Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement Unit KAU Commitment Present Value Projected Value Current % Projected % p1/p1 Developing Technologies & Technical Support 1. Presence of activated contracts with required partners specialized in the field of reengineering in all KAU sectors. VPD Office VPD IT Dean IT Deanship Partnership contract 100 0 60 0.00% 60.00% p1/p1 Developing Technologies & Technical Support 2. Availability of maps & guides in order to accelerate university affiliates' and students' administrative procedures. VPD Office VPD IT Dean IT Deanship Map / Guide 12 18 0 100.00% 0.00% p1/p1 Developing Technologies & Technical Support 3. Completing the transformation of all KAU sectors' paper transactions into e-documents that cannot be leaked or hacked. VPD Office VPD IT Dean IT Deanship Paper transaction into e- document 500000 732134 0 100.00% 0.00% p1/p1 Developing Technologies & Technical Support 4. Availability of an effective integrated system for technical follow up of projects, maintenance, operations, safety and security in all KAU sectors. VPD Office VPD IT Dean IT Deanship Program (system) for follow up & maintenance 1 0 1 0.00% 100.00% p1/p1 Developing Technologies & Technical Support 5. Presence of a highly integrated IT infrastructure for e-administration programs. VPD Office VPD IT Dean IT Deanship e-Administration program with its own infrastructure 1 1 1 100.00% 100.00% p1/p2 Developing e- administration & e-finance services. 1. Availability of experts, professionals and technical cadres for upgrading e- administration & e-finance services. VP Office VP Contracts & Purchases Administration Director Contracts & Purchases Administration Expert / specialist / technical cadre 10 4 10 40.00% 100.00% p1/p2 Developing e- administration & e-finance services. 2. Issuing a job description guide for all KAU administrative and financial sectors. VP Office VP Contracts & Purchases Administration Director Contracts & Purchases Administration Job description guide 1 1 1 100.00% 100.00% p1/p2 Developing e- administration & e-finance services. 3. Completing the process of preparing and training cadres and skilled personnel involved in developing e-finance and e- administration services (Financial and administrative personnel must attend at least one annual training course). VP Office VP Contracts & Purchases Administration Director Contracts & Purchases Administration Training course / concerned affiliates 800 800 800 100.00% 100.00% p1/p2 Developing e- administration & e-finance services. 4. Doubling the funding of programs for electronically developing KAU’s administrative and financial sectors through partnerships. VP Office VP Contracts & Purchases Administration Director Contracts & Purchases Administration Saudi riyal (funding allocation) 0 0 0 100.00% 100.00%

KAU Present Projected Current Projected Project KPI

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p1/p1 Developing

Technologies & Technical

Support

1. Presence of activated

contracts with required

partners specialized in the

field of reengineering in all

KAU sectors.

VPD Office VPD IT Dean IT Deanship Partnership contract 100 0 60 0.00% 60.00%

p1/p1 Developing

Technologies & Technical

Support

2. Availability of maps &

guides in order to

accelerate university

affiliates' and students'

administrative procedures.

VPD Office VPD IT Dean IT Deanship Map / Guide 12 18 0 100.00% 0.00%

p1/p1 Developing

Technologies & Technical

Support

3. Completing the

transformation of all KAU

sectors' paper transactions

into e-documents that

cannot be leaked or hacked.

VPD Office VPD IT Dean IT DeanshipPaper transaction into e-

document500000 732134 0 100.00% 0.00%

p1/p1 Developing

Technologies & Technical

Support

4. Availability of an

effective integrated system

for technical follow up of

projects, maintenance,

operations, safety and

security in all KAU sectors.

VPD Office VPD IT Dean IT DeanshipProgram (system) for follow

up & maintenance1 0 1 0.00% 100.00%

p1/p1 Developing

Technologies & Technical

Support

5. Presence of a highly

integrated IT infrastructure

for e-administration

programs.

VPD Office VPD IT Dean IT Deanshipe-Administration program

with its own infrastructure1 1 1 100.00% 100.00%

p1/p2 Developing e-

administration & e-finance

services.

1. Availability of experts,

professionals and technical

cadres for upgrading e-

administration & e-finance

services.

VP Office VPContracts & Purchases

Administration Director

Contracts & Purchases

Administration

Expert / specialist /

technical cadre10 4 10 40.00% 100.00%

p1/p2 Developing e-

administration & e-finance

services.

2. Issuing a job description

guide for all KAU

administrative and financial

sectors.

VP Office VPContracts & Purchases

Administration Director

Contracts & Purchases

AdministrationJob description guide 1 1 1 100.00% 100.00%

p1/p2 Developing e-

administration & e-finance

services.

3. Completing the process

of preparing and training

cadres and skilled

personnel involved in

developing e-finance and e-

administration services

(Financial and

administrative personnel

must attend at least one

annual training course).

VP Office VPContracts & Purchases

Administration Director

Contracts & Purchases

Administration

Training course / concerned

affiliates800 800 800 100.00% 100.00%

p1/p2 Developing e-

administration & e-finance

services.

4. Doubling the funding of

programs for electronically

developing KAU’s

administrative and financial

sectors through

partnerships.

VP Office VPContracts & Purchases

Administration Director

Contracts & Purchases

Administration

Saudi riyal (funding

allocation)0 0 0 100.00% 100.00%

Page 2: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p1/p3 Developing academic

services

1. Availability of upgraded e-

programs that serve the

academic process through

KAU’s e-portal

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Upgraded e-programs 5 1 0 20.00% 0.00%

p1/p3 Developing academic

services

2. Availability of students' e-

portfolio in all academic

programs.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatede-portfolio (every students

/ course)100000 160000 0 100.00% 0.00%

p1/p3 Developing academic

services

3. Availability of effective

local & international

specialized partnerships in

the process of modernizing

all academic services.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Specialized Partnership 100 88 1 67.00% 1.00%

P1/p4 Developing e-medical

services

1. Availability of

infrastructures and

computer programs that

are needed for

transforming all medical

services’ paper transactions

into electronic images

VP Office VP Not delegated Not delegated

Program (for transforming

transactions into digital

images)

2 2 2 100.00% 100.00%

P1/p4 Developing e-medical

services

2. Availability of qualified

technical cadres needed by

all medical units

VP Office VP Not delegated Not delegated Qualified technical cadre 40 20 40 50.00% 100.00%

P1/p4 Developing e-medical

services

3. Availability of modern

integrated systems at the

Medical Center

VP Office VP Not delegated Not delegated e-Program (system) 2 2 2 100.00% 100.00%

p1/p5 Total quality in e-

transactions

1. Increasing funds

allocated for satisfying total

quality requirements by a

percentage of no less than

100% of the current

allocations.

VPD Office VPD IT Dean IT DeanshipSaudi riyal (approved

funding allocation)2 0 0 0.00% 0.00%

p1/p5 Total quality in e-

transactions

2. Increasing the number of

agreements and

partnerships with

international universities

which implement total

quality concepts in e-

transactions every year.

VPD Office VPD IT Dean IT Deanship Agreement /Partnership 1 0 0 0.00% 0.00%

p1/p5 Total quality in e-

transactions

3. Following up the

implementation of KAU’s

Strategic Plan, and

rectifying it electronically.

VPD Office VPD IT Dean IT Deanship Follow-up program 1 1 1 100.00% 100.00%

p2/p1 Developing the e-

portal's infrastructure

1. Availability of

infrastructure and

interactive computer

programs required for

upgrading KAU’s website.

VPD Office VPD IT Dean IT Deanship e-infrastructure / program 1 1 1 100.00% 100.00%

p2/p2 Developing technical

specifications

1. Increase in average

Internet bandwidth by at

least 60% of its current

throughput – i.e., from

155MB to 264 MB.

VPD Office VPD IT Dean IT DeanshipMegabyte (targeted

capacity)264 300 264 100.00% 100.00%

Page 3: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p2/p2 Developing technical

specifications

2. Average increase in the

number of servers and their

efficiency (at least 8

servers).

VPD Office VPD IT Dean IT Deanship Servers 8 10 8 100.00% 100.00%

p2/p2 Developing technical

specifications

3. Increasing the capacity of

the two current storage

units in order to comply

with KAU’s futuristic needs.

VPD Office VPD IT Dean IT DeanshipGigabyte, Terabyte,

Petabyte (storage capacity)25 100 25 100.00% 100.00%

p2/p3 Achieving

webometrics rankings

1. Doubling the current

number of KAU’s website’s

external hyperlinks.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityIT Dean IT Deanship Hyperlink 50000 150000 50000 100.00% 100.00%

p2/p3 Achieving

webometrics rankings

2. Doubling the number of

web pages and Internet

files.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityIT Dean IT Deanship webpage 29408 24129 0 80.01% 0.00%

p2/p3 Achieving

webometrics rankings

3. Uploading all KAU’s

scientific reports and

published papers on the

university’s website.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityIT Dean IT Deanship

Published report / scientific

paper15083 10624 40 62.81% 0.27%

p2/p3 Achieving

webometrics rankings

4. Acquiring international

website awards

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityIT Dean IT Deanship Award 1 790 0 100.00% 0.00%

p3/p1 Promoting human

resources

1. Increasing the number of

qualified technical support

cadres in External and

Distance Learning programs

by an average of one

technician for every 5

teaching staff members.

VPD Office VPD IT Dean IT Deanship

Technical cadres for

externals programs (One

technician for every 5

teaching staff members)

400 109 206 27.00% 51.50%

p3/p1 Promoting human

resources

2. Availability of IT

specialists and scientific

experts who are qualified in

upgrading all Distance

Learning programs.

VPD Office VPD IT Dean IT Deanship

Technical and scientific

cadre for vocational

development

30 30 20 100.00% 66.67%

p3/p1 Promoting human

resources

3. Availability of various

training courses for

teaching staff members

involved in e-learning

programs in order to

provide them with the

necessary skills for

managing all relevant

programs with a high

degree of proficiency.

VPD Office VPD IT Dean IT Deanship Training program 500 300 300 60.00% 60.00%

p3/p2 Developing e-

administration & e-finance

systems for distance

learning programs

1. Approving the

restructuring of the

Distance Learning Deanship

into two separate

deanships: a Distance

Learning Deanship and an e-

Learning Deanship.

VPD Office VPD IT Dean IT DeanshipDecree approving

restructure1 1 1 100.00% 100.00%

Page 4: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p3/p2 Developing e-

administration & e-finance

systems for distance

learning programs

2. Availability of 5

partnerships with local and

international centers of

excellence in order to

benefit from their expertise

in e-learning and distance

learning.

VPD Office VPD IT Dean IT DeanshipPartnership with centers of

excellence5 1 1 20.00% 20.00%

p3/p2 Developing e-

administration & e-finance

systems for distance

learning programs

3. The administrative and

financial system’s flexibility

and efficiency in serving

50,000 students enrolled in

the Distance Learning

programs.

VPD Office VPD IT Dean IT DeanshipEfficient financial &

administrative program17 11 9 64.71% 52.94%

p3/p3 Academic

accreditation for distance

learning programs

1. The Distance Leaning

Deanship’s acquirement of

accreditation.

VPD Office VPD IT Dean IT Deanship Accreditation certificate 1 1 1 100.00% 100.00%

p3/p4 Developing IT &

technical systems

1. Transforming all KAU

courses into interactive e-

materials.

VPD Office VPD IT Dean IT Deanship e-Course 4150 786 154 18.92% 3.71%

p3/p4 Developing IT &

technical systems

2. Availability of an e-library

that is appropriate for

distance learning programs.

VPD Office VPD IT Dean IT Deanship e-Library 1 0 1 0.00% 100.00%

p3/p4 Developing IT &

technical systems

3. Availability of technical IT

systems for distance

learning programs.

VPD Office VPD IT Dean IT DeanshipIT technical system

(program)6 6 6 100.00% 100.00%

p3/p5Increasing students'

enrollment in Distance

Learning

1. All theoretical colleges’

academic programs grant

bachelor degrees via

distance learning programs.

VPD Office VPD IT Dean IT Deanship Academic program 49 12 0 24.49% 0.00%

p3/p5Increasing students'

enrollment in Distance

Learning

2. Increasing the number of

students who benefit from

distance learning programs

into 50,000.

VPD Office VPD IT Dean IT Deanship Student 50000 15769 0 31.54% 0.00%

p3/p5Increasing students'

enrollment in Distance

Learning

3. Transforming External

Students’ Programs into

Distance Learning programs.

VPD Office VPD IT Dean IT Deanship

Externals program

transformed into distance

learning

49 10 0 20.41% 0.00%

p4/p1 Establishing a center

for academic and

institutional assessment

1. Decree establishing a

center for assessing KAU’s

academic and institutional

performance.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit Approved decree 1 0 0 0.00% 0.00%

p4/p1 Establishing a center

for academic and

institutional assessment

2. Availability of a sufficient

number of classrooms and

labs; and suitable relevant

procedures for their

maintenance in compliance

with accreditation criteria.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit Classroom / lab 661 412 0 60.51% 0.00%

p4/p1 Establishing a center

for academic and

institutional assessment

3. The acquirement of

academic accreditation by

at least 100 new programs

in the next 5 years.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit Approved program 100 35 0 35.00% 0.00%

Page 5: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p4/p1 Establishing a center

for academic and

institutional assessment

4. Preparation for and

obtainment of academic

accreditation for remaining

academic programs in the

third Five-Year Plan (from

1436 H. to the end of 1440

H.).

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Accreditation-ready

academic program144 52 0 35.42% 0.00%

p4/p2 Developing curricula

and academic programs

1. 100% compliance of all

curricula with national

standards and academic

accreditation criteria.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedCurriculum satisfying

accreditation criteria1906 1420 0 74.40% 0.00%

p4/p2 Developing curricula

and academic programs

2. Producing course

portfolios for all remaining

academic programs.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Complete course portfolio 3279 1527 0 46.51% 0.00%

p4/p2 Developing curricula

and academic programs

3. Availability of an active

isochronal system for

reviewing academic

programs and curricula

every 3 years.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedUnit / committee (for

review)25 52 1 52.00% 4.00%

p4/p2 Developing curricula

and academic programs

4. Applying e-learning tools

and utilizing various

educational multimedia.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedProgram (for e-learning

tools)366 235 0 63.66% 0.00%

p4/p2 Developing curricula

and academic programs

5. Availability of an

effective e-library.VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated e-Library 1 0 1 0.00% 100.00%

p4/p3 Modernizing teaching

process

Availability of a committee

chaired by KAU’s Vice

President for Academic

Affairs for motivating

teaching staff members and

enhancing their academic

and professional

performance.

VPD Office VPD CTLD Director CTLD Committee 1 0 1 0.00% 100.00%

p4/p4 Enhancing academic

performance of teaching

staff members

1. Availability of an

effective system for

assessing the performance

of teaching staff members.

VPD Office VPD CTLD Director CTLDProgram for assessing

teaching staff performance91 70.5 0 75.27% 0.00%

p4/p4 Enhancing academic

performance of teaching

staff members

2. Enhancing teaching staff

members’ performance

through their attendance of

at least one training course

every semester.

VPD Office VPD CTLD Director CTLDTraining course / teaching

staff member / semester558 201 0 35.66% 0.00%

p4/p4 Enhancing academic

performance of teaching

staff members

3. Issuing and approving

new regulations for

selecting excellent graduate

assistants.

VPD Office VPD CTLD Director CTLD

Approved regulations for

selecting excellent graduate

assistants

72 58 0 77.78% 0.00%

p4/p5 Developing e-

information technology

1. Doubling the number of

educational websites on

KAU’s e-portal.

VPD Office VPD IT Dean IT Deanship e-Learning website 7534 7442 6500 94.66% 86.28%

p4/p5 Developing e-

information technology

2. Providing hyperlinks for

all remaining KAU buildings.VPD Office VPD IT Dean IT Deanship Building with hyperlink 170 145 150 85.29% 88.24%

Page 6: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p4/p6 Developing

administrative leadership

skills

1. Availability of an

administrative procedures'

guide and its

implementation in all KAU

units and entities in

compliance with academic

accreditation requirements.

VPD Office VPD CTLD Director CTLDAdministrative transactions'

guide100 32.2 0 30.20% 0.00%

p4/p6 Developing

administrative leadership

skills

2. Adopting total quality

criteria in at least 90% of all

KAU academic sectors.

VPD Office VPD CTLD Director CTLDApproved total quality

certificate63 21.25 0 33.73% 0.00%

p4/p7 Follow up &

assessment of academic

programs

1. Availability of academic

directories for all programs

in colleges which have not

yet been accredited.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Unaccredited college with a

directory for its academic

programs

78 52 0 65.38% 0.00%

p4/p7 Follow up &

assessment of academic

programs

2. Availability of special

databases for academic

accreditations already

acquired by various sectors

and specializations.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Updated database of

acquired accreditations87 63 0 67.82% 0.00%

p4/p7 Follow up &

assessment of academic

programs

3. Availability of effective

follow-up and assessment

systems for satisfying the

objectives of all academic

programs through student

participation in the teaching

and learning process.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Follow-up & assessment

program71 50 0 67.61% 0.00%

p4/p7 Follow up &

assessment of academic

programs

4 . Availability of plans for

improvement and

continuation of all

academic programs.

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Academic program with

plan for continuous

improvement

96 66 0 68.75% 0.00%

p4/p8 Follow up &

assessment of institutional

performance

Completion of all

institutional academic

accreditation requirements

in accordance with plan (19

requirements).

VPD Office VPDAcademic Assessment Unit

DirectorAcademic Assessment Unit

Requirement for

institutional accreditation291 152 52 51.89% 17.87%

p5/p1 Providing a

successful university

environment for students

1. Creating a Preparatory

Year Deanship (Forming a

higher supervisory

committee).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedPreparatory Year Deanship

(committee)1 0 0 0.00% 0.00%

p5/p1 Providing a

successful university

environment for students

2. Increase in success rate in

the preparatory year exams

(At least 80% of all regular

students succeed).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Successful student Not delegated 0 0 0.00% 0.00%

p5/p1 Providing a

successful university

environment for students

3. Availability of a social

and academic advisement

system for preparatory year

students (At least one

academic advisor for every

100 students).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedEffective academic

advisement programNot delegated 0 0 0.00% 0.00%

Page 7: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p5/p2 Enhancing students'

skills

1. Availability of a unit for

developing the skills of

preparatory year students.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Accredited unit 1 1 1 100.00% 100.00%

p5/p2 Enhancing students'

skills

2 . Availability of free

Internet educational and

scientific services in every

college.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedCollege with free Internet

services32 30 32 93.75% 100.00%

p5/p2 Enhancing students'

skills

3. Availability of well-

developed programs for

student practical training in

and out of KAU (At least

one program in every

semester).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated Upgraded training program 196 94 0 47.45% 0.00%

p5/p2 Enhancing students'

skills

4. Availability of an

interactive e-forum for all

preparatory year students.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedInteractive forum

(interactive website)1 1 0 100.00% 0.00%

p5/p3 Developing academic

programs

1 . Availability of an

effective accredited unit for

developing the preparatory

year’s academic program.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated

Unit for developing

Preparatory Year academic

programs

1 1 0 100.00% 0.00%

p5/p3 Developing academic

programs

2. A qualified and

specialized team for

following up the

implementation of the

preparatory year’s

academic program.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedQualified team (specialized

in follow up)1 1 0 100.00% 0.00%

p5/p3 Developing academic

programs

3. Increasing the number of

meetings, seminars, and

workshops that examine

the assessment of the

preparatory year’s

academic program (At least

one every semester).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedSeminar / meeting /

workshop10 0 1 0.00% 10.00%

p5/p3 Developing academic

programs

4. Availability of one

technician for every 5

English language labs and

computer labs (for a total of

50 labs).

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegated

Lab technician (for 50

English language labs &

computer labs)

10 0 0 0.00% 0.00%

p5/p3 Developing academic

programs

5. Availability of an

advanced academic

program for preparatory

year students in compliance

with total quality criteria.

VP Academic Affairs Office VP Academic Affairs Not delegated Not delegatedUpgraded program (for

preparatory year students)1 0 1 0.00% 100.00%

p5/p4 Enhancing teaching

staff members' skills

1. Decree launching and

inaugurating the Center for

Teaching & Learning

Development (CTLD).

VPD Office VPD CTLD Director CTLD Launching decree 1 0 0 0.00% 0.00%

p5/p4 Enhancing teaching

staff members' skills

2. Teaching staff members’

utilization of audiovisual

aids in their preparatory

year teaching

methodologies.

VPD Office VPD CTLD Director CTLD Teaching staff member Not delegated 0 0 0.00% 0.00%

Page 8: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p5/p4 Enhancing teaching

staff members' skills

3. Attendance of one

educational training course

every year by each teaching

staff member.

VPD Office VPD CTLD Director CTLDQualifying education course

/ teaching staff member5 3 0 60.00% 0.00%

p6/p1 Enhancing graduate

students’ knowledge and

skills

The participation of 5% of

the graduate students in

scientific chairs programs,

centers of excellence, and

research groups.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Graduate student 100 40 15 40.00% 15.00%

p6/p1 Enhancing graduate

students’ knowledge and

skills

Improvement in students’

knowledge and skills

through specialization-

specific training activities

and utilization of relevant

modern technology.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship

Exceptionally skillful &

knowledgeable student200 100 70 50.00% 35.00%

p6/p1 Enhancing graduate

students’ knowledge and

skills

The presence of a flexible

mechanism for attracting

400 exceptional students to

graduate studies programs.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Exceptional student 400 150 140 37.50% 35.00%

p6/p2 Enhancing teaching

staff members’ capabilities

in the field of graduate

studies

1. Availability of a

specialized administration

at the VP for Graduate

Studies & Scientific

Research’s office for

attracting top international

professors (Number of

professors).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Specialized administration 1 1 1 100.00% 100.00%

p6/p2 Enhancing teaching

staff members’ capabilities

in the field of graduate

studies

2. Availability of at least

one internationally

renowned foreign professor

to supervise the graduate

studies program (Number

of professors) in each

department.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Teaching staff member 140 52 35 37.14% 25.00%

p6/p2 Enhancing teaching

staff members’ capabilities

in the field of graduate

studies

3. Participation of

exceptional international

professors in supervising

the PhD theses of 30% of

the graduate students.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship

Internationally renowned

foreign professor 50 3 10 6.00% 20.00%

p6/p3 Developing graduate

studies programs

Fully developing and

enhancing 40 graduate

studies programs in keeping

with international

university rankings – e.g.,

the Shanghai Ranking of

World Universities.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Upgraded program 40 8 8 20.00% 20.00%

p6/p3 Developing graduate

studies programs

Increasing the number of

graduate students by about

20% of the total number of

KAU’s regular students.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Student 20 13 0 65.00% 0.00%

Page 9: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p6/p3 Developing graduate

studies programs

All KAU departments are to

offer Master’s degree

programs (Target is 34

programs).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Master’s program 34 6 16 17.65% 47.06%

p6/p3 Developing graduate

studies programs

Availability of a qualified

team in every college for

developing & reviewing

graduate studies programs.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship

Qualified team (Teaching

staff for follow up &

development)

18 20 16 100.00% 88.89%

p6/p3 Developing graduate

studies programs

Increasing the number of

PhD programs in new

specializations to 50

programs (Target is 33 PhD

programs).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship PhD program 50 32 27 64.00% 54.00%

p6/p4 Enhancing graduate

studies related research

1. The inclusion of 30

graduate students in

specialized research teams

under the supervision of

distinguished specialized

professors.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Graduate student 30 19 10 63.33% 33.33%

p6/p4 Enhancing graduate

studies related research

2. The formation of 7

research excellence groups

supervised by full-time

graduate studies professors.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Research group 7 7 7 100.00% 100.00%

p6/p4 Enhancing graduate

studies related research

3. Doubling the number of

research articles published

in scientific journals by

graduate students – i.e., at

least 50 a year.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchGraduate Studies Dean Graduate Studies Deanship Research 250 23 45 9.20% 18.00%

p7/p1 Developing human

resources

1. Availability of highly

qualified scientific teams

specialized in fields of

excellence and research

development programs (At

least 10 teams - A team for

each field of excellence).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Scientific team 10 5 4 50.00% 40.00%

p7/p1 Developing human

resources

2. Availability of experts in

the fields of investing and

marketing scientific

research outputs (at least 6

experts).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Expert 6 1 1 16.67% 16.67%

p7/p1 Developing human

resources

3. Availability of specialized

cadres (at least 10) for

managing and developing

scientific publications by

issuing scientifically

classified KAU periodicals.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Specialized cadre 10 2 3 20.00% 30.00%

p7/p2 Developing technical

& technological resources

1. Availability of an

accredited strategic

partnerships unit for

developing scientific

research technologies at

KAU.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Accredited unit for

partnerships1 1 1 100.00% 100.00%

Page 10: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p7/p2 Developing technical

& technological resources

2. Availability of advanced

infrastructure and support

services encompassing all

scientific research activities

in colleges (At least one

research lab in every

college).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Research laboratory 30 10 12 33.33% 40.00%

p7/p2 Developing technical

& technological resources

3. Satisfying criteria,

specifications and

procedures for establishing

external scientific

partnerships (At least 10

partnerships).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship External partnership 10 5 4 50.00% 40.00%

p7/p2 Developing technical

& technological resources

4. Availability of contracts

with specialized and

accredited external bodies

for reviewing and editing

scientific outputs in all

specializations in

conformity with scientific

publication requirements in

High Impact Factor fields

(At least 3 contracts).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Contract with external

publishers3 1 1 33.33% 33.33%

p7/p3 Developing

economies for scientific

research

1. Increasing by at least 60%

the current regulated

financial support for

pioneering scientific

research requirements.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Saudi riyal (funding

allocation)60 20 15 33.33% 25.00%

p7/p3 Developing

economies for scientific

research

2. Increasing by at least 70%

grants and Islamic

endowments in support of

scientific research at KAU.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Saudi riyal (funding

allocation)70 40 30 57.14% 42.86%

p7/p3 Developing

economies for scientific

research

3. Increasing by at least 30%

the funding of scientific

research by means of

partnerships.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Saudi riyal (funding

allocation)30 10 10 33.33% 33.33%

p7/p3 Developing

economies for scientific

research

4. Increasing by at least 80%

the incentives for all

scientific research

excellence groups in

colleges.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Saudi riyal / award (funding

allocation)80 40 40 50.00% 50.00%

p7/p4 Advancing research

performance

1. Forming 10 units for

developing scientific

research programs.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Development unit 10 2 4 20.00% 40.00%

p7/p4 Advancing research

performance

2. All KAU journals are to

become internationally

classified on the basis of the

Thomson ISI Impact Factor

by the completion of the

strategic plan (At least 5

journals).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship

Journal / periodical

(conforming to

international scientific

standards)

5 0 0 0.00% 0.00%

Page 11: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p7/p4 Advancing research

performance

3. Availability of (at least

100) scientific research

papers published in

internationally classified

periodicals (At least one

paper a year by each

teaching staff member).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Published research 100 770 60 100.00% 60.00%

p7/p4 Advancing research

performance

4. Registering patents in

local and international

institutions (At least 10

patents).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Patent 50 6 15 12.00% 30.00%

p7/p5 Scientific research

priorities

1. Availability of an

accredited unit in the

Scientific Research

Deanship for determining

KAU’s scientific research

priorities.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Accredited unit 1 1 1 100.00% 100.00%

p7/p5 Scientific research

priorities

2. Effective participation by

KAU’s scientific research in

KSA’s development plans

(At least 5 technological

development projects).

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Technological projects 5 31 3 100.00% 60.00%

p7/p5 Scientific research

priorities

3. Doubling the number of

applied research related to

community issues such as

environmental protection,

and water quality

improvement.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship Applied research 100 65 40 65.00% 40.00%

p7/p5 Scientific research

priorities

4. Holding an annual

national conference for

research & development.

VP Graduate Studies' OfficeVP Graduate Studies &

Scientific ResearchScientific Research Dean Scientific Research Deanship National conference 5 0 1 0.00% 20.00%

p8/p1 Developing

infrastructures

2. Completion of

infrastructure satisfying

internationally approved

criteria in order to serve

tracks including developing

internal resources for

graduate studies & scientific

research; community

service; and distance

learning.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p1) - Infrastructure

development project -

Engineer Nizar Al-Ghuraibi

VP Business & Knowledge

Creativity's Office

Infrastructures for

developing internal

resources

4 0 4 0.00% 100.00%

p8/p1 Developing

infrastructures

3. All Vice President for

Business & Knowledge

Creativity Office’s strategic

units are modern and well-

developed.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p1) - Infrastructure

development project -

Engineer Nizar Al-Ghuraibi

VP Business & Knowledge

Creativity's OfficeNewly created strategic unit 1 1 1 100.00% 100.00%

p8/p2 Developing human

resources

1. Availability of all training

programs for developing

administrative, financial,

and accounting skills;

performance assessment;

and documentation of work

procedures.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p2) - human resources

development project - Dr.

Ahmad Othman Maal

VP Business & Knowledge

Creativity's Office 5 Training programs 5 0 5 0.00% 100.00%

Page 12: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p8/p2 Developing human

resources

2. An existing team for

integrating graduate studies

& scientific research and

the diversification of

funding sources.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p2) - human resources

development project - Dr.

Ahmad Othman Maal

VP Business & Knowledge

Creativity's OfficeCoordination team 1 0 0 0.00% 0.00%

p8/p2 Developing human

resources

3. Fulfilling the needs for

human, financial and

technological requirements

in all KAU sectors in order

to develop investment and

marketing programs – e.g.,

Community Service

Deanship; Institute for

Research & Consultation;

Business & Knowledge

Alliance; and other

investment administrations.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p2) - human resources

development project - Dr.

Ahmad Othman Maal

VP Business & Knowledge

Creativity's Office

Human cadres / financial

allocation / technological

prerequisite

11 8 6 54.55% 54.55%

p8/p3 Developing financial

regulations & procedures

1. Completion of the

development of financial

affairs’ technical and

electronic systems in all

KAU sectors.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p3) - project for

developing financial

regulations & procedures -

Dr. Abdullah Ahmad Al-

Ghamdi

VP Business & Knowledge

Creativity's Office

Upgraded e-system (for

financial affairs)1 0 1 0.00% 100.00%

p8/p3 Developing financial

regulations & procedures

2. Availability of follow-up

& assessment programs and

mechanisms in every

financial regulations

development project.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p3) - project for

developing financial

regulations & procedures -

Dr. Abdullah Ahmad Al-

Ghamdi

VP Business & Knowledge

Creativity's Office

Follow-up & assessment

program4 0 4 0.00% 100.00%

p8/p3 Developing financial

regulations & procedures

3. Increasing KAU’s internal

funding resources’ revenue

by 200%.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p3) - project for

developing financial

regulations & procedures -

Dr. Abdullah Ahmad Al-

Ghamdi

VP Business & Knowledge

Creativity's OfficePercentage 200 30 120 15.00% 60.00%

p8/p3 Developing financial

regulations & procedures

4. Issuing all financial affairs

statutes & regulations after

developing them in order to

enable the development of

all KAU’s internal resources.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p3) - project for

developing financial

regulations & procedures -

Dr. Abdullah Ahmad Al-

Ghamdi

VP Business & Knowledge

Creativity's Office

Upgraded financial

regulations8 1 6 12.50% 75.00%

p8/p4 Marketing &

developing partnerships

1. Availability of an

approved plan for

marketing all KAU’s

potentials and services in

order to satisfy the needs of

society.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p4) - project for

Marketing & developing

partnerships - Dr.

Muhammad Najib Khayyat

VP Business & Knowledge

Creativity's OfficeApproved plan 19 2 19 10.53% 100.00%

p8/p4 Marketing &

developing partnerships

2. Tripling the current

number of investment

contracts.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p4) - project for

Marketing & developing

partnerships - Dr.

Muhammad Najib Khayyat

VP Business & Knowledge

Creativity's OfficeConsultation contract 200 90 200 45.00% 100.00%

Page 13: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p8/p4 Marketing &

developing partnerships

3. Availability of an

approved mechanism (a

working team) for

developing and activating

partnerships with various

community sectors in

fulfillment of KAU’s

strategic vision,

infrastructure, and scientific

expertise; and in realization

of the transparency of its

procedures.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p4) - project for

Marketing & developing

partnerships - Dr.

Muhammad Najib Khayyat

VP Business & Knowledge

Creativity's Office

Working team (activating

partnerships with

community sectors)

1 1 1 100.00% 100.00%

p8/p4 Marketing &

developing partnerships

4. Availability of well-

developed business

incubators by holding

partnerships with

internationally renowned

educational institutions.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Working team manager

(p8/p4) - project for

Marketing & developing

partnerships - Dr.

Muhammad Najib Khayyat

VP Business & Knowledge

Creativity's Office

Business incubator /

partnerships1 1 1 100.00% 100.00%

p9/p1 Program for

disseminating the culture of

talent & creativity

1. Availability of 3

accredited strategic units

for nurturing the

university’s gifted &

creative: Discovery &

Identification Unit; Care &

Training Unite; Planning

Unit.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeStrategic Unit for the Gifted 1 3 1 100.00% 100.00%

p9/p1 Program for

disseminating the culture of

talent & creativity

2. Publishing a periodical

that gives prominence to

the gifted & creative; and

reports their activities.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeJournal or periodical 1 0 1 0.00% 100.00%

p9/p1 Program for

disseminating the culture of

talent & creativity

3. Increasing the returns of

disseminating the culture of

the gifted & creative via a

website for promoting their

projects.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Project (for the gifted) that

have been marketed3 0 0 0.00% 0.00%

p9/p1 Program for

disseminating the culture of

talent & creativity

4. Doubling the number of

projects prepared annually

by the gifted & creative.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Student research project

(for the gifted)9 0 9 0.00% 88.89%

p9/p1 Program for

disseminating the culture of

talent & creativity

5. An interactive website for

marketing inventors’

projects.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Interactive website for

marketing inventors'

projects

1 0 1 0.00% 100.00%

p9/p2 Planning &

development unit for

nurturing the gifted and

creative

1. Existence of an

accredited planning and

development unit for

nurturing the gifted &

talented at KAU.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeAccredited unit 1 1 1 100.00% 100.00%

p9/p2 Planning &

development unit for

nurturing the gifted and

creative

2. Availability of a business

incubators’ mechanism for

adopting excellent outputs

from the colleges’ programs

for the gifted & creative.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Program for adopting

business incubators35 6 0 17.14% 0.00%

Page 14: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p9/p2 Planning &

development unit for

nurturing the gifted and

creative

3. Existence of an effective

mechanism in every college

and department for

communicating with and

attracting excellent

candidates from public

education and the

community; and providing

support for their induction

into programs for the gifted

& creative in order to

double their current

numbers.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Committee / unit/ applied

program54 9 0 16.67% 0.00%

p9/p2 Planning &

development unit for

nurturing the gifted and

creative

4. Training at least 2% of

KAU’s graduates to enable

them to become gifted &

creative, and business

pioneers.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

(Gifted, creative, or

pioneering) graduate256 27 0 10.55% 0.00%

p9/p3 Identifying &

nurturing talent and

creativity

1. An existing accredited

unit for nurturing and

training the gifted; and

organizing programs that

enrich their talents.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeAccredited unit 1 0 0 0.00% 0.00%

p9/p3 Identifying &

nurturing talent and

creativity

2. Issuing a procedures’

guide for identifying,

registering and testing the

gifted and creative in

accordance with approved

standard criteria.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeProcedures' Guide 1 0 0 0.00% 0.00%

p9/p3 Identifying &

nurturing talent and

creativity

3. Two annual partnership

contracts with various

community institutions for

nurturing the gifted and

creative.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficePartnership contract 10 0 0 0.00% 0.00%

p9/p3 Identifying &

nurturing talent and

creativity

4. Availability of training

programs for workers in the

field of identifying the

gifted and creative (At least

2 programs per semester).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeTraining program 88 18 0 20.45% 0.00%

p9/p4 Partnerships &

Support Unit

1. Diversification of

financial resources for

funding the gifted and

creative.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeFunding source Not delegated 0 0 0.00% 0.00%

p9/p4 Partnerships &

Support Unit

2. At least 5 annual

partnership contracts with

public and private sector

institutions for developing

and supporting programs

for nurturing the gifted and

creative; and creating

training opportunities for

them in and out of KSA.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's Office

Partnership (for

development & support)25 8 0 32.00% 0.00%

Page 15: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p9/p4 Partnerships &

Support Unit

3. All the gifted and creative

receive financial support

through various funding

programs – e.g., easy loans;

and ownership of project

equipment.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

CreativityProgram 9 supervisor

VP Business & Knowledge

Creativity's OfficeSaudi riyal (allocated fund) Not delegated 0 0 0.00% 0.00%

p10/p1 Preparing KAU

graduates to become

entrepreneurs, and

educational and community

leaders

1. Availability of a unit for

preparing and creating

leaders in the university.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's OfficeUnit for preparing leaders 1 1 1 100.00% 100.00%

p10/p1 Preparing KAU

graduates to become

entrepreneurs, and

educational and community

leaders

2. Issuing a procedures’

guide for identifying gifted

students in and out of KAU.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's Office

Guide for identifying gifted

students1 1 1 100.00% 100.00%

p10/p1 Preparing KAU

graduates to become

entrepreneurs, and

educational and community

leaders

3. Preparing at least 5% of

KAU’s graduates to become

educational leaders; and at

least 2% to become

entrepreneurs.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's Office

Graduate qualified as

educational leader /

business entrepreneurship

pioneer

230 40 200 17.39% 86.96%

p10/p1 Preparing KAU

graduates to become

entrepreneurs, and

educational and community

leaders

4. Preparing at least 1% of

KAU’s graduates to become

community leaders.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's Office

Graduate with community

leadership potential220 7 200 3.18% 90.91%

p10/p2 Training teaching

staff members to manage

programs for creating

future leaders

1. Availability of an

accredited unit for training

teaching staff members in

the field of creating future

leaders.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's OfficeAccredited unit 1 1 1 100.00% 100.00%

p10/p2 Training teaching

staff members to manage

programs for creating

future leaders

2. Availability of at least 2

qualified faculty staff

experts in every college for

supervising programs for

creating future leaders.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's OfficeQualified expert 62 22 18 25.81% 29.03%

p10/p2 Training teaching

staff members to manage

programs for creating

future leaders

3. Existence of clear

regulations and

mechanisms for selecting

and training teaching staff

members concerned with

follow up and development

of future leaders.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Program 10 supervisor Dr.

Said Misfir Al-Malki

VP Business & Knowledge

Creativity's Office

Program (for determining

selection criteria)1 1 1 100.00% 100.00%

p11/p1 Developing

infrastructures for serving

partnerships

1. Availability of Centers of

Transfer for serving

partnerships.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

AllianceCenter of Transfer 1 0 0 0.00% 0.00%

p11/p1 Developing

infrastructures for serving

partnerships

2. Existence of a unit for

activating partnerships with

economic institutions.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

Alliance

Unit for activating

partnerships1 0 0 0.00% 0.00%

p11/p1 Developing

infrastructures for serving

partnerships

3. Availability of advanced

labs and central

laboratories and business

incubators for activating

partnerships with economic

institutions.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

Alliance

Lab / Modern central

laboratory35 0 0 0.00% 0.00%

Page 16: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p11/p2 Developing human

resources in the field of

partnerships

1. Availability of an

accredited unit for

developing human

resources for serving

partnerships.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

Alliance

Accredited unit for

development1 0 1 0.00% 100.00%

p11/p2 Developing human

resources in the field of

partnerships

2. Existence of a qualified

team specialized in the

fields of activating and

benefitting from research

partnerships.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

AllianceSpecialized team 31 45 13 25.81% 41.94%

p11/p2 Developing human

resources in the field of

partnerships

3. A qualified team for

managing all special work

activities involving

partnerships at the college

level.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

AllianceQualified working team 27 8 11 22.22% 40.74%

p11/p3 Developing

partnerships

1. Existence of a committee

for developing partnerships

- under the chairmanship of

KAU’s president; and

membership of its vice

presidents – that is involved

with developing

partnership horizons in

various forms with the

university’s strategic

partners.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Research & Consultation

Institute Dean

Research & Consultation

Institute

Committee chaired by KAU

President1 0 1 0.00% 100.00%

p11/p3 Developing

partnerships

2. Availability of scientific

research programs

encompassing fields of

strategic technologies and

research groups for

developing partnerships.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Research & Consultation

Institute Dean

Research & Consultation

InstituteScientific research program 23 2 19 8.70% 82.61%

p11/p3 Developing

partnerships

3. Availability of a

procedures’ guide (applied,

administrative, financial,

technical) and a special

Business Model for

managing partnership

support projects, so that it

could be applied as the

need arises in various

partnership spheres.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Research & Consultation

Institute Dean

Research & Consultation

InstituteProcedures' Guide 1 0 1 0.00% 100.00%

p11/p3 Developing

partnerships

4. Increasing the number of

international partnerships

to 15; and promoting KAU’s

image as a research

university.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Research & Consultation

Institute Dean

Research & Consultation

InstituteInternational partnership 19 2 14 10.53% 73.68%

p12/p1 Developing media

communication

infrastructure

1. Availability of an

administration or

information center that acts

as a specialized reference

body for compiling KAU’s

achievements.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p1/p2 Project Director

VP Business & Knowledge

Creativity's OfficeAdministration or center 1 0 1 0.00% 100.00%

Page 17: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p12/p1 Developing media

communication

infrastructure

2. Availability of an

electronic database for

storing and documenting all

KAU’s programs and

achievements.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p1/p2 Project Director

VP Business & Knowledge

Creativity's OfficeDatabase 48 5 45 10.42% 91.67%

p12/p2 Developing

technological, financial and

human resources

1. Availability of a technical

team specialized in press

releases, translation,

management, and

maintenance of mass media

productions.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p1/p2 Project Director

VP Business & Knowledge

Creativity's OfficeQualified technical team 1 0 1 0.00% 100.00%

p12/p2 Developing

technological, financial and

human resources

2. Availability of an

adequate number of

electronic publication

programs for presenting

KAU’s achievements.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p1/p2 Project Director

VP Business & Knowledge

Creativity's Officee-publication program 5 5 0 100.00% 0.00%

p12/p2 Developing

technological, financial and

human resources

3. Increasing the

university’s revenues by

80% – e.g., through

publication contracts and

ads.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p1/p2 Project Director

VP Business & Knowledge

Creativity's OfficeSaudi riyal Not delegated 0 0 0.00% 0.00%

p12/p3 Enhancing

interaction with the mass

media

1. Diversification of KAU’s

periodical publications for

communicating and

presenting its achievements.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's Officepublication 42 40 13 38.10% 30.95%

p12/p3 Enhancing

interaction with the mass

media

2. Increasing contacts with

top officials, writers,

journalists, and

broadcasters. (At least 20

representatives from the

various print, radio, and TV

media).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's Office(Contact with) media 20 3 20 15.00% 100.00%

p12/p3 Enhancing

interaction with the mass

media

3. An upgraded modern

KAU website.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's Office

Newly created or upgraded

KAU website1 1 0 100.00% 0.00%

p12/p4 Enhancing KAU's

image

1. Publications and press

releases that reveal aspects

of KAU’s excellence (At least

one each per semester).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's Office

Periodical publication /

press release39 31 8 43.59% 20.51%

p12/p4 Enhancing KAU's

image

2. Documentary films that

present KAU’s

achievements in various

fields (At least one

documentary each year).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's OfficeDocumentary film 9 2 4 22.22% 44.44%

p12/p4 Enhancing KAU's

image

3. Satellite TV programs

that discuss KAU’s role in

solving social issues and

community problems (At

least 2 programs annually).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's OfficeTV program 10 0 9 0.00% 90.00%

p12/p4 Enhancing KAU's

image

4. A KAU permanent and

traveling exhibition.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativityp12/p3/p4 Project Director

VP Business & Knowledge

Creativity's OfficePermanent KAU exhibition 1 0 1 0.00% 100.00%

Page 18: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p13/p1 Developing the

central laboratories

1. Existence of specialized

central laboratories for

serving scientific research

and the community.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

AllianceCentral lab 30 26 30 86.67% 100.00%

p13/p1 Developing the

central laboratories

2. The central laboratories’

acquisition of total quality

certification from relevant

agencies for international

lab testing standards.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

Alliance

Central lab with total

quality certification6 0 6 0.00% 100.00%

p13/p1 Developing the

central laboratories

3. Existence of a program

for activating international

partnerships in order to

develop labs and

laboratories in compliance

with international

standards.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

Alliance

Program for activating

international partnership1 1 1 100.00% 100.00%

p13/p1 Developing the

central laboratories

4. Participation of the

central laboratories in

conducting lab experiments

on the local level.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Central

Laboratories' Sector

Business & Knowledge

Allianceagreement / partnership 10 35 10 100.00% 100.00%

p13/p2 Developing think

tanks

1. Existence of an approved

committee in the Business

& Knowledge Alliance for

developing and following

up KAU’s experiment in

marketing its teaching staff

members’ capabilities.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

AllianceApproved committee 1 1 0 100.00% 0.00%

p13/p2 Developing think

tanks

2. Increasing the number of

consultation contracts with

teaching staff members by

at least 30% in practical

colleges; and by at least

10% in humanities colleges.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

AllianceConsultation contract 200 209 6 89.50% 3.00%

p13/p2 Developing think

tanks

3. Existence of partnerships

with international

professional marketing

companies for marketing

KAU’s consultation services

(At least 20 partnerships).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Think Tanks Director -

Supervisor of the Business

& Knowledge Alliance's

Strategic Plan

Business & Knowledge

AllianceMarketing partnership 20 0 18 0.00% 90.00%

p13/p3 Developing Business

Incubators

1. Availability of the 4

strategic units (mentioned

in the plan) which

cooperate in realizing the

aims of the program; and

prepare, implement and

supervise the program and

various other activities.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Business

Incubators' Sector

Business & Knowledge

AllianceStrategic Unit 4 4 4 100.00% 100.00%

Page 19: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p13/p3 Developing Business

Incubators

2. Availability of various

kinds of incubators – e.g.,

multi-specialization

incubators and

technological incubators.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Business

Incubators' Sector

Business & Knowledge

AllianceBusiness incubator 4 1 4 25.00% 100.00%

p13/p3 Developing Business

Incubators

3. The gifted and creative

who are registered in

business incubator

programs constitute at least

2% of KAU’s students.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Business

Incubators' Sector

Business & Knowledge

AllianceStudent 1800 1200 1800 66.67% 100.00%

p13/p3 Developing Business

Incubators

4. Consultation

partnerships with

renowned national and

international institutions

specialized in developing

business incubators and

nurturing the gifted (At

least 2 partnerships each

year).

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

Director of Business

Incubators' Sector

Business & Knowledge

AlliancePartnership contract 10 8 10 80.00% 100.00%

p13/p5 Technology

Transfer Centers

1. Availability of an

approved plan for operating

the Transfer Center.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p5 Working Team

Director - Technology

Transfer Center

Business & Knowledge

AllianceApproved plan 1 0 1 0.00% 100.00%

p13/p5 Technology

Transfer Centers

2. Transforming at least

30% of basic products into

commercial products in

Jeddah Valley Co.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p5 Working Team

Director - Technology

Transfer Center

Business & Knowledge

AllianceCommercial product 1 0 0 0.00% 0.00%

p13/p5 Technology

Transfer Centers

3. Transforming at least

70% of basic products into

commercial products in

other industrial production

institutions.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p5 Working Team

Director - Technology

Transfer Center

Business & Knowledge

AllianceCommercial product Not delegated 0 0 0.00% 0.00%

p13/p5 Technology

Transfer Centers

4. The annual revenue

accruing from marketing

the Center’s products in the

first Five-Year Plan is at

least 40% of the total costs;

and will increase gradually

in the upcoming plans.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p5 Working Team

Director - Technology

Transfer Center

Business & Knowledge

AllianceRevenue in Saudi riyals Not delegated 0 0 0.00% 0.00%

p14/p1 Business

Development Center

Number of approved

projects.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p 14 Project Supervisor -

Executive President of

Jeddah Valley Co.

VP Business & Knowledge

Creativity's OfficeProject 0 0 0 100.00% 100.00%

p14/p1 Business

Development Center

Number of approved

projects.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p 14 Project Supervisor -

Executive President of

Jeddah Valley Co.

VP Business & Knowledge

Creativity's OfficeProject 0 0 0 100.00% 100.00%

p14/p2 Partnership

Contracts Administration

Number of projects

presented.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p 14 Project Supervisor -

Executive President of

Jeddah Valley Co.

VP Business & Knowledge

Creativity's OfficeContract 0 0 0 100.00% 100.00%

p14/p2 Partnership

Contracts Administration

Number of approved

projects.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p 14 Project Supervisor -

Executive President of

Jeddah Valley Co.

VP Business & Knowledge

Creativity's OfficeContract 0 0 0 100.00% 100.00%

Page 20: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

p13/p4 Developing

Knowledge Parks

1. KAU tops other Saudi

universities in developing

technology transfer

programs; and

domesticating technology in

its relevant fields of

excellence.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p4 Working Team

Director - Knowledge Parks

Business & Knowledge

Alliance

International ranking

certificate1 0 1 0.00% 100.00%

p13/p4 Developing

Knowledge Parks

2. Presence of experts on

the local and international

level for deepening

electronic communication

with bodies that support

the business & knowledge

creativity sector.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p4 Working Team

Director - Knowledge Parks

Business & Knowledge

AllianceKnowledge parks expert 2 0 2 0.00% 100.00%

p13/p4 Developing

Knowledge Parks

3. Existence of well-

developed central

laboratories that satisfy the

needs for technology

transfer, domestication and

development.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p4 Working Team

Director - Knowledge Parks

Business & Knowledge

AllianceAdvanced central laboratory 30 26 30 86.67% 100.00%

p13/p4 Developing

Knowledge Parks

4. Increasing the number of

international partnerships

with the knowledge parks

sector to 15.

VP Business & Knowledge

Creativity's Office

VP Business & Knowledge

Creativity

p13/p4 Working Team

Director - Knowledge Parks

Business & Knowledge

AllianceInternational partnership 15 2 15 13.33% 100.00%

p16/p1 Constructing a

building for the Distance

Learning Deanship

There are enough studios

and distance learning labs

to accommodate 50,000

students.

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects lab / studio 36 0 0 0.00% 0.00%

p16/p1 Constructing a

building for the Distance

Learning Deanship

Availability of a building for

the Distance Learning

Deanship

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects Deanship building 1 0 0 0.00% 0.00%

P16/p2 Fulfillment of

integrated e-infrastructure

requirements in all of KAU’s

current and future buildings.

Availability of integrated e-

infrastructures in all KAU

buildings.

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for ProjectsBuilding with e-

infrastructure50 50 50 100.00% 100.00%

P16/p3 Providing a fully

equipped computer lab for

every 100 students.

Availability of a fully

equipped computer lab for

every 100 students in the

preparatory year

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects Computer lab 30 0 0 0.00% 0.00%

P16/p4 Providing ample

parking for preparatory

year students

Availability of ample

parking for preparatory

year students

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects Car parking 5000 5000 2550 100.00% 51.00%

P16/p5 Completing and

fully equipping remaining

section of KAU’s University

Hospital.

Fully equipping remaining

section of KAU’s University

Hospital

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects Well-equipped hospital 1 0 0 0.00% 0.00%

Page 21: KAU Present Projected Current Projected Project KPI

Project KPI Responsible Office Responsible Sector Delegated to Sector Delegated to Measurement UnitKAU

Commitment

Present

Value

Projected

Value

Current

%

Projected

%

P16/p7 Constructing a

separate building for an

integrated mass media

center; and consolidating it

with advanced

infrastructures and

qualified specialists and

technical cadres.

Availability of an integrated

mass media center that is

consolidated with advanced

infrastructures

Vice President for Projects

& Chairman of the Second

Strategic Plan’s Supervisory

Executive Committee

VP for Projects p 16 Supervisor General VP for Projects Information center 1 0 0 0.00% 0.00%