8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
1/20
JSB600
DESIGNTHESISPROJECT
INCEPTIONMOHDRAFIE2009162823UNIVERSITITEKNOLOGI
MARA 01
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
2/20
Page | 2
| Designer Profile
Mohd Rae bin Abdul Alam
2009162823
26 Jun 1985
19 Jalan Camar 4/7Kota Damansara47810 Petaling JayaSelangor
6 month practical training
Khalid Ahmad Architects2 years working experience
Akitek Jururancang Malaysia (Asst. Arch)
+6012 365 7904
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
3/20
Page | 3
Proposal 1 | Integrated MRT Terminal @ Kota Damansara
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
4/20
Page | 4
| Project Background
Recently the Malaysian Government
has announced the RM50b Klang Valley Public Transport Plan o new MRT(Mass Rapid Trans-portation) line stretching rom Sungai Buloh toKajang. The proposed new line is included in the10th Malaysia Plan (RMK10) to be taken actionbetween 2011-2015. This new transportationsystem targeted to handle larger number o
passenger compared to PUTRA, STAR and KTM
line, it also will link the Golden Triangle within itsroute.
In-leiu with the plan, the upcomingproject to be related to this proposal is the In-tegrated Transportation Terminal or SungaiBuloh area, having the similar unction as the
established (ITT-BTS) Bandar Tasik Selatan Inte-grated Terminal. This ITT-Sg Buloh unctions as
the Northern Sector terminal. All incoming pas-
senger rom the northern area will be dispersedat this terminal where other mode o transpor-tation will be housed in the same place.
Responding to the both plan, this pro-posal will try to integrate the existing publictransportation mode and the upcoming MRTsystem in one place somewhere in Sg. Buloh
area. However, looking at the number o trac
and density o potential user, the location o thenew public transportation are debateable. Thisproposal will try to locate the best location andprogram to link all the public transportation inthe vicinity o the site.
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
5/20
Page | 5
| Theoretical Premise
This proposal is meant to be integrated
with the new upcoming proposed MRT line, itsalso about providing a hub or a place where di-erent mode o public transportation system be-ing handled.
Kota Damansara seems to be the poten-tial o having an integrated terminal other thanSungai Buloh because o the distance and loca-
tion is very strategic and close proximity to two
existing rail line which is the Kelana Jaya line(PUTRA) and also Seremban-Rawang line (KTM).
In other situation, the population o KotaDamansara itsel is growing rapidly and expect-ed to grow even more with the upcoming resi-dential proposal in the neighbouring area. The
number o people move by car is very huge be-cause o the lack o public transport service sys-
tem. Trac problems always occur during peak
hours and weekends because Kota Damansaraexit (PLUS) is an alternative road to Mutiara Da-mansara and Bandar Utama. These congestionis because o the unavailability o ecient pub-lic transportation handling system.
With this new proposed ITT in Kota Da-mansara, the public transportation system will
gradually ease the problem because people will
have more options on travelling orm the citycentre or to the city centre. Further more it alsolinked to the northern bound o Malaysia Penin-sular.
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
6/20
Page | 6
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
7/20
Page | 7
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
8/20
Page | 8
Production Indicators
Source:Malaysia Statistical Department (January 2011)
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
9/20
Page | 9
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
10/20
Page | 10
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
11/20
Page | 11
Taman Connaught
Batu 4
Jalan Peel
KL Sentral
Jalan Telawi
Jalan Maaro
Pusat Bandar Damansara
Phileo Damansara
Taman Tun Dr. Ismail
Bandar Utama
Kajang
Source: Wikipedia.org
Batu 9
Bandar Tun Hussien Onn
Cheras
Taman Segar
Taman Midah
Maluri
Bukit Bintang
Masjid Jamek
Raja Chulan
Pasar Seni
Bangsar
Sungai Buloh
Mutiara Damansara
Persiaran Surian
Kota Damansara
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
12/20
Page | 12
Eastern Bound
Southern Bound
Northern Bound
City Center
ITT-BTSBandar Tasik Selatan
Status : CompletedYear : 2010Project Cost : 570mil.
Area: 20.2 ha.Client : MOT (Ministry o Transportation)
Gombak (Terminal Putra)Status : Under ConstructionYear : End 2011
Project Cost : 200mil.Site Area: ha.Client : MOT (Ministry o Transportation)
ITT-GBKSite To Be AnnouncedStatus : PlanningYear : TBA
Project Cost : TBASite Area:Client : MOT (Ministry o Transportation)
ITT-???
?
Source: Skyscrapercity.org
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
13/20
Page | 13
| Basic Component
This proposal will consist o three mode
o transportation which will be the new MRTsystem, Bus and Taxi Handling. All these compo-nents will be integrated into one proposals.
The challenge o this project will be ondesigning the circulation ow and to help peo-ples in way nding to avoid pedestrian conges-tion. Apart rom that is to establish the image
that would reect the overall unction o the
proposal.
Integrated MRT Terminal
MRT Admin
MRT Lobby
Saety & Health
Facilities
Bus & Taxi handling
Parking Space
Taxi and Bus Area
Arrival & Departure
Building Management
Commercial & RentableSpace
Building Security
Link & Connection
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
14/20
Page | 14
| Proposed Client
Ministry o Transportation (MOT) are
dedicated to develop ecient, sae and efec-tive transport systems and service towards en-hancement o multi modalism and competitive-ness. They involve in planning, ormulating andimplementing rail, maritime, ports and civil avi-ation transport policies. In this case, or previousITT-BTS, MOT is the main client while the private
delivering partner is the KLIA Consultancy Ser-
vices.Gamuda was given the authority or lay-
ing the new MRT rail line as the MRT develop-ment partner. All stations and rail line will beunder the responsibility o Gamuda.
KLIA Consult will be the team that will be
the project leader or developing the ITT as be-ing done in previous ITT-BTS. KLIA Consult was
choosen because the experience o handling
multiple mode o transportation deisgn suchas the top class Kuala Lumpur International Air-port.
Client :
MRT Development Partner :
Terminal Development Partner :
KLIA Consult
Source: MinistryOf Transportation
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
15/20
Page | 15
| Precedent Study 01 - Integrated Transportation Terminal, Bandar Tasik Selatan (ITT-BTS)
Project DataArchitect: Hasbullah Chan & Assoc.Project Manager: KLIA ConsultProject Cost : RM 570 mil.Site: Bandar Tasik SelatanSite Area : 20 acreGFA : 95,000 SQMBus Bay : 55 platorms
Taxi bay : 150 bays
Parking Bay : 1,000Construction Period: Nov 2009 - End 2010
This terminal is one out o three pro-posed Integrated Transportation Terminal (ITT)in Klang Valley. This terminal will unction to
serve Southern bound express busses to avoidany trac problem caused by the busses. It
is also another way o solving the existing Pu-
duraya terminal.Based on BERNAMA reports, the termi-
nal equipped with advanced eatures, includingcentralized 24-hour customer service acilities,e-ticketing counters, public inormation displaysystem, dedicated halls or arrivals and depar-tures, an executive lounge, suraus and WiFi ser-
vice. It even has rooms or changing nappies.
The terminal also caters or disables with direc-tional tiles, lowered counters and special toilets,elevators and ramps.
The halls equipped with 1,800 seats andully aircond, it also provide special parking baysor women.
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
16/20
Page | 16
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
17/20
Page | 17
| Precedent Study 02 - Transbay Transit Centre, San Francisco California, USA
Project DataArchitect: Pelli Clarke Pelli ArchitectsProject Manager: HinesProject Cost : USD 4billionSite: San Francisco, CaliorniaStatus: Under Construction
The Transbay Transit Centre Project is a
visionary transportation and housing project
that transorms downtown San Francisco andthe San Francisco Bay Areas regional transporta-tion system by creating a Grand Central Stationo the West in the heart o a new transit-riendlyneighbourhood. The $4 billion project will re-place the current Transbay Terminal at First and
Mission streets in San Francisco with a modernregional transit hub connecting eight Bay Area
counties and the State o Caliornia through 11
transit systems: AC Transit, BART, Caltrain, Gold-en Gate Transit, Greyhound, Muni, SamTrans,WestCAT Lynx, Amtrak, Paratransit and utureHigh Speed Rail rom San Francisco to Los An-geles/Anaheim.
The project consists o three intercon-nected elements: Replacing the outdated Transbay Terminal at
First and Mission streets Extending Caltrain and Caliornia High
Speed Rail underground rom Caltrains cur-rent terminus at 4th and King streets intothe new downtown Transit Centre
Creating a new neighbourhood with homes,
oces, parks and shops surrounding thenew Transit Center
Source: www.transbaycenter.org
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
18/20
Page | 18
Source: www.transbaycenter.org
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
19/20
Page | 19
| Potential Site 01 - Kota Damansara
SunwayGIZA
CasaIndah1
KelabGolfNegeriSelangor
DataranSunway
DeStrand
SunSuriaAvenue
CityForestReserve
Condition : VacantOwnership : Kelab Gol Negeri Selangor
Title : Sports & Recreation
Area: 3.5 acreDensity/ Plot Ratio: Nil.
8/7/2019 JSB600: Project Inception-Proposal01-Integrated MRT Station @ Kota Damansara
20/20
Page | 20
| Potential Site 02 - Sungai Buloh
Condition : Partially OccupiedOwnership : Separate Land Lot
Title : Private Land
Area: 8 acreDensity/ Plot Ratio: Nil.
KTMRail
Toll
Gat
e
ArmyBase
Industrial