16
LIFE SCIENCES LIFE SCIENCES FACILITY FACILITY UNIVERSITY OF ALASKA FAIRBANKS

LIFE SCIENCESLIFE SCIENCES FACILITY - …€¢Collaborative research and teaching that is relevant to Alaskarelevant to Alaska •Life Sciences facilities have not been modernized

Embed Size (px)

Citation preview

LIFE SCIENCESLIFE SCIENCESFACILITYFACILITY

UNIVERSITY OF ALASKA FAIRBANKS

Center of Excellence in Life ScienceLearning and Discovery for Alaska…..Learning and Discovery for Alaska…..

• Affect over 1500 students (biology and wildlifeAffect over 1500 students (biology and wildlife majors and most popular science elective)

• Collaborative research and teaching that is relevant to Alaskarelevant to Alaska

• Life Sciences facilities have not been modernized since Bunnell was built– in 1959!

F $1 i t d b th t t UAF• For every $1 invested by the state, UAF secures another $6.30 in research funding.

Source: UAF Planning, Analysis and Institutional Research Research is Teaching by doing.

UNIVERSITY OF ALASKA FAIRBANKS

Life Sciences Facility Scope of Work

•Once complete, Life Sciences will provide multiuse teaching and researchlabs, classrooms, and office space for life science research and academicpurposes The research portion will provide nearly 60 000 gross square feetpurposes. The research portion will provide nearly 60,000 gross square feet(gsf) of much-needed research lab space for biology programs. Theteaching portion will provide 40,000 gross square feet of academicclassroom and lab space for biology and wildlife degree programs.p gy g p g

•Within the approximately 100,000 gsf, offices will be constructed for faculty(principal investigators) with research labs in the building. Offices will alsobe provided for the biology and wildlife degree program such that thedepartment chair and administrative staff will be housed in Life Sciences;making them more accessible to the students they serve.

•Life Sciences will be constructed with the most current, energy efficient andsustainable materials available to a project in such a northern climate.

UNIVERSITY OF ALASKA FAIRBANKS

Life Sciences Facility Scope of Work

•The exterior will feature high insulation value cladding and translucent panels andglass windows will be held to a minimum and placed such to maximize safety, theview shed building aesthetics and to capture natural lightingview shed, building aesthetics, and to capture natural lighting.

•Teaching labs will feature moveable and fixed casework that will allow rooms to actas both classrooms and class labs, thus increasing the utilization of the space.Research labs will follow the national trend of being open and modular to adapt tochanging research needs. Lab support spaces will be created around the labs tohouse large equipment, fume hoods, freezers, and more.

•Additional utilities work will include construction of a utilidor for service piping,installation of sanitary and storm drainage, and installation of steam absorptionchiller units for a district cooling loop.

•A specialty lab may be created in the building to support research radiology with thepossible installation of two (2) Magnetic Resonance Imaging machines.

UNIVERSITY OF ALASKA FAIRBANKS

UNIVERSITY OF ALASKA FAIRBANKS

Owner:

Life Sciences Facility TeamOwner:

University of Alaska FairbanksCameron Wohlford, PE

Sr. Project Manager

Design Team: General ContractorDesign Team:Bezek Durst SeiserSmith Group, Inc

PDC Inc.RFD I

General ContractorDavis Constructors and

Engineers, IncFulford Electric, Inc

RFD, Inc Patrick Mechanical, Inc

UNIVERSITY OF ALASKA FAIRBANKS

Life Sciences Facility Schedule•Schematic Design: Completed

•Funding: Received November 2010

Design De elopment Completed•Design Development: Completed

•Contractor Selected: January 5, 2011

•Steel Ordered NLT: March 7 2011•Steel Ordered NLT: March 7, 2011

•Ground Breaking: March 30, 2011

•Steel erected and Building Enclosed: October 15, 2011Steel erected and Building Enclosed: October 15, 2011

•Substantial Completion: Spring 2013

•Building Occupancy: Fall 2013

UNIVERSITY OF ALASKA FAIRBANKS

UNIVERSITY OF ALASKA FAIRBANKS

UAF Life Sciences Site Plan

LIFE SCIENCESLIFE SCIENCES FACILITY

UNIVERSITY OF ALASKA FAIRBANKS

UP

UP

SS

EW

BUILDING CIRCULATION

BUILDING SUPPORT

LAB SUPPORT

MRI LAB (FUTURE)

VERTICAL CIRCULATION

LOWER LEVEL

MRI EXAM 7T MRI EXAM 1.5T

MRI CIRCULATION MRI STORAGE

JANITOR'S CENTSTOR

DRESSING DRESSING RECOVERY PREP /ANESTHESIA

CORRIDOR

MAIN MECHANICAL

MAIN ELECTRICAL MAIN DATA /COMMUNICATION

INSTR EQUIPSTORAGE LOCAL CHILLER

HAZ MATSTORAGE

ELEVATORMACHINE

UTILIDOR

CORRIDOR

MEN WOMEN

JAN

ELEVATOR 1 ELEVATOR 2

SHOWER SHOWER SHOWER

LOADING ANDRECYCLING

CHILLER

FREEZER FARM

VESTIBULE

CORRIDOR

CORRIDOR

NORTH ENTRYSTAIR

STAIR 3

NORTH ENTRY

FIRE RISER & MAINPLUMB

MRI EQUIPMENT

UP

UP

UP

DN

SS SS

SS

EW EW

EW

BUILDING CIRCULATION

BUILDING SUPPORT

CLASSROOM

INTERACTION

LAB

LAB SUPPORT

OFFICE

OFFICE SUPPORT

OPEN OFFICE

SHAFT

VERTICAL CIRCULATION

GRAD STUDENTS COPY GRAD STUDENTS

PI OFFICEPI OFFICEPI OFFICEPI OFFICEPOST DOCPOST DOC

MAIN LEVEL

MICROSCOPE/CONFOCALTISSUE CULTURE EQUIPMENT AUTOCLAVE FUME HOOD

FABRICATIONCOLDHISTOLOGY

NEUROSCIENCEOPEN LAB

STAIR 3

CONFERENCE

STAIR 2

ELECTRICAL

KITCHENETTE

INTERACTION

DEPT OFFICERECEPTION

MAIL/COPY

DEPT CHAIR

STUDENTADVISER

GRAD STU.COORD ADMIN. ASST

CORRIDOR

SHAFT

CLASSROOM /CONF. ROOM CLASSROOM CLASSROOM

EAST ENTRY

SOUTH ENTRY

CORRIDOR

AUDITORIUM FOOD SERVICE

FOOD SERVICESTORAGE

VENDING

STORAGE

CLASSROOMPREP

VESTIBULE VESTIBULE &RAMP

SHAFT

SHAFTSHAFT

WOMEN

MEN

JANELEVATOR 1

STAIR 1

MICROSCOPE

FILE

ELEVATOR 2

EATING AREA

LOBBY

CORRIDOR TOIRVING

IRVING STAIREXTENSION

CORRIDOR

UP DN

UP DN

UP DN

SSSS SS

SS

SS SS

SS

SS

SS

EWEW EWEW

EW EW EW

EW

EW

BUILDING CIRCULATION

BUILDING SUPPORT

INTERACTION

LAB

LAB SUPPORT

OFFICE

OFFICE SUPPORT

OPEN OFFICE

SHAFT

TEACHING LAB

TEACHING SUPPORT

VERTICAL CIRCULATION

LEVEL 2

MOLECULAR BIOOPEN LAB

TISSUE CULTURE FUME HOOD

MICROSCOPY

INSTR. FLEX

EQUIPMENT GLASS WASH/AUTOCLAVE

DIRTY TISSUECULTURE

CONFERENCE

STAIR 3

SHAFTFLEX LABFLEX LAB

GRAD STUDENTS COPY GRAD STUDENTS

PI OFFICEPI OFFICEPI OFFICEPI OFFICEPOST DOCPOST DOCKITCHENETTE

INTERACTION

IDF

ELECTRICAL

SHAFT

AUTOCLAVE,GLASSWASH

INTRO TO BIOLOGYLAB

PREP LABSTOCKROOM

OFFICE

INTRO TO BIOLOGYLAB

DEVELOP. BIO /IMMUN. LAB

MICROBIOLOGYPREP

MICROBIO / CELLBIOLOGY

SHAFT

SHAFT

SHAFT

STAIR 1

CORRIDORCORRIDOR

CORRIDOR

LOBBY

STUDENT STUDY

WOMEN

MEN

JANELEVATOR 1

SHAFT

ELEVATOR 2

STAIR 2

DN

UP DN

UP DN

SS

SS

SS SS

SS SS

SS

SS

EW

EWEW EW

EW EW EW

EW

BUILDING CIRCULATION

BUILDING SUPPORT

INTERACTION

LAB

LAB SUPPORT

OFFICE

OFFICE SUPPORT

OPEN OFFICE

SHAFT

TEACHING LAB

TEACHING SUPPORT

VERTICAL CIRCULATION

LEVEL 3

BIOMEDICAL OPENLAB

FLEX LAB FLEX LAB SHAFT

STAIR 3

CORRIDOR

TISSUE CULTURE FUME HOOD INSTRUMENT /FLEX EQUIPMENT STORAGE/

AUTOCLAVE TISSUE CULTURE

CONFERENCE

GRAD STUDENTS COPY GRAD STUDENTS

PI OFFICEPI OFFICEPI OFFICEPI OFFICEPOST DOCPOST DOCKITCHENETTE

INTERACTION

IDF

ELECTRICAL

SHAFT

VESTIBULE

INSECTARY

ANIMAL HOLDINGPHYSIOLOGICALECOLOGY LAB

SPECIMENSTORAGE

ANAT / PHYS /WLDLF DIS LAB

ANAT / PHYS PREPLAB

CORRIDORCORRIDOR

AQ ORG / INVRTZOO LAB

WET PREP LAB GENETICS LAB

SHAFT

WOMEN

MEN

SHAFT

ELEVATOR 1

JAN

STAIR 2STUDENTINTERACTION

STUDENT STUDY

STAIR 1

LOBBY

ELEVATOR 2

SHAFTSHAFT

South ViewExterior Cladding is a mixture of insulated metal panel, translucent panel, glazed

UNIVERSITY OF ALASKA FAIRBANKS

curtain wall with clear and fritted glazing, and punched windows.

North ViewExterior Cladding is a mixture of insulated metal panel, translucent panel, glazed

UNIVERSITY OF ALASKA FAIRBANKS

curtain wall with clear and fritted glazing, and punched windows.

Life Sciences Contact InformationWebsite: www.uaf.edu/lifescience

Email: [email protected]

Phone: 907 474 1919Phone: 907-474-1919

Facebook: UAF Life Sciences

Parking Information: 474-PARK or [email protected]