12
SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE 1 Joint Meeting Panagiotis Lytrivis ([email protected] ) George Vafeiadis (gvaf @iccs.gr ) ICCS SP1-SP4 SP1-SP4

Joint Meeting Panagiotis Lytrivis ( [email protected] )

  • Upload
    deliz

  • View
    50

  • Download
    0

Embed Size (px)

DESCRIPTION

Joint Meeting Panagiotis Lytrivis ( [email protected] ) George Vafeiadis ( gvaf @iccs.gr ) ICCS. SP1-SP4. Outline. Status of the deliverables (D1.4.2 & D1.5.1) Performance of SR cycle (timing diagrams) Status of SR algorithms (implementation). Status of the deliverables. - PowerPoint PPT Presentation

Citation preview

Page 1: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE 1

Joint Meeting

Panagiotis Lytrivis ([email protected])

George Vafeiadis ([email protected])

ICCS

SP1-SP4SP1-SP4SP1-SP4SP1-SP4

Page 2: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Outline

2

• Status of the deliverables (D1.4.2 & D1.5.1)

• Performance of SR cycle (timing diagrams)

• Status of SR algorithms (implementation)

Page 3: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Status of the deliverables

D1.4.2

• Executive summary changes

• Under review from Christian

• Some information is still not sufficient (e.g. test sites description)

D1.5.1

• Finalize first the D1.4.2

• Include usage of MARS and update the test cases?

• Criteria for evaluation & validation (indicators)

• Template in compliance with MMSE?

• Number and quality of test cases sufficient?

• BOSCH, CRF, VOLVO, IBEO, ICCS

• CONTINENTAL, RENAULT, PIAGGIO, MMSE?

3

Page 4: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

SR status report

• Working on fog detection and traffic estimation modules (Bayesian Networks)

• AlongRoadElement table for Ego, other vehicles.

• Benchmarking of SR modules and queries to the LDM

• LDM queries time consuming

• SafeFusion simulator (update, integration of other modules)

• MARS successfully connected to the LDM (own scenarios?)

• Paper for the ITS in Stockholm 2009

4

Page 5: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Query performance (1 query/vehicle)

5

0

10

20

30

40

50

60

0 50 100 150 200

du

rati

on

(mse

c)

# SR iteration

5 vehicles

20 vehicles

Page 6: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Notes about LDM testing

• The LDM had only the static map features and randomly positioned vehicles (no other data)

• No other process (e.g. applications or IP) were connected and using the LDM

• Multiple threads usage investigated

6

Main PC - eBox638-FL

Page 7: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

New Proposed Internal Architecture SR

7

Thread-1: Ego Vehicle (path prediction, maneuver, etc)

Thread-2: other vehicle (path prediction, maneuver, etc)

Thread-n: other vehicle (path prediction, maneuver, etc)

.

.

.

Thread n+1: Fog Detection

Thread n+2: Traffic Estimation

OR module

IP/LDM

SR module

Page 8: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Path prediction performance

8

0

10

20

30

40

50

60

0 50 100 150 200

du

rati

on

(mse

c)

# SR iteration

5 vehicles

20 vehicles

Page 9: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

MARS & Simulation

• MARS successfully connected with LDP and in turn with LDM (observation of the changes in the LDM table egomotorvehicle)

• How to run our own scenarios?

• The incorporation of Orbassano track in MARS would be helpful

9

Page 10: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Bayesian Network

10

Fog (t)

Fog (t-1)

Seasonseason

fallwinter spring summer

fog

yesno

fog

yesno

temperature

temperature

very lowlowmediumhigh

speed

speed

zerolowmediumhigh

fog light fog light

onoff

VANET info

VANET info

nearmediumfar

Page 11: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Hugin BN

11

Page 12: Joint Meeting Panagiotis Lytrivis  ( panagiotis.lytrivis@iccs.gr )

SP1-SP4 Joint Meeting November 25-27 2008, Venaria, MMSE

Paper to be submitted to ITS 2009

12