28
LEED-NB Certification for New Buildings Presentation #1 Burnet D. Brown RNV Ventures Prepared for Benchmark Built Monday, December 1, 2008

LEED New Buildings Leed Nb Certification Process Burnet D Brown 12 22 08.Ppt

Embed Size (px)

Citation preview

Page 1: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

LEED-NB Certification for New Buildings Presentation #1

Burnet D. Brown RNV Ventures

Prepared for Benchmark Built Monday, December 1, 2008

Page 2: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-2

Points Required by LEED Rating

!   Gives the following ratings:

!   Certified 26 - 32 Points !   Silver 33 - 38 Points !   Gold 39 - 51 Points !   Platinum 52 - 69 Points

Page 3: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-3

Points Required by LEED Rating

Page 4: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-4

1.Sustainable Sites 2.Water Efficiency 3.Energy and Atmosphere Design 4.Materials and Resources 5.Indoor Environmental Quality 6.Innovation and Design Process

LEED rating is determined by earning points for fulfilling requirements in the following six areas:

Weight Assigned by USGBC by Category

Page 5: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-5

LEED Points, Credits and Prerequisites

Category� Sustainable�Sites�

Water�Efficiency�

Materials and

Resources �

Energy and Atmosphere�

Indoor Environmental

Quality�

Innovation in Design (Optional) �

Total�

Prerequisites� 1 � 0 � 1 � 3 � 2 � 0 � 7 �

Points � 14� 5 � 13� 17 � 15 � 5 � 69 �

Credits � 8 � 3 � 7 � 6 � 8 �

Page 6: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-6

Weight Assigned by USGBC by Category

Page 7: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-7

U.S. Energy Consumption by Infrastructure

Page 8: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-8

U.S. Energy Consumption by Infrastructure

Page 9: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-9

What are the Environmental Impacts of Buildings?* !  70% of electricity consumption !  39% of total energy use !  40% of raw materials use !  30% of greenhouse gas emissions !  30% of waste output !  12% of potable water consumption

*Statistics provided by USGBC’s LEED for Product Manufacturers presentation, ©2005

Page 10: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-10

How this relates to strategies for greening buildings…

Page 11: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-11

LEED Categories

Page 12: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-12

Sustainable Sites - Stormwater Management

Page 13: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-13

Where buildings are located near water sources it is important to mitigate the effects of stormwater runoff and parking lot pollution.

Stormwater Runoff and Parking Lot Pollution

Pervious pavers. Pervious pavers installed in the parking lot to allow stormwater to percolate into the ground and insure that stormwater runoff volumes are/were the same as “predevelopment levels.”

Page 14: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-14

Page 15: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-15

You can create detention ponds to capture runoff.

Detention Ponds and Underground Separation Tanks

Underground separation tanks can be installed to filter sand and oil from stormwater prior to its release into the city’s stormwater system.

Page 16: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-16

Energy and Atmosphere

Page 17: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-17

Goal: Minimize energy used for heating, cooling and lighting.

Summer. In the summer a night flush vent system replaces the hot air of the day with cool night time air.

Page 18: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-18

Radiant heat system. A radiant heat system using the highest efficiency commercial boilers and ceiling mounted radiant panels is used to warm buildings on cold days.

Page 19: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-19

Ceiling mounted radiant panels is used to warm buildings on cold days.

R30 insulation in the roof.

Page 20: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-20

R12 insulation in the walls retain heat in the winter and keep buildings cool in the summer

Roof mounted sky lights and smoke vents provide natural light to the interior and workspace.

Page 21: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-21

Photo sensors and motion detectors are used to shut off lights when area lighting is not necessary.

Page 22: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-22

What percent of the building materials used will be made of recycled sources?

Materials and Resources

Page 23: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-23

Recycled materials in walls and floors. Concrete with recycled content flyash for walls and floors.

See www.greenbuilder.com/sourcebook/Flyash.html

Interior columns and roof structures. Recycled steel for interior columns and roof structures.

Page 24: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-24

Use local materials. Distance from building site. How far were materials shipped from? X% of the building materials and products used were manufactured within 500 miles of the construction site.

X% of the construction materials derived from within 500 miles of the construction.

Page 25: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-25

FSC certified wood. Nearly 100% of the wood used in construction was FSC certified — meaning that it was certified as sustainable by the Forest Stewardship Council.

Low or No VOC finishes and carpets. The finishes and carpets contained low or no VOCs with no urea formaldehyde resins.

Page 26: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-26

Construction waste. 75% of the construction waste was recycled or salvaged.

Page 27: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-27

Page 28: LEED New Buildings Leed Nb Certification Process   Burnet D Brown 12 22 08.Ppt

RNV-28

Buyer’s Decision-Making Cycle

!  The factor driving the transition from one phase to the next is “performance oversupply”.