JIGAWA STATE GOVERNMENT
DUE PROCESS AND PROJECT MONITORING BUREAU
OFFICE OF THE EXECUTIVE GOVERNOR
2ND QUARTER PROJECTS REPORT
APRIL TO JUNE, 2017
CONTENTS SECTION (A) - EXECUTIVE SUMMARY
SECTION (B) - CONTRACTS AWARDED APRIL TO JUNE, 2017
SECTION (C) - COMPLETED/ON-GOING PROJECTS - MINISTRY OF HEALTH
- MINISTRY OF WATER RESOURCES
- MINISTRY OF WORKS AND TRANSPORT
- MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY
- GOVERNMENT HOUSE
- MINISTRY OF LAND AND HOUSING
- MINISTRY OF COMMERCE
- DIRECTORATE OF EONOMIC EMPOWEERMENT
- DUTSE CAPITAL DEVELOPMENT AUTHORITY
- CABINET OFFICE
- MINISTRY OF INFORMATION
- MINISTRY OF AGRICULTURE
- MINISTRY OF WOMEN AFFAIRS
- OFFICE OF THE HEAD OF SERVICE
- SUBEB
- MINISTRY OF JUSTICE
- MINISTRY OF FINANCE AND ECONOMIC PLANNING
- JIGAWA STATE COLLEGE OF ISLAMIC & LEGAL STUDIES, RINGIM
- BINYAMINU USMAN POLYTECHNIC, HADEJIA
EXECUTIVE SUMMARY. The second quarter report consist of two sections only, namely post contract and contracts awarded from April to June
2017. The pre-contract evaluation report has been deferred to end of year to allow maximum utilization of proffered
recommendation by government. It was observed that not all pre-contract evaluations were considered by
government as at the time of quarterly reports as such advised to be deferred to end of year report for record purposes.
In line with the provision of section 3(j) of the Jigawa State Due Process and Project Monitoring Bureau Law No 14 of
2012, ‘To provide relevant procurement and budget performance information to interested parties’ the two sections
under review in this report are as follows;
Post Contract Evaluation: - The section records both ongoing and completed projects within the reporting period
amounting to N107,610,443,508.93 only. It could be recalled that the sum of N67.486 Billion only was approved for
Capital expenditure representing 51.96% of the total approved budget this year. This figure includes only N31.636
billion for new projects while the balance of N35.850 billion for payment of on-going projects.
Contracts Awarded: - A total of 69No. Contracts were awarded under the period under review amounting to
N2,224,715,547.26 only representing 7.02% of the capital budgetary provision for new projects (N31.636 Billion). As
at Mid-year 2017 a total of 136no. contracts were awarded amounting to N3,819,362,455.49 only. This put the level
of new capital projects performance to be 12.07% of the capital provision as per documents made available to the
Bureau only.
Furthermore, it is worth noting that some contracts awarded this quarter were done through open competitive
(54.8%) and remaining through other tendering process (45.2%). It is anticipated that Ministries and Parastatals
should take note of this deficiency and improve within the next quarters to enable government achieve the anticipated
80% performance in open competitive process accordingly.
Observations: - The performance of some capital projects carried forward from the previous year and recently
awarded is not encouraging due to time lag in completion. This may be due to funding problems by the contractors
not willing to invest adequately to ensure prompt completion, despite government making timely payment on
certificates presented. Alternatively it might have arisen due to government non approval of the 30% mobilization on
new contracts which could have enhance their performances considerably, though it is not aright but a privilege. The
Ministries affected include: Health, Water Resources, Works & Transport, Education, Commerce, DCDA, Cabinet Office
and Ministry of Finance.
The level of contracts awarded through open competitive process is not encouraging within the last two quarter
(32%), which is far away from the anticipated achievement of 80% performance as per best practice. From the N3.79
billion contracts awarded only N1.22 billion was awarded by open tender process which represent 32% of the total.
Conclusion/Recommendations: - In conclusion the levels of performance of ongoing projects need to be enhanced
by all concerned to ensure that all contracts awarded were completed within reasonable period.
In addition government should consider revoking contracts delayed un-necessarily, after payment of adequate
mobilization where necessary, or charge interest on delayed completion.
Furthermore, more efforts should be made to improve the quantum of contracts awarded through open competitive
process to enable the state record 80% by the end of the year.
Finally, no contractor should be allowed to bid for any contract so long as he has not delivered on previous contract
from the preceding year.
………………………………………………… ……………………..……… Hon. Alh. Ibrahim Baba Chaichai Ado Hussaini MON Special Adviser. Director General.
PROJECTS SUMMARY SHEET
S/N Executing Agency Completed/On-going Total (N)
1 Ministry of Health 3,110,362,879.49 3,110,362,879.49 #REF!
2 Ministry of Water Resources 1,361,630,684.88 1,361,630,684.88
3 Ministry of Works & Transport 66,062,901,467.07 66,062,901,467.07
4 Min. of Education, Science & Tech. 7,283,200,405.37 7,283,200,405.37
5 Government House 178,247,520.00 178,247,520.00
6 Ministry of Land and Housing 113,697,584.82 113,697,584.82
7 Ministry of Commerce 154,041,364.69 154,041,364.69
8 Directorate of Economic Empowerment 8,566,587.15 8,566,587.15
9 Dutse Capital Development Authority 25,189,112,654.45 25,189,112,654.45
10 Cabinet Office 561,700,547.40 561,700,547.40
11 Ministry of Information 1,209,381,562.23 1,209,381,562.23
12 Ministry of Agriculture 744,887,264.60 744,887,264.60
13 Ministry of Women Affairs 244,642,000.00 244,642,000.00
14 Office of the Head of Service 932,378,354.95 932,378,354.95
15 Jigawa State Universal Basic Educ. Board 14,754,828.72 14,754,828.72
16 Ministry of Justice 51,319,674.07 51,319,674.07
17 Ministry of Finance 137,160,000.00 137,160,000.00
18 JSCI&LS Ringim 108,822,854.32 108,822,854.32
19 Binyaminu Usman Polytech. Hadejia 143,635,274.72 143,635,274.72
TOTAL 107,610,443,508.93 107,610,443,508.93
SECTION ( B )
CONTRACTS AWARDED
APRIL TO JUNE, 2017
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
WORKS
1 29/03/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project at
Yola, Masanawa, Larabar Gulai, Katanga Kudu, Dan koli and Dubal in Kiyawa Constituency. FGPC/39/2017/VOL.I/16 DE-MASTBO 3,331,430.00 Min of Water Resources 8 weeks
2 13/04/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project at
Baushe, Katanga, Tambai and Kadirawan G. Sarki in Kafin Hausa constituency FGPC/40/2017/VOL.I/19 A &T GOLOBAL 2,209,620.00 Min of Water Resources 8 weeks
3 5/4/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project at
Kwandiga, Garin Kanya, Kanya, Maina Binda, Arbu Kofar Liman, Yalleman Hausawa, Bultuwa
and Kuka Kwance in Kaugama constituency FGPC/41/2017/VOL.I/18 A &T GOLOBAL 4,419,240.00 Min of Water Resources 8 weeks
4 29/03/2017
Construction of Solar Powered Water supply schemes (Phase II) as constituency Projects at
Sabuwar Rafa (Andaza ward ) in Dutse constituency FGPC/27/2017/VOL.I/16 DE-MASTBO 6,270,000.00 Min of Water Resources 8 weeks
5 29/03/2017
Construction of Solar Powered Water supply schemes (Phase II) as constituency Projects at
Kantudu (Zango Ward ) in Gumel constituency FGPC/42/2017/VOL.I/16 JAG&H INT SVC 6,250,650.00 Min of Water Resources 8 weeks
6 4/5/2017
Construction of Water collection point Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA, Chadi,
Garko baya GSS Wunti, Bello Bayi and Bayan GSS Aminu Yusuf (Sabuwar Unguwa) in Hadejia
constituency FGPC/45/2017/VOL.I/19 ZURFAT INVT NIG LTD 9,874,848.00 Min of Water Resources 8 weeks
7 16/5/2017 Provision of additional water scheme at Mapower development Institute, Dutse FGPC/63/2017/VOL.I/5 BABAN DOKI GEN ENT 29,244,451.95 Min of Water Resources 12 weeks
8 6/6/2017 Cost Variation/Fluctuation on the improvement of Gumel Town Water supply FGPC/160/2016/VOL.I/9 MARB ENGR SVC LTD 33,651,870.00 Min of Water Resources
9 6/6/2-017 Cost Variation/Fluctuation on the improvement of BaburaTown Water supply FGPC/16/2016/VOL.I/9 PRESTIGE INT. SERVICES 23,180,335.00 Min of Water Resources
10 21/6/2017
Constr. Of 4no. Hand pumps Water supply schemes (phase II) as Constituency projects at
Kofar Gidan Liman, Bayan Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki
Constituency. FGPC/99/2017/VOL.1/5 Taqib Ventures Nig. Ltd. 2,340,000.00 Min of Water Resources 8 weeks
11 21/6/2017
Constr. Of Solar powered water supply scheme (phase II) as constituency projects at
Karkarna in Yankwashi Constituency. FGPC/97/2017/VOL.1/5 GRANATOIDS ENG SERV. 6,214,000.00 Min of Water Resources 8 weeks
12 21/6/2017
Constr. Of Solar powered water supply scheme (phase II) as constituency projects at Tattari
in Maigatari Constituency. FGPC/98/2017/VOL.1/5 Muhal Global Concept 6,074,000.00 Min of Water Resources 8 weeks
13 4/4/2017
Construction of second Phase Islamiyya Classroom block at Jabo Town in Balangu
constituency Kafin Hausa Local Government Area FGPC/51/2017/VOL.I/10 KAWU NIG LTD 2,805,718.53 Min of Education 6 weeks
14 4/4/2017 Construction of second Phase Islamiyya Classroom block at Dan Gyatin in Miga constituency FGPC/57/2017/VOL.I/9 AMIA INT NIG LTD 2,746,789.80 Min of Education 6 weeks
15 4/4/2017
Construction of second Phase Islamiyya Classroom block at Madaci Town in Kirikasamma
constituency FGPC/52/2017/VOL.I/10 ALH UMARU BABAN DOKI 2,801,000.00 Min of Education 6 weeks
16 4/4/2017
Construction of second Phase Islamiyya Classroom block at Janbulo (Arewa ward) in Kazaure
constituency FGPC/49/2017/VOL.I/10 DUTSEN TAURA 2,708,227.41 Min of Education 6 weeks
BALANCE C/F 144,122,180.69
1
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 144,122,180.69
17 20/3/2017
Construction of second Phase Islamiyya Classroom block at Addani (Gurjiya Ward) in
Yankwashi constituency FGPC/47/2017/VOL.I/8 GRANATOIDS ENGR 2,694,252.27 Min of Education 6 weeks
18 4/4/2017
Construction of second Phase Islamiyya Classroom block at Kadeta (medu) ward) in
Gagarawa constituency FGPC/56/2017/VOL.I/10 ESMAIL VEN LTD 2,728,050.34 Min of Education
19 22/05/2017
Construction of Kaugama-Turmi-Baban Tata-Dan zabiya-Gangara-Kuka kwance-Gujungu
Feeder Road (21KM) FGPC/64/2017/VOL.I/8 IGEE ENGR LTD 389,273,999.56 Min of Works 6 Month
20 4/5/2017
Approval for the payment of compensation of structures affected by the second phase of
Roni township road CONC/10/2017 46,398,285.00 Min of Works
21 10/5/2017 Compensation of Structures of those Affected by phase-one (1) of Jahun Township Roads CONC/11/2017 58,372,420.00 Min. of Land
22 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Garin Chiroma in Gagarawa consitituency. FGPC/92/2017/VOL.1/10 HARUNA LADAN INVEST. 19,285,412.31 Min of Health 16 weeks
23 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Auyakayi in Auyo consitituency. FGPC/65/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks
24 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Gangara in Gumel consitituency. FGPC/71/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,100,000.00 Min of Health 16 weeks
25 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Maraganta in Gwiwa consitituency. FGPC/72/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,253,751.00 Min of Health 16 weeks
26 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Gurarraji in Garki consitituency. FGPC/91/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,304,132.10 Min of Health 16 weeks
27 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Ba'auzini in Kazaure consitituency. FGPC/76/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,276,132.05 Min of Health 16 weeks
28 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Fake in Kiyawa consitituency. FGPC/77/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks
29 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dansure in Roni consitituency. FGPC/82/2017/VOL.1/10 DANGATA MEMORIAL 19,335,533.23 Min of Health 16 weeks
30 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Taka tsaba in Suletankarkar consitituency. FGPC/83/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,675,403.00 Min of Health 16 weeks
31 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dankari in Yankwashe consitituency. FGPC/87/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,490,741.50 Min of Health 16 weeks
32 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Baderin gabas in Hadejia consitituency. FGPC/88/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,035,479.45 Min of Health 16 weeks
BALANCE C/F 856,499,667.50
2
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 856,499,667.50
33 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Giginya in Babura consitituency. FGPC/89/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,312,904.52 Min of Health 16 weeks
34 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Sarkin baka in Kanya babba consitituency. FGPC/90/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,225,138.00 Min of Health 16 weeks
35 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Sabon garin yaya in Taura consitituency. FGPC/85/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,394,831.50 Min of Health 16 weeks
36 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Surko in Birnin kudu consitituency. FGPC/66/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,575,646.20 Min of Health 16 weeks
37 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Ruba in Kafin hausa consitituency. FGPC/79/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.00 Min of Health 16 weeks
38 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Jarmari in Kirikasamma consitituency. FGPC/78/2017/VOL.1/10 A.A MAIKATAKO 19,723,317.08 Min of Health 16 weeks
39 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Kantami in Kaugama consitituency. FGPC/75/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.08 Min of Health 16 weeks
40 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dawa in Guri consitituency. FGPC/73/2017/VOL.1/10 S.U.B. GEN VENTURES 19,253,751.00 Min of Health 16 weeks
41 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Zandam ta Gabas in Gwaram consitituency. FGPC/70/2017/VOL.1/10 S.U.B. GEN VENTURES 19,522,270.50 Min of Health 16 weeks
42 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dingiya in Fagam consitituency Gwaram Local Government Area FGPC/69/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks
43 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Falgeri in Buji consitituency. FGPC/68/2017/VOL.1/10 S.U.B. GEN VENTURES 19,435,197.06 Min of Health 16 weeks
44 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Tuminjira in Balangu constituency, Kafin Hausa Local Government Area FGPC/80/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks
45 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Fagi in Birniwa consitituency. FGPC/94/2017/VOL.1/10 S.U.B. GEN VENTURES 19,791,955.70 Min of Health 16 weeks
BALANCE C/F 1,110,229,008.74
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 1,110,229,008.74
46 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Karwai in Ringim consitituency. FGPC/84/2017/VOL.1/10 IMAM AHMAD NIG 19,666,797.24 Min of Health 16 weeks
47 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Mudiga in Miga consitituency. FGPC/81/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,329,482.25 Min of Health 16 weeks
48 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dinfiduwa in Malam Madori consitituency. FGPC/86/2017/VOL.1/10 A.G.GLOBAL GOLD 19,693,479.20 Min of Health 16 weeks
49 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Dan kumbo in Maigatari consitituency. FGPC/93/2017/VOL.1/10 IMAM AHMAD NIG 19,723,317.08 Min of Health 16 weeks
50 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Hamma yayi in Dutse consitituency. FGPC/67/2017/VOL.1/10 IMAM AHMAD NIG 19,595,410.37 Min of Health 16 weeks
51 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency project
at Idanduna in Jahun consitituency. FGPC/74/2017/VOL.1/10 IMAM AHMAD NIG 19,532,487.00 Min of Health 16 weeks
52 20/04/2017
Construction of Juvenile prison, Gate Lodg, Mosque, Classroom and perimeter wall at
Babura (Additional works) FGPC/132/2016/VOL.1/15 NAILA MULTI SERV 3,769,674.07 Min of Justice
53 31/5/2017 Construction of Juma'at Prayer Mosque at Takwardawa in Roni constituency FGPC/5/2017/VOL.1/5 NA'AYI RESOURCES 8,330,898.21 Cabinet Office 12 weeks
54 31/5/2017
Construction of the daily prayer Mosque at Adanbas,kwarin dogaji and wadugur in Ringim
Constituency FGPC/129/2016/VOL.1/6 MARB ENGR & MULT 4,749,281.16 Cabinet Office 8 weeks
GOODS
55 19/4/2017
Procurement and Apply of Termites and Bats Control Chemicals for 87no. Schools across the
State FGPC/60/2017/VOL.1/8 Ngloma Constr. Co. 12,789,000.00 Min. of Education 8 weeks
56 31/5/2017 Approval for the purchase of Grains (Maize) (650 MTS) CONC/14/2017 Juraj Gen. Entp. 99,162,000.00 Min. of Women Affairs 4 weeks
57 21/6/2017
Supply and Installation of Furniture and Electronics for the New Guest's Facilities at MDI
Dutse FGPC/95/2017/VOL.1/5 BABAN DOKI GEN. ENTP. 246,220,380.00 HOS Office 12 weeks
58 20/04/2017 Purchase of 2,000 Sets of Classroom Furniture FGPC/61/2017/VOL.I/7 FURNI-ELECT GLOBAL 30,000,000.00 Min of Education 12 weeks
59 20/04/2017 Purchase of 4,000 Sets of Classroom Furniture FGPC/62/2017/VOL.I/7 ABDUL-COM PROJECT 60,000,000.00 Min of Education 12 weeks
BALANCE C/F 1,692,791,215.32
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 1,692,791,215.32
SERVICES
60 11/4/2017
Supervision of the construction of Asphalt concrete Overlay of Tasheguwa-Guri Road
(42.14KM) FGPC/31/2013/VOL.I/38 EMACS ENG. CONSULTANT 41,228,554.70 Min of Works 12 months
61 18/05/2017
Supervision of the construction of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road (Phase II)
(37.1KM) FGPC/136/2012/VOL.I/171 HIMMA TECH SERV. 74,761,966.60 Min of Works 13 months
62 18/05/2017
Supervision of the construction of of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road (Phase
III) (44.7KM) FGPC/136/2012/VOL.I/173 HIMMA TECH SERV. 101,449,900.04 Min of Works 13 months
63 18/05/2017
Supervision of the construction of Arawa-Baturiya-Abunabo-Kadira-Guri Road (Phase III)
(33.7KM) FGPC/6/2012/VOL.I/95 LANDBASE ENG. SERV. 55,628,562.11 Min of Works 12 months
64 18/05/2017
Supervision of the construction of Andaza-Tsirma-Damutawa-Gadewa-Ajaura Road (Phase
II) (14.230KM) FGPC/51/2013/VOL.I/43 HARAD NIG LTD 29,194,382.97 Min of Works 12 months
65 11/4/2017 Supervision of the Rehabilitation of Kwanar Dundu-Bulangu Road (44KM) FGPC/59/2017/VOL.I/14 CURVES AND STR 58,048,209.43 Min of Works 14 months
66 11/4/2017
Supervision of the construction of JigawarDan-ali-Maitsamiya-Suletankarkar-Dangwanki-
Dankumbo to Matsatsagi (45KM) and construction of Kudai-Ruru-Dantawuya-Sakwaya
Feeder Road (15KM) FGPC/138/2012/VOL.I/199 UKM Civil Eng. 14,172,571.35 Min of Works 12 months
67 11/4/2017
Supervision of the construction of Gagarawa-Maisheda-Damaski Maikirabo-Madaka-Mallam
baki-Kangarwa-Bosuwa Road (SPUR from Madaka to Maikilili) (29.01KM) FGPC/139/2012/VOL.I/78 WURO ASSC ENGR & PRJ 59,790,551.40 Min of Works 14 months
68 11/4/2017
Supervision of the construction of Kila-Budinga-Rambazau-Tsangarwa-Nahuce-Isawa-Jikas-
Zandam Nagogo Road (48KM) FGPC/79/2013/VOL.I/44 WOODHILL ENGR CONSULTANTS 82,710,290.75 Min of Works 14 months
69 11/4/2017
Supervision of the construction of Shuwarin-Wurma-Abaya-Chamo-Isari Feeder Road
(28.9KM) Garki-Fagen gawo-Kore Feeder Road (30.8KM) and construction of Manga-Takwasa
road (4.5KM) FGPC/22/2011/VOL.I/89 HAG ENG. CONSULTANTS 14,939,342.59 Min of Works 12 months
TOTAL 2,224,715,547.26
SECTION ( C )
COMPLETED/ON-GOING PROJECTS
APRIL TO JUNE, 2017
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF HEALTH
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1 Constr. of New Gen. Hospital at B/Kudu Datum Constr. Limited B/kudu 1,498,970,413.02 1,498,970,413.02 422,537,711.82 19/5/2014 8 months 27 On-going
2 Cleaning Serv ices at School of Nursing B/kudu Basic Four Ltd. B/kudu 16,140,000.00 16,140,000.00 12,105,000.00 1/1/2014 56 w eeks 75 On-going
3
Commissioning/engagement as consultants for the
superv ision of construction of new general hospital at
Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 42,257,134.36 27/5/2014 10 month 57 On-going
4
5 Prov ision of Security Serv ices at College of Nursing and Kings Guard Nig. Ltd Birnin Kudu 9,248,400.00 9,248,400.00 2,312,100.00 1/6/2014 12month 25 On-going
6
Renov ation of X-Ray Block and Others at Hadejia
General Hospital
Spring Global Serv ice Hadejia 10,771,117.36 10,771,117.36 4,502,571.15 4/2/2014 2month 43 On-going
7
Constr. of Wall Fencing, Gate and House at the
Proposed Specialist Hospital, Hadejia Al-Bait Associates Hadejia 47,861,278.25 47,861,278.25 47,788,204.01 3/22/2016 4 months 100 Completed
8
Conversion of Catering Rest House to School of
Nursing, Hadejia Business Gold Ltd. Hadejia 67,757,628.62 67,757,628.62 34,157,371.29 3/22/2016 3 months 50 On-going
9
Renovation/Improvement works at Ringim General
Hospital Mashasha Invest. Ltd. Ringim 87,762,051.25 87,762,051.25 84,511,017.81 9/9/2016 20 weeks 100 Completed
10
Renovation/Improvement works at Babura
General Hospital Babandoki Gen. Entp. Babura 86,705,087.43 86,705,087.43 71,349,004.60 9/9/2016 20 weeks 78 On-going
11
Completion of 2no. Lassa wards at Ebola centre,
Dutse Rasheed Shekoni Specialist Hospital SUB General Ventures Dutse 8,415,746.33 8,415,746.33 8,313,598.29 8/10/2016 8 weeks 100 Completed
12
Renov ation/Improv ement and Water Scheme at Kafin
Hausa General Hospital. MOJAZ CONSTR. LTD K/Hausa 88,167,500.26 88,167,500.26 51,056,274.58 12/5/2016 16 w eeks 57 On-going
13
Construction of Gate And Gate House, Wall Fencing of
Student's Hostel And Landscaping At New School of NGALOMA CONSTR. LTD Hadejia 51,906,083.98 51,906,083.98 51,799,733.24 12/5/2016 16 w eeks 100 Completed
14
General Renov ation /Improv ement of Maigatari Primary
Health Care (PHC). S.U.B. GENERAL VENT. LTD Maigatari 49,170,156.46 49,170,156.46 46,590,625.25 12/5/2016 16 w eeks 72 On-going
15
General Renov ation/Improv ement w orks at Dutse
General Hospital Ummu Khulsum Global Dutse 56,668,862.45 56,668,862.45 24,133,254.04 30/12/2016 16 w eeks 42 On-going
16
General Renov ation/Improv ement w orks at Jahun
General Hospital Yanduna Ventures Jahun 62,314,663.17 62,314,663.17
21,855,135.62
30/12/2016 16 w eeks
34
On-going
17
General Renov . /Improv ement w orks at Fagam Primary
Health Care Ngaloma Const. Co. Ltd. Gw aram 64,869,057.07 64,869,057.07 34,819,043.34 30/12/2016 12 w eeks 51 On-going
18
General Renov . /Improv ement w orks at Taura Primary
Health Care Babandoki Gen. Entp. Ltd. Taura 66,748,706.88 66,748,706.88 46,679,563.15 30/12/2016 12 w eeks 66 On-going
Balance C/F 2,347,487,703.52 2,347,487,703.52
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,347,487,703.52 2,347,487,703.52
19
General Renov./Improvement of Works at Fagam
Primary Health Care Ngloma Constr. Co. Ltd. Gwaram 64,869,057.07 64,869,057.07 34,819,043.34 30/12/2016 12 weeks 51 On-going
20
General Renov./Improvement of Works at Taura
Primary Health Care Babandoki Gen. Entp. Taura 66,748,706.88 66,748,706.88 46,679,563.15 30/12/2016 12 weeks 66 On-going
21
Supply of Furniture to New School of Nursing,
Hadejia Wajabs Building & Constr. Hadejia 47,076,618.00 47,076,618.00 7/2/2017 12 weeks Just mobilized
22
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Garin
Chiroma in Gagarawa consitituency. HARUNA LADAN INVEST. Gagarawa 19,285,412.31 19,285,412.31 30/5/2017 16 weeks Just mobilized
23
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Auyakayi in Auyo consitituency. BABAN DOKI GEN. ENTP. Auyo 19,576,947.50 19,576,947.50 30/5/2017 16 weeks Just mobilized
24
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Gangara in Gumel consitituency. POLYSPEC NIG. LTD. Gumel 19,100,000.00 19,100,000.00 30/5/2017 16 weeks Just mobilized
25
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Maraganta in Gwiwa consitituency. NGALOMA CONSTR. CO. Gwiwa 19,253,751.00 19,253,751.00 30/5/2017 16 weeks Just mobilized
26
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Gurarraji in Garki consitituency. A.H.I.K. ENTP. LTD. Garki 19,304,132.10 19,304,132.10 30/5/2017 16 weeks Just mobilized
27
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Ba'auzini in Kazaure consitituency. BABAN DOKI GEN. ENTP. Kazaure 19,276,132.05 19,276,132.05 30/5/2017 16 weeks Just mobilized
28
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Fake in
Kiyawa consitituency. BABAN DOKI GEN. ENTP. Kiyawa 19,576,947.50 19,576,947.50 30/5/2017 16 weeks Just mobilized
29
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dansure in Roni consitituency. DANGATA MEMORIAL Roni 19,335,533.23 19,335,533.23 30/5/2017 16 weeks Just mobilized
30
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Taka
tsaba in Suletankarkar consitituency. POLYSPEC NIG. LTD. S/Tankarkar 19,675,403.00 19,675,403.00 30/5/2017 16 weeks Just mobilized
Balance C/F 2,700,566,344.16 2,700,566,344.16
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,700,566,344.16 2,700,566,344.16
31
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dankari in Yankwashe consitituency. BABAN DOKI GEN. ENTP. Yankwashi 19,490,741.50 19,490,741.50 30/5/2017 16 weeks Just mobilized
32
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Baderin gabas in Hadejia consitituency. NGALOMA CONSTR. CO. Hadejia 19,035,479.45 19,035,479.45 30/5/2017 16 weeks Just mobilized
33
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Giginya
in Babura consitituency. POLYSPEC NIG. LTD. Babura 19,312,904.52 19,312,904.52 30/5/2017 16 weeks Just mobilized
34
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Sarkin
baka in Kanya babba consitituency. BABAN DOKI GEN. ENTP. Babura 19,225,138.00 19,225,138.00 30/5/2017 16 weeks Just mobilized
35
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Sabon
garin yaya in Taura consitituency. A.H.I.K. ENTP. LTD. Taura 19,394,831.50 19,394,831.50 30/5/2017 16 weeks Just mobilized
36
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Surko
in Birnin kudu consitituency. A.H.I.K. ENTP. LTD. B/Kudu 19,575,646.20 19,575,646.20 30/5/2017 16 weeks Just mobilized
37
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Ruba in
Kafin hausa consitituency. S.U.B. GEN VENTURES K/Hausa 19,523,847.00 19,523,847.00 30/5/2017 16 weeks Just mobilized
38
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Jarmari
in Kirikasamma consitituency. A.A MAIKATAKO K/Kassamma 19,723,317.08 19,723,317.08 30/5/2017 16 weeks Just mobilized
39
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Kantami in Kaugama consitituency. S.U.B. GEN VENTURES Kaugama 19,523,847.08 19,523,847.08 30/5/2017 16 weeks Just mobilized
Balance C/F 2,875,372,096.49 2,875,372,096.49
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,875,372,096.49 2,875,372,096.49
40
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Dawa
in Guri consitituency. S.U.B. GEN VENTURES Guri 19,253,751.00 19,253,751.00 30/5/2017 16 weeks Just mobilized
41
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Zandam ta Gabas in Gwaram consitituency. S.U.B. GEN VENTURES Gwaram 19,522,270.50 19,522,270.50 30/5/2017 16 weeks Just mobilized
42
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Dingiya
in Fagam consitituency Gwaram Local
Government Area A.A. MAIKATAKO GEN ENT Gwaram 19,723,317.80 19,723,317.80 30/5/2017 16 weeks Just mobilized
43
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Falgeri
in Buji consitituency. S.U.B. GEN VENTURES Buji 19,435,197.06 19,435,197.06 30/5/2017 16 weeks Just mobilized
44
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Tuminjira in Balangu constituency, Kafin Hausa
Local Government Area A.A. MAIKATAKO GEN ENT K/Hausa 19,723,317.80 19,723,317.80 30/5/2017 16 weeks Just mobilized
45
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Fagi in
Birniwa consitituency. S.U.B. GEN VENTURES Birniwa 19,791,955.70 19,791,955.70 30/5/2017 16 weeks Just mobilized
46
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Karwai
in Ringim consitituency. IMAM AHMAD NIG Ringim 19,666,797.24 19,666,797.24 30/5/2017 16 weeks Just mobilized
47
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Mudiga
in Miga consitituency. A.H.I.K. ENTP. LTD. Miga 19,329,482.25 19,329,482.25 30/5/2017 16 weeks Just mobilized
48
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dinfiduwa in Malam Madori consitituency. A.G.GLOBAL GOLD M/madori 19,693,479.20 19,693,479.20 30/5/2017 16 weeks Just mobilized
49
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Dan
kumbo in Maigatari consitituency. IMAM AHMAD NIG Maigatari 19,723,317.08 19,723,317.08 30/5/2017 16 weeks Just mobilized
Balance C/F 3,071,234,982.12 3,071,234,982.12
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 3,071,234,982.12 3,071,234,982.12
50
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Hamma yayi in Dutse consitituency. IMAM AHMAD NIG Dutse 19,595,410.37 19,595,410.37 30/5/2017 16 weeks Just mobilized
51
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Idanduna in Jahun consitituency. IMAM AHMAD NIG Jahun 19,532,487.00 19,532,487.00 30/5/2017 16 weeks Just mobilized
Total 3,110,362,879.49 3,110,362,879.49
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF WATER RESOURCE
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Rehab. of Water Supply Schemes across the state at
Hadejia Zone (Water Board) Seltrix Nig. Ltd. Hadejia 76,214,488.22 76,214,488.22 52,868,287.50 9/21/2015 12 w eeks 66 Stalled
2
Rehab. of Water Supply Schemes across the state at
Gw aram Zone (Water Board) Interw orld I & E Gw aram 27,207,315.85 27,207,315.85 22,983,670.63 9/21/2015 12 w eeks 89 On-going
3 Constr. Of 40no. Hand pumps AGM & Sons Ltd. State 28,000,000.00 28,000,000.00 18,000,009.00 3/24/2014 6 months 65 On-going
4
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Sankara, Jigawa, Duzau and
Kiri Stations in Ringim zone (STOWA) MARB Eng. & Multy Serv . Ringim 22,958,250.00 22,958,250.00 4/29/2016 12 w eeks Just mobilized
5
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Balago station in Dutse zone
(STOWA) Essence Worldw ide Serv . Dutse 5,739,562.50 5,739,562.50 3,279,609.37 4/29/2016 12 w eeks 55 On-going
6
Constr. o f Solar Powered Water Supply Schemes as
Constituency Pro ject at Doko in Garki Constituency Barwa Eng. Co. Ltd. Garki 6,155,625.00 6,155,625.00 6,140,241.19 7/2/2017 8 weeks 100 Completed
7
Constr. o f Hand pumps Water Supply Schemes (phase
II) as Constituency pro jects at Ung. Gabas, Rugar M aina
Duka, Rugar Adamu Chilaro, Rugar Lamido Gardi and
Rugar Hardo Ghamma in Birniwa Constituency. Hambiscon Nig. Ltd. Birniwa 2,762,025.00 2,762,025.00 29/3/2017 8 weeks Just mobilized
8
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Idanduna, Koya, Sabon gida
and Dakayyawa stations in Jahun zone (STOWA) IMAM Ahmed Nig. Ltd. Jahun 16,237,593.74 16,237,593.74 4/29/2016 Just mobilized
9
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Kudigin, Nguwa, Likori, Musari
and Makaddari stations in Hadejia zone (STOWA) ABAT Global Inv est. Hadejia 12,877,265.61 12,877,265.61 4/29/2016 Just mobilized
10
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Ringim, Babura and Taura Stations in Ringim zone
(Water Board) Mutual Infrastructure Ringim 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed
11
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Dutse market and Mechanic village pump stations
in Dutse zone (Water Board) EAUXWELL Nig. Ltd. Dutse 7,871,850.00 7,871,850.00 497,000.00 5/18/2016 12 w eeks 100 Completed
12
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Hadejia, Kiri kasamma and Guri stations in Hadejia
zone (Water Board) EAUXWELL Nig. Ltd. Hadejia 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed
BAL. C/F 241,849,713.44 241,849,713.44
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 241,849,713.44 241,849,713.44
13
Conv.of Motorised Diesel powered water schemes to
Solar powered schemes across the state at Gumel,
Maigatari and S/Tankarkar stations in Gumel zone
(Water Board) JURAJ Gen. Entp. Ltd. Gumel 16,707,009.38 16,707,009.38 5/18/2016 8 weeks Just mobilized
14 Improvement of Kazaure town Water Supply Marb Eng. & Multy Serv ices Kazaure 131,208,239.13 163,939,534.76 110,316,638.40 7/28/2016 7 weeks 67 On-going
15
Rehab. of 4no. Water scheme at Basirka, Medu,
Hannun Giwa and Kore towns (STOWA) Laurat Global Ventures State 12,466,577.82 12,466,577.82 7,436,198.43 3/27/1900 8 weeks 57 On-going
16 Improvement of Ringim town water supply Marb Eng. & Multy Serv ices Ringim 137,576,766.21 137,576,766.21 131,746,851.39 11/23/2016 20 weeks 95 On-going
17
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Zagau in Miga Constituency LOYALTY PROPERTIES LTD Miga 6,100,700.00 6,100,700.00 6,085,448.25 11/28/2016 8 weeks 100 Completed
18
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at G/rafa in Buji Constituency LOYALTY PROPERTIES LTD Buji 6,104,700.00 6,104,700.00 6,089,438.25 11/28/2016 8 weeks 100 Completed
19 Improvement of Garki Town water supply Prestige Intergrated Serv . Garki 40,581,317.57 40,581,317.57 38,648,873.55 30/12/2016 100 Completed
20
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Sabaru in Kazaure
Constituency MARB ENG. & MULTY LTD Kazaure 6,171,900.00 6,171,900.00 6,156,470.28 11/28/2016 8 weeks 100 Completed
21
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Gwangi in Ringim
Constituency MARB ENG. & MULTY LTD Ringim 6,169,800.00 6,169,800.00 6,154,375.50 11/28/2016 8 weeks 100 Completed
22
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Diddigau in Roni Constituency MARB ENG. & MULTY LTD Roni 6,175,050.00 6,175,050.00 6,159,612.38 11/28/2016 8 weeks 100 Completed
23
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Masallachin Izala in Mallam
Madori Constituency LIMIS BRO & CO. LTD M/Madori 6,200,250.00 6,200,250.00 6,184,749.38 11/29/2016 8 weeks 100 Completed
24
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Zangon Buji in Dutse
Constituency MISTAB ENERGY INVT.LTD Dutse 6,094,200.00 6,094,200.00 6,078,964.50 11/29/2016 8 weeks 100 Completed
BAL. C/F 623,406,223.55 656,137,519.18
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 623,406,223.55 656,137,519.18
25
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kadane in Birnin Kudu
Constituency A.A. ALJAZEERA AGRO LTD B/Kudu 6,169,800.00 6,169,800.00 6,154,375.50 30/12/2016 8 w eeks 100 Completed
26
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Aduw are in Babura
Constituency M UFABAM EX CONCEPT LTD Babura 6,900,000.00 6,900,000.00 6,074,775.00 11/29/2016 8 w eeks 100 Completed
27
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Ramfa in Kafin Hausa
Constituency ADZ GLOBAL LTD K/Hausa 6,140,400.00 6,140,400.00 6,125,049.25 11/29/2016 8 w eeks 100 Completed
28
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Albashi in Kaugama
Constituency SALNAWU GLOBAL LTD Kaugama 6,129,900.00 6,129,900.00 6,114,575.25 11/29/2016 8 w eeks 100 Completed
29
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Garw a in Gw aram
Constituency A.A. ALJAZEERA AGRO LTD Gw aram 6,296,850.00 6,296,850.00 6,281,107.88 11/29/2016 8 w eeks 100 Completed
30
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kangal in Taura Constituency NUSHE BUSINESS REC. LTD Taura 6,083,699.00 6,083,699.00 6,068,490.66 11/29/2016 8 w eeks 100 Completed
31
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Akw ai ALLAH in Gagaraw a
Constituency DANM AWANKI NIG. LTD Gagaraw a 6,270,000.00 6,270,000.00 11/29/2016 8 w eeks Just mobilized
32
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kokinami in Gumel
Constituency JAG & H INTERGRATED Gumel 6,094,200.00 6,094,200.00 11/29/2016 8 w eeks Just mobilized
33
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Andaza in Kiy aw a
Constituency DEM ASTBO VENTURES LTD Kiy aw a 6,162,922.50 6,162,922.50 6,147,515.19 11/29/2016 8 w eeks 100 Completed
BAL. C/F 679,653,995.05 712,385,290.68
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 679,653,995.05 712,385,290.68
34
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Adugul, Kumo Rogo,
Dabazar Sambo, Fulanin Kankare and Daw an Dole in
Kany a Constituency Deetech NIG. LTD Babura 6,098,190.00 6,098,190.00 6,082,944.53 6/2/2017 8 w eeks 100 Completed
35
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Balew a, Kazan Kukoki,
B/Gagare, Sharbi Kununu And Agur Mezan in Kafin
Hausa Constituency ADZ GLOBAL LTD K/Hausa 2,754,150.00 2,754,150.00 2,747,264.63 11/29/2016 8 w eeks 100 Completed
36
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Maficin Sarki in Hadejia
Constituency BRIGHT STONE NIG LTD Hadejia 6,094,273.00 6,094,273.00 5,554,037.32 11/29/2016 8 w eeks 100 Completed
37
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Gunka Jahun Constituency BRIGHT STONE NIG LTD Jahun 6,094,373.00 6,094,373.00 5,554,137.06 11/29/2016 8 w eeks 100 Completed
38
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Mai-Hassan in Maigatari
Constituency BRIGHT STONE NIG LTD Maigatari 6,094,273.50 6,094,273.50 11/29/2016 8 w eeks Just mobilized
39
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Bulakuru, Hausaw a,
Danw ay re, Botai and Baradu in Dutse Constituency M ISTAB ENERGY INVT.LTD Dutse 2,731,911.00 2,731,911.00 2,725,081.22 11/29/2016 8 w eeks 100 Completed
40
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Fulanin Rafin Kany a,Fitatin
(Kw alau Ward), Gidan Nagi, Gama Kauy e And
Chukw aikw aiw a in Taura Constituency NUSHE BUSINESS REC. LTD Taura 2,780,800.00 2,780,800.00 11/29/2016 8 w eeks Just mobilized
41
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Makadi, Kay arda, Waje,
Fulanin Jarkasa And Tudun Yala Fulani in Babura
Constituency M UFABAM EX CONCEPT LTD Babura 2,562,000.00 2,562,000.00 2,293,751.25 11/29/2016 8 w eeks 100 Completed
42
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gw aram Senior Arabic
Secondry School, Salmande, Daliy a, Rambazau And
Isaw a in Gw aram Constituency A.A. ALJAZEERA AGRO LTD Gw aram 2,773,500.00 2,773,500.00 11/29/2016 8 w eeks Just mobilized
BAL. C/F 717,637,465.55 750,368,761.18
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 717,637,465.55 750,368,761.18
43
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gajigani, Gaw ajo, Kankare,
Fulanin G/Lamau And Gaban Giw a in Gagaraw a
Constituency DANM AWANKI NIG. LTD Gagaraw a 2,780,000.00 2,780,000.00 11/29/2016 8 w eeks - Just mobilized
44
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gidan Inusa M/Ruw a,Giginy a
Bakw ai, Mamuna, U/Yakubu And Kafin Alhaji in Buji
Constituency LOYALTY PROPERTIES LTD Buji 2,725,850.00 2,725,850.00 2,719,035.38 11/29/2016 8 w eeks 100 Completed
45
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tsakuw aw a, Agufa
K/Yamma, Gidan Garke Jagalari, Maduga Sabuw a and
Fidan Garba in Miga Constituency LOYALTY PROPERTIES LTD Miga 2,717,000.00 2,717,000.00 2,528,662.50 17/02/2017 8 w eeks Just mobilized
46
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Kauy en Boka, Yalaw a, Marke
U/Ganji, B/Kudu Tsohon Gari And Unity School in
Birnin Kudu Constituency BULANGU DRILLING SERVICES. B/Kudu 2,562,000.00 2,562,000.00 11/29/2016 8 w eeks 100 Completed
47
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tsima Junctiona, Tashako,
Raba, Tsima Waje And Rigar Mana'e in Kiy aw a
Constituency DEM ASTBO VENTURES LTD Kiy aw a 2,747,850.00 2,747,850.00 2,664,172.88 11/29/2016 8 w eeks 100 Completed
48
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tukuikui, Rigar Zigobiy a
(Maraba), Lafiy a Rigar Lamido Kaw u, Kury a And Garin
Kaba in Guri Constituency A.Y.H. INVT LTD Guri 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed
49
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Jama'ar Fulani, Bundu, Goran
Fulani, Tsaunin Gora And Tsakanin Roni Constituency M ARB ENG. & M ULTY LTD Roni 2,775,150.00 2,775,150.00 2,649,051.01 11/29/2016 8 w eeks 100 Completed
50
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Banbare Gidan Sallau, Ka'el
Village, Gizo Babba And Kabobi Village in Kazaure
Constituency M ARB ENG. & M ULTY LTD Kazaure 2,769,900.00 2,769,900.00 2,468,463.37 11/29/2016 8 w eeks 100 Completed
BAL. C/F 739,463,590.55 772,194,886.18
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 739,463,590.55 772,194,886.18
51
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tsamai, U/Daw a,
Kaka'akizara, Zangon Sallau Gabas And Dage in
Ringim Constituency M ARB ENG. & M ULTY LTD Ringim 2,769,285.00 2,769,285.00 2,598,273.04 11/29/2016 8 w eeks 100 Completed
52
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gaday aw a Fulanin Gabas
(Dagari), Nahuw a Fulani,Rubunji And Dan Gaw o in
Garki Constituency BARWA ENG COM P LTD Garki 2,728,425.00 2,728,425.00 2,114,440.65 11/29/2016 8 w eeks 100 Completed
53
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Diliy ari, Madaci, Jiy an, Garin
Ando in Kiri-Kasamma Constituency ALH UM ARU BABANDOKI LTD K/Kasamma 2,764,125.00 2,764,125.00 2,757,214.69 11/29/2016 8 w eeks 100 Completed
54
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gabari, Garko, Sabuw ar
unguw a, Chadi And Yay ari in Hadejia Constituency M UHAL GLOBAL CONCEPT Hadejia 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed
55
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Kanw a Maray a Gaw o,
DinzanGidan Makada, Yar Jigaw a, Kadiraw a Gidan
Fulani And Gov ernment Day Secondry School (GDSS)
Jahun in Jahun Constituency M UHAL GLOBAL CONCEPT Jahun 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed
56
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Boka Inusa Fulanin Magau,
Amanga v illage, Kabiw a v illage, Hardo Jauro Fulanin
D/Gumel and Fulanin Rambada in S/Tankarkar
Constituency UM ARCO ROOFING PROD. S/Tankarkar 2,748,375.00 2,748,375.00 2,041,412.10 11/29/2016 8 w eeks 80 On-going
57
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at U/kudu w aje Basirka,
Dikkw ana, U/Mal. Yusuf, Ganji and Gw adiko Asibiti in
Fagam Constituency RAM ADAN CONSTR. LTD Gw aram 2,773,312.50 2,773,312.50 2,766,379.22 11/29/2016 8 w eeks 100 Completed
58
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Rungo v illage in Fagam
Constituency RAM ADAN CONSTR. LTD Gw aram 6,223,350.00 6,223,350.00 6,207,791.63 20/02/2017 8 w eeks 100 Completed
59
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Garin Kosau in s/Tankarkar
Constituency UM ARCO ROOFING PROD. S/Tankarkar 6,083,699.90 6,083,699.90 11/29/2016 8 w eeks Just mobilized
60
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Ung. Malam in Yankw ashi
Constituency GRANITOID ENG. LTD. Yankw ashi 6,212,535.00 6,212,535.00 6,197,003.16 11/29/2016 8 w eeks 100 Completed
BAL. C/F 771,050,912.95 803,782,208.58
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 771,050,912.95 803,782,208.58
61
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Ganuwar Kuka, Kudigin,
Tsardawa, Tudun Gabi and Doguwar Tsamiya in Auyo
Constituency A.A. ALJAZEERA AGRO LTD Auyo 2,731,911.00 2,731,911.00 2,445,781.22 11/29/2016 8 weeks 100 Completed
62
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Falkin jalo Nasarawa, Fulanin
Kuka uku, Fulanin Liman mado, Sani Isya Primary Sch.
And Garin Kailu in Gumel Constituency JAG & H INTERGRATED Gumel 2,742,600.00 2,742,600.00 11/29/2016 8 weeks Just mobilized
63
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Luguwal, Kumo Rogo,
Dabazar Sambo, Fulanin Kankare and Dawan Dole in
Kanya Constituency Deetech NIG. LTD Babura 2,772,000.00 2,772,000.00 2,492,752.50 11/29/2016 8 weeks 100 Completed
64
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Karkarna town, Sabuwa
Fulani Gujiyar fulani, Kuda fulani and Rauda Fulani in
Yankwashi Constituency GRANITOID ENG. LTD. Yankwashi 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 weeks 100 Completed
65
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Gari Uku Fulani, Fulanin Bara
M usa, Leventis, Girdo and Garin Gabas in M alam-
M adori Constituency LIM IS BROTHERS & CO. M /madori 2,816,625.00 2,816,625.00 2,809,583.44 11/29/2016 8 weeks 100 Completed
66
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Fulanin Karanka, Fulanin
Diginsa (Rigar A lh. Isah), Fulanin Batu (Batu Yamma),
Fulanin Garagura and Fulanin Kubsa in Birniwa
Constituency Hambiscon Nig. Ltd. Birniwa 2,735,360.00 2,735,360.00 2,728,521.60 11/29/2016 8 weeks 100 Completed
67 Improvement of Babura town Water Supply Schemes Prestige Interg. Services Babura 119,811,906.43 119,811,906.43 87,704,939.63 29/12/2016 16 weeks 76 On-going
68 Improvement of Gumel town Water Supply Schemes M ARB Eng. & M ulty Gumel 179,054,167.87 179,054,167.87 29/12/2016 20 weeks 40 On-going
69
Constr. o f Hand pumps Water Supply Schemes as
Constitutuency Pro jects at Sabuwar unguwa, Kurket
G/Dabo, Roran Fulani, Daba Yamma and Kawti in Gwiwa
Constitutuency Isah Halilu Nig. Ltd. Gwiwa 2,762,025.00 2,762,025.00 2,755,119.94 1/2/2017 8 weeks 100 Completed
70
Constr. o f Hand pumps Water Supply Schemes as
Constitutuency Pro jects at Dangwabro, Gwabso,
Walawa, M alam Lawan mai Nono and Rigar Baushi in
M aigatari Constitutuency Nadada Ventures Nig. Ltd. M aigatari 2,755,800.00 2,755,800.00 2,748,910.50 1/2/2017 8 weeks 100 Completed
71
Constr. o f Solar Powered water supply scheme at
Santar Hayo in Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 6,176,625.00 6,176,625.00 6,161,183.44 1/2/2017 8 weeks 100 Completed
72
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Sabon Garin Yaya yamma,
Fitatin (Kwalau ward), Gidan Nagi, Gama Kauye and
Chukwaikwaiwa in Taura Constituency. Nushe Business Resources Taura 2,780,800.00 2,780,800.00 2,773,848.00 14/3/2017 8 weeks 100 Completed
73
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Turinjiran yamma, Fadawa
Karama, M alumawar Kiri, Shagen Gabas and M ajiya in
Bulangu Constituency. Bulangu Drilling Srvices K/hausa 2,759,500.00 2,759,500.00 2,752,601.25 9/3/2017 8 weeks 100 Completed
BAL. C/F 1,103,698,608.25 1,136,429,903.88
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 1,103,698,608.25 1,136,429,903.88
74
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Arewawa, Jaruwa, Tunfusa
Arewa, Riga and GDSS Jahun in Jahun Constituency. M uhal Global Concept Jahun 2,748,375.00 2,748,375.00 2638371.29 6/3/2017 8 weeks 100 Completed
75
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Banbare Gidan Sallau, Ka'el
village, Gumumuwa, Gizo Babba and Kabobi village in
Kazaure Constituency. M arb Eng. & M ulty Serv. Kazaure 2,769,900.00 2,769,900.00 7/3/2017 8 weeks Just mobilized
76
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Digawar Hausawa Fulani,
U/Dawa, Kaka'aiki Zara, Zangon Sallau Gabas and
M ajiyawar Kanawa in Ringim Constituency. M arb Eng. & M ulty Serv. Ringim 2,769,285.00 2,769,285.00 7/3/2017 8 weeks Just mobilized
77
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Baushina, Danya, Garin
Daudu and Unguwar Wala Shede in Kafin Hausa
Constituency. A &T Global Resources K/Hausa 2,209,620.00 2,209,620.00 2,204,095.95 29/3/2017 8 weeks 100 Completed
78
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Kwandiga, Garin Kanya,
Kanya, M aina Binda, Arbu Kofar Liman, Yalleman
Hausawa, Bultuwa and Kuka Kwance in Kaugama
Constituency. A &T Global Resources Kaugama 4,419,240.00 4,419,240.00 4,408,191.90 5/4/2017 8 weeks 100 Completed
79
Constr. o f Solar Water Supply Schemes (phase II) as
Constituency pro jects at Ruba (kafin Hausa ward) in
Kafin Hausa Constituency. A &T Global Resources K/Hausa 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed
80
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at M ajiyawa Kunama,
Layoyal, M argawa, Barebari, Jankawa, Farau and
Daguzau in Ringim Constituency. M arb Eng. & M ulti Serv. Ringim 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed
81
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Katoge, Kofar A lh. Zabgi,
Tsamiyar Ilu and Fed. Govt. Girls College (FGC)
Kazaure in Kazaure Constituency. M arb Eng. & M ulti Serv. Kazaure 2,209,620.00 2,209,620.00 29/3/2017 8 weeks 100 Completed
82
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Bosuwa Tsangaya,
Lallashi M akera, Hardo Jauro, Rugar M usa Ja'o ,
Fulanin Kankare, Hardo Gambo and Kaya Jamu in
M aigatari Constituency. M uhal Global Concept M aigatari 3,866,835.00 3,866,835.00 29/3/2017 8 weeks Just mobilized
83
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Kafi (Kanya ward) kanya
Constituency in Babura LGA. Deetech Nig. Ltd. Babura 6,075,825.00 6,075,825.00 6,060,635.43 29/3/2017 8 weeks 100 Completed
84
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at M alam M adori
(M /M adori ward) in M alam M adori Constituency. Ramadan Constr. Ltd. M /M adori 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed
85
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at M adachi (Kiri kasamma
ward) in Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 6,270,000.00 6,270,000.00 6,254,325.00 29/3/2017 8 weeks 100 Completed
86
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Sabuwar Daba (M argadu
ward) in Guri Constituency. A.Y.H. Invest. Co. Ltd. Guri 6,144,600.00 6,144,600.00 6,129,238.50 29/3/2017 8 weeks 100 Completed
87
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Kore Sabuwa (Garin
Chiroma ward) in Gagarawa Constituency. Loyalty PropertiesLtd. Babura 6,268,290.00 6,268,290.00 29/3/2017 8 weeks Just mobilized
BAL. C/F 1,165,818,333.25 1,198,549,628.88
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 1,165,818,333.25 1,198,549,628.88
88
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Wurmawa (Jahun ward) in
Jahun Constituency. Loyalty PropertiesLtd. Babura 6,268,290.00 6,268,290.00 29/3/2017 8 weeks Just mobilized
89
Constr. Of Water Collection Points (phase II) as
Constituency pro jects at Gawuna, M akara Huta, Fantai,
Bayan Vocational, Bayan Bitenary, Gagulmari, Kasuwar
Kudu, Bakin Kasuwa, Dubantu and Yankoli in Hadejia
Constituency. Zurfat Investment Ltd. Hadejia 9,874,848.00 9,874,848.00 9,874,847.85 29/3/2017 8 weeks 100 Completed
90
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Fulanin Kafa Ruwa, M ale
Fulani, Unguwar Shura, Baggade, Kankare, S/Unguwar
Hanyar Gumel, Gangara Bugaje, Unguwar Tsamiya,
M adalla, Takwasa, Jabirawa Fulani, Yantuba and
Gangara in Babura Constituency. M ufabamex Concept Ltd. Babura 7,181,265.00 7,181,265.00 7,163,311.83 29/3/2017 8 weeks 100 Completed
91
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Yosaro, Dilima/Zaramba
and M ungulo in B/Kudu Constituency. A.A. A ljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Just mobilized
92
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Gwaram, Jikas and
Dazara in Gwaram Constituency. A.A. A ljazeera Agro Properties Gwaram 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Just mobilized
93
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at M azawa Kwanar Karo in
M iga Constituency. Loyalty Properties Ltd. M iga 552,405.00 552,405.00 29/3/2017 8 weeks Just mobilized
94
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Gidan Riga, Dangolin
Kurori, M alamawa Narba, Kofar M alam Fulani and
Batsayi in Jahun Constituency. Loyalty Properties Ltd. Jahun 2,762,025.00 2,762,025.00 29/3/2017 8 weeks Just mobilized
95
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Garin Dutse in Gagarawa
Constituency. Loyalty Properties Ltd. Gagarawa 552,405.00 552,405.00 29/3/2017 8 weeks Just mobilized
96
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Rigar Hardo Shuaibu,
Rugar Yola, Rugar Gambo Baki, Nasarawa Qtrs. Rugar
Gaiye Kujuru, M ajanguwa and Zoriyo in Guri
Constituency. A.Y.H. Investment Co. Guri 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed
97
Constr. o f Hand pumps Water Supply Schemes (phase
II) as Constituency pro jects at Takaji, Yayari Yamma,
Tubali and Gorawa in Bulangu Constituency, K/Hausa
LGA. Bulangu Drilling Serv. K/Hausa 2,209,620.00 2,209,620.00 2,121,179.96 29/3/2017 8 weeks 100 Completed
BAL. C/F 1,202,400,456.25 1,235,131,751.88
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 1,202,400,456.25 1,235,131,751.88
98
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Yola, Masanawa, Larabar Gulai, Katanga Kudu,
Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Just mobilized
99
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Baushe, Katanga, Tambai and Kadirawan G.
Sarki in Kafin Hausa constituency A &T GOLOBAL K/Hausa 2,209,620.00 2,209,620.00 2,093,891.15 13/04/2017 8 weeks 100 Completed
100
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Kwandiga, Garin Kanya, Kanya, Maina Binda,
Arbu Kofar Liman, Yalleman Hausawa, Bultuwa
and Kuka Kwance in Kaugama constituency A &T GOLOBAL Kaugama 4,419,240.00 4,419,240.00 4,187,782.31 5/4/2017 8 weeks 100 Completed
101
Construction of Solar Powered Water supply
schemes (Phase II) as constituency Projects at
Sabuwar Rafa (Andaza ward ) in Dutse
constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Just mobilized
102
Construction of Solar Powered Water supply
schemes (Phase II) as constituency Projects at
Kantudu (Zango Ward ) in Gumel constituency JAG&H INT SVC Gumel 6,250,650.00 6,250,650.00 29/03/2017 8 weeks Just mobilized
103
Construction of Water collection point Makara
Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA,
Chadi, Garko baya GSS Wunti, Bello Bayi and
Bayan GSS Aminu Yusuf (Sabuwar Unguwa),
Gawuna in Hadejia constituency ZURFAT INVT NIG LTD Hadejia 9,874,848.00 9,874,848.00 9,381,105.46 4/5/2017 8 weeks 100 Completed
104
Provision of additional water scheme at
Mapower devlopment Institute, Dutse BABAN DOKI GEN ENT Dutse 29, 244, 451.95 29, 244, 451.95 27,692,031.68 16/5/2017 12 weeks 100 Completed
105
Cost Variation/Fluctuation on the improvement
of Gumel Town Water supply MARB ENGR SVC LTD Gumel 33,651,870.00 33,651,870.00 6/6/2017 On-going
106
Cost Variation/Fluctuation on the improvement
of BaburaTown Water supply PRESTIGE INT. SERVICES Babura 23,180,335.00 23,180,335.00 6/6/2-017 On-going
107
Constr. Of 4no. Hand pumps Water supply
schemes (phase II) as Constituency projects at
Kofar Gidan Liman, Bayan Gidan Sarkin Bai,
Zankuwa fulani and Sabuwar SSS in Garki
Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Just mobilized
108
Constr. Of Solar powered water supply scheme
(phase II) as constituency projects at Karkarna in
Yankwashi Constituency. GRANATOIDS ENG SERV. Yankwashi 6,214,000.00 6,214,000.00 21/6/2017 8 weeks Just mobilized
109
Constr. Of Solar powered water supply scheme
(phase II) as constituency projects at Tattari in
Maigatari Constituency. Muhal Global Concept Maigatari 6,074,000.00 6,074,000.00 5,755,874.25 21/6/2017 8 weeks 100 Completed
BAL. C/F 1,306,216,449.25 1,338,947,744.88
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 1,306,216,449.25 1,338,947,744.88
110
Constr. Of Hand Pumps Water Supply Schemes
as Constituency Projects at Falkin Jalo
Nasarawa, Fulanin Kuka Uku, Fulanin Liman
Mado, Fulanin Gangara and Fulanin Dan'ama
Gabas in Gumel Constituency. JAG & H Int. Services Gumel 2,742,600.00 2,742,600.00 997,091.03 29/8/2017 8 weeks 37 On-going
111
Constr. Of 2no. Hand pumps Water Supply
Schemes (2016) constituency project) phase II at
Feluwai and Daragi in Gwiwa Constituency . Isah Halilu Nig. Ltd. Gwiwa 1,104,810.00 1,104,810.00 1,104,810.00 25/3/2017 8 weeks 100 Completed
112
Constr. Of Complete Solar Powered Water
Supply Scheme (2016 Constituency project
phase I) at Kore-Sabuwa in Gagarawa
Constituency. Loyalty Properties Gagarawa 6,268,290.00 6,268,290.00 6,268,290.00 29/3/2017 8 weeks 100 Completed
113
Constr. Of Complete Solar Powered Water
Supply Scheme (2016 Constituency project
phase I) at Adaha in Auyo Constituency. A.A. Aljazeera Nig. Ltd. Auyo 6,298,950.00 6,298,950.00 5,856,322.50 29/11/2016 8 weeks 100 Completed
114
Constr. Of Complete Solar Powered Water
Supply Scheme (2016 Constituency project
phase I) at Wurmawa in Jahun Constituency. Loyalty Properties Jahun 6,268,290.00 6,268,290.00 6,268,290.00 29/03/2017 8 weeks 100 Completed
TOTAL 1,328,899,389.25 1,361,630,684.88
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF ENVIRONMENT
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TT OT A L P A YM EN TB A LA N C E T OST A T US
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E M A D E B Y M D A (N )C OM P L. (N ) IN %
Total
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF WORKS
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Installation of solar=pow ered to electric-pow ered street light at Ringim tow n
(Additional & rev ised scope) Saby Int. Nig Ltd Ringim 27,542,025.00 65,127,841.10 46,298,150.15 18/9/09 20 w eeks 72 Stalled
2 Constr. of Internal Road Netw ork and Drainage at College of Agriculture YamidiAmirco Univ ersal Concept Hadejia 114,852,386.25 499,296,564.31 379,082,108.24 6/10/2011 20 w eeks 76 Stalled
3
Consultancy serv ices for the Constr. of Limaw a-Warw ade-Jidaw a-
Sakw ay a-Dutse road KAP Civ il Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 On-going
4 Urban Tow ns Streetlight projects in B/kudu tow n (phase II) Stratrade Nig. Ltd. B/kudu 220,682,574.00 346,239,918.06 204,531,293.26 14/9/2012 7 months 59 Stalled
5 Constr. of Limaw a-Warw ade-Jidaw a-Sakw ay a-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,555,913,169.46 2/11/2012 14 months 86 On-going
6 Consultancy Superv ision for the Constr. of Sukullufi-Aujara roads Himma Tech. Serv ices Jahun 73,320,508.60 73,320,508.60 73,319,457.65 31/12/2012 18 months 100 Completed
7 Reconstr. Of Asphaltic concrete ov erlay of Kijaw al-Dabi road (4.5km) Triacta Nig. Ltd. Taura 453,412,679.27 526,840,847.35 318,255,144.90 18/3/2013 3 months 62 Stalled
8 Urban Tow ns Streetlight Projects at Karkarna Tow n Stratrade Nig. LTD Yankw ashi 234,338,917.73 234,338,917.73 150,598,245.00 11/11/2013 6 Months 67 Stalled
9 Urban Tow ns Streetlighting Project at M/madori Tow n Dutsen Taura Nig. LTD M/madori 280,310,404.50 280,310,404.50 233,111,157.13 11/11/2013 9 Months 83 On-going
10 Construction of Bamaina-zazika-Nasaru Road CGC Nig LTD B/kudu 1,095,894,699.37 1,587,928,133.36 1,482,146,810.82 2/13/2014 8 Months 93 On-going
11 Consultancy Serv ices for eastern by e pass (phase II) Landbase Eng. K/Kassamma 71,638,976.48 71,638,976.48 65,153,250.54 29/8/13 12 w eeks 100 Completed
12
Commissioning as Consultant on the superv ision of the Constr. of Maigatari-
Galadi-Karmashe-Karanka-Diginsa-Bursali-Kubsa-Birniw a road (114.6km)
(phase I) Himma Tech. Serv ices Maigatari 61,679,332.66 61,679,332.66 61,125,520.26 11/22/2013 16 months 100 Completed
13
Commissioning as Consultant on the Superv ision of the Constr. of Bamaina-
Zazika road Medal Civ il Eng. Consultants B/kudu 40,843,641.73 40,843,641.73 32,329,959.62 2/13/2014 10 months 83 On-going
14
Commissioning as Consultant on the Superv ision of the Urban Tow n
Streetlight Project at Auy o, M/Madori, K/Kasamma and 9No. General
Hospitals BOK Eng. Ltd. K/Kassamma 39,390,940.95 39,390,940.95 36,275,436.18 23/04/2014 93 stalled
15
Commissioning as Consultant on the superv ision of the Urban Tow n
Streetlight Project at Garki, Karkarna, Bamaina and 3no. Gen. Hosp. MBS Eng. Nig. Ltd. Garki 29,431,500.00 29,431,500.00 27,371,295.00 23/4/2014 93 stalled
16
Commissioning as Consultant on the superv ision of the Constr. of Andaza-
Tsirma-Gadiw a road spur from Fed. Road -Magama (phase 1) 45.73km Harad Nig. Ltd. Kiy aw a 55,376,646.51 55,376,646.51 53,868,283.74 5/22/2015 16 months 100 Completed
17
Constr. of Ky arama-Gasakole-Dadin Kow a-Danmakeri-Kasuw ar Dadi-
Sankara-Amaguw a-Tofa-Kagadama road (Spur from Ky arama to Shengel)
(29.95km) Geraw a Global Ringim 3,807,576,470.00 4,354,463,034.37 4,291,665,717.15 12/16/2014 18 months 100 Completed
18
Constr. of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road & Spur from
Fed. Road-Damutaw a-Magama (45.73km) (phase I) Alren Constr. Co. Kiy aw a 3,861,309,347.91 3,861,309,347.91 3,855,875,910.04 1/19/2015 14 months 100 Completed
Balance C/F 13,493,700,536.09 15,153,636,040.75
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Balance B/F 13,493,700,536.09 15,153,636,040.75
19
Letter of Commissioning/Engagement as Consultant for the Superv ision of
the Constr. of Ky arama-Kagadama road (spur from Ky arama-Shengel)
(29.95km) Himma Technical Serv ices Ringim 67,480,973.28 67,480,973.28 65,747,897.30 1/23/2015 18 months 100 Completed
20
Letter of Commisioning as Consultant on the Superv ision of the Constr. of
Roni-Mahuta-Bushe-Kay a-Tsakani-Gangare-Amary aw a-Mamudaw a-
Jigaw a-Gora-Gada road (49.19km) (phase II) UKM Civ il Eng. Roni 42,996,221.19 42,996,221.19 40,788,772.50 11/22/2015 18 months 100 Completed
21 Urban Tow ns Streetlighting Project at Garki Tow n Saby Int. Project LTD Garki 205,950,996.00 205,950,996.00 169,980,153.52 13/11/2013 8 Months 100 Completed
22
Commissioning as Consultant for the Superv ision of the Constr. of Gumel-
G/Gambo, feeder roads, M/madori-Dakido, Shafar-G/sani OPIQ Consultant LTD. Gumel 16,024,856.75 16,024,856.75 11,662,644.84 3/3/2014 6month 68 On-going
23 Constr. of feeder road at gumel-Garin Gambo in Gumel L.G.A. Omega Stars Nig. Ltd. Gumel 149,763,131.44 149,763,131.44 57,038,525.00 13/02/2014 6 months 38 On-going
24 Constr. of Feeder road at Shafar-G/Sani-Daguzau in Ringim L.G.A. Yanduna v entures Ringim 326,872,816.20 326,872,816.20 193,177,687.50 17/02/2014 8 months 59 On-going
25 Consulltancy serv ices for the Constr. Of Kiy ako-Zarenaw a feeder road UKM Civ il Eng. Consultant Babura 16,187,482.45 16,187,482.45 11,636,138.15 2/2/2014 8 months 65 On-going
26 Consultancy serv ices for the constr. Of T/kance-jamus feeder road UKM Civ il Eng. Consultant Babura 21,657,808.87 21,657,808.87 - 2/8/2014 8 Months 60 On-going
27
Commisioning as consultant on the superv ision of the construction of 6No.
New feeder road projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going
28 Consultancy Superv ision for the Constr. of Gw iw a tow nship roads (4.0km) Sadiq Eng. Serv ices Gw iw a 34,489,165.99 34,489,165.99 31,495,251.31 12/17/2012 6 months 95 Stalled
29
Commissioning as consultant for the superv ision of Kazaure urban centre
(15KM) Wuro Associate Kazaure 92,141,988.97 92,141,988.97 46,958,833.21 5/9/2013 8 months 50 On-going
30 Construction of Tow nship at kaugama Urban Centre (6.30KM) Rocad Contr. LTD Kaugama 940,127,208.47 940,127,208.47 263,578,988.93 13/12/2013 8 Months 28 Stalled
31 Constr. of Tow nship Roads at Hadejia Urban Centre (12.80KM) Paache Const. Nig. LTD Hadejia 2,507,773,876.62 2,507,773,876.62 638,756,078.97 12/31/2013 12 months 25 On-going
32 Constr. of Tow nship Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 573,354,694.50 17/12/2013 8 Months 52 On-going
33 Constr. of Tow nship Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 472,112,216.62 17/12/2013 8 Months 32 On-going
34
Commissioning as Consultant on the Superv ision of the Constr. of Maigatari
Tow nship Road (6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 50,331,569.40 19/12/2013 8 Months 78 On-going
35
Commissioning as Consultant on the Superv ision of the Constr. of M/Madori
tow nship Road (6.40KM) U.K.M Civ il Eng. LTD M/madori 59,544,758.06 59,544,758.06 31,791,306.24 12/31/2013 8 Months 52 On-going
36
Commissioning as Consultant on the Constr. Of Roni tow nship roads
(5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 27,018,070.64 12/31/2013 8 Months 44 On-going
Balance C/F 20,523,255,141.67 22,183,390,646.33
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Balance B/F 20,523,255,141.67 22,183,390,646.33
37 Commissioning as Consultant for the Constr. of K/Hausa Tow nship roads KAP Civ il Eng. K/Hausa 63,152,695.50 63,152,695.50 41,296,785.71 1/16/2012 12 months 65 On-going
38 Commissioning as Consultant for the Constr. of Hadejia Tow nship roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 54,834,008.43 12/31/2013 16 months 53 On-going
39
Commissioning as Consultant for the Constr. of Sule Tankarkar Tow nship
roads Thamar Eng. Ltd. S/tankarkar 64,638,503.00 64,638,503.00 29,476,602.25 13/02/2014 12 months 45 On-going
40 Commissioning as Consultant for the Constr. of Kaugama Tow nship roads Interactiv e Consultants Kaugama 66,347,751.06 66,347,751.06 35,628,154.55 12/31/2013 12 months 56 Stalled
41 Commissioning as Consultant for the Constr. of Guri Tow nship roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 39,738,362.77 12/3/2013 12 months 60 On-going
42
Fabrication and Erection of roads directional signs (Gantry ) and street
naming w ithin DutseMunicipality Durability Eng. Serv ices Dutse 90,081,840.00 90,081,840.00 77,618,236.51 18/3/2014 12 w eeks 87 Stalled
43 Construction of Gw iw a tow nship roads (4.0km) H & M Nig. Ltd. Gw iw a 509,414,865.75 509,414,865.75 412,393,839.50 29/11/2012 6 months 88 Stalled
44 Re-Constr. of Kafin Hausa Tow nship road (6.30km) Afdin Constr. Co. Ltd. K/Hausa 1,093,411,074.76 874,515,259.90 844,809,210.00 4/4/2016 8 months 96 On-going
45 Re-Constr. of Sule Tankarkar Tow nship road (5.16km) Afdin Constr. Co. Ltd. S/tankarkar 727,649,360.56 727,649,360.56 283,127,303.72 4/4/2016 8 months 33 On-going
46 Re-Constr. of Roni Tow nship road (5.00km) Alren Constr. Co. Ltd. Roni 645,608,565.02 645,608,565.02 52,456,972.31 4/4/2016 8 months 8 On-going
47 Re-Constr. of Kazaure Tow nship road (14.643km) Soject Nig. Ltd. Kazaure 2,090,736,236.34 2,090,736,236.34 61,957,476.25 4/4/2016 8 months 3 On-going
48 Re-Constr. of M/madori Tow nship road (6.41km) Triacta Nig. Ltd. M/madori 854,197,382.18 854,197,382.18 4/4/2016 8 months 5 On-going
49
Supply and Installation of 150 units of Standalone Solar streetlight poles w ith
Accessories at Gujungu tow n Marb Eng. & Multy Serv ices Taura 68,307,366.49 68,307,366.49 18,329,062.50 7/29/2016 2 w eeks 28 On-going
50 Constr. of Roni-Amary aw a-Gada (phase II) Alren Constr. Co. Ltd. Kazaure 2,396,820,976.20 2,396,820,976.20 2,395,491,359.90 11/22/2013 24 months 100 Completed
51
Constr. of Gagaraw a-Maisheda-Damaski Maikirabo-Madaka-Mallam Baki-
Kangarw a-Bosuw a road (Spur from Madaka to Maikilili) (29.01km) Gerawa Global Eng. Ltd. Gagaraw a 3,416,602,936.95 3,416,602,936.95 2,346,139,205.86 28/12/2016 14 months 68 On-going
52
Constr. of Kila-Budinga-Rambazau-Tsangarw a-Nahuci-Isaw a-Maruta-Jikas-
Zandam Nagogo road (48km) Gerawa Global Eng. Ltd. Gw aram 4,726,302,328.50 4,726,302,328.50 1,237,673,010.00 28/12/2016 19 months 26 On-going
53 Constr. of Asphalt concrete ov erlay of Tasheguw a-Guri road (42.14km) CGC Nigeria Ltd. Guri 2,355,917,411.62 2,355,917,411.62 572,707,647.00 30/12/2016 15 months 23 On-going
54 Rehab. of Kw anar Dundu-Bulangu road (44km) Alren Constr. Co. Ltd. K/Hausa 3,317,040,538.87 3,317,040,538.87 28/12/2016 14 months Just mobilized
55 Constr. of Dolen Kw ana-Batu-Kuka Inkiw a-Kupsa feeder road (32.6km) SDY Constr. Co. Ltd. Birniw a 579,242,475.00 579,242,475.00 28/12/2016 18 months Just mobilized
Balance C/F 43,756,710,691.53 45,197,950,381.33
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Balance B/F 43,756,710,691.53 45,197,950,381.33
56
Constr. of Jigaw ar Dan Ali-Maitsamiy a-S/tankarkar-Dangw anki-Dankumbo
Feeder road w ith Sur from Dankumbo to Matsatsagi (45km) H & M Nig. Ltd. S/tankarkar 639,156,955.50 639,156,955.50 28/12/2016 9 months Just mobilized
57
Constr. of Majingini-Maimazari-Dantuw o -Hannun Giw a-Dankumbo feeder
road (11.5km) H & M Nig. Ltd. S/tankarkar 188,786,408.33 188,786,408.33 28/12/2016 6 months Just mobilized
58 Construction of Manga-Takw asa road (4.5km) Feeder road Yanduna Ventures Nig. Ltd. S/tankarkar 64,396,253.25 64,396,253.25 46,298,264.25 28/12/2016 5 months 70 On-going
59 Constr. of Shuw arin-Wurma-Abay a-Chamo-Isari feeder road (28.9km) Ganan Constr. Co. Ltd. Dutse 379,249,085.25 379,249,085.25 86,251,412.10 28/12/2016 12 months 22 On-going
60 Constr. of Garki-Fagen Gaw o-Kore feeder road (30.8km) Ganan Constr. Co. Ltd. Garki 410,031,381.00 410,031,381.00 17,016,300.00 28/12/2016 14 months 2 On-going
61 Constr. of Kudai-Ruru-Dantaw uy a-Sakw ay a feeder road (15km) NHD Interbiz Pro jects Dutse 170,704,264.51 170,704,264.51 78,888,609.55 28/12/2016 9 months 45 On-going
62 Constr. Of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road (phase II) Alren Construction Co. Ltd. Jahun 1,858,611,617.41 1,858,611,617.41 1,162,036,163.09 19/10/2016 14 months 62 On-going
63
Constr. Of Maigatari-Galadi-Girbobo-Bursali-Diginsa-Birniw a road (phase II)
(37.1km) Triacta Nig. Ltd. Kaugama 4,746,791,530.21 4,746,791,530.21 1,361,094,108.15 24/08/2016 15 months 28 On-going
64
Constr. of Estern by e-pass road, Araw a-Kubay au-Masama-Gafta-Baturiy a-
Una(Spur to Yalw a-Musari)-Chacharan-Abunabo-Chapchapno-Lafiy a-Kadira-
Arinjasko-Matara-Abir-Guri road (phase II) (36km) CGC Nigeria Ltd. Kiri kasamma 3,918,044,342.91 3,918,044,342.91 3,888,415,559.18 5/4/2013 14 months 100 Completed
65
Constr. of Estern by e-pass road, Araw a-Kubay au-Masama-Gafta-Baturiy a-
Una(Spur to Yalw a-Musari)-Chacharan-Abunabo-Chapchapno-Lafiy a-Kadira-
Arinjasko-Matara-Abir-Guri road (phase III) (33.7km) CGC Nigeria Ltd. Guri 3,739,735,268.18 3,739,735,268.18 724,820,022.28 20/12/2016 14 months 19 On-going
66
Consultant for valuation of the State Govt.'s Investment in Electricity
Distribution network (PHCN) Emirate Consulting Ltd. State 125,000,000.00 125,000,000.00 62,500,000.00 19/6/2013 12 months 50 Stalled
67 Cons. of Handpumps Across the State (RUWASA) Muhabib Nig. Ltd State 28,000,000.00 28,000,000.00 26,000,013.06 3/1/2014 4month 93 Stalled
68 Electrification of Shakoto-Bulangu (REB) Aima Strong Store Ltd. K/hausa 36,199,059.19 36,199,059.19 29,923,001.66 2/19/2014 6 months 89 Stalled
69 Construction of Jahun Township Road (Phase II) Triacta Nigeria Ltd. Jahun 940,044,254.63 940,044,254.63 28/12/2016 8 months On-going
70
Constr. Of 2-SPAN Bridge as Change of Scope from 2No. 3-Cells box
culverts on Gwaram-Basirka road. Alren Constr. Co. Ltd. Gwaram 292,696,945.76 292,696,945.76 292,621,229.25 1/3/2017 6 months 100 Completed
71
Supply and Installation of Stand-Alone Solar Streetlight Poles with
Accessories (100 units) at Kanya Babba in Babura LGA. (change of
scope) SIMS Global Resoures Babura 63,283,500.00 63,283,500.00 48,678,000.00 6/3/2017 12 weeks 76 On-going
72
Supply and Installation of Stand-Alone Solar Streetlight Poles with
Accessories (100 units) along Old Police H/qtrs. To Garu road at
Dutse LGA. (change of scope) SIMS Global Resoures Dutse 63,283,500.00 63,283,500.00 53,047,826.08 6/3/2017 12 weeks 84 On-going
Balance C/F 61,420,725,057.66 62,861,964,747.46
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 61,420,725,057.66 62,861,964,747.46
73
Construction of Kaugama-Turmi-Baban Tata-Dan zabiya-Gangara-
Kuka kwance-Gujungu Feeder Road (21KM) IGEE ENGR LTD Kaugama 389,273,999.56 389,273,999.56 22/05/2017 6 Month Just mobilized
74
Approval for the payment of compensation of structures affected
by the second phase of Roni township road Roni 46,398,285.00 46,398,285.00 4/5/2017 Just mobilized
75
Supervision of the construction of Asphalt concrete Overlay of
Tasheguwa-Guri Road (42.14KM) EMACS ENG. CONSULTANT Guri 41,228,554.70 41,228,554.70 12,368,566.41 11/4/2017 12 months 29 On-going
76
Supervision of the construction of Maigatari-Galadi-Girbobo-
Diginsa-Birniwa Road (Phase II) (37.1KM) HIMMA TECH SERV. Birniwa 74,761,966.60 74,761,966.60 26,166,688.31 18/05/2017 13 months 35 On-going
77
Supervision of the construction of of Maigatari-Galadi-Girbobo-
Diginsa-Birniwa Road (Phase III) (44.7KM) HIMMA TECH SERV. Maigatari 101,449,900.04 101,449,900.04 18/05/2017 13 months Just mobilized
78
Supervision of the construction of Arawa-Baturiya-Abunabo-Kadira-
Guri Road (Phase III) (33.7KM) LANDBASE ENG. SERV. Guri 55,628,562.11 55,628,562.11 18/05/2017 12 months Just mobilized
79
Supervision of the construction of Andaza-Tsirma-Damutawa-
Gadewa-Ajaura Road (Phase II) (14.230KM) HARAD NIG LTD Jahun 29,194,382.97 29,194,382.97 17,516,630.02 18/05/2017 12 months 59 On-going
80
Supervision of the Rehabilitation of Kwanar Dundu-Bulangu Road
(44KM) CURVES AND STR K/Hausa 58,048,209.43 58,048,209.43 11,611,741.89 11/4/2017 14 months 20 On-going
81
Supervision of the construction of JigawarDan-ali-Maitsamiya-
Suletankarkar-Dangwanki-Dankumbo to Matsatsagi (45KM) and
construction of Kudai-Ruru-Dantawuya-Sakwaya Feeder Road
(15KM) UKM Civil Eng.
S/tankarkar +
Dutse 14,172,571.35 14,172,571.35 3,914,873.81 11/4/2017 12 months 35 On-going
82
Supervision of the construction of Gagarawa-Maisheda-Damaski
Maikirabo-Madaka-Mallam baki-Kangarwa-Bosuwa Road (SPUR
from Madaka to Maikilili) (29.01KM) WURO ASSC ENGR & PRJ Gagarawa 59,790,551.40 59,790,551.40 20,929,842.99 11/4/2017 14 months 34 On-going
83
Supervision of the construction of Kila-Budinga-Rambazau-
Tsangarwa-Nahuce-Isawa-Jikas-Zandam Nagogo Road (48KM) WOODHILL ENGR CONSULTANTS Gwaram 82,710,290.75 82,710,290.75 28,948,601.76 11/4/2017 14 months 35 On-going
84
Supervision of the construction of Shuwarin-Wurma-Abaya-Chamo-
Isari Feeder Road (28.9KM) Garki-Fagen gawo-Kore Feeder Road
(30.8KM) and construction of Manga-Takwasa road (4.5KM) HAG ENG. CONSULTANTS Garki 14,939,342.59 14,939,342.59 11/4/2017 12 months Just mobilized
85
Rehab. and Reconnection of Taura-Gujungu-Ajaura and Chuwasu-
Chakwaikwaiwa ITC Lines Al-majeed Constr. Co. Taura 29,567,211.07 29,567,211.07 16,676,798.67 3/3/2017 3 months 59 On-going
86
Consultancy services for the Constr. Of babaldu-Wurno-Jangargari-Buji-
Falgeri-Sagu road Wuro Associates Buji 55,961,055.70 55,961,055.70 55,959,750.00 2/12/2012 24 months 100 Completed
87 Consultancy services for the Constr. o f Gwaram township road Himma Tech. Services Gwaram 57,075,600.00 57,075,600.00 57,033,860.84 17/12/2012 12 months 100 Completed
88 Constr. o f Kazaure township road Soject Nig. Ltd. Kazaure 2,090,736,236.34 2,090,736,236.34 59,280,852.81 31/12/2013 12 months 3 On-going
TOTAL 64,621,661,777.27 66,062,901,467.07
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF EDUCATION
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
1
Establishment of 81 Nomadic Adult Literacy Centres in Collaboration with the
Agency for Mass Education Agency for Mass Education Various Schools 10,878,300.00 10,878,300.00 10,878,300.00 27/10/2011 On-going
2
Procurement of 2-sets of Sporting facilities at Bamaina Talented & Gifted School,
B/kudu L.G.A. BM Inv est. Nig. Ltd. B/kudu 36,030,000.00 36,030,000.00 31,987,558.79 16/8/2012 12 weeks 85 On-going
3 Supply of Classrooms, Staff Houses & Office Equip. to JICORAS A. Barde Global Concept. K/hausa 33,143,878.07 33,143,878.07 24,952,793.85 13/12/2012 3 weeks 75 On-going
4 Supply of Library books to JICORAS Al-kassam Jannah K/Hausa 30,785,750.00 30,785,750.00 28,526,075.95 2/5/2013 8 weeks 92 On-going
5 Constr. works at JICORAS (phase II) Datum Constr. Co. K/Hausa 1,677,895,165.73 1,677,895,165.73 1,367,787,139.21 30/8/13 18 weeks 82 On-going
6
Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No
Blocks 240 Capacity Students Hostels and Construction of Road Network Culvert
and Drainages at Jigawa State University Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,574,587,179.00 655,575,251.99 28/11/2013 6 Months 25 On-going
7 Construction of Senate Building at Jigawa State University , K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,698,949,299.60 1,160,524,220.10 24/7/2014 10 months 68 On-going
8 Construction of Vice Chancellor's lodge at Jigawa State University , K/Hausa A.G Ferrero K/Hausa 128,891,563.50 128,891,563.50 110,649,790.12 1/8/2014 9 months 85 On-going
9
Supply and Installation of 5HP Pumps at BEC Camp For the use of State
University Modang Inv estment Nig. Ltd Auyo 2,436,750.00 2,436,750.00 623,000.00 23 On-going
10 Furnishing of Academic and Admin. Block at Jigawa State University , K/Hausa Interior Wood Works K/Hausa 105,927,097.50 105,927,097.50 105,927,097.50 17/10/2014 4months 100 Completed
11
Commissioning as Consultant for the Designing and Superv ision of (phase II) for the
constr.of Jigawa State University , K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 107,283,361.53 12/18/2014 18months 67 On-going
12
Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5)
weeks E-learning Programme Activ ities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled
13
Constr. of Islamiyya classroom Blocks at Garki Cikin Gari and Kangari (Kargo
ward) in Garki Constituency MMZ Garki Constr. Ltd. Garki 5,606,595.50 5,606,595.50 5,606,595.50 29/12/2016 6 weeks 100 Completed
14
Constr. of Islamiyya classroom Blocks at Hammado Between G/Kailu and Garin-
Baki in Gumel Constituency JAG & H INT Gumel 5,575,714.53 5,575,714.53 29/12/2016 6 weeks Just mobilized
15
Constr. of Islamiyya classroom Blocks at Kagadama (Tofa ward) and J/Kadaje
(Ringim Ward) in Ringim Constituency MARB ENG.& MULT LTD. Ringim 5,385,740.22 5,385,740.22 5385740.22 29/12/2016 6 weeks 100 Completed
BAL. C/F 6,509,107,215.43 6,509,107,215.43
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 6,509,107,215.43 6,509,107,215.43
16
Constr. of Islamiy y a classrooms Blocks at Tigima and Safa-Karama in Auy o
Constituency A.A. ALJAZEERA AGRO Babura 5,797,788.48 5,797,788.48 5,797,788.48 29/12/2016 6 w eeks 100 Completed
17
Constr. of Islamiy y a classrooms Blocks atYakana (Kanba Ward) and Z/Mundi
(Gasakoli Ward) in Kany a Babba Constituency Babubra Local Gov t Area DEETECH NIG LTD Kany a babba 5,299,652.82 5,299,652.82 29/12/2016 6 w eeks Just mobilized
18
Constr. of Islamiy y a classrooms Blocks at Kw agga and Dandi in Kazaure
Constituency DEETECH NIG LTD Kazaure 5,416,454.82 5,416,454.82 5,416,454.40 29/12/2016 6 w eeks 100 Completed
19
Constr. of Islamiy y a classrooms Blocks at Medu and Kany u in Gagaraw a
Constituency M ODANG INVT LTD Gagaraw a 5,456,100.68 5,456,100.68 5,456,100.68 29/12/2016 6 w eeks 100 Completed
20
Constr. of Islamiy y a classrooms Blocks at Daragi/D. Sarki and Marganta in Gw iw a
Constituency ISA HALILUNIG LTD Gw iw a 5,590,792.62 5,590,792.62 5,590,792.62 29/12/2016 6 w eeks 100 Completed
21
Constr. of Islamiy y a classrooms Blocks at Hadejia Cikin Gari in Hadejia
Constituency UBJ NIG LTD Hadejia 5,579,391.68 5,579,391.68 5,579,391.67 29/12/2016 6 w eeks 100 Completed
22
Constr. of Islamiy y a classroom Blocks at Kaigamari and Malamaw ar Tudu in
Bulungu Constituency Kafin Hausa Local Gov t Area KAWU NIG LTD K/Hausa 5,613,437.06 5,613,437.06 5,613,437.06 29/12/2016 6 w eeks 100 Completed
23
Constr. of Islamiy y a classroom Blocks at Mairakumi Kashindula and Gandun Sarki
in Malam Madori Constituency AZZIDS NIG ENT LTD M/Madori 5,570,739.68 5,570,739.68 29/12/2016 6 w eeks Just mobilized
24
Contract. of Islamiy y a classroom Blocks at Ban'iy aka and Mamudaw a in Roni
Constituency UM AR ALIYU & SONGS LTD Roni 5,291,539.60 5,291,539.60 5,291,539.60 29/12/2016 6 w eeks 100 Completed
25
Constr. of 2NO. Block of Six Seater Pit Latrine and Renov ation of Students Hostel at
GGSS Sule Tankarkar. STEP BY STEP INT LTD S/tankarkar 17,374,267.13 17,374,267.13 16,607,953.08 30/12/2016 8 w eeks 100 Completed
26 Renov ation of classroom Block at GGASS Danzomo YAYARIN TUKUR NIG LTD Gagaraw a 16,329,231.83 16,329,231.83 30/12/2016 8 w eeks Just mobilized
27
Renov ation of 3NO.Junior Staff Quarters, Galadima 1 & 2 and Senior Staff Quarters
Block at at GGASS Danzomo KAFIYAM A GEN ENT LTD Gagaraw a 15,527,082.00 15,527,082.00 5,019,115.63 30/12/2016 8 w eeks 32 On-going
28 Renov ation of classroom Blocks at GGASS Babura. WAJAB BUILDING & CONSTR. Babura 14,637,375.54 14,637,375.54 30/12/2016 8 w eeks Just mobilized
29 Renov ation of 13NO. Students Hostel at GGASS Babura BABANDOKI GEN ENT LTD Babura 32,055,802.60 32,055,802.60 30,524,201.65 30/12/2016 7 w eeks 100 Completed
30 Renov ation of 5NO. Staff Quarters at GGASS Babura BABANDOKI GEN ENT LTD Babura 37,105,584.99 37,105,584.99 36,534,123.05 30/12/2016 7 w eeks 100 Completed
31 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (A) M OJAZ CONSTR LTD Gagaraw a 20,644,859.82 20,644,859.82 13,540,082.45 30/12/2016 7 w eeks 65 On-going
32 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (B) M OJAZ CONSTR LTD Gagaraw a 20,644,859.82 20,644,859.82 13,540,082.45 30/12/2016 8 w eeks 65 On-going
33 Construction of 2NO. Block of Six Seater Pit Latrineat GUSS Malam Madori. HARUNA LADAN INVT M/madori 3,721,904.40 3,721,904.40 3,552,740.48 30/12/2016 12 w eeks 100 Completed
34 Construction of 1NO.Students Hostel at GUSS Aujara M ODANG INVT LTD Jahun 25,625,472.89 25,625,472.89 25,602,883.22 30/12/2016 8 w eeks 100 Completed
BAL. C/F 6,733,042,176.60 6,733,042,176.60
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 6,733,042,176.60 6,733,042,176.60
35 Contract For the Construction of 2NO. Block of 3-Classroom at GGUSS Kazaure NABCOM TECH NIG LTD Kazaure 15,483,179.18 15,483,179.18 30/12/2016 8 w eeks Just mobilized
36 Constr. Of Line Drainage at GUSS Malam Madori HARUNA LADAN INVT M/madori 13,249,740.69 13,249,740.69 12,681,057.13 30/12/2016 8 w eeks 100 Completed
37 Renov ation of Senior Staff Quarters at Gov t Girls Arabic Secondary School Babura. A.H.F. GLOBAL NIG LTD Babura. 36,842,654.55 36,842,654.55 36,704,498.23 30/12/2016 8 w eeks 100 Completed
38 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (A) HARUNA LADAN INVT M/madori 25,625,472.89 25,625,472.89 8,956,610.52 30/12/2016 12 w eeks 35 On-going
39 Constr. of 1NO. Students Hostel at GUSS Malam Madori (B) HARUNA LADAN INVT M/madori 25,625,472.89 25,625,472.89 8,956,610.52 30/12/2016 12 w eeks 35 On-going
40 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (C ) HARUNA LADAN INVT M/madori 25,625,472.89 25,625,472.89 8,956,610.52 30/12/2016 12 w eeks 35 On-going
41
Contract For the Renov ation of Admin Block, ICT, Biology Lab and Toilets at GSS
Aujara M ODANG INVT LTD Jahun 7,538,982.10 7,538,982.10 30/12/2016 8 w eeks Just mobilized
42 Constr. Of Students Hostel at GUSS Malam Madori (D) HARUNA LADAN INVT M/madori 25,625,472.89 25,625,472.89 30/12/2016 8 w eeks Just mobilized
43
Contract For the Renov ation of Students Hostel at Gov t Girls Unity Secondry School
Kazaure AL-HAM SAD INVT LTD Kazaure 11,391,437.71 11,391,437.71 30/12/2016 7 w eeks Just mobilized
44
Constr. Of 2-Block of Six Saeter Pit Latrine and Renov ation of Dutse House at Gov t
Girls Unity Secondry School Kazaure. M UTAL INFRASTRUCTURE LTD Kazaure 9,039,611.35 9,039,611.35 30/12/2016 8 w eeks Just mobilized
45 Constr. of 1no. Students Hostel at Gov t Girls Unity Secondry School Kazaure AL-HAM SAD INVT LTD Kazaure 25,625,472.75 25,625,472.75 30/12/2016 8 w eeks Just mobilized
46 Renov ation of Students Hostel at Gov t Girls U nity Secondry School Kazaure M UTAL INFRASTRUCTURE LTD Kazaure 14,804,448.60 14,804,448.60 30/12/2016 7 w eeks Just mobilized
47 Constr. Of 5NO. Block of Six Seater pit Latrine at GUSS Malam Madori M .I. JAHUN COM M & GEN ENT M/madori 9,304,761.00 9,304,761.00 9,113,376.20 30/12/2016 12 w eeks 100 Completed
48 General Renov ation of 3NO. Classroom Blocks at GGASS Danzomo ALLAH ABIN DOGARA ENT Gagaraw a 11,940,648.89 11,940,648.89 11,906,824.19 30/12/2016 8 w eeks 100 Completed
49 Renov ation of Senior StaffQUARTERS at GGASS Danzomo UM AR ALIYU & SONGS LTD Gagaraw a 8,986,440.89 8,986,440.89 8,595,000.62 30/12/2016 7 w eeks 100 Completed
50 Renov ation of 6no. Students Hostels at GGASS Danzomo AL-SAHIH GEN ENT LTD Gagaraw a 14,586,233.24 14,586,233.24 14,548,234.14 30/12/2016 8 w eeks 100 Completed
51
Constr. of Islamiy y a classroom Blocks at J/w aw u and S/gari malanta in
Kirikasamma Constituency Alh. Umaru Babandoki K/kassamma 5,811,197.99 5,811,197.99 5,811,197.99 29/12/2016 6 w eeks 100 Completed
52
Constr. of Islamiy y a classroom Blocks at Gany aw a (Majiy aw a w ard) and Kauy an
Mata (Kw alam w ard) in Taura Constituency Abugani Gen. Invest. Taura 4,994,767.54 4,994,767.54 4,994,767.15 29/12/2016 6 w eeks 100 Completed
53
Constr. of Islamiy y a classroom Blocks at Zandam ta Gabas and Gw aram k/Gabas
in Gw aram Constituency Nushe Business Res. Gw aram 5,011,526.08 5,011,526.08 5,011,526.08 29/12/2016 6 w eeks 100 Completed
54
Constr. of Islamiy y a classroom Blocks at Sule-tankarkar cikin gari and Takatsaba in
S/tankarkar Constituency Nushe Business Res. S/tankarkar 5,592,369.88 5,592,369.88 5,592,369.69 29/12/2016 6 w eeks 100 Completed
55
Constr. of Islamiy y a classroom Blocks at B/k gari and Kantoga in B/kudu
Constituency Nushe Business Res. B/kudu 5,592,369.68 5,592,369.68 5,592,369.69 29/12/2016 6 w eeks 100 Completed
56
Supply of 1020NO. 3-Seater Desks and Benches to Some Boarding Senior
Secondary Schools Across the State. NADAK IND LTD Across the state 15,311,704.50 15,311,704.50 15,311,704.50 30/12/2016 3 w eeks 100 Completed
BAL. C/F 7,056,651,614.78 7,056,651,614.78
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 7,056,651,614.78 7,056,651,614.78
57
Supply of 760NO. Double bunk Bed to Some Boarding Senior Secondary Schools
Across the State. AL-HAM SAD INVT LTD Across the state 21,683,457.78 21,683,457.78 30/12/2016 3 w eeks Just mobilized
58
Constr. of Islamiy y a classroom Blocks at Karkarna and Yankw ashi Cikin Gari in
Yankw ashi Constituency . Granitoids Eng. Serv ices Ltd. Yankw ashi 5,811,197.99 5,811,197.99 29/12/2016 6 w eeks Just mobilized
59
Constr. of Islamiy y a classroom Blocks at Basirka fada and Basirka Wudilaw a in
Fagam Constituency , Gw aram LGA Ramadan Constr. Limited Gw aram 5,540,390.40 5,540,390.40 5,540,390.40 29/12/2016 6 w eeks 100 Completed
60
Constr. of Islamiy y a classroom Blocks atAndaza gabas and Markiba in Kiy aw a
Constituency . Damastbo Ventures Ltd. Kiy aw a 5,597,930.52 5,597,930.52 5597930.52 29/12/2016 6 w eeks 100 Completed
61 Constr. of 1no. Block of 10-rooms student's Hostel w ith 100 Beds at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 29,145,079.84 29,145,079.84 11,251,599.16 30/12/2016 6 w eeks 38 On-going
62 Constr. of 1no. Block of 3-classrooms w ith 90no. 3-seater Desks. at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 10,013,817.79 10,013,817.79 4,995,211.40 30/12/2016 6 w eeks 49 On-going
63 Constr. of 1no. Block of w orkshop w ith Standard w ork benchs at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 18,564,893.17 18,564,893.17 13,651,194.30 30/12/2016 6 w eeks 73 On-going
64 Constr. of 1no. Block of tw o (2) Science Laboratories at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 28,487,680.00 28,487,680.00 14,554,973.87 30/12/2016 6 w eeks 51 On-going
65
Constr. of Islamiy y a classroom Blocks at Majjanna/Diginsa w ard and Kakori/Birniw a
w ard in Birniw a Constituency . Gidan Adede Gen. Entp. Ltd. Birniw a 5,449,021.81 5,449,021.81 15/02/2017 6 w eeks Just mobilized
66
Constr. of Islamiy y a classroom Blocks at Tsakuw aw a and Gululu in Miga
Constituency . Loy alty Properties Ltd. Miga 5,493,579.61 5,493,579.61 5,493,579.60 29/12/2016 6 w eeks 100 Completed
67
Constr. of Islamiy y a classroom Blocks at Achau B/titi and Farfada Village in Jahun
Constituency . Loy alty Properties Ltd. Jahun 5,604,756.94 5,604,756.94 5,604,756.94 29/12/2016 6 w eeks 100 Completed
68
Constr. of Islamiy y a classroom Blocks at Dutse Dubeni (Madobi w ard) and Sabuw ar
Takur in Dutse Constituency . Al-kasam Jannah Nig. Ltd. Dutse 5,551,958.00 5,551,958.00 5,551,958.00 29/12/2016 6 w eeks 100 Completed
69
Constr. of Islamiyya Classroom Blocks at Tsakuwawa and Gululu in Miga
Constituency Loyalty Properties Ltd. Miga 5,493,579.61 5,493,579.61 29/12/2016 6 weeks Just mobilized
70
Constr. of Islamiyya Classroom Blocks at Achau B/titi and Farfada village in
Jahun Constituency Loyalty Properties Ltd. Jahun 5,604,756.94 5,604,756.94 29/12/2016 6 weeks Just mobilized
71
Constr. of Islamiyya Classroom Blocks at Dutse Dubeni (Madobi ward) and
Sabuwar Takur in Dutse Constituency Al-kasam Jannah Dutse 5,551,958.00 5,551,958.00 5,551,958.11 29/12/2016 6 weeks 100 Completed
72
Constr. of Islamiyya Classroom Blocks at Shabarawa (Fulata ward) and
Tsirya (Madana ward) in Maigatari Constituency Muhabib Nig. Ltd. Maigatari 5,592,369.68 5,592,369.68 29/12/2016 6 weeks Just mobilized
73
Constr. of Second phase Islamiyya Classroom blocks at Fanisau (Karnaya
ward) and Gofai (Limawa ward) in Dutse Constituency Al-kasam Jannah Dutse 5,551,958.00 5,551,958.00 20/3/2017 6 weeks Just mobilized
74
Constr. of Second phase Islamiyya Classroom block at Dangyatin in Miga
Constituency AMIA Integrated Serv. Miga 2,746,789.80 2,746,789.80 2,746,789.80 20/3/2017 6 weeks 100 Completed
75
Constr. of Second phase Islamiyya Classroom blocks at Kukuma Kofar
Yamma and Gubabbiya (Madabe ward) in Buji Constituency Loyalty Properties Ltd. Buji 5,449,021.80 5,449,021.80 20/3/2017 6 weeks Just mobilized
76
Constr. of Second phase Islamiyya Classroom blocks at Gidan Kanawa
(Kanya ward) in Kanya Babba Constituency in Babura LGA. Detech Nigeria Ltd. Babura 2,649,826.41 2,649,826.41 2,649,826.41 20/3/2017 6 weeks 100 Completed
BAL. C/F 7,225,838,042.86 7,225,838,042.86
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 7,225,838,042.86 7,225,838,042.86
77
Constr. of Second phase Islamiyya Classroom blocks at Jabo town in
Bulangu in Constituency in K/Hausa LGA. Kawu Nigeria Ltd. K/Hausa 2,805,718.53 2,805,718.53 2,805,718.53 4/4/2017 6 weeks 100 Completed
78
Constr. of Second phase Islamiyya Classroom blocks at Janbulo (Arewa
ward) in Kazaure Constituency Dutse Taura Constr. Co. Kazaure 2,708,227.41 2,708,227.41 20/3/2017 6 weeks Just mobilized
79
Constr. of Second phase Islamiyya Classroom blocks at Kadeta (Medu
ward) in Gagarawa Constituency. Esmail Ventures Ltd. Gagarawa 2,728,050.34 2,728,050.34 4/4/2017 6 weeks Just mobilized
80
Constr. of Second phase Islamiyya Classroom blocks at Guntai ward in
Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 2,795,396.31 2,795,396.31 2,795,369.31 4/4/2017 6 weeks 100 Completed
81
Constr. of Second phase Islamiyya Classroom block at Madaci town in
Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 2,801,000.00 2,801,000.00 2,801,000.00 20/3/2017 6 weeks 100 Completed
82
Constr. of Second phase Islamiyya Classroom blocks at Agamo (Gamawa
Juwai ward) in Auyo Constituency. A.A. Aljazeera Agro Properties Auyo 2,898,894.24 2,898,894.24 2,898,872.19 4/4/2017 6 weeks 100 Completed
83
Constr. of Second phase Islamiyya Classroom block at Jahun town behind
police stationin Jahun Constituency. Loyalty Properties Ltd. Jahun 2,800,000.00 2,800,000.00 2,800,000.00 20/3/2017 6 weeks 100 Completed
84
Construction of second Phase Islamiyya Classroom block at Jabo Town in
Balangu constituency Kafin Hausa Local Government Area KAWU NIG LTD K/Hausa 2,805,718.53 2,805,718.53 4/4/2017 6 weeks Just mobilized
85
Construction of second Phase Islamiyya Classroom block at Dan Gyatin in
Miga constituency AMIA INT NIG LTD Miga 2,746,789.80 2,746,789.80 4/4/2017 6 weeks Just mobilized
86
Construction of second Phase Islamiyya Classroom block at Madaci Town
in Kirikasamma constituency ALH UMARU BABAN DOKI K/Kasamma 2,801,000.00 2,801,000.00 4/4/2017 6 weeks Just mobilized
87
Construction of second Phase Islamiyya Classroom block at Addani
(Gurjiya Ward) in Yankwashi constituency GRANATOIDS ENGR Yankwashi 2,694,252.27 2,694,252.27 20/3/2017 6 weeks Just mobilized
88
Construction of second Phase Islamiyya Classroom block at Kadeta (medu)
ward) in Gagarawa constituency ESMAIL VEN LTD Gagarawa 2,728,050.34 2,728,050.34 4/4/2017 Just mobilized
89
Procurement and Apply of Termites and Bats Control Chemicals for 87no.
Schools across the State Ngloma Constr. Co. Across the state 12,789,000.00 12,789,000.00 8,967,000.00 19/4/2017 8 weeks 70 On-going
90 Purchase of 2,000 Sets of Classroom Furniture FURNI-ELECT GLOBAL Across the state 30,000,000.00 30,000,000.00 30,000,000.00 20/04/2017 12 weeks 100 Completed
91 Purchase of 4,000 Sets of Classroom Furniture ABDUL-COM PROJECT Across the state 60,000,000.00 60,000,000.00 60,000,000.00 20/04/2017 12 weeks 100 Completed
92
Constr of Islamiyya Classroom at Andaza and Markiba in Kiyawa
Constituency Damastbo Ventures Ltd. Kiyawa 5,597,930.52 5,597,930.52 5,597,930.52 29/12/2016 6 months 100 Completed
93
Constr of second phase Islamiyya classroom block at Janbulo (Arewa
ward) in kazaure constituency. Dutsen Taura Nig. Ltd. Kazaure 2,708,227.41 2,708,227.41 2,708,227.41 22/03/2017 6 months 100 Completed
94
Constr of Islamiyya classroom blocks at Gudduba (Kukuma ward) and Tijiyo
(Tijiyo ward) in Buji constituency Loyalty Properties Buji 5,449,021.80 5,449,021.80 5,449,021.80 29/12/2016 6 weeks 100 Completed
BAL. C/F 7,271,940,140.63 7,271,940,140.63
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 7,271,940,140.63 7,271,940,140.63
96
Constr of Islamiyya classroom blocks at Kadira cikin gari and Adiyani in
Guri constituency Limis Brothers & Co. Guri 5,871,760.20 5,871,760.20 5,871,760.20 12/1/2017 8 weeks 100 Completed
97
Constr of Islamiyya classroom blocks at Karkarna and Yankwashi cikin gari
in Yankwashi Constituency Grantoids Yankwashi 5,388,504.54 5,388,504.54 5,388,504.54 12/1/2017 8 weeks 100 Completed
TOTAL 7,283,200,405.37 7,283,200,405.37
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
GOVT. HOUSE
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Purchase of 2no. 2015 Toyota Camry, 1no. 2013 Toyota Prado and
1no. 2015 Toyota Landcruiser Al-hamsad Investment Dutse 85,847,520.00 85,847,520.00 85,847,520.00 13/04/2017 3 weeks 100 Completed
2 Purchase of 7no. Brandnew Toyota Camry (2015 model) Al-hamsad Investment Dutse 92,400,000.00 92,400,000.00 92,400,000.00 2/2/2017 3 weeks 100 Completed
Total 178,247,520.00 178,247,520.00
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF LAND & HOUSING
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr. of Official Residence of the Secretary to the State Government
(SSG) at Dutse Sahal-Bin Nig. Ltd. Dutse 55,984,869.84 55,984,869.84 32,408,641.09 11/23/2016 16 weeks 58 On-going
2
Constr. of Official Residence of the Head of Civ il Serv ice (HOS) at
Dutse Design Three Sixty Ltd. Dutse 57,712,714.98 57,712,714.98 25,961,356.14 11/23/2016 16 weeks 45 On-going
TOTAL 113,697,584.82 113,697,584.82
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF CEMMERCE
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1 Constr. of (3.5km) Culv erts & Drainage at Sara Market Beefar Constr. Nig. Ltd. Gw aram 76,329,801.45 76,329,801.45 59,864,067.40 22/11/2012 3 months 78 Stalled
2 Ex tension of road w orks at Maigatari Border Free Zone Beefar Constr. Nig. Ltd. Maigatari 37,677,600.00 37,677,600.00 11,259,724.00 11/12/2012 20 w eeks 30 Stalled
3
Consultancy services for the Constr. of
Drainages at Sara, Maigatari + Gujungu
markets Stirling Dev. Ltd. State 19,140,670.57 19,140,670.57 16,621,973.19 14/10/12 6 months 90 Stalled
4
Consultancy services for the Cons. Of Culvert
and Drainages at Hadejia, Kumsa and Furji
Market Yaqin Associate Ltd state 20,893,292.67 20,893,292.67 14,973,371.88 26/6/2014 6month 71 Stalled
Total 154,041,364.69 154,041,364.69
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
DIRECTORATE OF ECONOMIC EMPOWERMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Renovation work at National Youth Development Centre
Gwaram LGA FAR Tech Fabrication Gwaram 8,566,587.15 8,566,587.15 8,473,518.67 27/01/2017 8 weeks 100 Completed
Total 8,566,587.15 8,566,587.15
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
DCDA
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr. of New High Brow lay out in Dutse Dantata & Saw oe Dutse 3,822,690,275.89 5,073,417,718.02 4,577,814,987.09 14/10/2011 48 w eeks 83 Stalled
2 Constr. of Dutse tow nship road (15 & 20) Dantata & Saw oe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 w eeks 73 Stalled
3
Prov ision & Installation of Streetlights at the 3 Arms zone, Ibrahim Aliy u
Eastern By e-pass and Old Police Hqrs. To Gadadin-Fanisau Link road,
Dutse. Dantata & Saw oe Dutse 1,064,545,077.91 1,267,613,083.02 1,058,862,394.59 8/11/2012 12 w eeks 95 Stalled
4 Rehab. Of Dutse Tow nship road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled
5 Rehab. Of Dutse Tow nship road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled
6 Re-dualisation of Old Police H/qtrs-Gadadin road (2.55km) Dantata & Saw oe Dutse 1,487,873,351.19 1,487,873,351.19 646,282,346.61 11/4/2013 6 months 41.37 Stalled
7 Dualisation of Ibrahim Aliy u road (Dutse Eastern By e-pass) (5.65km) Dantata & Saw oe Dutse 2,861,812,037.79 3,160,794,816.68 1,106,644,353.04 11/4/2013 9 months 35 On-going
8
Consultant on the superv ision for the Constr. of New Airport (project
Dutse (phase 1B) El-Mansur Atelier Co. Dutse 457,296,050.38 457,296,050.38 457,274,905.85 17/6/2013 12 months 100 Completed
9 Constr. of 30No. Houses for Lagislators Afdin Constr. Co. Ltd. Dutse 1,682,137,080.00 1,995,675,982.50 1,585,338,898.82 19/8/13 14 month 76 Stalled
10
Consultant for the Constr. Of 30N0. Houses for Jigaw a State members of
the House of Assembly at Disina HAG Eng. Nig. Limited Dutse 131,922,214.60 147,301,384.74 140,671,347.56 11/7/2012 14 months 91 Stalled
11
Constr. Of Streetlights on Dutse township roads (17.576KM) phase I
& II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled
12
Constr. Of Access road (1.92KM) at the New House of Assembly
Members Qtrs. Disina, Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled
13 Constr. Of River Re- Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 558,276,899.20 26/9/2013 6 months 24 Stalled
14
Landscaping and External works at new Jigawa State
Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled
15
Supply and Installation of Fire Tender Trucks, Scanning Machine,
Check- in counters and Baggage handling Systems and Airfield
Lighting at new Dutse Int. Airport Afdin Constr. Nig. Ltd. Dutse 2,680,358,940.00 2,680,358,940.00 2,588,230,062.42 4/6/1900 4weeks 92 Ongoing
16
Letter of Commissioning as Consultant for the superv ision of the Dutse
International Airport project Phase 1c (Additional w orks) El-Mansur Atelier Co. Dutse 124,304,403.67 124,304,403.67 123,180,403.67 2/3/2015 12 months 99 On-going
17 Renov ation of His Ex cellency , the Deputy Gov ernor's Official Residence Edil Belmote Eng. Dutse 58,955,481.16 71,431,449.86 71,032,258.80 12/31/2015 12 w eeks 100 Completed
18 Constr. of 20no. Ultra Modern Market Stalls w ithin Dutse Metropolitain Sahal-Bin Nig. Ltd. Dutse 16,515,760.00 16,515,760.00 9,991,548.00 4/27/2016 12 w eeks 100 Completed
Balnnce C/F 2 1,5 0 8 ,3 0 4 ,4 4 2 .6 1 2 5 ,114 ,6 6 9 ,9 6 4 .4 5
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
BALANCE B/F 21,508,304,442.61 25,114,669,964.45
19
Procurement and Fixing of Furniture to Deputy Governor's
Residential complex, Dutse Connaught Internation Serv. Dutse 74,442,690.00 74,442,690.00 74,442,690.00 4/1/2017 4 weeks 100 Completed
TOTAL 21,582,747,132.61 25,189,112,654.45
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
CABINET OFFICE
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Upgrading and Renov ation of Jigaw a State Gov ernor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 57,143,166.20 5/11/2013 9 Months 46 On-going
2
Commissioning as Consultant on the Superv ision of the Upgrading and
Renov . of Gov ernor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going
3 Consultancy for the Upgrading og Gov ernor's Lodge Abuja Design+ Consultant LTD Abuja 4,182,711.59 4,182,711.59 3,395,808.47 22/10/12 4 w eeks 100 Completed
4
Constr. of Daily pray er mosque at Kaigari, Safa Babba and Jamaru Kuka in
Auy o Constituency A.A. ALJAZEERA AGRO LTD Auy o 4,648,363.00 4,648,363.00 4,512,974.60 12/15/2016 6 w eeks 100 Completed
5
Constr. of Daily pray er mosque at Fulanin G/Ganta, Kaga Fulani and
Hammadi in Babura Constituency M UFABAM EX CONCEPT LTD Babura 4,767,336.90 4,767,336.90 4,628,482.43 12/15/2016 6 w eeks 100 Completed
6
Constr. of Daily pray er mosque at Aja (Doraw a w ard), Adugul and Kany a
(Kany a w ard) in Kany a Constituency Babura Local Gov t. Area Deetech NIG. LTD Babura 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed
7
Constr. of Daily pray er mosque at Gallu, Tsamiy ar Ilu, and Walaw al in
Kazaure Constituency Deetech NIG. LTD Kazaure 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed
8
Constr. of Daily pray er mosque at Birnin Kudu Gari, Gangare and Ukadale
in Birnin Kudu Constituency NUSHE BUSINESS REC. LTD B/Kudu 4,515,216.00 4,515,216.00 4,405,334.85 12/15/2016 6 w eeks 100 Completed
9
Constr. of Daily pray er mosque at B/Gida Nahuce, Sara and Budinga in
Gw aram Constituency NUSHE BUSINESS REC. LTD Gw aram 4,707,981.00 4,707,981.00 4,593,406.39 12/15/2016 6 w eeks 100 Completed
10
Constr. of Daily pray er mosque at Madaw aki, Danzomo Gari and D/tuw o
gari in Sule Tankarkar Constituency NUSHE BUSINESS REC. LTDS/Tankarkar 4,712,464.77 4,712,464.77 12/15/2016 6 w eeks Just mobilized
11
Constr. of Daily pray er mosque at Kumdum, Rabadi and Galambi in Fagam
Constituency Gw aram LGA RAM ADAN CONSTR. LTD Gw aram 4,682,437.00 4,682,437.00 3,030,704.14 12/15/2016 6 w eeks 70 On-going
12
Constr. of Daily pray er mosque at Z/Kay a, Tsubut and Guntai in Gw iw a
Constituency ISA HALILU NIG. LTD. Gw iw a 4,749,281.07 4,749,281.07 4,611,265.97 12/15/2016 6 w eeks 100 Completed
13
Constr. of Daily pray er mosque at Garin Urema and Hadejia Cikin Gari in
Hadejia Constituency A.A. M AIKATAKO GEN. ENTP. Hadejia 4,335,919.41 4,335,919.41 4,209,630.48 12/15/2016 6 w eeks 100 Completed
14
Constr. of Daily pray er mosque at Kiri-Kasamma Gari, Tasheguw a and
Matafari in Kiri-Kasamma Constituency ALH. UM ARU BABANDOKI K/Kasamma 4,749,185.55 4,749,185.55 4,749,185.56 12/15/2016 6 w eeks 100 Completed
BAL. C/F 189,287,822.10 189,287,822.10
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
BAL. B/F 189,287,822.10 189,287,822.10
15
Constr. of Daily pray er mosque at Auroi, Kocoro and Dadada in Bulangu
Constituency K/Hausa LGA KAWU NIG. LTD. K/Hausa 4,722,180.75 4,722,180.75 4,584,641.50 12/15/2016 6 w eeks 100 Completed
16
Constr. of Daily pray er mosque at Kachakama, Maw adaci and Bura Musa
in Malam Madori Constituency AZZIDS NIG. ENTP. Malam Madori 4,937,867.34 4,937,867.34 4,794,045.95 12/15/2016 6 w eeks 100 Completed
17
Constr. of Daily pray er mosque at Tsamai, Kuka mai Ruw a and Tsufut in
Ringim Constituency M ARB ENG. & M ULTY LTD Ringim 4,749,281.16 4,749,281.16 12/15/2016 6 w eeks Just mobilized
18
Constr. of Daily pray er mosque at Katirje (L/kudu), K/Ug. Labiru (Buji) and
Azanaba in Buji Constituency LOYALTY PROPERTIES Buji 4,728,500.19 4,728,500.19 4,590,776.92 15/12/2016 6 w eeks 100 Completed
19
Constr. of Daily pray er mosque at g/Duka, Jarkuka and M/kara Gadaw a in
Jahun Constituency LOYALTY PROPERTIES Jahun 4,728,500.25 4,728,500.25 4,590,776.92 15/12/2016 6 w eeks 100 Completed
20
Constr. of Daily pray er mosque at Duja, Hamdu and Jamaga in Miga
Constituency LOYALTY PROPERTIES Miga 4,728,500.22 4,728,500.22 4,590,776.92 15/12/2016 6 w eeks 100 Completed
21
Constr. of Daily pray er mosque at Kiry a, Kupsa and Maiso in Birniw a
Constituency Gidan Adede Gen. Entp. Birniw a 4,728,500.19 4,728,500.19 4,590,776.92 15/12/2016 6 w eeks 100 Completed
22
Constr. of Daily pray er mosque at F/Dtse, Tisa and Duru Gari in Dutse
Constituency Al-kasam Jannah Nig. Ltd. Dutse 4,729,572.75 4,729,572.75 4,591,818.79 15/12/2016 6 w eeks 100 Completed
23
Constr. of Daily pray er mosque at Gusau, F/Duhuw a (G/barka) and Garin
Kailu in Gumel Constituency Jag & H Integrated Services Gumel 4,749,185.75 4,749,185.75 15/12/2016 6 w eeks Just mobilized
24
Constr. of Daily pray er mosque at Lafiy a tow n, Daw a tow n and Yalw a
(Musari w ard) in Guri Constituency LIM IS BROTHERS & CO. Guri 4,649,045.19 4,649,045.19 4,513,636.05 15/12/2016 6 w eeks 100 Completed
25
Constr. of Daily pray er mosque at Wadda, Habatsai and Kore Baletu in
Gagaraw a Constituency Esma'il Ventures Ltd. Gagaraw a 4,763,193.00 4,763,193.00 4,615,483.95 15/12/2016 6 w eeks 100 Completed
26
Constr. of Daily pray er mosque at Andaza Arew a, Dangoli and Tsirma in
Kiy aw a Constituency Damastbo Ventures Kiy aw a 4,749,281.34 4,749,281.34 4,610,949.60 15/12/2016 6 w eeks 100 Completed
27
Constr. of Daily pray er mosque at Luda, Dage and Bundu in Roni
Constituency Umar Aliyu & Sons Roni 4,895,934.60 4,895,934.60 4,789,571.85 15/12/2016 6 w eeks 100 Completed
28
Constr. of Daily pray er mosque at Tsadaw a, Fulanin Takai and Walaw a in
Taura Constituency Sadiya and Aisha Invest. Taura 4,738,563.72 4,738,563.72 4,600,547.28 15/12/2016 6 w eeks 100 Completed
29
Constr. of Daily pray er mosque at Mahuta, Kore S/Unguw a and Kunduge
(Maku w ard) in Garki Constituency M M Z Garki Constr. Ltd. Garki 4,747,748.22 4,747,748.22 4,627,353.40 15/12/2016 6 w eeks 100 Completed
BAL. C/F 260,633,676.77 260,633,676.77
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
BAL. B/F 260,633,676.77 260,633,676.77
30
Constr. of Daily pray er mosque at G/Babale, G/Jibo and Rangy ana in
Kaugama Constituency Lungun Fulani Nig. Ltd. Kaugama 4,648,363.83 4,648,363.83 4,512,974.60 15/12/2016 6 w eeks 100 Completed
31
Constr. of Daily pray er mosque at Maruka, Fanisau and Katanga in
K/Hausa Constituency Lungun Fulani Nig. Ltd. K/Hausa 4,625,561.40 4,625,561.40 4,512,914.91 15/12/2016 6 w eeks 100 Completed
32
Constr. of Daily pray er mosque at Farare, Burji and Kuda w aka in
Yankw ashi Constituency Granito ids Eng. Services Yankw ashi 4,749,281.10 4,749,281.10 15/12/2016 6 w eeks Just mobilized
33 Constr. of Daily pray er mosque at Fanisau in K/Hausa Constituency Nabakwai Gen. Entp. Kazaure 1,580,000.00 1,580,000.00 29/12/2016 6 w eeks Just mobilized
34
Constr. of Daily pray er mosques at Kanti/Dodary a/Gallu and Dabaza/Kacika
in Kazaure Constituency Dutsen Taura Kazaure 4,757,193.00 4,757,193.00 4,615,483.95 29/12/2016 6 w eeks 100 Completed
35
Constr. of Daily pray er mosques at Birnin-Kudu tow n opp. Farouk Adamu
Aliy u House, Wurno, Kumbura, Jikaina and Kauy en Maharba in Birnin-Kudu
Constituency Nushe Business Res. Birnin-Kudu 7,903,655.00 7,903,655.00 7,673,451.82 29/12/2016 6 w eeks 100 Completed
36
Constr. of Daily pray er mosques at Chakw aikw aiw a Ward/Sarkakiy a and
Renov . Of Kay ar Gazara v illage Juma'at mosque in Taura Constituency Nushe Business Res. Taura 1,800,730.00 1,800,730.00 1,533,515.76 29/12/2016 6 w eeks 100 Completed
37
Constr. of Daily pray er mosques atGw aram/Bakin kasuw a, Zandam
Nagogo/Sabuw ar Gw aram, Kila/Jugw a, Sara/Sakuw a and
Tsangarw a/Ranbazau in Gw aram Constituency Nushe Business Res. Gw aram 7,928,655.00 7,928,655.00 7,928,655.00 29/12/2016 6 w eeks 100 Completed
38 Supply of Furnitures and Kitchen w ards at Gov ernor's Lodge Abuja Gridarch Nigeria Ltd. Abuja 30,131,230.50 30,131,230.50 12/8/2016 4 w eeks Just mobilized
39
Constr. of Daily Pray er Mosques at Madobi w ard/Baranda and Jigaw a
Tsada w ard/Dantaw uy a in Dutse Constituency . Al-Kassam Jannah Nig. Ltd. Dutse 3,171,462.00 3,171,462.00 3,076,988.25 29/12/2016 6 w eeks 100 Completed
40
Constr. of Daily Pray er Mosques at Maw a/Kafur, Unguw ar Gabas/Ay an,
Ay ama, Afiy au/Tsidir and Renov . Of Dabulari mosque in Auy o Al-jazeera Agro-processing Ltd. Auy o 7,200,000.00 7,200,000.00 7,019,481.00 29/12/2016 6 w eeks 100 Completed
41
Constr. of Daily Pray er Mosques at Idanduna w ard/Walaw a in Jahun
Constituency . Loyalty Properties Ltd. Jahun 1,560,000.00 1,560,000.00 1,514,563.11 29/12/2016 6 w eeks 100 Completed
BAL. C/F 340,689,808.60 340,689,808.60
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
BAL. B/F 340,689,808.60 340,689,808.60
42
Constr. of Daily Pray er Mosques at Fegi Gantsa, Falgeri and Dakaw a in
Buji Constituency . Loyalty Properties Ltd. Buji 4,385,000.00 4,385,000.00 4,272,673.71 29/12/2016 6 w eeks 100 Completed
43
Constr. of Daily Pray er Mosques at Matamu w ard/Chilinfitari, Machinamari
w ard/Kupsa, Kazura w ard/Adamri and Karanga w ard/Kilbu in Birniw a
Constituency . Loyalty Properties Ltd. Birniw a 6,354,924.00 6,354,924.00 6,169,827.04 29/12/2016 6 w eeks 100 Completed
44
Constr. of Daily Pray er Mosques at Garbo w ard/Garbo in Miga
Constituency . AM IA Integrated Services Ltd. Miga 1,585,731.00 1,585,731.00 1,538,494.65 29/12/2016 6 w eeks 100 Completed
45
Constr. of Daily Pray er Mosques at Chiromaw a/y alo in Kaugama
Constituency . Lungun Fulani Nigeria Ltd. Kaugama 1,585,731.00 1,585,731.00 1,538,494.65 29/12/2016 6 w eeks 100 Completed
46
Constr. of Daily Pray er Mosques at Doraw a w ard/Gidan Ganji in Kany a
Constituency Babura LGA. Deetech Nig. Ltd. Babura 1,585,731.00 1,585,731.00 1,538,494.65 29/12/2016 6 w eeks 100 Completed
47
Constr. of Daily Pray er Mosques at Bulangu w ard/Malumaw ar Aw aso,
Majaw a w ard/Wailaw o and Mezan w ard/Yay ari in Bulangu Constituency
K/HausaLGA Kawu Nigeria Ltd. K/Hausa 4,757,193.00 4,757,193.00 4,584,641.51 29/12/2016 6 w eeks 100 Completed
48
Constr. of Daily Pray er Mosques at Karshi w ard/Gw allaw a, K/Babushe
w ard/Beguw a, Ringim T/w ada w ard/Kadiriy a and Sankara w ard/Darazai in
Ringim Constituency . M arb Eng. & M ulti-services Ringim 6,342,800.00 6,342,800.00 6,147,936.73 29/12/2016 6 w eeks 100 Completed
49
Constr. of Juma'at Pray er Mosque at Galambi, fagam Constituency in
Gw aram LGA. Ramadan Constr. Nig. Ltd. Gw arm 26,396,975.14 26,396,975.14 24/01/2017 6 w eeks Just mobilized
50
Constr. of Juma'at Pray er Mosque at Tauran Gabas and Yalw a in Kaugama
Constituency . Lungun Fulani Nigeria Ltd. Kaugama 4,461,077.19 4,461,077.19 2,289,813.88 24/01/2017 6 w eeks 51 On-going
51
Constr. of Juma'at Pray er Mosque at Amanga in Sule-Tankarkar
Constituency . Umar Roofing Products S/Tankarkar 9,164,435.46 9,164,435.46 8,897,510.16 24/01/2017 6 w eeks 100 Completed
52 Constr. of Juma'at Pray er Mosque at Umadu in Miga Constituency . AM IA Integrated Services Ltd. Miga 5,073,163.14 5,073,163.14 4,925,401.11 24/01/2017 6 w eeks 100 Completed
53 Constr. of Juma'at Pray er Mosque at Medu in Gagaraw a Constituency . Umar Roofing Products Gagaraw a 25,853,039.07 25,853,039.07 24/01/2017 6 w eeks Just mobilized
BAL. C/F 438,235,608.60 438,235,608.60
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
BAL. B/F 438,235,608.60 438,235,608.60
54
Constr. of Juma'at Pray er Mosque at Kukuma y amma and Gubabiy a in Buji
Constituency . Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 w eeks Just mobilized
55 Constr. of Juma'at Pray er Mosque at Fagw alay i in Jahun Constituency . Na-bakwai Gen. Enterprises Jahun 5,534,474.56 5,534,474.56 5,373,276.30 24/01/2017 6 w eeks 100 Completed
56
Constr. of Juma'at Pray er Mosque at Gorumo and Jibanin in Kiy aw a
Constituency . Damastbo Ventures Ltd. Kiy aw a 10,146,326.28 10,146,326.28 24/01/2017 6 w eeks Just mobilized
57
Constr. of Juma'at Prayer Mosque at Galambi, fagam Constituency
in Gwaram LGA. Ramadan Constr. Nig. Ltd. Gwaram 26,396,975.14 26,396,975.14 13,499,047.80 24/01/2017 16 weeks 50 On-going
58
Constr. of Juma'at Prayer Mosque at Tauran Gabas and Yalwa in
Kaugama Constituency. Lungun Fulani Nigeria Ltd. Kaugama 4,461,077.19 4,461,077.19 4,461,077.19 24/01/2017 8 weeks 100 Completed
59
Constr. of Juma'at Prayer Mosque at Amanga in Sule-Tankarkar
Constituency. Umar Co. Roofing Products S/tankarkar 9,164,435.46 9,164,435.46 24/01/2017 8 weeks Just mobilized
60 Constr. of Juma'at Prayer Mosque at Umadu in Miga Constituency. AM IA Integrated Services Ltd. Miga 5,073,163.14 5,073,163.14 24/01/2017 6 weeks Just mobilized
61
Constr. of Juma'at Prayer Mosque at Medu in Gagarawa
Constituency. Umar Co. Roofing Products Gagarawa 25,853,039.07 25,853,039.07 24/01/2017 16 weeks Just mobilized
62
Constr. of Juma'at Prayer Mosque at Kukuma yamma and Gubabiya
in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Just mobilized
63
Constr. of Juma'at Prayer Mosque at Fagwalayi in Jahun
Constituency. Na-bakwai Gen. Enterprises Jahun 5,534,474.56 5,534,474.56 24/01/2017 6 weeks Just mobilized
64 Constr. of Juma'at Prayer Mosque at Kwajali in Taura Constituency. Nushe Business Resources Taura 7,059,894.75 7,059,894.75 6,434,266.75 24/01/2017 6 weeks 100 Completed
65
Constr./Roofing/Maintenance of Daily prayer Mosques at Turu,
Garin Goto and Roofing/Maintenance of Dabawa Central Mosque in
Babura Constituency M ufabamex Concept Ltd. Babura 3,363,643.00 3,363,643.00 3,216,708.50 29/12/2016 6 weeks 100 Completed
66
Constr. of Daily prayer mosque at Turabu cikin Gari and Baturiya
ward/Yabal in Kirikasamma Constituency M uhabib Nig. Ltd. Kirikasamma 3,161,462.00 3,161,462.00 29/12/2016 6 weeks Just mobilized
67
Constr. of Daily prayer mosque at Dankargo, Matoya and Zazzabau
in Maigatari Constituency M uhabib Nig. Ltd. Maigatari 4,753,782.00 4,753,782.00 29/12/2016 6 weeks Just mobilized
BAL. C/F 548,687,212.19 548,687,212.19
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
BAL. B/F 548,687,212.19 548,687,212.19
68
Construction of Juma'at Prayer Mosque at Takwardawa in Roni
constituency NA'AYI RESOURCES Roni 8,330,898.21 8,330,898.21 31/5/2017 12 weeks Just mobilized
69
Construction of the daily prayer Mosque at Adanbas,kwarin dogaji
and wadugur in Ringim Constituency MARB ENGR & MULT Ringim 4,682,437.00 4,682,437.00 4,610,952.55 31/5/2017 8 weeks 100 Completed
Total 561,700,547.40 561,700,547.40
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF INFORMATION
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Upgrade of Dutse Stadium Lodgiani Nigeria Ltd. Dutse 351,853,465.25 524,794,441.42 349,628,686.75 25/06/2012 6 months 63 On-going
2
Consultancy Serv ices for the Constr. Of 5No. Mini
Stadiums in the state (stage 1, II & III) Design Plus Consultant Ltd. Dutse 72,628,137.06 72,628,137.06 71,447,709.35 10/2/2012 6 months 94 On-going
3 Consultancy Serv ices for TV station project (equipment) Royal Telecom Ltd. Dutse 92,313,015.08 92,313,015.08 71,988,075.57 12/12/2012 7 months 74 Stalled
4 Upgrading of kazaure Stadium H & M Nig. Ltd. Kazaure 391,139,151.00 519,645,968.67 458,794,574.70 6/21/2012 6 months 88 On-going
Total 907,933,768.39 1,209,381,562.23
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF AGRICUTURE
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Consultancy on 50No. Windmills Abasam Nig. Ltd. in the state 15,000,000.00 15,000,000.00 15,000,000.00 Nov . 2012 7 months 100 Completed
2
Prov ision of additional 30no. Wind pow ered Liv estock Watering
facilities at 30no. Grazing Reserv es
Ex cel Standards Nig.
Ltd. State 350,487,264.60 350,487,264.60 350,421,666.48 19/5/2014 6 months 100 Completed
3
Procurement of 2000 Metric Tons of Urea (46:0:0) for 2016 Wet
season Atafi Agro Merchandise in the state 224,400,000.00 224,400,000.00 9/5/2016 4 w eeks Stalled
4
Procurement of 1000 Metric Tons of NPK 20:10:10+1S+1Zn for
2016 Wet season Continental Fertilizer Ltd. in the state 105,000,000.00 105,000,000.00 9/5/2016 4 w eeks Stalled
5
Procurement of 500 Metric Tons of SSP (0:54:0) for 2016 Wet
season MBS Merchants Ltd. in the state 50,000,000.00 50,000,000.00 9/5/2016 4 w eeks Stalled
TOTAL 744,887,264.60 744,887,264.60
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF WOMEN AFFAIRS
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Purchase of Grains (Maize) (1000 mts) Juraj Gen. Entp. State 145,480,000.00 145,480,000.00 3/3/2017 4 weeks 100 Completed
2 Purchase of Grains (Maize) (650 MTS) Juraj Gen. Entp. State 99,162,000.00 99,162,000.00 31/5/2017 4 weeks Just mobilized
Total 244,642,000.00 244,642,000.00
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
HEAD OF SERVICE
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Constr. of Guest Facilities at Manpow er
Dev elopment Institute, Dutse Babandoki Gen. Entp. Dutse 650,250,473.88 650,250,473.88 587,571,225.68 12/10/2014 18 months 86 On-going
2
Commissioning/Engagement as Consultant for
the Superv ision of the Constr. of Guest
Facilities at Manpow er Dev elopment Institute,
Dutse Design Plus + Dutse 35,907,501.07 35,907,501.07 25,754,904.64 12/10/2014 18 months 93 On-going
3
Supply and Installation of Furniture and
Electronics for the New Guest's Facilities
at MDI Dutse Babandoki Gen. Entp. Dutse ############## 246,220,380.00 21/6/2017 12 weeks Just mobilized
,
TOTAL 932,378,354.95 932,378,354.95
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
JSCOE GUMEL
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
INFORMATICS INSTITUTE
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
TOTAL - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
SCIENCE & TEC.
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
SUBEB
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr of Dining Hall at bamaina
Academy BM Investment Ltd. B/kudu 14,754,828.72 14,754,828.72 13,655,465.79 15/4/2015 16 weeks 100 Completed
Total 14,754,828.72 14,754,828.72
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF LG
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
JISIEC
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF JUSTICE
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Renovation of Juvenile
Prison/Constr. Of gate lodge,
Mosque, Classroom and
Perimeter wall fence at
Babura town. Naila Multi Services Babura 33,500,000.00 37,269,674.07 26,499,632.30 20/12/2016 12 weeks 70 On-going
2
Purchase of 1no. Toyota Camry
(2015 model) to Sharia court,
Dutse Al-hamsad Investment Dutse 14,050,000.00 14,050,000.00 14,050,000.00 19/05/2017 3 weeks 100 Completed
Total 47,550,000.00 51,319,674.07
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
MINISTRY OF FINANCE
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Commissioning/Engagement as Consultant for the
Recov ery of about N783 million unremitted pay -as y ou
earn and Witholding Tax (WHT) by Defundct Pow er
Holding Co. of Nig. Plc. Datito M ultiservices Dutse 117,450,000.00 117,450,000.00 7/31/2015 On-going
2
Commissioning/Engagement as consultant to collect 10%
w ithholding tax , on div idend from indiv idual resident in
Jigaw a state and reconciliation of state gov t share holding
in v arious companies. Standard Union Securities Dutse 2/10/2016 On-going
3
Commission/Engagement as Consultant for the Technical
consultants on Softw are Dev . Consulting in the state and
MDAs. (IPSAS) Sparklesoft Solutions Ltd. Dutse 19,710,000.00 19,710,000.00 10/28/2016 6 months On-going
Total 137,160,000.00 137,160,000.00
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
GH
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
AGENCY FOR NOMADIC EDU
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
LEGAL
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr. of Centre for Education Technology at Jigaw a State
College of Islamic & Legal Studies, Ringim DAD A.E. Nig. Ltd. Ringim 38,822,854.32 38,822,854.32 21,140,130.02 2/11/2016 12 w eeks
52
On-going
2 Constr. of Library Complex (phase 1) at College of Islamic and
Legal Studies, Ringim
R & Partners Talatan
Mafara
Ringim 70,000,000.00 70,000,000.00 27,793,816.42 2/2/2017 24 w eeks 39 On-going
Total 108,822,854.32 108,822,854.32
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU,
SECOND QTR. APRIL TO JUNE, 2017 PROGRESS REPORT
BILYAMINU USMAN POLYTECNIC
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Procurement of Facilities, Equipment, Office Funiture
and Rehab. of Proposed Business Admin. Block for
NBTE Resources inspection at Biny aminu Usman
Poly technic, Hadejia. DAD A.E. Nig. Limited Hadejia 55,803,000.00 55,803,000.00 7,577,000.00 30/12/2016 24 w eeks 13 On-going
2
Constr. of Classrooms and Laboratories
complex at Binyaminu Usman Polytechnic,
Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 82,582,274.72 34,188,625.62 5/1/2017 24 weeks 39 On-going
3
Procurement of 1no. 30kva sound proof
generator Al-kasam janna Nig. Ltd. Hadejia 5,250,000.00 5,250,000.00 5,250,000.00 15/5/2017 2 weeks 100 Completed
TOTAL 143,635,274.72 143,635,274.72