Helsinki Airport – maintenance perspective

Smooth and hasslefree travelling via Helsinki Airport

Mission is to guarantee sufficiently good conditions for safe operations in the airport area and offer good passenger experiences to single passengers at a well-kept airport.

Page 3: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Size: 18 sqkmManouvering Area 250 + 250 ha5 ILS AreasApron area: 105 haLandside: 100 haParking spots ~12000Vehicles to maintain: ~250Forest: 200 ha

Helsinki Airport – maintenance perspective

Page 4: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Airfield Maintenance

Total personnel 120Seasonal workers 40

Contractor personnel 35

5+402+14 3+37 1+8 1

6-22 24/7 6-22 6-22 8-16

Page 5: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Operations, average day

One runway (36)

Two runways (64)

Page 6: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Efficient Winter Performance

Operational capabilities

Page 7: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Whole year prosess

July - September

Sept

embe

r - N

ovem

ber

November - April

April - May

May

- Ju

ne

Page 8: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Personnel vs. Operations (Flexible)

Page 9: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Helsinki Virtual Snow Desk

Airfield Maintenance Operation center

Apron management

ATC

Handling companies

Contractors

Airlines

Finnish Meterological Institute

Weather

Active Communication

Page 10: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Weather observation

• Actions with in 24 h • Actions with in 8 h • Actions with in 1 h• Actions during bad weather

WarningWarning and getting resourses (contractors)Get resourses (stand by personnel) and activities planningExecution, execution, execution

Page 11: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Runway conditions observation

Page 12: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Winter Maintenance – main idea

• Safety is paramount• Do as much as possible with same

amount of time• Concentrate power• Communication and co-operation• KIS

Page 13: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Winter Maintenance – use of patterns

• Analyse AOR• Plan (with a

clock)• Concentrate• Leadership• Co-operation• Interactively

Have a playbook for any situation

Page 14: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Winter Maintenance – main idea

• Analyse AOR• Use of contractors• Concentrate• Leadership• Co-operation• Interactively

Have a playbook for any situation

Page 15: Jyrki Pulkkinen chief of Airport maintenance Helsinki

• Special equipment for Manoeuvring Area– Fastness and broadness are important.

• Special equipment for Apron Area– Easy access to narrow places is essential.

• Special equipment for Land side– Easy access to low and narrow spaces

(pavements, cycle paths, parking houses)

02.03.10 HELSINKI AIRPORT15

Equipments

Page 16: Jyrki Pulkkinen chief of Airport maintenance Helsinki

• PSB5500 sweepers• high power snow blowers• combispreaders• friction tester vehicles• ILS-area snow blowers• graders, wheel loaders• trucks, cars• Equipment for Apron Area and Land side are used when

applicable

Special equipment for Manoeuvring Area

02.03.10 HELSINKI AIRPORT16

Page 17: Jyrki Pulkkinen chief of Airport maintenance Helsinki
Page 18: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Special equipment for Apron Area

• sweepers for apron area• SB sweepers• wheel loaders, graders• spreaders for chemical, -

sand• front sweeper• suction sweepers• snow blowers

02.03.10 HELSINKI AIRPORT18

Page 19: Jyrki Pulkkinen chief of Airport maintenance Helsinki
Page 20: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Statistics 2009 - 2010

• Total amount of snow fall 188 cm• Largest amount of snow on ground ~70 cm• 10 cm snow on apron area = 105 000 m3 = 7000 truckloads• 10 cm snow on manoeuvring area = 250 000 m3

So 188 cm means...• On aprons = 2 milj m3 = 131 000 truckloads• On manoeuvring area = 4,7 milj m3

Helsinki Airport / Airfield MaintenanceJyrki Pulkkinen

[email protected]

Page 21: Jyrki Pulkkinen chief of Airport maintenance Helsinki

• November – February snow aprox 180 cm

02.03.10 HELSINKI AIRPORT21

Statistics 2010 - 2011

Snow depth Helsinki Airport

Page 22: Jyrki Pulkkinen chief of Airport maintenance Helsinki

• November – February snow aprox 180 cm

02.03.10 HELSINKI AIRPORT22

Statistics 2010 - 2011

Page 23: Jyrki Pulkkinen chief of Airport maintenance Helsinki

Thank You

Airfield Maintenance – We make you flySmooth and hasslefree