3
SURABAYA GUBENG (SGU) MJ10 10AT J10 ZP10A 10BT ZP10B ZP10C (11B) ZP20A (21A) (21B) (31) (11A) SIDOTOPO (SDT) MJ30 30AT 3 J30 ZP30A 30BT ZP30B ZP30C (21C) (21D) (21E) (11C) 3 JL12A JL22A JL22B JL12B (13) (23A) (23B) (43B) (41) (61) 3 JL82A 3 JL62A 3 JL42A JL42B JL62B JL82B (43A) (63) (83) (103) L102 (105) (123) (142) (122) (141) (161) (181) (201) (143) 3 JL142A 3 JL162A 3 JL182A 3 JL202A 3 JL222A L124 JL142B SIDOTOPO (SDT) SEGITIGA MESIGIT (MESIGIT) J244 MJ244 J240 MJ240 240AT 240BT 244AT 244BT JPL 2/1 JPL 3 SURABAYA KOTA KM 0+299 (SB-BW) KM 9+799 (SB-SLO) KM 2+046 (SDT-SB) L20 L4 4A L4 4B Sinyal muka 2 aspek Sinyal masuk 3 aspek + Emergency + Fix speed indicator + Arah Meja pelayanan / PPKA Wesel terlayan pusat Sinyal Langsir Batas Langsir 3 Wheel Detector 3 Sinyal berangkat 2 aspek + Emergency + fix speed indicator + Sinyal Langsir 1 aspek + Arah Sinyal jalur akhir Sinyal masuk 2 aspek + Emergency + Variable speed indicator + Arah Sinyal berangkat 2 aspek + Emergency + Variable speed indicator + Sinyal Langsir 1 aspek + Arah Sinyal jalur akhir + Sinyal langsir 1 aspek ZP240A ZP240B ZP240C (241) ZP244A ZP244B ZP244C ZP222 ZP202 ZP182 ZP162 ZP142A ZP141 ZP122B ZP142B ZP102 ZP82B ZP62B ZP42B ZP22B ZP12B ZP23 ZP13 ZP44A ZP44B ZP106 ZP124 ZP82A ZP62A ZP42A ZP22A ZP12A ZP11B ZP21C ZP21A ZP21B ZP11A ZP31 ZP20B ZP122A L122 ZP144 JL14A ZP24A ZP14A L21 241T 222T 202T 182T 162T 143T 142T 14 1T 124T 122T 102T 82T 62T 42T 12T 22T 106T 44 T 43T 24T 14T 13T 23T 21 CT 21BT 11T 31T 20T 21AT (81) ZP61 81T 0+945 ZP30A 0+964 MJ30 1+464 J30 1+469 ZP30B 1+614 ZP30A 1+619 W.31 1+713 ZP10A 1+693 MJ10 1+224 J10 1+219 ZP10B 2+517 ZP244A 2+512 W.241 2+672 ZP244B 2+677 J244 2+927 ZP244C 2+877 MJ244 2+448 ZP240C 2+298 J240 2+303 ZP244B 1+798 MJ240 1+698 ZP240A 1+165 ZP20A 1+160 X20 1+003 ZP10C 0+899 L20 0+894 ZP20B 0+913 W.11A 0+896 W.11B 0+822 W.21B 0+759 ZP21A 0+784 W.21C 1+723 ZP21B 0+720 X21 0+827 W.21A 0+000 baduk = km 0.0 0+000 X14B, X24B 0+101 JL106A 0+169 L44B 0+220 L44A 0+308 ER 0+229 L24A 0+304 L14A 0+234 L124 0+368 JL22B 0+377 JL12B 0+308 JL42B 0+344 JL62B 0+375 JL82B 0+402 L102 0+299 J202B, J222B 0+300 J182B 0+310 J162B 0+505 L122 0+662 L21 0+661 X21 0+659 W.21D 0+574 JL142A 0+564 JL162A 0+555 JL12A, JL22A 0+549 JL42A 0+529 JL182A 0+514 JL82A 0+489 JL202A, JL222A PANJANG SEPUR EFEKTIF sp I : 178 m, Y1 : 211 m + 93 m = 304 m sp II : 187 m, Y2 : 136 m + 93 m = 229 m sp III : 241 m, Y3 : 101 m sp IV : 169 m sp V : 139 m sp VI : 181 m sp VII : 78 m sp VIII : 223 m sp IX : 254 m sp X : 229 m sp XI : 190 m sp XII : 190 m R144 JL24A JL106A 3 3 Batas Berhenti Pada Jalur akhir ZP105 105T

Layout Stasiun KA Surabaya Kota

Embed Size (px)

DESCRIPTION

buat tmen2 yg lgi ngrjain tgs

Citation preview

Page 1: Layout Stasiun KA Surabaya Kota

SURABAYAGUBENG(SGU)

MJ10 10AT

J10

ZP10A

10BT

ZP10B

ZP10C

(11B)

ZP20A(21A)

(21B)

(31)

(11A)

SIDOTOPO(SDT)

MJ30

30AT

3

J30

ZP30A 30BTZP30B

ZP30C

(21C) (21D)

(21E)

(11C)

3 JL12A

JL22A

JL22B

JL12B

(13)

(23A)

(23B)

(43B)

(41)

(61)

3 JL82A

3 JL62A

3 JL42A

JL42B

JL62B

JL82B

(43A)

(63)

(83)

(103)

L102(105)

(123)

(142)

(122)

(141)

(161)

(181)

(201)

(143)

3 JL142A

3 JL162A

3 JL182A

3 JL202A

3 JL222A

L124JL142B

SIDOTOPO(SDT)

SEGITIGAMESIGIT

(MESIGIT)

J244 MJ244

J240MJ240

240AT 240BT

244AT 244BT

JPL 2/1

JPL 3

SURABAYA KOTAKM 0+299 (SB-BW)

KM 9+799 (SB-SLO)

KM 2+046 (SDT-SB)

L20

L44A

L44B

Sinyal muka 2 aspek

Sinyal masuk 3 aspek + Emergency+ Fix speed indicator + Arah

Meja pelayanan / PPKA

Wesel terlayan pusat

Sinyal Langsir

Batas Langsir

3 Wheel Detector

3

Sinyal berangkat 2 aspek + Emergency+ fix speed indicator + Sinyal Langsir 1 aspek + Arah

Sinyal jalur akhir

Sinyal masuk 2 aspek + Emergency+ Variable speed indicator + Arah

Sinyal berangkat 2 aspek + Emergency+ Variable speed indicator + Sinyal Langsir 1 aspek + Arah

Sinyal jalur akhir + Sinyal langsir 1 aspek

ZP240A ZP240B ZP240C

(241) ZP244A ZP244B ZP244C

ZP222

ZP202

ZP182

ZP162

ZP142AZP141 ZP122B

ZP142B

ZP102

ZP82B

ZP62B

ZP42B

ZP22B

ZP12B

ZP23

ZP13

ZP44A

ZP44B

ZP106

ZP124

ZP82A

ZP62A

ZP42A

ZP22A

ZP12A

ZP11BZP21C

ZP21A

ZP21BZP11A

ZP31

ZP20B

ZP122A

L122

ZP144

JL14A

ZP24A

ZP14A

L21

241T

222T

202T

182T

162T

143T

142T

141T

124T

122T

102T

82T

62T

42T

12T

22T

106T

44T

43T

24T

14T13T

23T

21CT

21BT

11T

31T

20T

21AT

(81)

ZP61

81T

0+945ZP30A

0+964MJ30

1+464J30

1+469ZP30B

1+614ZP30A

1+619W.31

1+713ZP10A

1+693MJ10

1+224J10

1+219ZP10B

2+517ZP244A

2+512W.241

2+672ZP244B

2+677J244

2+927ZP244C

2+877MJ244

2+448ZP240C2+298

J240

2+303ZP244B

1+798MJ240

1+698ZP240A

1+165ZP20A

1+160X20

1+003ZP10C

0+899L20

0+894ZP20B

0+913W.11A

0+896W.11B

0+822W.21B

0+759ZP21A

0+784W.21C 1+723

ZP21B

0+720X21

0+827W.21A

0+000baduk = km 0.0

0+000X14B, X24B

0+101

JL106A

0+169L44B

0+220L44A

0+308ER

0+229L24A

0+304L14A

0+234L124

0+368JL22B

0+377JL12B

0+308JL42B

0+344JL62B

0+375JL82B

0+402L102

0+299J202B, J222B

0+300J182B

0+310J162B

0+505L122

0+662L21

0+661X21

0+659W.21D

0+574JL142A

0+564JL162A

0+555JL12A, JL22A

0+549JL42A

0+529JL182A

0+514JL82A

0+489JL202A, JL222A

PANJANG SEPUR EFEKTIF

sp I : 178 m, Y1 : 211 m + 93 m = 304 m

sp II : 187 m, Y2 : 136 m + 93 m = 229 m

sp III : 241 m, Y3 : 101 m

sp IV : 169 m

sp V : 139 m

sp VI : 181 m

sp VII : 78 m

sp VIII : 223 m

sp IX : 254 m

sp X : 229 m

sp XI : 190 m

sp XII : 190 mR144

JL24A

JL106A

3

3

Batas Berhenti Pada Jalur akhir

ZP105

105T

Page 2: Layout Stasiun KA Surabaya Kota

Tanggal

Hari

Mulai Jam

Selesai Jam

22 23 24 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21

I PEKERJAAN SAAT SWITCH OVER

a. Memasang roding dan menyetel motor wesel : Wesel

11A,31,11B,21A,21B,21C Hari H Tim Wesel

b. Memasang roding dan menyetel motor wesel : Wesel

11C,21E,21D,41,61,81Hari H Tim Wesel

c. Memasang roding dan menyetel motor wesel : Wesel

23B,43B,43A,,63,83,103Hari H Tim Wesel

d. Memasang roding dan menyetel motor wesel : Wesel

123 ,105,143Tim Wesel

e. Pengaktifan blok Sb - Sgu dan Sb - Sdt Hari H Tim Blok

f. Mendinaskan Perangkat Sinyal Elektrik (Parsial) untuk

jalur I, II, III,IV,V,Y1, Y2, Y3 dan Y4Hari H

Operasi KA dari dan ke Stsn Gubeng ( Sgu ),ke Stsn

Sidotopo ( Sdt ) dan Langsiran melalui jalur I - V

dan Y1 - Y4 bisa dilayani dengan sinyal elektrik

g. Memasang roding dan menyetel motor wesel : Wesel

141,161,181,201,122,142Hari H Tim Wesel

i. Menyetel dan mengaktifkan motor wesel : Wesel

241,13 dan 23AHari H Tim Wesel

h. Mendinaskan Perangkat Sinyal Elektrik (Parsial) untuk

jalur VI, VII,VIII,IX,X,XI,XIIHari H

Langsiran dari dan ke jalur 6,7, VIII - XII bisa

dilayani dengan sinyal elektrik

j. Meluardinaskan alat penggerak wesel Mekanik (existing)

secara ParsialHari H Tim PT LRS

TAHAPAN PEKERJAAN SWITCH OVER

SINYAL ELEKTRIK SIL 02 STASIUN SURABAYA KOTA ( SB )

DAOP VIII SURABAYA JAWA TIMUR

: 23 Oktober 2013

: Rabu

: 22.00 WIB

: 21.59 WIB (24 Oktober 2013)

NO NAMA PEKERJAAN Waktu KETERANGANJam (WIB)

Waktu Pelaksanaan dan Pelayanan Operasi KAWindow

Time Window Time

Page 3: Layout Stasiun KA Surabaya Kota

Koord. Ferinsyah ZH

1. Rudi Suherdiana

2. Hermanto ST

3. Arstyan ST

4. Riska

5. Satriyo

6. Ariza

7. Dendi Reza

8. Sony S / Eka F

AXLE COUNTER

1. Ritanto 1. Rahmat I S

2. Ade Sumpena 2. R Dwinanto

3 3.Dwi Apri

4. Warsidi

TIM EXT

MJ 10 J10 MJ244 J244

L20

I II I II I II JL12B JL22B

PM 11A PM 21B PM 11C PM 63 PM 23B PM 141 MJ30 J30 JL42B JL62B

PM 122 JL82B L102

L122

I II I II I II

PM 31 PM 21C PM 21B PM 83 PM 43B PM 161

PM 142 MJ240 J240 JL14A JL24A

JL106A JL142B

L44A L44B

I II I II I II L124

PM 11B PM 41 PM 21C PM 103 PM 105 PM 123

PM241 JL12A JL22A

JL42A JL62A

JL82A L21

I II I II JL142A JL162A

PM 21A PM 61 43A PM 201 JL182A JL202A

PM 81 PL143 JL222A

1. Erick A

2

TIM 4

2 Orang 2

TIM 4 TIM 11 TIM 1

3 Orang 3 Orang Emplasement Indoplaza

3 Orang 3 Orang 3 Orang Emplasement Timur

1. Gesang

2 Orang

2 Orang

1. Entang

2

TIM 3 TIM 7 TIM 10 TIM 1

TIM 7

3 Orang 3 Orang 3 Orang TIM 3 Emplasement Barat

1. Sutisna Hamdani

2

TIM 2 TIM 6 TIM 9 TIM 1

3 Orang 3 Orang 3 Orang 2 Orang 2 Orang Arah Sdt (atas) + SBI

TIM 1 TIM 5 TIM 8 TIM 2 TIM 6 TIM 2

Koordinator 1 Koordinator 2 Koordinator 3 1. Ade Witoyo

Roling D (Baba) Andri Dudin Minimal 8

(4 tim)

Orang

untuk

pasang

crossing

sinyal

mekanik

arah Sgu,

Sdt, Sdt

atas dan

arah SB

2

TIM 1 TIM 5

2 Orang 2 OrangKoord.

Yanto

TIM 1

Arah Sgu + Sdt

3. Aditya 3. Diki 3. Sendi

4

1. Nur Syaifudin 1. Toto S 1. Bambang Nur Enam Putra Bakti 1. Edi Supriadi

2. Fauzan 2. Angga RR 2. Sandra 2. Bani Ihsan

TIM LCP (IM) TIM Interlocking (IM) TIM Telkom (IM) TIM POWER (IM) TIM PM/WESSEL TIM SINYAL (IM)

4. Ega

Didampingin Tim Sintel DAOP 8

2. Yohanes Budi 2. Rana MR 2. Blok Gubeng (Adang)

3. Anom

Tim Blok Mekanik

LCP TIM Software (IM) ER

1. Bernard ST 1. Rijal F 1. MOBIS Sdt (Diki + Farouq)

Sariman Prawira Jawa Timur

STASIUN SBY.SBI

LEADER PT LRS

Dede Ahmad B

Adang Setiawan

PPKA KONSULTANPROJECT MANAGER

SATKER

Daop VIII Sbya PT. NUSA CONSULTANTS Surabaya

PT.Len Railway Systems

SUSUNAN ORGANISASI PEKERJAAN SWITCH OVER

SINYAL ELEKTRIK SIL 02 STASIUN SURABAYA KOTA ( SB )

DAOP VIII SURABAYA JAWA TIMUR

SUPREME

COMMANDER

PM 81 PL143 JL222A

R144