© ABB Group September 24, 2009 | Slide 1
ABB Capabilities for Electrification within Oil, Gas & PetrochemicalsMain Electrical Contractor (MEC)
Lars Torstveit, ABB AS
Agenda
Joint session8:00 - 8:158:15 - 9:30
Separate sessions Eletrification Automation & Safety Telecom
9:30 - 10:30 Introduction to ABB as a System Integrator
10:30 - 10:45
10:45 - 11:45 Main Electrical Contractor (MEC) -Total System Integration
Main Automation Contractor (MAC) - Total System Integration Support for Remote Operation
11:45-12:45 Peregrino project - Example of MEC Case studies: Challenges/Solutions DWDM, fiber optics high speed
communication12:45 - 14:00
14:00-15:00 Dry type transformers - Ideal for FPSOs
Automation & Safety System - Life Cycle Simulator Total FPSO networking
15:00 - 15:15
15:15-16:00 MV & LV switchgear solutions for FPSOs
Integratede Systems - Topside, Marine, Remote: Integrated
OperationRadio Switch Tetra, digital radio
16:00-17:00ABB Relion - Intelligent protection solutions integration with ICSS -
IEC61850 and ProfinetAdvanced Control / Services Integrated operations and
Integration towards Automation
17:00-17:30
Welcome and general introduction to the workshopABB introduction of company and O&G Division, FPSO reference anda ABB plans for the Offshore Market
Power Management System
Discussion
Coffe Break
Lunch
Coffe Break
Eventos na Sala 1 (404) Sala 1 - 61 pessoasEventos na Sala 2 (408) Sala 2 - 30 pessoasEventos na Sala 3 (411) Sala 3 - 30 pessoas
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
3
Agenda
Introduction to COE ElectrificationMEC concept Large Drives Subsea Drives Power From shore Packages Drilling DrivesAdditional Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
4
Application Areas for Electrification
ACHVDC
HVDC
ACHVDC
AC
Power from shore
Offshore Power Distribution
FPSO e-house solutions
Subsea drives solutions
Large Drives solutions
Packaged Drilling Drives
Onshore Power Distribution
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
6
ABB oil and gas centers around the world
Toronto
ClevelandBeijing
TokyoCairo
Mexico City
BangkokBangalore
Caracas
Sao Paulo
Sydney
Riyadh Abu Dabi
Singapore
Copenhagen
Azerbaijan
Bogota
Houston
BrusselsMannheim
WarsawAmsterdam
ShanghaiTehranKuwait
Kazakhstan
Angola
Nigeria
Moscow
LibyaAlgeria
Calgary
Buenos AiresJohannesburg
Bartlesville
LondonParis
Madrid
Oslo
MilanoIstanbul
Centers with Electrification activeties
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
7
Key capabilities Center of Excellence Electrification for Oil & Gas
Concept System study group Analysis and simulation during FEED and execution
Total life cycle solutionsCondition Monitoring and Remote operation
Packaged SolutionsE-HousesEngineered Drives Packages
Power Management Systems & Electrical ControlVital part of pursuing MEC system projects
Single interface between ABB and customerInternationally Certified Project Managers
Capable of Overall System ResponsibilitySolid project execution dedicated to O&G market, standards and applicationsStrong After Sales and Service Organization
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
8
What is an Electrical & Drive System?
Equipment/Products:
Generators, HV/MV Switchgears/MCC’s, LV Switchgears & MCC’s, Machines and Motors, Frequency Converters, Transformers, Filters, etc.
Services: From Product to Integrated SystemSystem Design Criteria, Studies/Analyzis & Calculations,Project Management, Engineering, Documentation (Product, Project, DFO),QA/QC, HES, Testing, Commissioning, Training, After Sales Support.
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
9
LV DistributionIndustrial
400/230V
MEC - Typical Integrated Electrical System
HV Motors
132/66kV
22kV
11kV
LV Motors
Power Transformers
400kV
HV Outdoor Switchgears
Indoor HV GIS
Indoor AIS
Indoor GIS
Ex
LV DrivesLV Distribution
Transformers
Power Transformers
Power Transformers
Battery UPS
HV Drives
LCIDrives
690V
Distribution Transformers
LV Switchboards
>20kVMotorformer
Turbines & Generators
Generator Transformers
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
10
LV DistributionIndustrial
400/230V
MEC - FPSO - Integrated Electrical System
Generator
HV
LV Motors
Indoor GIS
Ex
LV Drives
LV Distribution Transformers
Battery UPS
HV Drives
•Compressors
•ESP
•Water injection
•Etc
LV
Distribution Transformers
LV Switchboards
Generator
Indoor AIS
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
11
Motivation for MEC - The Hard Part: Hidden Costs
Equipment Costs Price Engineering Costs
Construction Costs Inspection & Testing
Performance Problems Safety Costs Customer Dissatisfaction Spare Parts
Duplication of Effort Debugging Costs
Air Freight Liability Costs Expediting Shipments
Scrap
Late Delivery Costs Overtime Startup Delays
Equipment Service Calls Maintenance Costs Energy Costs
Equipment Shutdown Costs High Inventory Costs
Construction Rework Maintenance Costs Toxic Emissions Training Costs Environmental Regulations Stress
Ease of Repair Engineering Changes Frustration
Paperwork Inspection Dissatisfaction Stocks
Rescheduling
HIDDEN COSTS
KNOWN COSTS
Interface Problems
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
12
Key values of the MEC concept…
Risk management
Lower procurement cost
Lower project cycle costs
Lower training costs
Lower life cycle support costs
…to provide the lowest total project cost
Integrated technology
Common solutions
Single source for documentation
Greater operability
Ease of life cycle maintenance
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
13
Early involvement through strategic partnershipEnables ABB’s full range of experience and ability to draw upon existing and proven solutions.
This Continuity and migration of knowledge optimises the design and improves project performance
The MEC concept;Reduces Commissioning & Installation riskCost & Time
Because ABB takes responsibility for a complete and integrated systems delivery
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
14
Value Added
Total Cost = Cost of Purchase + Cost of Project Execution
Lack of competition Interface Issues
Cost of Project ExecutionEPC’s hours spent on admin & engineering
Variations
Integration Testing
Installation, Commissioning, Hand-over
Penalties / Incentives
Balancing the risk
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
15
Both parties should benefit from this MEC concept
Creating win-win situations within;Competence development
Technical development
Administrative systems and routines
General information exchange and more efficient relationship
Improved Safety – a single team of installation and commissioning engineers reduces the number of incidents
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
16
Can MEC reduce my project CAPEX cost ?
100 %
80 %
Early involvement, standardisation, improved work processes and tools
Elimination enquiry, bidding and negotiation, reduced sales & Admin.
Increased productivitylower prices
Trusted performance on-time delivery
Standardisation and reuse
Reduce spare parts and training
Examples of cost saving potentials
EngineeringProcurement
Product costs
Expeditinginspection
Documentation
Commissioning, start up, training
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
17
Can MEC reduce my project schedule ?
0 12 months
MEC
Traditional
g Commercial g Designg Manufacturingg Preparationg Installationg Commissioning
Example of schedule reduction
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
18
Multiple Electrical Package Suppliers
1 of 2
R&C = Risk & Contingencies
Material
Admin
Engineering
Material
Admin
Engineering
Material
Admin
Engineering
Material
Admin
Engineering
Material
Admin
Engineering
Engineering
R&C
Admin
Engineering
R&C
Admin
Engineering
R&C
Admin
Engineering
R&C
Admin
Engineering
R&C
Admin
MEC Coordination
Pool of multiple suppliers
Project Management
Other Packages
Other Packages
Removing non-value add
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
19
Main Electrical Contractor / Electrical System Supplier
2 of 2
R&C = Risk & Contingencies
MEC
Engineering
(R&C)
Admin
MEC Coordination
(R&C)
Material
Engineering
Material
Engineering
Material
Engineering
Material
Engineering
Material
Engineering
Project Management
Other Packages
Other Packages
Admin
Removing non-value add
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
20
MEC Integrated Deliveries - Value Pyramid
PRODUCT
Service
Operations capabilities
Functionality. Performance
LIFE CYCLE
Project Execution
System functionality & performance
Quality, price for several products from one supplier
SYSTEM
BUNDLING
Quality and price for single products
Degre
e of I
nteg
ratio
n
ABB has experienced that increased degree of integration will decrease total project costs.
Cost (
Capex
+ Ope
x)
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
21
Business Process – Early Involvement
Product suppliers responds to RFQ here
System approachearly start
FeasibilityConcept
Market Shift to system approach
Pre Feed FeedBasic/
Detailed Design/FAT
Installation/Comissioning
Start-up Operation
All Electricdecision
Products and services
MEC decision
The most critical decisions are made early
Secure best information for optimal decisions
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
25
Technical concept study group
What can ABB offer with a concept study group?ABB can take the lead/participate in network planning at an early stage in a project.ABB can take the lead/participate in establishing design criteria and operational philosophyABB can hold the title to system responsibility with regard to the electrical power system
ABB’s strong points with regard to studies:Close relationship with equipment factoriesEasy access to all product informationInformation on ongoing development projects within ABBLong experience in calculations and product deliverables
Result:Optimised power system design and component ratingsCompletion of power system analysis during project phaseIncreased added value in system deliveriesReduced technical and financial risks for the client
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
26
Technical concept study group Technical focus areas
Technical focus areas:Systems:
Complete electrical power systemsLong AC transmission systems (electrification)HVDC light systemsMV and LV voltage drive systemsLong step-out systems
Studies:Feasibility studiesDynamical simulations/analysisShort circuit calculationsLoad flow analysisHarmonic analysis (VSD, LCI, filter)Motor start analysisTransient stability studiesProtective device coordination studiesVoltage drop calculationsVoltage surge evaluations
Calculations can give input to:Operational philosophies:
Operation of generatorsNetwork configuration (ring/radial, interlocks)Protection philosophyPower management system
Equipment rating:Switchboard rating (IN, Ik”)Transformer rating (S, ux)Power cables cross-sectionNeutral earth resistorCT/VTsRelay settings
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
27
Our tools
Electrical power systems : Non-linear functions, saturation, frequency dependencies….Requires dedicated tools for calculation
PTW NEPLAN EDSA MATLAB/ SIMULINK SIMSEN ATP
Loadflow X X X X
Short circuit X X X X
Motor start X X X X
Dynamic simulations X X X
Relay coordination X X X
Harmonic calcs X X X X
Transient simulations X X
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
31
Structure for Project Execution and Management
Screenshot of Work Process for Project Execution
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
32
Project Execution - Typical Organisation
Client
Project Manager
Project Steering
Committee
Lead Engineer
Quality
HES
Document
Control
Planning
Purchasing
Cost
Control
Coordination, Studies, etc
Supplier
/ Manufacturer
Package
Responsible
Package
Responsible
Supplier
/ Manufacturer
Install
+ CommPreparation
Site
Coord. / Management
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
36
Engineering (cont.)
System Design Coordination
BasicEngineering
Client
Primary
Documentation
*)
Supplier
Documentation
Client
Supplier
Supplier
(Package) Design Verification
Client
Feedback on
Documentation
Feedback to Supplier
on
Documentation
Basic Engineering
Review
Technical
Requisition4.2 Basic Engineering and Review
4.5 Detail Engineering
4.1 Design Basis4.3 Technical
Requisitions
for Procurement
4.4 Queries
DocumentControl
*) Such as:-
Document list- Single Line diagram- GA drw- Foundation drw- Vital Interface info- Input for system studies- Cable schedule- Revised Prod. Plan
DocumentControl
DocumentControl
DocumentControl
Establish
Project Standards and Guidelines
Produce
Primary
Documentation
Internal
Primary
Documentation
**)
**) Such as:- Dimensioning Studies- Calculations and Curves- Function Descriptions- Interface Records- Document Lists- Internal Requirements / Descriptions
MOM / Report
Basic Engineering
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
37
LV DistributionIndustrial
400/230V
MEC - FPSO - Integrated Electrical System
Generator
HV
LV Motors
Indoor GIS
Ex
LV Drives
LV Distribution Transformers
Battery UPS
HV Drives
•Compressors
•ESP
•Water injection
•Etc
LV
Distribution Transformers
LV Switchboards
Generator
Indoor AIS
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
45
Agenda
ABB Electrical products portfolioFPSO offeringsLarge Drives Subsea Drives Power From shore Packages Drilling DrivesAdditional Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
46
Statoil - Troll - VSD system for export Gas Compressors
5 x Megadrive LCI system5 x 41MW /48MW motors (EExp)132 kV TransformersFilters units and reactors12 pulse circuit systemSynchronous machine with brushless exitationWater cooled
1 x LCI Drive and 41MW motor delivered in 2006
Export Gas capacity upgraded to 146,5 mill Sm3/Day
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
47
Very large Variable Speed Drives Systems (VSDS)
Largest Oil&Gas VSDS (Ormen Lange):3 x 48 MW export compressor2 x 7,5 MW Recompression
Up to 100 MW possible (NASA windtunnel)Applications:
LNG plants (cryogenic)Gas Plants (turbo expanders, export)RecompressionRe-InjectionOffshore in combination with HVDC light
Issues:EmissionsMaintenanceFlexibility, control.
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
49
Ormen Lange / Back-to-Back
Back-to-back test setupBackground: Two LCI convertersForeground: Synchronous motor and generator coupled
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
50
Ormen Lange / Back-to-Back
Back-to-back test setupView of two transformers
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
51
Ormen Lange / Back-to-Back
Filter-components in the cellar
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
52
Agenda
ABB Electrical products portfolioFPSO offerings Large DrivesSubsea Drives Power From shore Packaged Drilling DrivesAdditional Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
53
Electrical subsea aplication equipmentABB
Transformers
Converters
Switchgear components (Vetco/ABB) - prototype
SEPDIS Subsea Electrical Power Drives Framo/Vetco/ABB)- prototype
System Studies
Aplication Control Software
OthersSubsea motors
Electrical connectors
Umbilical
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
54
Reference Project: Tyrihans SRSWIRAW SEAWATER INJECTIONSUBSEA PUMP INSTALLATION
GA
S IN
JEC
TIO
N
UM
BIL
ICA
L
TYR
IHA
NS
PRO
DU
CTI
ON
FLO
WLI
NE
ELEC
TRIC
PO
WER
STA
TUS/
CO
NTR
OL
SIG
NA
LS
KRISTIN ÅSG.B
WATERINJECTION PUMP
P
TYRIH.
FIGURE 3
WATERINJECTION
SEAWATERINTAKE
TELECOM LINK
Field Operator: Statoil
Application: Subsea Raw Sea Water Injection
Capacity: 14 000 m3 untreated seawater/day
Pump Qty: 2
Tie-in distance: 31 km
Host platform: Kristin
Pump vendor: Aker Kvaerner Subsea
Project completion: 2009/2011
The project will add production worth > 1000 MUSD
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
55
Reference Project: Tyrihans SRSWIABB Scope of Supply• 2 x Topside VSD System
• ACS1000 Water cooled converters
• Oil filled step-down/up transformers
•2 x Subsea Transformer
• 4000 kVA
• Insulation monitoring system on pump side
• Insulation monitoring system on umbilical
• System Design Report
• Time domain simulations
• Breakaway torque calculations
• Loadflow calculation
• Fault analysis
• THD calculations
-2000-1500-1000-500
0500
10001500
-1000-500
0
5001000
-10000-5000
0
500010000
0.00 0.05 0.10 0.15 0.20
Ceiba C4 Commissioning tests - 75 Hz 820 A
I3 aft
er si
ne fil
ter A
N-C4
_021
.csv
( A)
U1-U
3 afte
r sine
filter
AB-
C4_0
21.c
( V)
U3-G
ND af
ter st
ep-u
p tra
nsfor
mer
AN
( V)
Time ( s)
I3 after sine filter U1-U3 after sine filter
U3-GND after step-up transformer
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
56
Åsgard MF Project VSD & Long Step-out Power qualification
M
Sine filter
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
57
Åsgard MF Project VSD & Long Step-out Power qualification
Scope of supply for Åsgård long step-out qualification program
Equipment deliveriesQualification testsSimulationsInstallationCommissioningTesting
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
58
Åsgard MF Project VSD & Long Step-out Power qualification
Equipment deliveriesStep Up transformer
15 MVA, 6,6/36 kVTapingsWater cooled
Step Down transformer15 MVA, 30/6,2 kVTapingsSubsea (will be run with a water cooler at Kårstø)
Cable simulatorSimulate the 47 km cable52 kV voltage10 phi equivalent modelExist of resistance, inductance, capacitance, breakers
Measurement systemCustom sensors (voltage/current for high voltage, variable frequency and high band with)Data Acquisition system, by National Instruments Software for displaying and processing and saving data
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
61
Installation of Cable simulator
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
62
Åsgard MF Project VSD & Long Step-out Power qualification
Main Technical challenges for ABBWorld longest umbilical cable length connected to topside frequency converter output (47km)Biggest power rating for step-out system so far (rated for 6-8MW compressor power)Highest supply frequency performed on long step-out systemQualifying and building step-up and sub-sea transformer for rating up to 15MVA and supply frequencies up to 200Hz
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
63
Åsgard MF Project VSD & Long Step-out Power qualification
SimulationSteady state calculation
Loadflow / voltage drop at different operating pointsStart analysis
Dynamical simulationLoad variationsHarmonics during steady state operationTrip analysis
Done for:189 Hz Compressor159 Hz Compressor102 Hz Compressor400 kW Pump
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
64
System design
Dynamical simulations performed in time domainSoftware (Matlab/simulink)Dynamical model of the complete system including converter, topside transformer, cable, subsea transformer and motorModel of mechanical load The following analysis can be performed by ABB
Motor starting with specified break-away torqueTransient load variations Different operation pointsTrip analysis
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
65
Åsgard MF Project VSD & Long Step-out Power qualification
Testing at KårstøRun the compressor with and without the long step out system
Compressors with different speed6000 rpm (102 Hz)9500 rpm (159 Hz)11200 rpm (189 Hz)
Different voltage levels on the cableBoth transformers have tapings
Different cable cross-sectionLoad variations on the compressor
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
66
Åsgard MF Project VSD & Long Step-out Power qualification
Why testNever been delivered such system (length and power)Qualified the overall electrical system
Converter and softwareTransformer designCableMotor
Get experience with such systemCompare simulation and test measurement
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
67
Ormen Lange – Subsea TransformerPilot Subsea Transformer
20 MVA
132kV / 22kV
Single shell
132kV connector is new technology (Vetco)
Subsea Transformer70 MVA
132kV / 22kV
Single shell
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
68
Agenda
ABB Electrical products portfolioFPSO offerings Large Drives Subsea DrivesPower From shore Packages Drilling DrivesAdditional Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
69
Why Power From ShoreAvoiding emissions !
25 % of Norway CO2 emissions comes from offshoreSignificant contribution to fulfill Kyoto
protocol if the best projects is electrified
Operational and maintenanceSignificant lower OPEX then Gas turbine, CAPEX project dependentFacilitates remote operations, key trend in the offshore industry
Health Safety and Environmental impact
No gas turbines will reduce riskLess helicopter transport
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
70
Submarine cables
Troll A platform station Kollsnes
land station
Norway Sweden
UK
Troll-A Power From Shore: World’s 1st Offshore HVDC system
Statoil’s Troll A Pre-compression projectKey platform data:
Troll A delivers gas to Kollsnes
from all Troll field platforms
Total weight: 678 500 tones
Height: 472 m (approx. 120 m above sea level)
Current gas processing capacity:
100 million m3 per day
Reservoir pressure declines – pre-compression is needed
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
74
Troll VSD – Lifting of module
Approx 700 tones
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
77
Valhall HVDC Light Power From ShoreBP’s Valhall Platform Redevelopment project
Valhall
Lista
New PH platformNew PH platform Existing WIPExisting WIP
Status:Feasibility and pre-engineering studies between 2003-2005 were successful, leading to Valhallfield partners deciding in April 05 to take power from shore as main option
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
81
Gjøa Power from Shore
Power available at Mongstadrefinery
Double supply lines from national grid
Sub Sea Cable
Shore
Supply
11kVTransformer
Sub seaOnshore Offshore
Transformer132kV
90kV AC
90km
Gjøa
Kvitebjørn
Camilla&Belinda
ValemonHuldra
Hild TrollOseberg
TampenGjøa
Kvitebjørn
Camilla&Belinda
ValemonHuldra
Hild Troll
Langeled
Tampen
Oseberg
ÅTS
Gjøa
Kvitebjørn
Camilla&Belinda
ValemonHuldra
Hild TrollOseberg
TampenGjøa
Kvitebjørn
Camilla&Belinda
ValemonHuldra
Hild Troll
Langeled
Tampen
Oseberg
ÅTS
Florø
Mongstad
StureKollsnes
Vega
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
82
Gjøa Electrification - Overview©
ABB
AS
-82
-10
Apr
. 200
8
90kV Subsea Cable
90kV Offshore Cable
4.5MW VSD type ACS 1000
145kV Gas Insulated Switchgear
17.3MW & 11.1MW VSDs type ACS 5000
12kV Gas Insulated Switchgear
18MW 90/11kV Offshore Power Transformers
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
85
Agenda
ABB Electrical products portfolioFPSO offerings Large Drives Subsea Drives Power From shorePackaged Drilling DrivesAdditional Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
86
AC Drilling Drive System - Overview
DRAWWORK W/4 AC MOTORS
THREE WINDING TRANSFORMER
MUDPUMPS WITH AC MOTORS
TOP DRIVE DRILLINGMACHINE WITH AC MOTORS
CONVERTER PANELS DRILLING AND WINCH DRIVES
ACS/DCS 600MarineDrives
ANCHOR WINCH WITH AC MOTOR
HIGH VOLTAGE SWITCHBOARDS
DIESEL ENGINES/ GENERATORS
VESSEL AUTOMATION POWER MANAGEMENT
ALARM AND MONITORING
LOCAL CONSOLE FOR MUDPUMPS
REMOTE I/O PANEL
REMOTE I/O PANEL
DRILLERS CABIN MAIN CONSOLE
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
87
EDP Engineered Drives Products
•Try to get most of our deliveries as a Plug & Play delivery•Get more of ABB`s assortment into one delivery•To help customers to get a complete tested and working product•Capabilities is good due to large group of system engineers•Engineers are used to handle several systems into one delivery•Achievements•50 Containers systems to Aker, 6 large E houses for drilling to Ability
Packaged Drilling E- House
Strategy, Capabilities and Achievements
•For new build and retrofit concepts•Plug and play solutions•Electrical systems– generation, distribution and AC / DC drives•Life cycle support, and total package responsibility.•Standardized communication interfaces
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
88
Agenda
ABB Electrical products portfolioFPSO offerings Large Drives Subsea Drives Power From shore Packages Drilling DrivesAdd-on Technologies
Power ManagementCondition Monitoring
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
92
Electrical & Vibration CM – Portfolio todayDrive
MonitorMedium Voltage
Monitor
Transformer Monitor High Voltage
Monitoring
Low Voltage Monitor
Sea cable Monitor
Vibration Monitor
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
93
Our motivation factor
CO
E-0
017
©A
BB
Aut
omat
ion
Tech
nolo
gies
Div
isio
n -
94