LIGHTING CONSTRUCTION MANUAL

FLOOD LIGHTING

Go to SECTION INDEX Back to MAIN INDEX

Page 2: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

1-9-1-1

1 9 1-1 0E

LIGHTING

10500-A4-1-9-1-1

1-9-2-1

DESCRIPTIONTYPE PAGE TYPE DESCRIPTION PAGE

B 10.12.12

1-9-2-2

1-9-5-1

1-9-4-1

1-9-3-2

1-9-3-1

1-9-7-1

1-9-6-1

1-9-7-2

MINOR ROAD CONSTRUCTION

FLOODLIGHTING INDEX

1-9-8-2

1-9-8-1

1-9-11-1

SLBPM

SLBPM

SLBPM

1-9-11-2

SLWF

SLWF

SLWF

SLWF

SLWF

SLPX

SLPX

SLPX

Major Road BPM Steel Pole / Foundation - U/G Service

Pedestrian Crossing Floodlight Single - Materials

Major Road BPM Steel Pole / Foundation - U/G Service

Pedestrian Crossing Floodlight Single - Construction

Major Road BPM Steel Pole / Foundation - O/H Service

Major Road BPM Steel Pole / Foundation - O/H Service

Pedestrian Crossing Floodlight Single - Construction

Pedestrian Crossing Floodlight Single - Materials

Major Road BPM Steel Pole / Foundation - U/G Service

Pedestrian Crossing Floodlight Type PF3 - Materials

Major Road BPM Steel Pole / Foundation - U/G Service

Pedestrian Crossing Floodlight Type PF3 - Construction

C 08.01.14

D 03.04.18

E 15.08.18

Construction Type Guide - Watchman Floodlight

Construction Type Guide - Pedestrian Crossing

1-9-2-3Construction Type Guide - Pole Bracket

1-9-4-2

Watchman Floodlight Wood Pole - Material

Watchman Floodlight Wood Pole - Construction

Watchman Floodlight Existing O/H Supply

Steel / Concrete Pole - Materials

Watchman Floodlight Existing O/H Supply

Steel / Concrete Pole - Construction

Watchman Floodlight Existing U/G Supply

Steel / Concrete Pole - Materials & Construction

Watchman Floodlight Existing Customer Property

Pole O/H Supply - Materials & Construction

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

01/03/19

01/03/19

01/03/19

01/11/10

Page 3: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

EXAMPLE:-

STREETLIGHT

Adetail drawings in this manual.

appears on relevant construction

Type shown within dashed box

B 15.01.13

C 22.11.16

D 06.09.18

SLED PH 1012 F

SUPPLIER IDENTIFIER

GL = Gerard LightingBILLABLE LOAD / LAMP WATTAGE

1012 = 101.2W

LUMINAIRE TYPE

1-9-2-1

1 9 2-1 0E

LIGHTINGFLOODLIGHTING

CONSTRUCTION TYPE GUIDE

PEDESTRIAN CROSSING

10500-A4-1-9-2-1

NIL

NIL

PH = Philips Lighting

SLEDPH1012F = Streetlight pedestrian crossing LED, Philips Lighting 101.2W floodlight

EXAMPLE:-

STREETLIGHT

A

PEDESTRIAN CROSSING CONSTRUCTION TYPE

detail drawings in this manual.

appears on relevant construction

Type shown within dashed box

BILLABLE LOAD / LAMP WATTAGELUMINAIRE TYPE

LED PEDESTRIAN CROSSING CONSTRUCTION TYPE

SLED = Streetlight LED

Floodlight

F = Pedestrian Crossing

SL S250 F

SL = StreetlightS250 = HPS 250W Clear

S400 = HPS 400W Clear

H250 = Metal Halide 250W Clear

H400 = Metal Halide 400W Clear

Floodlight

F = Pedestrian Crossing

SLS250F = Streetlight, HPS 250W, Pedestrian Crossing floodlight

3128 = 312.8W

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

14/10/10E 26.06.19

2029 = 202.9W

Page 4: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

EXAMPLE:-

STREETLIGHT

A

WATCHMAN FLOODLIGHT CONSTRUCTION TYPE

detail drawings in this manual.

appears on relevant construction

Type shown within dashed box

B 19.07.18

1-9-2-2

1 9 2-2 0C

LIGHTINGFLOODLIGHTING

CONSTRUCTION TYPE GUIDE

WATCHMAN FLOODLIGHT

10500-A4-1-9-2-2

NIL

NIL

S150 = HPS 150W

S250 = HPS 250W

S400 = HPS 400W

H250 = H 250W

H400 = H 400W

EXAMPLE:-

STREETLIGHT

Adetail drawings in this manual.

appears on relevant construction

Type shown within dashed box

SLED PH 0713 W

SL S150 W

LAMP WATTAGE AND TYPELUMINAIRE TYPE

W = Watchman Floodlight

SW S150 W = Streetlight, HPS 150W, Watchman Floodlight

WATCHMAN LED FLOODLIGHT CONSTRUCTION TYPE

SLED = Streetlight LED

SUPPLIER IDENTIFIER

PH = Philips Lighting

BILLABLE LOAD

0713 = 71.3W

1012 = 101.2W

2029 = 202.9W

LUMINAIRE TYPE

W = Watchman Floodlight

SLED PH 0713 W = Streetlight LED, Philips Lighting, 71.3W, Watchman Floodlight

SL = Streetlight

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

14/10/10

26.06.19C

H150 = H 150W

Page 5: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

EXAMPLE:-

STREETLIGHT

Adetail drawings in this manual.

appears on relevant construction

Type shown within dashed box

1-9-2-3

1 9 2-3 0A

LIGHTINGFLOODLIGHTING

CONSTRUCTION TYPE GUIDE

POLE BRACKET

10500-A4-1-9-2-3

NIL

NIL

POLE BRACKETS CONSTRUCTION TYPE

S W 1 ABC

SLED = Streetlight LED

S = Streetlight

POLE TYPE

W = Wood Pole

P = Private

C = Concrete / Steel

NO. OF OUTREACH

1 = Single

CONNECTION

ABC = LV ABC Mains

Cu = Copper Mains

SER = ABC Service

AL = Aluminium Mains

UG = Underground

S W 1 ABC = Streetlight, Wood Pole, Single, LVABC mains

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

01/03/19

01/03/19

01/03/19

26/10/18

Page 6: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

B 19.03.13

03.04.18C

14.12.18D 1-9-3-1

1 9 3-1 0E

LIGHTINGFLOODLIGHTING

WATCHMAN FLOODLIGHT

WOOD POLE - MATERIAL

10500-A4-1-9-3-1

NIL

4927-A4-15.1

ASSY DESCRIPTION QTY

914-1

914-2 1

914-3

NOTES:

1.

2.

3.

Watchman floodlight L70

Watchman floodlight L100

Watchman floodlight L200

ASSY DESCRIPTION QTY

803-1

915-1

2804-6

916-1

804-1

804-2

804-7

805-1

805-6

MATERIAL - BRACKET & SUPPLY

Connector I.P.C 25/95mm† main to 6/35mm† tap

6-35mm Aluminium / 4-35mm Copper thru connector

AR

1

AR

AR

Connector tap-off bare aluminium main

Connector tap-off bare copper main

End cap - Push on 25mm† ABC

Conduit PVC flexible - 16mm

e.g. crossarm, arm braces, etc.

are not contacting other pole top hardware

Bracket / Floodlight shall be mounted such that they

66kV = 1800mm

11kV/22kV/33kV = 1200mm

LV = 100mm

Bracket / Floodlight minimum clearance to conductors:-

on regional location - configuration is illustrative only.

Open wire conductor configuration depends

Bracket watchman floodlight to wood pole

803-6 Bracket support to crossarm AR

Saddle (20mm) to wood pole

Bracket LED watchman to wood pole

904-1 1Fuseholder, with 10A HRC, type 10G

ASSY DESCRIPTION QTY

1914-6

914-4

914-5

914-7

914-8

914-9

Watchman floodlight S150

Watchman floodlight S250

Watchman floodlight S400

Watchman floodlight H150

Watchman floodlight H250

Watchman floodlight H400

MATERIAL - FLOODLIGHT LED WATCHMAN

MATERIAL - FLOODLIGHT WATCHMAN

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10E 26.06.19

Page 7: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

B 19.03.13

C 14.12.18

Construction Type

SLED

@

F

F

F

F

F

F

F

F

F

F

804-6 or 7

Assy Selection300 intervals

Assy 803-6

Assy 805-6

CONNECTION TO OPEN WIRE MAINS

@ 500 crs

Assy 803-1

Refer note 1

Conductor clearance

300

Assy 805-6

Pole

Wood

@ 500 crs

Assy 803-1

CONNECTION TO O/H SERVICE

Assy 804-2 (EGX)

Assy 804-1 (EE) or

Assy 805-1 (EE)

F

F

F

F

CONNECTION TO LV ABC MAINS

300

@ 500 crs

Assy 803-1

Assy 805-6

Pole

Wood

Assy 804-2 (EGX)

Assy 804-1 (EE) or

(Luminaire)

(Luminaire)

SW

SL

(Bracket)

F

Pole

Wood

F

F914-1 to 9

Assy Selection

or 916-1

Assy 915-1

Assy 805-6F

F

Assy 803-1

F

Assy 904-1

lowest point to G.L.

4.5m min. height

F

1-9-3-2

1 9 3-2 0C

LIGHTINGFLOODLIGHTING

WATCHMAN FLOODLIGHT

WOOD POLE - CONSTRUCTION

10500-A4-1-9-3-2

NIL

NIL

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

01/03/19

01/03/19

01/03/19

01/10/10

Page 8: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

ASSY DESCRIPTION QTY

914-1

914-2 1

914-3

B 19.03.13

NOTES:

1.

2.

3.

C 03.04.18

25.10.18D

Watchman floodlight L70

Watchman floodlight L100

Watchman floodlight L200

e.g. crossarm, arm braces, etc.

are not contacting other pole top hardware

Bracket / Floodlight shall be mounted such that they

66kV = 1800mm

11kV/22kV/33kV = 1200mm

LV = 100mm

Bracket / Floodlight minimum clearance to conductors:-

on regional location - configuration is illustrative only.

Open wire conductor configuration depends

ASSY DESCRIPTION QTY

1914-6

914-4

914-5

914-7

914-8

914-9

Watchman floodlight S150

Watchman floodlight S250

Watchman floodlight S400

Watchman floodlight H150

Watchman floodlight H250

Watchman floodlight H400

MATERIAL - FLOODLIGHT LED WATCHMAN

MATERIAL - FLOODLIGHT WATCHMAN

ASSY DESCRIPTION QTY

915-2

2804-6

916-2

804-1

804-2

804-7

805-1

805-6

MATERIAL - BRACKET & SUPPLY

Connector I.P.C 25/95mm† main to 6/35mm† tap

6-35mm Aluminium / 4-35mm Copper thru connector

1

AR

AR

Connector tap-off bare aluminium main

Connector tap-off bare copper main

End cap - Push on 25mm† ABC

Conduit PVC flexible - 16mm

866-1 1Fuseholder, with 10A HRC, type 10G (steel / conc)

Bracket LED watchman to steel / conc pole

Bracket watchman floodlight to steel / conc pole

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

1-9-4-1

1 9 4-1 0E

LIGHTINGFLOODLIGHTING

WATCHMAN FLOODLIGHT EXISTING O/H SUPPLY

STEEL / CONCRETE POLE - MATERIAL

10500-A4-1-9-4-1

NIL

4927-A4-15.2

E 26.06.19

Page 9: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

Construction Type

SLED

@

F

F

F

F

F

F

F

F

F

F

804-6 or 7

Assy Selection300 intervals

Assy 803-6

Assy 805-6

CONNECTION TO OPEN WIRE MAINS

@ 500 crs

Assy 803-1

300

Assy 805-6

Pole

Wood

@ 500 crs

Assy 803-1

CONNECTION TO O/H SERVICE

Assy 804-2 (EGX)

Assy 804-1 (EE) or

Assy 805-1 (EE)

F

F

F

F

CONNECTION TO LV ABC MAINS

300

@ 500 crs

Assy 803-1

Assy 805-6

Pole

Wood

Assy 804-2 (EGX)

Assy 804-1 (EE) or

(Luminaire)

(Luminaire)

SW

SL

(Bracket)

Assy 866-1

F

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

01/03/19

01/03/19

01/03/19

11/01/19

1-9-4-2

1 9 4-2 0A

LIGHTINGFLOODLIGHTING

WATCHMAN FLOODLIGHT EXISTING O/H SUPPLY

STEEL / CONCRETE POLE - CONSTRUCTION

10500-A4-1-9-4-2

NIL

NIL

F

F

F914-1 to 9

Assy Selection

lowest point to G.L.

4.5m min. height

F

Refer note 1

clearance

Conductor

or 916-2

Assy 915-2

Pole

Steel / Conc

Page 10: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

Construction Type

FLOODLIGHTING

LIGHTING

1 9 5-1 0E

F

WATCHMAN FLOODLIGHT EXISTING U/G SUPPLY

Assy 883-1

service not included in this construction

Streetlight pole, luminaire & overhead

4927-A4-15.3

NIL

1-9-5-1

10500-A4-1-9-5-1

B 19.03.13

lowest point to G.L.

4.5m min. height

F

03.04.18C

F

Ø26mm cable entry hole

(part of pole)

15.01.19D

ASSY DESCRIPTION QTY

914-1

914-2 1

914-3

Watchman floodlight L70

Watchman floodlight L100

Watchman floodlight L200

ASSY DESCRIPTION QTY

1914-6

914-4

914-5

914-7

914-8

914-9

Watchman floodlight S150

Watchman floodlight S250

Watchman floodlight S400

Watchman floodlight H150

Watchman floodlight H250

Watchman floodlight H400

MATERIAL - FLOODLIGHT LED WATCHMAN

MATERIAL - FLOODLIGHT WATCHMAN

ASSY DESCRIPTION QTY

915-2

916-2

805-6

MATERIAL - BRACKET & SUPPLY

1

ARConduit PVC flexible - 16mm

883-1 1

Bracket LED watchman to steel / conc pole

Bracket watchman floodlight to steel / conc pole

906-2 ARBandit strap (19mm) to pole

Watchman floodlight circuit breaker

914-1 to 9

Assy Selection

or 916-2

Assy 915-2

F

F

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

FAssy 805-6

STEEL / CONCRETE POLE - CONSTRUCTION

F

Assy 906-2

SLED

(Luminaire) SL

(Luminaire)

E 26.06.19

Page 11: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

FLOODLIGHTING

LIGHTING

1 9 6-1 0D

ASSY DESCRIPTION QTY

803-1 AR

MATERIAL

805-6

Saddle (20mm) to wood pole

ARConduit PVC flexible 16mm

not included in this construction

Overhead supply & pole

884-1 1

1-9-6-1

10500-A4-1-9-6-1

4927-A4-15.4

NIL

Consumer’s property pole label

B 19.03.13

C 15.01.19

F

Pole

Wood

914-1 to 9

Assy Selection

or 916-1

Assy 915-1

Assy 805-6

Assy 803-1

Assy 904-1

lowest point to G.L.

4.5m min. height

Construction Type

SLED (Luminaire)

(Luminaire)

SW

SL

(Bracket)

ASSY DESCRIPTION QTY

914-1

914-2 1

914-3

Watchman floodlight L70

Watchman floodlight L100

Watchman floodlight L200

MATERIAL - FLOODLIGHT LED WATCHMAN

915-1

916-11

Bracket watchman floodlight to wood pole

Bracket LED watchman to wood pole

904-1 1Fuseholder, with 10A HRC, type 10G

ASSY DESCRIPTION QTY

1914-6

914-4

914-5

914-7

914-8

914-9

Watchman floodlight S150

Watchman floodlight S250

Watchman floodlight S400

Watchman floodlight H150

Watchman floodlight H250

Watchman floodlight H400

MATERIAL - FLOODLIGHT WATCHMAN

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

PROPERTY POLE O/H SUPPLY - CONSTRUCTION

WATCHMAN FLOODLIGHT EXISTING CUSTOMER

D 26.06.19

Page 12: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

F F

MATERIAL - POLE & OUTREACH

ASSY

808-1

808-2

808-3

811-1

QTYDESCRIPTION

DOUBLE OUTREACH POLE ORIENTATION

Traffic flow

Double outreach Traffic flow

Terminal chamber door

1

1

1

1

Terminal panel and cable to single outreach arm

4.5m

3.0m

1.5m

Outreach arm - single

Pole base plate mounted steel

NOTES:

1. Access door to be on side of pole that is least hazardous

to maintenance personnel (normally facing building line).

3. Neutral and earth terminals of terminal panel are to be

bridged. Make bridge only after polarity has been established.

4. Ensure contact area between Base Plate and hold down bolt

washers is clean, free of paint, and bolts are tight.809-8

F

F

FLOODLIGHTING

PEDESTRIAN CROSSING FLOODLIGHT SINGLE - MATERIAL

LIGHITNG

1 9 7-1 0C

MAJOR ROAD BPM STEEL POLE / FOUNDATION - U/G SERVICE

846-1 Pedestrian floodlight outreach extension

refer diagram below.2. For location of terminal chamber relative to double outreach

MATERIAL - FOUNDATION

ASSY DESCRIPTION QTY

813-2

Foundation 350 PCD BPM steel pole - 1 conduit

842-2 Foundation precast 350 PCD BPM steel pole - 1 conduit 1

Foundation 350 PCD BPM (special purpose) - 1 conduit

810-2

7.0m ht.809-6

10.0m ht.

809-7 8.5m ht.

4927-A4-7.4, 2.21, 2.22

NIL

1-9-7-1

10500-A4-1-9-7-1

B 16.01.19

ASSY QTYDESCRIPTION

1

1

868-6

868-4

868-5

868-1

868-2

868-3

Pedestrian Floodlight L100

Pedestrian Floodlight L300

Pedestrian Floodlight S250

Pedestrian Floodlight S400

Pedestrian Floodlight H250

Pedestrian Floodlight H400

1

ASSY DESCRIPTION QTY

869-3 1

1869-2

1869-1

Floodlight adapter - Pierlite

MATERIAL - LUMINAIRE & BRACKET

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

02.08.19C

868-7 Pedestrian Floodlight L200 1 869-4 1

Floodlight adapter - Philips Tango (small)

Floodlight adapter - HID

Floodlight adapter - Philips Tango (medium)

Page 13: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

F

FF

F

F

F F

F

BPM BASE PLATE MOUNTED POLE

PROPERTY

SIDE

40 Grout

2.0m

ROAD

SIDE

special purpose only.

For shallow foundationConstruction Type

Drawing No. 1-4-7-1

Refer Services

Underground service.

Drawing 1-3-7-1

refer Construction Practices

Stabilisied backfill foundation F

}(normal soil)

808-1 to 3

Assy Selection

12.0m

10.5m

9.0m

Height

Mounting

Nominal

10.0m

8.5m

7.0m

Height

Pole

FLOODLIGHTING

MAJOR ROAD BPM STEEL POLE / FOUNDATION - U/G SERVICE

LIGHTING

1 9 7-2 0C

F

F

F

PEDESTRIAN CROSSING FLOODLIGHT SINGLE - CONSTRUCTION

F

842-2

810-2 or

Assy Selection

813-2

Assy Selection

809-6, 7 or 8

Assy Selection

(Luminaire) SLED

Refer Assemblies - Page 1-2-810 note 7.

For unsuitable soil conditions.

4927-A4-7.4, 2.21, 2.22

NIL

1-9-7-2

10500-A4-1-9-7-2

811-1

Assy Selection

B 16.01.19

F

F

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

846-1

Assy Selection

868-1 to 7

869-1 to 4 and

Assy Selection

(Luminaire) SL

02.08.19C

Page 14: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

F F

MATERIAL - POLE & OUTREACH

ASSY

808-1

808-2

808-3

811-1

811-2

MATERIAL - FOUNDATION

ASSY DESCRIPTION QTY

QTYDESCRIPTION

DOUBLE OUTREACH POLE ORIENTATION

Traffic flow

Double outreach Traffic flow

Terminal chamber door

1

1

1

Terminal panel and cable to double outreach arm

Terminal panel and cable to single outreach arm

4.5m

3.0m

1.5m

Outreach arm - single

NOTES:

1. Access door to be on side of pole that is least hazardous

to maintenance personnel (normally facing building line).

3. Neutral and earth terminals of terminal panel are to be

bridged. Make bridge only after polarity has been established.

4. Ensure contact area between Base Plate and hold down bolt

washers is clean, free of paint, and bolts are tight.

813-2

Foundation 350 PCD BPM steel pole - 1 conduit

842-2 Foundation precast 350 PCD BPM steel pole - 1 conduit 1

Foundation 350 PCD BPM (special purpose) - 1 conduit

F

F

810-2

FLOODLIGHTING

PEDESTRIAN CROSSING FLOODLIGHT SINGLE - MATERIAL

LIGHITNG

1 9 8-1 0C

MAJOR ROAD BPM STEEL POLE / FOUNDATION - O/H SERVICE

846-1 Pedestrian floodlight outreach extension

refer diagram below.2. For location of terminal chamber relative to double outreach

807-6 1

804-1

800-6

Supply to terminal panel steel pole

Eyebolt & eyenut M16 x 150 to streetlight pole

809-6

809-7

809-8

Pole base plate mounted steel

7.0m ht.

8.5m ht.

10.0m ht.

1

4927-A4-5.3, 2.21, 2.22

NIL

1-9-8-1

10500-A4-1-9-8-1

804-2

805-1

6-35mm Aluminium / 4-35mm Copper Thru Connector

Connector I.P.C. 25/95mm† main to 6/35mm† tap

End cap - push on 25mm† ABC

2

B 18.01.19

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

ASSY QTYDESCRIPTION

1

1

868-6

868-4

868-5

868-1

868-2

868-3

Pedestrian Floodlight L100

Pedestrian Floodlight L300

Pedestrian Floodlight S250

Pedestrian Floodlight S400

Pedestrian Floodlight H250

Pedestrian Floodlight H400

1

ASSY DESCRIPTION QTY

869-3 1

1869-2

1869-1

Floodlight adapter - Pierlite

MATERIAL - LUMINAIRE & BRACKET

868-7 Pedestrian Floodlight L200 1 869-4 1

Floodlight adapter - Philips Tango (small)

Floodlight adapter - HID

Floodlight adapter - Philips Tango (medium)

02.08.19C

1

Page 15: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

F

FF

F

F

F F

F

BPM BASE PLATE MOUNTED POLE

PROPERTY

SIDE

40 Grout

2.0m

ROAD

SIDE

special purpose only.

For shallow foundation

Construction Type

(Luminaire)Drawing 1-3-7-1

refer Construction Practices

Stabilisied backfill foundation F

}(normal soil)

12.0m

10.5m

9.0m

Height

Mounting

Nominal

10.0m

8.5m

7.0m

Height

Pole

FLOODLIGHTING

MAJOR ROAD BPM STEEL POLE / FOUNDATION - O/H SERVICE

LIGHTING

1 9 8-2 0C

F

811-1 or 2

Assy Selection

F

PEDESTRIAN CROSSING FLOODLIGHT SINGLE - CONSTRUCTION

F

Assy 800-6

Fully ribbed core

is neutralDrawing No. 1-4-3-1, 1-4-4-1 & 1-4-5-1

Overhead service. Refer Services

F

F

842-2

810-2 or

Assy Selection

813-2

Assy Selection

809-6, 7 or 8

Assy Selection

SLED

Refer Assemblies - Page 1-2-810 note 7.

For unsuitable soil conditions.

4927-A4-5.2, 2.21, 2.22

NIL

1-9-8-2

10500-A4-1-9-8-2

Assy 805-1 (EE)

Assy 804-2 (EGX)

Assy 804-1 (EE) or

B 18.01.19

F

807-6

F

808-1 to 3

Assy Selection

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

01/10/10

F

F

846-1

Assy Selection

868-1 to 7

869-1 to 4 and

Assy Selection

SL(Luminaire)

(Pole, Outreach & Foundation) SLBPM

02.08.19C

Page 16: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

MATERIAL - POLE & OUTREACH

ASSY QTYDESCRIPTION

1

1

1

NOTES:

13.0m height809-9

893-1 Pedestrian Outreach Arm PF3

Pole base plate mounted steel

7.0m height

8.5m height

10.0m height

809-6

809-7

809-8

811-2 Terminal panel and cable to double outreach arm

washers is clean, free of paint and bolts are tight.3. Ensure contact area between Base Plate and hold down bolt bridged. Make bridge only after polarity has been established.2. Neutral and earth terminals of terminal panel are to be to maintenance personnel (normally facing building line)1. Access door to be on side of pole that is least hazardous

ASSY DESCRIPTION QTY

841-4

841-1

841-2

841-31

MATERIAL - FOUNDATION

Foundation 350 PCD BPM steel pole - 1 conduit

Foundation 500 PCD BPM steel pole - 1 conduit

Foundation 350 PCD BPM steel pole - 1 conduit

Foundation 350 PCD BPM (special purpose) - 1 conduit

B 02.08.19

1-9-11-1

1 9 11-1 0B

LIGHTINGFLOODLIGHTING

BPM U/G FOUNDATION PEDESTRIAN CROSSING

FLOODLIGHT COMBINATIONS - MATERIAL

10500-A4-1-9-11-1

NIL

NIL

ASSY QTYDESCRIPTION

1

1

868-6

868-4

868-5

868-1

868-2

868-3

Pedestrian Floodlight L100

Pedestrian Floodlight L300

Pedestrian Floodlight S250

Pedestrian Floodlight S400

Pedestrian Floodlight H250

Pedestrian Floodlight H400

1

ASSY DESCRIPTION QTY

869-3 1

1869-2

1869-1

Floodlight adapter - Pierlite

MATERIAL - LUMINAIRE & BRACKET

868-7 Pedestrian Floodlight L200 1 869-4 1

Floodlight adapter - Philips Tango (small)

Floodlight adapter - HID

Floodlight adapter - Philips Tango (medium)

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

14/10/10

Page 17: LIGHTING CONSTRUCTION MANUAL · Major Road BPM Steel Pole / Foundation - U/G Service Pedestrian Crossing Floodlight Type PF3 - Materials Major Road BPM Steel Pole / Foundation - U/G

F

FF

F

F

F

F

F

F

BPM BASE PLATE MOUNTED POLE

40 Grout

PROPERTY

SIDE

special purpose only.

For shallow foundation

ROAD

SIDE

2.0m

F

F809-6 to 9

Assy Selection

13.0m

10.0m

8.5m

7.0m

Height

Pole

15.0m

12.0m

10.5m

9.0m

Height

Mounting

Nominal

SLBPM

Construction Type

(Pole, Outreach & Foundation)

Refer 1-2-810 note 7.

For unsuitable soil conditions.

813-2

Assy Selection

(normal soil)}842-2

839-2 or

810-2 or

Assy Selection

811-2

Assy Selection

Drawing No. 1-4-7-1

Refer Services

Underground service.

For Precast Foundations

Drawing No. 1-3-7-1

Refer Construction Practices

Stabilised backfill foundation

F

F893-1

Assy Selection

F

B 02.08.19

1-9-11-2

1 9 11-2 0B

LIGHTINGFLOODLIGHTING

BPM FOUNDATION - U/G SVC PEDESTRIAN CROSSING

FLOODLIGHT COMBINATIONS - CONSTRUCTION

10500-A4-1-9-11-2

NIL

NIL

868-1 to 7

869-1 to 4 and

Assy Selection

VOLUME FOLDER ISSUEPAGE

Approved Ergon

Approved Energex

Checked

Drawn

Date

Date

Date

Date

A ORIGINAL ISSUE

HARD COPY UNCONTROLLED

C COPYRIGHT 2019 ENERGEX

ABN 50 087 646 062

Ergon Energy Corporation Limited

C COPYRIGHT 2019 ERGON ENERGY

ABN 40 078 849 055

ENERGEX Corporation Limited

ENERGEX or Ergon Energy

without written permission from

reproduced in part or whole

This document must not be

REFERENCE DRAWING ENERGEX

REFERENCE DRAWING ERGON

EE DRWG NO:

EGX DRWG NO:

A. Bletchly

A. Bletchly

K. Slater

L. Burton / T. Borg

09/08/19

09/08/19

09/08/19

14/10/10

(Luminaire)

(Luminaire) SLED

SL