    JustJust--InIn--Time Manufacturing?Time Manufacturing? What is JIT Manufacturing?What is JIT Manufacturing?

    Where did it come from?Where did it come from?

    What are the main principles?What are the main principles?

    Is it easy to Implement?Is it easy to Implement?

    What phrase best describes JIT?What phrase best describes JIT?

  • 8/8/2019 JITmanufacturing[1]

    3/29

    JustJust--In Time ManufacturingIn Time Manufacturing

    JITJIT-- A philosophy ofA philosophy of continuous improvementcontinuous improvementthat puts emphasis on prevention rather thanthat puts emphasis on prevention rather than

    correction, and demands a company wide focuscorrection, and demands a company wide focuson quality.on quality.

    JITJIT-- operational management approach tooperational management approach toachieve world class manufacturing.achieve world class manufacturing.

    JITJIT-- production is based on demandproduction is based on demand

  • 8/8/2019 JITmanufacturing[1]

    4/29

    History of JIT ManufacturingHistory of JIT Manufacturing Evolved in Japan after World War II, as a result ofEvolved in Japan after World War II, as a result of

    their diminishing market share in the autotheir diminishing market share in the auto

    industry.industry.

    Toyota Motor CompanyToyota Motor Company-- Birthplace of the JITBirthplace of the JITPhilosophy Under Taiichi Ohno.Philosophy Under Taiichi Ohno.

    W. Edwards DemingW. Edwards Deming

    14 points for Management14 points for Management

    JIT is now on the rise in American Industries.JIT is now on the rise in American Industries.

  • 8/8/2019 JITmanufacturing[1]

    5/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    6/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    7/29

    Total Quality ManagementTotal Quality Management

    Seek longSeek long--term commitment to qualityterm commitment to quality

    efforts with continuous improvementefforts with continuous improvement

    Quality must be a higher priority than costQuality must be a higher priority than cost

    Minimizing wasteMinimizing waste

  • 8/8/2019 JITmanufacturing[1]

    8/29

    Total Quality ManagementTotal Quality Management Eliminate Quality InspectorsEliminate Quality Inspectors

    Quality is everyones responsibilityQuality is everyones responsibility

    Do it right the first timeDo it right the first time

  • 8/8/2019 JITmanufacturing[1]

    9/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    10/29

    Production ManagementProduction Management Pull System vs. Push SystemPull System vs. Push System

    Pull = Made to orderPull = Made to order

    Push = Made for inventoryPush = Made for inventory

    Flexability of the systemFlexability of the system

    Design For TestabilityDesign For Testability In the processIn the process

    PokaPoka--Yoke= MistakeYoke= Mistake--proofingproofing

    Throughout entire processThroughout entire process

  • 8/8/2019 JITmanufacturing[1]

    11/29

    Production ManagementProduction Management

    Reduced lot sizes= Shorter cycle timesReduced lot sizes= Shorter cycle times

    Eliminate disruptions in the processEliminate disruptions in the process

    Standardized Parts/ SimplicityStandardized Parts/ Simplicity

  • 8/8/2019 JITmanufacturing[1]

    12/29

    Production ManagementProduction Management Communication TechniquesCommunication Techniques

    Completion of taskCompletion of task--KanbanKanban

    ProblemProblem-- AndonAndon or siren/lightor siren/light

    Stopping the process if something goesStopping the process if something goes

    wrong =wrong =JidokaJidoka

    Preventive MaintenancePreventive Maintenance

  • 8/8/2019 JITmanufacturing[1]

    13/29

    Production Management atProduction Management at

    ToyotaToyota Toyota uses a Kanban pull systemToyota uses a Kanban pull system

    throughout the production process.throughout the production process.

    Each task in the process seems to takeEach task in the process seems to take

    identical length and work content, soidentical length and work content, so

    everyone is working at the same pace toeveryone is working at the same pace to

    reduce bottlenecks.reduce bottlenecks.

  • 8/8/2019 JITmanufacturing[1]

    14/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    15/29

    Supplier ManagementSupplier Management Establish Long Term Relationships with fewEstablish Long Term Relationships with few

    suppliers.suppliers.

    Delivery of Parts = 100% Defect FreeDelivery of Parts = 100% Defect Free

    Where they are neededWhere they are needed

    When they are neededWhen they are needed

    The exact quantityThe exact quantity

    Work TogetherWork Together

  • 8/8/2019 JITmanufacturing[1]

    16/29

    Supplier ManagementSupplier Management Elimination inspection of partsElimination inspection of parts

    Information SystemsInformation Systems

    Eliminating barriers to informationEliminating barriers to information

    Communicate problems to suppliers in aCommunicate problems to suppliers in a

    positive manner.positive manner.

  • 8/8/2019 JITmanufacturing[1]

    17/29

    Supplier Relations at ToyotaSupplier Relations at Toyota Toyota communicates their damand forToyota communicates their damand for

    parts 20 days in advance to their suppliers,parts 20 days in advance to their suppliers,

    with the right to change the forecast up towith the right to change the forecast up to

    the 10the 10thth day.day.

  • 8/8/2019 JITmanufacturing[1]

    18/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    19/29

    Inventory ManagementInventory Management Eliminate Safety Stock = Zero InventoryEliminate Safety Stock = Zero Inventory

    Reduce WIPReduce WIP

    JIT is not an inventory control systemJIT is not an inventory control system

    Reduction in inventory opens up spaceReduction in inventory opens up space

  • 8/8/2019 JITmanufacturing[1]

    20/29

    Inventory hides problems in aInventory hides problems in aprocess.process.

    Water Level = InventoryWater Level = InventoryRocks = Problems in the systemRocks = Problems in the system

    Boat = Company OperationsBoat = Company Operations

  • 8/8/2019 JITmanufacturing[1]

    21/29

    Principles Of JIT ManufacturingPrinciples Of JIT Manufacturing Total Quality ManagementTotal Quality Management

    Production ManagementProduction Management

    Supplier ManagementSupplier Management

    Inventory ManagementInventory Management

    Human Resource ManagementHuman Resource Management

  • 8/8/2019 JITmanufacturing[1]

    22/29

    Human Resource Management

    Human Resource Management

    CompanyCompany--wide Involvementwide Involvement

    Motivation for continuous improvementMotivation for continuous improvement

    Problem SolvingProblem Solving

    High Employee InteractionHigh Employee Interaction

    Build Pride In WorkmanshipBuild Pride In Workmanship

  • 8/8/2019 JITmanufacturing[1]

    23/29

    Human Resource Management

    Human Resource Management

    SelfSelf--Inspection of workInspection of work

    Diversified EmployeesDiversified Employees

    AbsenteeismAbsenteeism

    To eliminate boredom in processTo eliminate boredom in process

    Management Support and Empowerment ofManagement Support and Empowerment ofworkforceworkforce

  • 8/8/2019 JITmanufacturing[1]

    24/29

    Human Resource Management atHuman Resource Management at

    ToyotaToyota

    In 1986 from a labor force of 60,000 ToyotaIn 1986 from a labor force of 60,000 Toyotareceived 2.6 million improvementreceived 2.6 million improvement

    proposals, 96% of which were implementedproposals, 96% of which were implemented

    by either management or the employeesby either management or the employeesthemselves.themselves.

  • 8/8/2019 JITmanufacturing[1]

    25/29

    WIP ExampleWIP Example

  • 8/8/2019 JITmanufacturing[1]

    26/29

    Implementation ProblemsImplementation Problems

    Worker resistanceWorker resistance

    Lack of top management supportLack of top management support

    Lack of communicationLack of communication

    Lack of formal trainingLack of formal training

  • 8/8/2019 JITmanufacturing[1]

    27/29

    Most Important QuestionMost Important Question What phrase best describes theWhat phrase best describes the

    JustJust--InIn--Time philosophy?Time philosophy?

    Continuous ImprovementContinuous Improvement

  • 8/8/2019 JITmanufacturing[1]

    28/29

    SummarySummary

    JITJIT-- A philosophy ofA philosophy of continuous improvementcontinuous improvement

    that puts emphasis on prevention ratherthat puts emphasis on prevention rather

    than correction, and demands a companythan correction, and demands a company

    wide focus on quality.wide focus on quality.

  • 8/8/2019 JITmanufacturing[1]

    29/29

    ReferencesReferences

    Cammaranano, J.Cammaranano, J. Lessons to be Learned: JIT.Lessons to be Learned: JIT. Atlanta, Georgia: Engineering andAtlanta, Georgia: Engineering andManagement Press, 1997.Management Press, 1997.

    Dear, A.Dear, A. Working toward JIT: Management Technology.Working toward JIT: Management Technology. London: Derek Doyle and Associates,London: Derek Doyle and Associates,

    1988.1988.Fisher, D.Fisher, D. The JIT Self Test: Success Through Assesment and Implementation.The JIT Self Test: Success Through Assesment and Implementation. Chicago, IL:Chicago, IL:

    Irwin Inc., 1995.Irwin Inc., 1995.

    Hernandez, A.Hernandez, A. JIT Quality: A Practical Approach.JIT Quality: A Practical Approach. Englewood Cliffs, NJ: PrenticeEnglewood Cliffs, NJ: Prentice--Hall, 1993.Hall, 1993.

    Hutchins, D.Hutchins, D. JustJust--InIn--Time: Inventory Control.Time: Inventory Control. Brookfield, VT: Gower Publishing, 1988.Brookfield, VT: Gower Publishing, 1988.

    OGrady, P.J.OGrady, P.J. Putting the JIT PhilosophyInto Practice.Putting the JIT PhilosophyInto Practice. New York, NY: Nichols Publishing, 1988.New York, NY: Nichols Publishing, 1988.

    Reinfeld, N.V.Reinfeld, N.V. Handbook of Production and InventoryControl.Handbook of Production and InventoryControl. Englewood Cliffs, NJ: PrenticeEnglewood Cliffs, NJ: Prentice--Hall, 1987.Hall, 1987.

    Schneiderjans, M.J.Schneiderjans, M.J. Advanced Topics In JIT Management: JIT Systems.Advanced Topics In JIT Management: JIT Systems. Westport, CT:Westport, CT:Greenwood Publishing Group, 1999.Greenwood Publishing Group, 1999.

    Taver, R.W.Taver, R.W. Manufacturing Solutions for ConsistentQualityand Reliability: The 9 StepManufacturing Solutions for ConsistentQualityand Reliability: The 9 StepProblem Solving ProcessProblem Solving Process. New York, NY: AMACON, 1995.. New York, NY: AMACON, 1995.

    Wesner, J.W., Hiatt, J.M., and Trimble, D.C.Wesner, J.W., Hiatt, J.M., and Trimble, D.C. Winning withQuality: Applying QualityPrinciplesWinning withQuality: Applying QualityPrinciplesin ProductDevelopment.in ProductDevelopment. Reading, MASS: AddisonReading, MASS: Addison--WesleyPublishing Co., 1995.WesleyPublishing Co., 1995.