Upload
vuongdan
View
217
Download
2
Embed Size (px)
Citation preview
KEMPSEY WASTE AND EDUCATION STRATEGY 2014-15 TO 2021-22
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Hyder Consulting Pty Ltd
ABN 76 104 485 289
Level 16, 31 Queen Street
Melbourne VIC 3000
Australia
Tel: +61 3 8623 4000
Fax: +61 3 8623 4111
www.hyderconsulting.com
KEMPSEY SHIRE COUNCIL
WASTE AND EDUCATION STRATEGY 2014-15 TO 2021-22
Final Strategy
Author
Charlotte Wesley, Sara-
Rose Pogson, Tanya
Rajaratnam, Janelle
Booth, Warren Burgess
Checker Matt Genever
Approver Matt Genever
Report No AA006543-R03-02
Date 24 November 2014
This report has been prepared for Kempsey Shire Council in
accordance with the terms and conditions of appointment for
Waste and Education Strategy 2014-15 to 2021-22 dated 18
November 2014. Hyder Consulting Pty Ltd (ABN 76 104 485
289) cannot accept any responsibility for any use of or
reliance on the contents of this report by any third party.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page i
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
CONTENTS
1 Executive Summary ....................................................................................................................... 3
Preamble ........................................................................................................................................... 3 1.1
2 Action Plans ................................................................................................................................... 6
3 Introduction .................................................................................................................................. 19
Need For This Strategy.................................................................................................................... 19 3.1
Guiding Principles ............................................................................................................................ 22 3.2
4 Where Are We Now? ................................................................................................................... 23
Kempsey’s People and Economy .................................................................................................... 23 4.1
How Do We Perform Against Industry Benchmarks ........................................................................ 23 4.2
Where Does Our Waste Come From? ............................................................................................. 25 4.3
Recovery of Waste .......................................................................................................................... 29 4.4
Kerbside Bin Services ..................................................................................................................... 30 4.5
Where Does The Waste Go? ........................................................................................................... 31 4.6
5 Where Do We Want To be? ........................................................................................................ 34
Avoid and Reduce Waste ................................................................................................................ 35 5.1
Increase Recovery of Waste ............................................................................................................ 37 5.2
Improve Problem Waste Management ............................................................................................ 38 5.3
Reduce Litter and Illegal Dumping ................................................................................................... 39 5.4
6 Tracking Our Progress ................................................................................................................ 41
APPENDICES
Appendix A
Appendix B
Appendix C
Measurement of progress against targets
Detailed Policy Context
Options Analysis
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 2
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Definitions
Term Definition
BWRF Better Waste Recycling Fund – The EPA returns a proportion of the waste levy
payments Council submits based on population size.
Commercial and
Industrial Waste
(C&I)
Solid waste generated by businesses, industries (including shopping centres,
restaurants and offices) and institutions (such as schools, hospitals and
government offices), but not C&D waste or MSW
Construction and
Demolition Waste
(C&D)
Solid waste sourced from construction and demolition works, including building
and demolition waste, asphalt waste and excavated natural material.
Gate Fee (or tipping
fee)
The charge to bury or process a given quantity/type of waste material when
received for disposal at a designated waste management facility.
FOGO Food Organics and Garden Organics
Landfill A State regulated local waste disposal site designed for proper disposal of solid
wastes into managed land filled areas.
Materials recovery
facility (MRF)
A materials recovery facility is a specialised plant that receives, separates and
prepares recyclable materials for marketing to end-users.
Municipal Solid
Waste (MSW)
Solid waste from households and local government operations, including waste
placed at the kerbside for local council collection and waste collected by councils
from municipal parks and gardens, street sweepings, council engineering works
and public council bins
Problem Wastes
Problem wastes can include e-waste, paint, batteries, smoke detectors,
fluorescent lamps, gas bottles and fire extinguishers, motor oils and fluids, and
other toxic and hazardous household products.
Recovery A process that extracts materials or energy from the waste stream.
Recovery rate Solid waste recycled and recovered for energy (net of contaminants/residuals) as
a proportion of waste generation.
Recycling A set of processes (including biological) that converts solid waste into useful
materials or products, net of contaminants/residuals disposed.
Recycling rate Solid waste recycled (net of contaminants/residuals) as a proportion of waste
generation.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 3
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
1 EXECUTIVE SUMMARY
PREAMBLE 1.1
Growing costs of disposing waste to landfill, coupled with increasing community concern about
conservation of resources, greenhouse gas emissions, environmental pollution and costs of
living, have driven the need for Kempsey Shire Council (KSC) to seriously consider the future
direction for waste minimisation and management within Kempsey Shire.
This Waste and Education Strategy 2014-15 to 2021-22 (“this Strategy”) is a vision for the
minimisation of waste, recovery of waste, and better waste management services within
Kempsey to promote economic sustainability in conjunction with positive environmental and
social outcomes. It describes a number of areas in which KSC plans to take definitive steps
towards keeping waste management affordable whilst delivering better waste services and
infrastructure and encouraging the community to adopt more environmentally sustainable
behaviours.
This Strategy is based on the requirements placed on local governments by the NSW State
Government (as contained in the NSW Draft Waste and Resource Recovery (WARR) Strategy
2013-21) and has been developed to synergistically benefit from the Midwaste Regional Waste
Avoidance and Resource Recovery Strategy 2014-21, which outlines the Mid North Coast’s
strategic response to the NSW Draft WARR Strategy. Aligning this Strategy with the State and
regional WARR strategies provides KSC with greater potential to gain contestable Waste Less,
Recycle More funding and take advantage of regional collaboration to best meet the ambitious
State targets. However, whilst consistent with the overall direction of the broader strategies, it is
important to note that the KSC Strategy is tailored to address unique local issues and
challenges, and focusses strongly on identifying and delivering solutions from the local level up.
The Macleay Valley 2036 Community Strategic Plan details the driving goals which shape the
actions and outputs desired by the community for the future. The 2013-2017 Delivery Program
lists the program item “Minimise Impacts Of Waste & Safely Dispose Of Waste Products” under
the primary strategy;
HS-04 Restore damaged environments and removal of environmental threats
The program has linkages to the secondary strategies of;
HS-05 Use planning controls to ensure that environmental impacts do not negatively
affect lifestyle
HS-06 Minimise risk to community’s health
WS-05 Increasing value of production
SOS-03 Include social behaviour as part of education
To measure performance against the objectives in the Community Strategic Plan & Delivery
Program, KSC plans to achieve the following overarching key performance indicator (KPI)
targets that are specified in the 2013-2017 Delivery Program
Reduce the quantity of domestic waste material disposed of to landfill each year to below
4,400 tonnes
Increase the quantity of domestic waste material diverted from landfill each year to more
than 6,600 tonnes
Achieve greater that a 60% diversion of domestic waste from landfill to reuse/recycling
each year.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 4
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Kempsey Shire Council’s strategy to promote waste avoidance, resource recovery and improve
waste management between 2014-15 and 2021-22 involves undertaking action in the following
four focus areas, which are further described below:
1 Avoid and reduce waste
2 Recover more waste
3 Improve management of problem wastes
4 Reduce litter and illegal dumping
Each focus area is supported by an Action Plan, which contains a specific objective, related key
performance indicators and associated targets, and actions designed to enable KSC to achieve
these objectives and targets. The actions incorporate a series of priority steps that are linked to
a timeline and a budget estimate for implementation, against which performance can be
monitored and tracked.
Each of the focus areas are summarised below, followed immediately by the detailed Action
Plans which have been included in the Executive Summary so that the implementation element
of this Strategy is directly accessible to the reader.
Avoid and Reduce Waste
Kempsey Shire Council aspires to improve the use of resources within the Kempsey community
in order to avoid creating unnecessary waste. To measure performance against this objective,
KSC plans to achieve the following key performance indicator (KPI) target:
By 2021-22 to reduce waste generation per capita, when compared to the baseline period
2011-12.
KSC will undertake four key actions in order to improve the use of resources and reduce waste
generation within its community:
1 Build capacity for reuse of materials
2 Support households and businesses in reducing disposal of food waste
3 Reduce the impact of tourism on overall waste generation and littering
4 Improve capacity of the community to make more sustainable consumption choices
Increase Recovery of Waste
Kempsey Shire Council aims to increase the recovery of waste materials in order to meet the
State targets that reduce landfill impacts, to boost the local economy through new industry, and
to use natural resources more sustainably.
To measure performance against this objective, KSC will use the following KPIs and plans to
work towards increasing the:
recycling rate of municipal solid waste (MSW) to 70% by 2021-22
recycling rate for commercial and industrial (C&I) waste to 70%, by 2021-22
recycling rate for construction and demolition (C&D) waste to 80%, by 2021-22
waste diverted from landfill (across the MSW, C&I and C&D streams) to 75% by 2021-22.
KSC will undertake four key actions in order to increase the recovery of waste within the local
government area:
1 Recover more organics from the residual waste stream
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 5
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
2 Improve source separation of commingled recyclables through best practice kerbside
collection contracts
3 Further develop industry partnerships to encourage waste recovery in the C&I and C&D
sectors
4 Improve the Waste Management Centre to process more C&I and C&D material for
greater resource recovery
Improve Problem Waste Management
Kempsey Shire Council aims to better manage problem wastes so as to reduce potential risks to
environmental and human health. To measure performance against this objective, KSC plans to
achieve the following KPI target:
Provide all Kempsey residents with reasonable access to a facility for correct disposal of
problem wastes, by 2017-18.
Improving the management of problem wastes will prove challenging, especially considering the
convenience of the kerbside general waste bin, and requires government and the community to
both play their part. To this end, KSC will undertake two key actions in order to improve problem
waste management:
1 Provide improved infrastructure to collect problem wastes
2 Engage the community to correctly dispose problem wastes
Reduce Litter and Illegal Dumping
Kempsey Shire Council plans to improve the Kempsey region’s amenity and decrease risks to
humans, animals and the environment caused by incorrectly disposed waste. To deliver this
objective, KSC plans to:
Reduce the incidence of littering and illegal dumping in identified community hotspots
annually through enforcement and education programs by 2021-22.
KSC plans to undertake two key actions in order to reduce littering and illegal dumping:
1 Gather and analyse data to better understand the sources and causes of litter and illegal
dumping in the Kempsey region
2 Utilise data to inform, develop and target education and enforcement actions
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 6
2 ACTION PLANS
Focus Area 1 - Avoid and Reduce Waste
Key Actions Key Steps Timeline Costing
1 – Avoid and Reduce Waste
Objective: To improve the use of resources within the Kempsey community in order to avoid creating unnecessary waste
Key Performance Indicator and Target: To reduce waste generation per capita by 2021-22, when compared to the baseline period 2011-12
1.1 Build capacity for
reuse of materials
Short-term Priorities:
Implement measures to improve the efficiency and
capacity of existing ReUse shop including new
roofed and hard stand area.
July 2015
$107,000 from Waste Less Recycle More Initiative.
Review and revise KSC’s waste website to ensure
it is up to date, relevant and an informative
resource
July 2015 / ongoing Incorporated within current waste and education budgets
Develop a listing of regular waste types and
quantities received and identify opportunities for
others to reuse these waste streams
August 2015/ Yearly Incorporated within current waste and education budgets
Identify opportunities for social enterprise to
develop and operate the Reuse Shop
June 2016 Incorporated within current waste and education budgets
Continue to work with Macleay Options and
explore opportunities to expand infrastructure to
enable the stripping of mattresses
August 15 – On going WLRM funding available in August 2015. Budget to be
incorporated with current BWRF project and Macleay Options
funding.
Continue to support the Men’s and Ladies Shed
initiative through awareness-raising and building
capacity for expansion of operations.
January 2016 Midwaste project and Incorporated within current waste and
education budgets
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 7
Key Actions Key Steps Timeline Costing
Medium-term Actions:
Develop market to collect reusable goods at
transfer stations, for sale at existing ReUse shop
or through new ReUse shop operations at SWR
June 2015 – June 2017
$70,00 per reuse shop. WLRM funding to be sourced to offset
capital costs. SWR to be the first priority.
Construct undercover areas with suitable storage
for reusable goods/materials at transfer stations
and the waste management centre
June 2017 Linked with Reuse shop infrastructure primarily at SWR transfer
station.
Implement regional community-based projects
(e.g. clothing swap events, Junk Art exhibitions
etc.).
June 2017
$3,000. Midwaste to fund one event with KSC
1.2 Support households
and businesses to
reduce disposal of food
waste
Short-term Priorities:
Continue program offering subsidised compost
bins to schools and early childhood centres
Yearly $1,500 annually, from within existing Waste and Education budget
Work with the Midwaste region to expand and
improve behaviour-change programs such as the
Love Food Hate Waste program with households
and business.
2014 – June 2017
$0. Contingent on Midwaste funding.
Investigate the feasibility of offering green bin
waste collection services to commercial properties
August 2016 $0. This will be funded with new collections contract. User pays
system. Linked to action 2.1
Review the kerbside collection service to optimise
the recovery of greenwaste within the community
August 2016 Linked to Action 2.1
Investigate the feasibility of offering greenwaste
services to commercial properties
August 2016 $0. This will be funded with new collections contract. User pays
system. Linked to action 2.1
Continue to provide kitchen foodwaste collection
bins and compostable liner bag replacements to
domestic properties
Ongoing. Funded directly through existing Domestic Waste Collection
service. Linked to action 2.1.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 8
Key Actions Key Steps Timeline Costing
Medium-term Actions:
Work with the Midwaste region to develop and
implement region-wide home composting
program, incorporating focus on households, as
well as community composting locations (i.e.
schools, early childhood centres, community
centres, community gardens).
December 2015 – June 2017
Contingent on Midwaste or other external funding.
1.3 Reduce impact of
tourism upon waste
generation
Short-term Priorities:
Review service requirements for caravan parks
and major accommodation/hospitality providers.
October 2015 $0. Incorporated within current waste and education budgets
Expand the provision of public place waste and
recycling infrastructure.
April 2015 – Jun 2022 $50,000. Contributions funded yearly with the BWRF and
Midwaste contributions
Investigate weekly waste and recycling collections
during the peak holiday period in December &
January each year
October 2016 To be funded from respective increases in the domestic waste
collection charges commensurate with the increased costs to
Council.
Investigate expansion and promotion of
permanent and portable water refill stations in
public places and at community events.
Dec 2014 – June 2017
$0. Water refill stations are currently being installed in key
locations. Midwaste has supported KSC with a portable refill
station at Kempsey Riverside Markets
Subsidies Macleay Valley Markets to provide
plastic bag-less events through the provision of
reuse bags
July 2015 $2,000. Incorporated within current waste and education budgets
Develop a dog waste strategy and install dog bag
dispensers to reduce the incidence of dog waste.
Install new dispensers each year at key locations.
Dec 2014 – July 2018 $10,000. Per year Incorporated within current waste and
education budgets
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 9
Key Actions Key Steps Timeline Costing
Medium-term Actions:
Develop and promote and provide practical
support for Waste Wise Events through
collaborative partnerships with event organisers,
event waste guidelines, event bins infrastructure
support and education materials.
July 2016 $1,000. Incorporated within current waste and education budgets
Work with tourism operators to gather further
information on waste management attitudes and
behaviour of local tourists.
June 2016
Incorporated within current waste and education budgets
1.4 Improve capacity of
the community to make
more sustainable
consumption choices
Short-term Priorities:
Work with community groups to develop initiatives
to promote avoidance of single-use and
excessively packaged products frequently used by
tourists (surf riders at Crescent Head)
June 2015 – June 2021 Linked to Macleay Valley Markets initiative. Incorporated within
current waste and education budgets
Develop partnerships with community
organisations to drive community change
programs. Surf Riders Keep NSW Beautiful Grant
submission
June 2015 – on going $10,000 from Public place recycling initiative
Expand targeted business waste reduction
program for shopping centres and major C&I
waste generators
Ongoing from 2014 $5,000 annually over first 3 years, then to be reviewed.
Incorporate sustainable shopping and waste
avoidance principles into existing education
programs and resources, including online
resources, community workshops and
presentations, event stalls, local media
communications.
Ongoing from 2014 $3,000 annually over first 3 years, then to be reviewed.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 10
Key Actions Key Steps Timeline Costing
Medium-term Actions:
Expand targeted business waste reduction
program for shopping centres and major C&I
waste generators
July 2016 $5,000 annually. Incorporated within current waste and education
budgets
Incorporate sustainable shopping and waste
avoidance principles into existing education
programs and resources, including online
resources, community workshops and
presentations, event stalls, local media
communications.
July 2016 $3,000 annually Incorporated within current waste and education
budgets
Promote avoidance of single-use products and
excessive packaging through expansion of the
Schools Waste-Wise program and awards
scheme.
June 2016 – June 2022 In partnership with Midwaste program
Investigate a general business waste avoidance
measures through expansion of Business Waste-
Wise program and awards scheme.
July 2017 Scoping required
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 11
Focus Area 2 – Recover More Waste
Key Actions Key Steps Timeline Costing
2 – Increase Recovery of Waste
Objective: To increase the recovery of waste materials in order to reduce landfill impacts, to boost the local economy through new industry, and to use natural resources more
sustainably.
Key Performance Indicators and Targets:
To contribute to the following targets:
increase the recycling rate for MSW to 70% by 2021-22
increase the recycling rate for C&I waste to 70% by 2021-22
increase the recycling rate for C&D waste to 80% by 2021-22
increase the waste diverted from landfill (across the MSW, C&I and C&D streams) to 75% by 2021-22
2.1 Recover more
organics from the
residual waste stream
Short-term Priorities:
Maintain FOGO kitchen foodwaste bins and
compostable liner bag supply to all residents with
green bins
Jan 2015 $93,000 from WLRM funding received and maintained within
existing waste collection contract budget
Improve data collection in order to test efficiency
of FOGO roll-out
June 2015 To be included within regular waste audits, as per Action 2.2
below
Medium-term Actions:
Work regionally to investigate the cost-benefit of
processing local organics vs. central processing
June 2015 to June 2016 Incorporated within current waste and education budgets
Work regionally to align recycling educational
messages and deliver regional education program
to reduce contamination of organics and increase
capture of organics
June 2016 Dependent upon scope of program
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 12
Key Actions Key Steps Timeline Costing
Develop and deliver a detailed FOGO
communication and education plan, with a flagship
locally recognisable marketing theme and high
profile ambassador to promote the service
October 2016 $15-$20,000
Monitor regional developments in energy-from-
waste options for energy recovery
Ongoing $0 Incorporated within current waste and education budgets
2.2 Improve kerbside
waste collection systems
and source separation of
organics and
commingled recyclables
Short-term Priorities:
Plan for and introduce a new Kerbside Collection
Contract, including but not limited to:
Investigate best practice kerbside collection
options to help achieve NSW EPA Waste
avoidance targets
Rollout of FOGO as per Action 2.1 above
Determining feasibility and scope of a further
rollout of public place recycling
Determining the most effective way to collect
public place recycling
2014 – October 2016 Community Consultation, planning and procurement may cost in
the vicinity of $50,000 - $100,000. Included in new waste
collection contract.
Investigate regional processing of 3 bin waste to
reduce ongoing processing costs and diversion
targets
June 2015 – October 2016 $0 Incorporated within current waste and education budgets.
Make it easier for users to source separate at
waste drop-off facilities
June 2014 - 2017 $150,000 BWRF funding received for upgrade to Crescent Head
WMC.
Make it easier to recycle in public places, through
installation of additional recycling bins and
improved signage (Linked with the planning and
introduction of a new Collection contract , above)
June 2015 – June 2022 $50,000. Contributions funded yearly with the BWRF and
Midwaste contributions. Linked to action 1.3.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 13
Key Actions Key Steps Timeline Costing
Undertake regular waste audits on kerbside bins
in order to understand opportunities for improving
source separation
October 2016 Contractor contributions for audits across all 3 bins in years 2, 4,6,
8 of new collections contract.
Medium-term Actions:
Undertake an audit on drop-off residual waste in
order to understand diversion opportunities
July 2016 $30 - $40,000. Funding will be applied for through the BWRF.
Collaborate with Midwaste to identify future landfill
opportunities.
June 2016 Could be undertaken within Council’s current staff resources
Identify and develop unmanned waste drop off
centres for communities without access to a
kerbside waste collection service
June 2016 - June 2017 $25,000 per site.
2.3 Further develop
industry partnerships to
encourage waste
recovery in the C&I and
C&D sectors
Short-term Priorities:
Promote funding available to businesses through
Bin Trim.
January 2015 $0. Incorporated within current waste and education budgets
Continue to promote recycling services and
opportunities to the C&I sector including web-
based resources and promotion
June 2014 - Ongoing $0. Incorporated within current waste and education budgets
Medium-term Actions:
Investigate a Pilot of a centralised recycling area
in the city centre (resources permitting)
August 2017 Scoping study required
Explore additional reprocessing opportunities to
divert waste and create local industry
July 2017 Scoping study required
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 14
Key Actions Key Steps Timeline Costing
2.4 Improve the Waste
Management Centre to
comply with current EPA
guidelines and to process
more C&I and C&D
material for greater
resource recovery
Short-term Priorities:
Introduce tip vouchers for domestic waste
customers to increase waste received and reduce
illegal dumping
Completed July 2015 An additional charge has been included in the 2015/2016 Fees &
Charges to fund the voucher scheme.
Prepare a site Master Plan for the WMC to identify
future development opportunities, investigate
organic processing and provide further
opportunities for social enterprise
Completed by July 2016 $50,000 – Funded through the BWRF
Installation of a second weighbridge and traffic
plan to ensure Council complies with the new EPA
landfill guidelines and landfill licence including
modifications to the existing administration
building.
June 2016 $250,000 . Funding will need to be found to help deliver this
initiative.
Investigate introducing differential gate fees at the
WMC and WTSs to encourage source separated
loads as opposed to mixed loads
April 2016 Could be undertaken within Council’s current staff resources
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 15
Focus Area 3 – Improve Management of Problem Wastes
Key Actions Key Steps Timeline Costing
3 – Improve Problem Waste Management
Objective: To better manage problem wastes so as to reduce potential risks to environmental and human health.
Key Performance Indicator and Target: By 2017-18, to provide all Kempsey residents with reasonable access to a facility for correct disposal of problem wastes.
3.1 Provide improved
infrastructure to collect
problem wastes
Short-term Priorities:
Improve collection of problem wastes at drop-off
centres through the installation of the Community
Recycling Centre at the Waste management
Centre
July 2015 $107,000 WLRM funding received
Provide an alternative service to residents without
access to drop-off centres with the introduction of
a mobile collection vehicle.
January 2015 $29,000 WLRM funding received and $50,000 BWRF is used to
offset the operator each year.
Continue support of the Chemical CleanOut,
drumMUSTER and ChemClear programs
Review annually Midwaste funding and EPA funding will be used to continue
these events.
Continue to work with Macleay Options to further
develop the mattress stripping industry located at
the Waste Management Centre and incorporate
the Kempsey Revitalisation Strategy.
July 2015 Seek EPA WLRM funding and utilise $50,000 of BWRF to
develop infrastructure at the Waste Management Centre.
3.2 Engage the
community to correctly
dispose problem wastes
Short-term Priorities:
Conduct community consultation in order to
formulate a baseline for community awareness
and engagement in correct disposal of problem
wastes, and to understand barriers to correct
disposal
Completed by December 2015 $2,000 Incorporated within current waste and education budgets
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 16
Key Actions Key Steps Timeline Costing
Continue to include correct disposal information
on standard Council waste education material,
such as Council’s website, at drop-off centres, and
in mail-outs
Annually Incorporated within current waste and education budgets
Support the community to properly dispose of
asbestos wastes through the completion of a pilot
free asbestos disposal scheme.
Completed August 2015 $20,000 EPA WLRM funding received for pilot program
Mid-term Actions:
Use results of the above community consultation
to inform communication and awareness
initiatives, including working with Midwaste to
develop and deliver a regional educational
initiative
March 2016 Will seek funding through Midwaste and EPA programs.
Develop partnerships with the C&I sector to
investigate further recovery opportunities for local
problem wastes
January 2017 Dependent upon scope of projects
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 17
Focus Area 4 – Reduce Litter and Illegal Dumping
Key Actions Key Steps Timeline Costing
4 – Reduce Littering and Illegal Dumping
Objective: To improve the beauty of the Kempsey region and to decrease risks to humans, animals and the environment.
Key Performance Indicator and Target: Reduce the incidence of illegal dumping and littering by 2021-22.
4.1 Gather and analyse
data to better understand
the sources and causes
of litter and illegal
dumping in the Kempsey
region
4.2 Utilise data to inform
remedial actions
Short-term Priorities:
Work with existing community groups to undertake litter
clean up events offering $1,000 per community group
June 2015 $5,000 in total supported by the BWRF
Ensure data on illegal dumping and littering is collected
as per EPA guidelines, and provide this information to
the community for education through various media
including the KSC website and Mayoral column
Completed by September
2015 and annually
Incorporated within current waste and education budgets
Develop council surveillance strategy to ensure the use
and enforcement of surveillance cameras in known
illegal dumping hotspots and extract key data from
existing databases on illegal dumping investigations
and fines to target hotspots and actions for potential
WLRM grants
July 2016 Incorporated within current waste and education budgets
Identify and implement surveillance initiatives across all
waste facilities.
July2016 $10,000 per site
Provide support for community-based clean-up events June 2015 Dependent upon scope. Could be factored into Council’s existing
Waste and Education budget or BWRF allocation
Medium-term Actions:
Build local community partnerships with Crown Lands,
Forests NSW, NSW National Parks and Wildlife
Services, Mid North Coast Aboriginal Land Council and
community groups to identify illegal dumping and
littering hotspots and targeted actions
June 2016 Incorporated within current waste and education budgets
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Page 18
Key Actions Key Steps Timeline Costing
Work with Midwaste to develop a region-wide education
program targeting illegal dumping and littering
June 2016 Dependent upon scope
Work with Midwaste to investigate the feasibility of a
regional RID squad
June 2016 Dependent upon scope
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 19
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
3 INTRODUCTION
Kempsey Shire Council (KSC) is located on the mid north coast of New South Wales and is
home to nearly 30,000 people. The Kempsey local government area (LGA) stretches from the
Pacific Ocean in the east through to Macleay River hinterland in the west and encompasses the
townships of Kempsey, South West Rocks, Crescent Head as well as Willawarrin, Bellbrook,
Stuarts Point, Hat Head, Gladstone, Smithtown & Frederickton. Key economic sectors in the
region include manufacturing, tourism, retail and health/community services.
This Waste and Education Strategy 2014-15 to 2021-22 (“this Strategy”) creates a vision for
minimisation of waste, recovery of waste, and better waste management services within the
Kempsey LGA to promote economic sustainability in conjunction with positive environmental
and social outcomes. It describes a number of areas in which KSC plans to take definitive and
practical steps towards delivering better waste services and infrastructure and encouraging the
community to adopt more environmentally sustainable behaviours.
The Kempsey area has a number of waste management issues, including the increasing cost
and value of remaining local landfill space, increasing demands by the community for affordable
systems of waste management and disposal. Further, the fluctuation of waste generation rates
as a result of tourism presents significant issues with respect to waste collection, transportation
and landfill capacity and operation. This Strategy aims to mitigate the risk to KSC presented by
these issues.
NEED FOR THIS STRATEGY 3.1
A number of drivers inform the need for this Strategy and provide the foundation of its content.
These include the NSW Draft Waste Avoidance and Resource Recovery Strategy 2013-21, the
Midwaste Regional Waste Avoidance and Resource Recovery Strategy 2014-21, the Waste
Less, Recycle More funding program, NSW 2021: A Plan to Make NSW Number One and the
landfill levy under the Protection of the Environment Operations Act 1997, outlined in Figure 3-1.
Figure 3-1 Kempsey Waste and Education Strategy drivers
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 20
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
The NSW Draft Waste Avoidance and Resource Recovery (WARR) Strategy 2013-21 re-
focuses the strategic direction for waste avoidance and resource recovery in NSW up to 2021-
22. Various quantitative targets are set out including a state-wide requirement to divert 70% of
household waste away from landfill by 2021-22.
The Midwaste Regional WARR Strategy is based upon the NSW WARR Strategy, and provides
waste management guidance and actions for the eight councils on New South Wales’ mid north
coast, of which KSC is one. The key result areas are in line with the NSW Draft WARR Strategy
and aim to strengthen and develop collaborative strategic partnerships with a focus on
implementing effective local waste management solutions. Aligning this Strategy with the
Midwaste WARR Strategy allows KSC to benefit from resource and knowledge-sharing, and to
take advantage of economies of scale.
The Macleay Valley 2036 Community Strategic Plan details the driving goals which shape the
actions and outputs desired by the community for the future. The 2013-2017 Delivery Program
lists the program item “Minimise Impacts Of Waste & Safely Dispose Of Waste Products” under
the primary strategy;
HS-04 Restore damaged environments and removal of environmental threats
The program has linkages to the secondary strategies of;
HS-05 Use planning controls to ensure that environmental impacts do not negatively
affect lifestyle
HS-06 Minimise risk to community’s health
WS-05 Increasing value of production
SOS-03 Include social behaviour as part of education
To measure performance against the objectives in the Community Strategic Plan & Delivery
Program, KSC plans to achieve the following overarching key performance indicator (KPI)
targets that are specified in the 2013-2017 Delivery Program
Reduce the quantity of domestic waste material disposed of to landfill each year to below
4,400 tonnes
Increase the quantity of domestic waste material diverted from landfill each year to more
than 6,600 tonnes
Achieve greater that a 60% diversion of domestic waste from landfill to reuse/recycling
each year.
However, whilst consistent with the overall direction of the broader strategies, it is important to
note that the KSC Strategy is tailored to address unique local issues and challenges, and
focusses strongly on identifying and delivering solutions from the local level up.
The Waste Less, Recycle More (WLRM) funding program will deliver $456.7 million up until
2017 through a series of grants and funding for local governments that are designed to provide
financial assistance and improve resource recovery systems. The funding available under
WLRM is in accordance with the strategic framework of the Draft NSW WARR Strategy, hence
this Strategy is founded upon the Draft NSW WARR Strategy in order to best position KSC to
successfully apply for contestable funding under the WLRM program.
NSW 2021: A Plan to Make NSW Number One is a key strategic document for NSW in which
goals for 2021 are established and coupled with priority actions, a number of which relate to
waste management and local governments, including targets around illegal dumping, littering
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 21
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
and problem wastes. These targets have been taken into consideration in the development of
this Strategy.
Landfill Levy
In 2014-15, KSC will pay the NSW Government $65.40 on each tonne of waste disposed to
landfill, and projected to rise to at least $89.50 by 2021-2022. The waste levy is designed to
drive greater resource recovery that can reduce landfill waste and its increasing cost burden to
the local economy. KSC must try to facilitate greater access and these must be passed on to
the community with increased illegal dumping cost consequences possible.
Landfill Replacement Costs
While KSC’s landfill still has the capacity to accept waste for many years to come, this landfill
space needs to be maintained for as long as possible. Community concerns about living near
disposal facilities, stringent environmental regulations and engineering requirements can make
developing a new landfill extremely difficult and expensive. It is therefore of paramount
importance to conserve landfill space, to ensure KSC retains a cost effective option for the
ongoing disposal of unavoidable residual waste for which there are no other viable recovery or
treatment alternatives. The existing landfill capacity should not be compromised through the
sale of space below the true value of that space to the community in the future.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 22
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
GUIDING PRINCIPLES 3.2
The concept of a ‘waste hierarchy’ is a key component in most modern waste management
policies and strategies. The hierarchy identifies the preferred approach to waste management,
with avoidance and reduction of waste the most preferable option, and disposal the least
preferable.
While waste avoidance is most preferable, it is also one of the most difficult areas for KSC to
control. Influencing waste avoidance is most effective when action is taken at a household-level.
Through effective community education, provision of avoidance and reuse opportunities and
advocating to other levels of government KSC can drive improvement at the ‘top’ of the waste
hierarchy.
KSC will typically have more control over the lower portion of the hierarchy, through the choice
of end destinations for collected waste materials. However, individuals within the community
have a large influence on how effective those systems are. For example, KSC can provide a
kerbside recycling service, but this will not be effective if householders place the wrong
materials into the recycling bins.
These differing levels of control and mechanisms for change are an important consideration in
the development of actions within this Strategy, as they inform what KSC can do in its LGA.
Avoid / Reduce
Reuse
Recycle
Recover Energy
Dispose
Individuals control their own purchasing decisions, and must
take responsibility for reducing the volume of waste created.
Councils can influence the
community by creating avoidance and reuse opportunities, and
through education and advocacy.
Councils control the destination of collected waste materials and
are responsible for choosing waste management systems
appropriate for their local communities.
Individuals can influence the
effectiveness of waste systems by using them properly (such as
reducing contamination in recycling).
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 23
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
4 WHERE ARE WE NOW?
Before developing a strategic vision for waste management within Kempsey, it is important to
understand the current state of waste generation and services within the Kempsey LGA.
Following are descriptions of the demographics of Kempsey, the quantity and sources of waste
generated within the area, what happens to the waste, and the services and facilities set up to
deal with the waste.
KEMPSEY’S PEOPLE AND ECONOMY 4.1
Over 29,000 people currently live in the local government area (LGA) of Kempsey with the
population having increased by 3.6% since 2007, according to the Australian Bureau of
Statistics’ National Regional Profile. The NSW Department of Planning suggests the population
will increase by a further 5% to 30,600 by 2021.
The majority of growth in the area is predicted to occur in Kempsey (including nearby Euroka
and Green Hills), South West Rocks and Crescent Head. This follows similar trends throughout
the region being driven mainly by a large influx of retirees, attracted by the popular “sea-
change” lifestyle.
The overall population of the area fluctuates considerably over holiday periods, with over
500,000 visitors to the Macleay Valley Coast each year.
KSC has faced some socio-economic challenges with the unemployment in the region at 8.9%
and household income generally below the state average. However growth has been recorded
in some sectors including retail, health care and social assistance which represents a shift away
from traditional industries in the area such as agriculture and manufacturing. The Kempsey
region has also seen strong growth in tourism over recent years, particularly in Crescent Head
and South West Rocks, which are popular tourist destinations in summer and school holiday
periods. The socio-economics of the Kempsey area signifies that waste management costs to
residents and businesses need to be minimised.
HOW DO WE PERFORM AGAINST INDUSTRY 4.2BENCHMARKS
The existing waste service performance statistics for domestic waste collection are detailed in
the table below:
Service Levels Target Results Achievement
Of KPI’s
Change
Necessary
to Achieve
KPI
14/15 13/14 12/13
# tonnes of domestic waste
material per year disposed to
landfill
4,400 5,971 6,061 5,966
The pro rata
YTD target
was 1571
# tonnes of domestic waste
material per year diverted from
landfill
6,600 4,883 4,734 4,725
+1717t/yr
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 24
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Service Levels Target Results Achievement
Of KPI’s
Change
Necessary
to Achieve
KPI
14/15 13/14 12/13
% material reused/recycled as a
proportion of the quantity of
material disposed in the landfill
each year
60% 45% 44% 44%
+15%
To achieve the current and future targets set by the State Government in the WARR Strategy it
is clear that significant action will be required.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 25
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
WHERE DOES OUR WASTE COME FROM? 4.3
Three sources of solid waste contribute to waste generation in the Kempsey LGA:
Municipal Solid Waste (MSW) – generated by residents and local government operations
Commercial and Industrial (C&I) waste – generated by businesses, industries and
institutions
Construction and Demolition (C&D) waste – generated by construction and demolition
works.
4.3.1 MSW
Services to manage MSW are the responsibility of KSC while C&I and C&D wastes are
generally the responsibility of businesses or industry. KSC provides the community with
collection, disposal and drop-off services for MSW which include the residual, recyclable and
organic waste streams.
In 2011-121, over 14,000 tonnes of MSW waste was generated in the Kempsey LGA, or
approximately 500 kilograms of waste per person. Figure 4-2 shows that the majority of this
waste (around 7,600 tonnes) was residual waste, which is disposed to landfill.
Figure 4-2 Generation of waste within Kempsey LGA
More recent figures from 2013-14 show an MSW waste to landfill has increased to around 8,900
tonnes per annum. This figure includes both kerbside collected and self-haul waste.
Composition of Waste
Based on a waste audit conducted in 2014, the residual waste portion of the MSW stream can
be broken down as illustrated in Figure 4-3, with a large portion of the stream actually consisting
of recoverable material.
1 2011-12 data has been used as baseline data with all modelling based on this information. More recent 2013-14 figures
have been provided for comparison where available.
Residual 52%
Recyclable 21%
Organic 27%
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 26
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
The data indicates that over 16% of kerbside residual waste is made up of materials that could
be recovered through the current commingled recycling collection (such as newspaper,
cardboard, recyclable plastics and metals). A further 35% of material is food and garden
organics, which could be recovered through the existing organics collection.
Figure 4-3 KSC residual waste composition
Impact of tourism
Annual kerbside waste generation quantities have remained relatively constant over recent
years, however due to the influx of visitors over the summer holiday period, waste generation is
typically higher during this time compared to the winter months.
Monthly variation in waste generation from July 2012 to June 2013 for the residual waste stream
is presented in Figure 4-4. The trend line for kerbside residual waste demonstrates seasonal
fluctuation in waste generation with peaks in the summer period and troughs during the winter
months.
Figure 4-4 Seasonal variation in Kempsey residual waste generation
Food organics, 34.7%
Potentially recyclable,
16.5% Garden organics, 0.8%
Other, 48.1%
300
400
500
600
700
Was
te t
on
ne
s p
er
mo
nth
Month
Residual Waste Generation
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 27
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
4.3.2 C&I WASTE
Commercial and Industrial waste refers to the solid component of the waste stream generated
from commercial, industrial, government, public or manufacturing premises. This section of the
market is generally serviced by the private sector, however, the State C&I targets and Waste
Levy encouraged KSC to offer the 3 bin system collection service to commercial properties sited
within the existing municipally serviced areas of the Shire. Recycling and organics bins are
currently offered at domestic rates to further incentivise and facilitate greater waste diversion.
Due to the fragmented nature of the market, accurate data relating to commercial waste
streams across Australia is limited, and the Kempsey LGA is no exception. While landfill
weighbridge data may provide an indication of the quantities disposed, private commercial
operators also service many businesses in the Kempsey region and KSC does not have direct
access to data where waste or recycling is taken elsewhere.
Crescent Head WMC weighbridge data presented in Figure 4-5 shows some year on year
fluctuation in the amount of C&I waste disposed to landfill in Kempsey, with the most recent
data indicating that around 5,313 tonnes of C&I waste was disposed in 2013-14.
Figure 4-5 C&I waste disposed to landfill at Crescent Head WMC
As noted above, KSC does not have access to industry collection data and as such cannot
accurately establish a recovery rate for the area. However, broader NSW Government data
indicates that the C&I sector represents a significant opportunity for greater material diversion2
and this is likely the case in KSC also.
2 The NSW WARR Strategy Progress Report (2010) indicates that 52% of C&I waste material generated in NSW was
diverted from landfill in 2008–09, against a state-wide target to achieve 63% diversion by 2014
0
1,000
2,000
3,000
4,000
5,000
6,000
2010-11 2011-12 2012-13 2013-14
Was
te d
isp
osa
l (to
nn
es)
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 28
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
4.3.3 C&D WASTE
Construction and demolition waste can be summarised as the solid inert component of the
waste stream generated through construction, demolition or refurbishment activities. C&D waste
generally contains a high proportion of ‘heavy’ materials such as brick, stone and concrete and
as such is sensitive to increases in the landfill levy (which is applied on a ‘per tonne’ basis).
Kempsey landfill weighbridge data suggests significant variation in the amount of C&D waste
being disposed to landfill at the Crescent Head WMC with data from the last four years being
presented in Figure 4-6. This is predominantly related to the amount of fill (including
contaminated soil) entering the facility year to year. The fluctuations in the amount of fill entering
the site can significantly skew the C&D waste figures making it difficult to understand
construction waste trends. As such, KSC now tracks contaminated soil through a different
category and this is reflected in the marked decrease in C&D waste to landfill in 2013-14.
Figure 4-6 C&D waste disposed to landfill at Crescent Head WMC
Much like the C&I waste stream discussed above, KSC does not collect data from private
operators and as such there is no clear indication of the diversion rate for C&D waste in the
area. NSW Government data shows that the landfill diversion rate for C&D waste was 75% in
2010–11, against a 2014 target diversion rate of 76%. High recycling rates are achieved from
this stream due to it being relatively homogenous and relatively heavy; weight-based disposal
charging provides a clear incentive for regular generators of this waste to seek alternative
resource recovery options, such as crushing masonry materials to produce aggregates that can
displace the use of virgin crushed rock products in various civil engineering applications. Non
consistent materials and sizes can make it more difficult to meet engineering standards that
must be complied with. Opportunities exist for these materials to be processed to standards that
will enable their use in various KSC civil engineering applications.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
2010-11 2011-12 2012-13 2013-14
Was
te d
isp
osa
l (to
nn
es)
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 29
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
RECOVERY OF WASTE 4.4
Based on 2011-12 figures, approximately 6,800 tonnes of MSW was diverted from landfill and
recovered in the Kempsey region, equating to 46% of the total MSW stream.
It is noted that the overall diversion is likely to have increased since the 2011-12 data due to the
introduction of food organics collection and recovery after this period.
Figure 4-7 Disposal and diversion of residual, recyclable and organic waste (based on weight)
The recyclables stream constituted 42% of the total waste recovered, with 9% of the recyclables
stream disposed as contamination.
Garden organic waste accounted for nearly 60% of the total waste recovered and this organic
material was virtually uncontaminated, with 99% able to be recovered.
Residual Waste Disposed
52.1%
Recyclable Waste Recovered
19.2%
Recyclable Waste
Disposed 1.8%
Organic Waste Recovered
26.7%
Organic Waste Disposed
0.2%
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 30
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
KERBSIDE BIN SERVICES 4.5
KSC provides residents with a three-bin system for kerbside collection of residual waste,
commingled recycling, and organics. Figure 4-8 highlights the final destination of the three
waste streams.
Figure 4-8 Kempsey waste destinations
4.5.1 RESIDUAL WASTE (RED BIN)
KSC provides a weekly residual waste collection service; this waste is disposed at the Kempsey
Waste Management Centre Landfill. Residual waste can also be dropped off at a number of
transfer stations in the region as outlined in Section 4.6.
4.5.2 RECYCLABLES (YELLOW BIN)
Kerbside recyclables are collected fortnightly and taken to the Cairncross Waste Management
Facility where a materials recovery facility (MRF) separates out recoverable products such as
metal, glass, paper and cardboard. Residents can also use local transfer stations to drop-off
recyclables. In October 2014 KSC delivered a ReUse Recycling Bag to assist residents in
source separation of recyclables within the home.
4.5.3 FOOD & GARDEN ORGANICS (GREEN BIN)
An organics collection system was introduced in 2009 with the collection of garden organics
(GO) and then expanded in 2011 to include food organics (FO) despite remaining as a
fortnightly collection. A free household food-scrap collection bin and compostable liner system
was offered to the community to promote the option to divert more organics from being wasted
in landfill. The compostable liners made it easier to contain and dispose of FO in the kerbside
Green Bin with minimal odour issues despite not being a weekly collection. There was also a
non-aerated bin option which could be used without liners and made available to addresses with
or without a Green Bin so FO could be diverted from landfill to home composting systems, worm
farms or chook pens more easily. .
In October 2014 KSC gained WLRM funding to supply and deliver a smaller non-aerated
kitchen organics bin and liner system to all households with a Green Bin service to shift from the
voluntary opt in system and further improve diversions for this waste stream.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 31
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
WHERE DOES THE WASTE GO? 4.6
KSC owns and operates one integrated waste management centre at Crescent Head and three
transfer stations at South West Rocks, Stuarts Point and Bellbrook. The locations of the facilities
are displayed below.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 32
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
4.6.1 CRESCENT HEAD WASTE MANAGEMENT CENTRE
The Crescent Head WMC (Figure 4-9) is an integrated waste management site incorporating a
landfill and resource recovery transfer station. The site is approximately 12 hectares in size and
has a remaining lifespan of approximately 31 years, with significant room for expansion (if
approved by the relevant authorities) into surrounding Crown Lands. The landfill is currently
licensed to accept 10,000 tonnes of waste per year, including general solid waste (both
putrescible and non-putrescible), tyres and asbestos waste.
The site incorporates an electronic weighbridge, a ReUse shop, and a dedicated area for
separation of materials for recycling (resource recovery area). The WMC recovers a range of
recyclables including commingled recyclables, garden organic waste and hazardous and
problem wastes.
Figure 4-9 Aerial view of Crescent Head WMC
4.6.2 WASTE TRANSFER STATIONS
KSC’s waste transfer stations accept household waste and recycling, with most resource
recovery streams accepted free of charge or at cost. Each site also accepts greenwaste,
concrete, brick and tile rubble, waste oils, eWaste, polystyrene, scrap metal, gas bottles, fire
extinguishers, paint, fluorescent lighting, batteries (lead acid and dry cell), printer cartridges,
mobile phones and accessories.
The South West Rocks transfer station is open part time 4 days per week with a waste
attendant offering front loader skip bins for both waste and recycling.
The Stuarts Point transfer station opens part time 2 days a week with a waste attendant and has
front loader skip bins for both waste and recycling.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 33
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Bellbrook transfer station opens 2 days a week part time with a waste attendant and has front
loader skip bins for waste and Mobile Garbage Bins (MGBs) for recycling.
Each of the transfer stations could only be classified as “primitive” waste facilities and
substantial investment is required to bring these sites up to the standard that is required for
modern workplaces as well as encouraging proper use, reuse & recycling opportunities to the
community.
4.6.3 REGIONAL FACILITIES
The Cairncross Waste Management Facility in the Port Macquarie-Hastings Local Government
Area has two significant waste facilities that KSC uses to manage the community’s waste.
Commingled recyclables collected from Kempsey Shire and Port Macquarie-Hastings Council
areas are transferred for processing at the Cairncross Materials Recovery Facility (MRF), which
recovers paper/cardboard, plastic and metals for further recycling and reuse.
The Cairncross Organic Resource Recovery Facility commercially composts garden and food
waste collected in the two shires, with composted products sold to the local landscaping,
gardening and farming community for beneficial reuse.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 34
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
5 WHERE DO WE WANT TO BE?
Kempsey Shire Council’s strategy to promote waste avoidance, resource recovery and improve
waste management between 2014-15 and 2021-22 involves undertaking action in the following
four focus areas:
1 Avoid and reduce waste
2 Recover more waste
3 Improve management of problem wastes
4 Reduce litter and illegal dumping
These four key areas, and subsequent targets and actions, are based upon the strategic
frameworks contained within the NSW WARR Strategy and the Midwaste Regional WARR
Strategy. Action in these four areas ensures that KSC is operating within State Government
requirements and enables regional cooperation to achieve these goals.
This Chapter outlines key objectives, key performance indicators and associated targets, and
actions under each of the four key areas outlined above. Appendix A contains a series of Action
Plans which outline some of the key steps required to achieve the key actions and targets, and
include timelines and responsibilities. The Action Plans will be reviewed on a yearly basis in
order to ensure that the key steps remain relevant and effective.
Delivery Principles
Actions to achieve the objectives and targets under each of the four key areas outlined above
are informed by the following delivery principles, which are of high importance to KSC and its
community:
Waste management that can provide employment for KSC residents and, where possible,
provides opportunity for training, education and community engagement
Costs associated with waste management are to be minimised to keep best practice
options affordable and attractive to residents and industry. The cost of delivering projects
was strongly weighted when evaluating and prioritising the key actions and steps for
inclusion in the Strategy Action Plans.
Regional collaboration is encouraged in order to benefit from resource and knowledge-
sharing, and to take advantage of economies of scale
Utilisation of best practice waste management programs and technologies, where
possible
Social, environmental and economic objectives are to be weighed against each other to
achieve the best possible outcomes
Council shows leadership in delivering the objectives of Strategy.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 35
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
AVOID AND REDUCE WASTE 5.1
Kempsey Shire Council aspires to improve the use of resources within the Kempsey community
in order to avoid creating unnecessary waste. To measure performance against this objective,
KSC plans to achieve the following Key Performance Indicator (KPI) target:
By 2021-22 to reduce waste generation per capita, when compared to the baseline period
2011-12.
Avoidance of waste is at the top of the waste management hierarchy and therefore is the
highest priority action in progressing towards sustainable use of resources. Reducing the
generation of waste, however, is a highly complex and difficult issue to address, requiring multi-
faceted solutions and ownership of the problem by a wide range of stakeholders.
For both households and businesses, waste avoidance largely relies on changes in the
decisions, systems and behaviours of the waste generator, therefore councils are best placed to
contribute to waste avoidance and reduction through delivering behavioural change programs
which build the capacity of their local communities to implement these changes. These
programs should aim to empower householders and businesses to utilise alternative pathways
for unwanted goods and materials, rather than allowing these items to enter established waste
collection systems.
Measuring improvements in the efficiency of resource use is an inherently difficult task and the
draft NSW WARR Strategy has therefore not set a quantitative target for waste avoidance. The
Draft Strategy Guidelines do however suggest that Councils could set a target for reducing the
average amount of waste generated per person.
KSC is certainly able to play a part in encouraging more efficient use of resources, with the
purpose of minimising the quantity of material entering the waste management system and
hence reducing the financial, environmental and social impacts of waste. It is important to
recognise that given the complexity of the issue, a measurable reduction in per capita waste
generation may be an aspirational target for the Kempsey community in the medium term.
However, this target is achievable in the longer term providing that other external factors to
reduce the resource-intensity of the economy also take effect. These factors may include
developments such as sustainable product design, light-weighting of packaging, product
stewardship initiatives, industrial ecology processes or increased up-take of ‘product service
system’ business models.
Kempsey Shire Council will undertake four key actions in order to improve the use of resources
and reduce waste generation within its community:
1 Build capacity for reuse of materials
KSC will prioritise support for maintaining or expanding the reach and effectiveness of
existing reuse initiatives which are already proven to be effective, such as the ReUse
shop at the Waste Management Centre, and other local ReUse promotions. At a later
stage, collaboration at the regional level may provide for social enterprise opportunities to
expand collection and/or resale of unwanted goods at additional sites in the LGA or
potentially introduce an operation to capture reusable building materials.
2 Support households and businesses in reducing disposal of food waste
As food waste forms a significant component of the residual waste stream, it is important
to put in place actions that minimise the amount of food entering the waste stream. In the
short-term, KSC will focus on maintaining and improving existing initiatives aimed at food
waste minimisation. Later, KSC will explore regional opportunities for food waste
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 36
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
minimisation, such as developing a local composting facility that can provide inexpensive
composts back to the communities that create them to close the loop.
3 Reduce the impact of tourism on overall waste generation and littering
Visitors to the Kempsey area generate large quantities of waste and recycling each year
and much of this ends up being the responsibility of KSC to collect. Initially, KSC will
focus on supporting and expanding existing initiatives including, for example, the
continued support and delivery of waste wise events and business waste reduction
programs. Medium-term action will align with strategic plans of Midwaste, and include
further research into the waste management attitudes and behaviours of tourists to allow
KSC to target specific behaviours.
4 Improve capacity of the community to make more sustainable consumption choices
Consumer purchasing power can be used to positively influence supply chains and
improve social responsibility in the market. However, since sustainable consumption
relies on the ability of consumers to make informed decisions, KSC can play an important
role in the provision of relevant information. KSC will continue to work with businesses,
schools and the community to develop and disseminate decision making information that
encourages waste minimisation and better recycling.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 37
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
INCREASE RECOVERY OF WASTE 5.2
Kempsey Shire Council aims to increase the recovery of waste materials in order to reduce
landfill impacts, to boost the local economy through new industry, and to use natural resources
more sustainably.
To measure performance against this objective, KSC will use the following KPIs and plans to
work towards increasing the:
recycling rate of municipal solid waste (MSW) to 70% by 2021-22
recycling rate for commercial and industrial (C&I) waste to 70%, by 2021-22
recycling rate for construction and demolition (C&D) waste to 80%, by 2021-22
waste diverted from landfill (across the MSW, C&I and C&D streams) to 75% by 2021-22.
While it is preferable to minimise and avoid the creation of waste in the first place, recovery of
waste also plays an important part in decreasing the environmental impacts of waste. Recovery
of waste slows down the consumption of natural resources by lengthening the amount of time a
material is useful and can subsequently decrease water and power consumption associated
with extraction of virgin materials, and preserve valuable landfill space for materials which are
difficult to recover. The NSW Government’s levy on each tonne of waste sent to landfill and
employment created through recycling industries provide a dual economic incentive to recover
waste, and community expectations around sustainability of resources and greenhouse gas
emissions also drive the improvement of waste recovery.
KSC currently offers a kerbside recycling and FOGO collection service to approximately 65% of
residents where food organics is collected in the same bin as the garden organics. Recyclables
are also accepted for free at KSC’s waste drop-off facilities however GO does have a
processing charge. FO must currently be taken and charged as mixed waste to landfill.
In 2011-12, KSC achieved a recycling rate of 46% of its residential waste, which means that
54% (or nearly 8,000 tonnes) of waste was still disposed to landfill. To improve KSC’s recovery
rate towards the 70% target set by the State Government, further organics and recyclables will
need to be captured into the recycling system.
While the residential waste stream is the area over which KSC has the greatest amount of
control and influence, the State Government has also set targets around increasing diversion
from the C&I and C&D sectors. KSC has the ability to exercise some influence on these sectors
in order to improve waste diversion across its local government area.
To increase recovery of waste in the Kempsey local government area, KSC plans to undertake
four key actions:
1 Recover more organics from the residual waste stream
As organics form nearly half of the contents of the kerbside residual waste stream, this
material presents the greatest opportunity for increasing recovery. KSC will achieve this
action by continuing to implement the kerbside FOGO system and educating and
engaging residents to correctly use the service.
2 Improve source separation of commingled recyclables through best practice kerbside
collection contracts
Source separation of recyclables can be improved both by capturing more recyclables out
of the residual waste stream and by reducing contamination in the recyclables bin. A
recently conducted waste audit has identified that KSC’s actual kerbside diversion rate
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 38
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
(with the current bin system) is 56.77%, and that this could increase to 63.49% if
recyclables in the waste stream were recovered. Encouragingly, results of the audit
suggest that the potential diversion rate could increase to 77.95% with the recovery of
food and garden organics.
KSC should investigate best practice kerbside collection contracts including the roll out of
organics and recycling services to all residents including reviewing the frequency of
collections to ensure the greatest level of diversion can be achieved.
Capture of recyclables can also be improved in public spaces and at the waste drop-off
centres, where only around 50% of waste is currently being recovered. Improvement of
source separation involves making it easier, cost effective and convenient to separate
recyclables, and through encouragement of sustainable behaviour.
3 Further develop industry partnerships to encourage waste recovery in the C&I and C&D
sectors
Encouraging waste recovery in the C&I and C&D sectors can assist the local economy by
reducing levies paid for disposal of waste, and by generating employment in the recycling
industry. KSC will provide encouragement through providing communications about grant
funding and recycling services available. Resources permitting, KSC will explore
facilitating greater C&I and C&D recycling options and exploring additional reprocessing
opportunities.
4 Improve the Waste Management Centre to process more C&I and C&D material for
greater resource recovery
Greater resource recovery from the C&I and C&D waste streams can be facilitated by
systematically improving the layout of the centre, required infrastructure and operational
practices.
IMPROVE PROBLEM WASTE MANAGEMENT 5.3
Kempsey Shire Council aims to better manage problem wastes so as to reduce potential risks to
environmental and human health. To measure performance against this objective, KSC plans to
achieve the following KPI target:
Provide all Kempsey residents with reasonable access to a facility for correct disposal of
problem wastes, by 2017-18.
Problem wastes can be divided into three categories:
Low volume, high toxicity materials – these materials are generally collected through the
Household Chemical CleanOut program and include acids, pesticides, fuels, asbestos
and other toxic chemicals
High volume, low toxicity materials – these materials include the EPA’s list of ‘core’
materials (oil, paint, gas bottles, fluorescent lamps, batteries, smoke detectors) and e-
waste
Other difficult wastes – including expanded polystyrene (EPS) and mattresses.
The Crescent Head WMC accepts all problem wastes listed above, in addition to empty
chemical drums under the DrumMUSTER program, with KSC’s three smaller transfer stations
(at South West Rocks, Bellbrook and Stuarts Point) accepting most of the EPA’s ‘core’ list of
materials, e-waste and expanded polystyrene (e.g. used as packing material for electronic
items). Materials form the EPA’s list of ‘core’ materials, household chemicals and EPS are
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 39
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
accepted for free, with charges applying to mattresses, and asbestos (unless registered for free
acceptance under the Kempsey Household Asbestos Disposal Scheme that commenced July
2014 as a 12 month State funded pilot program).
However, even though these drop-off facilities are offered for problem wastes, problem wastes
are still being disposed through the kerbside bin system. Problem wastes can risk the safety of
personnel who work in the waste management industry, potentially pollute the soil and water if
disposed to landfill, potentially contaminate recyclable material and use up unnecessary
amounts of valuable landfill space.
Improving the management of problem wastes will prove challenging, especially considering the
convenience of the kerbside bin, and requires government and the community to both play their
part. To this end, Kempsey Shire Council will undertake two key actions in order to improve
problem waste management:
1 Provide improved infrastructure to collect problem wastes
KSC will aim to make it as convenient as possible for residents to dispose of problem
wastes in a safe and correct manner. This will involve actions such as continuing and
improving the collection of problem wastes at the Crescent Head WMC and other transfer
stations, and investigating the feasibility of services for residents who are not easily able
to access these facilities. These alternative services will include a mobile drop-off centre
which could visit all communities on a rotational basis and additional drop-off points for
certain problem wastes in central locations, such as the library and Council chambers
which already have bins for batteries and mobile phone wastes.
2 Engage the community to correctly dispose problem wastes
As well as making it easier for the community to correctly dispose problem wastes,
residents also need to be engaged to do so. This will involve educating the community
about the issues associated with problem wastes and communicating how these wastes
should be disposed.
REDUCE LITTER AND ILLEGAL DUMPING 5.4
Kempsey Shire Council plans to improve the amenity of the Kempsey region and to decrease
risks to humans, animals and the environment caused by incorrectly disposed waste. To
measure performance against this objective, KSC plans to achieve the following KPI target:
Reduce the incidence of littering and illegal dumping in identified community hotspots by
2021-22.
It is difficult to measure the cost and impact of litter and illegal dumping on the community. It is
also a challenge to build accurate information on the extent of illegal dumping because the
intent behind the dumping is to keep it out of sight, undetected and anonymous.
Illegal dumping and littering are carried out by all types of people in the community. The NSW
Illegal Dumping Strategy 2014-16 identifies the following reasons for illegal dumping:
convenience, an uncaring attitude, unwillingness to pay and using organised networks to avoid
disposal costs. The first two reasons are the main drivers behind littering behaviour as well.
The Illegal Dumping Strategy promotes the following methods for reducing illegal dumping:
Making dumping more difficult – by using infrastructure such as barriers, lighting or
landscaping
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 40
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Increase the risk of getting caught by increasing monitoring, enforcement and community
engagement
Reducing the reward for dumping by issuing fines and getting the offenders to clean up
dump sites
Providing convenient alternatives to dumping such as tip passes for residents, drop off
points, affordable gate fees and removing dumped waste promptly
Removing excuses by informing the community through advertising existing waste
services, signage at known dumping hotspots and targeted education.
The same principles apply to reducing littering behaviour by improving infrastructure, awareness
and increasing the likelihood of being caught. The NSW EPA is developing a broad awareness
campaign, providing some funding for regional illegal dumping (RID) squads and developing an
application for capturing increased data for litter and illegal dumping incidents.
Reducing litter and illegal dumping is important to the Kempsey area in order to maintain the
visual amenity of Kempsey’s natural environment and to prevent risks to humans and animals.
Therefore, KSC plans to undertake two key actions in order to reduce littering and illegal
dumping:
1 Gather and analyse data to better understand the sources and causes of litter and illegal
dumping in the Kempsey region
Collection and analysis of data is the first step in understanding the scope and
prevalence of littering and illegal dumping within the Kempsey area. Kempsey Shire
Council plans to implement surveillance initiatives at each of the waste facilities to
increase awareness and opportunities to address illegal and after-hours activities. The
NSW EPA is currently formulating an illegal dumping reporting mechanism, and has in
place a Local Litter Check for councils to understand littering in their areas. Partnership
with local community groups and organisations will assist KSC in identifying areas which
require targeted support for the prevention of littering and illegal dumping.
2 Utilise data to inform remedial actions
Upon identifying regional hotspots and areas for concern and improvement, available
WLRM grants will be sought in order to capitalise on available resources and to provide
funding for decreasing littering and illegal dumping in Kempsey. KSC will also work on a
regional basis to develop regional educational and enforcement initiatives.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 41
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
6 TRACKING OUR PROGRESS
As described above, this Strategy is a vision for the minimisation of waste, recovery of waste,
and better waste management services within Kempsey to promote economic sustainability in
conjunction with positive environmental and social outcomes. Work will now commence on
implementing the key actions and steps, and in some cases it has already begun under existing
KSC initiatives.
Tracking our progress focusses on two specific elements. Firstly, it is important that the status of
the implementation of the actions and key steps, and progress towards the targets contained
within this Strategy are monitored and reported upon on a periodic basis. Secondly, it is crucial
that the elements of this Strategy are subject to periodic review and revision to ensure ongoing
suitability, adequacy and effectiveness.
Tables 6.1 and 6.2 set out and describe the Strategy’s monitoring and review frameworks,
respectively.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 42
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Table 6-1 Monitoring Framework
Timeline Strategy Element Methodology
Annually Targets (KPIs) Measurement of progress against the Strategy targets (KPIs) should be undertaken in accordance with the approach
in Table 5.7 in Appendix B.
The results of the analysis should be inserted into the relevant sections of the Project Tracking Framework
(Appendix C)
Quarterly
(Or as per project-specific
requirements
Key Steps The progress and status of the implementation of the key steps should be undertaken using the framework detailed
in the Project Tracking Framework (Appendix C).
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 43
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Table 6-2 Review Framework
Timeline Strategy Element Methodology
Annually Objectives, Targets, Action
Plans, and Key steps
Inputs to the annual review should include, but are not limited to:
Changes to overarching legal, policy and strategy context;
Changes to KSC policy context;
Changes to KSC Community Strategic Planning requirements
Adoption of relevant KSC resolutions;
Follow up actions from Management reports
The extent to which the objectives and targets have been met
Advances in science and technology
The review should compile the results from analysis of the above, and any other relevant inputs (e.g. Quarterly and
annual monitoring data), into a KSC report framework and make relevant conclusions and recommendations
regarding any changes or additions to the applicable Strategy elements.
Review of key elements of the Strategy should also be undertaken if major changes to federal and State policy and legislation should occur (including finalisation of
the draft NSW WARR Strategy), and if there are significant changes to waste quantities and/or composition.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 44
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
APPENDIX A
MEASUREMENT OF PROGRESS AGAINST TARGETS
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 45
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Table 6-3 outlines the baseline for each target contained in the Strategy and identifies how progress should
be measured against that baseline.
Table 6-3 Measurement of Progress against Targets
Key Area Target Baseline Measurement
Avoid and
Reduce Waste
To reduce waste
minimisation per
capita by 2021-
22
Waste generation
per capita in 2011-
12
503 kg / ea
(see Table 6-4)
Waste generation = total tonnage generated in one year
for the following waste streams:
Residential kerbside residual waste
Residential kerbside commingled recyclables
Residential kerbside organics (garden and/or food
and garden)
Residential residual waste, recyclables and
organics dropped-off at KSC waste management
centres
Residential waste collected through kerbside clean
up collections, should this be introduced in the
future
NOTE: The above waste streams were chosen as these
are the streams currently used by the NSW EPA to
report waste generation in the annual NSW Local
Government Waste and Resource Recovery Data
Reports. However, should the NSW EPA alter its
reporting requirements, the above methodology and the
associated baseline should be revised to include any
additional waste streams.
Per Capita = Kempsey population, which should be
obtained from the Australian Bureau of Statistics,
Dataset 3218.0, or equivalent, should this dataset be
discontinued.
Increase
Recovery of
Waste
To work towards
increasing the
recycling rate of
MSW to 70% by
2021-22
Recycling rate in
2011-12
46%
(see Table 6-4)
The recycling rate = tonnage of material recycled / total
tonnage generated, in one year.
NOTE: Recycling, in this instance, does not include any
material recovered through an energy-from-waste
process.
The waste streams used to calculate the recycling rate
should be the same waste streams as outlined above for
calculating waste generation. As above, should the
NSW EPA alter its reporting requirements, then the
baseline and subsequent measurements should be
modified in line with the new requirements.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 46
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Key Area Target Baseline Measurement
To contribute to
the following
statewide
targets:
Increase the
recycling rate
for C&I waste
to 70% by
2021-22
Increase the
recycling rate
for C&D waste
to 80% by
2021-22
Increase the
waste diverted
from landfill
(across the
MSW, C&I and
C&D streams)
to 75% by
2021-22
Statewide, the
following rates were
reported for 2010-
11:3
C&I – 57%
C&D – 75%
Diversion across
all streams – 63%
Data specific to the
Kempsey area is not
available on
recovery of waste in
the C&I and C&D
sectors.
As reported by the NSW EPA
Improve Problem
Waste
Management
By 2017-18, to
provide all
Kempsey
residents with
reasonable
access to a
facility for correct
disposal of
problem wastes.
Crescent Head
WMC accepts all
‘core’ problem
wastes, household
chemicals, e-waste,
mattresses, EPS,
empty chemical
drums and asbestos.
The waste transfer
stations currently
collect paint, oil,
batteries, e-waste
and EPS.
All problem wastes are able to be accepted at Crescent
Head WMC and the waste transfer stations.
Alternatives are available for residents who have
difficulty accessing the waste management facilities.
Decrease
Littering and
Illegal Dumping
Reduce the
incidence of
illegal dumping
and littering by
2021-22
Baseline to be
developed utilising
EPA methodology.
Hotspots for
targeting to be
decided by KSC.
The NSW EPA is currently devising its reporting
methodology for illegal dumping.
Measurement of littering should be undertaken using the
NSW EPA’s Local Letter Check, unless this is updated
in the future.
3 http://www.epa.nsw.gov.au/resources/warr/130294DftWARRStrat.pdf
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 47
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
APPENDIX B
DETAILED POLICY CONTEXT
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 48
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
The Strategy document presents a brief summary of the drivers behind the creation of this policy. Outlined below is a more comprehensive list of the various policies, legislation and plans which have informed the development of this Strategy.
Instrument Relevant provisions
NSW Waste Avoidance and
Resource Recovery Act 2001
(WARR Act)
The NSW Waste Avoidance and Resource Recovery Act 2001 (WARR Act)
promotes waste avoidance and resource recovery by developing appropriate
strategies and programs. The WARR Act includes the following objectives,
applicable to a council’s waste service responsibilities:
To encourage the most efficient use of resources and to reduce
environmental harm in accordance with the principles of ecologically
sustainable development;
To ensure that resource management options are considered against the
waste hierarchy;
To provide for the continual reduction in waste generation;
To minimise the consumption of natural resources and the final disposal of
waste by encouraging the avoidance of waste and the reuse and recycling
of waste;
To ensure that industry shares with the community the responsibility for
reducing and dealing with waste;
To ensure the efficient funding of waste and resource management
planning, programs and service delivery;
To achieve integrated waste and resource management planning,
programs and service delivery on a State-wide basis; and
To assist in the achievement of the objectives of the Protection of the
Environment Operations Act 1997.
Draft Waste Avoidance and
Resource Recovery Strategy
(Draft WARR Strategy)
The Draft WARR Strategy replaces the 2007 WARR Strategy and aims to reduce
the environmental impact of waste and improve the well-being of the NSW
environment, community and economy across the following key areas:
Principles
Avoid and reduce waste generation – reducing the amount of material
entering the waste management or recycling systems by using products
and materials more efficiently and avoiding unnecessary product use
Increase recycling – increasing the amount of material that is recycled
within the productive economy
Divert more waste from landfill – increasing the amount of material in the
waste stream that is diverted from landfill to alternative uses, such as
reuse, recycling and energy recovery
Manage problem wastes better – separating and managing materials in the
waste stream that hinder effective recycling
Reduce litter – reducing the presence of litter in the environment
Reduce illegal dumping – reducing the incidence of illegal dumping in the
community.
Targets
Key to delivering the Draft WARR Strategy in the key result areas are the following
targets:
By 2021–22, reduce the rate of waste generation per capita
By 2021–22, increase recycling rates for:
municipal solid waste from 52% (in 2010–11) to 70%
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 49
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Instrument Relevant provisions
commercial and industrial waste from 57% (in 2010–11) to 70%
construction and demolition waste from 75% (in 2010–11) to 80%
By 2021–22, increase the waste diverted from landfill from 63% (in 2010–
11) to 75%
By 2021–22, establish or upgrade 86 drop-off facilities or services for
managing household problem wastes statewide
By 2016–17, reduce the number of litter items by 40% compared with
2011–12 levels and then continue to reduce litter items to 2021–22
By 2016–17:
reduce the incidence of illegal dumping of waste detected in Sydney
and the Illawarra, Hunter and Central Coast regions by 30% compared
with 2010–11
establish baseline data to allow target-setting in other parts of the
state.
Protection of the Environment
Operations Act 1997 and the
Protection of the Environment
Operations Amendment
(Scheduled Activities and
Waste) Regulation 2008
The Protection of the Environment Operations Act 1997 (POEO Act) defines 'waste'
for regulatory purposes and establishes management and licensing requirements
along with offence provisions to deliver environmentally appropriate outcomes.
The Act contains a list of activities that require an environment protection licence,
and, as such, all Council facilities are operated under Environment Protection
Authority Licences.
Under the Environment Operations Amendment (Scheduled Activities and Waste)
Regulation 2008, licensed waste facilities in the regulated area of NSW must pay a
waste and environment levy for each tonne of waste received for disposal (charged
to the waste generator at the point of disposal). KSC is located within the Regional
Regulated Area (RRA) which means that waste facilities within the area are subject
to the levy.
Waste levy The NSW Government imposes a Section 88 Waste and Environment Levy (the S88
levy) on the deposition of waste in the regulated area under the POEO Act.
The levy varies between regulated areas of NSW. As a member of the Regional
Regulated Area, waste generators within Kempsey Shire Council are scheduled to
pay $53.70 per tonne in 2013-14.
This fee is absorbed into rates paid by waste generators. The fee is likely to
increase over time (currently at $10 pa increments) and is a significant source of
revenue for the state government.
Waste Facility Licensing
Waste and resource recovery facilities require licensing in NSW, where there is
potential risk to the environment from their operations. Schedule 1 of the POEO Act
sets out the activities, including waste and resource recovery activities, that require
licensing.
Licencing categories include:
Waste disposal (application to land)
Waste disposal (thermal treatment)
Waste processing
Waste storage
Resource recovery licensing categories include:
Resource Recovery
Energy Recovery
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 50
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Instrument Relevant provisions
Local Government Act 1993 The Local Government Act 1993 stipulates the conditions under which councils may
charge its residents for the provision of waste management services, and how that
income may be applied.
The Environmental Guidelines:
Solid Waste Landfill 1996
The Environmental Guidelines: Solid Waste Landfill 1996 (NSW Environment
Protection Authority) aims to ensure that landfilling across NSW is conducted in an
environmentally responsible manner, using a performance-based approach. The
areas of primary concern are:
Water pollution;
Air pollution;
Land management and conservation; and
Hazards and loss of amenity.
Waste Less Recycle More
(WLRM)
To assist in achieving the WARR targets, the NSW Government has committed
$465.7 million under the Waste Less, Recycle More: Waste and Resource Recovery
Initiative (WLRM).
Through five key focus areas, the funding package aims to increase recycling
through supporting investment in waste collection systems and infrastructure. The
Local Government Waste and Resource Recovery program will provide $137.7
million over 5 years to support local communities to increase recycling and reduce
illegal dumping and littering through a range of initiatives, and an additional $85.1
million has been allocated exclusively to local government grants.
NSW 2021: A Plan to Make
NSW Number One
In NSW 2012, the NSW Government has renewed commitment in achieving the
2014 WARR Strategy recycling targets by setting this as a key priority (Goal 23).
It also established new priorities for reducing litter (Goal 23), reducing illegal
dumping (Goal 22), and supporting community drop-off centres to improve the
management of household hazardous wastes (Goal 23).
NSW 2021: Mid North Coast
Regional Action Plan
The Mid North Coast Regional Action Plan is a supporting document for the NSW
2021 strategy.
The Plan calls for prioritising the development of a regional waste avoidance and
resource recovery strategy.
Priority actions include increasing recycling, combating illegal dumping and tackling
littering, consistent with Goals 22 and 23 of the NSW plan.
Community Strategic Plan:
Kempsey Shire – Our 20 Year
Vision 2007
The KSC Community Strategic Plan Kempsey Shire – Our 20 Year Vision 2007 (the
Strategic Plan) aims to preserve and enhance the natural environment and lifestyle
enjoyed in the area. Based around 5 key goals, the Strategic Plan provides broad
direction for key local themes across environment, relationships and council
accountabilities. Waste management actions are spread across two strategies as
follows:
1. To protect and enhance the environment
Reduce the amount of waste going to landfill
Manage waste systems in commercially, environmentally and socially
responsible ways
2. To provide employment opportunities
Attract new and creative businesses that add to the diversity of the
Shire's economy
Increase the number of training opportunities available to enhance
skills development in the Shire.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 51
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Instrument Relevant provisions
Kempsey Shire Council
Delivery Program 2013-2017
Supporting the delivery of the Community Strategic Plan is the Kempsey Shire
Council Delivery Program 2013 – 2017. Within this program are actions aimed at
minimising the impact of waste management and disposal, including:
Provide a collection service to defined areas
Provide and operate facilities for disposal of waste.
Educate the community on the advantages of waste minimisation.
Re-establish the Crescent Head Landfill facility to better accommodate reuse
& recycling of waste.
Provide improved ways to minimise waste impacts.
Review operation of transfer stations to reduce the cost.
Measures of success for the delivery program established by KSC include:
Quantity of domestic waste material per year disposed to landfill (target
<4,400t)
Quantity of domestic waste materials per year diverted from landfill (target
>6,600t)
Quantity of material reused/recycled as a proportion of the quantity of
material disposed in the landfill each year (target 60%)
Percentage improvement in the quantity of materials diverted from the landfill
per month (target 5%)
Midwaste Regional Waste
Avoidance & Resource
Recovery Strategy 2014-2021
The vision for the Midwaste Regional Waste Avoidance & Resource Recovery
Strategy 2014-2021 is as follows:
Midwaste member councils will use Innovative approaches for increasing
Diversion rates to meet the NSW WARR Strategy targets; prioritising waste
Avoidance and behaviour change, Sustainable regional solutions,
collaboration, and consideration of appropriate Technology for positive
Environmental, social and economic outcomes.
The Key Result Areas include:
1. Avoid and reduce waste generation
2. Increase recycling
3. Divert more waste from landfill
4. Manage problem wastes better
5. Reduce litter
6. Reduce illegal dumping
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 52
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Instrument Relevant provisions
Kempsey Waste Education
Implementation Plan Strategy
2013-2015
The Kempsey Waste Education Implementation Plan Strategy 2013–2015 focuses
on strategic actions and options that were tabled to deliver measurable outcomes
within budgeted allocations.
The implementation strategies for waste education align with the NSW EPA
Strategic Waste Action Plan (SWAP) and the Midwaste Waste Education Strategy
2010-2015. Central objectives and means of performance review include:
Objective Measurement
Reduce contamination rate of
recycled materials
Comparing numbers of contamination
warning letters with aspirational target of
reducing them by 10% per year
Improve waste recovery Comparing annual recovery rates of
municipal kerbside collected wastes by at
least 5% per annum.
School participation in
recycling and sustainability
initiatives
Number of schools signed up to the recycling
and sustainability networks
Reduce illegal dumping Comparison of tonnes of material cleaned up
in different years to assess the efficacy of
education initiatives
Reporting and management Number of hours spent on WARR reporting
.
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 53
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
APPENDIX C
OPTIONS ANALYSIS
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 54
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Improvements required to Kempsey’s current waste collection and diversion system were modelled in order
to demonstrate how Kempsey could achieve a 70% recycling of MSW by 2021-22.
Assumptions
The data in Table 6-4 was used as a baseline for modelling, with waste flows projected through to 2021-22
assuming a population increase in line with the NSW Department of Planning growth projections4 and a 0%
waste generation per capita increase. The data in Table 6-4 was sourced from Local Government Waste and
Resource Recovery reports5, with updates to the kerbside tonnages by KSC. Population data was sourced
from the most recent release of the Australian Bureau of Statistics Dataset 3218.0.6
Table 6-4 Baseline data used for modelling purposes
MSW Waste Stream 2011-12
Kerbside residual (t) 5,846
Kerbside recycling –recovered (t) 2,575
Kerbside recycling – disposed (t) 266
Kerbside organics – recovered (t) 2,328
Kerbside organics – disposed (t) 25
Drop-off residual (t) 1,831
Drop-off recycling (t) 257
Drop-off organics (t) 1,611
Total Generation (t) 14,739
Population 29,286
Diversion Rate 46%
4 New South Wales Statistical Local Area Population Projections, 2006-2036”, last modified March
2010,http://www.planning.nsw.gov.au/LinkClick.aspx?fileticket=yvzXybG72TA%3D&tabid=124&language=en
5 Available at: http://www.epa.nsw.gov.au/warr/datareport.htm
6 Available at: http://www.abs.gov.au/AUSSTATS/[email protected]/Lookup/3218.0Main+Features12012-13?OpenDocument
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 55
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
The composition of the residual waste stream was taken from the EC Sustainable Audit conducted in 2011,
with the relevant information utilised as per Table 6-5. 7
Table 6-5 Compositional data used for modelling purposes
Waste Stream % of total waste in
residual waste stream
(w/w)
Tonnage in total kerbside
stream potentially able to be
recycled (2011-12)8
Food organics 36.5% 2,133
Garden organics 5.8% 2,666
Recyclable commingled materials 13.5% 3,364
Modelling Scenarios and Results
Figure 6-10 demonstrates the MSW recovery which was achieved in 2011-12, utilising the data from Table 6-
4, and shows three theoretical scenarios for achieving the 70% recycling target by 2021-22 (Scenarios A, B
and C). These Scenarios are outlined in Table 6-6, and described below:
The 2011-12 Baseline represents waste collected and diverted before the FOGO system was
introduced. Utilising the residual waste bin audit and the tonnage of GO collected at the kerbside, it
can be ascertained that 87% of available GO in the kerbside waste stream was collected through the
kerbside GO bins. The recycling rate of material dropped off at KSC waste facilities was 51%, with the
remaining 49% of material disposed to landfill.
2021-22 Scenario A represents an implemented FOGO system which is operating 100% effectively
i.e. all residents are using the system, all food and garden organics are collected through the FOGO
bin and the FOGO bin is not contaminated. Additionally, 100% of available recyclables in the kerbside
stream are captured, and the recycling rate of drop-off materials has improved from 51% to 59%.
2021-22 Scenario B represents a kerbside system which captures 80% of available FO, 95% of
available GO and 100% of available recyclables, while increasing the recycling rate of drop-off
materials to 75%.
2021-22 Scenario C represents a kerbside system which captures 75% of available FO, 90% of
available GO and 100% of available recyclables, while increasing the recycling rate of drop-off
materials to 80%.
Table 6-6 Parameters used for each modelling Scenario
Scenario % of FO captured
from the kerbside
stream
% of GO captured
from the kerbside
stream
% of dry recyclables
captured from the
kerbside stream
Recycling rate of
drop-off materials
2011-12 Baseline 0% 87% 77% 51%
2021-22 Scenario A 100% 100% 100% 59%
7 It should be noted that this composition is indicative only, as the audit sample size for Kempsey was significantly less
than what is considered statistically valid.
8 Includes recyclables captured through the recyclables bin + potentially available recyclables in the residual waste bin
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 56
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
Scenario % of FO captured
from the kerbside
stream
% of GO captured
from the kerbside
stream
% of dry recyclables
captured from the
kerbside stream
Recycling rate of
drop-off materials
2021-22 Scenario B 80% 95% 100% 75%
2021-22 Scenario C 75% 90% 100% 80%
Figure 6-10 Recycling rate achieved under each modelling Scenario, with the contribution of each stream
Discussion
It is clear that the capture and recovery rates under Scenario A, B and C would be extremely difficult to
achieve. Previous studies9 show that an average garden organics capture rate is around 96% and an
average food organics capture rate is 33%. Hence, while there could be scope to increase Kempsey’s
current GO capture rate of 87% to the average of 96%, achieving a FO capture rate of over 75% would prove
very difficult.
Additionally, Kempsey’s current recyclables capture rate of 77% is already significantly higher than the NSW
average of 67%10
, indicating that a significant increase of recyclables capture would also prove quite difficult.
9 Food and Garden Organics Best Practice Collection Manual 2012, published by the Department of Sustainability,
Environment, Water, Population and Communities. Available at:
http://www.environment.gov.au/system/files/resources/8b73aa44-aebc-4d68-b8c9-c848358958c6/files/collection-
manual.pdf
10 This 67% capture rate was calculated using the information available in Domestic kerbside waste and recycling NSW –
Results of the 2011 waste audits, published by the NSW EPA in 2014.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2011-12 Baseline 2021-22 Scenario A 2021-22 Scenario B 2021-22 Scenario C
Re
cove
ry A
chie
ved
Scenario
Kerbside Residuals Organics Dry Recycling Drop-off Target
Waste and Education Strategy 2014-15 to 2021-22—Final Strategy
Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 57
f:\infrastructure\waste\waste and education strategy\appendix b - item 3 - waste and education strategy 2014-15 to 2021-22 final.docx
The potential for increased recovery of drop-off materials is unknown, due to a lack of data on these
materials.
It is worth noting at this point, that the above modelling was conducted utilising an audit which was
statistically invalid, and this could have some impact on the results of the modelling. It is recommended that
a complete waste characterisation audit is conducted of all kerbside bins in order to better identify
opportunities for improvement of recycling.
Notwithstanding, given that the above information is the best available to date, it is recommended that the
NSW WARR target of 70% recycling for MSW be adopted as an aspirational target only. This will induce
KSC to put in place measures to improve recycling within its local government area, while allowing that this
target is unrealistic, unless improved data collection and/or innovative waste practices prove otherwise in the
future.