kanopi gereja

Embed Size (px)

DESCRIPTION

kanopi gereja

Citation preview

  • 1 27,280,000.00 Dua Puluh Tujuh Juta Dua Ratus Delapan Puluh Ribu Rupiah

    2 2.00 Dua Rupiah

    3 3.00 Tiga Rupiah

    4 4.00 Empat Rupiah

    5 5.00 Lima Rupiah

    6 6.00 Enam Rupiah

    7 7.00 Tujuh Rupiah

    8 8.00 Delapan Rupiah

    9 9.00 Sembilan Rupiah

    10 10.00 Sepuluh Rupiah

    11 11.00 Sebelas Rupiah

    12 12.00 Dua Belas Rupiah

    27,280,000.00 Dua Puluh Tujuh Juta Dua Ratus Delapan Puluh Ribu Rupiah

    Rupiah -

    0 0 2 27,280,000.00 - -

    1 Satu 1 27,280,000.00 - -

    2 Dua Dua Ratus Delap 0 27,280,000.00 - -

    3 Tiga Dua Puluh Tujuh -1 27,280,000.00 - -

    4 Empat 000 -2 27,280,000.00 - -

    5 Lima 000 -3 27,280,000.00 - -

    6 Enam -4 27,280,000.00 80 80 Delapan Puluh

    7 Tujuh -5 27,200,000.00 200 200 Dua Ratus

    8 Delapan -6 27,000,000.00 7 7 Tujuh

    9 Sembilan -7 20,000,000.00 20 20 Dua Puluh

    10 Sepuluh -8 - - -

    11 Sebelas -9 - - -

    12 Dua Belas -10 - - -

    13 Tiga Belas -11 - - -

    14 Empat Belas -12 - - -

    15 Lima Belas -13 - - -

    16 Enam Belas -14 - - -

    17 Tujuh Belas

    18 Delapan Belas

    19 Sembilan Belas 2.00 Dua Rupiah

    20 Dua Puluh Rupiah -

    30 Tiga Puluh 0 2 2.00 - -

    40 Empat Puluh Dua 1 2.00 - -

    50 Lima Puluh 000 0 2.00 2 2 Dua

    60 Enam Puluh 000 -1 - - -

    70 Tujuh Puluh 000 -2 - - -

    80 Delapan Puluh 000 -3 - - -

    90 Sembilan Puluh -4 - - -

    100 Seratus -5 - - -

    200 Dua Ratus -6 - - -

    300 Tiga Ratus -7 - - -

    400 Empat Ratus -8 - - -

    500 Lima Ratus -9 - - -

    600 Enam Ratus -10 - - -

    D

    C

  • 700 Tujuh Ratus -11 - - -

    800 Delapan Ratus -12 - - -

    900 Sembilan Ratus -13 - - -

    1000 Seribu -14 - - -

  • Dua Puluh Tujuh Juta Dua Ratus Delapan Puluh Ribu Rupiah 3.00 Tiga Rupiah

    Rupiah -

    0 2 3.00 - -

    Tiga 1 3.00 - -

    000 0 3.00 3 3 Tiga

    000 -1 - - -

    000 -2 - - -

    Ribu 000 -3 - - -

    -4 - - -

    -5 - - -

    Juta -6 - - -

    -7 - - -

    -8 - - -

    -9 - - -

    -10 - - -

    -11 - - -

    -12 - - -

    -13 - - -

    -14 - - -

    4.00 Empat Rupiah

    Rupiah -

    0 2 4.00 - -

    Empat 1 4.00 - -

    000 0 4.00 4 4 Empat

    000 -1 - - -

    000 -2 - - -

    000 -3 - - -

    -4 - - -

    -5 - - -

    -6 - - -

    -7 - - -

    -8 - - -

    -9 - - -

    -10 - - -

  • -11 - - -

    -12 - - -

    -13 - - -

    -14 - - -

  • 5.00 Lima Rupiah

    Rupiah -

    0 2 5.00 - - 0 2

    Lima 1 5.00 - - Tujuh 1

    000 0 5.00 5 5 Lima 000 0

    000 -1 - - - 000 -1

    000 -2 - - - 000 -2

    000 -3 - - - 000 -3

    -4 - - - -4

    -5 - - - -5

    -6 - - - -6

    -7 - - - -7

    -8 - - - -8

    -9 - - - -9

    -10 - - - -10

    -11 - - - -11

    -12 - - - -12

    -13 - - - -13

    -14 - - - -14

    6.00 Enam Rupiah

    Rupiah -

    0 2 6.00 - - 0 2

    Enam 1 6.00 - - Delapan 1

    000 0 6.00 6 6 Enam 000 0

    000 -1 - - - 000 -1

    000 -2 - - - 000 -2

    000 -3 - - - 000 -3

    -4 - - - -4

    -5 - - - -5

    -6 - - - -6

    -7 - - - -7

    -8 - - - -8

    -9 - - - -9

    -10 - - - -10

  • -11 - - - -11

    -12 - - - -12

    -13 - - - -13

    -14 - - - -14

  • 7.00 Tujuh Rupiah 9.00 Sembilan Rupiah

    Rupiah - Rupiah -

    7.00 - - 0 2 9.00 -

    7.00 - - Sembilan 1 9.00 -

    7.00 7 7 Tujuh 000 0 9.00 9

    - - - 000 -1 - -

    - - - 000 -2 - -

    - - - 000 -3 - -

    - - - -4 - -

    - - - -5 - -

    - - - -6 - -

    - - - -7 - -

    - - - -8 - -

    - - - -9 - -

    - - - -10 - -

    - - - -11 - -

    - - - -12 - -

    - - - -13 - -

    - - - -14 - -

    8.00 Delapan Rupiah 10.00 Sepuluh Rupiah

    Rupiah - Rupiah -

    8.00 - - 0 2 10.00 -

    8.00 - - Sepuluh 1 10.00 -

    8.00 8 8 Delapan 000 0 10.00 -

    - - - 000 -1 10.00 10

    - - - 000 -2 - -

    - - - 000 -3 - -

    - - - -4 - -

    - - - -5 - -

    - - - -6 - -

    - - - -7 - -

    - - - -8 - -

    - - - -9 - -

    - - - -10 - -

  • - - - -11 - -

    - - - -12 - -

    - - - -13 - -

    - - - -14 - -

  • Sembilan Rupiah 11.00 Sebelas Rupiah

    Rupiah -

    - 0 2 11.00 - -

    - Sebelas 1 11.00 - -

    9 Sembilan 000 0 11.00 1 -

    - 000 -1 10.00 10 11 Sebelas

    - 000 -2 - - -

    - 000 -3 - - -

    - -4 - - -

    - -5 - - -

    - -6 - - -

    - -7 - - -

    - -8 - - -

    - -9 - - -

    - -10 - - -

    - -11 - - -

    - -12 - - -

    - -13 - - -

    - -14 - - -

    12.00 Dua Belas Rupiah

    Rupiah -

    - 0 2 12.00 - -

    - Dua Belas 1 12.00 - -

    - 000 0 12.00 2 -

    10 Sepuluh 000 -1 10.00 10 12 Dua Belas

    - 000 -2 - - -

    - 000 -3 - - -

    - -4 - - -

    - -5 - - -

    - -6 - - -

    - -7 - - -

    - -8 - - -

    - -9 - - -

    - -10 - - -

  • - -11 - - -

    - -12 - - -

    - -13 - - -

    - -14 - - -

  • REKAPITULASI RENCANA ANGGARAN BIAYA

    KEGIATAN : PEMBUATAN ATAP KANOPI

    NO URAIANJUMLAH

    (Rp.)A PEKERJAAN LOKASI RUMAH 10,360,000.00 B PEKERJAAN LOKASI GEREJA 16,920,000.00

    TOTAL 27,280,000.00

    Terbilang : Dua Puluh Tujuh Juta Dua Ratus Delapan Puluh Ribu Rupiah

    P.Siantar, 2015Diperbuat oleh,

  • RENCANA ANGGARAN BIAYA

    KEGIATAN : PEMBUATAN ATAP KANOPI

    NO PEKERJAAN VOLUME SAT.HARGA SATUAN JUMLAH HARGA

    (Rp) (Rp)PERHITUNGAN LUAS ATAP

    A Kanopi lokasi rumah- Luas spandek atap = 5,36x3,8 = 20.37 Pembulatan 21.00 - Luas spandek samping = 2,5x2 = 5.00 Pembulatan 5.00

    Total 26.00 B Kanopi lokasi Gereja

    - Luas spandek atap = 3,85x11,3 = 43.51 Pembulatan 44.00 - Luas spandek samping = 1,5x2 = 3.00 Pembulatan 3.00

    Total 47.00 A PEKERJAAN LOKASI RUMAH1 Bongkaran atap kanopi lama 1.00 ls 1,000,000.00 1,000,000.00 2 Kanopi baru 26.00 m2 360,000.00 9,360,000.00

    - Besi hollow 25/50- Atap spandek t=0,3mm- Besi hollow finishing cat hitam doff- Pondasi plat diangkur

    SUB TOTAL A 10,360,000.00 B PEKERJAAN LOKASI GEREJA1 Kanopi 47.00 m2 360,000.00 16,920,000.00

    - Besi hollow 25/50- Atap spandek t=0,3mm- Besi hollow finishing cat hitam doff- Pondasi plat diangkur

    SUB TOTAL B 16,920,000.00

  • PERHITUNGAN LUAS / VOLUME BANGUNAN

    No Uraian Pekerjaan Lebar (m') Perkalian

    a b c d e fA LOKASI 11 Galian tanah 7.00 1.60 0.80 2.00 g=cxdxexf2 Timbunan tanah 7.00 2.70 3.65 1.00 g={(c/2)xd)xexf3 Pas. Dinding batu padas kanan 0.30 0.80 4.00 7.00 g={(c+d)/2}xexf

    Pas. Dinding batu padas kiri 0.30 0.80 4.00 7.00 g={(c+d)/2}xexfPondasi dinding kanan 7.00 1.60 0.80 1.00 g=cxdxexfPondasi dinding kiri 7.00 1.60 0.80 1.00 g=cxdxexf

    4 Plesteran dinding kanan 4.50 7.00 g=exfPlesteran dinding kanan 4.50 7.00 g=exf

    5 Pondasi batu padas 5.00 2.70 0.20 1.00 g=cxdxexf6 Pondasi beton 1.00 1.30 0.50 2.00 g=cxdxexf7 Balok beton 0.30 0.30 7.00 2.00 g=cxdxexf6 Lantai batu padas 7.00 2.20 0.20 1.00 g=cxdxexf7 Lantai cor 7.00 2.20 0.15 1.00 g=cxdxexf8 Pipa PVC 2" 7.00 1.00 0.50 2.00 g=cxdxexfB LOKASI 21 Galian tanah 8.00 1.10 0.50 1.00 g=cxdxexf2 Timbunan tanah 8.00 2.00 2.50 1.00 g={(c/2)xd)xexf3 Pas. Dinding batu padas 0.30 0.50 2.50 8.00 g={(c+d)/2}xexf

    Pondasi dinding 8.00 1.10 0.50 1.00 g=cxdxexf4 Plesteran dinding 3.00 8.00 g=exf5 Pipa PVC 2" 6.45 1.00 0.50 1.00 g=cxdxexfC LOKASI 31 Galian tanah 6.67 1.65 0.50 1.00 g=cxdxexf

    Galian tanah 3.00 1.65 0.50 1.00 g=cxdxexf2 Timbunan tanah 6.00 2.40 1.95 1.00 g=cxdxexf3 Pas. Dinding batu padas 0.30 0.60 2.10 6.67 g={(c+d)/2}xexf

    Pas. Dinding batu padas bawah plat 0.30 0.60 2.10 2.40 g={(c+d)/2}xexfPondasi dinding 6.67 1.70 0.50 1.00 g=cxdxexfPondasi dinding bawah plat 3.00 1.70 0.50 1.00 g=cxdxexf

    4 Plesteran dinding 3.00 6.67 g=exfPlesteran dinding bawah plat 2.10 4.20 g=exf

    5 Plat beton 2.00 3.00 0.20 1.00 g=cxdxexfPlat beton 0.25 0.25 3.00 2.00 g={(c/2)xd)xexf

    0.50 0.10 3.00 2.00 g={(c/2)xd)xexf6 Kolom beton 0.30 0.30 2.10 2.00 g=cxdxexf7 Lantai batu padas 3.00 1.20 0.15 1.00 g=cxdxexf8 Pipa PVC 2" 8.00 1.00 0.50 1.00 g=cxdxexf

    Panjang (m')

    Tebal / Tinggi (m')

    Banyak / Panjang

    Unit

  • PERHITUNGAN LUAS / VOLUME BANGUNAN

    g

    17.92 34.49 15.40 15.40 8.96 8.96 31.50 31.50 2.70 1.30 0.63 3.08 2.31 7.00

    4.40 20.00 8.00 4.40 24.00 3.23

    5.50 2.48 28.08 6.30 2.27 5.67 2.55 20.01 8.82 1.20 0.19 0.15 0.19 0.54 4.00

    Panjang(m')/Luas(m2)/Volu

    me(m3)

  • A N A L I S A H A R G A S A T U A N

    GALIAN TANAH UNTUK KONSTRUKSI

    ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia2. Membuang tanah galian sejauh 2. Kapasitas kerja per orang 1,3m3/hari

    30 m dari lubang galian 3. Kedalaman rata -rata galian s/d 3m4. Umur alat bantu rata -rata 1 bulan/orang/set @ 3 alat

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 1 L061 1 120,000.00 Pekerja tak Terampil 30 1 L101 30 75,000.00

    E

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Alat - alat bantu kerja (3 set) set M170 1.20 5,000.00

    A

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam)

    E

  • RALATAN

    VOLUME : 40.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N K O D E

    GALIAN TANAH UNTUK KONSTRUKSI

    K224( MENGGUNAKAN BURUH )

    DISIAPKAN OLEH : TANGGAL :

    B I A Y A SUB TOTAL( Rp. ) ( Rp. )

    120,000.00 2,250,000.00

    PEKERJA 2,370,000.00 B I A Y A SUB TOTAL

    (Rp.) (Rp.) 6,000.00

    MATERIAL 6,000.00 B I A Y A SUB TOTAL

    (Rp.) (Rp.)

  • PERALATAN - TOTAL (Rp.) 2,376,000.00

    59,400.00

    59,400.00 PER M3

  • A. DAFTAR HARGA SATUAN BAHAN

    HARGANO. URAIAN KODE SATUAN SATUAN KETERANGAN

    (Rp.)1 Batu kali 15 - 20 cm M3 261,400.002 Batu Belah 10 - 15 cm M010 M3 252,900.004 Kerikil Pecah 3 - 5 cm M023 M3 501,200.005 Kerikil Pecah 5 - 7 cm M022 M3 491,200.006 Kerikil Pecah 2 - 3 cm M024 M3 521,200.007 Kerikil Pecah 1 - 2 cm M025 M3 551,200.008 Kerikil Pecah 0.5 - 1 cm M3 421,200.009 Batu Pecah Tersaring (Stone Cruser) K017 M3 427,900.00

    10 Sirtu M09 M3 384,000.0011 Pasir Urug M040 M3 146,500.0012 Pasir Pasang M041 M3 184,000.0013 Tanah Timbun/Urug M050 M3 134,000.0014 Bitumen ( Asphalt ) M061 KG 12,258.0615 Kerosene ( Minyak Tanah ) M065 LITER 6,000.0016 Portland Cement ( zak ) M080 Zak 65,000.0017 Kayu Bakar M070 M3 150,000.0018 Paku M166 KG 20,000.0019 Tulangan Besi beton M167 KG 15,000.0020 Kawat Beton KG 30,000.0021 Alat bantu M170 SET 5,000.0022 Kayu sembarang keras M180 M3 6,000,000.0023 Broti/Papan Meranti Batu kls I M3 9,000,000.0024 Broti/Papan Meranti Batu kls II M3 7,500,000.0025 Solar LITER 6,600.0026 Premium / Bensin LITER 6,800.0027 Minyak Pelumas LITER 40,000.0028 Pipa 2 " M' 31,666.6731 Filler kg 1,680.0032 Cat Tembok Vinilex kg 50,000.0033 Cat Minyak kuda terbang kg 80,000.0034 Cat Minyak Glotek kg 49,600.0035 Meni Kayu kg 35,000.0036 Meni Besi kg 35,000.0037 Tinner ltr 27,000.0038 Kapur Kering/Basah kg 3,000.0039 Kapur Hidrasi M081 m3 344,000.0040 ATB K026 ton 1,154,342.0041 AC K040 ton 1,298,636.00

  • B. DAFTAR HARGA SATUAN UPAH

    HARGA HARGANO. URAIAN KODE SATUAN SATUAN

    / HARI (Rp.) / JAM (Rp.)1 Mandor L. 061 120,000.00 17,142.002 Mekanik Terampil L. 071 150,000.00 21,428.003 Kepala Tukang L. 073 120,000.00 17,142.004 Tukang L. 079 110,000.00 15,714.005 Operator Terampil L. 081 150,000.00 21,428.006 Pembantu Operator L. 083 100,000.00 14,285.007 Sopir Terampil L. 091 150,000.00 21,428.008 Pembantu Sopir L. 099 100,000.00 14,285.009 Pekerja Semi Terlatih L. 101 75,000.00 10,714.00

    10 Pekerja Terampil L. 106 90,000.00 12,857.00

  • HARGA & JARAK RATA-RATA

    DARI SUMBER BAHAN (QUARRY)

    Kecamatan Dolok Panribuan

    HARGA JARAK

    No. U R A I A N SATUAN ROYALTY QUARRY KET.

    (Rp) ( Km )

    1. Pasir M3 150,000.00 5.00 Ke Lokasi Pek.

    2. Batu Kali 15 - 20 cm M3 225,000.00 5.00 Ke Lokasi Pek.

    3. Batu Quarry Besar/Batu Belah 10-15 cm M3 200,000.00 5.00 Ke Lokasi Pek.

    4. Batu Pecah 1-2 cm M3 460,000.00 10.00 Ke Lokasi Pek.

    5. Batu Pecah 2-3 cm M3 430,000.00 10.00 Ke Lokasi Pek.

    6. Batu Pecah 3-5 cm M3 410,000.00 10.00 Ke Lokasi Pek.

    7. Batu Pecah 5-7 cm M3 400,000.00 10.00 Ke Lokasi Pek.

    8 Batu Pecah 0.5 -1 cm (Abu batu) M3 330,000.00 10.00 Ke Lokasi Pek.

    9 Batu Pecah Tersaring (Stone Cruser) M3 395,000.00 10.00 Ke Lokasi Pek.

    10 S i r t u M3 350,000.00 5.00 Ke Lokasi Pek.

    11 Pasir Urug M3 112,500.00 5.00 Ke Lokasi Pek.

    12 Tanah Urug M3 100,000.00 5.00 Ke Lokasi Pek.

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Pasir PasangLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km4 Harga satuan pasir di Quarry RM1 1.00 M3 150,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 Pasir digali dengan Excavator2 Excavator sekaligus memuat pasir hasil

    galian ke dalam Dump Truck3 Dump Truck mengangkut pasir ke lokasi

    Base Camp

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.50 menit

    Ts1 1.00 menitKap. Prod. / jam =V x Fb x Fa x 60 Q1 21.06 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,583.00 Rupiah

    3.b DUMP TRUCK (E08)Kapasitas bak V 4.00 M3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q1) x 60 T3 11.40 menit- Lain-lain T4 1.00 menit

    Ts2 25.90 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Pasir PasangLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    Lanjutan

    No. URAIAN KODE KOEF. SATUAN KET.

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 7.23 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 20,401.55 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar Pasir =

    ( RpM1 + Rp1 + Rp2 ) M040 183,984.55 Rupiah

    Dibulatkan : M040 184,000.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Batu Kali 15 - 20 cmLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke Lokasi Pekerjaan L 5.00 Km4 Harga satuan batu kali di Quarry RpM2 1.00 M3 225,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 Batu kali digali dengan Excavator2 Excavator sekaligus memuat batu kali

    hasil galian ke dalam Dump Truck3 Dump Truck mengangkut batu kali ke

    lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.50 menit

    Ts1 1.00 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 21.06 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,583.00 Rupiah

    3.b DUMP TRUCK (E08)Kapasitas bak V 3.30 m3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q1) x 60 T3 9.40 menit- Lain-lain T4 1.00 menit

    Ts2 23.90 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Batu Kali 15 - 20 cmLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    Lanjutan

    No. URAIAN KODE KOEF. SATUAN KET.

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 6.46 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 22,824.71 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar Batu kali =

    ( RpM2 + Rp1 + Rp2 ) M 261,407.71 Rupiah

    Dibulatkan : M 261,400.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Batu Belah 10-15Lokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke Lokasi Pekerjaan L 5.00 Km4 Harga satuan batu kali di Quarry RpM3 1.00 M3 200,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00 7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 327,268.00 8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 12,857.00

    II. URUTAN KERJA1 Batu kali digali dengan Excavator2 Batu kali dibelah oleh Pekerja3 Dengan Wheel Loader batu belah dimuat

    ke Dump Truck yang mengangkut batubelah ke lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.75 menit- Lain-lain T2 0.50 menit

    Ts1 1.25 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 14.04 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 20,374.50 Rupiah

    3.b WHEEL LOADER (E15)Kapasitas Bucket V 1.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi Alat Fa 0.78 -Waktu sklus Ts1- Muat T1 0.75 menit- Lain-lain T2 0.50 menit

    Ts1 1.25 menitKapasitas Produksi / Jam =

    V x Fb x Fa x 60 Q2 42.12 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 7,769.90 Rupiah

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Batu Belah 10-15Lokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    Lanjutan

    No. URAIAN KODE KOEF. SATUAN KET.

    3.c DUMP TRUCK (E08)Kapasitas bak V 3.30 m3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q2) x 60 T3 4.70 menit- Lain-lain T4 1.00 menit

    Ts2 19.20 menit

    Kapasitas Produksi / Jam =V x Fa x 60 Q3 8.04 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 18,335.67 Rupiah

    3.d PEKERJA

    Produksi menentukan : Excavator Q1 14.04 M3 / JamHasil galian batu / hari = Q1 x 7 Jam Qt 98.28 M3 / 7 jamKebutuhan Pekerja P 7.00 Orang

    Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01 Rp4 6,410.19 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar Batu belah =

    RpM3 + Rp1 + Rp2 + Rp3 + Rp4 M010 252,890.25 Rupiah

    Dibulatkan : M010 252,900.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : Kerikil Pecah Tersaring Lokasi : Stone Cruser (30 km)Tujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN #REF!

    I. ASUMSI1 Biaya hanya untuk mengangkut bahan dari batching plant

    ke lokasi pekerjaan dengan dump truk2 Kondisi Jalan : sedang / baik3 Jarak Batching plant ke Base Camp L 10.00 Km4 Harga satuan batu pecah (stone cruser) di Batching Pla Rp K017 1.00 M3 395,000.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 Gravel diangkut ke lokasi pekerjaan dari batching plan dengan dump truk2 Excavator sekaligus memuat gravel

    hasil stone cruser ke dalam Dump Truck3 Dump Truck mengangkut gravel ke

    lokasi pekerjaan

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.75 menit- Lain-lain T2 0.50 menit

    Ts1 1.25 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 14.04 M3 / JamTs1

    3.b DUMP TRUCK (E08)Kapasitas bak V 4.00 M3Faktor efisiensi alat Fa 0.75 -Kecepatan rata-rata bermuatan v1 50.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 12.00 menit- Waktu tempuh kosong = (L/v2) x 60 T2 10.00 menit- Muat = (V/Q1) x 60 T3 17.09 menit- Lain-lain T4 1.00 menit

    Ts2 40.09 menit

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 4.49 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp1 32,850.59 Rupiah/M3

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    a. Harga Satuan Batu Pecah tersaring di Batching plan K017 395,000.00 Rupiah

    Harga di Lokasi = RpK017 + Rp1 427,850.59 Rupiah 32,850.59

  • Dibulatkan : K017 427,900.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M4 - M 8 Kerikil PecahLokasi : Quarry TulasTujuan : Base Camp

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke Base Camp L 10.00 Km4 Harga satuan batu pecah 1-2 cm di Quarry RpM04 1.00 M3 460,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00 7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 327,268.00 8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 12,857.00

    II. URUTAN KERJA1 Gravel digali dengan Excavator2 Excavator sekaligus memuat gravel

    hasil galian ke dalam Dump Truck3 Dump Truck mengangkut gravel ke

    lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.75 menit- Lain-lain T2 0.50 menit

    Ts1 1.25 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 14.04 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 20,374.50 Rupiah

    3.b WHEEL LOADER (E15)Kapasitas Bucket V 1.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi Alat Fa 0.78 -Waktu sklus Ts1- Muat T1 0.75 menit- Lain-lain T2 0.50 menit

    Ts1 1.25 menitKapasitas Produksi / Jam =

    V x Fb x Fa x 60 Q2 42.12 M3 / JamTs1

    Biaya Wheel Loader / M3 = (1 : Q2) x RpE15 Rp2 7,769.90 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M4 - M 8 Kerikil PecahLokasi : Quarry TulasTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN Ke Lokasi Pek.

    3.b DUMP TRUCK (E08)Kapasitas bak V 3.30 M3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 15.00 menit- Waktu tempuh kosong = (L/v2) x 60 T2 12.00 menit- Muat = (V/Q1) x 60 T3 14.10 menit- Lain-lain T4 1.00 menit

    Ts2 42.10 menit

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 3.67 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp3 40,205.44 Rupiah

    3.d PEKERJA

    Produksi menentukan : Excavator Q1 14.04 M3 / JamHasil galian batu / hari = Q1 x 7 Jam Qt 98.28 M3 / 7 jamKebutuhan Pekerja P 25.00 OrangBiaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01 Rp4 22,893.52 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    a. Harga Satuan Batu Pecah 1 - 2 cm di Quarry M4 460,000.00 Rupiah

    Harga di Lokasi = RpM4 + Rp1 + Rp2 + Rp3 + Rp4 M4 551,243.36 Rupiah 91,243.36

    Dibulatkan : M4 551,200.00 Rupiah

    b. Harga Satuan Batu Pecah 2 - 3 cm di Quarry RpM5 430,000.00 Rupiah

    Harga di Lokasi = RpM5 + Rp1 + Rp2 + Rp3 + Rp4 M5 521,243.36 Rupiah 91,243.36

    Dibulatkan : M5 521,200.00 Rupiah

    c. Harga satuan batu pecah 3-5 cm di Quarry RpM6 410,000.00 M3

    Harga di Lokasi = RpM06 + Rp1 + Rp2 + Rp3 + Rp4 M6 501,243.36 Rupiah 91,243.36

    Dibulatkan : M6 501,200.00 Rupiah

    c. Harga satuan batu pecah 5-7 cm di Quarry RpM7 400,000.00 M3

    Harga di Lokasi = RpM07 + Rp1 + Rp2 + Rp3 + Rp4 M7 491,243.36 Rupiah

    Dibulatkan : M7 491,200.00 Rupiah

    d. Harga satuan batu pecah 0.5-1 cm di Quarry RpM8 330,000.00 Rupiah

  • Harga di Lokasi = RpM08 + Rp1 + Rp2 + Rp3 + Rp4 M8 421,243.36 Rupiah

    Dibulatkan : M8 421,200.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M10 - SirtuLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke lokasi Base Camp L 5.00 Km4 Harga satuan Sirtu di Quarry RpM10 1.00 M3 350,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 Sirtu digali dengan Excavator2 Excavator sekaligus memuat sirtu hasil

    galian ke dalam Dump Truck3 Dump Truck mengangkut sirtu ke lokasi

    Base Camp

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.50 menit

    Ts1 1.00 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 21.06 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,583.00 Rupiah

    3.b DUMP TRUCK (E08)Kapasitas bak V 4.00 m3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q1) x 60 T3 11.40 menit- Lain-lain T4 1.00 menit

    Ts2 25.90 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M10 - SirtuLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 7.23 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 20,401.55 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar Sirtu =

    ( RpM09 + Rp1 + Rp2 ) M10 383,984.55 Rupiah

    Dibulatkan : M10 384,000.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M11 - Pasir UrugLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km4 Harga satuan pasir urug di Quarry RpM11 1.00 M3 112,500.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 pasir urug digali dengan Excavator2 Excavator sekaligus memuat pasir urug

    hasil galian ke dalam Dump Truck3 Dump Truck mengangkut pasir urug

    ke lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.50 menit

    Ts1 1.00 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 21.06 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,583.00 Rupiah

    3.b DUMP TRUCK (E08)Kapasitas bak V 4.00 m3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q1) x 60 T3 11.40 menit- Lain-lain T4 1.00 menit

    Ts2 25.90 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M11 - Pasir UrugLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    Lanjutan

    No. URAIAN KODE KOEF. SATUAN KET.

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 7.23 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 20,401.55 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar pasir urug =

    ( RpM11 + Rp1 + Rp2 ) M11 146,484.55 Rupiah

    Dibulatkan : M11 146,500.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M12-Tanah TimbunLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    No. URAIAN KODE KOEF. SATUAN KET.

    I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km4 Harga satuan tanah urug di Quarry RpM12 1.00 M3 100,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 286,058.00 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 147,481.00

    II. URUTAN KERJA1 pasir urug digali dengan Excavator2 Excavator sekaligus memuat pasir urug

    hasil galian ke dalam Dump Truck3 Dump Truck mengangkut pasir urug

    ke lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)Kapasitas Bucket V 0.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.78 -Waktu siklus Ts1- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.50 menit

    Ts1 1.00 menitKap. Prod. / jam =

    V x Fb x Fa x 60 Q1 21.06 M3 / JamTs1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,583.00 Rupiah

    3.b DUMP TRUCK (E08)Kapasitas bak V 4.00 m3Faktor efisiensi alat Fa 0.78 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 7.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 6.00 menit- Muat = (V/Q1) x 60 T3 11.40 menit- Lain-lain T4 1.00 menit

    Ts2 25.90 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Pekerjaan : Pembuatan Tembok Penahan Kecamatan Dolok PanribuanJenis : M12-Tanah TimbunLokasi : Quarry Simpang 2 MarihatTujuan : Lokasi Pekerjaan

    Lanjutan

    No. URAIAN KODE KOEF. SATUAN KET.

    Kapasitas Produksi / Jam =V x Fa x 60 Q2 7.23 M3 / Jam

    Ts2

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 20,401.55 Rupiah

    IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

    Harga Satuan Dasar tanah urug =

    ( RpM12 + Rp1 + Rp2 ) M12 133,984.55 Rupiah

    Dibulatkan : M12 134,000.00 Rupiah

  • PERHITUNGAN BIAYA OPERASIONAL PERALATAN

    NAMA KEGIATAN :TAHUN ANGGARAN : 2015LOKASI PEKERJAAN :NOMOR PAKET :

    NO K NAMA ALAT TEM O NAO D GAR E ( EQUIPMENT ) KUDA

    ( E ) ( HP )A B C D

    ASPHALT MIXING PLANT E01 1 E01 Asphalt Mixing Plant (AMP) 220ASPHALT FINISHER E02 2 E02 Asphalt Finisher 50ASPHALT SPRAYER E03 3 E03 Asphalt Sprayer towed 15BULLDOZER 100-150 HP E04 4 E04 Bulldozer 140COMPRESSOR 4000-6500 L\ME05 5 E05 Compressor 80CONCRETE MIXER 0.3-0.6 M3 E06 6 E06 Concrete Mixer 15CRANE 10-15 TON E07 7 E07 Crane 10 - 15 Ton 150DUMP TRUCK 3-4 M3 E08 8 E08 Dump Truck (3-4 M3) 125DUMP TRUCK E09 9 E09 Dump Truck ( 6-8 m3) 100EXCAVATOR 80-140 HP E10 10 E10 Excavator (0.5 m3) 80FLAT BED TRUCK 3-4 M3 E11 11 E11 Flat Bed Truck (4 m3) 100GENERATOR SET E12 12 E12 Generator Set 125 KVA 175MOTOR GRADER >100 HP E13 13 E13 Motor Greder 125TRACK LOADER 75-100 HP E14 14 E14 Track Loader75 - 100 mm 90WHEEL LOADER 1.0-1.6 M3 E15 15 E15 Loader Wheeled 1.0 - 1.6 m3 105THREE WHEEL ROLLER 6-8 T E16 16 E16 Roller 3 Wheel 6-10 Ton 55TANDEM ROLLER 6-8 T. E17 17 E17 Tandem Roller 6-8 Ton 50TIRE ROLLER 8-10 T. E18 18 E18 Pneumatic/Tire Roller 6-10 Ton 60VIBRATORY ROLLER 5-8 T. E19 19 E19 Vibrator Roller 5-8 Ton 75CONCRETE VIBRATOR E20 20 E20 Concrete Vibrator 10STONE CRUSHER E21 21 E21 Stone Crusher 220WATER PUMP 70-100 mm E22 22 E22 Water Pump 70-100 mm 6WATER TANKER 3000-4500 L. E23 23 E23 Water Tank Truck 3000-4500 ltr 100PEDESTRIAN ROLLER E24 24 E24 Pedestrian Roller 11TAMPER E25 25 E25 Plate Vibrator Stamper 5JACK HAMMER E26 26 E26 Jack Hammer 3FULVI MIXER E27 27 E27 Fulvi Mixer 75CONCRETE PUMP E28 28 E28 Concrete Pump 100TRAILER 20 TON E29 29 E29 Trailer 20 Ton 175PILE DRIVER + HAMMER E30 30 E30 Pile Driver + Hammer 25CRANE ON TRACK 35 TON E31 31 E31 Crane on track 35 Ton 125WELDING SET E32 32 E32 Welding Set 40BORE PILE MACHINE E33 33 E33 Bore Pile Machine 150

  • ASPHALT LIQUID MIXER E34 34 E.020 Hydraulic Ecavator 9035 E.053 Tractor Wheeled 6036 E.130 Chip Spreader 537 E.401 Tractor Equipment 5

    Mesin Penyaring 80

  • PERHITUNGAN BIAYA OPERASIONAL PERALATAN

    BIAYA OPERASIONAL ( Rp./ jam )HARGA UMUR NILAI CRF JAM DEPRESIASI KEBUTUHAN BBM/OLIE

    ALAT i = 15 % KERJA ALAT SOLAR = OLIE =ALAT ( n ) PER ( Rp. ) Rp. 6,600.00 40,000.00

    ix(1+i) TAHUN 1_(90% xExG) x 0,16 x D x 0,006 x D ( Rp. ) (Thn) (1+i) (Jam) H

    E F G H = I = J = K =3,000,000,000 10 0.19925 1500 358,650.00 1,354,320.00 52,800.001,200,000,000 7 0.24036 1200 216,324.00 52,800.00 12,000.00

    139,548,000 6 0.26424 750 44,249.00 15,840.00 3,600.001,800,000,000 8 0.22285 1200 300,847.50 147,840.00 33,600.00

    120,000,000 8 0.22285 750 32,090.40 84,480.00 19,200.00250,000,000 5 0.29832 1500 44,748.00 15,840.00 3,600.00

    158,400.00 36,000.00150,000,000 6 0.26424 1500 23,781.60 132,000.00 30,000.00300,000,000 105,600.00 24,000.00

    1,800,000,000 5 0.29832 2000 241,639.20 84,480.00 19,200.00150,000,000 6 0.26424 1500 23,781.60 105,600.00 24,000.00200,000,000 184,800.00 42,000.00

    1,500,000,000 8 0.22285 1500 200,565.00 132,000.00 30,000.0095,040.00 21,600.00

    1,000,000,000 8 0.22285 1500 133,710.00 110,880.00 25,200.00260,000,000 10 0.19925 1500 31,083.00 58,080.00 13,200.00280,000,000 10 0.19925 1500 33,474.00 52,800.00 12,000.00280,000,000 10 0.19925 1500 33,474.00 63,360.00 14,400.00600,000,000 6 0.26424 1200 118,908.00 79,200.00 18,000.00

    35,000,000 5 0.29832 600 15,661.80 0 2,400.003,000,000,000 52,800.00

    20,000,000 4 0.35027 750 8,406.48 0 1,440.00170,000,000 6 0.26424 1500 26,952.48 105,600.00 24,000.00

    2,640.0018,000,000 6 0.26424 750 5,707.58 5,280.00 1,200.00

    720.0018,000.0024,000.0042,000.006,000.00

    30,000.009,600.00

    36,000.00

  • 815,352,000 8 0.22285 1500 109,020.72 95,040.00 21,600.00165,416,000 10 0.19925 1500 19,775.48 63,360.00 14,400.00

    33,084,000 6 0.26424 600 13,113.17 0 1,200.0081,808,000 5 0.29832 600 36,607.44 5,280.00 1,200.00

    19,200.00

  • PERHITUNGAN BIAYA OPERASIONAL PERALATAN

    TOTAL BIAYA ( Rp, )KEBUTUHAN BBM/OLIE REPERASI JUMLAH DIBULAT

    BENSIN = &6,800.00 SPARE I+J+K+M

    x 0,17 x D PART KAN 60% x I

    L = M = N = O0 215,190.00 1,980,960.00 1,980,960.00 1,486,583.00 E.1550 129,794.40 410,918.40 410,918.00 121,265.00 E.1570 26,549.40 90,238.39 90,238.00 55,086.00 E.1540 180,508.50 662,796.00 662,796.00 255,509.00 E.0010 19,254.24 155,024.64 155,025.00 86,155.00 E.3010 26,848.80 91,036.80 91,037.00 57,358.00 E.252

    152,605.000 14,268.96 200,050.56 200,051.00 147,481.00 E.211

    172,984.00 E.2120 144,983.52 490,302.72 490,303.00 286,058.000 14,268.96 167,650.56 167,651.00 143,942.00 E.221

    174,000.00 E.3110 120,339.00 482,904.00 482,904.00 212,305.00 E.010

    220,342.00 E.0510 80,226.00 350,016.00 350,016.00 327,268.00 E.0520 18,649.80 121,012.80 121,013.00 77,796.00 E.0800 20,084.40 118,358.40 118,358.00 104,957.00 E.0810 20,084.40 131,318.40 131,318.00 116,400.00 E.0840 71,344.80 287,452.80 287,453.00 122,908.00 E.082

    408 9,397.08 27,458.88 27,459.00 38,400.00 E.089407,699.00 E.031

    244.8 5,043.89 14,890.37 14,890.00 21,455.00 E.3410 16,171.49 172,723.97 172,724.00 122,146.00 E.211

    59,743.00 E.0870 3,424.55 15,612.13 15,612.00 38,684.00 E.088

    50,875.00 E.35180,111.0093,600.00

    148,759.0072,224.00

    159,500.0040,969.00

    716,700.00

  • 0 65,412.43 291,073.15 291,073.00 291,073.000 11,865.29 109,400.77 109,401.00 109,401.00

    204 7,867.90 22,181.08 22,181.00 22,181.000 21,964.47 65,051.91 65,052.00 65,052.00

    155,000.00 E.040

  • RENCANA ANGGARAN BIAYA

    KEGIATAN : PENINGKATAN JALAN PUTRI LOPIAN (Hotmix)VOLUME : 850 M x 4,5 MKECAMATAN : PANGURURANKABUPATEN : SAMOSIRSUMBER DANA : DAK APBD KAB. SAMOSIR TA. 2006

    Harga Jumlah No. Uraian Kegiatan Volume Satuan Analisa Satuan Harga

    ( Rp. ) ( Rp. )I. PEKERJAAN PENDAHULUAN

    1 Pengukuran / Pematokan 850.00 M' Ls 500.00 425,000.002 Papan Nama Proyek 1.00 BH Ls 450,000.00 450,000.003 Mobilisasi / Demobilisasi 1.00 unit Ls 4,600,000.00 4,600,000.004 Pondok Kerja 1.00 unit Ls 1,500,000.00 1,500,000.00

    6,975,000.00II. PEKERJAAN BADAN JALAN (4,5 m x 850)

    1 Pek. Sisip Sirtu 153.00 M3 EI-323 492,700.00 75,383,100.002 Pek. Lapis Pondasi Atas (LPA)-klas B, t. 15 cm 573.75 M3 EI-512 407,685.00 233,909,268.753 Pek. ATB t. 5 cm 191.25 M3 EI-634 #REF! #REF!4 Timbunan Sirtu 168.75 m3 EI-323 492,700.00 83,143,125.005 Prime Coat 3,825.00 ltr EI-611 11,267.00 43,096,275.006 Pek. Patok KM (KM Post) 1.00 bh Dihit. 250,000.00 250,000.00

    #REF!III. PEK. TEMBOK PENAHAN TYPE III, T=1,8 M, L=63M

    1 Bongkar tembok penahan lama 19.00 M' LS 50,000.00 950,000.002 Galian Tanah 6.84 M3 A.1 75,500.00 516,420.003 Timbunan kembali 6.84 M3 A.11 22,600.00 154,584.004 Timbunan Tanah 11.40 M3 A.18a 189,000.00 2,154,600.005 Pas. Batu kali 1 : 4 11.09 M3 G.32h 964,400.00 10,695,196.006 Plesteran 1 : 4 (t. 1,0 cm) 88.20 M2 G.50.j 59,800.00 5,274,360.007 Pipa PVC dia 2 " 3.50 M' LS 31,666.67 110,833.33

    19,855,993.33IV. PEK. TEMBOK PENAHAN TYPE III, T=1,8 M, L=63 M

    1 Bongkar tembok penahan lama 63.00 M' LS 50,000.00 3,150,000.002 Galian Tanah 18.90 M3 A.1 75,500.00 1,426,950.003 Timbunan kembali 18.90 M3 A.11 22,600.00 427,140.004 Timbunan Tanah 50.40 M3 A.18a 189,000.00 9,525,600.005 Pas. Batu kali 1 : 4 35.75 M3 G.32h 964,400.00 34,477,300.006 Plesteran 1 : 4 110.25 M2 G.50.j 59,800.00 6,592,950.007 Pipa PVC dia 2 " 11.00 M' LS 31,666.67 348,333.33

    55,948,273.33V. PEK. TEMBOK PENAHAN TYPE IV, T=1,25 M, L=6 M

    1 Bongkar tembok penahan lama 6.00 M' LS 50,000.00 300,000.002 Galian Tanah 1.35 M3 A.1 75,500.00 101,925.003 Timbunan kembali 1.35 M3 A.11 22,600.00 30,510.004 Timbunan Tanah 2.70 M3 A.18a 189,000.00 510,300.005 Pas. Batu kali 1 : 4 3.08 M3 G.32h 964,400.00 2,970,352.006 Plesteran 1 : 4 6.60 M2 G.50.j 59,800.00 394,680.007 Pipa PVC dia 2 " 1.50 M' LS 31,666.67 47,500.00

    4,355,267.00VI. PEK. TEMBOK PENAHAN TYPE II, T=0.50 M, L=10 M

    1 Timbunan tanah 2.63 M3 A.18a 189,000.00 497,070.002 Pas. Batu kali 1 : 4 4.00 M3 G.32h 964,400.00 3,857,600.003 Plesteran 1 : 4 13.00 M2 G.50.j 59,800.00 777,400.00

    5,132,070.00VII. PEK. PLAT DUICKER

    1 Galian tanah 19.44 M3 A.1 75,500.00 1,467,720.002 Timbunan kembali 19.44 M3 A.11 22,600.00 439,344.003 Pas. Batu kali 1 : 4 6.75 M3 G.32h 964,400.00 6,509,700.004 Plesteran 1 : 4 13.53 M2 G.50.j 59,800.00 809,094.005 Cor Plat 1.44 M3 Supl. V 27,984,900.00 40,298,256.00

    49,524,114.00VIII. PEK. JEMBATAN RUSAK (L=6 M, B = 6.5 M)A. Pek. Bongkaran

    1 Bongkaran bangunan atas jembatan 9.57 M3 Dihit 400,000.00 3,828,000.003,828,000.00

  • Harga Jumlah No. Uraian Kegiatan Volume Satuan Analisa Satuan Harga

    ( Rp. ) ( Rp. )B. Pek. Pasangan

    1 Pas. Batu Kali 1 : 4 60.72 M3 G.32h 964,400.00 58,558,368.002 Plesteran 1 : 4 101.00 M2 G.50.j 59,800.00 6,039,800.003 Cor beton bertulang 10.61 M3 Supl. V 27,984,900.00 296,919,789.004 Pipa GIP dia. 3" x 6,8 m' 27.20 M' Dihit. 46,150.00 1,255,280.005 Cor tiang sandaran 10.00 Set Dihit. 250,000.00 2,500,000.006 Cat tembok 12.30 M2 K-23.a 63,100.00 776,130.007 Cat Minyak 6.40 M2 K-23.b 78,600.00 503,040.00

    366,552,407.00370,380,407.00

    IX. PEK. PELEBARAN JEMBATAN BINANGA SIOTO1 Bongkaran plat lama 1.50 M3 500,000.00 750,000.002 Galian tanah pondasi 2.70 M3 A.1 75,500.00 203,850.003 Timbunan kembali 2.70 M3 A.11 22,600.00 61,020.004 Timbunan tanah 20.00 M3 A.18a 189,000.00 3,780,000.005 Onderlaag (Telford) 2.00 M3 EI-512 407,685.00 815,370.006 Pas. Batu Kali 1 : 4 11.10 M3 G.32h 964,400.00 10,704,840.007 Plesteran 1 : 4 15.40 M2 G.50.j 59,800.00 920,920.008 Cor plat (beton bertulang) 2.90 M3 Supl. V 27,984,900.00 81,156,210.009 Cor Tiang Sandaran 6.00 Set Dihit. 250,000.00 1,500,000.00

    10 Pipa GIP dia. 3" x 3,3 m' 13.20 M' Dihit. 46,150.00 609,180.0011 Cat Tembok 7.40 M2 K-23.a 63,100.00 466,940.0012 Cat Minyak 3.12 M2 K-23.b 78,600.00 245,232.00

    101,213,562.00X. PEK. DRAINASE P=540 M'Uk. : b=25 : b'=50 : h=50

    1 Galian tanah pondasi 210.60 M3 A.1 75,500.00 15,900,300.002 Timbunan kembali 210.60 M3 A.11 22,600.00 4,759,560.003 Pas. Batu Kali 1 : 4 117.45 M3 G.32h 964,400.00 113,268,780.004 Plesteran 1 : 4 837.00 M2 G.50.j 59,800.00 50,052,600.00

    183,981,240.00XI. PEK. LAIN-LAIN

    1 Foto Dokumentasi 3.00 Roll LS 250,000.00 750,000.00750,000.00

    REKAPITULASI :I. PEKERJAAN PENDAHULUAN = Rp 6,975,000.00II. PEKERJAAN PERKERASAN L = 850 M = Rp #REF!III. PEK. TEMBOK PENAHAN TYPE III, T=1,8 M, L=63M = Rp 19,855,993.33IV. PEK. TEMBOK PENAHAN TYPE III, T=1,8 M, L=63 M = Rp 55,948,273.33V PEK. TEMBOK PENAHAN TYPE IV, T=1,25 M, L=6 M = Rp 4,355,267.00VI PEK. TEMBOK PENAHAN TYPE II, T=0.50 M, L=10 M = Rp 5,132,070.00VII PEK. PLAT DUICKER = Rp 49,524,114.00VIII PEK. JEMBATAN RUSAK (L=6 M, B = 6.5 M) = Rp 370,380,407.00IX PEK. PELEBARAN JEMBATAN BINANGA SIOTO = Rp 101,213,562.00X PEK. DRAINASE P=540 M' = Rp 183,981,240.00XI PEK. LAIN-LAIN = Rp 750,000.00

    A. JUMLAH =JUMLAH I + II + III + IV + V + VI + VII + VIII + IX + X + XI = Rp #REF!B. PPN =10 % x A = Rp #REF!C. GRAND TOTAL =A + B = Rp #REF!

    DIBULATKAN = = Rp #REF!Terbilang : "Sembilan ratus lima belas juta rupiah".

    Pangururan, 2006

    DIKETAHUI KEPALA DINAS PU KAB. SAMOSIR

    DR. Ir. AMBROCIUS SINABUTAR, MMNIP. 110 036 579

  • ITEM PEMBAYARAN NO.JENIS PEKERJAAN : Biaya angkut Agregat Klas ASATUAN PEMBAYARAN : Rp/M3 URAIAN ANALISA HARGA SATUAN

    DUMP TRUCK (DT)Berat jenis bahan :- Agregat Klas A D1 1.60 Sewa Dump Truck E211 147,481.00 Jarak Angkut L 25.0000 Kapasitas bak V 8.00 Faktor Efisiensi alat Fa 0.75 Kecepatan rata-rata bermuatan v1 50.00 Kecepatan rata-rata kosong v2 60.00 Waktu Siklus Ts- Angkut = (L : v1) x 60 menit T1 30.00 - Tunggu + dump + Putar T2 15.00 - Kembali = (L : v2) x 60 menit T3 25.00

    Ts 70.00

    Kap.Prod. / jam = V x Fa x 60 Q4 3.21 D1 x Ts2

    Koefisien Alat/M3 = 1 : Q4 0.3111 Biaya Angkut / m3 = (1:Q4)xRpE08 45,882.98

    28,676.86

  • Analisa EI-631

    URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

    ton / M3Rp/JamKM

    Ton-

    KM / JamKM / Jam

    menitmenitmenitmenit

    M3/Jam

    JamRp/m3Rp/ton

  • Analisa EI-635

    FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

  • JENIS PEKERJAAN : Biaya Aspal Beton (ATB)SATUAN PEMBAYARAN : Rp/ton URAIAN ANALISA HARGA SATUAN

    DUMP TRUCK (DT)Berat jenis bahan :- ATB D1 2.20 Sewa Dump Truck E211 147,481.00 Jarak Angkut L 50.0000 Kapasitas bak V 8.00 Faktor Efisiensi alat Fa 0.75 Kecepatan rata-rata bermuatan v1 50.00 Kecepatan rata-rata kosong v2 60.00 Kapasitas AMP / batch Q2b 0.50 Waktu menyiapkan 1 batch ATB Tb 1.00 Waktu Siklus Ts2- Mengisi Bak = (V : Q2b) x Tb T1 16.00 - Angkut = (L : v1) x 60 menit T2 60.00 - Tunggu + dump + Putar T3 15.00 - Kembali = (L : v2) x 60 menit T4 50.00

    Ts2 141.00

    Kap.Prod. / jam = V x Fa x 60 Q4 1.16 D1 x Ts2

    Koefisien Alat/M3 = 1 : Q4 0.8617 Biaya Angkut / m3 = (1:Q4)xRpE211 127,079.46 Biaya Angkut / ton = (1:Q4)/D1xRpE211 Rp1 57,763.39

    HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan ATB di Batching plan RpK026' 1,096,579.00

    Harga di Lokasi = Rp1 + Rp2 RpK026 1,154,342.39

    Dibulatkan : RpK026 1,154,342.00

  • JENIS PEKERJAAN : Biaya Aspal Beton (AC)SATUAN PEMBAYARAN : Rp/ton URAIAN ANALISA HARGA SATUAN

    DUMP TRUCK (DT)Berat jenis bahan :- AC D1 2.25 Sewa Dump Truck E211 147,481.00 Jarak Angkut L 50.0000 Kapasitas bak V 8.00 Faktor Efisiensi alat Fa 0.75 Kecepatan rata-rata bermuatan v1 50.00 Kecepatan rata-rata kosong v2 60.00 Kapasitas AMP / batch Q2b 0.50 Waktu menyiapkan 1 batch AC-WC Tb 1.00 Waktu Siklus Ts2- Mengisi Bak = (V : Q2b) x Tb T1 16.00 - Angkut = (L : v1) x 60 menit T2 60.00 - Tunggu + dump + Putar T3 15.00 - Kembali = (L : v2) x 60 menit T4 50.00

    Ts2 141.00

    Kap.Prod. / jam = V x Fa x 60 Q4 1.13 D1 x Ts2

    Koefisien Alat/ton = 1 : Q4 0.8813 Biaya Angkut / m3 = (1:Q4)xRpE211 129,967.63 Biaya Angkut / ton = (1:Q4)/D1xRpE211 Rp1 57,763.39

    HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan AC di Batching plan RpK040' 1,240,873.00

    Harga di Lokasi = Rp1 + Rpk040' RpK040 1,298,636.39

    Dibulatkan : RpK040 1,298,636.00

  • URAIAN ANALISA HARGA SATUAN

    ton / M3Rp/JamKM

    Ton-

    KM / JamKM / Jam

    tonmenit

    menitmenitmenitmenitmenit

    M3/Jam

    JamRp/m3Rp/ton

    Rp/ton

    Rupiah

    Rupiah

  • URAIAN ANALISA HARGA SATUAN

    ton / M3Rp/JamKM

    m3-

    KM / JamKM / Jam

    m3menit

    menitmenitmenitmenitmenit

    ton/Jam

    JamRp/m3Rp/ton

    Rp/ton

    Rupiah

    Rupiah

  • FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

  • FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

  • HARGA SATUAN ALAT

    NO K NAMA ALAT TE Harga / jamM O NAO D GA (Rp)R E ( EQUIPMENT ) KUDA

    ( E ) ( HP )A B C D

    1 E.155 Asphalt Mixing Plant (AMP) 150 1,486,583.002 E.157 Asphalt Finisher 47 121,265.003 E.154 Asphalt Sprayer towed 15 55,086.004 E.001 Bulldozer 140 255,509.005 E.301 Compressor 80 86,155.006 E.252 Concrete Mixer 15 57,358.007 Crane 10 - 15 Ton 150 152,605.008 E.211 Dump Truck (3-4 M3) 125 147,481.009 E.212 Dump Truck ( 6-8 m3) 100 172,984.00

    10 Excavator (0.5 m3) 80 286,058.0011 E.221 Flat Bed Truck (4 m3) 100 143,942.0012 E.311 Generator Set 125 KVA 175 174,000.0013 E.010 Motor Greder 125 212,305.0014 E.051 Track Loader75 - 100 mm 90 220,342.0015 E.052 Loader Wheeled 1.0 - 1.6 m3 105 327,268.0016 E.080 Roller 3 Wheel 6-10 Ton 55 77,796.0017 E.081 Tandem Roller 6-8 Ton 50 104,957.0018 E.084 Pneumatic/Tire Roller 6-10 Ton 60 116,400.0019 E.082 Vibrator Roller 5-8 Ton 75 122,908.0020 E.089 Concrete Vibrator 10 38,400.0021 E.031 Stone Crusher 220 407,699.0022 E.341 Water Pump 70-100 mm 6 21,455.0023 E.211 Water Tank Truck 3000-4500 ltr 100 122,146.0024 E.087 Pedestrian Roller 11 59,743.0025 E.088 Plate Vibrator Stamper 5 38,684.0026 E.351 Jack Hammer 3 50,875.0027 E.040 Mesin Penyaring 80 155,000.0028 Fulvi Mixer 75 80,111.0029 Concrete Pump 100 93,600.0030 Trailer 20 Ton 175 148,759.0031 Pile Driver + Hammer 25 72,224.0032 Crane on track 35 Ton 125 159,500.0033 Welding Set 40 40,969.0034 Bore Pile Machine 150 716,700.0035 Hydraulic Ecavator 90 291,073.0036 Tractor Wheeled 60 109,401.0037 Chip Spreader 5 22,181.0038 Tractor Equipment 5 65,052.00

  • A N A L I S A H A R G A S A T U A N

    MEMBUAT PARIT

    ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Gali parit dengan tenaga manusia 1. Menggunakan tenaga manusia (100 m/ hari )2. membuang sisa galian mengguakan 2. Dimensi parit : Lebar bawah = 0.50 m

    truck bak terbuka Lebar atas = 1.30 mKedalaman = 0.60 m

    3. 25 % hasil galian di buang setempat4. Sisa galian dibuang 2 km5. Menggali dan membuang di hitung 1.5 m3 / orang/hari6. Umur alat bantu rata rata 1 bulan/orang/set @ 3 alat

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 1 L061 1 120,000.00 Sopir - Trampil 2 1 L091 2 150,000.00

    E Pembantu sopir 2 1 L099 2 100,000.00 Pekerja tak Terampil 36 1 L101 36 75,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Alat - alat bantu kerja (3 set) set M170 1.44 100,000.00

    A

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Flat Bed Truck 2 1 E.221 12.0 143,942.00

    PERAL

  • ATAN

    VOLUME : 54.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    KONSTRUKSI PASANGAN BATU

    ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Material ditimbun di lokasi pekerjaan 1. Dilakukan untuk pekerjaan Gorong - gorong, Jembatan, Dinding penahan tanah dan struktur lainnya

    oleh pemasok yang menggunakan konstruksi pasangan batu2. Pekerjaan membawa batu peca ketempat 2. Material - material dikirim ketempat pekerjaan oleh pemasok

    tukang batu bekerja 3. Tidak termasuk Galian / Timbunan3. Tukang batu memasang batu pecah dengan 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu

    dengan adukan pasir untuk lubang drainase

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Kepala Tukang 1 1 L073 1 120,000.00 Tukang 4 1 L079 4 110,000.00

    E Pekerja tak Terampil 7 1 L101 7 75,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Batu quarry/batu besar ( ukuran crusher ) m3 M010 5.00 252,900.00 Agregat halus/pasir bersih m3 M041 2.61 184,000.00

    A Portland Cement (dalam kantong) 40 kg M080 15.00 65,000.00 Alat - alat bantu kerja (3 set) set M170 0.75 100,000.00

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Water Pump 1 1 E.341 2.0 5,827.00

    PERALATAN

  • VOLUME : 5.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    ACUAN UNTUK BETON STRUKTUR

    ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Pengadaan oleh pemasok 1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja2. Kelompok tukang kayu memotong 2. 1/3 material dapat dipakai kembali

    dan membuat acuan 3. Pengadaan bahan oleh pemasok3. Kelompok tukang kayu membongkar 4. Untuk 1 m3 beton dipakai 20 lembar plywood ( 120 x 240 x 1.75 cm )

    acuan setelah beton cukup kuat 5. kelompok tukang kayu membongkar acuan4. Kelompok tukang kayu membersihkan

    acuan untuk dipakai kembali

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Kepala Tukang 1 1 L073 1 120,000.00 Tukang 4 1 L079 4 110,000.00

    E Pekerja tak Terampil 7 1 L101 7 75,000.00 Pekerja Trampil 3 1 L106 3 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Baja, paku-paku jembatan kg M166 4.00 15,000.00 Acuan dari kayu m3 M180 0.60 6,000,000.00

    A Alat - alat bantu kerja (3 set) set M170 0.56 6,800.00

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam)

    PERALATAN

  • VOLUME : 20.0 SATUAN : m2 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    MEMOTONG, MEMBENGKOK DAN MEMASANG TULANGAN BESI BETON

    ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari

    panjang yang diperlukan 2. Besi tulangan dikirim ketempat pekerjaan oleh pemasok2. Batang dan beugel besi beton di bengkokkan 3. Penyusutan akibat pemotongan 10 % dan pakai kawat baja dll di anggap 1 %

    sesuai yang diperlukan 4. Panjang dan diameter besi tulangan yang biasa dipakai Gorong - gorong dll3. Perakitan tulangan besi beton den di ikat 5. Membengkokan dan memasang batang besi dilaksanakan dengan tangan

    dengan kawat baja 6. 0.8 orang-hari memotong 200 kg batang besi beton7. 1.0 orang-hari membengkokan 200 kg batang besi beton8. 1.2 orang-hari memasang dan mengikat 200 kg batang besi beton9. Umur alat bantu rata 1 bulan/orang/set @ 3 alat

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 1 L061 1 120,000.00 Kepala Tukang 1 1 L073 1 120,000.00

    E Pekerja tak Terampil 3 1 L101 3 75,000.00 Pekerja Trampil 1 1 L106 1 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Tulangan baja dan kawat baja kg M167 225.00 15,000.00 Alat - alat bantu kerja (3 set) set M170 0.12 6,800.00

    A

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam)

    PERALATAN

  • VOLUME : 200.0 SATUAN : kg HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    BETON NON STRUKTUR / RABAT KELAS BO

    ( MENGGUNAKAN ALAT PENGADUK BETON 125 LITER )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Pemasok mengirim material 1. Bahan - bahan dasar dikirim kelokasi pekerjaan oleh pemasok2. Acuan dan tulangan besi beton di pasang 2. Dipakai agregat pecah dan tersaring yang termurah3. Beton di aduk dilokasi pekerjaan 3. Dicor 6.5 m3/hari dengan 54 adukan/6 jam/hari4. Beton di cor dan di getar sampai padat 4. Adukan 1Pc:3Ps:5Kr ( yaitu: 1 : 8 ); semen:220 kg/m3;air:120kg/m3;2326 kg/m3

    5. Anggap tiap adukan membutuhkan 2/3 zak (18,5 ltr lepas ) semen portland;55,6 ltr pasir; 92,6 ltr kerikil DAN 14,5 ltr airdan 15.6 ltr air

    6. Beton khusus dipakai untuk dasar dan lantai kerja pondasi, dll7. Untuk dasar / lantai kerja beton diizinkan memakai acuan seperlunya8. Sesuai Peraturan Beton Bertulang Indonesia ( PBI 1971 N.I.2 )

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 2 L061 2 120,000.00 Kepala Tukang 1 2 L073 2 120,000.00

    E Pekerja tak Terampil 12 2 L101 24 75,000.00 Pekerja Trampil 2 2 L106 4 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Agregat halus/pasir bersih m3 M041 6.00 184,000.00 Portland Cement (dalam kantong) 40 kg M080 72.00 65,000.00

    A Acuan dari kayu m3 M180 0.26 7,500,000.00 Alat - alat bantu kerja (3 set) set M170 0.96 5,000.00

    T Batu pecah tersaring m3 K018 10.00 451,890.00

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Concrete Vibrator 1 4 E.089 12.0 38,400.00

    P Concrete Mixer 1 4 E.252 12.0 57,358.00 E Water Pump 1 4 E.341 4.0 21,455.00 RALATAN

  • VOLUME : 23.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    BETON MASA KLAS K125

    ( MENGGUNAKAN ALAT PENGADUK BETON 125 LITER )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Pemasok mengirim material 1. Bahan - bahan dasar dikirim kelokasi pekerjaan oleh pemasok2. Acuan dan tulangan besi beton di pasang 2. Dipakai agregat pecah dan tersaring yang termurah3. Beton di aduk dilokasi pekerjaan 3. Dicor 5.75 m3/hari dengan 48 adukan/6 jam/hari4. Beton di cor dan di getar sampai padat 4. Adukan 1Pc:3Ps:4Kr ( yaitu: 1 : 7 ); semen:250 kg/m3;air:130kg/m3;2359kg/m3

    5. Anggap tiap adukan membutuhkan 3/4 zak (20.8 ltr lepas ) semen portland;62.5 ltr pasir; 83.3 ltr kerikildan 15.6 ltr air

    6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang 7. Beton bertulang dipakai untuk pilar, Gorong - gorong, dinding penahan dll8. Sesuai Peraturan Beton Bertulang Indonesia ( PBI 197 N.I.2 )

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 4 L061 4 120,000.00 Pekerja tak Terampil 12 4 L101 48 75,000.00

    E Pekerja Trampil 2 4 L106 8 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Agregat halus/pasir bersih m3 M041 12.00 184,000.00 Portland Cement (dalam kantong) 40 kg M080 144.00 65,000.00

    A Alat - alat bantu kerja (3 set) set M170 1.92 5,000.00 Batu Pecah tersaring m3 K018 16.00 451,890.00

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Concrete Vibrator 1 4 E.089 24.0 38,400.00

    P Concrete Mixer 1 4 E.252 24.0 57,358.00 E Water Pump 1 4 E.341 8.0 21,455.00 RALATAN

  • VOLUME : 23.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    BETON STRUKTUR KLAS K175

    ( MENGGUNAKAN ALAT PENGADUK BETON 125 LITER )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Pemasok mengirim material 1. Bahan - bahan dasar dikirim kelokasi pekerjaan oleh pemasok2. Acuan dan tulangan besi beton di pasang 2. Dipakai agregat pecah dan tersaring yang termurah3. Beton di aduk dilokasi pekerjaan 3. Dicor 6.0 m3/hari dengan 50 adukan/6 jam/hari4. Beton di cor dan di getar sampai padat 4. Adukan 2Pc:2Ps:7Kr ( yaitu: 1 : 8 ); semen:300 kg/m3;air:150kg/m3;2485kg/m3

    5. Anggap tiap adukan membutuhkan 0.9 zak (25.0 ltr lepas ) semen portland;62.56 ltr pasir; 87.5 ltr kerikildan 18.0 ltr air

    6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang 7. Beton bertulang dipakai untuk pilar, Gorong - gorong, dinding penahan dll8. Sesuai Peraturan Beton Bertulang Indonesia ( PBI 197 N.I.2 )

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 4 L061 4 120,000.00 Pekerja tak Terampil 12 4 L101 48 75,000.00

    E Pekerja Trampil 2 4 L106 8 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Agregat halus/pasir bersih m3 M041 12.50 184,000.00 Portland Cement (dalam kantong) 40 kg M080 180.00 65,000.00

    A Alat - alat bantu kerja (3 set) set M170 1.92 5,000.00 Batu pecah tersaring m3 K018 17.50 451,890.00

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Concrete Vibrator 1 4 E.089 24.0 38,400.00

    P Concrete Mixer 1 4 E.252 24.0 57,358.00 E Water Pump 1 4 E.341 8.0 21,455.00 RALATAN

  • VOLUME : 24.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    BETON STRUKTUR KLAS K225

    ( MENGGUNAKAN ALAT PENGADUK BETON 125 LITER )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Pemasok mengirim material 1. Bahan - bahan dasar dikirim kelokasi pekerjaan oleh pemasok2. Acuan dan tulangan besi beton di pasang 2. Dipakai agregat pecah dan tersaring yang termurah3. Beton di aduk dilokasi pekerjaan 3. Dicor 6.17 m3/hari dengan54 adukan/6 jam/hari4. Beton di cor dan di getar sampai padat 4. Adukan 1Pc:2Ps:3Kr ( yaitu: 1 : 5 ); semen:350 kg/m3;air:160kg/m3;2487kg/m3

    5. Anggap tiap adukan membutuhkan 1 zak (27.8 ltr lepas ) semen portland;55.6 ltr pasir; 83.3 ltr kerikildan 18.3 ltr air

    6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang 7. Beton bertulang dipakai untuk pilar, Gorong - gorong, dinding penahan dll8. Sesuai Peraturan Beton Bertulang Indonesia ( PBI 197 N.I.2 )

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 6 L061 6 120,000.00 Pekerja tak Terampil 12 6 L101 72 75,000.00

    E Pekerja Trampil 2 6 L106 12 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Agregat halus/pasir bersih m3 M041 18.00 184,000.00 Portland Cement (dalam kantong) 40 kg M080 324.00 65,000.00

    A Alat - alat bantu kerja (3 set) set M170 2.88 5,000.00 Batu pecah tersaring m3 K018 27.00 451,890.00

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Concrete Vibrator 1 6 E.089 36.0 38,400.00

    P Concrete Mixer 1 6 E.252 36 57,358.00 E Water Pump 1 6 E.341 12 21,455.00 RALATAN

  • VOLUME : 37.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    PENGURUGAN KEMBALI DAN DIPADATKAN

    ( UNTUK JEMBATAN & GORONG - GORONG ) ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Membersikan struktur dari bahan bahan 1. Bahan urugan dikirim kelokasi pekerjaan oleh pemasok

    organik 2. Digunakan kerikil galian/sungai tidak tersaring yang termurah2. Buruh mengurug bagian belakang struktur 3. Urugan di padatkan berlapis tebal 10 cm3. Memadatkan dengan taper dan mesin

    gilas bergetar

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 1 L061 1 120,000.00 Pekerja tak Terampil 10 1 L101 10 75,000.00

    E Pekerja Trampil 3 1 L106 3 90,000.00

    K

    E

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Sirtu m3 M09 20.00 384,000.00 Alat - alat bantu kerja (3 set) set M170 0.40 5,000.00

    A

    T

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Vibrator Roller 1 6 E.087 5.0 122,908.00

    P Plate Vibrator Tamper 1 6 E.088 10 38,684.00 ERALATAN

  • VOLUME : 15.0 SATUAN : M3 HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    GORONG -GORONG KOTAK PAS BATU DGN PLAT BETON BERTULANG

    (1000mm x 1000mm TANPA DDG KEPALA ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Buat plat beton bertulang 1. Tidak termasuk dinding kepala2. Gali tanah lebar 2,10m dlm 1,65m 2. Timbunan 0,6m sampai 1,0m3. Buang hasil galian dengan truck 3. Lantai dasar beton tidak bertulang (1.8m x 40 cm)4. Cor beton lantai dasar 4. Dinding pasangan batu bagian dalam miring (kearah tegak), dasar 50cm, atas 30cm, tinggi 1,0m5. Tidak termasuk dinding kepala 5. Plat beton bertulang tebal = 25cm, Lebar = 1,8m dgn pembesian 84kg/m6. Buat abutment dari pas batu 6. Pemasok mengirim material kelokasi pekerjaan7. Letakan pelat beton di atasnya 7. Upah tukang termasuk biaya produksi8. Urug kembali dan padatkan 8. Lihat gambar Standard d4.1/2/3

    belakang abutmentP E KE R J A VOL HARI KODE TOTAL VOL UPAH

    (ORG.HARI) (Rp./ORG/HARI)P Mandor 1 6 L061 6 120,000.00

    Operator - Trampil 1 2 L081 2 75,000.00 E Sopir - Trampil 1 2 L091 2 90,000.00

    Pembantu Operator 1 2 L083 2 100,000.00 K Pembantu sopir 1 2 L099 2 100,000.00

    Pekerja tak Terampil 5 6 L101 30 75,000.00 E Pekerja Trampil 1 6 L106 6 90,000.00

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Alat - alat bantu kerja (3 set) set M170 1.20 5,000.00 Pembesian kg K715 756.00 19,654.00

    A Bekisting m2 K710 6.30 250,940.00 Konstruksi pasangan batu m3 K705 13.68 780,239.00

    T Beton struktur klas K225 m3 K722 5.04 1,283,572.00 Pengurugan kembali m3 K225 7.60 654,892.00

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Loader Wheeled 1 2 E.052 10.0 327,268.00

    P Flat Bed Truck 1 2 E.221 10.0 143,942.00 ERALATAN

  • VOLUME : 9.0 SATUAN : m HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    GORONG -GORONG KOTAK PAS BATU DGN PLAT BETON BERTULANG

    (700mm x 700mm TANPA DDG KEPALA ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Acuan dibersihkan dan dilapisi oli 1. Beton K225 diaduk di lokasi pekerjaan (54 adukan/hari @ 114 liter/adukan)2. Jaringan Tulangan beton dibuat 2. Dicor kira-kira 6.0 m3/hari (terbuang 3%)3. Acuan dirakit melingkari jaringan tulangan beton 3. Diameter 4. Adukan beton dicor kedalam acuan dan digetar 4. Dinding pasangan batu bagian dalam miring (kearah tegak), dasar 50cm, atas 30cm, tinggi 1,0m

    sampai padat 5. Plat beton bertulang tebal = 18cm, Lebar = 1,44m dgn pembesian 68kg/m5 Membuka acuan setelah beton cukup kuat 6. Pemasok mengirim material kelokasi pekerjaan6 Pipa dipindahkan dengan loader 7. Upah tukang termasuk biaya produksi

    8. Lihat gambar Standard d4.1/2/3

    P E KE R J A VOL HARI KODE TOTAL VOL UPAH (ORG.HARI) (Rp./ORG/HARI)

    P Mandor 1 6 L061 6 120,000.00 Operator - Trampil 1 2 L081 2 150,000.00

    E Sopir - Trampil 1 2 L091 2 150,000.00 Pembantu Operator 1 2 L083 2 100,000.00

    K Pembantu sopir 1 2 L099 2 100,000.00 Pekerja tak Terampil 5 6 L101 30 75,000.00

    E Pekerja Trampil 1 6 L106 6 90,000.00

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Alat - alat bantu kerja (3 set) set M170 1.20 5,000.00 Pembesian kg K715 612.00 19,654.00

    A Bekisting m2 K710 6.30 250,940.00 Konstruksi pasangan batu m3 K705 10.26 780,239.00

    T Beton struktur klas K225 m3 K722 3.24 1,283,572.00 Pengurugan kembali m3 K225 5.00 654,892.00

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G A

    KERJA KERJA (Rp./jam) Loader Wheeled 1 2 E.052 10.0 327,268.00

    P Flat Bed Truck 1 2 E.221 10.0 143,942.00 ERALATAN

  • VOLUME : 9.0 SATUAN : m HARGA SATUAN Rp.

    DIBULATKAN Rp.

  • A N A L I S A H A R G A S A T U A N

    GORONG -GORONG KOTAK PAS BATU DGN PLAT BETON BERTULANG

    900mm x 900mm TANPA DDG KEPALA ( MENGGUNAKAN BURUH )

    PROPINSI : KODE KABUPATEN : KODE( ) ( )

    PROSES : ANGGAPAN :1. Buat plat beton bertulang 1. Tidak termasuk dinding kepala2. Gali tanah lebar 2,10m dlm 1,65m 2. Timbunan 0,6m sampai 1,0m3. Buang hasil galian dengan truck 3. Lantai dasar beton tidak bertulang (1.68m x 40 cm)4. Cor beton lantai dasar 4. Dinding pasangan batu bagian dalam miring (kearah tegak), dasar 50cm, atas 30cm, tinggi 1,0m5. Tidak termasuk dinding kepala 5. Plat beton bertulang tebal = 20cm, Lebar = 1,68m dgn pembesian 72kg/m6. Buat abutment dari pas batu 6. Pemasok mengirim material kelokasi pekerjaan7. Letakan pelat beton di atasnya 7. Upah tukang termasuk biaya produksi8. Urug kembali dan padatkan 8. Lihat gambar Standard d4.1/2/3

    belakang abutmentP E KE R J A VOL HARI KODE TOTAL VOL UPAH

    (ORG.HARI) (Rp./ORG/HARI)P Mandor 1 6 L061 6 120,000.00

    Operator - Trampil 1 2 L081 2 75,000.00 E Sopir - Trampil 1 2 L091 2 90,000.00

    Pembantu Operator 1 2 L083 2 100,000.00 K Pembantu sopir 1 2 L099 2 100,000.00

    Pekerja tak Terampil 5 6 L101 30 75,000.00 E Pekerja Trampil 1 6 L106 6 90,000.00

    R

    J

    A

    M A T E R I A L SATUAN KODE TOTAL H A R G AVOL ( Rp./Unit )

    M Alat - alat bantu kerja (3 set) set M170 1.20 5,000.00 Pembesian kg K715 648.00 19,654.00

    A Bekisting m2 K710 6.30 250,940.00 Konstruksi pasangan batu m3 K705 12.60 780,239.00

    T Beton struktur klas K225 m3 K722 3.96 1,283,572.00 Pengurugan kembali m3 K225 6.00 654,892.00

    E

    R

    I

    A

    LP E R A LA T AN JUMLAH HARI KODE JAM H A R G