F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Contract Number: F04684-98-C-0014 CDRL Item Number: A006 Date Submitted: October 9, 2003 Revision 0 Copy Number 1 of 2 Government Services Division

LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

  • Upload
    dolien

  • View
    223

  • Download
    3

Embed Size (px)

Citation preview

Page 1: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 2: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

Table of Contents

Page Number Section Pp. 1 Title Page Pp. 2 Table of Contents Pp. 3 - 10 Appendix A – Facilities Inspection Schedule Pp. 11 - 16 Appendix B – Cranes and Hoists Inspection Schedule Pp. 17 - 19 Appendix C – Elevator Inspection Schedule Pp. 20 - 21 Appendix D – Pressure Vessel Inspection Schedule Pp. 22 - 23 Appendix E – Towers Inspection Schedule

-2-

Page 3: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE Appendix A- Facilities

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 4: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish186 21109 WEATHER INSTR SHELTER Mon 10/27/03 Mon 10/27/03

187 21151 AUTO SWITCHING CENTER Mon 10/27/03 Mon 10/27/03

173 1765 SC LAB MET Tue 10/28/03 Tue 10/28/03

174 1826 WINDS SITE 050 HUT, MISSILE INSTM STATION Tue 10/28/03 Tue 10/28/03

175 1861 AUTO SWITCHING CENTER Tue 10/28/03 Tue 10/28/03

176 1928 WINDS HUT, MSL INSTM STATION Tue 10/28/03 Tue 10/28/03

177 1945 WINDS HUT 018, MSL INSTM STATION Tue 10/28/03 Tue 10/28/03

178 7004 ELEC PWR GEN PLT Tue 10/28/03 Tue 10/28/03

179 7017 UTILITY VAULT Tue 10/28/03 Tue 10/28/03

180 7014 WASTE DISPOSAL FACILITY Tue 10/28/03 Tue 10/28/03

188 1SY SANTA YNEZ PEAK MSL INSTRM STATION Wed 11/5/03 Wed 11/5/03

189 12SY SANTA YNEZ PEAK MICROWAVE BLDG Wed 11/5/03 Wed 11/5/03

190 7SY SANTA YNEZ PEAK GENERATOR BUILDING Wed 11/5/03 Wed 11/5/03

191 7SY(2) SANTA YNEZ PEAK GENERATOR SHED Wed 11/5/03 Wed 11/5/03

132 1322 WHEELER ARMY BASE NETWORK CONTROL C Mon 11/17/03 Mon 11/17/03

133 1324 WHEELER ARMY BASE ELECTRICAL POWER ST Mon 11/17/03 Mon 11/17/03

134 172EB EWA BEACH LAND SITE Mon 11/17/03 Mon 11/17/03

135 241EB EWA BEACH VEHICLE STORAGE FACILITY Mon 11/17/03 Mon 11/17/03

136 272EB EWA BEACH BUILDING FACILITY CONCRETE Mon 11/17/03 Mon 11/17/03

137 371EB EWA BEACH SYSTEM ELECTRICAL POWER Mon 11/17/03 Mon 11/17/03

138 20KP KAENA POINT WAREHOUSE Mon 11/17/03 Mon 11/17/03

139 41KP KAENA POINT SATELLITE STATION Mon 11/17/03 Mon 11/17/03

140 42KP KAENA POINT HAZARDOUS SHED & STORAGE Mon 11/17/03 Mon 11/17/03

141 43KP KAENA POINT CMPRS AIR PLT BLDG Mon 11/17/03 Mon 11/17/03

142 1MS MOLOKAI COMM RECEIVER Mon 11/17/03 Mon 11/17/03

143 2MS MOLOKAI ELEC POWER STATION Mon 11/17/03 Mon 11/17/03

144 3MS MOLOKAI VEHICLE OPS SHED Mon 11/17/03 Mon 11/17/03

181 8402 TRAFFIC CHK HOUSE Mon 11/17/03 Mon 11/17/03

182 8403 TRAFFIC CHK HOUSE Mon 11/17/03 Mon 11/17/03

183 8404 RSCH EQUIP STORAGE Mon 11/17/03 Mon 11/17/03

184 8406 RSCH EQUIP STORAGE Mon 11/17/03 Mon 11/17/03

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 1

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 5: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish185 8409 SHREDDER BLDG Mon 11/17/03 Mon 11/17/03

145 1PP PILLAR POINT WAREHOUSE Mon 11/24/03 Mon 11/24/03

146 2PP PILLAR POINT MACHINE SHOP Mon 11/24/03 Mon 11/24/03

147 3PP PILLAR POINT FACILITY SUPPORT OFFICE Mon 11/24/03 Mon 11/24/03

148 6PP PILLAR POINT SUPPORT SHED Mon 11/24/03 Mon 11/24/03

149 8PP PILLAR POINT ELECT POWER STATION BLDG Mon 11/24/03 Mon 11/24/03

150 9PP PILLAR POINT LUNCHROOM Tue 11/25/03 Tue 11/25/03

151 10PP PILLAR POINT SATEL CON STATION Tue 11/25/03 Tue 11/25/03

152 12PP PILLAR POINT ELEC PWR STATION BLDG Tue 11/25/03 Tue 11/25/03

153 13PP PILLAR POINT MSL/SPACE RSCH TST Tue 11/25/03 Tue 11/25/03

154 16PP PILLAR POINT WATER PUMP STATION Tue 11/25/03 Tue 11/25/03

155 17PP PILLAR POINT RDR TWR BLDG Wed 11/26/03 Wed 11/26/03

156 34PP PILLAR POINT WAREHOUSE Wed 11/26/03 Wed 11/26/03

157 105PP PILLAR POINT ENTRY CONTROL FACILITY Wed 11/26/03 Wed 11/26/03

158 110PP PILLAR POINT WAREHOUSE Wed 11/26/03 Wed 11/26/03

159 111PP PILLAR POINT HAZARDOUS WASTE SHED Wed 11/26/03 Wed 11/26/03

160 112PP PILLAR POINT HAZARDOUS WASTE SHED Thu 11/27/03 Thu 11/27/03

161 120PP PILLAR POINT SUPPORT BUILDING Thu 11/27/03 Thu 11/27/03

162 221PP PILLAR POINT ELEC SUBSTATION Thu 11/27/03 Thu 11/27/03

163 25PP PILLAR POINT WATER PUMP STATION Thu 11/27/03 Thu 11/27/03

164 86PP PILLAR POINT VEHICLE PACKING STATION Thu 11/27/03 Thu 11/27/03

192 1AP ANDERSON PEAK INSTRUMENT BLDG Thu 11/27/03 Thu 11/27/03

193 23AP ANDERSON PEAK BUNKHOUSE Thu 11/27/03 Thu 11/27/03

194 24AP ANDERSON PEAK VEHICLE OPS BLDG Thu 11/27/03 Thu 11/27/03

195 7AP ANDERSON PEAK GENERATOR BLDG Thu 11/27/03 Thu 11/27/03

165 708 TROOP SHELTER Fri 12/5/03 Fri 12/5/03

166 718 BUNKER Fri 12/5/03 Fri 12/5/03

167 744 HAZARDOUS STORAGE Fri 12/5/03 Fri 12/5/03

168 745 AUTO SWITCHING CENTER Fri 12/5/03 Fri 12/5/03

169 782 AUTO SWITCHING CENTER Fri 12/5/03 Fri 12/5/03

170 930 ELEC SWITCHING STATION UPS BLDG CT-2 Fri 12/5/03 Fri 12/5/03

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 2

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 6: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish171 934 MSL/SPACE RESEARCH ENG Fri 12/5/03 Fri 12/5/03

1 890 TPQ-18 BORESITE TOWER (SOUTH Vandenberg Tue 1/6/04 Tue 1/6/04

2 398 SOLID ROCKET MOTOR PROCESSING FACILITY Tue 1/6/04 Tue 1/6/04

3 376 WEATHER HUT, SITE 301 Tue 1/6/04 Tue 1/6/04

4 330 MISSILE SPACE RESEARCH TEST Tue 1/6/04 Tue 1/6/04

5 331 HAZARDOUS STORAGE FACILITY Tue 1/6/04 Tue 1/6/04

6 332 STORAGE TANK FOR 398 Tue 1/6/04 Tue 1/6/04

7 333 FENCE FOR 330 Tue 1/6/04 Tue 1/6/04

8 906 TPQ -18 POWER PLANT/UPS BUILDINGS Thu 1/8/04 Thu 1/8/04

9 907 TPQ-18 METRIC RADAR SUPPORT BUILDING Thu 1/8/04 Thu 1/8/04

10 900 UPPER AIR OBSERVATORY WEATHER STATION Thu 1/8/04 Thu 1/8/04

11 2525 WEATHER HUT, SITE 51 Fri 1/16/04 Fri 1/16/04

12 63 TELEMETRY RECEIVING SITE (TRS) UPS BUILD Mon 1/19/04 Mon 1/19/04

13 64 OAK MOUNTAIN POWER PLANT Mon 1/19/04 Mon 1/19/04

14 313 WEATHER HUT, SITE 33 Tue 1/20/04 Tue 1/20/04

15 10709 WEATHER HUT, SITE 7 Tue 1/20/04 Tue 1/20/04

16 935 COMMAND TRANSMITTER (CT-2) BUILDING Tue 1/20/04 Tue 1/20/04

17 908 PUMP HOUSE Tue 1/20/04 Tue 1/20/04

18 929 COMMAND TRANSMITTER (CT-2) GENERATOR Tue 1/20/04 Tue 1/20/04

19 185 TRANQ PEAK DIESEL GENERATOR SUBSTATIO Tue 2/3/04 Tue 2/3/04

20 1633 WEATHER HUT, SITE 102 Tue 2/3/04 Tue 2/3/04

21 1639 HAIR AND ANTENNA (NORTH VANDENBERG) Tue 2/3/04 Tue 2/3/04

22 1638A HAIR GENERATOR BUILDING Tue 2/3/04 Tue 2/3/04

23 1759 WEATHER HUT, SITE 5, MSS#1 Tue 2/10/04 Tue 2/10/04

24 75 WEATHER HUT, SITE 65, TRS Tue 2/10/04 Tue 2/10/04

25 181 LA-24 OPTICAL Tue 2/10/04 Tue 2/10/04

26 1891 WEATHER HUT, SITE 59 Tue 2/10/04 Tue 2/10/04

27 1189 WEATHER HUT, SITE 4, AGENA TANK FARM Tue 2/10/04 Tue 2/10/04

28 1638 HIGH ACCURACY INSTRUMENTATION RADAR ( Tue 2/10/04 Tue 2/10/04

29 21101 TPQ-39 RADAR ADMINISTRTION BUILDING Fri 2/13/04 Fri 2/13/04

30 1860 SEGMENT TRANSFER/RAIL GARRISON LAUNCH Fri 2/13/04 Fri 2/13/04

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 3

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 7: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish31 1983 WEATHER HUT, SITE 60,LF-08 Mon 2/16/04 Mon 2/16/04

32 1862 SEGMENT TRANFER/ RGLS Mon 2/16/04 Mon 2/16/04

33 1863 SEGMENT TRANFER/ RGLS Tue 2/17/04 Tue 2/17/04

34 188 FPS-16 BORESIGHT TOWER Tue 2/17/04 Tue 2/17/04

35 1980 LAUNCH FACILITY (LF) -6 Tue 2/17/04 Tue 2/17/04

36 1968 WEATHER HUT, SITE 17, LF-06 Thu 2/19/04 Thu 2/19/04

37 1764 UPPER AIR OBSERVATORY WEATHER STATION Thu 2/19/04 Thu 2/19/04

38 763 LAUNCH OPERATIONS BUILDING (LOB) Thu 2/19/04 Thu 2/19/04

39 760 TECHNICAL SUPPORT BUILDING ANNEX Thu 2/19/04 Thu 2/19/04

40 761 TECHNICAL SUPPORT BUILDING Thu 2/19/04 Thu 2/19/04

41 762 TECHNICAL SUPPORT BUILDING Thu 2/19/04 Thu 2/19/04

42 1972 LAUNCH FACILITY (LF) -3 Thu 2/19/04 Thu 2/19/04

43 1937 HF RECEIVER BUILDING Thu 2/26/04 Thu 2/26/04

44 1894 RGLS/SRMU IGLOO Mon 3/1/04 Mon 3/1/04

45 475 SVAFB OPERATIONAL COMMUNICATION CENT Wed 3/3/04 Wed 3/3/04

46 23252 WEATHER HUT, SITE 8 Wed 3/24/04 Wed 3/24/04

47 520 SOLID ROCKET BOOSTER PROCESSING AND S Mon 3/29/04 Mon 3/29/04

48 754 THEODOLITE STATION, (DEMO'D?) Mon 3/29/04 Mon 3/29/04

49 756 WEATHER HUT, SITE 54 Mon 3/29/04 Mon 3/29/04

50 525 SOUTH VANDENBERG POWER PLANT Mon 3/29/04 Mon 3/29/04

51 7011 VANDENBERG NETWORK CONTROL CENTER Mon 3/29/04 Mon 3/29/04

52 7050 DATA TRANSFER DIVISION BUILDING Mon 3/29/04 Mon 3/29/04

53 7005 INET MOTOR GENERATOR BUILDING Mon 3/29/04 Mon 3/29/04

54 7000 TEST OPERATION CONTROL CENTER (TOCC) Mon 3/29/04 Mon 3/29/04

55 751 LAUNCH SERVICE BUILDING Mon 3/29/04 Mon 3/29/04

56 739 THEODOLITE BUILDING Thu 4/1/04 Thu 4/1/04

57 476 EXTERIOR LIGHTING AREA Wed 4/7/04 Wed 4/7/04

58 501 ARSR POWER PLANT/UPS BUILDING Wed 4/7/04 Wed 4/7/04

59 500 AIR ROUTE SURVEILLANCE RADAR (ARSR) & A Wed 4/7/04 Wed 4/7/04

60 6832 WEATHER HUT, SITE 58 Wed 4/7/04 Wed 4/7/04

61 511 CT-3 POWER PLANT/SWITCHGEAR/SUBSTATIO Mon 4/12/04 Mon 4/12/04

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 4

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 8: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish62 510 COMMAND TRANSMITTER (CT-3) BUILDING Mon 4/12/04 Mon 4/12/04

64 1280 HIGH FREQUENCY (HF) BUILDING Mon 4/12/04 Mon 4/12/04

63 68 OAK MOUNTAIN GUARD SHACK Wed 4/14/04 Wed 4/14/04

65 70 OAK MOUNTAIN SUPPLY/STORAGE BUILDING Wed 4/14/04 Wed 4/14/04

66 67 OAK MOUNTAIN WATER PUMP STATION Wed 4/14/04 Wed 4/14/04

67 66 OAK MOUNTAIN WATER TOWER Wed 4/14/04 Wed 4/14/04

68 21203 CT-1 POWER PLANT/UPS BUILDING Fri 4/16/04 Fri 4/16/04

69 522 SOLID ROCKET BOOSTER PROCESSING AND S Mon 4/19/04 Mon 4/19/04

70 509 WEATHER HUT, SITE 55 Mon 4/19/04 Mon 4/19/04

71 179 WEATHER HUT, SITE 56 Fri 4/23/04 Fri 4/23/04

72 21200 COMMAND TRANSMITTER (CT-1) BUILDING Fri 4/23/04 Fri 4/23/04

73 21150 BASE WEATHER STATION Fri 4/23/04 Fri 4/23/04

74 21149 WEATHER HUT, SITE 15 Fri 4/23/04 Fri 4/23/04

76 175 AN/MPS-39 MOTR RADAR FPS-16-2 Fri 4/23/04 Fri 4/23/04

75 178 FPS-16 RADAR BUILDING Wed 4/28/04 Wed 4/28/04

77 7007 UNINTERRUOTIBLE POWER SUPPLY BUILDING Mon 5/3/04 Mon 5/3/04

78 8337 PAYLOAD FAIRING PROCESSING FACILITY Mon 5/24/04 Mon 5/24/04

79 843 WEATHER HUT, SITE 66 Mon 5/24/04 Mon 5/24/04

80 757 PYRO BUNKER Mon 5/24/04 Mon 5/24/04

81 759 ENTRY CONTROL FACILITY (ECF) Mon 5/24/04 Mon 5/24/04

82 8401 VEHICLE ASSEMBLY BUILDING Mon 5/24/04 Mon 5/24/04

83 88 WEATHER HUT, TRS Wed 6/2/04 Wed 6/2/04

84 8510 REMOTE LAUNCH CONTROL CENTER Wed 6/2/04 Wed 6/2/04

85 645 WEATHER HUT, UHF ROAD SITE 061 Wed 6/2/04 Wed 6/2/04

86 790 STORAGE WAREHOUSE Mon 6/14/04 Mon 6/14/04

87 789 FITNESS CENTER Mon 6/14/04 Mon 6/14/04

88 780 PUMPHOUSE Mon 6/14/04 Mon 6/14/04

89 778 UTILITY BUILDING Mon 6/14/04 Mon 6/14/04

90 781 WATER TANK Fri 6/18/04 Fri 6/18/04

91 777 POWER SUBSTATION Mon 6/21/04 Mon 6/21/04

92 81 10 METER ANTENNA (OAK MOUNTAIN) Mon 6/21/04 Mon 6/21/04

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 5

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 9: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish93 86 30 FOOT ANTENNA, (GKR-7) (OAK MOUNTAIN) Mon 6/21/04 Mon 6/21/04

94 776 EQUIPMENT STORAGE Mon 6/21/04 Mon 6/21/04

95 768 ENTRY CONTROL POINT Fri 7/2/04 Fri 7/2/04

96 765 TECHNICAL SUPPORT BUILDING Fri 7/2/04 Fri 7/2/04

97 766 PAYLOAD SUPPORT BUILDING Fri 7/2/04 Fri 7/2/04

172 945 RSCH EQUIP STORAGE Thu 7/15/04 Thu 7/15/04

98 764 TECHNICAL SUPPORT BUILDING Fri 7/16/04 Fri 7/16/04

99 722 OXIDIZER HOLDING AREA Mon 8/9/04 Mon 8/9/04

100 736 OXIDIZER HOLDING AREA Mon 8/9/04 Mon 8/9/04

101 720 LIVE END ITEM STORAGE Mon 8/9/04 Mon 8/9/04

102 726 OXIDIZER SCRUB PAD Mon 8/9/04 Mon 8/9/04

103 737 PAD SUPPORT BUILDING Mon 8/9/04 Mon 8/9/04

104 740 WEATHER HUT, SITE 300 Tue 8/10/04 Tue 8/10/04

105 723 FITNESS CENTER (INCLUDES T 723, MODULAR Tue 8/10/04 Tue 8/10/04

106 725 TECHNICAL SUPPORT BUILDING Tue 8/10/04 Tue 8/10/04

107 728 SECURITY FENCE Tue 8/10/04 Tue 8/10/04

108 729 SECURITY SYSTEM UPS BUILDING Wed 8/11/04 Wed 8/11/04

109 730 LAUNCH OPERATIONS BUILDING (INCLUDES FA Wed 8/11/04 Wed 8/11/04

110 731 ADMISTRATIVE OFFICE Wed 8/11/04 Wed 8/11/04

111 746 PAD ENTRY CONTROL POINT Wed 8/11/04 Wed 8/11/04

112 724 SLC-4 EXTERIOR SECURITY LIGHTING SYSTEM Mon 8/16/04 Mon 8/16/04

113 783 NAPA ROAD COMMUNICATIONS SHACK Mon 8/16/04 Mon 8/16/04

114 465 WEATHER HUT, MOTR BORE SITE 064 Wed 9/1/04 Wed 9/1/04

115 444 WEATHER HUT, SITE 14 Wed 9/1/04 Wed 9/1/04

116 425 FMS POWER PALNT AND UPS BUILDING (USED Wed 9/1/04 Wed 9/1/04

117 441 FREQUENCY MONITORING STATION (FMS) Wed 9/1/04 Wed 9/1/04

118 738 LAUNCH SERVICES BUILDING (INCLUDES MOB Wed 9/1/04 Wed 9/1/04

119 716 FUEL HOLDING AREA Wed 9/8/04 Wed 9/8/04

120 719 CLEAN ENCLOSURE AC BUILDING Wed 9/8/04 Wed 9/8/04

121 727 ELECTRICAL SWITCH HOUSE Wed 9/8/04 Wed 9/8/04

122 733 FUEL HOLDING AREA Wed 9/8/04 Wed 9/8/04

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 6

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 10: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Task Name Start Finish123 734 PAYLOAD AC BUILDING Wed 9/8/04 Wed 9/8/04

124 741 VEHICLE SUPPORT BUILDING, BOILER BUILDIN Wed 9/8/04 Wed 9/8/04

125 742 MAIN SLC-4 ENTRY CONTROL POINT Wed 9/8/04 Wed 9/8/04

126 717 PAYLOAD FAIRING AC BUILDING Wed 9/8/04 Wed 9/8/04

127 702 WATER TANK Fri 9/10/04 Fri 9/10/04

128 713 PAYLOAD AC FACILITY Fri 9/10/04 Fri 9/10/04

129 714 FUEL INCINERATOR PAD AND FUEL TRAILER P Fri 9/10/04 Fri 9/10/04

130 715 LAUNCH SERVICES BUILDING (INCLUDES MOB Fri 9/10/04 Fri 9/10/04

131 960 SOLID ROCKET MOTOR STORAGE Wed 9/29/04 Wed 9/29/04

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 44th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 7

Project: Annual Inspections 2004Date: Mon 10/20/03

Page 11: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE Appendix B – Hoist & Cranes

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 12: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Unit Number Task Name Start27 22300 215 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

30 6601 66 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

33 6816 188 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

61 10711 216 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

89 23215 226 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

90 22312 197 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

91 23201 LIFT NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

104 6527 65 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

124 23235 227 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

125 23235 METEOR NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

126 945 11 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

127 907 CHESTER CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

128 960 13 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 10/27/03

29 6419 157 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 10/30/03

102 6523 62 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 10/30/03

103 6523 63 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 10/30/03

9 1639 33 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 11/17/03

55 1639 34 CRITICAL CRANE QUARTERLY MAINT- 13 WEEKS Mon 11/17/03

59 988 14 NON CRITICAL CRANE ANNUAL MAINT- 52 WEEKS Mon 11/17/03

60 995 15 CRITICAL CRANE ANNUAL MAINT- 52 WEEKS Mon 11/17/03

77 1735 158 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 11/17/03

78 1735 159 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 11/17/03

97 330 166 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 11/17/03

98 330 118 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 11/17/03

45 9320 91 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 11/27/03

46 9320 92 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 11/27/03

49 9320 95 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 11/28/03

1 12000 114 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/2/03

6 1555 147 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/2/03

7 1555 27 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/2/03

8 1555 28 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/2/03

4th Quarter 1st Quarter 2nd Quarter 3rd Quarter4th Quarter 1st Quarter 2nd Quarter 3rd Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 1

Project: ALLcranesDate: Wed 10/22/03

Page 13: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Unit Number Task Name Start101 542 160 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/9/03

28 525 12 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 12/15/03

58 9320 98 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 12/15/03

115 9320 153 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/16/03

116 9320 154 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/16/03

117 9320 185 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/16/03

82 1784 212 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 12/30/03

79 1737 139 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 1/15/04

80 1737 140 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 1/15/04

62 10711 217 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

63 10711 219 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

64 10711 220 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

65 10711 221 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

66 10711 222 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

67 10711 224 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

107 6710 155 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 1/28/04

37 7525 74 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

38 7525 75 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

40 8250 231 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

42 8415 81 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

43 8415 82 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

44 8415 83 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

113 8305 119 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 2/13/04

11 1806 45 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

12 1806 46 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

41 8250 232 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

69 11439 110 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

70 11439 111 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

71 11439 112 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

72 11439 113 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/1/04

83 1785 229 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

4th Quarter 1st Quarter 2nd Quarter 3rd Quarter4th Quarter 1st Quarter 2nd Quarter 3rd Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 2

Project: ALLcranesDate: Wed 10/22/03

Page 14: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Unit Number Task Name Start84 1785 230 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

85 1800 42 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

86 1800 43 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

87 1800 44 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

118 9320 96 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

119 9320 97 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 3/29/04

34 6817 70 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 4/9/04

106 6601 253 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 4/28/04

52 1559 29 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

53 1559 30 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

54 1559 31 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

120 1559 32 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

121 1559 142 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

122 1559 143 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

123 1559 144 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/3/04

35 7525 138 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 5/13/04

36 7525 134 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 5/13/04

50 9327 115 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 5/14/04

26 1972 148 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/17/04

39 766 137 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/17/04

56 1980 149 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 5/17/04

51 9340 195 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 6/3/04

47 9320 93 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 6/4/04

48 9320 94 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 6/4/04

10 1784 211 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 6/15/04

4 1546 25 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 6/30/04

5 1546 26 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 6/30/04

108 7425 71 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 6/30/04

109 7525 132 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 6/30/04

110 7525 133 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 6/30/04

111 763 129 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 7/12/04

4th Quarter 1st Quarter 2nd Quarter 3rd Quarter4th Quarter 1st Quarter 2nd Quarter 3rd Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 3

Project: ALLcranesDate: Wed 10/22/03

Page 15: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Unit Number Task Name Start73 1731 35 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/15/04

74 1731 36 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/15/04

75 1731 37 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/15/04

76 1731 LIFT NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/15/04

112 790 174 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/22/04

114 8425 84 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 7/22/04

13 1819 48 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

14 1819 49 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

15 1819 50 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

16 1819 51 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

17 1819 RESCUMATIC CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

18 1824 52 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

19 1824 53 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

31 6601 67 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

32 6601 68 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

57 6601 69 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/9/04

92 41KP 1 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

93 41KP 2 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

94 12PP 500 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

95 17PP 1 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

96 17PP 2 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

99 502 250 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

100 502 251 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Thu 8/12/04

81 1768 38 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Tue 8/24/04

2 1546 23 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/30/04

3 1546 24 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/30/04

88 1930 233 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Mon 8/30/04

68 10713 102 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/1/04

105 660 213 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Fri 9/3/04

20 1833 54 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

21 1833 55 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

4th Quarter 1st Quarter 2nd Quarter 3rd Quarter4th Quarter 1st Quarter 2nd Quarter 3rd Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 4

Project: ALLcranesDate: Wed 10/22/03

Page 16: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

ID Location Unit Number Task Name Start22 1900 57 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

23 1900 58 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

24 1900 59 NON CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

25 1900 60 CRITICAL CRANE ANNUAL MAINT - 52 WEEKS Wed 9/15/04

4th Quarter 1st Quarter 2nd Quarter 3rd Quarter4th Quarter 1st Quarter 2nd Quarter 3rd Quarter

Task

Split

Progress

Milestone

Summary

Project Summary

External Tasks

External Milestone

Deadline

Page 5

Project: ALLcranesDate: Wed 10/22/03

Page 17: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE Appendix C - Elevators

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 18: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

Elevator Requirements and Schedule from 1 Oct. 2003 through 31 Mar. 2004 for CDRL A006, Appendix C

A. SLC-4 Alimak East Pad North Elevator: 1. Yearly Elevator Inspection Date: Dec. 28th 2003. (1 Day) 2. Brake Change out (Every six months) (1 Day). Gearbox Oil change out: (Every

Six Months), (1 Day) Next Change, Dec. 2003. B. SLC-4 Alimak East Pad, South Elevator:

1. Yearly Elevator Inspection Date: Nov. 6th 2003. (1 Day) 2. Brake Change out (Every six months): (1 Day) and Gearbox Inspection and Oil

Change (Every six months): (1Day) Dec. 2003. C. SLC-4 Montgomery West Pad North Elevator:

1. Yearly Inspection: Oct. 17th, 2003. (1 Day) 2. The next five-year Inspection: Oct 2005. (1 Day)

D. SLC-4 Montgomery West Pad South Elevator:

1. Yearly Inspection: Oct. 16th, 2003. (1 Day) 2. Five-Year Inspection: Oct. 2005. (1 Days)

E. Building 398

1. Yearly inspection: Nov 9th 2003 (1 Day) 2. Five-year Inspection: Oct. 2005 (1 Day)

Page 19: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F. 30th Space Wing Elevator Inspections FY03 Bldg. No Last Insp. Next Insp. 1450 11-12-2002 11-12-2003 1565 11-13-2002 11-13-2003 1974 11-14-2002 11-14-2003 1987 11-15-2002 11-15-2003 7000 11-16-2002 11-16-2003 7015 11-19-2002 11-19-2003 8290 11-20-2002 11-20-2003 9340 11-21-2002 11-21-2003 10577 11-22-2002 11-22-2003 12000 11-23-2002 11-23-2003 7025 N/A 11-23-2003

Page 20: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE Appendix D – Pressure Vessels

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 21: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

General Physics Corporation.

FY 2003 MONTH

SLC-2 BOEING / WAYNE TODD 734-3099 31

Jul-04

BLDG 738 2Apr-04

PILLAR POINT 2

BLDG 21150 2

VAFB PRESSURE VESSEL IN-SERVICE INSPECTION (ISI) 2004 SCHEDULE

LMA / JIM EMANUALS 5-1868 LMA / MARK WARE 5-5370

BLDG. 8401 LMA / ROD NORTHTROP 5-2690 1

SOUTH VANDENBERG 2

BLDG. 1559

BLDG 790

1

3

Fuels Lab / Roy Wurzbach 6-2149

1

1

SLC-4E

UPC / STEVE LOWN 5-5000

BLDG. 398 SOUTH VANDENBERG BLDG. 475

May-04

BLDG. 13835

BLDG. 7307

27

SLC-3 (LOX SIDE)LMA / JIM EMANUALS 5-1868 LMA / MARK WARE 5-5370

33

Jun-04

36

SLC-3 (FUEL SIDE 4 THRU 7)LMA / JIM EMANUALS 5-1868 LMA / MARK WARE 5-5370

23

SLC-3 (FUEL SIDE 8 THRU 10)

2

4

BLDG. 6670

BLDG. 871ASTRO TECH / ROSS PORTER 6-7548 5

171

SLC-4WBLDG. 1737

LMA / LARRY CRASS 5-2312DYN. SCI. / J ALAGRETTO 6-0945

HSF (BLDG 974 / 976) UPC / MIKE BENNET 5-3756

BLDG. 8350

SLC-3 (FUEL SIDE 1 THRU 3)LMA / JIM EMANUALS 5-1868 LMA / MARK WARE 5-5370

UPC / SHORTY EHRSAM 5-8517

SLC-4 HPGSALMA / LARRY CRASS 5-2312LMA / LARRY CRASS 5-2312

2410

BLDG 733 1

BLDG. 980 1

2

# OF VESSELS LOCATED AT FACILITY TO BE INSPECTED

ALGAS 1

FACILITY TO BE INSPECTED SYSTEMS OWNER USER / POINT OF CONTACT

1BLDG 330

3BLDG. 1819 ORBITAL SCI. / DAN GIVENS 734-3488 7

BOEING

19

TOTAL VESSELS 269

BLDG. 9320 MCA 1BLDG. 8337 LMA / DON AIRS 5-0889 3BLDG. 8310 LMA / MEL MADISON 6-5721 2BLDG. 7525 LMA / STEVE COFFEY 6-5287

Page 1 of 1

Page 22: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

F04684-98-C-0014 i 1 November 1998

LAUNCH OPERATIONS AND SUPPORT

CONTRACT (LO&SC) VAFB

INSPECTION SCHEDULE Appendix E - Towers

CCoonnttrraacctt NNuummbbeerr::

F04684-98-C-0014

CCDDRRLL IItteemm NNuummbbeerr:: A006 Date Submitted: October 9, 2003

Revision 0

Copy Number 1 of 2

Government Services Division

Page 23: LAUNCH OPERATIONS AND SUPPORT CONTRACT … · F04684-98-C-0014 i 1 November 1998 LAUNCH OPERATIONS AND SUPPORT CONTRACT (LO&SC) VAFB INSPECTION SCHEDULE Appendix A- Facilities

2nd SPACE LAUNCH SQUADRON CDRL A006 Appendix E

SLC-3

Facility Location Description Height

None 23 March 2004

SLC-3 Facility All Camera Towers

756

23 March 2004 SLC-3 Facility Winds Equip.

Tower 60 ft.

SLC-4 740

20 August 2004 SLC-4 Facility Winds Equip.

Tower 300 ft.

North Base None

22 February 2004 Near Bldg 1559 Microwave

Antenna Tower 120 ft.

30 Space Wing 1633

1 January 2004 SLC- 2 HAIR Boresite

Tower 102 ft.

Det 1, 22nd SPACE OPERATIONS SQUADRON Vandenberg

Tracking Station

NONE 17 July 2004

Bldg 23225, Roof Winds Equip., Alum. Pole

12 ft.

Vandenberg

Tracking Station

NONE 17 July 2004

Bldg 23225, Roof S Side

(Five dishes) Tower

20 ft.

These Facilities will be inspected between 10-1-03 and 9-30-04