KANSAS SOLAR ELECTRIC CO~OPERATIVES. TEN 10 MWp Yearly Production Building-Integrated Photovoltaic Manufacturing Museums BI-PV MM. Southwest Power Pool Distributed Generation Planning. Critical Infrastructure Protection Working Group [CIPWG] Distributed Generation [DG] - PowerPoint PPT Presentation
Citation preview
KANSASSOLAR ELECTRIC CO~OPERATIVES
TEN 10 MWp Yearly Production
Building-Integrated Photovoltaic
Manufacturing Museums
BI-PV MM
Southwest Power Pool Distributed Generation Planning
• Critical Infrastructure Protection Working Group [CIPWG] Distributed Generation [DG]
• CIP-002-1 Critical Cyber DG BI-PV [1302]– Modified Criteria to Include Fuel-Free Non-
Polluting Distributed Generation [DG]
• CIP-003-1 Security Mmgt Controls [1301]– Critical Positioning Distributed Generation [DG]
• Hospitals ~ Security Zones ~ Schools
Southwest Power Pool Distributed Generation Planning
CYBER SECURITY STANDARDS
• CIP-002-1 Critical Cyber DG
• CIP-003-1 DG Security Mgmt
• CIP-004-1 Personnel Training
• CIP-005-1 Electric Security
• CIP-006-1 Physical Security
• CIP-007-1 DG Security Mgmt
• CIP-008-1Incident Report Mgt
• CIP-009-1 Recovery Plans
• CIP-010-1 DG Interconnection Standards w/BI-PV EMS Planning
DISTRIBUTED GENERATION [DG]
• BI-PV DG 30-Year Reliability Contracts
• BI-PV DG Local Security EE Management
• BI-PV DG Staff Familiarity/Expertise
• BI-PV DG Critical EMS Mgmt for Hospitals
• BI-PV DG Strategic EMS Schools ~ Govt.
• BI-PV DG EMS 10% for Every Community
• BI-PV DG Back-up Redirect Exercises
• BI-PV DG Recovery Resource Planning
• BI-PV DG Long-term Assurance Contracts
• BI-PV DG EMS Solar Electric Cooperatives Production, Installation & Grid Management
450 MWp BI-PV DG Installed Capacity by 2010
2006 Five @ 5MWp 50 MWp
2.5 Million SF
2.5 Million SFRes @ 500 SF =5,000 Com@10,000 SF =250
Total Res: 5,000
Total Com: 250
2007 Ten @10 MWp
150 MWp
5 Million SF
5 Million SF
Res @ 500 SF =10,000
Com@10,000 SF =500
Total Res: 15,000
Total Com: 750
2008 Ten @10 MWp
250 MWp
5Million SF
5 Million SF
Res @ 500 SF =10,000
Com@10,000 SF =500
Total Res: 25,000
Total Com: 1,250
2009 Ten @10 MWp
350 MWp
5Million SF
5 Million SF
Res @ 500 SF =10,000
Com@10,000 SF =500
Total Res: 35,000
Total Com: 1,750
2010 Ten @10 MWp
450 MWp
5Million SF
5 Million SF
Res @ 500 SF =10,000
Com@10,000 SF =500
Total Res: 45,000
Total Com: 2,250
YEAR |10 MWp Plants|[email protected]|Manufacturing | Museums
YEAR|CONST MATERIALS BOS LABOR TOTAL $.50 Wp $.25 Wp $.25 Wp $1 Wp
2006|$25M $25 M $12.5M $12.5M $50 M
2007|$25M $50 M $25 M $25 M $150 M
2008 $50 M $25 M $25 M $250 M
2009 $50 M $25 M $25 M $350 M
2010 $50 M $25 M $25 M $450 M
450 MWp BI-PV DG Production Expenses by 2010
YEAR PROD 1$Wp INSTALLATION 35-yr Warranty $ INVESTMT
2006 $50 M | $25M $12.5M $12.5M $100M
2007 $100 M | $25 M $25 M $25 M $275M
2008 $100 M $25 M $25 M $425M
2009 $100 M $25 M $25 M $575M
2010 $100 M $25 M $25 M $725M
450 MWp BI-PV DG Total Expense to 2042
450 MWp BI-PV DG Installed Electric Valuation to 2010
2007 225 56,250 $2.8 M $2.8 M
2008 675 168,750 $8.4 M $11 M
2009 1125 281,250 $14 M $25 M
2010 1575 393,750 $20 M $45 M
2011 2025 506,250 $25 M $70 M
YEAR 4.5SUNHRS=MWh YRLY MWh $GEN @$50MWh CUM $GEN
2012-2016100 to 500 MWp
$750 1.687 $84 $195
2017-2021600 to 1 GWp
$2,250 3.375 $252 $320
2022-2026
1.1 to 1.5 GWp $4,500 5.062 $505 $445
2027-2031
1.6 to 2 GWp $7,500 6.749 $842 $570
2032-2036
2.1 to 2.5 GWp $11,250 8.436 $1,264 $695
2,500 MWp BI-PV DG Installed Electric Valuation by 2036
CUM EXP GEN$M@$50MWh 450 MWpFIVE YEARS $1.50 Wp=$M 500 MWp=GWh GEN CUM $M GEN CUM $M
RATIO 2,500 MWp=GWh 450 MWpYEARS $12B DEBT/INC GEN$B@$50MWh GEN CUM $B GEN CUM $M
2037-2041 2.4% $2.8 $4.1 $820
2042-2046 1.5% $2.8 $6.9 $945
2047-2051 1.2% $2.8 $9.7 $1,070
2052-2056 1% $2.8 $12.5 $1,195
2057-2066 .75% $2.8 $15.3 $1,320