Page 1: LITWIN Corporate Presentation Master 02

Litwin 2013 1

Corporate PresentationFebruary 2013

Page 2: LITWIN Corporate Presentation Master 02

Litwin 2013 2

Target Industries & Market Segments

OIL & GAS ENERGY INDUSTRIES

• Production

• Processing

• Transport

• Refining

• Generation

• Cogeneration

• Renewable

• Waste Management

• Flue gas treatment

• Petrochemicals

• Processing

• Fertilizers

• Chemicals

• Bio-fuels

Page 3: LITWIN Corporate Presentation Master 02

Litwin 2013 3

Recent development

Litwin, established in 1955, has been taken over by a group of investors.

It is headed by its former CEO who successfully developed and managed this engineering firm from 2004 to 2008

Page 4: LITWIN Corporate Presentation Master 02

Litwin 2013 4

Industry Expertise

- Oil & GasCrude Oil Production Facilities

Boosting & Pumping Stations

Crude Oil Production Facilities

Topsides

Refining Units• Crude Oil Units• Hydro treating

- Energy & EnvironmentPower Plants

Cogeneration, Tri-generation

Combined cycle

Waste to Energy Plants

Flue Gas Treatment

- Industries & ServicesPetrochemicals

Chemicals

Feasibility Studies

Industrial assessments

• Procurement• Construction• Start-up• Operation

Page 5: LITWIN Corporate Presentation Master 02

Litwin 2013 5

Competitive Advantages

Proven track record of developing marketing in high growth regions where Litwin has a strong cultural affinity.

Expertise and skills in market segments where most of the investment are directed (Oil & Gas, Energy, Environment, Petrochemicals)

Recognized complementarities with major equipment suppliers (e.g. Siemens, ABB, etc.)

Partnership with selected Middle East and Asia international companies.

Close working relationship with its procurement specialist affiliateICARE Procurement Services.

Engineering Consultancy services provide early involvement in projects.

Recognized skills for PMC when required by clients.

Multi disciplinary in-house competencies.

State of the art engineering tools.

Strong QA/QC system.

Page 6: LITWIN Corporate Presentation Master 02

6

Procurement

For Procurement Litwin shall use its affiliate organization, ICARE Procurement Services (IPS) as the link between Engineering and Construction by sourcing, purchasing and delivering bulk materials and equipment.

The procurement team of IPS will ensure that all materials and equipment purchased are manufactured or fabricated in accordance with engineering specifications, and delivered to the construction site on schedule.

IPS manages an extensive database of suppliers as a result of continuous feed back and quality monitoring worldwide through its Europe and Middle East offices together with its partners in Asia.

Litwin 2013

Page 7: LITWIN Corporate Presentation Master 02

Litwin 2009 7

LITWIN has designed, produced or revamped more than 500 Refining units throughout the world, amongst them:

Crude Oil & Vacuum Distillation Units

Fluid Bed Catalytic Crackers

Hydrotreating Units

Catalytic Reformers

Hydrocrackers, Mild Hydrocrackers

LPG recovery units

“Prime G” Units

Alkylation Units

Isomerization Units

Lube Oil Plants

Sulphur Recovery Plants

Asphalt Units

Visbreaking

MTBE

Refining

Page 8: LITWIN Corporate Presentation Master 02

Litwin 2009 8

Chlorine-caustic

Ethylbenzene

Ethylene oxide / glycol

Hexane

Isocyanates

Methanol

Methylmethacrylate

Nitric acid

Phenol

Cumene

Acrylic Esters

Acrylonitrile

Alpha Olefins

Aromatics

Bromide compounds

Carbon black

Chlorinated hydrocarbons

LITWIN has designed, produced or revamped more than 200 Petrochemical or Chemical units throughout the world, amongst them:

Process & Petrochemical Plants

Page 9: LITWIN Corporate Presentation Master 02

9

Power Generation

Litwin 2013

LITWIN has been involved in more than 70 power projects doing EPC, revamp, services as well as design and safety studies throughout the world, amongst them:

Fossil Fuel

• Combined Cycle Power Plants

• Industrial Co-generation Plants

• District Heating Co-generation Plants

• Tri-Generation Plants

Renewable Fuel

• Waste to Energy Plants

• Biomass Plants

Nuclear Power

• Nuclear Units Effluent Treatment Solids (TES),

• Auxiliary Circuits,

• Specialized Tools and Equipment

• Nuclear Waste End Storage Solutions

• Risk Analysis & EIA Studies

Page 10: LITWIN Corporate Presentation Master 02

10

Naphtha HDT, FCC gasoline HDT (Total RN, Ceska Kralupy)

Catalytic Reforming (Total RN, Boukhara, Polimex Gdansk, Lukoil Nijni Novgorod)

GO HDS (Total RN, Total Nangis)

FCC (Total RN)

Isomerisation (Total la Mède)

Mild hydrocracking (IES Montova)

Crude distillation / vacuum distillation (Total RN, Tupras Izmit, Midia Constanza)

Tank farm (HTTSA Tanger)

Crude and Gas treatment (Sonatrach Rhourde Nouss, Burlington/Sonatrach Berkin bassin, Mashinoimport Tenguiz)

LPG Storage (Total Cameroun)

Gas compression (GRT Gas Oscar, NIOC South Pars)

Gas underground storage (Storengy Beynes)

Engineering Strength

Litwin 2013

Page 11: LITWIN Corporate Presentation Master 02

11

Software-Tools

PhastCFastAFT FathomPhaworksHazop mANAGERDnv ProPipenet

INDUSTRIALRISKS

PDS / PDMSSmartplant PIDSmart Plant 3D ReviewPelican Forge

PIPING CAD

DRAWING

Microstation 2D & 3DAutocad 2D & 3D

INSTRUMENTATION &CONTROL

SmartPlant Instrumentation (INtools)

ELECTRICITY

Caneco

EQUIPEMENT

HTRI/ISTMICROPOL

VESSELS

Microprotol

CIVIL ENG & STRUCTURES

Staad ProRobot MilleniumFrameWorksTriforma/Power CivilSmartPlant 3DPDMS

PIPING/PIPING ANALYSIS

Caesar II

MANAGEMENTMATERIAL/PIPING

MICROPIPE

PLANNING

PRIMAVERAMS PROJECT

MANAGEMENT ENGINEERINGDOCUMENTS

MEDOC

MANAGEMENT VENDOR/ SUPPLIER DOCUMENTS

VDCS

MAN HOURS

TRACS

ENGINEERING&

PROJECTMANAGEMENT

ESTIMATION

DEVIS

Activities control

RESPLAN

QUALITY

MANOLI

Litwin 2013

Page 12: LITWIN Corporate Presentation Master 02

12

Software Applications for Project Management

RESPLAN - For Personnel allocation planification

MEDOC - For Engineering Document control and Physical progress measurements

VDCS - For Supplier documentation control

TRACS - To follow-up spent hours

DEVIS - To estimate man-hours budget in proposals

PRIMAVERA / MICROSOFT PROJECT - For time Schedule

Litwin 2013

Page 13: LITWIN Corporate Presentation Master 02

13

Software for Process

• Hysis: Basic Engineering (process flow sheet, static simulation)

• Pro II: Basic Engineering (process flow sheet, static simulation)

• Thermoflow (Thermal calculation)

Software for Industrial Risk

• Phast: Process Hazard Analysis Software Tools

• Cfast: Fire Effects Evaluation in Buildings

• AFT Fathom: Hydraulic Analysis of Piping Network

• Phaworks

• Hazop Manager

• Pipenet

Litwin 2013

Software Applications for Engineering

Page 14: LITWIN Corporate Presentation Master 02

14

Software for Instrumentation• Smartplant Instrumentation

Software for Electrical• Caneco

• PowerTools

• ARRCAD

• GroundMat

Software for Equipment• MICROPOTOL (boiler making)

• HTRI (Thermal calcs)

Litwin 2013

Engineering Tools

Software for Civil Works / Structural• STAAD PRO (calcs)

• ROBOT Millenium (calcs)

• FrameWorks Plus (Steel Structure Modeling)

• Power Civil (Road and Landscape Modeling)

Page 15: LITWIN Corporate Presentation Master 02

15

MicroStation

AUTOCAD

ISOCAD

PDS (Piping, steel structure, equipment)

Support Modeller / Manager (PDS)

SmartPlant Review

SmartPlant PID

SmartPlant 3D

Litwin 2013

Software for Piping

ISOGEN

PDMS (Piping / Review/ PSI)

CAESAR II

Page 16: LITWIN Corporate Presentation Master 02

Litwin 2013 16

Reference Projects

Page 17: LITWIN Corporate Presentation Master 02

ANGOLA : • Girassol Field FPSO

• Sahna Bonbocco

ALGERIAGas Compression

POLAND : NHT/CCR, Polystyrene Plant

PORTUGAL : Trigeneration

FRANCE : F.C.C Revamp

GUADELOUP & MARTINIQUE :Tank Farm

FRANCE : 2 “Prime G”

ITALY : New MHC

FRANCE: Cogeneration

TURKEY:Distillation Units Revamp

ALGERIA : • Burlington Oilfield

dev.• “OZ2” project

CHINA:Waste to Energy

NIGERIA : • YOKRI• EHRA

CZECH REPUBLIC : New 3 cut splitter & NHT revamp

Litwin 2013 17

Most recent projects worldwide

Page 18: LITWIN Corporate Presentation Master 02

18

France

Activities: Construction of 5 gas compressor stations

Location220 Million EurosProject value

2007-2009Project duration310 000Hours

EPCProject typeGRTgazCustomer

Activities: Construction of an oil storage terminal in the port of Tangiers

Location82 Million EurosProject value

2008-2010Project duration490 000 m3Capacity

EPCProject typeHTTSACustomer

Activities: Construction of a new mild hydro cracker

Location37 Million EurosValue project

2002-2004Project duration1 900 t/dayCapacity

LSTK EPCProject typeIESCustomer

Oil & Gas up-stream & down-stream

Activities: Construction of 1 gas compressor station

Location55 Million EurosProject value

2008-2010Project duration75 000Hours

EPCProject typeGRTgazCustomer

France

Morocco Italy

Litwin 2013

Page 19: LITWIN Corporate Presentation Master 02

19

References in Oil & Gas

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTION TECHNO-LOGYCONTR.

TYPEE P C CM PMC

COST and/or

MANHOURS

GRT Gaz GdF France Construction of 5 Gas Compressor Station - P P P 310,000 HRS220 M€

Storengy Beynes, France Natural Gas Compression, Storage and Treatment P 160,000 HRS

GRT Gaz GdF France Construction of 1 Gas Compressor Station - P P P 75,000 HRS55 M€

HTTSA Tangiers, Morocco Construction of 490,000 m3 Tank Farm P P P 82 M€

AGIP -KCOKASHAGAN

KAZAKHSTAN KASHAGAN OIL FIELD UTILITIES - LSTK P P P 250.000 HRS

NIGC / GOHDSNIROO

IRAN5 COMPRESSORS STATIONS PART OF THE IGAT V TRUNKLINE – SOUTH PARS DEVELOPMENTS

- - P50.000 HRS

7 MM€ (TOTAL INVEST. 1B$)

BRC - SONATRACH

RHOURDE NOUSSMOROCCO

PROCESSING OF 1.800 M3/D OF CRUDE OIL, GAS PROCESSING, COMPRESSION AND RE-INJECTION

- LSTK P P P19 MM€ + 5 MM€ +

100-150 MM€ 200.000 HRS

BINA CONSULTING ENGINEERS

IRAN IGAT IV - - P -

BURLINGTON RESOURCE / SONATRACH

BERKIN BASSINALGERIA

OIL FIELD DEVELOPMENT:SEPARATION - GAS COMPRESSION DESALTING, STABILISATION, STORAGE AND PUMPING

- SERV. P P 50.000 HRS

GEIE "SPIE CAPAG SAIPEM" SONATRACH

ALGERIAPIPE LINE 34" "OZ2". 6 CRUDE OIL PUMPING STATIONS

- LS P 100.000 HRS

SONARA / TOTALLIMBECAMEROON

LPG STORAGE NEW PRESSURIZED SPHERE

- SERV. P P 10.000 HRS

SONATRACHHASSI MESSAOUDALGERIA

COMPRESSION OF ASSOCIATED GAS INGEROP P P P 60.000 HRS

BOUYGUES OFFSHORE / CPC

NOVOROSSYISK RUSSIA

OIL TERMINAL FOR CASPIAN PIPELINE CONSORTIUM

FLUOR DANIEL REIMB. & LS P 30.000 HRS

NNPCLAGOSNIGERIA

LPG STORAGE LITWIN LSTK P P P 18.6 MM$

Page 20: LITWIN Corporate Presentation Master 02

20Litwin 2013

References in Oil & Gas

CLIENT LOCATION PROJECT DESCRIPTION TECHNO-LOGYCONTR.

TYPEE P C CM PMC

COST and/or

MANHOURS

ETPM NIGERIAEWAN PP PROJECT (CHEVRON) PIPING ENGINEERING

- LS P 4.000 HRS

ETPM NIGERIAREVAMPING OF OP, OA, ASABO PLATFORMS FOR MOBIL EKPE GAS COMPRESSION PROJECT

- LS P 15.000 HRS

ESSO REPCAZAUXFRANCE

OIL FIELD PRODUCTION FACILITIES PETROTECHNA LS P 4.000 HRS

GDF / TOTAL PORTUGAL GLN TERMINAL - - P P P STOPPEDCONTRACT

HEURTEY PETROCHEM ENGINEERING

SEVERAL SITES SKIDS ON ONSHORE FIELDS - LS P 4.000 HRS

ELF (EAP) CONGO

TCHIBOUELA FIELD CONGO

OFFSHORE PLATFORM TOP SIDE FACILITIES BASIC ENGINEERING

EAP / PETROTECHNA

LS P 12.000 HRS

SEREPT / DRESSERASHTART FIELD TUNISIA

PROCESS AUXILIARIES OF GAS LIFT COMPRESSION STATION

PETROTECHNA LSTK P P P 1.6 MM$

STATOIL NORWAY9/2 GAMMA FIELDINSTALLATION OF PRODUCTION TESTS

PETROTECHNA LS P 2.000 HRS

GEOSERVICES FRANCE SKID MOUNTED CRUDE OIL HEATER PETROTECHNA LS P 3.000 HRS

ETPM / CHEVRON ANGOLA 2 OFFSHORE PLATFORMS (PIPING ENGINEERING) CHEVRON LS P 20.000 HRS

MASHINOIMPORTTENGUIZ I, II & IIIKAZAKHSTAN

CRUDE AND GAS TREATMENT UNIT 3 X 3.000.000 T/Y

LURGI / LITWINSERV.

LS P P P 128 MM$225.000 HRS

NNPC NIGERIAESCRAVOS – LAGOS GAS PIPELINE –UGHELLI METERING STATION

- LS P 15.000 HRS

PD OMAN OMAN GAS LIFT COMPRESSION STATION PETROTECHNA LS P 8.000 HRS

Page 21: LITWIN Corporate Presentation Master 02

21

References in Refining

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-

LOGYCONTR.

TYPEE P C CM

COST and/or

MANHOURS

IES Montova, Italy Construction of 1,900 t/d Mild Hydro Cracker - LSTK P P P 37 M€

CESKA RAFINERSKA

KRALUPYCZECH REPUBLIC

3 CUT SPLITTER & NHT REVAMP - LSTK P P P 8 MM€30.000 HRS

SARA GUYANAEXTENSION OF THE TRUCK LOADING STATION & NEW VAPOR RECOVERY UNIT

-SERV.

LS P P 7 MM€

I.E.S.MANTOVAITALY

MILD HYDROCRACKING UNIT (MHC) MAKFINING LSTK P P P 36,5 MM€

TOTAL FINA ELFNORMANDY REFINERYFRANCE

PRIME G UNITS I.F.P. LSTK P P P 57.000 HRS

TOTAL FINA ELFNORMANDY REFINERYFRANCE

FCC REVAMP TOTALSERV.

LS P P 20.000 HRS

TOTAL SARAMARTINIQUE /GUADELOUPE

EXTENSION OF THE TRUCK LOADING STATION & NEW VAPOR RECOVERY UNIT

-SERV.

LS P P 18.000 HRS6 MM€ EACH

TOTALNORMANDY REFINERYFRANCE

REFORMING GASOLINE FRACTIONATION REVAMPING (FUEL 2000 PROJECT)

-SERV.

LS P P 12.000 HRS

TOTALFLANDRES REFINERYFRANCE

REFINERY REVAMPING (SP1) -SERV.

LS P P 22.000 HRS

TOTALLA MEDE REFINERYFRANCE

ISOMERIZATION UNIT REVAMPING -SERV.

LS P P 3.000 HRS

OCTELESSO PORT JERÔME FRANCE

CETANE BOOSTER INJECTION UNIT - LSTK P P P 180 K$

TUPRASIZMIT TURKEY

ATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING (NR. 2), 1.900.000 MT/Y

LITWIN LSTK P P P 60 MM$

LUKOILNIJNI NOVGOROD (KSTOVO) RUSSIA

REFORMING NHT/CCR, 1.000.000 MT/Y UOP LS P P 75 MM$190.000 HRS

Page 22: LITWIN Corporate Presentation Master 02

22

CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-

LOGYCONTR.

TYPEE P C CM

COST and/or

MANHOURSSOCIETE AFRICAINE DE RAFFINAGE (SAR)

DAKARSENEGAL

BUTAN LOGISTIC - LSTK P P P 5 MM$

TOTAL RAFFINAGE DISTRIBUTION

NORMANDY REFINERY FRANCE

ETBE UNIT ELECTRICAL SUBSTATION - LSTK P P P 1.8 MM$

ELFNANGIS FRANCE

REVAMPING OF GO HDS AND SULFUR RECOVERY UNITS, 1.500.000 MT/Y

LITWINSERV.

LS P P P 3.7 MM$60.000 HRS

TECHNIPBOUKHARA REFINERY OUZBAKISTAN

CCR UNIT I.F.P. LS P 28.000 HRS

TOTALLE HAVRE FRANCE

NR. 2 GO HDS UNIT REVAMPING, 4.200 T/D LITWIN LSTK P P P 2.8 MM$

TOTAL RAFFINAGE DISTRIBUTION

FLANDRES REFINERY FRANCE

INSTALLATION OF RECYCLED HYDROGEN COMPRESSOR IN HDS GAS OIL UNIT

- LS P 4.000 HRS

TUPRASIZMIT TURKEY

ATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING (NR. 5), 4.000.000 MT/Y

LITWIN LSTK P P P 175.000 HRS

POLIMEXGDANSK POLAND

CCR, 600.000 MT/Y UOPSERV.

LS P P P 36 MM$85.000 HRS

SHELLPETIT COURONNE FRANCE

REVAMPING OF BITUMEN AND LUBE OIL STORAGE SHELL REIMB. P 30.000 HRS

LUBRIZOLLE HAVRE FRANCE

C4 PURIFICATION UNIT LITWIN LS 5.000 HRS

MIDIA REFINERY CONSTANZA ROMANIAATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING,, FCC, 6.250.000 MT/Y

LITWIN / UOPREIMB.SERV.

LSP P P 10 MM$

14.000 HRS

SHELLPORT-HERRIOTFRANCE

STORAGE AND PUMPING FACILITIES OF VARIOUS AUTOMOTIVE FUELS AND/OR ADDITIVES (LEAP FROG AND AMADEUS PROJECTS)

- LS P 10.000 HRS

ELFGISORSFRANCE

ROAD COATING ADDITIVE UNIT, 20.000 MT/Y STYRELFSERV.

LS P P P 5 MM$16.000 HRS

COMPAGNIE RHENANE DE RAFFINAGE

REICHSTETTFRANCE

MODIFICATIONS /REVAMPING OF VARIOUS REFINING UNITS

SHELL REIMB. P 40.000 HRS

Litwin 2013

References in Refining

Page 23: LITWIN Corporate Presentation Master 02

23

Petrochemicals & Process Industry

Activities: Construction of a phosphoric acid plant of 1,5 million t/y

Saudi ArabiaLocation400 Million EurosProject value

2007-2010Project duration550 000 Hours

LSTK EPCProject typeMA’ADENCustomer

Activities: Construction of a distillation unit

ChinaLocation6,7 Million EurosProject value

2003-2005Project duration300 000 t/yCapacity

EPTProject typeSHANXI COKING PLANTCustomer

Activities: Naphthalene purification plant

BelgiumLocation1 Million EurosProject value

2000-2001Project duration33 000 t/yearCapacity

EPTProject typeVFT RUTGERSCustomer

Activities: Revamping of a caprolactam unit- production from 65 kt/y to 156 kt/y

GermanyLocation70 Million EurosProject value

2000-2001Project duration156 kt/yCapacity

LSTK EPCProject typeDOMOCustomer

Litwin 2013

Page 24: LITWIN Corporate Presentation Master 02

24

Petrochemicals & Process Industry

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-

LOGYCONTR.

TYPEE P C

COST and/or

MANHOURS

Maaden Saudi Arabia Construction of Phosphoric Acid Plant 1.5 MT/d LSTK P P P 550,000 HRS400 M€

Shanxi Coking Plant

China Construction of a Destillation Unit 300,000 t/yr P P 6.7 M€

VFT Rutgers Belgium Naphthalene Purification Plant 33,000 t/yr P P 1 M€

CAPROLEUNALEUNA GERMANY

CONCENTRATION & CLEAVAGE UNITS RECONSTRUCTION DOMO LSTK P P P 20 MM$

TOTAL SOLVANTSOUDALLE FRANCE

HIGH PRESSURE HYDROGENATION UNIT (H.D.A.) 25 MT/HRTOTAL

SOLVANTSFORFAIT P 1.000 HRS

TOTALGONFREVILLEFRANCE

REVAMP OF AROMATICS EXTRACTION UNITS / PAREX UOPSERV.

LS P P P 2 MM$25.000 HRS

S.O.C.C.SHANGHAI CHINA

HYDROGENE PEROXIDE UNIT, 33.000 MT/Y OXYSYNTHESESERV.

LS P P 30.000 HRS

CAPROLEUNALEUNA GERMANY

PHENOL UNIT REVAMPING, 130.000 MT/Y, THEN 156.000 MT/Y ENICHEM LSTK P P P 55 MM$

CAPROLEUNALEUNA GERMANY

CUMENE UNIT, 180.000 MT/YMOBIL / BADGER

LSTK P P P 30 MM$

OXYSYNTHESE(ATOFINA)

LEUNA GERMANY

HYDROGENE PEROXIDE UNIT, 33.000 MT/Y OXYSYNTHESE LSTK P P P 33 MM$50.000 HRS

NORSOLOR / ELF ATOCHEM

CARLING FRANCE

STORAGE AND LOADING FACILITIES OF ACRYLIC ESTERS NORSOLOR LS P P 40.000 HRS

NORSOLORCARLING FRANCE

ACRYLIC ESTERS UNIT, 70.000 MT/Y NORSOLORREIMB.SERV. P P 80.000 HRS

ELF ATOCHEM FOS-SUR-MER FRANCE CHLORINE/CAUSTIC PLANT (MEMBRANE ELECTROLYSIS) ATOCHEM LS P P 95.000 HRS

TECHNOEXPORTNERATOVICE CZECH REPUBLIC

n-ALPHA-OLEFINS PLANT CHEVRONSERV.

LS P P P 2.5 MM$

DWORYOSWIECIM POLAND

POLYSTYRENE UNIT, 50.000 MT/Y FINASERV.

LS P P P 18 MM$110.000 HRS

EXXONCHEMICALS

FRANCEEXTENSION OF 2 RESIN PRODUCTION UNITS 44.000 T/Y

- SERV. P P P -

Page 25: LITWIN Corporate Presentation Master 02

25

Petrochemicals & Process Industry

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-

LOGYCONTR.

TYPEE P C

COST and/or

MANHOURS

ELF ATOCHEMFOS-SUR-MERFRANCE

VINYL CHLORIDE MONOMER PLANT REVAMPINGBADGER / ATOCHEM

SERV.LS P P P 50.000 HRS

ELF ATOCHEMGONFREVILLEFRANCE

REVAMPING OF STEAM CRACKER (HOT SECTION)STONE & WEBSTER

SERV.LS P P P 60.000 HRS

ENICHEMSEVERAL SITESFRANCE-ITALY

HIGH PRESSURE LOW DENSITY POLYETHYLENE

ENICHEM LS P 7.000 HRS

TECHMASHIMPORTVORONEJ RUSSIA

THERMOPLASTIC ELASTOMERS UNIT, 30.000 MT/Y FINASERV.

LS P P P 45 MM$180.000 HRS

CNTICFUSHUN CHINA

PMMA UNIT, 12.000 MT/Y PTISERV.

LS P P P 30 MM$FOR BOTH

ELF-ATOCHEMCARLINGFRANCE

REVAMPING OF STEAM CRACKER N°2 LUMMUS LS P 10.000 HRS

INDUSTRIEANLAGEN

SCHWEDTGERMANY

SODIUM CYANIDE COMPACTING UNIT, 8.000 MT/Y LITWIN LSTK P P P 2.1 MM$

NORSK HYDROAZOTE

BORDEAUXFRANCE

LIQUID AMMONIA ATMOSPHERIC STORAGE AND AUXILIARY FACILITIES 20 000 TONS

PETROTECHNA LSTK P P P 6,5 MM$

TOTAL SOLVANTSYANBU SAUDI ARABIA

HYDROCARBON SOLVENT PLANTTOTAL

SOVANTSREIMB. P 3.000 HRS

GRANDE PAROISSE

ROUENFRANCE

NITRIC ACID UNIT, 1.000 MT/D SCGP LS P 17.000 HRS

ELF-ATOCHEMCARLINGFRANCE

ACRYLIC ACID PLANT (DISTILLATION SECTION) REVAMPING / EXTENSION

ATOCHEM LS P 25.000 HRS

CNTICFUSHUN CHINA

MMA UNIT, 13.000 MT/Y POLYTECHNA LS P P -

OXYCHEMBECANCOURTCANADA

HYDROGEN PEROXIDE H202 ATOCHEM LS P 22.000 HRS

ATOCHEMSERQUIGNY FRANCE

POLYAMIDE UNIT 12.500 MT/Y ATOCHEMSERV.

LS P P 70.000 HRS

INDUSTRIEANLAGEN

SCHWEDT GERMANY

POLYOL STORAGE, 625 M3 IAI LSTK P P P 3,1 MM$

Page 26: LITWIN Corporate Presentation Master 02

26

Petrochemicals & Process Industry

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-

LOGYCONTR.

TYPEE P C

COST and/or

MANHOURS

TECHNOPOLZILINASLOVAKIA

PMMA UNIT, 6 000 MT/Y PTI SERV. P P P -

APPRYLGONFREVILLEFRANCE

POLYPROPYLENE UNIT EXTENSION ATOCHEMSERV.

LS P P P 12 MM$20.000 HRS

CNTIC, DALIAN BRANDA CHINA

PMMA UNIT, 12.000 MT/Y PTISERV.

LS P P P 23.000 HRS

TECHNOEXPORTKRALUPYCZECH REPUBLIC

EXPANDABLE POLYSTYRENE CAPACITY INCREASE, 22.500 MT/Y

LITWIN / CHEMOPETROL

SERV. LS P P P 8 MM$

ROHM & HAASLAUTERBOURGFRANCE

RETROFIT OF ACRYLIC EMULSIONPOLYMERIZATION REACTOR (PIPING AND PROCESS CONTROL STUDIES)

ROOM & HAAS LS P 15.000 HRS

SOLVAYSARRALBEFRANCE

DESIGN & ENGINEERING OF MODIFIED HIGH DENSITY POLYETHYLENE LINE (RETROFIT)

SOLVAY LS P 10.000 HRS

SHELL CHIMIEBERREFRANCE

REVAMPING OF BUTADIENE RUBBER PLANT SHELL CHIMIESERV.

LS P P P 20.000 HRS

PETROKEMYAJUBAIL SAUDI ARABIA

POLYSTYRENE UNIT, 30.000 MT/Y FINA - 3.000 HRS

ELF ATOCHEMLAVERA FRANCE

POLYPROPYLENE UNIT APPRYL - 150.000 T/Y CIVIL ENGINEERING STUDIES OF STEEL/CONCRETE STRUCTURE

ATOCHEM LS P 10.000 HRS

ELF ATOCHEMGONFREVILLEFRANCE

POLYPROPYLENE COPOLYMERIZATION UNIT ATOCHEM LS P 10.000 HRS

TECHNOEXPORTKRALUPY CZECH REPUBLIC

POLYSTYRENE UNIT - 38.000 MT/Y FINA SERV. P P P 5.8 MM$

Page 27: LITWIN Corporate Presentation Master 02

27

References in Power

Morocco

Activities: Construction of 2 steam power plants

Location32 Million EurosProject value

2006-2008Project duration2 x 32 MWeCapacity

LSTK EPCProject typeOCPCustomer

Activities: Construction of a cogeneration plant

Location22 Million EurosProject value

1999-2001Project duration40 MWeCapacity

LSTK EPCProject typeADPCustomer

Activities: Construction of a cogeneration plant

Location32 Million EurosProject value

2007-2009Project duration40 MWeCapacity

LSTK EPCProject typeSAMIRCustomer

Activities: Construction of a cogeneration plant

Location30 Million EurosProject value

2000-2002Project duration125 MWCapacity

LSTK EPCProject typeCPCUCustomer

France

Morocco France

Litwin 2013

Page 28: LITWIN Corporate Presentation Master 02

28

References in Power

Litwin 2013

CLIENT LOCATION PROJECT DESCRIPTIONCONTR.

TYPEFEAS E P C CM START-UP COST

SLN LE NICKELNOUMEANEW CALEDONIA

COAL FIRED POWER PLANT, CIRCULATING FLUIDIZED BED BOILER, 3 x 70 MW

LSTK P PHASE 1: 3.5 MM€

MAROC PHOSPHORE(OCP GROUP)

SAFIMOROCCO

STEAM POWER PLANTS, 2 x 16 MW STEAM TURBINES (SIEMENS), SUPPLY OF 2 x 16 MW EXTRACTION CONDENSING STEAM TURBINE GENERATORS

LSTK P P P 55 MM€

GAZ DE FRANCE (COFATECH PROJIS OWNER'S ENGINEER)

SAINT BRIEUCFRANCE

PEAK POWER PLANT WITH 4 ROLLS ROYCE GAS TURBINES TRENT 60 WLE IN CONSORTIUM WITH CENTRAX GAS TURBINES (UK)

LSTK P P P 105 MM€, LITWIN PART 45 MM€

SAMIRMOHAMMEDIAMOROCCO

COGENERATION, GAS TURBINE 40 MWe (MS6001 B FROM GE), RECOVERY BOILER 70 T/H (STEIN ENERGIE)

LSTK P P P 32 MM€

OFFICE CHERIFIENS DES PHOSPHATES (OCP)

JORF LASFARMOROCCO

2 STEAM POWER PLANTS 2 x 32 MWe IN CONSORTIUM WITH SIEMENS LSTK P P P 32 MM€

ENERTHERMLA DEFENSEFRANCE

1COGEN. PLANT OF 10 MWe/30 MWTH AND 3 CONVENT. GAS FIRED SUPERHTD WATER BOILERS 2 x 60 MWTH AND 1 x 30 MWTH

LSTK P P P 15.5 MM€

CPCUVITRYFRANCE

COGENERATION, GAS TURBINE 125 MWe (9171E FROM GE), RECOVERY BOILER 400 T/H (CNIM), DEMIN. UNIT 400 T/H, ELECTR. SWITCHYARD 225 KV

LSTK P P P 30 MM€

ADP France Construction Cogeneratin Plant 40 MWe LSTK P P P 22 M€

DALKIA FRANCE COGENERATION PLANT AT ORLEANS SOUTH DISTRICT HEATING NETWORK SOCOS PROJECT GT COGENERATION 1 MARS 100

- P P S.O.F.L.E.C FRANCE

FLEURY LES AUBRAIS COGENERATION GE COGENERATION 2 x 2.000 kW GE

- P P P S.O.B.E.C. FRANCE

BOURGES URBAN HEATING COGENERATION GE COGENERATION 4 x 2.000 kW GE

- P P P CLIMAESPACO EXPO 1998

PORTUGAL TRIGENERATION FOR THE LISBON WORLD FAIR 1998 GT TRIGENERATION AND ABSORPTION AND COMPRESSION COOLING GROUPS 1 x 4.700 kW GT

LSTK P P P

AEROPORTS DE PARIS

FRANCEPROSPECTIVE STUDY FOR ENERGY DEVELOPMENT AT CHARLES DE GAULLE ENERGY MGT PLAN, 2 x 3.500 kW GT 1 x 14.000 kW GT 1 x 24.000 kW GE

- P

Page 29: LITWIN Corporate Presentation Master 02

29

CLIENT LOCATION PROJECT DESCRIPTIONCONTR.

TYPEFEAS E P C CM START-UP

GIAT INDUSTRIES

FRANCEHEATING RESTRUCTURING STUDY FOR GIAT INDUSTRIES PLANT IN TARBES GT COGENERATION 1 x 3.500 kW GT

- P AEROPORTS DE PARIS

FRANCE DECENTRALISED COGENERATION FOR THE "AIR FRANCE - FEDEX" ZONE GT COGENERATION 1 x 4.900 kW GT

- P C.H. OF DIJON FRANCE

COGENERATION IN DIJON HOSPITAL GE COGENERATION 3 x 1.000 kW GE

- P HOECHST FRANCE

COGENERATION IN CUISE LA MOTTE ST COGENERATION 1 x 3.000 kW ST

- P P C.H. OF MANTES FRANCE

COGENERATION IN MANTES HOSPITAL GE AND DE COGENERATION 1 x 750 kW GE + 1 x 1.000 kW DE

- P P P C.H.R. OF ST. OMER

FRANCE COGENERATION IN ST. OMER HOSPITAL GE AND DE COGENERATION 1 x 1.000 kW GE + 1 x 1.400 kW DE

- P P P KOTVA POLAND

TRIGENERATION FOR KOTVA DEPARTMENT STORES 2 x 650 kW GE

- P P MERLIN GERIN FRANCE

MG COGENERATION THEORY STUDY GE COGENERATION 500, 700 and 1.000 kW GE P

CPCU-COGETHERM

FRANCE COGENERATION PLANT IN VITRY SUR SEINE COGENERETION 125 MW 1 GE 9171 E

LSTK P P P AEROPORTS DE PARIS

FRANCE COGENERATION PLANT IN ROISSY-CHARLES DE GAULLE COGENERATION 40 MW 1 LM 6.000PD

LSTK P P P

ELYO FRANCE COGENERATION PLANT AT MODO PAPER PONT SAINTE MAXENCE FACTORY - OISE COGENERATION 25 MW 1 GT 10 B2

LSTK P P P

ELF-ANTAR FRANCE COGENERATION PLANT AT DONGES OIL REFINERY - LOIRE ATLANTIQUE COGENERATION 12 MW 1 PGT 10

- P P

Litwin 2013

References in Power

Page 30: LITWIN Corporate Presentation Master 02

30

CLIENT LOCATION PROJECT DESCRIPTION FEAS CM START-UP

BAYER ELASTOMERES

FRANCE COGENERATION ON THE BAYER ELASTOMERES SITE IN LILLEBONNE COGENERATION 40 MW 1 LM 6.000 P

GEC ALSTHOM BELGIUM COMBINED CYCLE PLANT AT BAUDOUR 350 MW COMBINED CYCLE VEGA 109 FASS P

ISERGIE FRANCE ISERGIE PROJECT COGENERATION 40 MW LM 6.000 GT P CPCU FRANCE

COGENERATION AT THE CPCU HEATING PLANT FOR LA VILLETTE COGENERATION 30 MW FRAME 6 B GT P

IBM FRANCE TRIGENERATION ON THE IBM SITE AT CORBEIL TRIGENERATION 25 MW Frame 5 P GT P

EZAC BUDA HUNGARY KUNIGUNDA HEAT RECUPERATION 25 MW FRAME 5 P GT P WESAG GERMANY THALMANN HEAT RECUPERATION 30 MW FRAME 6 B GT P P.E.E. SYRIA JANDAR 2 x 300 MW COMBINED CYCLE GROUPS W 701 GT P ELECTROLIMA PERU SANTA ROSA 1 x 165 MW COMBINED CYCLE GROUPS FT4-8C GT P P.E.E. SYRIA BANIAS 1 x 35 MW GT FRAME 6 B GT P P P P.E.E. SYRIA BANIAS 3 & 4 2 x 170 MW ST COMBUSTIBLE: HEAVY FUEL P P P P.E.E. SYRIA MEHARDEH 1 x 33 MW GT GT-9 GT P P P P.E.E. SYRIA MEHARDEH 3 & 4 2 x 165 MW ST COMBUSTIBLE: HEAVY FUEL AND GAS P P P P.L.N. INDONESIA BUKIT ASAM 2 x 65 MW ST COMBUSTIBLE: COAL P P P DEBA ARGENTINA

BAHIA BLANCA 2 x 310 MW ST COMBUSTIBLE: COAL, HEAVY FUEL AND GAS P P P

SCECO C. SAUDI ARABIA RIYADH 8 20 x 50 MW GT GT-11 GT P P P RHONE POULENC

FRANCE PONT DE CLAIX 4 x 30 MW COMBINED CYCLE GROUPS FRAME 5 P GT P E.E.A. EGYPT ABU QIR 1 x 25 MW GT FRAME 5 GT P P P P.E.E. SYRIA MEHARDEH 1 & 2 2 x 150 MW ST COMBUSTIBLE: HEAVY FUEL AND GAS P P P E.E.A. EGYPT CAIRO EAST 2 x 25 MW GT FRAME 5 GT P P P E.E.A. EGYPT EL TEBBIN 2 x 25 MW GT FRAME 5 GT P P P TAVANIR IRAN RAMIN 4 x 310 MW ST COMBUSTIBLE: HEAVY FUEL P P P

Litwin 2013

References in Power

Page 31: LITWIN Corporate Presentation Master 02

31

CLIENT LOCATION PROJECT DESCRIPTION FEAS BASIC FEED E

ALSTOM LUXEMBURG ESCH-SUR-ALZETTE 350 MW UNIT GT 9 FA «SINGLE SHAFT» P

ALSTOM BELGIUM BAUDOUR / SAINT GHISLAIN C350 MW UNIT GT 9 FA «SINGLE SHAFT» P

GEC ALSTHOM GREECE LAVRION 550 MW UNIT VEGA 309 E PGEC ALSTHOM THAILAND MAP TA PHUT 200 MW UNIT VEGA 206 PGEC ALSTHOM TUNISIA SOUSSE200 MW UNIT VEGA 206 PDISTRICT OF CHARTRES

FRANCEW TO E OF 2 LINES 7,5 T/H EACH. STAT. MV/LV, GTA 10 MVA, GENERATING SET 1.000 KVA. POWER SUPPLY DISTRIB., CONTROL, MONITOR. AND INSTR. P

SMITRED OUESTD'ARMOR

FRANCEW TO E OF 1 LINE 7 T/H. STATION MV/LV, GTA 4 MVA, GENERATING SET 1.000 KVA. POWER SUPPLY DISTRIBUTION, CONTROL, MONITORING AND INSTR. P

EDM FRANCE INSTALLATION OF POWER PRODUCTION UNITS P

ASTRIA FRANCEUIOM 3 LINES OF 11T/H EACH. STAT. 63/20 KV - 22 MVA GTA 25 MVA. GENERATING SETS 2X1.000 KVA. TRANSF. STAT. 5X1.000 KVA. SUPERV. SYSTEM

P

GEC ALSTHOM FRANCE COMBINED CYCLE THERMAL STATION 1XSS VEGA 109 FA (350 MW) PTOTAL FRANCE ELECTRICAL STATION OF THE REFINERY SOUTH CONTROL CENTER (P1092) P P PTOTAL FRANCE

CREATION OF TRANSFORMATION STATION MV/LV AT THE REFINERY, DESIGNED TO SUPPLY POWER TO INSTRUMENTATION OF SOUTH UNITS P P P

HOECHST FRANCE INTEGRATION OF ONE COGENERATION STATION WITH ONE TURBINE 2 MW. PSERVICE DE LA NAVIGATION DE LA SEINE

FRANCE SURVEY OF 20 LOCKS AND 7 DIKES INSTALLATIONS P

CHARGES MINÉRALES DU PÉRIGORD

SAINTE CROIX DE MAREUILFRANCE

2 PRODUCTION LINES COMPR. 5 CRUSHERS EACH. SUPPLY AND TRANSF. STAT. (2.500 + 1.250 KVA) POWER SUPPLY DISTRIB. & AUTOMATIC CONTROLS. P

CIMENTS LAFARGE FRANCEELECTRIC & INSTRUMENT. ENG. INCL. AUTOMATIC CONTROL & MONITORING SYSTEMS FOR UPSTREAM & DOWNSTREAM OF 2 HEATERS & 2 MV/LV STAT. P

SIMACUR FRANCEPROJECT OF TRANSFER OF FUEL AND COAL BOILER PLANTS TO W TO E PLANT THE SITE. TOTAL CAPACITY 200 MWTH. P

KAYSERSBERG FRANCEPLANT EXTENSION STAT. 90/20 KV - 2 TRANSF. OF 30 MVA. POWER DISTRIB., CONTROL - MONITORING AND INSTR. P

Litwin 2013

References in Power

Page 32: LITWIN Corporate Presentation Master 02

32

Environment Technologies

France

Activities: Revamping of a waste-to-energy plant

Location15 Million EurosProject value

2005-2006Project duration87 000 t/yearCapacity

LSTK EPCProject typeCURMACustomer

Activities: Revamping of a waste-to-energy plant

Location72 Million EurosProject value

2005-2010Project duration160 000 t/yearCapacity

LSTK EPCProject typeSIGIDURSCustomer

Activities: Modifications of furnaces in a waste incineration plant

Location4 Million EurosProject value

2006-2007Project duration75 000 t/yearCapacity

LSTK EPCProject typeBAYETCustomer

Activities: Construction of a waste-to-energy plant

Location27 Million EurosProject value

1998-2002Project duration365 000 t/yearCapacity

LSTK EPCMProject typeSHANGAI PUDONG MUNICIPALITY

Customer

France

France

China

Litwin 2013

Page 33: LITWIN Corporate Presentation Master 02

33Litwin 2013

Environment Technologies

CLIENT LOCATION PROJECT DESCRIPTIONCONTR.

TYPEFEAS E P C CM PMC COST

SIGIDURSSARCELLESFRANCE

REVAMP. OF THE EXISTING WASTE INCINER. PLANT, INCLUDING NEW FURNACES AND BOILERS AND FLUE GAS TREATMENT WITH CATALYTC DENOX

LSTK P P P 72 MM€

NOVAOLPORTO CORSINIITALY

BIOFUEL PLANT LSTK P P P P 0,5 MM€

CURMA France Revamp of WTE Plant 87,000 t/yr capacity LSTK P P P 15 M€

SICTOM SUD ALLIER

BAYETFRANCE

MODIFICATION OF THE FURNACES FOR ADAPTATION TO NEW EU REGULATIONS. REPLACEMENT OF COOLING TOWER BY AIR-COOLED CONDENSER

LSTK P P P 4 MM€

SYBERTBESANCONFRANCE

MODIFICATION OF THE FURNACES FOR ADAPTATION TO NEW EU REGULATIONS, 2 LINES - 3.5 T/H, 60.000 T/Y

LSTK P P P 1 MM€

SIMACURMASSYFRANCE

REVAMPING OF THE EXISTING PLANT, INCLUDING MODIFICATIONS OF FURNACES AND BOILERS, NEW UNIT FOR FLUE GAS TREATMENT WITH DENOX SCR

LSTK P P P 13 MM€

SHANGHAI-PUDONG MUNICIPALTY

CHINAMSWI PLANT WITH 3 LINES OF 15,2 MH CAPACITY EACH 365.000 T/Y

- P P 27 M€

SIVOMMETZFRANCE

SORTING 40.000 T/Y INCINERATION 150.000 T/Y - PANGERS DISTRICT

ANGERSFRANCE

FLUE GAS TREATMENT INCLUDED DIOXINS AND FURANS CAPTATION 100.000 T/Y

- P

SMEDARROUEN FRANCE

TECHNICAL ASSISTANCE FOR A NEW WASTE TO ENERGY PLANT IN GRAND-QUEVILLY (VESTA PROJECT) 3 LINES 14,5 T/HR 315.000 T/Y

-

SMITREDCOTES D'ARMORFRANCE

TECH. ASSIST. SORTING 25.000 T/YTECH. ASSISTANCE FOR FLUE GAS TREATMENT (NOx, DIOXINS, FURANS) INCINERATION 55.000 T/Y

- PDISTRICT OF CHARTRES

EURE ET LOIRFRANCE

EVALUATION OF WASTE QUANTITY AND OF ITS EVOLUTION 110.000 T7Y

- PDISTRICT OF CHARTRES

EURE ET LOIRFRANCE

COMPARATIVE STUDY OF INCINERATION SYSTEMS (GRATE OR FLUIDIZES BED)

- P

Page 34: LITWIN Corporate Presentation Master 02

34

CLIENT LOCATION PROJECT DESCRIPTION FEAS BASIC FEED E CM PMC

DISTRICT OF CHARTRES

EURE ET LOIRFRANCE

PROJECT MANAGEMENT & TECHNICAL ASSISTANCE FOR MWSI WITH 2 LINES 7.5 TH/HOUR PASTRIA

BÈGLESFRANCE

PROCESS ENGINEERING STUDIES AND PROJECT MANAGEMENT OF MSWI (3 LINES 11 TONS/HOUR) SORTING 30.000 T/Y INCINERATION 255.000 T/Y P

CDCAGGRENOBLEFRANCE

REVAMPING OF THE MUNICIPAL SOLID WASTE INCINERATION PLANT (MSWI) 250.000 T/Y PCDCAG

GRENOBLEFRANCE

CONSTRUCTION OF A SORTING CENTER PCDCAG

GRENOBLEFRANCE

IMPACT STUDY - SORTING CENTER PROJECT MANAGEMENT P PCDCAG

GRENOBLEFRANCE

IMPACT STUDY FOR THE MSWI - FLUE GAS TREATMENT COMPARISON 3 LINES 8 T/HR PCDCAG

GRENOBLEFRANCE

BASIC ENGINEERING AND TECHNICAL ASSISTANCE FOR HOSPITAL WASTE INCINERATION (AT LA TRONCHE) P

CDCAGGRENOBLEFRANCE

TECHNICAL ASSISTANCE FOR THE COMPOSTING PLANT (AT MURIANETTE)

PUDONG NEW AREA MUNICIPALITY

SHANGHAI / PUDONGCHINA

MSWI (3 LINES 14 T/HR) INCINERATION 315.000 T/Y PSIMACUR

MASSY-ANTONYFRANCE

MSWI FEASIBILITY STUDY 2 LINES PSIMACUR

MASSY-ANTONYFRANCE

ALL DISCIPLINE ENGINEERING - CONNECTION TO DISTRICT HEATING NETWORK 5.5 T/HR PSIMACUR

MASSY-ANTONYFRANCE

3rd LINE FEASIBILITY STUDY, 4 MW STEAM TURBINE, REFRIGERATION PLANT PSIMACUR

MASSY-ANTONYFRANCE

PROJECT MANAGEMENT OF FLUE GAS CLEANING UNIT 12 T/HR PSIMACUR

MASSY-ANTONYFRANCE

FLUID BED COAL BOILER PLANT PROJECT MANAGEMENT PSIMACUR

MASSY-ANTONYFRANCE

DISTRICT HEATING NETWORK PROJECT MANAGEMENT 2X32 MW 35 KM 135 S/STATIONS P

-BRATISLAVASLOVAKIA

WASTE TO ENERGY FACILITYWASTE VALORIZATION AND RESIDUE MANAGEMENT STUDIES WASTE COMPOSTING FACILITY

P

SITALSTRASBOURGFRANCE

TECHNICAL ASSISTANCE FOR A NON HAZARDOUS INDUSTRIAL WASTE SORTING CENTER 50.000 T/Y P

LELY EVAC ORDURESFONTAINE FRANCE

SORTING LINE 40 T/HR PMINISTRY OF ENVIRONMENT

SLOVENIA MASTER PLAN OF DOMESTIC WASTE MANAGEMENT IN SLOVENIA 40.000 T/YR P

Litwin 2013

Environment Technologies