KUMC Parking Garage #5
Weekly Construction Progress Report
Week Ending: October 21th, 2016
This Week’s Progress
JED
o Precast Erection at Column Line 5/2-C/E
o Topping Slab - Pour 6 Complete
o SOG - Pour 5
Superior
o Backfill and grading SOG - Up to Column Line 5.
Stanger
o Drain pipe and floor drains throughout project
Midland Steel
o Stair Tower #4
Flynn
E & K
o Insulation at Level 3 & 5 IT/Electric al Room. South of column line 9.
Shaw Electric
o Electrical rough-in throughout structure.
o Conduit throughout structure.
o Emergency Light Fixtures
o Wire pulls
Kone
o Elevators
Atlas Glass
o SW Level 6 interior Lobby
o SW Level 6 interior Lobby
o Stair tower #2 and elevator shaft #2
o Water Test – Elevator shafts #1 and #2
Century
Jabral
o Exterior Caulking
Dayco Painting
o Plywood painting at Ground Level
o Plywood painting South Level 3 and Level IT/Electrical Room
Upcoming Work Overview
JED
o Precast erection – Column line 5/2-C/E
o Topping Slab - Pour 7
o SOG – Pour 6
Superior Bowen
o Backfill and grading SOG – Column Line 5/2-A/C.
Stanger
o Drain pipe and floor drains.
Midland Steel
o Stair Tower #4
Flynn
E & K
o Parking Office - Storefront Header & Drywall
o Parking Office - Interior Framing
Shaw
o Electrical rough-in throughout structure.
o Conduit throughout structure.
o Emergency Light Fixtures
o Level 0 Electrical Room
o Wire pulls
Kone
o Elevator
Atlas Glass
o SE Level 6 Interior Lobby
o SW Stair Tower
Century
Jabral
o Exterior Caulking
o Traffic Coating Level 6 & Level 4 & Level 1 – South of Column Line 9
Dayco Painting
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
UP FROM THIRD
DOWN FROM FIFTH
E E
A A
1
5
S430
1
S421
1
S411
2 3 4 5 6 8 9 10 11 12 13
14
14 14.4
15
15 16
D D
C C
B B
A.2A.3
D.7
14.5
3.6
D.8
D.2
A.8
7
RA
MP
UP
RA
MP
DN
15.1
15.1
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
991'-8 1
/2"
991'-10"
991'-0"
991'-7"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
991'-5"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
992'-0"
991'-8 1
/2"
991'-10"
991'-11"
992'-3"
991'-6"
992'-2"
992'-2"
992'-10"
991'-10 1
/2"
991'-10 1
/2"
991'-11"
992'-3"
992'-2"
991'-6"
991'-6"
990'-10"
992'-0"
991'-7"
991'-7"
991'-0"
991'-0"
991'-0"
991'-0"
991'-7"
991'-7"
991'-0"
991'-7"
991'-5"
991'-7"
991'-7"
991'-0"
991'-0"
991'-0"
991'-0"
991'-7"
991'-7"
991'-6"
992'-0"
991'-6"
991'-10 1
/2"
991'-2"
5
S440
TRAFFIC TOPPINGSEE NOTE 2
TRAFFIC TOPPINGSEE NOTE 2
991'-10 1
/2"
1. SEE SHEET S103 FOR TYPICAL SHEET NOTES AND LOCATIONS OF TYPICALDETAIL REFERENCES (UNLESS NOTED).
2. INDICATES HEAVY DUTY TRAFFIC TOPPING MEMBRANE. EXTEND 1'-0"BEYOND LIMITS OF ROOM BELOW, UNLESS NOTED OTHERWISE.
ISOMETRIC
1
A
E
16
VALET PARKING
GROUND TIEREL 955'-8"
2ND TIEREL 967'-0"
3RD TIEREL 980'-8"
4TH TIEREL 992'-0"
5TH TIEREL 1003'-4"
TOP TIEREL 1014'-8"
TR
UE
NO
RT
H
N
S
W
E
1
A
c
D
E
F
G
H
J
K
L
M
N
P
Q
R
A
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
1
B B
S S
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
UN
IVER
SIT
Y O
F K
AN
SA
S M
EDIC
AL
CEN
TER
GA
RA
GE
#5
3724
CA
MB
RID
GE
ST.
KA
NS
AS
CIT
Y, K
AN
SA
S 6
6160
DA
TE: 2
/19/
2016
DR
AW
N B
Y: W
ALK
ER
Dep
artm
ent o
f Adm
inis
trat
ion
Offi
ce o
f Fac
ilitie
s an
d
Pro
pert
y M
anag
emen
t
Des
ign,
Con
stru
ctio
n &
Com
plia
nce
800
SW
Jac
kson
, Sui
te 7
00
Tope
ka, K
ansa
s 66
612-
1216
Pho
ne 7
85-2
96-8
899
UNIVERSITY OF KANSAS
MEDICAL CENTER
PARKING GARAGE #5
Kansas City, Kansas
KIDS # WY24K1X46
KUMC # 14102
KS # A-012720
BNIM Architects Architect106 West 14th Street, Suite 200, Jackson County, Kansas City MO 64105
p.816.783.1500 f.816.783.1501
MO State Certificate of Authority #00235006
Henderson Engineers, Inc. MEP Engineers8345 Lenexa Drive, Suite 300, Lenexa KS 66214
p.913.742.5000 f.913.724.5001
Certificate of Authority
SK Design Group, Inc. Civil Engineers4500 College Blvd, Suite 100, Overland Park KS 66211
p.913.451.1818 f.913.451.7599
Walker Parking Consultants Structural/FunctionalEngineers505 Davis Road, Elgin IL 60123
p.847.697.2640 f.847.697.7439
FINAL CONSTRUCTION
DOCUMENTS
S104
FOURTH TIER PLAN
1/16" = 1'-0"1FOURTH TIER PLAN
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TOVERIFY THAT THERE IS A MINIMUM OF HEADROOMBETWEEN ALL DRIVING SURFACES AND OVERHEADBEAMS PRIOR TO PLACING CONCRETE.
8'-4"
GENERAL SHEET NOTES
Rev. # Description Date Issued
PPMR #: 15U17
55'-1
/8"
55'-1
/8"
55'-1
/2"
27'-6 3/8"27'-5 1/8"
27'-5"
13,216.56 sf 13,187.74 sf16,011.88 sf
4,65
8.57
7 sf
14,382.67 sf
108'-7/8"
15,661.52 sf
2,481.508 sf
11,839.78 sf4,
515.
497
sf
11,997.03 sf
11,999.09 sf
1
2
3456
7
8
9A9B10/14/16 - Precast Erected Thru Area 7
11/2/16 - Precast Erected Thru Area 8
12/02/16 - Precast Erection Complete
CIP: Work Ongoing. Complete by 10/21
CIP: 10/24/16 - 11/04/16
CIP: 11/07/16 - 11/18/16
CIP: 12/05/16 - 12/16/16
KUMC Garage #5 - Erection / Pour Sequence
Elevator #3 and #4
Stair Tower #4 Structural Steel
Water Test - Elevator Shaft #2
Parking Office Flat Slab
Precast Progress