2
www.thamestunnelconsultation.co.uk Kirtling Street  New Covent Garden Market Royal Mail Sorting Office Kirtli ng St reet Nine Elms Pier Battersea Power Station   B  a  t  t  e  r  s  e  a   P  a  r   k   R  o  a  d C r i n g l e  S t r e e t   N   i   n  e   E   l   m   s   L  a   n  e N CITY OF WESTMINSTER WANDSWORTH Local authority boundary Draft limit of land to be acquired or used Proposed tunnel route – centreline Heathwall Pumping Station site Location plan  Jack up barge servicingpiling operations Cranes Piling rig Conveyor Shaft N Maximum extent of construction site for phases 1 and 2 Site hoarding Site support/welfa re Excavated material storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path ThamesPathdiversion  Aerial view of the completed works Phases one and two construction plan  Shaft Barges Gantry crane N Maximum extent of construction site for phase 3 Site hoarding Sitesupport/welfare Excavatedmaterial storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path Thames Path diversion Noise enclosure over shaft and gantry crane Crane Conveyor  N Shaft Gantry crane Conveyor Maximum extent of construction site for phases 4 and 5 Site hoarding Site support/welfar e Excavatedmaterial storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path Thames Path diversion Noise enclosure over shaft and gantry crane  Permanent access for maintenance Combined ventilation structure and equipmentkiosk Safeguarded Wharf jetty retained Temporary hoarding around site for development by others ‘Riverlight’ development Nine Elms pier Kirtling Street resurfaced Thames Path wayfinding signage Kirtling Street C r i n g l e  S t r e e t     N    i    n   e     E     l    m   s     L   a    n   e N New fence to boundary of concrete batching works site Layout of the site once construction works complete Phase three construction plan Phases four and ve construction plan

Kirtling_St display board

Embed Size (px)

Citation preview

8/3/2019 Kirtling_St display board

http://slidepdf.com/reader/full/kirtlingst-display-board 1/1

www.thamestunnelconsultation.co.uk

Kirtling Street

 

New CoventGarden Market

Royal MailSorting Office

Kirtling Street Nine Elms Pier

Battersea PowerStation

  B a t t e

 r s e a   P

 a r  k   R o

 a d

C r i n g l e  S t r e e t   N  i  n e

  E  l  m  s  L

 a  n e

N

CITY OF WESTMINSTER

WANDSWORTH

Local authority boundary

Draft limit of land tobe acquired or used

Proposed tunnelroute – centreline

Heathwall PumpingStation site

Location plan

 

Jack up bargeservicing pilingoperations

Cranes

Piling rig

Conveyor

Shaft

N

Maximum extent of construction site forphases 1 and 2

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

 

Aerial view of the completed works

Phases one and two construction plan

 

Shaft

Barges

Gantry crane

N

Maximum extent of construction site forphase 3

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

Noise enclosure overshaft and gantry crane

Crane

Conveyor

 

N

Shaft

Gantry crane

Conveyor

Maximum extent of construction site forphases 4 and 5

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

Noise enclosure overshaft and gantry crane

 

Permanentaccess for

maintenance

Combinedventilation

structure andequipment kiosk

SafeguardedWharf jetty

retained

Temporaryhoardingaround site fordevelopmentby others

‘Riverlight’development

Nine Elms pier

Kirtling Streetresurfaced

Thames Pathwayfinding

signage

Kirtling Street

C r i n g l e  S t r e e t 

    N   i   n

  e    E    l   m

  s    L  a   n

  e

N

New fence toboundary of concrete

batching works site

Layout of the site once construction works complete

Phase three construction plan

Phases four and ve construction plan