KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21 th , 2016 This Week’s Progress JED o Precast Erection at Column Line 5/2-C/E o Topping Slab - Pour 6 Complete o SOG - Pour 5 Superior o Backfill and grading SOG - Up to Column Line 5. Stanger o Drain pipe and floor drains throughout project Midland Steel o Stair Tower #4 Flynn E & K o Insulation at Level 3 & 5 IT/Electric al Room. South of column line 9. Shaw Electric o Electrical rough-in throughout structure. o Conduit throughout structure. o Emergency Light Fixtures o Wire pulls Kone o Elevators Atlas Glass o SW Level 6 interior Lobby o SW Level 6 interior Lobby o Stair tower #2 and elevator shaft #2

KUMC Parking Garage #5 progress report... · 2016-10-25 · KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21th, 2016 This Week’s Progress JED o

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KUMC Parking Garage #5 progress report... · 2016-10-25 · KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21th, 2016 This Week’s Progress JED o

KUMC Parking Garage #5

Weekly Construction Progress Report

Week Ending: October 21th, 2016

This Week’s Progress

JED

o Precast Erection at Column Line 5/2-C/E

o Topping Slab - Pour 6 Complete

o SOG - Pour 5

Superior

o Backfill and grading SOG - Up to Column Line 5.

Stanger

o Drain pipe and floor drains throughout project

Midland Steel

o Stair Tower #4

Flynn

E & K

o Insulation at Level 3 & 5 IT/Electric al Room. South of column line 9.

Shaw Electric

o Electrical rough-in throughout structure.

o Conduit throughout structure.

o Emergency Light Fixtures

o Wire pulls

Kone

o Elevators

Atlas Glass

o SW Level 6 interior Lobby

o SW Level 6 interior Lobby

o Stair tower #2 and elevator shaft #2

Page 2: KUMC Parking Garage #5 progress report... · 2016-10-25 · KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21th, 2016 This Week’s Progress JED o

o Water Test – Elevator shafts #1 and #2

Century

Jabral

o Exterior Caulking

Dayco Painting

o Plywood painting at Ground Level

o Plywood painting South Level 3 and Level IT/Electrical Room

Upcoming Work Overview

JED

o Precast erection – Column line 5/2-C/E

o Topping Slab - Pour 7

o SOG – Pour 6

Superior Bowen

o Backfill and grading SOG – Column Line 5/2-A/C.

Stanger

o Drain pipe and floor drains.

Midland Steel

o Stair Tower #4

Flynn

E & K

o Parking Office - Storefront Header & Drywall

o Parking Office - Interior Framing

Shaw

o Electrical rough-in throughout structure.

o Conduit throughout structure.

o Emergency Light Fixtures

o Level 0 Electrical Room

o Wire pulls

Kone

o Elevator

Atlas Glass

o SE Level 6 Interior Lobby

o SW Stair Tower

Century

Jabral

o Exterior Caulking

o Traffic Coating Level 6 & Level 4 & Level 1 – South of Column Line 9

Dayco Painting

Page 3: KUMC Parking Garage #5 progress report... · 2016-10-25 · KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21th, 2016 This Week’s Progress JED o

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

UP FROM THIRD

DOWN FROM FIFTH

E E

A A

1

5

S430

1

S421

1

S411

2 3 4 5 6 8 9 10 11 12 13

14

14 14.4

15

15 16

D D

C C

B B

A.2A.3

D.7

14.5

3.6

D.8

D.2

A.8

7

RA

MP

UP

RA

MP

DN

15.1

15.1

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

991'-8 1

/2"

991'-10"

991'-0"

991'-7"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

991'-5"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

992'-0"

991'-8 1

/2"

991'-10"

991'-11"

992'-3"

991'-6"

992'-2"

992'-2"

992'-10"

991'-10 1

/2"

991'-10 1

/2"

991'-11"

992'-3"

992'-2"

991'-6"

991'-6"

990'-10"

992'-0"

991'-7"

991'-7"

991'-0"

991'-0"

991'-0"

991'-0"

991'-7"

991'-7"

991'-0"

991'-7"

991'-5"

991'-7"

991'-7"

991'-0"

991'-0"

991'-0"

991'-0"

991'-7"

991'-7"

991'-6"

992'-0"

991'-6"

991'-10 1

/2"

991'-2"

5

S440

TRAFFIC TOPPINGSEE NOTE 2

TRAFFIC TOPPINGSEE NOTE 2

991'-10 1

/2"

1. SEE SHEET S103 FOR TYPICAL SHEET NOTES AND LOCATIONS OF TYPICALDETAIL REFERENCES (UNLESS NOTED).

2. INDICATES HEAVY DUTY TRAFFIC TOPPING MEMBRANE. EXTEND 1'-0"BEYOND LIMITS OF ROOM BELOW, UNLESS NOTED OTHERWISE.

ISOMETRIC

1

A

E

16

VALET PARKING

GROUND TIEREL 955'-8"

2ND TIEREL 967'-0"

3RD TIEREL 980'-8"

4TH TIEREL 992'-0"

5TH TIEREL 1003'-4"

TOP TIEREL 1014'-8"

TR

UE

NO

RT

H

N

S

W

E

1

A

c

D

E

F

G

H

J

K

L

M

N

P

Q

R

A

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

1

B B

S S

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

UN

IVER

SIT

Y O

F K

AN

SA

S M

EDIC

AL

CEN

TER

GA

RA

GE

#5

3724

CA

MB

RID

GE

ST.

KA

NS

AS

CIT

Y, K

AN

SA

S 6

6160

DA

TE: 2

/19/

2016

DR

AW

N B

Y: W

ALK

ER

Dep

artm

ent o

f Adm

inis

trat

ion

Offi

ce o

f Fac

ilitie

s an

d

Pro

pert

y M

anag

emen

t

Des

ign,

Con

stru

ctio

n &

Com

plia

nce

800

SW

Jac

kson

, Sui

te 7

00

Tope

ka, K

ansa

s 66

612-

1216

Pho

ne 7

85-2

96-8

899

UNIVERSITY OF KANSAS

MEDICAL CENTER

PARKING GARAGE #5

Kansas City, Kansas

KIDS # WY24K1X46

KUMC # 14102

KS # A-012720

BNIM Architects Architect106 West 14th Street, Suite 200, Jackson County, Kansas City MO 64105

p.816.783.1500 f.816.783.1501

MO State Certificate of Authority #00235006

Henderson Engineers, Inc. MEP Engineers8345 Lenexa Drive, Suite 300, Lenexa KS 66214

p.913.742.5000 f.913.724.5001

Certificate of Authority

SK Design Group, Inc. Civil Engineers4500 College Blvd, Suite 100, Overland Park KS 66211

p.913.451.1818 f.913.451.7599

Walker Parking Consultants Structural/FunctionalEngineers505 Davis Road, Elgin IL 60123

p.847.697.2640 f.847.697.7439

FINAL CONSTRUCTION

DOCUMENTS

S104

FOURTH TIER PLAN

1/16" = 1'-0"1FOURTH TIER PLAN

IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TOVERIFY THAT THERE IS A MINIMUM OF HEADROOMBETWEEN ALL DRIVING SURFACES AND OVERHEADBEAMS PRIOR TO PLACING CONCRETE.

8'-4"

GENERAL SHEET NOTES

Rev. # Description Date Issued

PPMR #: 15U17

55'-1

/8"

55'-1

/8"

55'-1

/2"

27'-6 3/8"27'-5 1/8"

27'-5"

13,216.56 sf 13,187.74 sf16,011.88 sf

4,65

8.57

7 sf

14,382.67 sf

108'-7/8"

15,661.52 sf

2,481.508 sf

11,839.78 sf4,

515.

497

sf

11,997.03 sf

11,999.09 sf

1

2

3456

7

8

9A9B10/14/16 - Precast Erected Thru Area 7

11/2/16 - Precast Erected Thru Area 8

12/02/16 - Precast Erection Complete

CIP: Work Ongoing. Complete by 10/21

CIP: 10/24/16 - 11/04/16

CIP: 11/07/16 - 11/18/16

CIP: 12/05/16 - 12/16/16

KUMC Garage #5 - Erection / Pour Sequence

Page 4: KUMC Parking Garage #5 progress report... · 2016-10-25 · KUMC Parking Garage #5 Weekly Construction Progress Report Week Ending: October 21th, 2016 This Week’s Progress JED o

Elevator #3 and #4

Stair Tower #4 Structural Steel

Water Test - Elevator Shaft #2

Parking Office Flat Slab

Precast Progress