KAY SONS ELECTRICALS PVT LTD
VARANASI INDIA
QUALITY ASSURANCE PLAN
FOR
FUEL PUMP DIESEL LOCOMOTIVE –HHP Locos
AN ISO 9001:2008 CERTIFIED ORGANAZATION
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
2 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Table Contents
Sl.No. Section No. Title Page No. 1 QAP: TC Table of Contents 2 QAP:CONF Confidentiality 3 QAP:CP Company profile 4 QAP:CC Certificate of conformity 5 QAP : QC Quality Control 6 QAP:ORG Organization Chart 7 QAP:QKP Qualification of Key Personal 8 QAP:PFC Process Flowchart 9 QAP- Section-D Detail of Su Assembly /Components manufactured in house and out sourced Items
10 QAP:01 Inward Inspection Test Format & Production Planning 11 QAP:SP Sampling Plan 12 QAP:02 Quality Assurance System – Inspection and Testing Plan Product Control 13 QAP:03(TR) Test Reports (Final Testing In House of Product ) 14 QAP: CC& WF Customer Complaints & Warranty Failure 15 QAP:WIS Work Instruction for Soldering 16 QAP:WIM Work Instruction for Mechanical assemblies 17 QAP:WIW Work instruction for wiring
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
3 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
CONFIDENTIAL DOCUMENT
This document is the property of KAY SONS ELECTRICALS PVT. LTD. No. portion of this document can be copied without written permission of the Managing Director of Kay Sons Electricals Pvt. Ltd.
These documents are issued to DLW for their reference Only.
Copy No. : Issued to : DLW
01 Varanai
For : KAY SONS ELECTRICALS PVT. LTD., (RAVI GUPTA) (Managing Director ) Office Seal :
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
4 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QAP : CP (Company Profile )
INTRODUCTION
Ours is a small –scale industries engaged in design, development, manufacture and supply of sophisticated custom built Electrical, Electro Mechanical & Electronics Equipments at a very competitive price to Indian Railways for last 20 years. Company Registered with Resistor of Companies U.P. in 1991 vide registration no. 20-12984 Dt.02.04.1991. It started operations in 1992.
We have a strong technological base for designing and manufacturing of power electronics and control equipments.
Ours is an ISO 9001:2008 firm certified by Management System Certification Body vide Registration No. R91/108 when we are continues till date. (QSCert).
Kay Sons Electricals Pvt. Ltd. has strictly adhered to quality standards and years of trouble-free service our equipment have put in, can vouch for this fact. Stringent Inward component checks, in process inspection of drilling, Machining, Assembly and required checks are routine in our Quality Control Procedures.
We got BIS Certification for use of ISI Mark on our Conduit pipes vide License No. CM/L-9283487 as per IS 9537 Part 2:1981.
Our Company Excise Registration No. AAACK9725D XM001
VAT Registration No. 09983800587 Dt. 03.06.1992
CST Registration No. VN-5236176 Dt. 03.06.1992
Import /Export License NO. 1592000444 Dt. 08.07.1992
All the items manufactured by us are conforming to relevant IS/ BS/ ASTM/ CLW/RDSO Specification and Drawing and serving to CLW/Indian Railway with excellent
reputation for quality and timely delivery for last many years.
We are having in house design and Development facilities for development of new products supported by engineers and consultants within the country and abroad.
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
5 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QUALITY POLICY
Our Quality Policy: “To improve the quality of Products through continuous improvement in quality of raw material, manufacturing techniques and effective quality management system to enhance Customer satisfaction.” Our Objectives: The policy is developed through the following Quality Objectives:
1. Product design to meet customer specification and ease of production with technology up – gradation.
2. Adequate Vendor/Trader evaluation and monitoring the performance to ensure quality of incoming material.
3. Adherence to specification at different stages, product and assembly with aim of defect prevention.
4. Training and involvement of employees in development, implementation and improvement of quality system.
5. Continual reduction in customer complaints.
6. Monitor effectiveness of implementation of quality system.
7. Interaction with customers to increase order position.
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
6 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QAP : CC (Certificate of Conformity & Capacity )
Product FUEL PUMP Manufactured By M/S KAY SONS ELECTRICALS PVT. LTD. Model No. KSEL/FP/000 Brand KEPCO DLW DRG.NO. DRG. No. 40122943 ALT b P.L.No. 17454633 Application HHP LOCOS Capacity of Monthly Production 50 Nos. Capacity of Yearly Production 400 Nos.- 600 Nos. The above product have been Inspected and Tested according to above specification and found meeting all the requirements. The Product is conformed to Specification and drawing as said above
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
7 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Technical Detail
Maximum Outlet Pressure
120 PSI at 74 VDC
FUEL FLOW RATE 7GPM @90PSI and 74 VDC 0 GPM @120 PSI and 74V (Relief Valve FULL Bypass )
Max Continous Current At 120 PSI 20 AMPS Input Voltage 45-87 VDC Nominal With Short Duration Drops to 25VDC Weight 85 LBS Max Dry
QAP : QC (Quality Control )
The policy is developed through the following Quality Objectives:
1. Product design to meet customer specification and ease of production with technology up – gradation. 2. Adequate Vendor/Trader evaluation and monitoring the performance to ensure quality of incoming material. 3. Adherence to specification at different stages, product and assembly with aim of defect prevention. 4. Training and involvement of employees in development, implementation and improvement of quality system. 5. Continual reduction in customer complaints. 6. Monitor effectiveness of implementation of quality system. 7. Interaction with customers to increase order position.
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
8 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QAP : ORG (ORGANAZATION CHART ) MANAGING DIRECTOR
DIRECTOR
GENERAL MANAGER FA& C. A. O. Marketing Manager Quality Control R & D Head Material Production Manager
Account Officer-I Account Officer-II
Product Design Group In charge QC
Production Supervisor Production Supervisor
Marketing Ex.-I Marketing Ex.-II Marketing Ex.-III Marketing Ex.-IV In charge Store Purchase Supervisor
Inward Q.C. Inspector Testing Supervisor Final QC Inspector
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
9 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QAP : QKP (Qualification of Key Personal )
Pat I:
Sl.No. Requirement as per STR/Spec. Details of Personnel employed STR/Spec Para
No. Qualification Specified in Spec/STR
Experience Specified in Spec/STR
Name Designation Qualific. Experience Brief Scope of Responsibilities
STR/ Spec.
Para
1 NIL NIL NIL NIL Sir Uma Shankar Head R&D & Q.C.
BE Mechanical
40 Year Design & Development
2 NIL NIL NIL NIL Mr. Anjani Tiwari Production Head BE 12 Year Production 3 NIL NIL NIL NIL Mr.Ajay Mishra Final QC Inspection Diploma 6 Year Testing 4 NIL NIL NIL NIL Mr.Gopal Incoming QC BE 6 Year Testing 5 NIL NIL NIL NIL Mr.Rajesh Mishra Testing Supervisor Diploma 12 Year Testing 6 NIL NIL NIL NIL Mr.Akhilesh Design Engineer BE 10 Year Design 7 NIL NIL NIL NIL Mr. Biredra CNC Programmer Diploma 4Year Programmer 8 NIL NIL NL NIL Mr. Avinash Sr. Manager (Co-
ordination ) BE 6 Year Material procurement
Part II: Not Applicable
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
10 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Part I: Process Flow Chart
Customer Specified PO Copy
Head R & D Head Materials Head Production
Reject
Mechanical Supplier
PO’s to Supplier s & Vendors
Electrical Supplier
Check according to Drawing by IE
Production Planning
In Process Q.C. (wiring)
Sock & Burn Test
Store
Inward Q.C
System Assembly in Cabinet
Final Testing With Test Report
OK
Wave Soldering OF PCB Wire harness prep, cabinet wiring
Component lid cutting and shaping
Customer or Third Party Inspection
Winding of chock Cabinet Printing
In Process Inspection (Chok /Transf)
Finish Goods Packing & Forwarding
Dispatch to Customer
Reject OK
In Process Q.C. of Soldering
In process Inspection /Testing of PCB
In Process Q.C. Inspection /Testing of
equipment
Re work
NC
OK
OK
ABBREVIATIONS NC- Non Conformity Rej.- Reject O.K. Accept TPI. Third Person Ins.
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
11 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Sl.No. Item Characteristic Classification Type of Check
Quantum Check
Reference Document
Acceptance Norm
Agency
1 Electrical Cover Plate , Body and Base
Visual , Dimensional
Major Measurement & Observation
As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
2 Bare PCB Thickness ,Grade, Solder ability, BBT (for PTH ) visual
check
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
3 Lifting Eye Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
4 Relief valve Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
5 Factory set Relief Valve
Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
6 Electrical Conduit Interface Female
Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
7 CL Of INLET Outlet & Relief Valve Vent
Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
8 INLET Port Grade &, Dimensional
Major Observation As per sampling Plan
DLW Drg. & Specification
Inspection Report Q.C. Depot
9 Component Assembly
Grade &, Dimensional
Major Observation 100% Check DLW Drg. & Specification
Test report Quality Inspector
10 Populated PCB Visual Check of Soldering
Major Observation 100% Check DLW Drg. & Specification
Test report Quality Inspector
11 Positive negative Terminals
Visual & Dimensional
Major Measurement 100% Check DLW Drg. & Specification
Test report Production supervisor
12 Outlet Port Grade &, Dimensional
Major Measurement 100% Check DLW Drg. & Specification
Test report Production supervisor
13 Wire Visual check Major Observation 100% Check DLW Drg. & Specification
Test report Quality Inspector
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
12 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Sl.No. Item Characteristic Classification Type of Check Quantum Check
Reference Document
Acceptance Norm
Agency
14 Condenser 250V Visual Check & Electrical Checking
Major Observation 100% Check DLW Drg. & Specification
Test report Quality Inspector
15 PF Condenser Visual Check & Electrical Checking
Major Measurement 100% Check DLW Drg. & Specification
Test report Production supervisor
16 Transistor Visual Check & Electrical Checking
Major Measurement 100% Check DLW Drg. & Specification
Test report Production supervisor
17 Terminal Lug Visual Measurement &
testing
Major Observation Measurement
100% Check DLW Drg. & Specification
Test report Production supervisor/ Q.C.
18 Hardware Visual Performance
Testing
Major Observation Measurement
100% Check DLW Drg. & Specification
Final Test report Production supervisor/Q.C
19 Sub Assembly Visual Measurement &
testing
Major Observation Measurement
100% Check Inspection for Subassembly /final
product
Test report Production supervisor/ Q.C.
20 Product Assembly Visual Performance
Testing
Major Observation Measurement
100% Check Inspection for Subassembly /final product & W.I. &
Product Specification
Final Test report Production supervisor/Q.C
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
13 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
In Process Su Assembly Sl.No.
Component Operation
Machine/ Equipment used for Operation
Character-sticks to be Monitored
Classification of Criticality
Type /Method of Check
Quantum of Check Reference Document
Acceptance Norms
Format of Records
Agency for Inspection
If Out source Address of Agency
Remark
21 Wire Cutting Cutting Machine
Visual defects 2. Dimensional Check 3. Finish
Major V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
22 Sizing Sizing Machine
Visual defects 2. Dimensional Check 3. Finish
Major V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
23 Machining CNC Machine
Visual defects 2. Dimensional Check 3. Finish
Major V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
24 Grinding Grinder Machine
Visual defects 2. Dimensional Check 3. Finish
Major V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
25 Buffing Buff Machine
Visual defects 2. Dimensional Check 3. Finish
Major V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
26 Crimping Crimping Tool
Visual ,Crimping of wire
Critical V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
27 Soldering Soldering Equipment
Visual ,Crimping of wire
Critical V/I First off 100% for approval sampling for regular production
As per Quality Procedure
As per Quality Procedure
Inspection Register .
Internal Quality control Checks
Internal Goods Receiving Bay
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
14 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Equipment Sub Assembly Sl.No.
Component Operation
Machine/ Equipment used for Operation
Character-sticks to be Monitored
Classification of Criticality
Type /Method of Check
Quantum of Check Reference Document
Acceptance Norms
Format of Records
Agency for Inspection
If Out source Address of Agency
Remark
28 Electrical Cover Plate ASM
Screw Driver ,Riveting Machine
Visual Defects Dimensional Checks
Critical V/I First of 100% for approval sampling for regular production
As per DLW Drg & Specification
As per DLW Drg & Specn.
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
29 Mechanical Assembly
Wire cutting tools Crimping tools
Visual Defects Dimensional Checks
Critical V/I First of 100% for approval sampling for regular production
As per DLW Drg & Specification
As per DLW Drg & Specn.
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
30 Out Let ASM Visual Defects Dimensional Checks
Critical V/I First of 100% for approval sampling for regular production
As per DLW Drg & Specification
As per DLW Drg & Specn.
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
31 LIFTING EYE ASM
Screw Driver ,Riveting Machine
Visual Defects Dimensional Checks
Critical V/I First of 100% for approval sampling for regular production
As per DLW Drg & Specification
As per DLW Drg & Specn.
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
15 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Equipment Final Assembly AS PER DRG.NO. 40122943
Sl.No.
Component Operation
Machine/ Equipment used for Operation
Character-sticks to be Monitored
Classification of Criticality
Type /Method of Check
Quantum of Check Reference Document
Acceptance Norms
Format of Records
Agency for Inspection
If Out source Address of Agency
Remark
32 Electrical Cover Plate Assembly
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
33 Relief Valve Port Assembly
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
34 Factory Set ASM
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
35 Electrical Conduit Interface Female ASM
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
36 Positive Negative Terminal Posts Polarity
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
16 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
PRODUCT FINAL TESTING AS PER DLW DRG. Sl.No. Component
Operation Machine/ Equipment used for Operation
Character-sticks to be Monitored
Classification of Criticality
Type /Method of Check
Quantum of Check Reference Document
Acceptance Norms
Format of Records
Agency for Inspection
If Out source Address of Agency
Remark
1 Visual Test Visual Visual Defect Critical V/I/T 100 % Testing Checking Routine Test
As per DLW Drg
As perDLW Drg
Inspection Register .
Internal Quality control Checks
Internal/ Testing Agency
Goods Final Product Testing Bay
2 Preliminary Checking
General workmanship & Finish
General Operation
Critical V/I 100 % Testing Checking Routine Test
As per DLW Drg
As perDLW Drg
Inspection Register .
Internal Quality control Checks
Internal/ Testing Agency
Goods Final Product Testing Bay
3 Dimensional Checks
Dimensional Checks
As per DLW Drg & Specification
Critical 1.Digital Vernier. 2.Micromertr
100 % Testing Checking Routine Test
As perDLW Drg
As perDLW Drg
Inspection Register
Internal Quality control Checks
Internal/ Testing Agency
Goods Final Product Testing Bay
4 Insulation Resistance Test
Megger I.R.Level Critical V/I 100 % Testing Checking Routine Test
As perDLW Drg
As perDLW Drg
Inspection Register
Internal Quality control Checks
Internal/ Testing Agency
Goods Final Product Testing Bay
5 High Voltage test
High Voltage Tester
Should With Stand the Test
Critical V/I 100 % Testing Checking Routine Test
As perDLW Drg
As perDLW Drg
Inspection Register .
Internal Quality control Checks
Internal/ Testing Agency
Goods Final Product Testing Bay
37 CL Of Inlet Out Let & Relief Valve vent asm
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
38 Main Assembly (Consisting of Electrical ASM and Mechanical ASM
Visual Defects Dimensional Checks ,Performance check
Critical, Major V/I First of 100% for approval sampling for regular production
DLW Drg. & As per Quality Procedure KSEL/FP
As per DLW Drg & Specification
Inspection Register . Raw material Test Report
Internal Quality control
Internal Goods Receiving Bay
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
17 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Procedure for Inspection & Testing of Incoming material (Inward Inspection ) QAP : 01
Part –I : Document No. KSEL/FP/000 Date : Name of Material : EMD Part No. : KEPCO Pt. No. : Sample Plan :
Incoming No.____________ Date:__________ Batch No .__________ Date:__________ Vendor Details.___________________ Invoice/Challan No.__________ Date:__________ P.O.No. ___________________________ Date:___________ Qty Received : ____________ Sample Qty:----------------------------- Parameters Checked
Sl.No. Check Point Specified Observation Remarks 1. Visual Checking 2 Dimensional Checking 3 Material
Qty. Sample Size 1-10 5 11-25 15 26-50 35 51-100 75
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
18 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Step I
PRODUCTION MONTHLY PLAN
P.O.No. D.P. Product. Name Qty. for Month Consignee Remarks
Step II
Production Requisition Pleas Issue the Following Material For :-
Sl.No. Description of Material Qty. Required Material Required Issue Remarks
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
19 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
INCOMING MATERIALS Item Sample size and frequency of
insp. Parameter for insp.
Equipment Used Acceptance limit/criteria/ specified value
Rejection details
IGBT 100% INSPECTION As per work instruction
Multi Meter As per characteristic Returned to vendor
Enclosure & Heat Sink
100% inspection Ss per SIPL Scale, Vernier As per Drawing -do-
Discrete Electronic Components
Sampling Plan as per IS- 2500 Part- I:L 2000 Insp. Level S-1
As per Multi Meter, LCR Bridge, Voltage Source
As per their characteristic -do-
Discrete Mechanical Items
-do- -do- Scale, Vernier As per items characteristic -do-
Discrete Electrical Components
-do- -do- Multi Meters, voltage Source, Current Source
As Per items characteristic -d0-
PROCESS CONTROL
Item Sample size and frequency of insp.
Parameter for insp. Equipment Used Acceptance limit/criteria/specified value
Rejection details
Populated PCB 100% Visual checking of soldering & burn in test
Magnifier As per Work Instructions for Soldering
Reworked or scrapped as per Product Nonconformity Report
Populated PCB 100% Burn in Test at 70°C Environmental chamber and Power supply
Test for functionality -do-
Sub- assembly 100% Visual, Measurement & Testing
Multi Meter, Oscilloscope
As per Work Instruction for Sub- Assembly Inspection
-do-
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
20 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
PRODUCT CONTROL Item Sample size and
frequency of insp. Parameter for insp. Equipment Used Acceptance
limit/criteria/specified Rejection details
Complete product assembly of Fuel PUMP
100% Visual, Performance as per DLW DRG. & spec. No. 40122943
Oscilloscope, Multi Meter, Voltage Source, Testing ZIG
As per WINS for inspection of FUEL PUMP
Reworked or scrapped as per Product Nonconformity Report
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
21 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Title System of Maintaining The Date of Customer Complaints/ Warranty Failures Date 04.12.2012 Section No. QAP : WF Page No. 42 of 45
SN
Dat
e of
Rpo
rt of
C
ompl
aint
Lette
r No.
Com
plai
nt R
ecei
ved
From
Classification of Failure
Whe
ther
any
per
son
depu
ted
for c
olle
ctin
g fie
ld s
ampl
e
Dat
e of
Joi
nt In
spec
tion
Failu
re A
naly
sis
& C
ause
of F
ailu
re
Dat
e of
Com
plia
nce
in
case
of W
arra
nty
C &
P a
ctio
n ta
ken
War
rant
y Fa
ilure
/In
ser
vice
fa
ilure
/cal
l for
Jo
int I
nspe
ctio
n /C
onsi
gnee
end
R
ejec
tion
/Gen
eral
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
22 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
QAP : WIS (WORK INSTRUCTION FOR SOLDERING )
1. Soldering will be done by qualified soldering Operators with appropriate tools. 2. Components are assembled in an order depending on their height and size 3. Solder joints are inspected 100% visually by operators in process control. 4. Inward Inspection cleared only is taken for soldering operators. 5. Soldering Iron Tip is wetted to achieve good solder flow and hens good joint. 6. Heating :-
a. Surface to be soldered is applied with sufficient heat by soldering iron. b. Heat should not be high as to cause damage to component
7. Optimum quantity of solder shall be applied to avoid Excess or under solder joints for especially for PTH border. 8. Solder Joints are inspected for the following.
a. Dry solder b. Excess and under solder c. Short and bridging effects d. Pin holes and blow holes e. Spikes and cavities
9. Goods contact between the soldering tip and the parts to be maintained. 10. Keep the contacts maintain between irons, the joint memers until good flow of solder occurs. 11. Proper tools must be used for bending, cutting and striping of wires and they should be kept clean and in order. 12. The high wattage soldering shall be used for soldering heavy components and wire joints. Like Brass contact, copper contacts. 13. After soldering the are cleaned with recommended solvents. 14. Visual inspection is done for good workmanship and sound and bright surface. 15. The soldering operator shall qualified for every 6-8 months as stated in KEPCO /Production department /F
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
23 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
Work Instruction for Assemblies
1. Conform the sub assemblies and their dimensions are as per drawing. By using measuring tools like, screw gauge and height gauge. Large dimensions. Are
measured with steel rule.
2. Mechanical assemblies are carried out by approved samples or approved assembly drawings.
3. Rivet, Screw to with adequate strength.
4. Use proper tools and jigs for mechanical assemblies.
5. Check for loose fixing
6. Fixing of Each Nut, Bolt, Screw, spring pin, Retaining Ring, Pins and Dowel Pins at actual position shall be adequately tightened.
7. Fixing of handle and cover
8. Visual Inspection of Rheostat Plate Handle and Readout Drum alignment to base.
9. Visual Inspection of all Cable tie shall be adequately tightened.
10. Visual Inspection of Marking of all wires with wire marker.
11. Indentify the non –conforming and rejected products/components by means of tag and separately store in bins.
QUALITY ASSURANCE PLAN FOR
FUEL PUMP FOR DIESEL LOCOMOTIVES
Revision No. Date Page No.
00 15.01.2015
24 of 24
KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by
SOM PHOTOGRAPH OF FUEL PUMP TO DRG.NO. 40122943