Page 11: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

11

Pilot phases

• Prove technical connectivity

• Enable hands on experience for business users

• Process familiarisation

• Sign off for business as usual

Page 12: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

12

•Complete technical readiness

•Participate in practitioner workshops

•Engage in business scenario testing

•Reach operational readiness by 1 September

Next steps

Page 13: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

13

Workshops

•Additional sessions now taking bookings

•www.lmalloyds.com

[Marketplaces>Ops and Change>Placing Support>Endorsements]

•What to do next: To book onto a session please contact

[email protected]

Page 14: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

14

Technical documentation

•www.lmalloyds.com

[Marketplaces>Ops and Change>Placing Support>Endorsements]

Technical GuideBusiness IntroductionProject OverviewSingle Page Summary

Consolidated Implementation Guide

Technical GuideBusiness IntroductionProject OverviewSingle Page Summary

Consolidated Implementation Guide

Page 15: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

15

Contacts

LMA & Endorsements Pilot Contacts

• Rob Gillies

Telephone: 020 7327 8377

Email: [email protected]

• Peter Holdstock

Telephone: 020 7327 8383

Email: [email protected]

LMG Secretariat contact

• Steve Hulm

Telephone: 020 7327 5249

Email: [email protected]

Lloyd’s Contacts

• Paul Willoughby

Telephone: 020 7327 6634

Email: [email protected]

• Trevor Madison

Telephone: 020 7327 5231

Email: [email protected]

• Abby Wiggin

Telephone: 020 7327 5631

Email: [email protected]

LIIBA Contact

• Chris Buer

Telephone: 020 7280 0154

Email: [email protected]

IUA Contact

• John Hobbs

Telephone: 020 7617 4445

Email: [email protected]

Page 16: LMG Secretariat Endorsements Pilot 2010 John Hobbs (IUA) Chris Buer (LIIBA)

London M

ark

et

Gro

up

16

Questions…?