    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    1.0 INTRODUCTION

    1.1 BRIEF OF WORK

    2.0 PROPOSED PILOTING RECORD

    3.0 PROPOSED PILOTING PROFILE DATA

    3.1 PROPOSED PIPELINE DATA/PROPERTIES

    3.2 PROPOSED CURVATURE DATA

    4.0 CALCULATIONS

    4.1 MAXIMUM DEPTH FROM ENTRY TO HORIZONTAL PITCH

    4.2 MINIMUM HORIZONTAL LENGTH FROM ENTRY TO HORIZONTAL PITCH

    4.3 MAXIMUM DEPTH FROM HORIZONTAL PITCH TO EXIT

    4.4 MINIMUM HORIZONTAL LENGTH FROM HORIZONTAL PITCH TO EXIT

    5.0 CONCLUSION OF PROPOSED PILOTING PROFILE

    6.0 ATTACHMENTS

    - PROPOSED PROFILE DRAWING

    - SITE DATA PILOTING PROFILE RECORD

    TABLE OF CONTENT

  • 8/18/2019 KL1 15 HDD 3 Proposed

    2/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    1.0 INTRODUCTION

    This document is submitted to Gas Malaysia Bhd (GMB) for reviewal and to obtain approval from

    GMB to undertake the work of Horizontal Directional Drilling (HDD) for back-reaming and pipe-pulling

    for the Gas Pipeline Construction at Kuala Lumpur FL Stage 1/15 (Sunway Velocity).

    1.1 BRIEF OF WORK

    The work involves the proposed HDD for NPS 8" steel feeder line CH 665.00 to CH821.00.

    1.2 BRIEF OF SUBMISSION

    This submission briefly outline the following:

    i. Proposed Piloting Record

    ii. Proposed Piloting Profile Data

    iii. Proposed Curvature Data

    iv. Calculationsv. Proposed Profile Drawing

    The objective of this submission is to:

    i. Obtain approval from GMB for back-reaming and pipe-pulling work based on the GMB

    approved HDD piloting profile submission.

    ii. Calculate and analyse the proposed Maximum Depth, Dmax1 and max2 and Minimum Horizontal

    Length, L1 and 2 based on the proposed piloting profile and shall conform to GMB acceptance

    criteria.

    The acceptance criteria of the proposed piloting profile shall conform to the followings:

    i. The proposed Maximum Depth, Dmax1 and max2 shall less than the GMB Maximum Depth,

    Dmax1GMB and Max2GMB based on the GMB Minimum Bending Radius, RGMB.

    ii. The proposed Minimum Horizontal Length, L1 and 2 shall more than the GMB Minimum

    Horizontal Length, Lmin1GMB and min2GMB.

  • 8/18/2019 KL1 15 HDD 3 Proposed

    3/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    2.0 PROPOSED PILOTING RECORD

    ROD LENGTH 4.50 m ENTRY ANGLE = 11.00 %

    ROD PITCH CURVATURE HORIZONTAL DEPTH FROM EXISTING PIPE DEPTH PIPE LEVEL DEPTH FROM

    NO. LENGTH LENGTH ENTRY GROUND LEVEL FROM EGL FROM EGL EXIT

    (%) (m) (m) (m) (m FROM MSL) (m) (m FROM MSL) (m)

    0 11.00 4.50 0.00 0.00 38.45 0.00 38.45 1.00

    1 11.00 4.50 4.47 0.49 39.63 1.67 37.96 1.49

    2 10.00 9.00 8.95 0.94 39.61 2.10 37.51 1.94

    3 9.00 13.50 13.43 1.34 39.61 2.50 37.11 2.34

    4 8.00 18.00 17.92 1.70 39.61 2.86 36.75 2.70

    5 7.00 22.50 22.41 2.02 39.63 3.19 36.44 3.01

    6 6.00 27.00 26.90 2.28 39.64 3.47 36.17 3.28

    7 5.00 31.50 31.39 2.51 39.65 3.71 35.94 3.51

    8 4.00 36.00 35.89 2.69 39.66 3.90 35.76 3.69

    9 3.00 40.50 40.39 2.82 39.66 4.03 35.63 3.82

    10 2.00 45.00 44.89 2.91 39.65 4.11 35.54 3.91

    11 1.00 49.50 49.39 2.96 39.65 4.16 35.49 3.96

    12 0.00 54.00 53.89 2.96 39.65 4.15 35.49 3.96

    13 0.00 58.50 58.39 2.96 39.64 4.15 35.49 3.96

    14 0.00 63.00 62.89 2.96 39.63 4.14 35.49 3.96

    15 0.00 67.50 67.39 2.96 39.62 4.12 35.49 3.96

    16 0.00 72.00 71.89 2.96 39.60 4.11 35.49 3.96

    17 0.00 76.50 76.39 2.96 39.58 4.09 35.49 3.96

    18 0.00 81.00 80.89 2.96 39.57 4.07 35.49 3.96

    19 0.00 85.50 85.39 2.96 39.56 4.07 35.49 3.96

    20 0.00 90.00 89.89 2.96 39.64 4.15 35.49 3.96

    21 0.00 94.50 94.39 2.96 39.73 4.23 35.49 3.96

    22 0.00 99.00 98.89 2.96 39.80 4.31 35.49 3.96

    23 0.00 103.50 103.39 2.96 39.91 4.42 35.49 3.96

    24 -1.00 108.00 107.89 2.91 39.91 4.37 35.54 3.91

    25 -2.00 112.50 112.39 2.82 40.02 4.39 35.63 3.8226 -3.00 117.00 116.88 2.69 40.06 4.30 35.76 3.69

    27 -4.00 121.50 121.38 2.51 40.12 4.17 35.94 3.51

    28 -5.00 126.00 125.87 2.28 40.17 4.00 36.17 3.28

    29 -6.00 130.50 130.37 2.02 40.22 3.78 36.44 3.01

    30 -7.00 135.00 134.86 1.70 40.27 3.52 36.75 2.70

    31 -8.00 139.50 139.34 1.34 40.35 3.23 37.11 2.34

    32 -9.00 144.00 143.82 0.94 40.42 2.91 37.51 1.94

    33 -10.00 148.50 148.30 0.49 40.50 2.54 37.96 1.49

    34 -11.00 153.00 152.77 0.00 40.57 2.12 38.45 1.00

    35 -12.00 157.50 157.24 -0.53 39.45 0.47 38.98 0.47

    Maximum depth: From entry (m) = 4.16 From exit (m) = 5.16

  • 8/18/2019 KL1 15 HDD 3 Proposed

    4/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    ROD PITCH CURVATURE HORIZONTAL DEPTH FROM EXISTING DEPTH FROM PIPE LEVEL DEPTH FROM

    NO. LENGTH LENGTH ENTRY GROUND LEVEL EGL FROM EGL EXIT

    (%) (m) (m) (m) (m FROM MSL) (m) (m FROM MSL) (m)

  • 8/18/2019 KL1 15 HDD 3 Proposed

    5/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    3.0 PROPOSED PILOTING PROFILE DATA

      Min Bending Radius,R1   Min Bending Radius,R2

      R1-Dmax1   R2-Dmax2

      Entry Ground Level Ref Level2   Exit Point

      α2Ref Level1   α1

      Max Depth,Dmax1   Max Depth,Dmax2

      α0

      Horizontal Length,L1   Horizontal Horizontal Length,L2

      Length,L0

      Total Horizontal Length

    3.1. PROPOSED PIPELINE DATA/PROPERTIES

    Pipeline Material = Steel

    Nominal Pipeline Size = 8"

    Pipeline Wall Thickness = 7.90 mm

    Pipeline Outer Diameter, Do   = 219.1 mm

    Pipeline Inner Diameter,Di   = 203.3 mm

    Pipeline Grade = Grade X-42

    Pipeline Coating Type = 3 LPE

    3.2 PROPOSED CURVATURE DATA

    Horizontal Length,L1   = 49.39 m

    Horizontal Length,L0   = 54.00 m

    Horizontal Length,L2   = 53.86 m

    Total Horizontal Length = 157.24 m

    Entry Angle,α1   = 11.00 %

    Exit Angle,α2   = -12.00 %

    Entry Reference Level1   = 38.45 m

    Entry Ground Level = 38.45 m

    Maximum Depth,Dmax1   = 4.16 m

    Exit Reference Level2   = 38.98 m

    Exit Ground Level = 39.45 m

    Maximum Depth,Dmax2   = 5.16 m

  • 8/18/2019 KL1 15 HDD 3 Proposed

    6/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    4.0 CALCULATIONS

    4.1 MAXIMUM DEPTH FROM ENTRY TO HORIZONTAL PITCH

    Min Bending Radius,R1

      R1-Dmax1

      Entry Point Entry Reference Level1

      α1   Ground Level

      Maximum Depth,Dmax1

      α0

      Horizontal Length,L1

    Minimum Bending Radius by GMB,RGMB = 1000 Do

    RGMB = 219.10 m

    Maximum Depth based on Minimum Bending Radius by GMB with Horizontal LengthL1 :Dmax1GMB

    → Horizontal Length,L1 = 49.39 m

    → RGMB = 219.10 m

    Hence, R1 -Dmax1 = √(RGMB) - (L1)

    = 213.46 m

    Therefore, Dmax1GMB = RGMB - (R1 - Dmax1)

    = 5.64 m

    Proposed Maximum Depth,Dmax1 = 4.16 m

    Since, Dmax1GMB > Dmax1, maximum depth proposed is ACCEPTABLE

  • 8/18/2019 KL1 15 HDD 3 Proposed

    7/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    4.2 MINIMUM HORIZONTAL LENGTH FROM ENTRY TO HORIZONTAL PITCH

    Min Bending Radius,R1

      R1-Dmax1

      Entry Point Entry Reference Level1

      α1   Ground Level

      Maximum Depth,Dmax1

      α0

      Horizontal Length,L1

    Minimum Bending Radius by GMB,RGMB = 1000 Do

    RGMB = 219.10 m

    Minimum Horizontal Length on Minimum Bending Radius by GMB with Maximum Depth,Dmax1: Lmin1GMB

    → Maximum Depth,Dmax1 = 4.16 m

    → RGMB -Dmax1 = 214.94 m

    Therefore, Lmin1GMB = √(RGMB)2 - (RGMB - Dmax1)

    2

    = 42.48 m

    Proposed Horizontal Length,L1 = 49.39 m

    Since, L1 > Lmin1GMB, horizontal length proposed is ACCEPTABLE

  • 8/18/2019 KL1 15 HDD 3 Proposed

    8/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    4.3 MAXIMUM DEPTH FROM HORIZONTAL PITCH TO EXIT

      Min Bending Radius,R2

      R2-Dmax2

    Entry Reference Level2   Exit Point

      Ground Level   α2

      Max Depth,Dmax2

    α0

      Horizontal Length,L2

    Minimum Bending Radius by GMB,RGMB = 1000 Do

    RGMB = 219.10 m

    Maximum Depth based on Minimum Bending Radius by GMB with Horizontal Length,L2 :DmaxGMB

    → Horizontal Length,L2 = 53.86 m

    → RGMB = 219.10 m

    Hence, R2 -Dmax2 = √(RGMB) - (L2)

    = 212.38 m

    Therefore, Dmax2GMB = RGMB - (R2 - Dmax2)

    = 6.72 m

    Proposed Maximum Depth,Dmax2 = 5.16 m

    Since, Dmax2GMB > Dmax2, maximum depth proposed is ACCEPTABLE

  • 8/18/2019 KL1 15 HDD 3 Proposed

    9/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    4.4 MINIMUM HORIZONTAL LENGTH FROM HORIZONTAL PITCH TO EXIT

      Min Bending Radius,R2

      R2-Dmax2

    Entry Reference Level2   Exit Point

      Ground Level   α2

      Max Depth,Dmax2

    α0

      Horizontal Length,L2

    Minimum Bending Radius by GMB,RGMB = 1000 Do

    RGMB = 219.10 m

    Minimum Horizontal Length on Minimum Bending Radius by GMB with Maximum Depth, Lmin2GMB

    → Maximum Depth,Dmax2 = 5.16 m

    → RGMB -Dmax2 = 213.94 m

    Therefore, Lmin2GMB = √(RGMB) - (RGMB - Dmax2)

    = 47.25 m

    Proposed Horizontal Length, L2 = 53.86 m

    Since, L2 > Lmin2GMB, horizontal length proposed is ACCEPTABLE

    5.0 CONCLUSION OF PROPOSED PILOTING PROFILE

    Based on the calculation, all acceptance criteria are met.

  • 8/18/2019 KL1 15 HDD 3 Proposed

    10/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    6.0 ATTACHMENTS

  • 8/18/2019 KL1 15 HDD 3 Proposed

    11/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    SITE DATA PILOTING PROFILE RECORD

    Chainage :

    Date :

    ROD PITCH PIPE DEPTH UTILITY DEPTH

    NO. FROM EGL FROM EGL REMARK

    (%) (m) (m)

    0

    1 0.3m TNB Cable

    2 0.5m Water Pipeline

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    2425

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    HDD Supervisor : BESB QC : GMB Rep :

    Date : Date : Date :

  • 8/18/2019 KL1 15 HDD 3 Proposed

    12/13

    Broadgate Engineering (M) Sdn Bhd EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/15, KUALA LUMPUR

    SITE DATA PILOTING PROFILE RECORD

    Chainage :

    Date :

    ROD PITCH PIPE DEPTH UTILITY DEPTH

    NO. FROM EGL FROM EGL REMARK

    (%) (m) (m)

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    6061

    62

    63

    64

    65

    66

    67

    68

    69

    70

    HDD Supervisor : BESB QC : GMB Rep :

    Date : Date : Date :

  • 8/18/2019 KL1 15 HDD 3 Proposed