Cells along the well path

Values assigned to cells

Upscaled logs used to fill in

the 3D grid

Up-scaling well logs Principle

Page 2: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 2/11

Upscale well logs

Resample logs into cells intersected by well trackDiscrete logs: Assign the most frequently occurring log values to each

cell

Continuous logs: Averaged log values per cell

 Arithmetic, Harmonic, Geometric average

Biased to a discrete log

Treat logs as points or lines

Options to treat partially penetrated cells

Page 3: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 3/11

1 - Select the log to upscale or the

Well Tops attribute

2 –

Select the wells to be upscaled

3  – Select the Scale up settings

NOTE: The upscaled logs will be part of the 3D property at the well

positions. That means, the property will always have the values of the

upscaled logs at the position of the wells!

Process

Page 4: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 4/11

Log as bias Why bias to a discrete log?

Raw facies Raw por Upscaled facies Upscaled por 

Sand

Page 5: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 5/11

Settings  Averaging methods

Arithmetic: Typically used for properties such as porosity, saturation and

net/gross because these are additive variables.

Harmonic: Gives the exact effective vertical permeability if the reservoir islayered with constant permeability in each layer.

Geometric: Normally a good estimate for permeability if the population has

no spatial correlation and is log normally distributed.

Minimum: Samples the min value of the well log for the cell.

Maximum: Samples the max value of the well log for the cell.

Most of (only for discrete logs): Will select the discrete value which ismost represented in the log for each particular cell (used for Facies,Lithology Code, Zone logs etc.).

Page 6: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 6/11

Settings Weighting 

Select weighted as averagemethod.

Go to the weighted tab and set the

weighting factor for each facies.

Page 7: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 7/11

As points: All sample valueswithin each cell are used for 

averaging.

As lines: Data between points

will be interpreted (points outside

the cell may affect the result).

vi: weighted value of each point involved

ni: log value of the point

N: total number of points

Settings Treat log as lines vs. points

Page 8: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 8/11

Simple: all cells penetrated by the well

trajectory are included

Through cell: the well trajectory must

penetrate two opposite cell walls (top

and base - opposite sidewalls) to be

included

Option to set a minimum number of 

data points in a cell for it to be

included.

Neighbour cells: cells in the same cell

layer are averaged.

Settings Method 

Page 9: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 9/11

Upscaling logs QC of upscaled logs

Display the log in

the well section

Display theproperty directly in

the well section

Page 10: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 10/11

Create Synthetic logs

Display synthetic logs

together with raw logs

Upscaling logs QC of upscaled logs

Page 11: L12_Log-Upscaling (5 Days)

7/28/2019 L12_Log-Upscaling (5 Days)

http://slidepdf.com/reader/full/l12log-upscaling-5-days 11/11

Scale up well logs