1
ngle A 9(T) 449m Mast 449m 448m 450m Dalnaspidal Station eepers Cottage Glen Garry Track All Garryview d 442m s Military Road The Old Schoolhouse (disused) Lay-by TIE-IN EXISTING ROCK CUT OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE-OH OP-400k EXISTING ALLT COIRE MHIC-SITH UNDERBRIDGE EXISTING TELECOMMUNICATION MAST NEW SUDS BASIN NEW SUDS BASIN NEW SUDS BASIN NEW FOOTPATH LINK TO NCN7 NEW ALLT COIRE MHIC-SITH SIDE ROAD BRIDGE DATUM=432.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L NB SCALE 1:2500H/1:500V DATUM=432.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L NB SCALE 1:2500H/1:500V DATUM=432.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L NB SCALE 1:2500H/1:500V EXISTING ALLT COIRE MHIC-SITH UNDERBRIDGE NEW DALNASPIDAL JUNCTION UNDERBRIDGE 447m 43 Lay-by TIE-IN TO EXISTING NCN7 V-ELE-OH OP-400kV-ELE-OH OP-400kV-ELE- NEW SHARED NCN7 AND MAINTENANCE ACCESS NEW SUDS BASIN DATUM=438.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L SB SCALE 1:2500H/1:500V DATUM=438.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L SB SCALE 1:2500H/1:500V DATUM=438.000m. PROPOSED LEVEL ORIGINAL GL HORIZONTAL ALIGN. VERTICAL ALIGN. CHAINAGE LONG SECTION P07 ML L SB SCALE 1:2500H/1:500V PROJECT 07 GLEN GARRY TO DALWHINNIE DMRB STAGE 3 PLAN AND PROFILE R VILLALAIN 16/11/16 B.TIGHE B OKUNFOLAMI A9P07-CFJ-HML-L_ML000_ML-DR-RD-0001 1:2500 at A1 (1:5000 at A3) 1 7 P03 S4 R GRAY A9P07-CFJ-HML-L_ML000_ML-DR-RD-0001.dwg 495298 D B A C 2 3 4 5 1 of PROJ: DATE: SHEET: DWG: GENERAL NOTES SUIT DESCRIPTION APP BY REV REVISION: Reproduced by permission of Ordnance Survey on behalf of Her 0DMHVW\V 6WDWLRQHU\ 2IILFH &URZQ FRS\ULJKW DQG GDWDEDVH ULJKW All rights reserved. Ordnance Survey Licence Number: 100046668. SUITABILITY: DATE DESIGN: DRAWN: CHK: APP: Reproduced by permission of Ordnance Survey on behalf of Her 0DMHVW\V 6WDWLRQHU\ 2IILFH &URZQ FRS\ULJKW DQG GDWDEDVH ULJKW All rights reserved. Ordnance Survey Licence Number: 100046668. CLMHDHAIL ALBA 1. ALL DIMENSIONS IN METRES UNLESS STATED OTHERWISE. CH2M HILL Fairhurst JV C/O: City Park 368 Alexandra Parade Glasgow G31 3AU Tel +44 (0)141 552 2000 Fax +44 (0)141 552 2525 CULVERTS / WATERCOURSE STRUCTURE LEGEND: RIVER / STREAM / LOCH CFJV FLOOD MAPPING (1:200 YEAR) EXISTING ROAD / FOOTPATH / CYCLE ROUTE BUILDINGS RAILWAY UTILITIES OP-400Kv-ELE-OH BEAULY TO DENNY POWER LINE, PYLONS AND EXCLUSION ZONE KEY ENVIRONMENTAL CONSTRAINTS SSSI (SNH) SAC (SNH) SPA (SNH) ROAD ROAD EARTHWORKS CUTTING EARTHWORKS EMBANKMENT CARRIAGEWAY SLOPE BETWEEN CARRIAGEWAYS CENTRAL RESERVE / VERGE FOOTPATH 2. THE MAINLINE ALIGNMENTS INCORPORATE VARIED EARTHWORKS SLOPES. WHERE POSSIBLE EARTHWORKS SLOPES HAVE BEEN ADJUSTED TO ACCOMMODATE LANDSCAPING CONSIDERATIONS. IN ADDITION, EARTHWORKS SLOPES HAVE BEEN STEEPENED WHERE NECESSARY TO MINIMISE IMPACTS ON ADJACENT CONSTRAINTS SUCH AS THE AQUEDUCT, RAILWAY AND WHERE ROCK CUTS ARE ANTICIPATED. INSERT A

Lay-by Allt Coire Mhic-sith€¦ · side road bridge datum=432.000m. proposed level original gl horizontal align. vertical align. chainage long section p07 ml l nb scale 1:2500h/1:500v

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lay-by Allt Coire Mhic-sith€¦ · side road bridge datum=432.000m. proposed level original gl horizontal align. vertical align. chainage long section p07 ml l nb scale 1:2500h/1:500v

S

h

i

n

g

l

e

A 9

(T

)

4

4

9

m

M

a

s

t

449m

4

4

8

m

4

5

0

m

D

aln

aspid

al S

tation

K

e

e

p

e

r

s

C

o

t

t

a

g

e

G

l

e

n

G

a

r

r

y

T

r

a

c

k

A

llt

C

o

ir

e

M

h

ic

-

s

it

h

G

a

r

r

y

v

i

e

w

P

o

n

d

4

4

2

m

G

e

n

e

r

a

l

W

a

d

e

'

s

M

i

l

i

t

a

r

y

R

o

a

d

T

h

e

O

l

d

S

c

h

o

o

l

h

o

u

s

e

(dis

used)

L

a

y-b

y

Lay-by

TIE-IN

EXISTING

ROCK CUT

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

O

P

-

4

0

0

k

V

-

E

L

E

-

O

H

OP-400kV-ELE-OHOP-400kV-ELE-OH

OP-400kV-ELE-OHOP-400kV-ELE-OH

OP-400kV-ELE-OHOP-400kV-ELE-OH

O

P

-4

0

0

k

V

-E

L

E

-O

H

O

P

-4

0

0

k

V

-E

L

E

-O

H

EXISTING ALLT COIRE

MHIC-SITH UNDERBRIDGE

EXISTING

TELECOMMUNICATION

MAST

NEW SUDS

BASIN

NEW SUDS

BASIN

NEW SUDS

BASIN

NEW FOOTPATH

LINK TO NCN7

NEW ALLT COIRE MHIC-SITH

SIDE ROAD BRIDGE

DATUM=432.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L NB SCALE 1:2500H/1:500V

DATUM=432.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L NB SCALE 1:2500H/1:500V

DATUM=432.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L NB SCALE 1:2500H/1:500V

EXISTING ALLT COIRE

MHIC-SITH UNDERBRIDGE

NEW DALNASPIDAL JUNCTION

UNDERBRIDGE

4

4

7

m

4

3

7

m

L

a

y-b

y

TIE-IN TO

EXISTING

NCN7

O

P

-4

0

0

k

V

-E

L

E

-O

H

O

P

-4

0

0

k

V

-E

L

E

-O

H

O

P

-4

0

0

k

V

-E

L

E

-O

H

NEW SHARED

NCN7 AND

MAINTENANCE

ACCESS

NEW SUDS

BASIN

DATUM=438.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L SB SCALE 1:2500H/1:500V

DATUM=438.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L SB SCALE 1:2500H/1:500V

DATUM=438.000m.

PROPOSED LEVEL

ORIGINAL GL

HORIZONTAL ALIGN.

VERTICAL ALIGN.

CHAINAGE

LONG SECTION

P07 ML L SB SCALE 1:2500H/1:500V

PROJECT 07

GLEN GARRY TO DALWHINNIE

DMRB STAGE 3

PLAN AND PROFILE

R VILLALAIN

16/11/16

B.TIGHE B OKUNFOLAMI

A9P07-CFJ-HML-L_ML000_ML-DR-RD-0001

1:2500 at A1 (1:5000 at A3)

1 7 P03 S4

R GRAY

A9P

07-C

FJ-H

ML-L_M

L000_M

L-D

R-R

D-0001.dw

g

495298

D

B

A

C

2 3 4 51

of

PROJ:

DATE:

SHEET:

DWG:

GENERAL NOTES

SUIT DESCRIPTION APPBYREV

REVISION:

Reproduced by permission of Ordnance Survey on behalf of Her

Majesty's Stationery Office, © Crown copyright and database right 2016.

All rights reserved. Ordnance Survey Licence Number: 100046668.

SUITABILITY:

DATE

DESIGN: DRAWN: CHK: APP:

Reproduced by permission of Ordnance Survey on behalf of Her

Majesty's Stationery Office, © Crown copyright and database right 2016.

All rights reserved. Ordnance Survey Licence Number: 100046668.

CÒMHDHAIL ALBA

1. ALL DIMENSIONS IN METRES UNLESS STATED OTHERWISE.

CH2M HILL Fairhurst JV

C/O: City Park 368 Alexandra Parade Glasgow G31 3AU

Tel +44 (0)141 552 2000 Fax +44 (0)141 552 2525

CULVERTS / WATERCOURSE STRUCTURE

LEGEND:

RIVER / STREAM / LOCH

CFJV FLOOD MAPPING (1:200 YEAR)

EXISTING ROAD / FOOTPATH / CYCLE ROUTE

BUILDINGS

RAILWAY

UTILITIES

OP-400Kv-ELE-OH

BEAULY TO DENNY POWER LINE,

PYLONS AND EXCLUSION ZONE

KEY ENVIRONMENTAL CONSTRAINTS

SSSI (SNH)

SAC (SNH)

SPA (SNH)

ROAD

ROAD

EARTHWORKS CUTTING

EARTHWORKS EMBANKMENT

CARRIAGEWAY

SLOPE BETWEEN CARRIAGEWAYS

CENTRAL RESERVE / VERGE

FOOTPATH

2. THE MAINLINE ALIGNMENTS INCORPORATE VARIED

EARTHWORKS SLOPES. WHERE POSSIBLE

EARTHWORKS SLOPES HAVE BEEN ADJUSTED TO

ACCOMMODATE LANDSCAPING CONSIDERATIONS. IN

ADDITION, EARTHWORKS SLOPES HAVE BEEN

STEEPENED WHERE NECESSARY TO MINIMISE IMPACTS

ON ADJACENT CONSTRAINTS SUCH AS THE AQUEDUCT,

RAILWAY AND WHERE ROCK CUTS ARE ANTICIPATED.

INSERT A