KERTAS TAKLIMAT TAPAK

KERJA-KERJA PEMBAIKAN STRUKTUR DAN PENDAWAIAN ELEKTRIK SMK BANGGI KUDAT

TENDER - NSC MEKANIKAL

SISTEM PAM PENGGALAK & SISTEM PENCEGAH KEBAKARAN

Page 2: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

PERINGATAN KEPADA KONTRAKTOR

1. SILA PASTIKAN DOKUMEN TENDER DIISI DENGAN LENGKAP BERDASARKAN SPESIFIKASI YANG TELAH DITENTUKAN

DALAM DOKUMEN TENDER.

2. DOKUMEN TAWARAN TENDER YANG TIDAK DIISI DENGAN LENGKAP DAN TIDAK MEMENUHI SPESIFIKASI AKAN DITOLAK.

3. LAWATAN TAPAK ADALAH TIDAK DIWAJIBKAN. NAMUN DEMIKIAN, KONTRAKTOR ADALAH DINASIHATKAN UNTUK MEMBUAT LAWATAN TAPAK SENDIRI BAGI MENDAPATKAN GAMBARAN SEBENAR KEADAAN TAPAK SEBELUM MENGHARGAKAN DOKUMEN TENDER (JIKA PERLU).

4. SEKIRANYA PETENDER MAHU MELAWAT SENDIRI KAWASAN ATAU TAPAK BERKENAAN, SILA HUBUNGI PEMILIK PREMIS TERLEBIH DAHULU UNTUK MENDAPATKAN KEBENARAN. SILA AMALKAN PENJARAKAN SOSIAL, PENGGUNAAN HAND SANITIZER DAN PEMAKAIAN PELITUP MUKA (FACE MASK) SEPANJANG MASA BERADA DI TAPAK .

5. SLAID INI HANYALAH GAMBARAN KASAR UNTUK KEADAAN DI TAPAK.

6. KONTRAKTOR DIKEHENDAKI UNTUK MEMBACA SERTA MEMAHAMI BQ, DAN SPESIFIKASI SEBELUM MENGHARGAKAN DOKUMEN TENDER.

7. HARGA MESTILAH KOMPETITIF DAN BERDASARKAN HARGA PASARAN SEMASA.

Page 3: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

MAKLUMAT PELAN LOKASI SEKOLAH YANG TERLIBAT SEKOLAH MENENGAH

KEBANGSAAN (SMK) BANGGI,

KUDAT

KOORDINAT 7.1307° N, 117.0738° E

JARAK DARIPADA BANDAR KOTA

KINABALU

180KM KE JETI TERMINAL FERI

KUDAT, 1 JAM 40 MINIT

PERJALANAN MENAIKI FERI KE JETI

PULAU BANGGI, 3KM DARI JETI

BANGGI KE SMK BANGGI

KEADAAN JALAN BERTURAP

PENGAKUTAN KE LOKASI KENDERAAN BIASA

Page 4: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

1) Berdaftar dengan CIDB G3

Kategori ME, Pengkhususan : B10 (Pemasangan Paip Air Dalaman)

DAN M02 (Sistem Pencegahan dan Perlindungan Kebakaran)

dan

Memegang Sijil Perolehan Kerja Kerajaan (SPKK) yang masih sah

ATAU

2) Berdaftar dengan PUKONSA D;

Pengkhususan : Tajuk III – Tajuk kecil 3 (Pemasangan Paip dan Alat-

alat kebakaran)

dan

Memegang perakuan pendaftaran CIDB yang masih sah

Page 5: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

MAKLUMAT TENDER NAMA TENDER : KERJA-KERJA PEMBAIKAN DAN PENDAWAIAN ELEKTRIK DI

SMK BANGGI,KUDAT, SABAH

[NSC MEKANIKAL - SISTEM PAM PENGGALAK DAN SISTEM

PENCEGAH KEBAKARAN]

TARIK DOKUMEN DIJUAL : 10 Disember 2020 – 4 Januari 2021

TEMPAT DOKUMEN DIJUAL : Kaunter Penjualan Dokumen Tender, Tingkat Bawah, Ibu Pejabat

JKR, 88582 Kota Kinabalu.

HARGA DOKUMEN DIJUAL : RM 150.00

TARIKH TUTUP TENDER : 4 Januari 2020 (Isnin - Jam 12.00 Tengahari)

TEMPAT MEMASUKAN TENDER : Peti Tender,

Lembaga Perolehan Persekutuan Sabah,

Lobby PAH, Level 3,

Sabah International Convention Centre (SICC),

Jalan Tanjung Lipat,

88400 KOTA KINABALU, SABAH.

Page 6: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SKOP KERJA

A)SISTEM PAM

PENGGALAK

BOOSTER PUMP SYSTEM AND PUMPHOUSE

1) Dismantling, cleaning and clearing, making good works for preparation

of existing old pump house, to place new Booster Pump system.

2) Supply and install electric motor driven vertical multistage inline

centrifugal pump system(duty and standby, head = min 35 meter,

flowrate = min 36 m3/hr) complete with starter, mounting, base plates,

concrete plinth, neoprene pads etc and other necessary valves, fitting

and wiring works.

3) Supply and install control c/w conduit,cabling control wiring between

switchboard and various equipment, switches and controls, 30 A

ammeter, voltmeter, overvoltage protector etc.

4) Supply and install 50 mm diameter non modulating stainless steel float

valve for every storage tank at each block within the scope of work (27

units).

Page 7: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SKOP KERJA

A)SISTEM PAM

PENGGALAK

5) Supply and install sensor cable c/w G.I conduit from existing suction

tank to pumpset c/w float swithc, support, brackets etc.

6) Piping works within pump room, single line schematic diagram, valve

indicator etc.

EXTERNAL WORKS - SERVICE PIPE

7) Supply and install Galvanized iron (G.I) Class C (100mm dia, 80 mm dia

and 50mm dia) pipeworks above ground and underground, covering from

existing suction tanks towards pumphouse, and from pumphouse booster

pump to each respective blocks' storage tanks via riser pipe. Blocks

covered are Surau, Main Office, Canteen,Classroom, Laboratories, Bengkel

Kemahiran Hidup, Asrama Perempuan, Asrama Lelaki, Dewan Makan, dan

Kuarters Guru (16 units).

Page 8: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SKOP KERJA

A)SISTEM PAM

PENGGALAK

SUCTION TANKS,STORAGE TANKS AND RAINWATER HARVESTING

TANKS

8) Making good works for existing suction tanks.

9) Supply and install SIRIM approved HDPE type storage tank (400 gallons

and 800gallons) c/w accessories and fittings, inlet outlet opneing, float

valve, piping connection, drain/overflow piping, hoisted and place outside

of building, placed higher than intended building. Installation is inclusive

of metal trestle with a height of min 40 feet from ground level.

10) Supply and install Rainwater Harvesting Tank for each block , c/w all

accessories and fittings, inlet/outlet opening, inspection chamber, air bemt,

gate valve, piping connection, drain piping and place on ground level on

metal trestle.

11) Making good works for existing metal trestle for rainwater

harvesting trestles.

Page 9: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SKOP KERJA

A)SISTEM PAM

PENGGALAK

INTERNAL PLUMBING SYSTEM

12) Supply and install Internal pipeworks using Class E PN15 ABS piping (

25mm dia,20 mm dia,and 15 mm dia) for each blocks, covering from

storage tank downpipe to buildings toilets, c/w fittings, connection, bracket

and support, concealed works, elbow, tee, reducer, valve, bends etc. Blocks

covered are Surau, Main Office, Canteen,Classroom, Laboratories, Bengkel

Kemahiran Hidup, Asrama Perempuan, Asrama Lelaki, Dewan Makan, dan

Kuarters Guru (16 units).

TESTING AND COMMISSIONING

13) Testing and commissioning of whole installed booster pumping system

Page 10: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SKOP KERJA

B) SISTEM

PENCEGAH

KEBAKARAN

FIRE EXTINGUISHERS

1) Supply and install fire extinguishers of 9KG ABC and 5 KG C02 types c/w

BOMBA sticker and lockable cabinets covering for Surau, Main Office,

Canteen,Classroom, Laboratories, Bengkel Kemahiran Hidup, Asrama

Perempuan, Asrama Lelaki, Dewan Makan, dan Kuarters Guru (16 units).

Page 11: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

PELAN TOP VIEW SMK BANGGI DARIPADA GOOGLE EARTH

Page 12: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

PELAN TOP VIEW SMK BANGGI DARIPADA GOOGLE EARTH DENGAN LABEL

Page 13: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

SCHOOL ENTRANCE AND MAIN CON SIGNBOARD

Page 14: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

EXISTING 2 UNITS SUCTION TANK

Page 15: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

OLD PUMPHOUSE

Page 16: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

EXISTING RAINWATER HARVESTING TANK AND WATER STORAGE TANKS DI BLOK KUARTERS

GURU

Page 17: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

RAINWATER HARVESTING TANKS AT DEWAN MAKAN AND BLOCK ASPURI

Page 18: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

EXISTING WATER STORAGE TANK AND RAINWATER HARVESTING TANK AT CLASSROOM AND

LAB BLOCKS

Page 19: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

WALKWAYS

Page 20: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

WALK WAYS ( SURAU AND SUCTION TANK BEHIND [UPHILL], WALKWAYS IN THE MIDDLE OF

SCHOOL

Page 21: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

SCHOOL SURROUNDINGS ( BENGKEL KH, ASPURI, OFFICE, CLASSROOM, LAB)

Page 22: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEBAHAGIAN GAMBARAN TAPAK

SCHOOL SURROUNDINGS (ASPURA AND KUARTERS GURU BLOCK)

Page 23: KERTAS TAKLIMAT TAPAK - Jabatan Kerja Raya Sabah

SEKIAN, TERIMA KASIH