JIGAWA STATE GOVERNMENT
DUE PROCESS AND PROJECT MONITORING BUREAU
LOCAL GOVERNMENT UNIT
OFFICE OF THE EXECUTIVE GOVERNOR
END OF THE YEAR REPORT,2013
ii
CONTENTS
EXECUTIVE SUMMARY
CHARTS
SECTION (A) ----------------------COMPLETED PROJECTS.
SECTION (B) ----------------------ON-GOING PROJECTS.
SECTION (C) ----------------------PRE-CONTRACT EVALUATION.
SECTION (D) ----------------------CONTRACTS AWARDED.
SECTION (E) ----------------------- CONTRIBUTION OF 27NO LOCAL GOVERNMENTS TO JOINT CAPITAL PROJECTS
AND OTHER CAPITAL DEDUCTIONS.
SECTION (F) ---------------------APPENDIX-SECTOR BASED REPORTS.
ROAD/DRAINAGE PROJECTS
WATER SUPPLY PROJECTS
ELECTRIFICATION PROJECTS
BUILDING PROJECTS
iii
JIGAWA STATE GOVERNMENT
DUE PROCESS AND PROJECT MONITORING BUREAU
LOCAL GOVERNMENT UNIT
END OF YEAR REPORT JANUARY-DECEMBER, 2013
EXECUTIVE SUMMARY
In accordance with the governor’s statement during the year 2014 budget speech that ‘2013 budget is first-rate performance budget as preliminary performance appraisal gives a budget implementation rate of about 90%. There is no doubt, Jigawa state is now in the limelight of National development as a truly prosperous and transformed state as well as a reference point in various spheres of human endeavour. The Due Process and Project Monitoring Bureau being an organization responsible for monitoring and implementations of this success will continue to put more emphasis on guiding the local government councils in the state on the uses of standard bidding document and procurement planning template in addition with proper contract documentation to enable them put control on the budget.
However, the efforts of other local government councils like; Buji, Miga, Jahun, Gwiwa, Auyo and Birniwa deserve
commendation as they always try to abide by the provision of the Due Process Law as much as possible.
iv
This report consist of six sections, namely; Completed projects, On-going projects, Pre-contract projects
Evaluation, Contracts awarded, contribution of state/local government joint account and Appendix-Sector based
reports.
COMPLETED PROJECTS
This section contains information on projects completed 100% by each of the 27no Local government council as at
December, 2013. A total of (617) projects valued at N3,772,951,533.18 [Three Billion, Seven Hundred and Seventy
Two Million Nine Hundred and Fifty One Thousand, Five Hundred and Thirty Three Naira Eighteen Kobo] out
of N9,107,701,412.89 being reported on, representing 41.43% were completed.
ON-GOING PROJECTS
This section deals with projects that have reached various stages of completion. A total of (142) projects valued at
N5,334,749,879.71 [Five Billion, Three Hundred and Thirty Four Million, Seven Hundred and Forty Nine
Thousand, Eight Hundred and Seventy Nine Naira Seventy One Kobo] out of N9,107,701,412.89 being reported
on, representing 58.57% were recorded as on-going.
v
PRE-CONTRACT PROJECTS EVALUATION
This section gives account of proposals presented by the 27No Local government councils to the Bureau for
Vetting and recommendation. A total of N 3,344,139,812.43 (Three Billion Three Hundred and Forty Four Million,
One Hundred and Thirty Nine Thousand, Eight Hundred and Twelve Naira, Forty Three Kobo) worth of proposals
was presented for Vetting out of which the Bureau recommends N 3,353,855,744.91 [Three Billion Three Hundred
and Fifty Three Million, Eight Hundred and Fifty Five Thousand, Seven Hundred and Forty Four Naira, Ninety
One Kobo only] with by an increase of N 9,715,932.48 [Increase of Nine Million Seven Hundred and Fifteen
Thousand, Nine Hundred and Thirty Two Naira, Forty Eight Kobo only which represents (1%) of the total
forwarded, the increase was primarily due to standardization in design and bill of quantities of 2no road
construction project in Guri and Kiyawa . Furthermore the amount N 3,344,139,812.43 forwarded for vetting
represent 57.80% of the total funds released (N 5,786,197,052.67) to the local government councils, out of the total
sum budgeted for capital expenditure (N17.032 billion) in the year 2013.
CONTRACT AWARDED
This section deals with Capital projects awarded by the 27no.Local government councils, and all information in this section were made available to the Bureau by the local councils through the Ministry of Local government to the Bureau and Verified within 2013 financial year. Contract worth N 5,954,840,611.32 (Five Billion, Nine Hundred and Fifty Four Million, Eight Hundred and Forty
Thousand, Six Hundred and Eleven Naira Thirty Two kobo) were awarded by 27No Local government councils.
vi
CONTRIBUTION OF 27 LOCAL GOVERNMENT COUNCIL TO STATE/LOCAL GOVERNMENT JOINT ACCOUNT.
The state and local government joint account as approved by the Law has impacted positively to the development
and uplifted the local government status within the year under review.
The total sum of N 5,786,197,052.67 was contributed by all the 27no Local government councils out of which N4,212,000,000.00 goes to state and local government joint account and N585,935,723.96 goes to Jigawa State University, while the balance of N988,261,328.71 goes to street light, water supply facilities, water resources logistic for implementation, Millennium Development Goals Projects/Conditional Grand Scheme. See attached Appendix. Some of the major projects executed from the joint account include:-
1. Construction of Township roads at Kazaure.
2. Construction of Township roads at Guri.
3. Construction of Township roads at Gumel (Phase II).
4. Construction of Township roads at Hadejia.
5. Construction of Township roads at Roni.
6. Construction of Township roads at Sule Tankarkar.
7. Construction of Township roads at Malam Madori.
8. Construction of Township roads at Kafin Hausa.
9. Construction of Township roads at Kaugama.
10. Construction of Township roads at Maigatari.
vii
APPENDIX –SECTOR BASED REPORT
In this section the whole projects executed by 27 No. local government councils were categorized into 4 sectors,
namely; Road sector, Water supply sector, Electrical sector and Building sector. Relevant Charts were made
available to show the performance of local governments based on sector report.
OBSERVATION
The following observations are critically been made on the following impending bottleneck that affect the
implementation of capital projects being executed by the 27 Local government councils in the state.
Despite the training in Standard Bidding Documents (SBD) none of the Local Government responds to its
uses.
The figure representing On-going projects becomes large due to the award of Duplex houses and public
convenience later in the year.
It has been observed that quite a number of projects exceeded their agreed completion period without
convincing reasons.
viii
RECOMMENDATION Ministry for local government in conjunction with Due Process and project Monitoring bureau (DPPMB)
should be organizing a retraining workshop for procurement officers on the uses of Standard Bidding Document (SBD) at least twice a year.
All local government councils should endeavor to make use of procurement plan template, so that each procurement should be started and finished within the time frame.
All local government councils should endeavor to make prompt payment to the contractors as at when due to enable the completion of projects within the stipulated contract period.
CONCLUSION
In conclusion, the above observations raised if adequately addressed, will improve budget performance and
enhance value for money on project execution in the local government councils.
.................................................................... ……………………………………………………………..
JIBRIN KAWU ADO HUSSAINI (MON)
DIRECTOR LOCAL GOVERNMENT UNIT DIRECTOR GENERAL
ix
SUMMARY SHEET S/N LOCAL GOVERNMENT Completed (N) On-going (N) Total (N)
1 AUYO
283,966,977.36 196,421,197.38 480,388,174.74
2 BABURA 95,652,815.92 153,634,310.50 249,287,126.42
3 BIRNIWA 274,473,033.67 180,764,726.12 455,237,759.79
4 BIRNIN KUDU 97,699,728.19 649,853,881.96 747,553,610.15
5 BUJI 302,830,391.94 347,936,053.07 650,766,445.01
6 DUTSE 163,946,495.72 245,905,171.78 409,851,667.50
7 GARKI 29,318,940.90 149,880,660.86 179,199,601.76
8 GAGARAWA 61,324,883.75 122,644,493.39 183,969,377.14
9 GUMEL 66,171,558.10 231,498,081.27 297,669,639.37
10 GURI 14,659,470.45 191,187,652.39 205,847,122.84
11 GWARAM 72,296,857.25 558,287,240.62 630,584,097.87
12 GWIWA 219,773,024.01 137,303,963.93 357,076,987.94
13 HADEJIA 84,555,805.65 107,985,023.03 192,540,828.68
14 JAHUN 94,003,913.49 128,724,133.83 222,728,047.32
15 KAUGAMA 145,418,255.53 184,637,085.01 330,055,340.54
16 KAFIN-HAUSA 105,231,927.96 139,850,309.43 245,082,237.39
17 KAZAURE 36,065,415.40 142,925,392.50 178,990,807.90
18 KIRI-KASAMMA 271,075,234.88 187,674,848.57 458,750,083.45
19 KIYAWA 198,772,623.24 107,985,023.03 306,757,646.27
20 MALAM-MADORI 103,188,596.73 128,809,804.28 231,998,401.01
21 MAIGATARI 158,495,593.11 160,652,852.03 319,148,445.14
22 MIGA 332,240,494.49 107,985,023.03 440,225,517.52
x
23 RINGIM 28,752,110.65 119,901,817.33 148,653,927.98
24 RONI 125,255,425.97 107,985,023.03 233,240,449.00
25 SULE-TANKARKAR 139,748,973.14 205,024,132.53 344,773,105.67
26 TAURA 43,978,402.35 208,071,675.78 252,050,078.13
27 YANKWASHI 224,054,583.33 131,220,303.03 355,274,886.36
TOTAL 3,772,951,533.18 5,334,749,879.71 9,107,701,412.89
xi
CHARTS
SHOWING PROJECTS PERFORMANCE
JANUARY – DECEMBER, 2013
xii
COMPLETED PROJECTS41.43%
ON - GOING PROJECTS58.57%
PIE CHART SHOWING COMPLETED AND ON- GOING PROJECTSFOR THE 27NO LOCAL GOVERNMENT COUNCILS
JANUARY - DECEMBER, 2013.
xiii
28
3,9
66
,97
7.3
6
95
,65
2,8
15
.92
27
4,4
73
,03
3.6
7
97
,69
9,7
28
.19
30
2,8
30
,39
1.9
4
16
3,9
46
,49
5.7
2
29
,31
8,9
40
.90
61
,32
4,8
83
.75
66
,17
1,5
58
.10
14
,65
9,4
70
.45
72
,29
6,8
57
.25
21
9,7
73
,02
4.0
1
84
,55
5,8
05
.65
94
,00
3,9
13
.49
14
5,4
18
,25
5.5
3
10
5,2
31
,92
7.9
6
36
,06
5,4
15
.40
27
1,0
75
,23
4.8
8
19
8,7
72
,62
3.2
4
10
3,1
88
,59
6.7
3
15
8,4
95
,59
3.1
1
33
2,2
40
,49
4.4
9
28
,75
2,1
10
.65
12
5,2
55
,42
5.9
7
13
9,7
48
,97
3.1
4
43
,97
8,4
02
.35
22
4,0
54
,58
3.3
3
19
6,4
21
,19
7.3
8
15
3,6
34
,31
0.5
0
18
0,7
64
,72
6.1
2
64
9,8
53
,88
1.9
6
34
7,9
36
,05
3.0
7
24
5,9
05
,17
1.7
8
14
9,8
80
,66
0.8
6
12
2,6
44
,49
3.3
9
23
1,4
98
,08
1.2
7
19
1,1
87
,65
2.3
9
55
8,2
87
,24
0.6
2
13
7,3
03
,96
3.9
3
10
7,9
85
,02
3.0
3
12
8,7
24
,13
3.8
3
18
4,6
37
,08
5.0
1
13
9,8
50
,30
9.4
3
14
2,9
25
,39
2.5
0
18
7,6
74
,84
8.5
7
10
7,9
85
,02
3.0
3
12
8,8
09
,80
4.2
8
16
0,6
52
,85
2.0
3
10
7,9
85
,02
3.0
3
11
9,9
01
,81
7.3
3
10
7,9
85
,02
3.0
3
20
5,0
24
,13
2.5
3
20
8,0
71
,67
5.7
8
13
1,2
20
,30
3.0
3
BAR CHART SHOWING COMPLETED AND ON-GOING PROJECTS FOR 27NO LOCAL GOVERNMENT COUNCILS
JANUARY - DECEMBER, 2013
Completed (N) On-going (N)
xiv
SECTION (A)
COMPLETE PROJECT
JANUARY – DECEMBER, 2013
xv
AUYO LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED REMARKS AMOUNT(N) CONTRACT SUM (N)
1 ELECTRIFICATION PROJECT MWT REAL ESTATE KATAJE 6,757,181.22 6,757,181.22 COMPLETED
2 ELECTRIFICATION PROJECT SHIGO GEN. ENTP SHIYO 18,162,995.13 18,162,995.13 COMPLETED
3 ELECTRIFICATION PROJECT GANO VENTURES MAJIYA 12,433,009.13 12,433,009.13 COMPLETED
4 ELECTRIFICATION PROJECT GANO VENTURES AYAN 28,175,192.80 28,175,192.80 COMPLETED
5 ELECTRIFICATION PROJECT GANO VENTURES GUDITO 14,741,731.97 14,741,731.97 COMPLETED
6 COMP. MOTORISED W/SCHEME BUKAR MAKODA HADIYAU 7,560,665.00 7,560,665.00 COMPLETED
7 ELECTRIFICATION PROJECT TARABU CONSTR. GASANYA 13,043,370.54 13,043,370.54 COMPLETED
8 CONSTR OF SLAUGHTER HOUSE. GANO VENTURES AUYO 6,552,103.20 6,552,103.20 COMPLETED
9 CONSTR. OF MOTOR PARK Adamu Digatawa Fuge 1,615,373.34
1,615,373.34 COMPLETED
10 COMPLETE WATER SCHEME A Garba Auta Kaudan 1,615,373.34
1,615,373.34 COMPLETED
11 ELECTRIFICATION PROJECT
IHSAN & INVESTMENT Kure
13,141,518.64
13,141,518.64 COMPLETED
12 CONSTR. OF DAILY PRAYER MOSQUE Adamu Digatawa Fuge
1,615,373.34
1,615,373.34 COMPLETED
13 CONSTR. OF DAILY PRAYER MOSQUE A Garba Auta Kaudan
1,615,373.34
1,615,373.34 COMPLETED
14 CONSTR. OF DAILY PRAYER Bako Jura Akubushin COMPLETED
xvi
MOSQUE 1,615,373.34 1,615,373.34
15 CONSTR. OF DAILY PRAYER MOSQUE Abdullahi Amani Atisga
1,615,373.34
1,615,373.34 COMPLETED
16 CONSTR. OF DAILY PRAYER MOSQUE Abulsalamu 2 Boys Minari
1,615,373.34
1,615,373.34 COMPLETED
17 Constr. Of 1 No. Lock Up Shop A. Idi Gatafa & Others Auyo 3,712,681.50
3,712,681.50 COMPLETED
18 Constr. Of 1 No. Lock Up Shop Umar Galadima & Others Auyo
3,712,681.50
3,712,681.50 COMPLETED
19 DRILLING 5 NO. H/PUMPS G/Kuka Drilling Com. Kajilmari & 4 Others
1,102,500.00
1,102,500.00 COMPLETED
20 CONSTR, OF 2 C/ROOMS WITH OFFICE A.U.O & Sons Arabic SS Auyo
7,017,285.10
7,017,285.10 COMPLETED
21 COMPLETE WATER SCHEME Limis Brothers Ayanduwa 12,060,423.90
12,060,423.90 COMPLETED
22 UPGRADING OF SOLAR W/SCHEME Limis Brothers Furawa 5,370,321.60
5,370,321.60 COMPLETED
C/F 164,851,274.61
164,851,274.61
1a
B/F 164,851,274.61
164,851,274.61
23 ELECTRIFICATION PROJECT LAMU & BABALDU Maska 13,795,574.87 13,795,574.87 COMPLETED
24 ELECTRIFICATION PROJECT HAMSU NIG LTD Maro
22,817,962.00 22,817,962.00 COMPLETED
25 RENOVATION OF LEA Ismaila Maaji Auyo LEA Auyo 1,949,326.03 1,949,326.03 COMPLETED
26 COMPLETE SOLAR WATER SCHEME Limis Brothers Auyo 6,646,470.60 6,646,470.60 COMPLETED
xvii
27 COMPLETE SOLAR WATER SCHEME Limis Brothers Auyo 6,646,470.60 6,646,470.60 COMPLETED
28 ELECTRIFICATION PROJECT Maro Engg Ltd Mado 18,635,578.25 18,635,578.25 COMPLETED
29 ELECTRIFICATION PROJECT Limis Brothers S/Gabas & S/Yamma
45,970,919.00 45,970,919.00 COMPLETED
30 RENOVATION OF BUS STOP Musa Guyu Kwanar Gawo 271504.2 271504.2 COMPLETED
31 RENOVATION OF BUS STOP Hassan Shahada Kwanar Kataje 271,504.20 271,504.20 COMPLETED
32 REPAIRS OF 2NO. POLICE VEHICLE Alh. Haladu Gasanya Auyo Police 2,110,393.00 2,110,393.00 COMPLETED
TOTAL 283,966,977.36
283,966,977.36
xviii
BABURA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT
SUM (N) DATE IN %
1 5004/2 CONSTR. OF FRIDAY PRAYER MOSQUE A. MUSA SHEHU ACHIYA
3,004,000.00
3,004,000.00 11/11/2012 100 COMPLETED
2 5004/2 CONSTR. OF FRIDAY PRAYER MOSQUE SANI HARU DAN YAYI
3,004,000.00
3,004,000.00 11/11/2012 100 COMPLETED
3 5001/9 CONSTR. OF ISLAMIYYA SCOOL MATI DANHALIL GANA
3,126,219.14
3,126,219.14 11/4/2012 100 COMPLETED
4 5004/2 CONSTR. OF ISLAMIYYA SCOOL ZUBAIRU KANYA
TSAMIYA KWANO
3,126,219.14
3,126,219.14 11/4/2012 100 COMPLETED
5 6004/7 CONSTR. OF NOMADIC SCHOOL SANI MOHMUD DANZAGO
5,000,000.00
5,000,000.00 20/12/12 100 COMPLETED
6 5004/2 CONSTR. OF NOMADIC SCHOOL A. SADE KANYA KARFAWA
3,126,219.14
3,126,219.14 11/4/2012 100 COMPLETED
7 7001/10 CONSTR. OF DRAINAGE
ADO MOHD MASKO MASKO
3,200,000.00
3,200,000.00 16/8/12 100 COMPLETED
8 7001/11 ELECTRIFICATION PROJECT
PRESTIGE. NIG LTD
UNGUWAR SHURI
9,170,252.00
9,170,252.00 23/3/10 100 COMPLETED
9 5004/7 CONSTR. OF JUMAAT MOSQUE IRO GAMBO KYANKYARO
3,004,000.00
3,004,000.00 28/3/13 100 COMPLETED
10 7002/3 CONSTR. DISTRICT HEAD HOUSE PHASE I SABO YUSIF JIGAWA
4,825,000.00
4,825,000.00 3/5/2013 100 COMPLETED
11 7002/3 CONSTR. OF DISTRICT HEAD HOUSE PHASE I SANI MAMU GARU
4,825,000.00
4,825,000.00 8/5/2013 100 COMPLETED
xix
12 5004/8 CONSTR. OF 5 DAILY PRAYER MOSQUE INUSA MATI
KANKARAN FULANI
500,000.00
500,000.00 16/4/13 100 COMPLETED
13 5004/8 CONSTR. OF 5 DAILY PRAYER MOSQUE NASIRU MATI DANKABA
500,000.00
500,000.00 16/4/13 100 COMPLETED
14 4001/6 DRILLING OF 2NO. BOREHOLES ABDU DAN NANA JIGAWA
1,500,000.00
1,500,000.00 3/7/2013 100 COMPLETED
C/F 47,910,909.42
47,910,909.42
2a
COMPLETET PROJECTS
B/F 47,910,909.42
47,910,909.42
15 6001/4 CONSTRUCTION OF 10 NO. HANDPUMPS
SUNDRY PERSONS V/PLACES 4,950,000.00 4,950,000.00 22/5/13 100 COMPLETED
16 CONSTR. OF DRAINAGE A HAMIDAN ABDU KANYA 865,308.15 865,308.15 27/6/13 100 COMPLETED
17 REHABLITATION OF 15KM FEEDER ROAD A MOHD KORAU
KANYA-DORAWA-
FIGI 3,880,800.00 3,880,800.00 24/6/13 100 COMPLETED
18 CONSTR. OF 5-DAILY PRAYER MOSQUE A NASIRU GARBA KANAWA 500,000.00 500,000.00 25/6/13 100 COMPLETED
19 CONSTR. OF JUMAAT MOSQUE A ABDU GARU ANDO 3,004,000.00 3,004,000.00 13/8/13 100 COMPLETED
20 DRILLING AND INST. OF H/PUMP A GAMBO T
JABURAWA FULANI 450,000.00 450,000.00 8/8/2013 100 COMPLETED
21 CONSTR. OF DRAINAGE MOHD MOHD
JIGAWAR DAN ALI 937,768.00 937,768.00 3/7/2013 100 COMPLETED
22
RENOVATION OF TASAWA PRIIMARY SCHOOL A SABO YUSIF TAKWASA 1,859,184.65 1,859,184.65 4/7/2013 100 COMPLETED
xx
23 RE-CONSTR. OF ENGINE ROOM TAKWASA 476,280.00 476,280.00 10/7/2013 100 COMPLETED
24 DRILLING AND INST. OF 2NO.H/PUMP
HAMISU MAITAMA JIGAWAI 1,520,954.00 1,520,954.00 3/7/2013 100 COMPLETED
25
CONSTR. OF 2NO. SOLAR POWERED W/SCHEME MAP. ENG
BABURA MARKET 13,272,412.00 13,272,412.00 14/10/13 100 COMPLETED
26
CONSTR. OF 2NO. MODEL PUBLIC CONVINIENCE A. A SHITU
BABURA MARKET 16,025,199.70 16,025,199.70 14/10/13 100 COMPLETED
TOTAL
95,652,815.92
95,652,815.92
xxi
BIRNIWA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT COMMENCEMENT STATUS REMARKS
AMOUNT(N) DATE IN %
1 6001/1 ELECTRIFICATION PROJECT TURABU
CONSTRUCTION ABARI 5,996,939.72
5,996,939.72 14/3/13 100 COMPLETED
2 6001/1 ELECTRIFICATION PROJECT
MAJERI ELECTRICAL VENTURES SUMBURTU
6,290,382.72
6,290,382.72 14/3/2013 100 COMPLETED
3 ELECTRIFICATION PROJECT TURABU
CONSTRUCTION ISFARI 8,525,613.88
8,525,613.88 18/3/2013 100 COMPLETED
4 4006/1 SUPPLY OF 15KVA GENERATOR LIMIS BROTHERS DAJILBANI 1,800,000.00
1,800,000.00 19/3/2013 100 COMPLETED
5 6001/7 COMPLETE WATER SCHEME LIMIS BROTHERS GOMARI 11,264,276.39
11,264,276.39 13/3/2013 100 COMPLETED
6 5007/3 COMPLETE WATER SCHEME TURABU
CONSTRUCTION TATAJIYA/DALLARI 13,455,495.14
13,455,495.14 13/3/2013 100 COMPLETED
7 6001/2 CONSTR. OF I BEDROOM BUNGALOW KHALI & TALBA
DISTRICT HOUSE BIRNIWA
3,387,705.16
3,387,705.16 16/7/2013 100 COMPLETED
8 6001/2 ELECTRIFICATION PROJECT IHSAN GEN ENTP. LIMITED DOLEN KWANA
23,599,542.42
23,599,542.42 18/07/2013 100 COMPLETED
9 6001/2 SUPPLY OF 15KVA GENERATOR LIMIS BROTHERS KIHINDE 1,800,000.00
1,800,000.00 19/7/2013 100 COMPLETED
10 6001/2 ELECTRIFICATION PROJECT STEP BY STEP ZAINI 11,086,717.00
11,086,717.00 18/07/2013 100 COMPLETED
11 6001/2 COMPLETE WATER SCHEME ADZ GLOBASL
SERVICES ADAMARI 11,616,990.89
11,616,990.89 15/03/2013 100 COMPLETED
12 6001/2 DRILLING OF HAND PUMP INDAGI DAUDA R TSAMIYAR ZAKI 400,000.00
400,000.00 22/05/2013 100 COMPLETED
13 6001/2 COMPLETE WATER SCHEME LIMIS BROTHERS KUNDI 13,527,434.00
13,527,434.00 20/06/2013 100 COMPLETED
14 6001/2 CONSTR. OF WALL FENCING A SUNUSI ISA GGSS BIRNIWA
25,502,074.00
25,502,074.00 12/5/2008 100 COMPLETED
xxii
15 7001/7 SUPPLY OF PLASTIC CHAIRS A BABA M ABBAS
SONS BIRNIWA 486,000.00
486,000.00 7/5/2013 100 COMPLETED
16 7001/10 CONSTR. OF HANDPUMP LIMIS BROTHERS KILBU 935,211.98
935,211.98 15/05/2013 100 COMPLETED
C/F 139,674,383.30
139,674,383.30
3a
B/F 139,674,383.30
139,674,383.30
17 4006/1 CONSTR. OF SLAUTHER HOUSE GANO VENTURES DIGINSA 5,874,099.00
5,874,099.00 8/5/2008 100 COMPLETED
18 4006/1 CONSTR OF WALL FENCING A SUNUSI ISAH GGSS BIRNIWA
25,502,074.00
25,502,074.00 12/5/2008 100 COMPLETED
19 6001/12 ELECTRIFICATION PROJECT GANO VENTURES KANYA 10,221,305.23
10,221,305.23 13/10/2010 100 COMPLETED
20 600/12 ELECTRIFICATION PROJECT GANO VENTURES KABUNA 6,477,343.33
6,477,343.33 13/10/2010 100 COMPLETED
21 6001/12 ELECTRIFICATION PROJECT GANO VENTURES ABBARI 54,062,263.47
54,062,263.47 15/10/2010 100 COMPLETED
22 4006/1 WORKS AT COMPUTER ROOM MATRIX NIG LTD LG SEC 17,767,725.15
17,767,725.15 10/5/2009 100 COMPLETED
23 5003/1 REHABILITATION OF FM RADIO STATION
LIMIS BROTHERS LTD FM BIRNIWA
2,905,881.30
2,905,881.30 15/05/2013 100 COMPLETED
24 6001/1 ADDITIONAL OVER HEAD TANK TALAKU ENT LTD WARGADU 10,676,958.89
10,676,958.89 12/3/2013 100 COMPLETED
25 4006/1 COMPLETION OF KANYA MOSQUE
LIMIS BROTHERS LTD DOLEN KWANA
511,000.00
511,000.00 20/02/2013 100 COMPLETED
26 5007/4 CONSTR. OF HANDPUMP BULAMA SURAJO
& SONS FULANI
KILBU/FULANI
800,000.00
800,000.00 11/6/2013 100 COMPLETED
xxiii
TOTAL 274,473,033.67
274,473,033.67
xxiv
BIRNIN KUDU LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT SUM DATE IN %
1 CONSTR. OF FRIDAY MOSQUE AUWWALU MATO BUDINGA VILLAGE
4,107,698.00
4,310,492.96 24/3/11 100 Completed
2 ELECTRIFICATION PROJECT BLUE SKY NIG LTD B/DANGIWA 17,597,275.20
17,597,275.20 Sep-11 100 Completed
3 ELECTRIFICATION PROJECT BLUE SKY NIG LTD KWANGWARA 22,548,477.55
22,548,477.56 15/10/2010 100
Completed
4 CONSTRUCTION OF JUMAAT MOSQUE ADO B/KUDU GIWA 2,395,900.00
2,395,900.00 24/03/2011 100 Completed
5 CONSTRUCTION OF JUMAAT MOSQUE A AMADU MK BUDISU 4,626,832.50
4,626,832.50 24/03/2011 100 Completed
6 CONSTRUCTION OF JUMAAT MOSQUE JAMILU B/KUDU JIKAINA 3,376,000.32
3,376,000.32 24/03/2011 100 Completed
7 COMPLETE SOLAR WATER SCHEME
HAMBISCON NIG LTD B/KUDU
6,646,470.00
6,646,470.00 3/12/2013 100 Completed
8 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD
TSANGAYA B/KUDU
7,446,169.60
7,446,169.60 3/12/2013 100 Completed
9 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD
TSANGAYA B/KUDU
6,646,470.00
6,646,470.00 3/12/2013 100 Completed
10 COMPLETE SOLAR WATER SCHEME
ABAMGOS NIG LTD
KANGIRE ROAD
6,646,470.60
6,646,470.60 3/12/2013 100 Completed
11 CONSTR. OF PUBLIC CONVINIENCE
ABAMGOS NIG LTD
KANGIRE ROAD
8,012,999.85
8,012,999.85 3/12/2013 100 Completed
12 CONSTR. OF PUBLIC CONVINIENCE
TIBAB FACILITY SERVICES
K/FADA B/KUDU
7,446,169.60
7,446,169.60 3/12/2013 100 Completed
TOTAL 97,496,933.22
97,699,728.19
xxv
DUTSE LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT
SUM DATE IN %
1 COMPLETE
WATER SCHEME ALKALI
SAKWAYA GAKIKWA
7,264,270.00
7,264,270.00 23/10/2012 100 COMPLETED
2
REPAIRS OF SOLAR
BOREHOLE PRESTEGE
LTD DARAU 284,287.50
284,287.50 14/2/2012 100 COMPLETED
3
REPAIRS OF SOLAR
BOREHOLE PRESTEGE
LTD WURMA 284,287.50
284,287.50 14/2/2012 100 COMPLETED
4
REPAIRS OF SOLAR
BOREHOLE PRESTEGE
LTD
GALAMAWA 284,287.50
284,287.50 14/2/2012 100 COMPLETED
5 CON. OF JUMAAT
MOSQUE SAGOGO
VENTURERS KANDI
8,007,618.33
8,007,618.33 Mar-10 100 COMPLETED
6 ELECTRIFICATION
PROJECT
IBRACO INTER. CO
LTD DURU
17,931,655.04
17,931,655.04 23/12/2011 100 COMPLETED
7 ELECTRIFICATION
PROJECT HARO
SHEHU WURMA
28,018,224.00
28,018,224.00 23/12/2011 100 COMPLETED
8 CONS.. OF DWARF WALL
MOHD M LIMAWA KYARAN
1,250,429.25
1,250,429.25 11/3/2013 100 COMPLETED
10 CONS. OF 2NO. C/ROOMS
ALH. M FULANI
BAKIN RUWA
4,102,894.62
4,102,894.62 9/5/2013 100 COMPLETED
11 CONS. JUMAAT MOSQUE
ITAFAZIHA ENT.
ZANGON BUJI
10,193,722.29
10,193,722.29 9/5/2013 100 COMPLETED
12 ELECTRIFICARION PROJECT
GALAMAWA GEN ENT. WARWADE
13,329,977.50
13,329,977.50 9/5/2013 100 COMPLETED
xxvi
13
COMPL. MOTORISED WATER SCHEME
HASKE GEN ENT. ZOBIYA
10,058,968.96
10,058,968.96 9/5/2013 100 COMPLETED
C/F
101,010,622.49
101,010,622.49
xxvii
BUJI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM DATE IN %
1 CONSTR. BUJI DISTRCT
HEAD HOUSE YAYARI TUKUR NIG
LTD BUJI
11,214,965.81
11,214,965.81 25/42012 100 COMPLETED
2 CONSTR. OF JUMAAT
MOSQUE YAYARI TUKUR NIG
LTD MADABE
11,339,700.59
11,339,700.59 24/4/2012 100 COMPLETED
3 CONSTR. OF LOCK-UP
SHOPS IHSAN NIG. LTD SARA MARKET
13,780,694.70
13,780,694.70 12/4/2012 100 COMPLETED
4 CONSTR. OF DAILY PRAYER
MOSQUE SANI AHOTO AHOTO
1,648,372.40
1,648,372.40 24/4/2012 100 COMPLETED
5 CONSTR OF DAILY PRAYER
MOSQUE GARBA UBALE &
OTHER GWADAYI
1,648,372.40
1,648,372.40 24/4/2012 100 COMPLETED
6 CONSTR OF PIT LATRINE SALE YAU & OTHERS U/MAINA
616,075.95
616,075.95 30/12/12 100 COMPLETED
7 ELECTIRIFICATION PROJECT YAYARI TUKUR NIG
LTD SARA-KUKUMA
37,900,795.67
37,900,795.67 18/10/2011 100 COMPLETED
8 ELECTIRIFICATION PROJECT IHSAN NIG. LTD U/MAINA
31,567,217.94
31,567,217.94 18/10/2011 100 COMPLETED
9 CONSTR. OF CHIRBIN
CHAKWAMA ROAD ALPHA & SGMA NIG
LTD CIRBIN -
CAKWAMA
33,449,850.00
33,449,850.00 29/12/2010 100 COMPLETED
10 CONSTR OF PIT LATRINE HARUNA A IDI Y/ TUKUR
616,075.95
616,075.95 30/12/12 100 COMPLETED
11 CONSTR OF PIT LATRINE MUDDAFA & OTHERS GWADAYI
616,075.95
616,075.95 30/1212 100 COMPLETED
12 5004/2
WALL FENCING OF KUKUMA CENTRAL MOSQUE BABANNAN ALI KUKUMA
1,106,580.40
1,106,580.40 20/3/2013 100 COMPLETED
15 6001/2 CONSTR. OF LOCK-UP SHOPS
IHSAN INVST. LTD SARA MARKET
10,572,817.24
10,572,817.24
12/3/2013
100 COMPLETED
xxviii
C/F
156,077,595.00
156,077,595.00
5a
B/F
156,077,595.00
156,077,595.00
16 6001/3 LYING OF PRECAST INTERLOCK
A AMADU KUKUMA
KUKUMA FRIDAY MOSQUE
930,987.20
930,987.20
20/3/2013
100 COMPLETED
17 5004/2 CONSTR. OF JUMAAT MOSQUE
YAYARIN TUKUR NIGERIA
MADABE 11,339,700.00
11,339,700.00
12/3/2013
100 COMPLETED
18 4007/2 CONSTR. OF JUMAAT MOSQUE
IHSAN INVST. LTD YAYARIN CHAKAURI
11,339,700.00
11,339,700.00
12/7/2013
100 COMPLETED
19 5002/2 DRILLING OF 3NO. BOREHOLES
WATER & WASTE WATER
GANTSA & JAJIKOLIi
4,903,866.00
4,903,866.00
12/8/2013
100 COMPLETED
20 5002/2 REHABLITATION OF WATER SCHEME
WATER & WASTE WATER
KAWAYA 3,875,000.00
3,875,000.00
23/8/13
100 COMPLETED
21 5004/5 CONSTR. OF ISLAMIYYA SCHOOL
SHUAIBU UMARU MAMUNA 2,904,310.00
2,904,310.00
4/8/2013
100 COMPLETED
22 5004/5 CONSTR. OF JUMAAT MOSQUE
PERFORMANCE ENG LTD
GANTSA 27,753,689.40
27,753,689.40
20/9/13
100 COMPLETED
23 5004
CONSTR. OF COMPLETE WATER SCHEME
WATER & WASTE WATER
KAUYEN MAKERA
6,522,112.50
6,522,112.50
18/10/13
100 COMPLETED
24 5004/5
CONSTR. OF COMPLETE WATER SCHEME
WATER & WASTE WATER
SAGU GABAS 12,057,106.36
12,057,106.36
18/10/13
100 COMPLETED
xxix
25 6002/1
CONSTR. OF PIT LATRINE
A WADA DRIVER & M BAFFA
BUJI PHC 545,538.00
545,538.00
22/10/13
100 COMPLETED
26 6002/1 CONSTR. OF 10NO. HANDPUMPS
Y-TEK INV. & AGRO ALLIED 10 WARDS
7,334,470.05
7,334,470.05 18/10/13 100 COMPLETED
27 4007/2
CONSTR. OF COMPLETE WATER SCHEME
WATER & WASTE WATER
GWADAYI 10,980,132.02
10,980,132.02
18/10/13
100 COMPLETED
28 4007/2
CONSTR. OF PIT LATRINE
A AMADU TELA KUKUMA PHC
545,538.00
545,538.00
22/10/13
100 COMPLETED
C/F 257,109,744.53
257,109,744.53
5b
B/F 257,109,744.53
257,109,744.53
29 4007/2
CONSTR. OF SUNNA JUMAAT MOSQUE
ATAMFA MARKETING NIG. LTD
GWADAYI 9,460,062.12
9,460,062.12
18/10/13
100 COMPLETED
30 4007/2
CONSTR. OF 1-BLOCK OF 2 CLASSROOMS
ATAMFA MARKETING NIG. LTD
DAKAWA 5,709,492.69
5,709,492.69
18/10/2013
100 COMPLETED
31 7001/10 COMPLETE WATER SCHEME
WATER & WASTE WATER
BUJI 6,646,470.60
6,646,470.60
30/10/13
100 COMPLETED
32 7001/11 COMPLETE WATER SCHEME
WATER & WASTE WATER
GANTSA 6,646,470.60
6,646,470.60
30/10/13
100 COMPLETED
xxx
33 4007/2
CONSTR. OF PIT LATRINE
ALH. IDI & OTHERS
Y/ TUKUR 616,075.95
616,075.95
14/3/13
100 COMPLETED
34 4007/2
CONSTR. OF PIT LATRINE
MUSTAFA & OTHARS
GWADAYI 616,075.95
616,075.95
1/3/2013
100 COMPLETED
35 4007/2
COSTR. OF PUBLIC CONVINIENCE
YAYARIN TUKUR NIG. LTD
GANTSA 8,012,999.75
8,012,999.75
3/10/2013
100 COMPLETED
36 400/2
COSTR. OF PUBLIC CONVINIENCE
YAYARIN TUKUR NIG. LTD
BUJI 8,012,999.75
8,012,999.75
3/10/2013
100 COMPLETED
TOTAL 302,830,391.94
302,830,391.94
xxxi
GARKI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM
(N) DATE IN %
1 CONSTR. OF PUBLIC CONVINIENCE AA SHITU
GARKI MOTOR PARK 8,012,999.85 8,012,999.85 12/11/2013 100 COMPLETED
2 CONSTR. OF PUBLIC CONVINIENCE AA SHITU KWANAR GARKI 8,012,999.85 8,012,999.85 12/11/2013 100 COMPLETED
3 COMPLETE SOLAR W/SCHEME
IHSAN DRILLING & INVSTM GARKI MARKET 6,646,470.60 6,646,470.60 12/11/2013 100 COMPLETED
4 COMPLETE SOLAR W/SCHEME
IHSAN DRILLING & INVSTM KWANAR GARKI 6,646,470.60 6,646,470.60 12/11/2013 100 COMPLETED
5 FENCING OF GARKI GGSS SLM AMINCI LTD GARKI 19,253,694.00
19,253,694.00 2/6/2012 100 COMPLETED
6 ELECTRIFICATION POJECT MARB ENG SERV MUKU 14,966,120.85
14,966,120.85 5/6/2012 100 COMPLETED
7 CONSTR. OF JUMAAT MOSQUE A MAGAJI GARKI DUNKUMI
4,165,494.61
4,165,494.61 10/9/2012 100 COMPLETED
8 RENOVATION OF HEALTH POST DIRECT LABOUR MUKU
3,510,328.37
3,510,328.37 17/06/2012 100 COMPLETED
TOTAL
29,318,940.90
29,318,940.90
xxxii
GAGARAWA LOCAL GOVT.
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT REVISED
CONTRACT COMMENCEMENT STATUS REMARKS
(N) SUM DATE IN %
1 6001/7 RE-CONSTR. 0F ENG. ROOM
M/UNGUWA DANLADI G. TASHA
487,012.00 487,012.00 21/08/2013 100 Completed
2 6001/7 RE-CONSTR. 0F ENG. ROOM SULE GAMJI G/CHIROMA
488,012.00 488,012.00 21/08/2013 100 Completed
3 6001/7 FIXING OF BURGLER PROOF & DOORS YUSHAU USAINI BHC G. TASHA
361,522.00 361,522.00 2/7/2013 100 Completed
4 6001/7 RENOVATION OF STAFF QTRS MOHD S/DARE G. TASHA
1,571,043.00 1,571,043.00 7/3/2013 100 Completed
5 7001/11 RENOVATION OF STAFF QTRS IBRAHIM HABU G. TASHA
1,795,384.00 1,795,384.00 14/01/2013 100 Completed
6 6001/3 RENOVATION OF JUMAT MOSQUE MALAM IDI KYAURE MAKERABU
2,377,197.90 2,377,197.90 7/6/2013 100 Completed
7 6001/3 CONSTR. OF ENGINE ROOM
M/UNGUWA DANLADI LG QTRS
313,304.00 313,304.00 14/05/2013 100 Completed
8 6001/3 RENOVATION OF DAILY PRAYER MOSQUE DANSUDU MEDU
GAGARAWA TUDU
388,377.00 388,377.00 22/05/2013 100 Completed
9 6001/3 RENOVATION OF STAFF QTRS KABIRU IBRAHIM OLD SITE
1,425,120.00 1,425,120.00 10/5/2013 100 Completed
10 6001/3 RENOVATION OF DAILY PRAYER MOSQUE
A ISIYA ABDU MEDU
GIDAN YAKUBU
363,200.00 363,200.00 30/04/2013 100 Completed
11 6001/3 RENOVATION OF ISLAMIYYA SC M SABO SHEHU G. TASHA
518,952.00 518,952.00 30/04/2013 100 Completed
12 6001/3 PURCHASE OF P A SYSTEMS AMINU MEDU V/ MOSQUE
450,000.00 450,000.00 30/07/2013 100 Completed
13 6001/3 PURCHASE OF ROOFING MATEIALS HUDU KARYAKAHO
VARIOS MOSQUE
340,000.00 340,000.00 27/04/2013 100 Completed
14 6001/3 PURCHASE OF PAS & GEN. MANSUR MUSA
KORE BALATU MOSQUE
387,900.00 387,900.00 16/04/2013 100 Completed
15 6001/3 PURCHASE OF MOSQUE EQIUPMQNTS BUNIYA TAJJAWA
VARIOS MOSQUE
450,000.00 450,000.00 21/08/2013 100 Completed
xxxiii
16 5004/3 PURCHASE OF 20NO. GERATORS AMINU MOHD
VARIOS MOSQUE
500,000.00 500,000.00 23/05/2013 100 Completed
18 4002/1 ELECTRIFICATION PROJECT
BNB GLOBAL NIG LTD KANGARWA
18,175,454.85 18,175,454.85 15/09/2010
19 4002/1 ELECTRIFICATION PROJECT
GANO VENTURES NIG LTD MADAKA
30,932,405.00 30,932,405.00 15/09/2010 100 Completed
TOTAL 61,324,883.75 61,324,883.75
xxxiv
GURI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
REVISED CONTRACT
SUM COMMENCEMENT STATUS REMARKS
AMOUNT (N) DATE IN %
1 CONSTR. OF PUBLIC CONVINIENCE
A MAGAJI & SONS
GURI TOWN 8,012,999.85 8,012,999.85 10/10/2013 100 Completed
2 COMPLETE SOLAR W/SCHEME
ADZ GLOBAL SERVICES
GURI TOWN
6,646,470.60
6,646,470.60 10/10/2013 100 Completed
TOTAL
14,659,470.45
14,659,470.45
xxxv
GUMEL LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT SUM
(N) DATE IN %
1 2009/A CONST OF DRAINAGE & CULVERT
BAFSA GLOBAL CONC
NASARAW AMANTUS 3,893,290.00 3,893,290.00 7/10/2010 100 Completed
2 5001/9 CONSTR. JUMAAT MOSQUE MAI ZABBI BAIKAYA 5,229,000.00 5,229,000.00 19/07/2010 100 Completed
3 4002/2 CONSTR. DWARF FENCING WALL A.A.M KANTI STAFF QTRS 11,053,371.00 11,053,371.00 10/9/2010 100 Completed
4 2009/C CONSTR. OF SHOPPING PLAZA A SARKI ILU GUMEL TOWN 39,322,230.00 39,322,230.00 19/06/2010 100 Completed
5 5001/9 CONSTR. OF DAILY PRAYER MOSQUE
MAL IBRAHIM DOGO KOKINAMI 1,334,733.42 1,334,733.42 24/6/2013 100 Completed
6 5001/9 CONSTR. OF DAILY PRAYER MOSQUE
ALH. A TSANGAYA TSANGAYA 1,334,733.42 1,334,733.42 24/06/2013 100 Completed
7 5001/9 CONSTR. OF DAILY PRAYER MOSQUE A. ADO D/KAYA DAGARIYO 1,334,733.42 1,334,733.42 24/06/2013 100 Completed
8 5001/9 CONSTR. OF DAILY PRAYER MOSQUE
BABANDI BUSINESS GAMBAWA 1,334,733.42 1,334,733.42 24/06/2013 100 Completed
9 6003/2 CONSTR. OF DAILY PRAYER MOSQUE SABO ZAKAR MAJINGINI 1,334,733.42 1,334,733.42 24/06/2013 100 Completed
TOTAL 66,171,558.10 66,171,558.10
xxxvi
GWIWWA LOCAL GOVT.
POST CONTRACT PROJECT
EVALUATION PROJECT
S/N HEAD EXECUTOR LOCATION CONTRACT
AMOUNT REVISED COMMENCEMENT STATUS REMARKS
(N) CONTRACT
SUM DATE IN %
1 5004/6
CONSTR. 9-BEDROOM STAFF QUARTERS
ASHALLE NIG. LTD GWIWWA
6,994,051.35
6,994,051.35 10/10/2010 100 COMPLETED
2 4001/4 ELECTRIFICATION PROJECT
B O K NIG LTD
BURMA RUWA
22,506,803.67
22,506,803.67 23/4/2012 100 COMPLETED
3 6002/2 CONSTR. OF DRAINAGE
M/UNGUWA ABDULLAHI RORAU
3,459,318.66
3,459,318.66 21/6/2012 100 COMPLETED
4 5004/6
CONSTR. OF BLOCK OF 2 CLASSROOMS
USMAN NAMADI
ZANGON KAYA
4,128,705.94
4,128,705.94 17/6/2012 100 COMPLETED
5
CONSTR. OF BLOCK OF 2 CLASSROOMS
A TUKUR ALTO DARAGI
4,128,705.94
4,128,705.94 17/6/2012 100 COMPLETED
6 5001/4 CONSTR. OF 2 NO. PIT LATRINE
AUWALU AYUBA K/RUWA PS
676,781.70
676,781.70 Oct-13 100 COMPLETED
7 5004/6
CONSTR OF DAILY PRAYER MOSQUE
HUDU D . FANKE DAGE
1,555,814.93
1,555,814.93 17/6/2012 100 COMPLETED
8 5004/6
CONSTR OF DAILY PRAYER MOSQUE
SAFIYANU USAINI FIRJI
1,555,814.93
1,555,814.93 17/6/2012 100 COMPLETED
9 5004/6
CONSTR OF DAILY PRAYER MOSQUE
ABDULLAHI BAWA U/GANJI
1,555,814.93
1,555,814.93 17/6/2012 100 COMPLETED
10 5001/4
CONSTR. OF 2NO. CLASSROOM BLOCKS
HAROLINE & SONS K/RUWA
2,993,446.00
2,993,446.00 17/6/2012 100 COMPLETED
11 5004/9 INTERLOCKING SHUAIBU DABI 17/6/2012 100 COMPLETED
xxxvii
OF JUMAT MOSQUE
LAWAN 1,556,000.00 1,556,000.00
12 5004/9
INTERLOCKING OF JUMAT MOSQUE
MUSTAPHA MUSA GUNTAI
1,670,707.00
1,670,707.00 17/6/2012 100 COMPLETED
13 5004/9
INTERLOCKING OF JUMAT MOSQUE
AMINU YAHAYA Z/GAURAYE
980,721.00
980,721.00 17/6/2013 100 COMPLETED
14 7002/4 FENCING OF INDIRAWA HALL SADI USMAN GWIWWA
1,999,849.00
1,999,849.00 10/4/2013 100 COMPLETED
15 4006/4 EXTENTION OF LT LINE
MUSHTEK NIG. LTD RORAU MAL
2,999,177.96
2,999,177.96 10/4/2013 100 COMPLETED
16 4006/4 EXTENTION OF LT LINE
MUSHTEK NIG. LTD FIRJI U/UKU
1,630,604.90
1,630,604.90 10/4/2013 100 COMPLETED
17 6001/9
CONSTR. OF COMPLETE WATER SCHEME
FRESS ASSET LTD S/YOLA
9,120,288.00
9,120,288.00 14/5/2013 100 COMPLETED
18 6001/13
PURCHASE OF 27KVA GENERATOR HABU SALE INDIRAWA
2,457,500.00
2,457,500.00 14/5/2013 100 COMPLETED
19 6001/13
PURCHASE OF 27KVA GENERATOR
ABDRHAMAN HABU TSUBUT
2,457,500.00
2,457,500.00 14/5/2013 100 COMPLETED
C/F 74,427,605.91
74,427,605.91
12a
xxxviii
B/F 74,427,605.91
74,427,605.91
21 7002/2 CONSTR. OF ENGINE ROOM
ZUBAIRU RABIU S/YOLA
537,997.30
537,997.30 20/6/2013 100 Completed
22 5004/4 CONSTR. OF ENGINE ROOM
IDRITH ABUBAKAR KORAYAL 537,997.30 537,997.30 20/6/2013 100 Completed
23 6001/7 DRILLING OF BOREHOLE
FRESS ASSET DAN ABZIN 1,840,000.00 1,840,000.00 20/6/2013 100 Completed
24 6001/10 DRILLING OF BOREHOLE
FRESS ASSET LTD INDIRAWA 1,840,000.00 1,840,000.00 20/6/2013 100 Completed
25 6001/10 DRILLING OF BOREHOLE
FRESS ASSET LTD BUNTUSU 1,840,000.00 1,840,000.00 20/6/2013 100 Completed
26 6001/10 DRILLING OF BOREHOLE
FRESS ASSET LTD MARAGANTA 1,840,000.00 1,840,000.00 20/6/2013 100 Completed
27 6001/2 DRILLING OF BOREHOLE
FRESS ASSET LTD DINYA 1,840,000.00 1,463,000.00 20/6/2013 100 Completed
28 6001/2 DRILLING OF BOREHOLE
FRESS ASSET LTD G/KYAU 1,840,000.00 1,463,000.00 20/6/2013 100 Completed
29 4006/1 ELECTRIFICATION PROJECT
MUSHTECK NIG. LTD J/MAHARBA 17,125,623.00 17,125,623.00 20/6/2013 100 Completed
30 4001/4 ELECTRIFICATION PROJECT
DARAGI & SONS
OLD SDP OFFICE 894,937.00 894,937.00 20/6/2013 100 Completed
31 7001/7 CONSTR. OF JUMAAT MOSQUE
MANHAF GLOBAL Z/MAHAUTA 7,112,608.00 7,112,608.00 6/11/2013 100 Completed
32 4006/4 CONSTR. OF JUMAAT MOSQUE
ASA MAIBULAWUS ABUJA 7,112,608.00 7,112,608.00 15/7/2013 100 Completed
33 4006/4 EXTENTION OF LT LINE
MUSHTECK NIG. LTD FIRJI U/UKU 2,364,874.00 2,364,874.00 11/7/2013 100 Completed
34 4007/4 CONSTR. OF LOCK-UP SHOPS
AL. RABE GWIWA GWIWA 2,999,629.00 2,999,629.00 11/6/2013 100 Completed
35 6002/4 CONSTR. OF DRIFT
AMADU AWWALU
GWIWA-SHAFE 2,903,124.00 2,903,124.00 11/6/2013 100 Completed
36 5001/5
COSTR. OF ISLAMIYYA SCHOOL
ISAH A KORAYAL KWAMARAWA 2,911,687.00 2,911,687.00 10/7/2013 100 Completed
37 5001/2 CONSTR. OF 2NO. CLASSROOMS
JAFARU SAIDU FIRJI 5,865,515.00 5,865,515.00 10/7/2013 100 Completed
xxxix
38 5001/2 CONSTR. OF 2NO. PIT LATRINE
M LAWAN USAINI FIRJI 676,781.00 676,781.00 10/7/2013 100 Completed
39 5002/4 CONSTR. OF HEALTH POST
YAHAYA DAGA DINYA 4,618,744.00 4,618,744.00 10/7/2013 100 Completed
40 5004/6 COSTR. OF DAILY PRAYER MOSQUE MUSA BALA WARDAWA 1,555,814.00 1,555,814.00 10/7/2013 100 Completed
C/F 142,685,544.51 141,931,544.51
12b
B/F 142,685,544.51 141,931,544.51
41 5004/6
CONSTR. OF DAILY PRAYER MOSQUE
INUSA HARUNA
KUNDIGA JAMA 1,555,814.00 1,555,814.00 15/7/2013 100 Completed
42 4006/3 ELECTRIFICATION PROJECT
MUSHTECK ENGRR KARSHI 21,931,361.00 21,931,361.00 18/7/2013 100 Completed
43 5004/4 CONSTR. OF WAITING SHED
M GARBA SAADU AGANGARO 630,052.00 630,052.00 18/7/2013 100 Completed
44 5004/4 CONSTR. OF WAITING SHED M SULE ALTO
KARSHI DINYA 630,052.00 630,052.00 18/7/2013 100 Completed
45 5004/4 CONSTR. OF WAITING SHED
M MUSA JAURO TSABAWA 630,052.00 630,052.00 18/7/2013 100 Completed
46 5004/10 CONSTR. OF TOILET MAL SUNUSI
TINKISHI J/MOSQUE 338,390.00 338,390.00 22/7/2013 100 Completed
47 5004/10 CONSTR. OF DANIYA GUNTAI 338,390.00 338,390.00 22/7/2013 100 Completed
xl
TOILET SAIDU
48 5004/7 CONSTR. OF JUMAAT MOSQUE
ASHAL NIG LTD INDIRAWA 7,195,384.30 7,195,384.30 22/7/2013 100 Completed
49 5004/7 CONSTR. OF JUMAAT MOSQUE
ASA MAIBULAWUS GASAKOLI 7,195,384.30 7,195,384.30 22/7/2013 100 Completed
50 5001/2 CONSTR. OF 2NO. CLASSROOMS
SHAFIU ABDULLAHI S/GANGARA 6,338,605.30 6,338,605.30 23/7/2013 100 Completed
51 5001/2 CONSTR. OF 2NO. CLASSROOMS
TUKUR G YARO TABANNI 6,338,605.30 6,338,605.30 23/7/2013 100 Completed
52 6001/14 DRILLING OF BOREHOLE
FRESS ASSETS J/MALAMAI 850,000.00 850,000.00 23/7/2013 100 Completed
53 6001/14 DRILLING OF BOREHOLE
FRESS ASSETS BUNTUSU 850,000.00 850,000.00 23/7/2013 100 Completed
54 6001/14 DRILLING OF BOREHOLE
FRESS ASSETS K/RUWA 850,000.00 850,000.00 23/7/2013 100 Completed
55 6001/14 DRILLING OF BOREHOLE
FRESS ASSETS KURMA 1,463,000.00 1,463,000.00 23/7/2013 100 Completed
56 5002/4 CONSTR. OF HEALTH POST
SULEIMAN ILIYASU KUNDIGA 3,409,446.00 3,409,446.00 28/8/2013 100 Completed
57 5002/4 CONSTR. OF HEALTH POST
ISAH & 2 OTHERS TSABAWA 3,409,446.00 3,409,446.00 28/8/2013 100 Completed
58 6002/4 CONSTR. OF DRAINAGE
ISAH & 2 OTHERS S/YOLA 2,489,030.00 2,489,030.00 28/8/2013 100 Completed
59 5004/4 CONSTR. OF WAITING SHED
ASA MAIBULAWUS T/NAGORA 525,119.00 525,119.00 13/11/2013 100 Completed
60 5004/7 CONSTR. OF JUMAAT MOSQUE
FRESS ASSETS MAIYAKI 7,195,348.30 7,195,348.30 6/11/2013 100 Completed
61 6001/3 CONSTR. OF OVERHEAD TANK
FRESS ASSETS YOLA 1,839,000.00 1,839,000.00 28/8/2013 100 Completed
62 6001/3 CONSTR. OF OVERHEAD TANK
FRESS ASSETS
MPHC GWIWA 1,839,000.00 1,839,000.00 28/8/2013 100 Completed
TOTAL
220,527,024.01
219,773,024.01
xli
GWARAM LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED
CONTRACT SUM
COMMENCEMENT STATUS REMARKS
AMOUNT DATE IN %
1 CONST. OF PUBLIC CONVINIENCE YAYARIN TUKUR NIG. LTD
GWARA TOWN 8,012,900.85 8,012,900.85
1/11/2013 100 Completed
2 CONST. OF PUBLIC CONVINIENCE YAYARIN TUKUR NIG. LTD GWANI 8,012,900.85 8,012,900.85
6/11/2013 100 Completed
3 COMPLETE SOLAR W/SCHEME YAYARIN TUKUR NIG. LTD GWARAM TOWN 6,446,470.60 6,446,470.60
6/11/2013 100 Completed
4 COMPLETE SOLAR W/SCHEME YAYARIN TUKUR NIG. LTD GWANI 6,446,470.60 6,446,470.60 6/11/2013 100 Completed
5 CONST. OF PUBLIC CONVINIENCE IYE ENGG. SERVICES KILA 8,012,900.85 8,012,900.85
23/10/2013 100 Completed
6 COMPLETE SOLAR W/SCHEME IYE ENGG. SERVICES KILA 6,446,470.60 6,446,470.60 23/10/2013 100 Completed
7 COMPLETE SOLAR W/SCHEME ASSD VENTURES SARA 6,446,470.60 6,446,470.60 23/11/2013 100 Completed
8 CONST. OF PUBLIC CONVINIENCE ASSD VENTURES SARA 8,012,900.85 8,012,900.85
23/11/2013 100 Completed
9 CONST. OF PUBLIC CONVINIENCE LAMU & BABALDU BASIRKA 8,012,900.85 8,012,900.85
23/10/2013 100 Completed
10 COMPLETE SOLAR W/SCHEME LAMU & BABALDU BASIRKA 6,446,470.60 6,446,470.60 23/12/2013 100 Completed
Total 72,296,857.25
72,296,857.25
xlii
HADEJI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM DATE IN %
1 4000/2
CONSTR. OF PUBLIC CONVINIENCE
KAWU NIG LTD
HADEJIA/JAMARE A
7,446,169.00
7,446,169.00 31/12/2013 100 Completed
2 5004/2
CONSTR. OF PUBLIC CONVINIENCE
KAWU NIG LTD
HADEJIA/JAMARE B
7,446,169.00
7,446,169.00 31/12/2013 100 Completed
3 2009/2
CONSTR. OF PUBLIC CONVINIENCE
ALH. DANYARO WELDER MEDICAL STORE
7,446,169.00
7,446,169.00 31/12/2013 100 Completed
4 4001/2
CONSTR. OF PUBLIC CONVINIENCE
KAWU NIG LTD M/MADORI ROAD
7,446,169.00
7,446,169.00 31/12/2013 100 Completed
5 4001/2
CONSTR. OF PUBLIC CONVINIENCE
KAWU NIG LTD YANKIFI MARKET
7,446,169.00
7,446,169.00 31/12/2013 100 Completed
6 4001/2
RENOVATION OF PUBLIC CONVIIENCE
KAWU NIG LTD
TSOSHUWAR TASHA
581,496.00
581,496.00 31/12/2013 100 Completed
7 4001/2
RENOVATION OF PUBLIC CONVIIENCE
KAWU NIG LTD
CENTRAL MOSQUE
1,626,213.00
1,626,213.00 31/12/2013 100 Completed
8 4001/2
RENOVATION OF PUBLIC CONVIIENCE
KAWU NIG LTD
S/TASHA YANHATSI
2,141,980.00
2,141,980.00 31/12/2013 100 Completed
9 4001/2
RENOVATION OF PUBLIC CONVIIENCE
KAWU NIG LTD KASUWAR KIFI
3,096,451.05
3,096,451.05 31/12/2013 100 Completed
xliii
10 4001/2
COMPLETE SOLAR WATER SCHEME
KAWU NIG LTD
HADEJIA/JAMARE B
6,646,470.60
6,646,470.60 31/12/2013 100 Completed
C/F 51,323,455.65
51,323,455.65
13a
B/F 51,323,455.65
51,323,455.65
11 4001/2
COMPLETE SOLAR WATER SCHEME
KAWU NIG LTD
HADEJIA/JAMARE A
6,646,470.00
6,646,470.00 31/12/2013 100 Completed
12 4001/2
COMPLETE SOLAR WATER SCHEME
KAWU NIG LTD M/MADORI ROAD
6,646,470.00
6,646,470.00 31/12/2013 100 Completed
13 4001/2
COMPLETE SOLAR WATER SCHEME
KAWU NIG LTD YANKIFI MARKET
6,646,470.00
6,646,470.00 31/12/2013 100 Completed
14 4001/2
COMPLETE SOLAR WATER SCHEME
A MOHD NABAKIN
DOGO CENTRAL MOSQUE
6,646,470.00
6,646,470.00 31/12/2013 100 Completed
15 4001/2
COMPLETE SOLAR WATER SCHEME
KAWU NIG LTD MEDICAL STORE
6,646,470.00
6,646,470.00 31/12/2013 100 Completed
TOTAL 84,555,805.65
84,555,805.65
xliv
JAHUN LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION REVISED
COMMENCEMENT
STATUS REMARKS
CONTRACT
SUM (N) CONTRACT
SUM (N) DATE IN %
1 6001/
2 CONSTR. OF OPEN WELL AMADU DANAKWARA BAJIDAWA 180,000.00
180,000.00 4/3/2013 100 COMPLETED
2 4005/
4 PURCHASE OF TRANSFORMER
IBRACO MAFRICA NIG LTD
HARBO TSOHUWA 2,807,437.50
2,807,437.50 7/1/2013 100 COMPLETED
3 7004/
4 CONSTR. OF 5 DAILY PRAYER MOSQUE
M GARBA DANYARO GEMU YANSABO 950,000.00
950,000.00 12/3/2013 100 COMPLETED
4 6001/
2 CONSTR. OF OPEN WELL M ABDU MAIGORO GIDAN MAJE 180,000.00
180,000.00 14/3/2013 100 COMPLETED
5 6001/
3 CONSTRUCTION OF COMPLETE WATER SCHEME
LIMIS BROTHERS AUJARA 8,317,522.90
8,317,522.90 22/3/2013 100 COMPLETED
6 5005/
4 ELECTRIFICATION WORK
IBRACO MAFRICA NIG LTD ZANGO 2,229,467.77
2,229,467.77 20/3/2013 100 COMPLETED
7 4005/
4 ELECTRIFICATION PROJECT MARB ENGINEERING
ASAYAYA-KUKA KWACE 21,856,431.09
21,856,431.09 2/4/2013 100 COMPLETED
8 LAND COMPENSATION ALH. SHUAIBU JIJI JAHUN 350,000.00
350,000.00 4/4/2013 100 COMPLETED
9 6001/
4 RETICULATION WORK LIMIS BROTHERS GANDUN HAKIMI 4,608,450.00
4,608,450.00 4/4/2013 100 COMPLETED
10 6001/
1 PURCHASE H/PUMP MATERIALS ABBA IBRAHIM LG SEC 3,830,370.00
3,830,370.00 6/4/2013 100 COMPLETED
11 6001/
1 CONSTR. OF 10NO. H/PUMPS LIMIS BROTHERS V/PLACES 3,500,000.00
3,500,000.00 5/6/2013 100 COMPLETED
12 4005/
4 ELECTRIFICATION PROJECT
IBRACO MAFRICA NIG LTD AJURA 2,670,869.25
2,670,869.25 11/6/2013 100 COMPLETED
13 6001/
2 SUPPLY OF FURNITURE MOHD YUSIF STAFF QTRS 953,589.00 953,589.00 8/7/2013 100 COMPLETED
xlv
C/F 52,434,137.51 52,434,137.51
BF 52,434,137.51 52,434,137.51
15 5004/4 CONSTR. OF OPEN WELL KANI AUJARA BADIN 180,000.00 180,000.00 8/7/2013 100 COMPLETED
16 5004/4 GENERAL REHABLITATION OF COMPRE. HEALTH CENTERDIRECT LABOUR KADOAWAWA 14,383,924.00 14,383,924.00 1/12/2012 100 COMPLETED
17 6001/2 CONSCR. OF FRIDAY PRAYER MOSQUEDIRECT LABOURTARAYE & GWAMPAI 8,000,000.00 8,000,000.00 1/12/2012 100 COMPLETED
18 6001/2 CONSTR. OF FIVE DAILY PRAYER MOSQUED/MAIGADA GORA 882,589.00 882,589.00 7/3/2012 100 COMPLETED
19 5005/4 ELECTRIFICATION PROJECT IBRACO MARFARICA ATUMAN 18,123,262.98 18,123,262.98 18/11/2011 100 COMPLETED
TOTAL 94,003,913.49 94,003,913.49
xlvi
KAFIN HAUSA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
REVISED CONTRACT
SUM
COMMENCEMENT DATE
STATUS REMARKS
1 ELECTRIFICATION PROJECT PURE HAND KUNUNU 7,336,100.25 7,336,100.25 21/06/2010 100 COMPLETED
2 ELECTRIFICATION PROJECT PURE HAND ABDALLAWA 8,895,924.81 8,895,924.81 21/06/2010 100 COMPLETED
3 COMPLETE M/ WATER SCHEME WATSAN BIRKIDI 7,688,006.45 7,688,006.45 21/6/2010 100 COMPLETED
4 COMPLETE M/ WATER SCHEME WATSAN KWARMAZA 6,365,933.15 6,365,933.15 21/06/2010 100 COMPLETED
5 CONSTR. OF SLAUGHTER HOUSE A. JAFARU M/GORO K/HAUSA 6,965,171.08 6,965,171.08 10/8/2011 100 COMPLETED
6 CONST. OF SLAUGHTER HOUSE A. ISIYAKA BUDAN BULANGU 6,965,171.08 6,965,171.08 10/8/2011 100 COMPLETED
7 ELECTRIFICATION PROJECT PURE HAND KORE 8,070,240.00 8,070,240.00 23/6/2010 100 COMPLETED
8 COMPLETE M/ WATER SCHEME DIRECT LABOUR
AGURAN MAZANA 8,318,479.00 8,318,479.00 23/6/2010 100 COMPLETED
9 CONSTR. OF JUMAAT MOSQUE DIRECT LABOUR
TAMBALE 2,000,000.00 2,000,000.00 10/8/2011 100 COMPLETED
10 REACTIVATION OF SOLAR BOREHOLE LAWAL BUSURI
G/SARKI 1,504,117.00 1,504,117.00 24/4/2012 100 COMPLETED
11 RENV. OF 2NO. 3-B-ROOM HOUSE Y/INVEST STAFF QTRS 11,972,003.12 11,972,003.12 10/10/2012 100 COMPLETED
12 RENV. OF 1NO. 2-BEDROOM HOUSE ALHAJI BABANI STAFF QTRS 7,185,219.36 7,185,219.36 10/10/2012 100 COMPLETED
13 RENV OF 1NO. 5-BEDROOM HOUSE ALH. ZAKAR A
JABO STAFF QTRS
6,615,902.24 6,615,902.24 10/10/2012 100 COMPLETED
14 PUBLICATION OF MAGAZINE
ISHAQ PUBLICATION
SERVICES K/HAUSA 450,000.00 450,000.00 5/2/2013 100 COMPLETED
15 DRILLING OF HAND PUMP MOHD A SARAWA
SARAWA BUS STOP 250,000.00 250,000.00 10/2/2013 100 COMPLETED
16 DRILLING OF HAND PUMP ALH. TATA M/GORO
TAMBALE CEMETRY 250,000.00 250,000.00 18/2/2013 100 COMPLETED
xlvii
17 DRILLING OF HAND PUMP
ALIYU ABDULLAHI
D/TOKA AUNO BELI 250,000.00 250,000.00 20/2/2013 100 COMPLETED
18 DRILLING OF HAND PUMP IDRITH
ABDULLAHI AUNO MAKERA 250,000.00 250,000.00 20/2/2013 100 COMPLETED
C/F 91,332,267.54 91,332,267.54
16a
B/F 91,332,267.54 91,332,267.54
19 DRILLING OF HAND PUMP
KABIRU HADAGWAIGWA
I LUFUDA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
20 DRILLING OF HAND PUMP BUBA KABO SABARA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
21 DRILLING OF HAND PUMP LAWAL BUSORI YOLA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
22 DRILLING OF HAND PUMP MAIGARI MUSA G/KANYA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
23 DRILLING OF HAND PUMP A GARBA BODO KURZA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
24 DRILLING OF HAND PUMP ABDULLAHI D/ATAFOWA KWAIMAWA 250,000.00 250,000.00 20/3/2013 100 COMPLETED
25 DRILLING OF HAND PUMP ABDALLA
ABDULLAHI BULANGU CHC 250,000.00 250,000.00 29/4/2013 100 COMPLETED
26 DRILLING OF HAND PUMP GAMBO A MUSA BULANGU
CHC 250,000.00 250,000.00 29/4/2013 100 COMPLETED
27 ELECTRIFICATION PROJECT A YA'U
M/KANYU AUTAKO VILLAGE 4,999,660.42 4,999,660.42 8/5/2013 100 COMPLETED
28 CONSTR. OF 4NO. MARKET STALLS A MOHD TOYIN BULANGU 1,840,000.00 1,840,000.00 8/5/2013 100 COMPLETED
29 CONSTR. OF 4NO. MARKET STALLS A JAFARU M/GORO
K/HAUSA MARKET 1,840,000.00 1,840,000.00 8/3/2013 100 COMPLETED
30 CONSTR. OF 3NO. MARKET STALLS SABO
KWATALO KWATALO MARKET 1,380,000.00 1,380,000.00 8/3/2013 100 COMPLETED
31 CONSTR. OF 2NO. MARKET STALLS A KANI JABO JABO MARKET 920,000.00 920,000.00 8/3/2013 100 COMPLETED
xlviii
32 CONSTR. OF 4NO. MARKET STALLS KAMILU ADAMU
RUBA
RUBA MARKET 920,000.00 920,000.00 8/3/2013 100 COMPLETED
TOTAL 105,231,927.96 105,231,927.96
xlix
KAZAURE LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED CONTRACT
SUM
COMMENCEMENT STATUS REMARKS
AMOUNT DATE IN %
1 CONSTR. OF PUBLIC CONVINIENCE
MANU GEN. CONST & ENGG
KAZAURE B/HOSPITAL 7,446,169.60 7,446,169.60 20/11/2013 100 COMPLETED
2 CONSTR. OF PUBLIC CONVINIENCE
MANU GEN. CONST & ENGG KANTI 7,446,169.60 7,446,169.60 20/11/2013 100 COMPLETED
3 COMPLETE SOLAR W/SCHEME
K-MANU GEN CONSTR. KANTI 6,646,470.60 6,646,470.60 21/11/2013 100 COMPLETED
4 COMPLETE SOLAR W/SCHEME
HOME AGE HYDRO WORKS GADA KASUWA 6,646,470.60 6,646,470.60 22/01/2013 100 COMPLETED
5 CONSTR. OF PUBLIC CONVINIENCE
KAZAYA NIG LTD GADA KASUWA 7,880,135.00 7,880,135.00 20/11/2013 100 COMPLETED
TOTAL
36,065,415.40 36,065,415.40
l
KIRIKASAMMA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION
CONTRACT AMOUNT REVISED
COMMENCEMENT
STATUS REMARKS
(N) CONTRACT SUM
(N) DATE IN %
1 ELECTRIFICATION PROJECT
TURABU CONSTRUCTION KARGIDI
16,941,845.00
16,941,845.00 8/3/2013 100 COMPLETED
2 ELECTRIFICATION PROJECT ALH. T. MOHD BULUNCHAI
17,390,293.00
17,390,293.00 8/3/2013 100 COMPLETED
3 ELECTRIFICATION PROJECT ALH. T. MOHD KABAK
16,350,506.00
16,350,506.00 3/5/2013 100 COMPLETED
4 ELECTRIFICATION PROJECT KAWU NIG LTD GADARI
8,958,703.36
8,958,703.36 18/7/2013 100 COMPLETED
5 ELECTRIFICATION PROJECT
TURABU CONSTRUCTION MAGUWA
13,715,920.09
13,715,920.09 18/7/2013 100 COMPLETED
6 ELECTRIFICATION PROJECT USMAN MOHD BUSUKU
10,091,729.55
10,091,729.55 18/7/2013 100 COMPLETED
7 SOLAR WATER SCHEME A. D. Z GLOBAL MARAWAJI 7,793,394.00
7,793,394.00 8/3/2013 100 COMPLETED
8 SOLAR WATER SCHEME A. D. Z GLOBAL KIRA 8,793,394.00
8,793,394.00 8/3/2013 100 COMPLETED
9 SOLAR WATER SCHEME A. D. Z GLOBAL ALLUWARI 6,257,760.60
6,257,760.60 10/6/2013 100 COMPLETED
10 UPGRADING OF WATER SCHEME
GLOMA GEN ENTPRISES DILMARI
3,731,721.61
3,731,721.61 10/6/2013 100 COMPLETED
11 UPGRADING OF W/SUPPLY A. D. Z GLOBAL MATARA GANJI
6,077,610.00
6,077,610.00 3/5/2013 100 COMPLETED
12 CONSTR. OF FRIDAY MOSQUE
GARBA MOHD SAWO IYO
9,792,370.00
9,792,370.00 8/3/2013 100 COMPLETED
13 CONSTR. OF FRIDAY MOSQUE
ISA ADAMU MATARA M/GALADIMA
9,792,370.00
9,792,370.00 8/3/2013 100 COMPLETED
li
14 CONSTR. OF FRIDAY MOSQUE DODO MOHD MATTAFARI
8,984,241.00
8,984,241.00 8/3/2013 100 COMPLETED
15 CONSTR. OF FRIDAY MOSQUE
IBRAHIM USMAN GANJI M/GARIGANA
9,792,370.00
9,792,370.00 8/3/2013 100 COMPLETED
16 CONSTR. OF FRIDAY MOSQUE YUSIF MAAJI GAYIN
8,984,241.00
8,984,241.00 8/3/2013 100 COMPLETED
17 CONSTR. OF FRIDAY MOSQUE
ADAMU IBRAHIM GIRA MALAKAURI
8,984,241.00
8,984,241.00 8/3/2013 100 COMPLETED
18 SIMPLE SPAN CULVERT & FILLING ALHAJI DILYARI KURA DIGE ROAD
1,113,388.00
1,113,388.00 3/5/2013 100 COMPLETED
C/F 173,546,098.21
173,546,098.21
18a
B/F 173,546,098.21
173,546,098.21
19 SIMPLE SPAN CULVERT & FILLING
ALH. ALIN JANMAKO ILALLAH ROAD
1,145,741.00
1,145,741.00 3/5/2013 100 COMPLETED
20 SIMPLE SPAN CULVERT & FILLING ADAMU ISA ILALLAH ROAD
2,065,943.00
2,065,943.00 10/6/2013 100 COMPLETED
21 CONSTR. OF DAILY PRAYER MOSQUE
A USMAN GUJI TARABU LG QUARTERS
4,152,810.52
4,152,810.52 17/7/2013 100 COMPLETED
22 CONVERSION OF TOILET TO OFFICE
MUSA ABDULLAHI
LG SECRETARIATE
937,721.61
937,721.61 18/7/2013 100 COMPLETED
23 CONSTR. OF DOUBLE SPAN CULVERT MOHD BAKO GAYIN
7,096,428.00
7,096,428.00 18/7/2012 100 COMPLETED
24 CONST OF 500 SEATER HALL
TURABU CONSTRUCTION K/KASAMMA
17,243,128.20
17,243,128.20 18/7/2013 100 COMPLETED
25 CONSTR. OF WOMEN CENTER YUSIF MAAJI K/KASAMMA
6,952,387.50
6,952,387.50 3/5/2013 100 COMPLETED
26 CONSTR. OF CULVERT SLAB
SADI ABBA GASHINAWO IYO
801,700.00
801,700.00 3/4/2013 100 COMPLETED
lii
27 CONS OF 2NO. SIGLE CULVERT
MOHD GARBA JIYAN TAGE
2,225,907.00
2,225,907.00 2/2/2013 100 COMPLETED
28 PURCHASE OF 2NO. SHARON BUSES
DIRECT PURCHASE LG
2,600,000.00
2,600,000.00 3/5/2013 100 COMPLETED
29 PUR. OF MODEL F BUS DIRECT PUR. LG 1,400,000.00
1,400,000.00 10/6/2013 100 COMPLETED
30 CONSTR. OF 956M ENBANKMENT USMAN MOHD LIKORI
3,794,364.00
3,794,364.00 10/6/2013 100 COMPLETED
31 PUR. OF FURNITURE CM HOUSE
SAMINU HUSSAINI LG
2,205,682.00
2,205,682.00 10/6/2013 100 COMPLETED
32 PUR. OF FURN. TO SEC,DAGS & DPRS
SAMINU HUSSAINI LG
2,177,775.00
2,177,775.00 14/11/2013 100 COMPLETED
33 CONSTR. OF1257M ENBANKMENT
TURABU CONST
SUMANU/MASAMA
5,189,033.00
5,189,033.00 3/5/2013 100 COMPLETED
34 CONSTR. OF C. LODGE TURABU CONST TURABU 26175368.94 26175368.94 18/7/2013 100 COMPLETED
35 ELECTRIFICATION PROJECT
TURABU CONSTR. BARMAGUWA
11,365,146.90
11,365,146.90 18/7/2013 100 COMPLETED
TOTAL 271,075,234.88
271,075,234.88
liii
MAIGATARIN LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT REVISED COMMENCEMENT STATUS REMARKS
(N) CONTRACT
SUM (N) DATE IN %
1 RATICULATION WORK DAYYABU RAMBO KAKIJULA 1,275,304.00 1,275,304.00 16/01/13 100 COMPLETED
2 CONSTR. OF HANDPUMP HARUNA BAUSHE GIDAN SARKI 429,000.00 429,000.00 12/2/2013 100 COMPLETED
3 CONSTR. OF HANDPUMP SULE HABU RIGAR SAIDU 429,000.00 429,000.00 12/2/2013 100 COMPLETED
4 CONSTR. OF HANDPUMP 2NO. UMAR SANDA
MAKABARTA/K/KUDU BSW 858,000.00 858,000.00 12/2/2013 100 COMPLETED
5 CONSTR. OF HANDPUMP 3NO.
ALH ISYAKU IBRAHIM B/TASHA/K/YAMMA 1,287,000.00 1,287,000.00 12/2/2013 100 COMPLETED
6 SUPPLY OF 2NO. WATWR GENERATORS
HALI DRILLERS. YANWAKE/BOSUWA 6,328,000.00 6,328,000.00 6/2/2013 100 COMPLETED
7 COMPLETE WATER SCHEME DIRECT LABOUR
BUZAYE/WAKILI MADO 10,549,545 10,549,545 6/2/2013 100 COMPLETED
8 CONSTR. OF OVERHEAD WATER TANK HALI DRILLERS JAJERI 4,026,100.00 4,026,100.00 15/3/13 100 COMPLETED
9 COMPLETE WATER SCHEME HALI DRILLERS GARMAKA 17,016,095.00 17,016,095.00 14/03/13 100 COMPLETED
10 ELECTRIFICATION PROJECT. ISAH TURAKI K/DANIYA- JAJERI 718,885.13 718,885.13 4/4/2013 100 COMPLETED
11 CONSTR. OF HANDPUMP ALH. ROMA/NADIDIJI F/FULANI 429,000.00 429,000.00 12/4/2013 100 COMPLETED
12 ELECTRIFICATION PROJECT. MUHAHIB NIG LTD ARBUS 9,820,425.00 9,820,425.00 18/4/13 100 COMPLETED
13 CONSTR. OF DENTAL CLINIC YAHAYA IBRAHIM PHC MAIGATARI 3,691,065.21 3,691,065.21 23/04/13 100 COMPLETED
liv
14 REPAIR OF HT LINE ALH. ISA TURAKI K/DANIYA - JAJERI 1,071,191.10 1,071,191.10 2/1/2012 100 COMPLETED
15 CONSTR. OF HANDPUMP 2NO.
DIRECT LABOUR
B/DANIYA & DANKWARBO 700,000.00 700,000.00 30/3/2013 100 COMPLETED
C/F
58,628,610.91
58,628,610.91
21a
B/F
58,628,610.91
58,628,610.91
16 CONSTR. OF DOCTOR'S HOUSE
GARE INVESTMENT BOSUWA 6,743,634.00 6,743,634.00 20/05/13 100 COMPLETED
17 RENOVATION OF FM STATION MAL. ARI DABO EPZ MAIGATARI 646,657.00 646,657.00 6/6/2013 100 COMPLETED
18 DRILLING OF 6" BOREHOLE & ACCESORIES HALI DRILLERS MJAIGATARI 2,800,000.00 2,800,000.00 6/6/2013 100 COMPLETED
19 DRILLING OF 6" BOREHOLE & ACCESORIES HALI DRILLERS MAIGATARI 8,524,950.00 8,524,950.00 6/6/2013 100 COMPLETED
20 DRILLING OF 6" BOREHOLE & ACCESORIES HALI DRILLERS KAKI JULA 4,202,760.00 4,202,760.00 6/6/2013 100 COMPLETED
21 DRILLING OF 6" BOREHOLE & ACCESORIES HALI DRILLERS KANKARE 4,169,300.00 4,169,300.00 6/6/2013 100 COMPLETED
22 RENOVATION OF HOUSE NO. 6 L.G QTRS
ALH. WADA SALIS MAIGATARI 2,220,436.13 2,220,436.13 14/06/13 100 COMPLETED
23 CONSTR. OF DRAINAGE ALH. SAFINU & OTHERS DAKIDO 4,313,196.39 4,313,196.39 14/6/13 100 COMPLETED
24 SUPPLY OF 1 NO. 60KVA GENERATOR
S UMAR CHAMO MAIGATARI 3,169,000.00 3,169,000.00 15/8/13 100 COMPLETED
25 COSTRUCTION OF 4 SEATER PIT LATRINE
ALH. SALE TSUNI MAIGATARI 1,249,719.03 1,249,719.03 2/1/2013 100 COMPLETED
C/F 96,668,263.46 96,668,263.46
lv
21b
B/F 96,668,263.46 96,668,263.46
26 CONSTR. OF PUBLIC CONVENIENCE KANU NIG LTD
MAIGATARI C MARKET 7,446,169.60 7,446,169.60 13/11/2013 100 COMPLETED
27 COMPLETE SOLAR WATER SCHEME
MUHABIB NIG LTD
MAIGATARI C MARKET 6,646,470.60 6,646,470.60 13/11/2013 100 COMPLETED
28 COMPLETE SOLAR WATER SCHEME
TALAKU INTERGRATED SERVICS
MAIGATARI C MARKET 13,292,941.20 13,292,941.20 13/11/2013 100 COMPLETED
29 RATICULATION WORK DAYYABU RAMBO KANKARE 1,574,695.00 1,574,695.00 16/01/2013 100 COMPLETED
30 ELECTRIFICATION PROJECT A SANI ADAMU
LTD MAIGATARI
8,524,542.00
8,524,542.00 27/3/2012 100 COMPLETED
31 RENOVATION & FURNISHING OF DOCTORS HOUSE TANIMU MAGAJI MAIGARI PHC
1,410,000.00
1,410,000.00 30/7/2012 100 COMPLETED
32 CONSTRUCTION OF FRIDAY MOSQUE A I G VENTURES BOSUWA
22,932,511.25
22,932,511.25 22/12/2011 100 COMPLETED
TOTAL
158,495,593.11
158,495,593.11
lvi
MALAM MADORI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM
(N) DATE IN %
1 WALL FENCING AND GATE MANNIRU & HARUNA
KAMPALA H/ POST
315,888.00
315,888.00 19/3/2013 100 COMPLETED
2 CONSTR. OF 3-SEATER PIT LATRINE
BABANNAN KOLI & KOLI KAMPALA
351,169.52
351,169.52 19/3/2013 100 COMPLETED
3 ELECTRIFICATION PROJECT ALH. IDRIS MAIYADI KAMPALA
530,000.00
530,000.00 19/3/2013 100 COMPLETED
4 ELECTRIFICATION PROJECT HASSANA IASAH DAKIDO
1,658,995.00
1,658,995.00 6/3/2013 100 COMPLETED
5 PURCHASE OF TOYOTA HILUX DIRECT PURCHASE
M/MADORI DIVISION
5,550,000.00
5,550,000.00 13/5/2013 100 COMPLETED
6 CONSTR OFENBANKMENT DAN AD CON. COMPANY
VARIOS VILLAGES
10,000,000.00
10,000,000.00 5/5/2013 100 COMPLETED
7 PURCHASE OF OFFICIAL VEHICLE DIRECT PURCHASE LG COUNCIL
1,500,000.00
1,500,000.00 3/6/2013 100 COMPLETED
8 CONSTR. OF CENTRAL MOSQUE
ADAMA WORLD WIDE M/MADORI
43,575,069.00
43,575,069.00 4/6/2013 100 COMPLETED
9 CONSTR. OF DISTRICT H. HOUSE JARAKO NIG LTD M/MADORI
7,449,000.00
7,449,000.00 3/72013 100 COMPLETED
10 ELECTRIFICATION PROJECT PASE II
PRESTIGE INVETMENT JAJIKURA
2,153,448.00
2,153,448.00 19/3/2013 100 COMPLETED
11 CONSTR. OF JUMAAT MOSQUE JARAKO NIG LTD MAIRAKUMI
3,750,012.00
3,750,012.00 18/4/2013 100 COMPLETED
12 PURCHASE OF H/PUMP MATERIALS DIRECT PURCHASE LG COUNCIL
7,000,000.00
7,000,000.00 18/4/2013 100 COMPLETED
13 CONSTR. OF H/PUMP 4 VILLAGES 1,400,000.00
1,400,000.00 7/6/2013 100 COMPLETED
14 LAND COMPENSATION DIRECT PAYMENT M/MADORI 4/9/2013 100 COMPLETED
lvii
450,000.00 450,000.00
15 LAND COMPENSATION DIRECT PAYMENT M/MADORI 3,000,000.00
3,000,000.00 17/9/2013 100 COMPLETED
16 CONSTR. OF JUMAAT MOSQUE DUTSEN TAURA GARIN GABAS
14,505,015.21
14,505,015.21 3/11/2011 100 COMPLETED
TOTAL 103,188,596.73
103,188,596.73
lviii
SULE TANKARKAR LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N.HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENTSTATUS REMARKS
AMOUNT CONTRACT SUM (N) DATE IN %
1 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL ABDULLAHI DODO SULAWA FULANI 3,621,000.00 3,621,000.00 15/4/2012 100 COMPLETED
2 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL TIJJANI SAYYADI GIDAN MARKE 3,621,000.00 3,621,000.00 Aug-12 100 COMPLETED
3 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL ABUBAKAR MOHD GWADAYI 3,621,000.00 3,621,000.00 4/4/2012 100 COMPLETED
4 4006/1 ELECTRIFICATION PROJECT SAHEL & ASSOCIATE MAI TSAMIYA 42,000,000.00 42,000,000.00 Oct-10 100 COMPLETED
5 4006/1 ELECTRIFICATION PROJECT PRESTIGE NIG LTD DANYARDA 13,875,109.50 13,875,109.50 Oct-10 100 COMPLETED
7 6001/1 RENOVATION. OF LG STAFF QUARTERS MAIWAKE STAFF QTRS 17,688.92 17,688.92 Jun-10 100 COMPLETED
8 4006/1 DRILLING OF 2NO M/BOREHOLES A SANI FULAWA SHAFTA/U/MAGAJI 13,420,000.00 13,420,000.00 Jan-08 100 COMPLETED
9 4006/1 DRILLING OF 24NO. H/PUMP TRIL DRILLING LTD V/LOCATIONS 10,596,000.00 10,596,000.00 Jan-11 100 COMPLETED
10 4006/1 COMPLETE SOLAR WATER SCHEME
LOYALTY
PROPERTIES LTD KUKAWA 6,467,470.60 6,467,470.60 21/11/2013 100 COMPLETED
11 5002/2 CONSTR. OF PUBLIC CONVENIENCE
LOYALTY
PROPERTIES LTD SULE-TANKARKAR. 8,012,999.85 8,012,999.85 21/11/2013 100 COMPLETED
12 4006/1 DRILLING OF HANDPUMP
TRIAL DRILLING &
CONSTR. LULA 686,418.60 686,418.60 4/5/2013 100 COMPLETED
13 4006/1
COMPLETE MOTORISED WATER
SCHEME
FELLY MORE INVST.
LTD BAGGADE 10,071,128.03 10,071,128.03 19/9/2013 100 COMPLETED
14 4006/1
COMPLETE MOTORISED WATER
SCHEME
FELLY MORE INVST.
LTD DANGAYA 10,071,128.03 10,071,128.03 19/9/2013 100 COMPLETED
15 4002/1 SUPPLY OF 2 NO. GENERATORS KUYORO & SONS DANLADI/DANBANKI 6,173,000.00 6,173,000.00 22/10/2013 100 COMPLETED
16 4006/1 DRILLING OF HANDPUMPS
TRIAL DRILLING &
CONSTR. SOME WARDS 3,775,200.00 3,775,200.00 21/5/2013 100 COMPLETED
17 5001/1 CONSTR. OF 7NO. WASTE POINTS SABI U MUSA IDRIS 7 WARDS 2,325,232.81 2,325,232.81 25/5/2013 100 COMPLETED
19 4006/1 DRILLING OF 2 NO. HANDPUMPS
TRIAL DRILLING &
CONSTR. TAKATSABA 1,394,596.80 1,394,596.80 3/5/2013 100 COMPLETED
TOTAL 139,748,973.14 139,748,973.14
lix
TAURA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT SUM DATE IN %
1 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD GUJUNGU K/SHANU 8,012,990.85 8,012,990.85 30/10/2013 100 COMPLETED
2 COMPLETE SOLAR W/SCHEME KAWU NIG LTD GUJUNGU K/SHANU 6,646,470.60 6,646,470.60 30/10/2013 100 COMPLETED
3 CONSTR. OF PUBLIC CONVINIENCE AA SHITTU GUJUNGU MARKET 8,012,999.85 8,012,999.85 1/11/2013 100 COMPLETED
4 COMPLETE SOLAR W/SCHEME 313 DRILLING &
CONS LTD TAURA M,ARKET 6,646,470.60 6,646,470.60 30/10/2013 100 COMPLETED
5 CONSTR. OF PUBLIC CONVINIENCE AA SHITTU TAURA M,ARKET 8,012,999.85
8,012,999.85 1/11/2013 100 COMPLETED
6 COMPLETE SOLAR W/SCHEME AA SHITTU GUJUNGU MARKET
6,646,470.60
6,646,470.60 30/10/2013 100 COMPLETED
TOTAL 43,978,402.35 43,978,402.35
lx
RONI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT
SUM IN %
1 5002/2 CONSTR. OF HEALTH CENTER BELLO HARUNA TUTUBE
2,224,624.50
2,224,624.50 13/8/2012 100 Completed
2 5002/2 CONSTR. OF HEALTH CENTER UMAR SALMA &
OTHER WUDDI
2,224,624.50
2,224,624.50 15/82012 100 Completed
3 4006/2 ELECTRIFICATION PROJECT ALH. SHEHU UMAR JANGEFE
20,603,306.59
20,603,306.59 10/7/2012 100 Completed
4 6001/5 CONST. OF MOTORISED WATER SCHEME ALH GARZALI YAU UNGUWAR KAYA
14,289,966.60
14,289,966.60 12/6/2012 100 Completed
5 5004/1 COMPLETION OF ISLAMIYYA SCHOOL A. YUSIF & OTHERS
FANFAN ISKA RONI
1,000,000.00
1,000,000.00 4/6/2012 100 Completed
6 5004/2 CONSTR. OF JUMAAT MOSQUE
YANDOMA VENTURES GORA
3,800,000.00
3,800,000.00 13/8/2012 100 Completed
7 4008 CONSTR. OF DRAINAGE ALH. ABDU DAM JATAKA 897,028.16
897,028.16 13/4/2012 100 Completed
8 6001/5 DRILLING OF 6NO. H/PUMP LIMIS BROTHERS
CO. V/LOCATIOS 7,081,160.00
7,081,160.00 10/10/2011 100 Completed
9 4008/2 CONSTR. OF CULVERT/DRAINAGE
GARBART ENTPRISES AMARYAWA
4,383,496.08
4,383,496.08 3/11/2011 100 Completed
10 5003/1 CONSTR. 3-SEATER LATRINE GARBART
ENTPRISES AMARYAWA 1,418,798.09 1,418,798.09 3/11/2011 100 Completed
11 4006/2 ELECTRIFICATION PROJECT CHAMO ENGINEERING JANGEFE
20,630,306.97
20,630,306.97 10/7/2013 100 Completed
12 6001/5 CONSTR. MOTORISED WATER SCHEME C0 ROM NIG. LTD UNGUWAR KAYA
14,289,966.60
14,289,966.60 15/05/2013 100 Completed
13 5004/2 CONSTR. OF MORDERN PUBLIC CONVINIENCE AA SHTU RONI
8,012,999.85
8,012,999.85 24/11/2013 100 Completed
14 5004/2 CONSTR OF MODERN. PUBLIC CONVINIENCE AA SHTU RONI
7,446,169.60
7,446,169.60 24/11/2013 100 Completed
lxi
15 6001/1 CONSTR. OF 2NO. SOLAR POWERED WATER SCHEME AA SHTU RONI
13,292,941.20
13,292,941.20 12/11/2013 100 Completed
16 5004/3 RENOVATION OF DISTRICT HEAD HOUSE GARBA DANTILA RONI
3,660,037.23
3,660,037.23 13/03/2013 100 Completed
TOTAL
125,255,425.97
125,255,425.97
lxii
MIGA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT LOCATION CONTRACT
SUM REVISED
CONTRACT SUM
COMMENCEMENT STATUS REMARKS
CONTRACTOR DATE IN %
1 REPAIRS OF PUMP STATION MOHD MAKAMA MUDUGA 522,698.00 522,698.00 18/4/2013 100 COMPLETED
2 ELECTRIFICATION PROJECT ALKASIM JANNAH NIG LTD NAFADAWA 13,419,563.50 13,419,563.50 19/03/2013 100 COMPLETED
3 COMPLETE MOTORISED WATER SCHEME
IBRAHIM MUSA KIGAWA JAMAGA 8,432,688.63 8,432,688.63 19/03/2013 100 COMPLETED
4 COMPLETE MOTORISED WATER SCHEME
IBRAHIM MUSA KIGAWA
KOME ALLAH YAYI 8,754,367.13 8,754,367.13 19/03/2013 100 COMPLETED
5 PIPELINE EXTENTION ALH. ABDU ZAREKU HANTSU 5,483,226.00 5,483,226.00 19/03/2013 100 COMPLETED
6 CONSTR. OF 10 NO. HANDPUMPS ALH. WADA BURJI
ACROSS10 WARDS 3,152,742.00 3,152,742.00 19/03/2013 100 COMPLETED
7 CONSTR. OF 10 NO. HANDPUMPS MUH'D NATA ALA
ACROSS 10 WARDS 3,152,742.00 3,152,742.00 19/03/2013 100 COMPLETED
8 CONSTR. OF DAILY PRAYER MOSQUE ALH. WAKILI MIGA SHUNAWA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
9 CONSTR. OF DAILY PRAYER MOSQUE
ALH. IASAH YANDUNA DANGOLI BABBA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
10 CONSTR. OF DAILY PRAYER MOSQUE A. USAINI G/KANYA TSALLIYA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
11 CONSTR. OF DAILY PRAYER MOSQUE
M/UNGUWA DANJUMA SANSANI YAMMA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
12 CONSTR. OF DAILY PRAYER MOSQUE ALH. SALE DAHIRU HANTSAKI 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
13 CONSTR. OF DAILY PRAYER MOSQUE
A KABIRU SARAWUYA SARAWUYA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
14 CONSTR. OF DAILY PRAYER MOSQUE
A. SALISU ABDU ZAREKU
U/ M/ADO GABASHI 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
lxiii
C/F 51,407,158.26 51,407,158.26
22a
B/F 51,407,158.26 51,407,158.26
15 SUPPLY & INSTALL 100 KVA TRANSFORMER
A MOHD DANLADI ZANGO MIGA 1,302,640.79 1,302,640.79 12/4/4013 100 COMPLETED
16 ELECTRIFICATION PROJECT MOHAMMED BANGAYYA MIGA 777,277.54 777,277.54 12/4/2013 100 COMPLETED
17 CONSTR. OF 5 DAILY PRAYER MOSQUE HALILU ALFA JIGAWAR TSABA 428,906.96 428,906.96 12/4/2013 100 COMPLETED
18 CONSTR. OF FRIDAY MOSQUE A GARBA NASSARAWA NASARAWA 3,121,111.20 3,121,111.20 12/4/2013 100 COMPLETED
19 EARTH FILLING SHUAIBU ADO KOYA KOYA 606,375.00 606,375.00 30/4/2013 100 COMPLETED
20 COMPLETION OF DAILY PRAYER MOSQUE SALE BOYI GIDAN KANYA 69,149,149.00 69,149,149.00 30/4/2013 100 COMPLETED
21 COMPLETION OF DAILY PRAYER MOSQUE M DANLADI ZANGO HANTSU 501,620.10 501,620.10 2/5/2013 100 COMPLETED
22 RENOVATION OF HEALTH POST A GARBA D/GYATIN JAMAGA 2,479,974.18 2,479,974.18 6/5/2013 100 COMPLETED
23 CONSTR. OF DAILY PRAYER MOSQUE A. JUMA GARBO ALFA 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
24 CONSTR. OF DAILY PRAYER MOSQUE A. UBALE GULULU ZAGAU 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
C/F 132,199,679.03
132,199,679.03
lxiv
22b
B/F 132,199,679.03 132,199,679.03
25 CONST. OF PRAYER MOSQUE A. SALISU A. ZAREKU U/ ADO GABASHI 1,212,733.00 1,212,733.00 10/4/2013 100 COMPLETED
26 CONSTR, OF BHC NABAKWAI ALJAZERA HANTSU 17,974,692.31 17,974,692.31 30/04/2013 100 COMPLETED
27 CONSTR, OF BHC MAIBURTANI NIG DANGYATIN 17,974,692.31 17,974,692.31 30/04/2013 100 COMPLETED
28 CONSTR, OF BHC DANGYATIN VENt. KOYA 17,974,692.31 17,974,692.31 10/5/2013 100 COMPLETED
29 ELECTRIFICATION PROJECT HANSHU NIG LTD DAMAGANAWA 20,808,150.67 20,808,150.67 10/5/2013 100 COMPLETED
30 ELECTRIFICATION PROJECT DANGYATIN VENT. BURJI 11,598,088.50 11,598,088.50 10/5/2013 100 COMPLETED
31
COMPLETE MOTORISED WATER SCHEME
BAFFA UMARU BAMAINA ALFA 9,420,534.00 9,420,534.00 10/5/2013 100 COMPLETED
32 MOTORISED W/ SCHEME LOYALTY PROPERTY. GULULU 12,699,196.65 12,699,196.65 16/05/2013 100 COMPLETED
33 ELECTRIFICATION PROJECT ALKASAM JANNAH NAFADAWA 638,839.00 638,839.00 16/05/2013 100 COMPLETED
34 ELECTRIFICATION PROJECT HAM SUN NIG LTD DAMAGANAWA 3,070,825.30 3,070,825.30 11/8/2013 100 COMPLETED
35 CONSTR. OF WATER SCHEME TALAKU INT. SERV. ROMAWA 10,259,841.90 10,259,841.90 15/08/2013 100 COMPLETED
36 CONSTR. OF WATER SCHEME ALH. JIBRIN JAHUN GIDAN KANYA 10,636,731.53 10,636,731.53 15/08/2013 100 COMPLETED
37 ELECTRIFICATION PROJECT SAHEL ASSO. LTD UMMADU 20,317,934.47 20,317,934.47 15/08/2013 100 COMPLETED
38 CONSTR. OF FRIDAY MOSQUE IBRAHIM M.KIGAWA KIGAWA 8,243,524.05 8,243,524.05 15/08/2013 100 COMPLETED
39 CONST OF FRIDAY MOSQUE DANGYATIN VENTURES S/GARI 19,232,320.77 19,232,320.77 20/03/2013 100 COMPLETED
40
GENERAL RENOVATION OF CHAIRMAN HOUSE
ADAMU SARKI MIGA MIGA 1,369,077.87
1,369,077.87 21/03/2013 100 COMPLETED
lxv
41
GENERAL RENOVATION OF POLICE STATION HARUNA ALIYU D MIGA 3,030,923.00
3,030,923.00 22/03/2013 100 COMPLETED
42 CON. OF D PRAYER MOSQUE GARBA NASARAWA NASARAWA
497,389.38
497,389.38 12/4/2013 100 COMPLETED
43 CONSTR. OF FRIDAY MOSQUE SHUAIBU ADO KOYA KOYA
974,064.66
974,064.66 12/4/2013 100 COMPLETED
44 EARTH FILLING SALE BOYI GIDAN KANYA 361,397.00
361,397.00 30/4/2013 100 COMPLETED
45 RENOV. OF HEALTH POST A GARBA D/GYATIN JAMAGA 2,479,974.18 2,479,974.18 2/5/2013 100 COMPLETED
46 RENOVATION OF DRAINAGE MOHD I. TSAKUWA TSAKUWA 373,951.46
373,951.46 6/5/2013 100 COMPLETED
C/F 323,349,253.35
323,349,253.35
22c
B/F 323,349,253.35
323,349,253.35
47 REPAIRS OF POLICE VEHICLE JUBRILA MOTORS MIGA
1,148,600.00
1,148,600.00 6/6/2013 100 COMPLETED
48 REPAIRS OF VEHICLE MAMUDA MOTORS MIGA 547,300.00 547,300.00 7/7/2013 100 COMPLETED
49 REPAIRS OF VEHICLE JUBRILA MOTORS MIGA 749,749.00
749,749.00 7/7/2013 100 COMPLETED
50 REPAIRS OF VEHICLE MUMUDA MOTORS MIGA 331,697.00
331,697.00 7/7/2013 100 COMPLETED
51 CONSTR. OF WAITING SHED ADAMU YARIMA MIGA 825,682.00 825,682.00 7/7/2013 100 COMPLETED
52 ADDITIONAL CONSTR. WORKS MUSA IBRAHIM TSAKUWA 3,455,362.10 3,455,362.10 20/07/2013 100 COMPLETED
53 CONSTR. OF STORE A GARBA
NASARAWA NASARAWA 497,389.38
497,389.38 2/7/2013 100 COMPLETED
54 CONSTR. OF HAND PUMP YAHAYA UMAR DANGYATIN
974,064.66
974,064.66 20/08/2013 100 COMPLETED
55 CONSTR. OF HAND PUMP LOYALTY
PROPERTY G/DANGWA 361,397.00
361,397.00 16/7/2013 100 COMPLETED
TOTAL 332,240,494.49
332,240,494.49
lxvi
YAN KWASHI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT REVISED COMMENCEMENT STATUS REMARKS
(N) CONTRCT
SUM DATE IN %
1 4008/2 RENOVATION OF STAFF QUARTERS MOHD & OTHERS STAFF QTRS
12,000,000.00 12,000,000.00 18/04/2012 100 COMPLETED
2 6001/10 FENCING OF KARKARNA GRAVEYARD [ AREWA]
MARB ENG SERVICES KARKARNA
9,020,488.00 9,020,488.00 18/04/2012 100 COMPLETED
3 7001/1 DRILLING OF HAND PUMP H TADE DRILLING
NIG LTD 16NO VARIOS LOCATIONS
13,000,000.00 13,000,000.00 15/10/2012 100 COMPLETED
4 7001/1 CONSTR. OF FEEDER ROAD LAND MGMT NIG
LTD
MURDEN KASA-
MURDEN DAMA
10,000,000.00 10,000,000.00 18/04/2012 100 COMPLETED
5 6001/10 FENCING OF KARKARNA GRAVEYARD [ YAMMA ]
MARB ENG SERVICES
KARKARA YAMMA
9,248,800.00 9,248,800.00 18/04/2012 100 COMPLETED
6 7001/5 CONSTR. OF FEEDER ROAD[ 6KM]
313 DRILLING NIG LTD KUDA- FIRJI
68,709,178.13 68,709,178.13 15/9/2012 100 COMPLETED
7 7001/10 CONSTR. OF FEEDER ROAD [ 1.1KM
Y TEK ENGINEERING CO
MURDE-U/MAGAJI
11,590,582.00 11,590,582.00 21/10/2012 100 COMPLETED
8 7001/11 DRILLING OF 2NO. BOREHOLES HABIBU SANI G
RINGIM & DANKARI 2,423,402.00 2,423,402.00 13/2/2013 100 COMPLETED
9 7001/1 WATER SCHEME EXTENTION & REHABLITATION A AHAMED UMAR BANDAWA 6,680,000.00 6,680,000.00 6/3/2013 100 COMPLETED
10 4006/1 ELECTRIFICATION PROJECT MARB ENGINEERING GURJIYA 1,700,000.00 1,700,000.00 16/3/13 100 COMPLETED
lxvii
11 4006/1 ELECTRIFICATION PROJECT MARB ENGINEERING KARKARNA 4,076,807.25 4,076,807.25 15/4/2013 100 COMPLETED
12 4006/1 ELECTRIFICATION PROJECT MARB ENGG & MULTI SER. KARKARNA 2,962,630 2,962,630 16/4/2013 100 COMPLETED
C/F 151,411,887.38 151,411,887.38
27a
C/F 151,411,887.38 151,411,887.38
13 6001/10 CONSTR. OF JUMAAT MOSQUE
MARB ENGINEERING & MULTI SERVICES FIRJI 19,446,046.45 19,446,046.45 27/5/13 100 COMPLETED
14 7001/5 CONSTR. OF FEEDER ROAD LAD MAG Constr. Ltd Yankwashi - Zoto 24,269,332.50 24,269,332.50 30/5/13 100 COMPLETED
15 7001/1 DRILLING OF 2NO. BOREHOLES
SIR WALTER DRILLINGS.
Across 10 Wards 16,004,900.00 16,004,900.00 5/9/2013 100 COMPLETED
16 7001/1 COMPLETE WATER SCHEME SIR WALTER DRILLINGS. U/KALGO 12,922,417.00 12,922,417.00 5/9/2013 100 COMPLETED
Total
224,054,583.33 224,054,583.33
lxviii
KIYAWA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT REVISED
CONTRACT SUM COMMENCE
MENT STATUS REMARKS
(N) DATE IN %
1 6004/3
CONSTR. OF DAILY PRAYER MOSQUE UMAR KAGAMA KAGAMA
635,524.00 635,524.00 12/4/2013 100 Completed
2 6003/4
CONSTR. OF DAILY PRAYER MOSQUE
A. ADAMU MAI MAI GIDAN RINCHI
635,524.00 635,524.00 22/3/2013 100 Completed
3 6004/5 Construction of Hand punp LAWAN SALISU DUNGUZU
328,630.00 328,630.00 25/3/2013 100 Completed
4 6004/3 CONSTR. OF HAND PUMP LAWAN SALISU DANGWALA
328,630.00 328,630.00 25/3/2013 100 Completed
5 5001/1
CONSTR. OF ISLAMIYYA SCHOOL
ISIYAKU KALKUTAN KALKUTAN
5,281,928.66 5,281,928.66 19/3/2013 100 Completed
6 5004/3
CONSTR. OF DAILY PRAYER MOSQUE
A AMADU KWAIMAWA KARFAWA
4,888,798.25 4,888,798.25 19/3/2013 100 Completed
7 5001
CONSTR. OF ISLAMIYYA SCHOOL SUNUSI GURUM GURIN
5,300,000.00 5,300,000.00 13/3/2013 100 Completed
8 6004/5 CONSTR. OF HAND PUMP SHUGABA RABILU FAKE
DUHUWA GABAS
328,630.00 328,630.00 20/3/2013 100 Completed
9 6004/3
CONSTR. OF DAILY PRAYER MOSQUE MUSA UMAR MANGARI QTRS
328,524.00 328,524.00 26/3/2013 100 Completed
10 6004/3
CONSTR. OF DAILY PRAYER MOSQUE
A DANJUMA IDRITH MAKARA HUTA
328,524.00 328,524.00 2/4/2013 100 Completed
11 4007/4 3- SEATER PIT LATRINE UBALE SULEIMAN K JSS KATUKA
736,643.00 736,643.00 9/4/2013 100 Completed
12 6004/5 CONSTR. OF HAND PUMP M/UNGUWA ASAYAYA ASAYAYA
328,630.00 328,630.00 10/4/2013 100 Completed
13 6004/5 CONSTR. OF HAND PUMP A AYUBA FAKE FGC KIYAWA
328,630.00 328,630.00 10/4/2013 100 Completed
14 6004/5 CONSTR. OF HAND PUMP A AYUBA FAKE GARIN KWARI 328,630.00 10/4/2013 100 Completed
lxix
328,630.00
15 6004/5 CONSTR. OF HAND PUMP ISMAILA ALIYU MOHD KADIRAWA
328,630.00 328,630.00 10/4/2013 100 Completed
16 6004/5 CONSTR. OF HAND PUMP ISMAILA ALIYU MOHD FAKE
328,630.00 328,630.00 10/4/2013 100 Completed
17 4006/1 EXTENSION OF ELECTRICITY A NASIRU DAN
UMMA U/MATU ZANGO
QTRS 510,730.00 510,730.00 30/4/2013 100 Completed
18 6004/3
CONSTR. OF DAILY PRAYER MOSQUE A SALISU ZERO
FATARA VILLAGE
635,524.00 635,524.00 6/5/2013 100 Completed
19 6004/3
CONSTR. OF DAILY PRAYER MOSQUE ABBA BARDE GIDAN RIJIYA
635,524.00 635,524.00 23/4/2013 100 Completed
20 7002/3
RENOVATION OF HOD COMM. HOUSE
A ABDULLAHI BILYA LG QTRS
2,693,833.33 2,693,833.33 22-4-12 100 Completed
C/F
25,240,117.24 25,240,117.24
19a
B/F
25,240,117.24 25,240,117.24
21 6004/3
CONSTR. OF DAILY PRAYER MOSQUE ABDU GEMU KATUKA
1,857,531.49 1,857,531.49 17/5/2013 100 Completed
22 6004/5 CONSTR. OF HAND PUMP ABUBAKAR
SALISU G/ALHAZAI KARKASHI
328,630.00 328,630.00 21/5/2013 100 Completed
23 6004/1 CONSTR. OF JUMAAT MOSQUE A AMADU
KWAIMAWA KARFAWA 5,118,620.62 5,118,620.62 4/4/2013 100 Completed
24 6004/5 CONSTR. OF HAND PUMP ABUBAKAR
SALISU GIDAN JAJI 328,630.00 328,630.00 28/6/2013 100 Completed
25 6004/5 CONSTR. OF HAND PUMP LAWAN SALISU GIDAN TILO 328,630.00 328,630.00 30/6/2013 100 Completed
26 5001/1
CONSTR. OF ISLAMIYYA SCHOOL ABDU GEMU TANADE
5,856,186.56 5,856,186.56 24/5/2013 100 Completed
27 6004/3
CONSTR. OF DAILY PRAYER MOSQUE A ADAMU MAI MAI
S/UNGUWA KIYAWA
900,000.00 900,000.00 7/6/2013 100 Completed
28 6004/3
CONSTR. OF DAILY PRAYER MOSQUE
MUSA NUHU DUNGU
TSANGAYAR KUDU
635,524.00 635,524.00 18/6/2013 100 Completed
29 6001/3 NEW CONCRETE OPEN WELL ZAILANI KWANDA JABERI 280,000.00 280,000.00 19/6/2013 100 Completed
lxx
30 6004/3
CONSTR. OF DAILY PRAYER MOSQUE
A KABIRU TSANGAYAWA KAKA SUNA
1,013,000.00 1,013,000.00 18/6/2013 100 Completed
31 5001/2
CONSTR. OF ISLAMIYYA SCHOOL A SABO KWARA KATUKA
5,856,136.56 5,856,136.56 20/6/2013 100 Completed
32 6004/3
CONSTR. OF DAILY PRAYER MOSQUE A DALLADI BILYA KATI VILLAGE
635,524.00 635,524.00 20/6/2013 100 Completed
33 5001/1
CONSTR. OF ISLAMIYYA SCHOOL A ABDU GEMU
GURUM BAYAN GARI
5,856,186.56 5,856,186.56 20/6/2013 100 Completed
34 6004/4 CONSTR. OF JUMAAT MOSQUE AMINU NUHU SHIWARI 14,893,820.27 14,893,820.27 4/4/2013 100 Completed
35 6004/3
CONSTR. OF DAILY PRAYER MOSQUE
MUSTAPHA AMINU
U/FULANI SHUWARIN
704,416.00 704,416.00 22/5/2013 100 Completed
36 6004/3
CONSTR. OF DAILY PRAYER MOSQUE ?
DUTSAWA FULANI
780,000.00 780,000.00 8/7/2013 100 Completed
37 6004/3
CONSTR. OF DAILY PRAYER MOSQUE ABDU INUWA BAKUTA
635,524.00 635,524.00 10/7/2013 100 Completed
38 6001/3 MOTORISED WATER SCHEME S. WATER DRILLING KIYAWA
10,000,000.00 10,000,000.00 2/8/2012 100 Completed
39 6004/5 CONSTR. OF HAND PUMP A IBRAHIM JET RIGAR AMINU 328,630.00 328,630.00 3/8/2012 100 Completed
40 6004/5
RENOVATION OF JUMAAT MOSQUE A YAKUBU FAKE FAKE
3,084,230.61 3,084,230.61 16/7/2013 100 Completed
41 6004/3
ELECTRIFICATION PROJECT (EXT.)
IBRAHIM YALLARO ANDAZA
ANDAZA PHC QTRS
328,193.00 328,193.00 29/7/2013 100 Completed
C/F 84,989,530.91 84,989,530.91
19b
C/F
84,989,530.91 84,989,530.91
42 6004/5 CONSTR. OF HAND PUMP A GARBA GARUN
YALLE GIDAN TAURA 328,630.00 328,630.00 29/7/2013 100 Completed
43 6004/3
CONSTR. OF DAILY PRAYER MOSQUE A SALISU ZERO FATARA
635,524.00 635,524.00 29/7/2013 100 Completed
44 6004/5 CONSTR. OF HAND PUMP A SALISU ZERO GIDAN TAURA 328,600.00 328,600.00 12/8/2013 100 Completed
45 4007/3 CONSTR. OF MARKET STALL USAINI MAIHULA KATUKA MARKET
758,270.00 758,270.00 24/7/2013 100 Completed
lxxi
46 6004/5 CONSTR. OF HAND PUMP DAN ASABE
ANDAZA RURA GARKO
WARD 328,630.00 328,630.00 12/8/2013 100 Completed
47 6001/3 CONSTR. OF OPEN WELL AMINU ILIYASU DODI FULANI 280,962.00 280,962.00 12/8/2013 100 Completed
48 6004/5 CONSTR. OF HAND PUMP LAWAN SALISU JAWA 328,630.00 328,630.00 12/8/2013 100 Completed
49 6001/3 CONSTR. OF OPEN WELL BABA ZABI MATAYAN
FULANI 280,962.05 280,962.05 2/9/2013 100 Completed
50 6004/3
CONSTR. OF DAILY PRAYER MOSQUE BAFFA SUNUSI KORAUW
635,524.00 635,524.00 6/9/2013 100 Completed
51 6004/3
CONSTR. OF DAILY PRAYER MOSQUE A DANLADI BILYA KANTI KIYAWA
650,000.00 650,000.00 22/10/2013 100 Completed
52 6001/3
CONSTR. OF PUBLIC CONV. & W/SCHEME
GIDAN ADEDE NIG LTD B/KUDU ROAD
14,659,470.45 14,659,470.45 25/10/2013 100 Completed
53 6004/3
RENOVATION OF HEALTH CLINIC ALH. ABDU GEMU GORUMO
3,795,353.97 3,795,353.97 25/10/2013 100 Completed
54 5001/6 CONSTR. OF BOUNDRY WALL A SAIDU
MASAMAWA KARA
SHUWARIN 2,711,636.45 2,711,636.45 25/10/2013 100 Completed
55 6004/5 CONSTR. OF HAND PUMP A YAKUBU FAKE FAKE 328,630.00 328,630.00 4/11/2013 100 Completed
56 6004/3
CONSTR. OF DAILY PRAYER MOSQUE
A HARUNA BALAGO DUNGUZU
635,524.00 635,524.00 30/10/2013 100 Completed
57 6001/3 CONSTR. OF OPEN WELL BUBA ZABI GIDAN M KUNTAL
280,462.00 280,462.00 6/11/2013 100 Completed
58 6001/3
CONSTR. OF PUBLIC CONV. & W/SCHEME LOYALTY
SHIWARIN TOWN
14,659,470.45 14,659,470.45 25/10/2013 100 Completed
59 6004/5 CONSTR. OF HAND PUMP LAWAN SALISU JABBAMA VILLAGE
328,630.00 328,630.00 8/11/2013 100 Completed
C/F
126,944,440.28 126,944,440.28
19c
B/F 126,944,440.28 126,944,440.28
lxxii
60
CONST. OF 5 DAILY PRAYER MOSQUE
GARBA ISYAKU LTD KATANGA K/ 1,253,293.30 1,253,293.30 11/10/2012 100 COMPLETED
61
CONST. OF 5 DAILY PRAYER MOSQUE IBRAHIM SAKAI D/GOLAWA 635,524 635,524 30/7/2012 100 COMPLETED
62 COMP. SOLAR WATER SCHEME 313 DRILLING N. LTD DANFUSAN 5,222,810.00 5,222,810 10/11/2012 100 COMPLETED
63
VARIATION WORKS OF ANDAZA MOSQUE
ANDAZA & SONS LTD ANDAZA
1,927,356.10 1,927,356.10 14/12/2011 100 COMPLETED
64 ELECTRIFICATION PROJECT IHSAN DRILLING
NIG LYTD GARKON ALLI
12,745,923.81 12,745,923.81 12/12/2011 100 COMPLETED
65 ELECTRIFICATION PROJECT IHSAN DRILLING
NIG LYTD MAJIYAWA
9,009,372.47 9,009,372.47 2/4/2011 100 COMPLETED
66 ELECTRIFICATION PROJECT IHSAN DRILLING
NIG LYTD FAKE- G/ BAYI
10,672,878.57 10,672,878.57 3/4/2011 100 COMPLETED
67 DRILLING OF 6NO. BORE HOLE BASHAR V/PLACES
3,876,390.00 3,876,390.00 3/11/2011 100 COMPLETED
68
CONSTRUCTION OF JUMAAT MOSQUE A A KWAIMAWA BAKATA
4,397,776.65 4,397,776.65 3/11/2011 100 COMPLETED
69
CONSTRUCTION OF OPEN WELL UBA KATUKA K/SHIDI
225,187.00 225,187.00 2/4/2011 100 COMPLETED
70
CONSTRUCTION OF OPEN WELL A HARUNA TAKANADU
235,531.00 235,531.00 5/5/2011 100 COMPLETED
71 DRILLING OF 6NO. BORE HOLE IDRITH AUYO TSADOWA
310,000.00 310,000.00 7/7/2011 100 COMPLETED
72
COMPLETION OF JUMAAT MOSQUE
ANDAZA & SONS LTD ANDAZA
8,201,673.90 8,201,673.90 18/08/2011 100 COMPLETED
73
RENOVATION OF CENTRAL MOSQUE SABO KWARE KIYAWA
6,375,272.12 6,375,272.12 26/07/2010 100 COMPLETED
74
CONSTRUCTION OF DISPENSARY A UBA NABERE KAGARA
3,556,765.77 3,556,765.77 26/07/2010 100 COMPLETED
75
CONSTRUCTION OF ISLAMIYYA SCHOOL A SALISU ZERO KIYAWA
3,182,428.27 3,182,428.27 5/11/2010 100 COMPLETED
TOTAL
198,772,623.24 198,772,623.24
lxxiii
RINGIM LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRCT SUM DATE IN %
1 CONSTR. OF PUBLIC CONVINIENCE
MARB ENGG SERVICES RINGIM
7,446,169.60
7,446,169.60 21/11/2013 100 COMPLETED
2 CONSTR. OF PUBLIC CONVINIENCE
MARB ENGG SERVICES BEGUWA
8,012,999.85
8,012,999.85 21/11/2013 100 COMPLETED
3 COMPLET SOLAR W/SCHEME
MARB ENGG SERVICES
RINGIM MARKET
6,646,470.60
6,646,470.60 21/11/2013 100 COMPLETED
4 COMPLET SOLAR W/SCHEME
MARB ENGG SERVICES
BEGUWA MARKET
6,646,470.60
6,646,470.60 21/11/2013 100 COMPLETED
TOTAL 28,752,110.65
28,752,110.65
lxxiv
SECTION (B)
ON-GOING PROJECT
JANUARY – DECEMBER, 2013
lxxv
AUYO LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT SUM DATE IN %
1
CONSTR, OF DISTRICT HEAD
HOUSE
KADARA G
CONCEPT Ayama 18,856,805.14 18,856,805.14 14/6/2013 65 ON-GOING
2 CONSTR. OF MOTOR PARK A.U.O & Sons Auyo 10,315,509.01 10,315,509.01 13/6/2013 75 ON-GOING
3 ELECTRIFICATION PROJECT LIMIS BROTHERS
S/GABAS/
YAMMA 45,970,919.00 45,970,919.00 7/11/2013 60 ON-GOING
4 TOTAL 75,143,233.15 75,143,233.15
lxxvi
BABURA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT
SUM DATE IN %
8 ELECTRIFICATION PROJECT Prestige Inter Nig.
Ltd Unguwa Shuri 9,170,252.00
9,170,252.00 23/3/2010 70 ON-GOING
9 CONSTR. OF FEEDER ROAD JIRMA MANGA-
TAKWASA 7,560,293.75
7,560,293.75 12/2/2010 35 ON-GOING
TOTAL 16,730,545.75
40,317,203.17
lxxvii
BIRNIWA LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
S/N EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
PROJECT AMOUNT(N) CONTRACT SUM (N) DATE IN %
1 CONSTR. OF FRIDAY MOSQUE SUBIMUM BIRNIWA 20,788,291.77
20,788,291.77 14/5/2013 80 On-Going
TOTAL 20,788,291.77
20,788,291.77
lxxviii
BIRNIN KUDU LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. HEAD PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT
SUM DATE IN %
1 4008/3 CONSTR. OF MASAYA - TUKUDA TAR ROAD GERAWA GLOBAL
LTD MASAYA-TUDA
17KM 344,522,430.06
444,169,130.74 24/3/11 50 ON-GOING
2
3
4
5
6
7
TOTAL 344,522,430.06
495,648,108.96
lxxix
DUTSE LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. HEAD PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT
SUM DATE IN %
1 6001/2 ELECTRIFICATION
PROJECT HASKE
GEN ENTP. ZOBIYA
10,058,968.96
10,058,968.96 20/4/2012 75 ONGOING
2 4001/2 CONSTR. OF FEEDER
ROAD SY HASSN
LTD ISARI-ABAWA
113,467,300.00
113,467,300.00 Jun-10 70 ONGOING
3 5002/1 CONSTR, OF MODEL
CLINIC IBRACO INT LTD KARNAYA
14,393,879.79
14,393,879.79 28/06/2011 40 ONGOING
TOTAL
137,920,148.75
137,920,148.75
lxxx
BUJI LOCAL GOVT.
S/N. PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMCMTSTATUSREMARKSAMOUNT CONTRACT SUM DATE IN %
1 5004/2 ELECTIRIFICATION PROJECT YAYARI TUKUR NIG LTD .TIJIYO-AHOTO 39,179,164.44 39,179,164.44 6/9/2013 90 ONGOING
2 4002/1
CONSTR. OF FIRST SURFACE COAT
ROAD
GANO VENTURES NIG
LTD
KARANJAU -
K/MADAKI 200,771,865.60 200,771,865.60 9/4/2013 70 ONGOING
TOTAL 239,951,030.04 239,951,030.04
lxxxi
GARKI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT
CONTRACT
SUM DATE IN %
Bal. B/F -
23 Supply & Installation of Internet work station at 7No. Schools (B)Gare Invest. State 7,746,952.12 12/12/2011 100 Completed
24 Solar Light Extention at GUSS Ringim Amin Consult Ringim 2,983,995.00 9/11/2011 100 Completed
25 Constr. Of 1No. Kitchen block at GGSS GwaramFamusa Resources Gwaram 6,755,996.09 9/11/2011 100 Completed
26 Constr. Of class room block at GDSS Chai-chaiA A Maikatako Ringim 7,228,421.87 23/11/11 100 Completed
27 Constr. Of class room to Adimn. Block + Lab at Doko + TsakuwaAA Maikatako Ringim 5,957,333.80 13/12/11 100 Completed
28 Renov. Of 2No. Staff qtrs. At GGSS Sule TankarkarBlue Beads Invest. Ltd. S/tankarkar 8,102,459.90 23/11/11 100 Completed
29 Constr. Of Kitchen at GGSS Sule TankarkarBlue Beads Invest. Ltd. S/tankarkar 6,927,595.24 23/11/11 100 Completed
30 Renov. Of 2No. Staff qtrs. At GDSS GarkiAA Maikatako Garki 2,584,543.29 13/12/11 100 Completed
31 Renov. Of Birniwa Zonal Office Idi Aliko Ltd. Birniwa 3,418,338.70 20/11/11 100 Completed
32
Constr. Of wall fence at GDSS
Kazaure Dutsen taura Ltd. Kazaure 26,017,690.77 2711/11 100 Completed
33 Supply of Toyota Hiace to NAJISS Babandoki Gen. Ent. Dutse 7,605,000.00 24/01/12 100 Completed
34 Constr. of Sporting facilities at Dutse Model SchoolModang Invest. Ltd. Dutse 18,008,817.64 16/8/2012 62 On-going
35 Renov. of 3No. Staff qtrs. at GGSS Sule TankarkarDutsen Taura Nig. Ltd. S/Tankarkar 12,047,917.02 16/8/2012
36
Procurement of 2-sets of Sporting
facilities at Bamaina Talented &
Gifted School, B/kudu L.G.A. BM Invest. Nig. Ltd. B/kudu 36,030,000.00 16/8/2012
37 Renov. of 3No. Staff qtrs. at GGUSS GwaramJango Internation Ltd. Gwaram 18,649,322.29 16/8/2012
38
Supply of (2000Nos.) 3-seater
Benches to selected Senior Sec. Aybee Nig. Ltd. Dutse 31,910,000.00 16/8/2012
39
Renov. of 3No. Staff qtrs. At GUSS
Ringim Babandoki Gen. Ent. Ringim 15,933,336.97 17/8/2012
40
Supply of 1,800 Double Bunk beds
to Science Sec. Schs. in the state Babandoki Gen. Ent. in the state 53,991,000.00 17/8/2012
41
Renov. of 3No. Staff qtrs. at GSS
Roni Babandoki Gen. Ent. Roni 11,738,722.29 31/8/2012
42 Renov. of 3No. Staff qtrs. at GSS Fantai, HadejiaBabandoki Gen. Ent. 14,810,232.13 31/8/2012
43 Constr. of Computer Centre at State Library, DutseBabandoki Gen. Ent. Dutse 7,015,487.83 31/8/2012
lxxxii
44 Renov. of 2No. Staff qtrs. at GGUSS GwaramFamusa Resources Gwaram 11,647,409.84 3/9/2012
45
Constr. Of Solar Powered Boreholes
with Overhead Tanks at GGASS
Babura & GGASS Kaugama Gare Invest. Nig. Ltd. Kaugama 11,519,050.00 5/9/2012
46 Renovation works at GDSS Marke A. Barde Global Concept. Marke 11,916,841.10 19/9/2012
47 Constr. of Additional 2 & 3 Courses wall fence, rendering and Painting at GSCS, DutseIbraco Mafrica Nig. Ltd. Dutse 10,308,961.19 19/9/2012
Bal. C/F 350,855,425.08
6b
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM DATE IN %
Bal. B/F
48 Constr. of 3No. Students Hostel at Dutse Model int. Sch. Maradun Constr. Co. Dutse 84,338,996.27 27/9/2012
49 Procurement of 2-sets of Sporting facilities at Bamaina Talented and Gifted SchoolBM Inv . Nig. Ltd. B/kudu 30,030,000.00 28/9/2012
50 Constr. of Remidial Sch. K/hausa (Min. of Education) Datum Constr. Nig. Ltd. K/hausa 1,062,280,645.68 23/07/12 Just mobilized
51 Supply of 300mts of Desks to Dutse Model Aklan Ltd. Dutse 4,800,000.00 3/8/2012 100 Completed
52 Supply Instructional Materials & Vehicle (SANE) Khairussabah Nig. Ltd. Dutse 12,000,000.00 10/5/2012 100 Completed
53 Supply Instructional Materials & Furniture (SANE) Edifice Eng. Serv ices Dutse 16,505,000.00 10/5/2012 55 On-going
Total
lxxxiii
GAGARAWA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED COMMENCEMENTSTATUS REMARKS
(N) CONTRACT SUM (N) DATE IN %
TOTAL
lxxxiv
GUMEL LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT RIVISED COMMENCEMENTSTATUSREMARKS
AMOUNT (N)
CONTRACT
SUM DATE IN %
1 4006/4 ELECTRIFICATION PROJECT SHOW CASE DANFARANTAMA 17,521,651.19 17,521,651.19 5/11/2008 60 ONGOING
2 7002/3 COMPLETION OF SNR STAFF QTRS J IKANDE NIG LTD GUMEL 34,389,233.00 34,389,233.00 8/8/2008 50 ONGOING
3 CONSTR. OF MOTOR PARK ISMAEL VENTURES GUMEL KANO RD 43,416,895.65 43,416,895.65 28/06/2012 50 ONGOING
TOTAL 51,910,884.19 51,910,884.19
lxxxv
GURI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT RIVISED COMMENCEMENT STATUS REMARKS
(N) CONTRACT
SUM DATE IN %
4 4006/1 ELECTRIFICATION PROJECT AMIM NIG LTD
GURI-ADIYANI-TUK
32,299,278.48
32,299,278.48 6/7/2012 75
ON-GOING
5 4008/3 CONSTR. OF FEEDER ROAD
GANO VENTURES GURI - ZUGO
50,903,350.88
50,903,350.88 Jun-12 65
ON-GOING
Total
98,172,064.86
98,172,064.86
lxxxvi
GWIWA LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED COMMENCEMENTSTATUS REMARKS
(N) CONTRACT SUM (N) DATE IN %
TOTAL
lxxxvii
GWARAM LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENTSTATUS REMARKS
AMOUNT CONTRACT SUM (N) DATE IN %
1 5001/9 FENCING OF GG UNITY SCHOOL RINGIM GALADANCI GWARAM 36,825,149.24 36,825,149.24 12/9/2012 60 ONGOING
2 5001/7 CONSTR. OF ISLAMIYYA SCHOOL AS DANKURGWI KUYUNGU 2,629,645.60 2,629,645.60 13/12/2012 85 ONGOING
3 CONSTR. OF ISLAMIYYA SCHOOL SAYYAKO BASIRKA KIJIN 2,629,645.60 2,629,645.60 29/12/2011 70 ONGOING
4 CONSTR. OF ISLAMIYYA SCHOOL DANLAMI KILA KILA GABAS 2,629,645.60 2,629,645.60 17/12/2012 75 ONGOING
5 CONSTR. OF ISLAMIYYA SCHOOL DANLAMI KILA ZAGANGANDO 2,629,645.60 2,629,645.60 17/12/2012 77 ONGOING
6 CONSTR. OF ISLAMIYYA SCHOOL YAU MUSA JIKAS GAGURU 2,629,645.60 2,629,645.60 17/12/2012 65 ONGOING
7 NEW LG SECRETARIATE CIROCO GWARAM 357,314,412.85 357,314,412.85 15/12/2012 90 ONGOING
8 CONST. OF MINI STADIUM PHASE I BAHUTU NIG LTD KILA 12,000,000.00 12,000,000.00 5/12/2008 87 ONGOING
9 CONSTRUCTION OF FEEDER ROAD ALH. SABO ILU KILA LUNGU 31,014,427.50 31,014,427.50 15/12/2012 40 ONGOING
TOTAL 450,302,217.59 450,302,217.59
lxxxviii
HADEJIA LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM (N) DATE IN %
1
2
3
4
5 TOTAL
lxxxix
JAHUN LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION REVISED COMMENCEMENTSTATUS REMARKS
CONTRACT SUM (N) CONTRACT SUM (N) DATE IN %
xc
KAFIN HAUSA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
SUM (N) REVISED COMMENCEMENT STATUS REMARKS
CONTRACT SUM DATE IN %
1 CONSTR. OF 4NO. MARKET STALLS A MOHD TOYIN
BULANGU
1,840,000.00
1,840,000.00 8/5/2013 50 ON-GOING
2 CONSTR. OF 4NO. MARKET STALLS
A JAFARU M/GORO
K/HAUSA MARKET
1,840,000.00
1,840,000.00 8/3/2013 30 ON-GOING
TOTAL
3,680,000.00
3,680,000.00
xci
KIRIKASAMMA LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT REVISED COMMENCEMENT STATUS REMARK
(N) CONTRACT SUM
(N) DATE in %
1 CONSTR. OF 500 SEATER HALL
TURABU CONSTRUCTION K/KASAMMA 17,243,128.20
17,243,128.20 18/7/2013 40 ONGOING
2 CONSTR. OF WOMEN CENTER YUSIF MAAJI K/KASAMMA 6,952,387.50
6,952,387.50 3/5/2013 75 ONGOING
3 CONSTR. OF COPPERS LODGE
TURABU CONSTRUCTION TURABU 26175368.94 26175368.94 18/7/2013 50 ONGOING
TOTAL 50,370,884.64
50,370,884.64
xcii
MAIGATARI LOCLA GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT
SUM REVISED COMMENCEMENT STATUS REMARKS
(N) CONTRACT SUM
(N) DATE IN %
1 7002 CONSTR. OF DISTRICT HEAD HOUSE
ISMAILA GALADI GALADI 4,500,000.00 4,500,000.00 6/6/2013 100 ON-GOING
2 7002 CONSTR. OF DISTRICT HEAD HOUSE
IBRAHIM ADAMU DANKUMBO 4,500,000.00 4,500,000.00 6/6/2013 100 ON-GOING
3 7002 CONSTR. OF DISTRICT HEAD HOUSE
ALH. ISA TURAKI BOSUWA 4,500,000.00 4,500,000.00 6/6/2013 100 ON-GOING
4 7002 CONSTR. OF DISTRICT HEAD HOUSE
ALH. BASIRU ABDULLAHI MADANA 4,500,000.00 4,500,000.00 6/6/2013 100 ON-GOING
5 7002 CONSTR. OF DISTRICT HEAD HOUSE
ALH. SANI THINKING GARMAKA 4,500,000.00 4,500,000.00 6/6/2013 100 ON-GOING
6 7002 ELECTRIFICATION PROJECT AIG VENTURES
MATSATSAGI-FULATA 26,488,566.00 26,488,566.00 6/6/2013 100 ON-GOING
7 7002 CONSTR. OF I BLOCK OF 2
CLASSROOMS BABU BALARABE BOSUWA 3,679,263.00 3,679,263.00 10/5/2013 100 ON-GOING
TOTAL 52,667,829.00
xciii
M/MADORI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT
SUM (N) DATE IN %
1 CONSTR. OF DRAINAGE ALH. RABIU SABO GARIN GABAS 2,432,000.00
2,432,000.00 Apr-13 30 ON-GOING
2 ELECTRIFICATION PROJECT DUTSEN TAURA NIG
LTD SHAYYA 3,765,187.84
3,765,187.84 Sep-12 75 ON-GOING
3 ELECTRIFICATION PROJECT DUTSEN TAURA NIG
LTD AKURYA 4,627,593.41 4,627,593.41 Jun-12 70 ON-GOING
4 CONSTR. OF ENBARNKMENTS DAN AD COMPANY V/LOCATIONS 10,000,000.00
10,000,000.00 Mar-13 30 ON-GOING
TOTAL 20,824,781.25 20,824,781.25
xciv
KAUGAMA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCMENT STATUS REMARKS
AMOUNT(N) CONTRACT
SUM (N) DATE IN %
1 5004/1 CONSTR. 0F JUMAAT MOSQUE
S. A. H. VENTURES MARKE
11,550,467.00 11,550,467.00 10/1/2010 60 ON-GOING
2 5004/3 CONSTR. 0F CENTRAL MOSQUE
STRONG ALLIANCE KAUGAMA
35,782,653.00 35,782,653.00 12/5/2010 65 ON-GOING
Total 47,333,120.00 47,333,120.00
xcv
MIGA LOCAL GOVT.
MIGA
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR
LOCATION CONTRACT REVISED
COMMENCEMENT
STATUS
REMARKS
AMOUNT CONTRACT SUM
(N) DATE IN %
xcvi
SULE TANKARKAR
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT CONTRACT SUM
(N) DATE IN %
1 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL ABDULLAHI DODO SULAWA FULANI
3,621,000.00 3,621,000.00 15/4/2012 45 ON-GOING
2 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL TIJJANI SAYYADI GIDAN MARKE 3,621,000.00 3,621,000.00 Aug-12 45 ON-GOING
3 5001/1 CONSTR. NOMADIC PRIMARY SCHOOL ABUBAKAR MOHD GWADAYI 3,621,000.00 3,621,000.00 4/4/2012 45 ON-GOING
4 4006/1 ELECTRIFICATION PROJECT SAHEL &
ASSOCIATE MAI TSAMIYA
42,000,000.00 42,000,000.00 Oct-10 95 ON-GOING
5 4006/1 ELECTRIFICATION PROJECT PRESTIGE NIG
LTD DANYARDA
13,875,109.50 13,875,109.50 Oct-10 50 ON-GOING
6 4003/1 DRILLING OF 2NO BOREHOLES H/SHATTIMA JSS S/TANKAR
6,285,000.00 6,285,000.00 Jan-08 60 ON-GOING
7 6001/1 RENOVATION. OF LG STAFF QUARTERS MAIWAKE STAFF QTRS
17,688.92 17,688.92 Jun-10 60 ON-GOING
8 4006/1 DRILLING OF 2NO M/BOREHOLES A SANI FULAWA SHAFTA/U/MAGAJI
13,420,000.00 13,420,000.00 Jan-08 85 ON-GOING
9 4006/1 DRILLING OF 24NO. H/PUMP TRIL DRILLING
LTD V/LOCATIONS
10,596,000.00 10,596,000.00 Jan-11 50 ON-GOING
TOTAL 97,056,798.42 97,056,798.42
xcvii
TAURA LACAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) DATE IN %
1 5004/5 CONSTR. OF FRIDAY MOSQUE ABDU SHITTU NALEKO 35,577,217.22 35,577,217.22 20/11/2012 60 ON-GOING
2 6002/1 CONSTR. OF HAND PUMP [ 4No.] AMINU TAKO V/PLACES 1,400,000.00 1,400,000.00 25/11/2012 60 ON-GOING
3 6001/1 CONSTR. OF HAND PUMP [ 6No.] A ABBAS MOHD V/PLACES 2,100,000.00 350,000.00 27/11/2012 60 ON-GOING
4 6001/1 CONSTR. OF HAND PUMP [ 5No.] A GAMBO K V/PLACES
1,750,000.00 350,000.00 27/11/2012 30 ON-GOING
5 CONST. OF M/WATER SCHEME 313 DRILLING NIG
LTD WAYU
17,502,570.42 17,502,570.42 27/07/2010 30 ON-GOING
6 COMPLETION OF FRIDAY MOSQUE AA SHUAIBU GURJAWA 911,220.80 911,220.80 27/7/2010 80 ON-GOING
7 CONST. OF M/WATER SCHEME IY DRILLING NIG
LTD L/GURJANYA
15,602,166.42 15,602,166.42 24/11/2010 40 ON-GOING
8 RENOVATION OF D/HEAD HOUSE NURA USMAN TAURA
4,180,889.00 4,180,889.00 24/11/2010 70 ON-GOING
9 COMPLETION OF WALL FENCING RINGIM GALADANCHI
GGSS TAURA
24,212,588.89 24,212,588.89 24/11/2010 36 ON-GOING
TOTAL 103,236,652.75 #############
xcviii
RONI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT SUM
(N) DATE IN %
1 5004/1 CONSTR. OF DUPLEX HOUSE
NA UKU PETROLUEM RONI
67,998,800.00 67,998,800.00 10/3/2013 80
ON-GOING
Total
67,998,800.00 67,998,800.00
xcix
YAN KWASHI LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED COMMENCEMENT
DATE STATUS REMARKS
(N) CONTRACT SUM (N) IN %
1 ELECTRIFICATION PROJECT ELDEE RURUMA 23,235,280.00
23,235,280.00 15/10/2012 50
ON-GOING
TOTAL 23,235,280.00
23,235,280.00
c
KIYAWA LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N HEAD PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED COMMENCEMENTSTATUS REMARKS
(N) CONTRACT SUM (N) DATE IN %
TOTAL - -
ci
RINGIM LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
HEAD AMOUNT(N) CONTRACT SUM
(N) DATE IN %
1 4006/1 ELECTRIFICATION PROJECT
SURAJO DUNGU GASKOLE 8,635,182.67 8,635,182.67 3/1/2012 85 ON-GOING
2 7001/6 RENOVATION OF INEC OFFICE
SALMANU UBA RINGIM 3,281,611.63 3,281,611.63 10/1/2012 96 ON-GOING
TOTAL 11,916,794.30 11,916,794.30
cii
KAZAURE LOCAL GOVT.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED COMMENCEMENT STATUS REMARKS
AMOUNT(N) CONTRACT SUM
(N) DATE IN %
1 5004/2/ CONSTR. OF 1 BLOCK ISLAMIYYA
HASSAN ADAMU
GIDAN GONA 1,518,000.00
1,518,000.00 3/6/2008 90 ON-GOING
2 7002/3 CONSTR. OF DISTRICT HOUSE MAN HAB GLOB DANDI ############ 21,931,456.47 27/7/2012 50 ON-GOING
3 7002/3 PURCH. OF 18KVA GEN & B/HOLE
BABANGIDA FACI GANGULI 3,637,475.00
3,637,475.00 27/7/2012 90 ON-GOING
4 CONSTR. OF CLASSROOM BLOCK
KURTU GEN. ENT
TSOFON KAFI 2,965,934.00
2,965,934.00 8/7/2010 50 ON-GOING
5 CONSTR. OF CLASSROOM BLOCK
OPEN WAYES NIG.
KANTI KUNCHI 2,965,934.00
2,965,934.00 8/7/2010 90 ON-GOING
6 CONSTR. OF CLASSROOM BLOCK BABA AFFA KARAFTAYI 1,921,570.00
1,921,570.00 15/12/2011 70 ON-GOING
TOTAL ############ 34,940,369.47
ciii
SECTION (C)
PRE CONTRACT PROJECT EVALUATION
JANUARY – DECEMBER, 2013
civ
END OF YEAR REPORT JANUARY - DECEMBER,2013 PRE- CONTRACT EVALUATION GENERAL
SUMMARY
PRE-CONTRACT PROJECT EVALUATION
S/NO LOCAL GOVERNMENT NO OF PROPOSAL SUBMITTED
QUOTTED SUM (#)
VETTED SUM (#) SAVING/INCREASE (#)
REMARK
1 AUYO 15 216,208,112.62 212,847,101.01 3,361,011.61 saving due to vetting
2 BABURA
5 53,874,198.73 54,829,909.78
(955,711.05) Increase due to rate vetting
3 BIRNIWA 20 354,840,467.41 345,979,937.32 8,860,530.09 saving due to vetting
4 BIRNIN KUDU 5 53,484,443.16 48,017,556.95 5,466,886.21 saving due to vetting
5 BUJI 26 421,724,458.19 412,706,818.33 9,017,639.86 saving due to vetting
6 DUTSE 7 63,331,877.09 72,310,864.06 (8,978,986.97) Increase due to rate vetting
7 GARKI 7 77,501,641.72 78,621,429.28 (1,119,787.56) Increase due to rate vetting
8 GAGARAWA 9 87,835,206.83 92,361,708.01 (4,526,501.18) Increase due to rate vetting
9 GUMEL 5 59,799,774.10 60,690,918.79 (891,144.69) Increase due to rate vetting
10 GURI 8 219,686,954.38 241,637,113.77 (21,950,159.39) Increase due to rate vetting
11 GWARAM 10 110,468,965.96 109,345,829.80 1,123,136.16 saving due to vetting
12 GWIWA 18 158,510,266.42 160,027,246.20 (1,516,979.78) Increase due to rate vetting
13 HADEJIA 3 28,802,604.16 28,752,110.65 50,493.51 saving due to vetting
14 JAHUN 14 255,125,892.52 238,729,666.23 16,396,226.29 saving due to vetting
15 KAUGAMA 3 28,802,604.16 28,752,110.65 50,493.51 saving due to vetting
16 KAFIN-HAUSA 4 38,324,033.69 37,956,728.07 367,305.62 saving due to vetting
17 KAZAURE 5 38,611,994.35 38,491,416.27 120,578.08 saving due to vetting
18 KIRI-KASAMMA 11 140,529,731.27 141,415,527.64 (885,796.37) Increase due to rate vetting
19 KIYAWA 9 205,890,855.11 258,716,781.57 (52,825,926.46) Increase due to rate vetting
20 MALAM-MADORI 3 28,802,604.16 28,752,110.65 50,493.51 saving due to vetting
21 MAIGATARI 3 28,802,604.16 28,752,110.65 50,493.51 saving due to vetting
22 MIGA 19 253,503,553.47 262,278,496.67 (8,774,943.20) Increase due to rate vetting
cv
23 RINGIM 4 40,464,343.51 40,792,529.65 (328,186.14) Increase due to rate vetting
24 RONI 6 83,989,849.66 80,103,793.98 3,886,055.68 saving due to vetting
25 SULE-TANKARKAR 4 41,779,029.16 38,823,238.68 2,955,790.48 saving due to vetting
26 TAURA 6 73,060,793.52 60,221,057.83 12,839,735.69 saving due to vetting
27 YANKWASHI 11 180,382,952.92 151,941,632.42 28,441,320.50 saving due to vetting
GRAND TOTAL 240 3,344,139,812.43 3,353,855,744.9
1
(9,715,932.48)
Increase due to rate
vetting
X
cvi
21
6,2
08
,11
2.6
2
53
,87
4,1
98
.73
35
4,8
40
,46
7.4
1
53
,48
4,4
43
.16
42
1,7
24
,45
8.1
9
63
,33
1,8
77
.09
77
,50
1,6
41
.72
87
,83
5,2
06
.83
59
,79
9,7
74
.10
21
9,6
86
,95
4.3
8
11
0,4
68
,96
5.9
6
15
8,5
10
,26
6.4
2
28
,80
2,6
04
.16
25
5,1
25
,89
2.5
2
28
,80
2,6
04
.16
38
,32
4,0
33
.69
38
,61
1,9
94
.35 1
40
,52
9,7
31
.27
20
5,8
90
,85
5.1
1
28
,80
2,6
04
.16
28
,80
2,6
04
.16
25
3,5
03
,55
3.4
7
40
,46
4,3
43
.51
83
,98
9,8
49
.66
41
,77
9,0
29
.16
73
,06
0,7
93
.52 1
80
,38
2,9
52
.92
21
2,8
47
,10
1.0
1
54
,82
9,9
09
.78
34
5,9
79
,93
7.3
2
48
,01
7,5
56
.95
41
2,7
06
,81
8.3
3
72
,31
0,8
64
.06
78
,62
1,4
29
.28
92
,36
1,7
08
.01
60
,69
0,9
18
.79
24
1,6
37
,11
3.7
7
10
9,3
45
,82
9.8
0
16
0,0
27
,24
6.2
0
28
,75
2,1
10
.65
23
8,7
29
,66
6.2
3
28
,75
2,1
10
.65
37
,95
6,7
28
.07
38
,49
1,4
16
.27 14
1,4
15
,52
7.6
4
25
8,7
16
,78
1.5
7
28
,75
2,1
10
.65
28
,75
2,1
10
.65
26
2,2
78
,49
6.6
7
40
,79
2,5
29
.65
80
,10
3,7
93
.98
38
,82
3,2
38
.68
60
,22
1,0
57
.83
15
1,9
41
,63
2.4
2
Chart Showing pre contract evaluation Jan-Dec 2013 QUOTTED SUM (#) VETTED SUM (#)
cvii
SUMMARY OF PROJECTS REPORTED JANUARY-DECEMBER,2013
S/NO VALUES(N)
1 PRE-CONTRACT EVALUATION (QUOTTED) 3,344,139,812.43
2 PRE-CONTRACT EVALUATION (DPPMB RECOMMENDED)
3,353,855,744.91
3 SAVINGS (9,715,932.48)
4 APPROVED CAPITAL BUDGET FOR THE 27NO. L.G.COUNCILS
17,032,382,192.00
5 CONTRACTS AWARDED JANUARY-DECEMBER,2013
5,954,840,611.32
cviii
END OF YEAR REPORT JANUARY - DECEMBER,2013 AUYO LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#) SAVING/ INCREASE (#)
REMARKS
1 15/8/2013 Complete motorised water scheme s/gida Ayundu 12,192,745.95 12,060,423.90 132,322.05
2 15/8/2013 Electrification project maro yakasai 21,930,296.22 22,817,962.00 (887,665.78)
3 15/8/2013 Electrification project maskan gayu 14,309,120.99 13,795,574.87 513,546.12
4 15/8/2013 Construction of 1no classroom with office
S.A.S.S AUYO 7,027,162.10 7,017,285.10 9,877.00
5 26/9/2013 Electrification project Shingen Gabas 47,403,169.50 45,970,919.00 1,432,250.50
6 26/9/2013 Electrification project Mado 18,393,484.32 18,635,578.25 (242,093.93)
7 26/9/2013 Reticulartion of 1500M and psp construction Matakuwa 2,709,945.60 2,761,500.00 (51,554.40)
8 26/9/2013 Construction of vetenary clinic Auyo 6,642,631.15 6,249,878.89 392,752.26
9 23/5/2013 Construction of motor pack Auyo 14,903,310.40 10,315,509.01 4,587,801.39
10 23/5/2013 Electrification project Kure 9,893,075.73 12,472,035.66 (2,578,959.93)
11 23/5/2013 Complete motorised water scheme Maje Hausawa 12,638,845.00 13,141,518.54 (502,673.54)
12 23/5/2013 Construction of Distric Haed house Ayama 19,361,721.50 18,856,805.14 504,916.36
13 29/10/2013 Construction of public convience for male and female Auyo 7,808,029.99 7,446,169.60 361,860.39
14 20/08/2013 Construction of Modern public convience Auyo 7,880,132.97 8,012,999.85 (132,866.88)
15 15/3/2013 Construction of 2No complete solar powered water supply scheme Auyo 13,114,441.20 13,292,941.20 (178,500.00)
cix
CARRIED TO GENERAL SUMMARY 216,208,112.62 212,847,101.01 3,361,011.61
cx
END OF YEAR REPORT JANUARY - DECEMBER,2013 BABURA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM # VETTED SUM SAVING/ INCREASE # REMARK
1 5/9/2013 Extention of Electricity t0 manga Manga 15,136,930.86 14,900,358.52 236,572.34
2 5/9/2013 Construction of slaughter house Babura 9,934,663.71 11,177,440.61 (1,242,776.90)
3 29/10/2013
Construction of public convience for male and female Babura 7,808,029.99 7,446,169.60 361,860.39
4 20/08/2013
Construction of Modern public convience Babura 7,880,132.97 8,012,999.85 (132,866.88)
5 15/3/2013 Construction of 2No complete solar powered water supply scheme Babura 13,114,441.20 13,292,941.20 (178,500.00)
Carried to Summary 53,874,198.73 54,829,909.78 (955,711.05)
cxi
END OF YEAR REPORT JANUARY - DECEMBER,2013 BIRNIWA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 5/9/2013 Electrification project Nguwa 25,706,672.80 24,896,236.08 810,436.72
2 5/9/2013 Electrification project Koranka 31,232,811.68 29,479,084.09 1,753,727.59
3 5/9/2013 Electrification project Zainu 11,641,052.80 11,470,548.72 170,504.08
4 8/1/2013 Construction of Complete water scheme and Reticulation 1,559m Beguwa 12,420,757.28 10,664,829.80 1,755,927.48
5 8/1/2013 Construction of Complete water scheme and Reticulation 1,023m
Beguwa Walawa 12,520,757.28 11,323,305.82 1,197,451.46
6 8/1/2013 Electrification project gabasmari 6,560,805.06 6,213,827.82 346,977.24
7 8/1/2013 Electrification project Matara Uku 12,634,330.37 12,677,291.00 (42,960.63)
8 8/1/2013 Electrification project Dolen kwana 25,634,462.52 23,599,542.42 2,034,920.10
9 8/1/2013 Electrification project Burseli 7,792,214.37 8,838,806.20 (1,046,591.83)
10 8/5/2013 Construction of Complete water scheme Gomari 11,264,276.39 11,141,759.78 122,516.61
11 8/5/2013 Construction of Complete water scheme Wargale 10,676,958.89 10,920,683.02 (243,724.13)
12 8/5/2013 Construction of Complete water scheme
Talayiya Dalari 13,455,495.14 13,644,886.27 (189,391.13)
13 6/8/2013 Upgrading/Rehabillitation of solar powered motorised water scheme Tsinkaina 9,493,500.00 9,119,653.00 373,847.00
14 6/8/2013 Construction of Complete water scheme Kundi 13,527,434.95 12,924,446.28 602,988.67
15 25/4/2013 Electrification project Isfari 8,525,613.00 8,643,655.50 (118,042.50)
16 25/4/2013 Electrification project Sunbartu 6,290,382.73 6,417,919.20 (127,536.47)
cxii
17 21/11/2013
upgrading of solar powered water scheme to motorised borehole water scheme and reticulation (1633m)
Kasarwa town
Carried forward 219,377,525.26 211,976,475.00 7,401,050.26
END OF YEAR REPORT JANUARY - DECEMBER,2013 BIRNIWA LOCAL GOVERNMENT PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
brought forward 326,037,863.25 317,227,826.67 8,810,036.58
18 29/10/2013
Construction of public convience for male and female Birniwa 7,808,029.99 7,446,169.60 361,860.39
19 20/08/2013
Construction of Modern public convience Birniwa 7,880,132.97 8,012,999.85 (132,866.88)
20 15/3/2013 Construction of 2No complete solar powered water supply scheme Birniwa 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 354,840,467.41 345,979,937.32 8,860,530.09
cxiii
END OF YEAR REPORT JANUARY - DECEMBER,2013 BIRNIN-KUDU LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 16/12/2013 Re-Construction of daily prayer mosque (Additional Work)
Birnin Kudu L.G secretariat 5,006,315.00 4,028,772.57 977,542.43
2 29/10/2013
Construction of public convience for male and female Birnin Kudu 7,808,029.99 7,446,169.60 361,860.39
3 20/08/2013
Construction of Modern public convience Birnin Kudu 7,880,132.97 8,012,999.85 (132,866.88)
4 15/3/2013 Construction of 2No complete solar powered water supply scheme Birnin Kudu 13,114,441.20 13,292,941.20 (178,500.00)
5 28/8/13 Re-Constr. of daily prayer mosque LG SEC 19,675,524.00 15,236,673.73 4,438,850.27
CARRIED TO GENERAL SUMMARY 53,484,443.16 48,017,556.95 5,466,886.21
cxiv
END OF YEAR REPORT JANUARY - DECEMBER,2013 BUJI LOCAL GOVERNMENT PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 3/10/2013 Construction of complete water scheme Gwadayi 10,766,211.25 10,980,132.02
(213,920.77)
2 3/10/2013 Construction of 10no Hand pumps Ten wards 7,200,000.00 7,334,470.50
(134,470.50)
3 3/10/2013 Construction of 1 block of 2 classroom with office Dakawa 4,421,515.54 5,709,492.69
(1,287,977.15)
4 3/10/2013 Construction of Five (5) daily prayer mosque
Gwadayi,kagada,zango,u/maina & kanji 3,157,975.16 3,503,201.64
(345,226.48)
5 3/10/2013 Construction of pit latarine toilet 2 block Kukuma and Buji 1,232,151.90 1,191,076.22
41,075.68
6 28/05/2013
Construction of solar powered water scheme Kauyan 5,376,084.75 5,275,122.00
100,962.75
7 28/05/2013 Reticulation works (818m) Makara 1,208,928.00 1,156,527.75
52,400.25
8 28/05/2013 Drilling of motorised borehole Gantsa Gabas 1,574,622.00 1,754,622.00
(180,000.00)
9 28/05/2013
Drilling of motorised borehole 2no Jajikoli 3,149,244.00 3,149,244.00
-
10 28/05/2013 Construcion of juma'at mosque Yayarin Chakuri 11,339,700.00 11,339,700.00
-
11 16/7/2013 Construction of complete water scheme Kayen Makera 6,585,012.75 6,522,112.50
62,900.25
12 25/5/2013 Construcion of juma'at mosque Gantsa 29,316,869.46 27,753,689.50 1,563,179.96
cxv
13 9/9/2013 Consultancy services on Karanga - Yayarin Tukur. Karanga-Yayarin Tukur 6,410,371.80 6,410,371.80
-
14 7/11/2013 Construction of 1 block of 2 classroom with office Gwadayi 5,317,875.83 5,510,026.04
(192,150.21)
15 7/11/2013 Wall Fencing of primary Health centre Gwadayi 7,413,315.06 8,320,912.28
(907,597.22)
Carried Forward 104,469,877.50 105,910,700.94 (1,440,823.44)
6a
END OF YEAR REPORT JANUARY - DECEMBER,2013 BUJI LOCAL GOVERNMENT PRE-CONTRACT PROJECT EVALUATION
DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
S/NO Brought Forward 104,469,877.50 105,910,700.94
(1,440,823.44)
16 7/11/2013 Construcion of juma'at mosque Danbazau 11,337,700.09 11,214,064.33 123,635.76
17
29/10/2013
Construction of public convience for male and female Buji 7,808,029.99 7,446,169.60 361,860.39
18 20/08/201
3
Construction of Modern public convience Buji 7,880,132.97 8,012,999.85 (132,866.88)
19 15/3/2013
Construction of 2No complete solar powered water supply scheme Buji 13,114,441.20 13,292,941.20 (178,500.00)
20 8/1/2013 construction of drainage Yayarin tukur - Kafin Madaki 6,468,315.56 5,856,000.00 612,315.56
21 8/1/2013 Construction of first coat surface dressing Karanjau -K/madaki
206,319,992.90
201,939,412.50 4,380,580.40
cxvi
22 17/9/2013 Construction 16no lockup shops Sara market 14,348,481.84 10,672,817.24 3,675,664.60
23 17/9/2013 Electrification project Kwanar Tijiyo - Tijiyo Ahuta 27,158,998.00 23,940,234.55 3,218,763.45
24 17/9/2013 Construction of Islamiyya school Mamuwa 1,418,846.34 2,904,310.00
(1,485,463.66)
25 17/9/2013 Complete water scheme Sagu Gabas 11,980,130.00 12,057,106.00 (76,976.00)
26 17/9/2013 Construction of Sunnah Juma'at mosque Gwadayi 9,419,511.80 9,460,062.12 (40,550.32)
CARRIED TO GENERAL SUMMARY
421,724,458.19
412,706,818.33 9,017,639.86
cxvii
END OF YEAR REPORT JANUARY - DECEMBER,2013 DUTSE LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 10/6/2013
Laterate filling along Gandu Fawa feeder road and construction of half bridge
Gwari - Gadun Fawa junction 9,997,187.00 9,977,184.00 20,003.00
2 10/6/2013 Construction of Juma'at mosque Zagon Buji 7,729,797.28 10,193,722.89 (2,463,925.61)
3 15/8/2013 Electrification project Zobiya 8,693,857.50 10,058,468.96 (1,364,611.46)
4 15/8/2013 Electrification project warwade 8,108,431.15 13,329,377.56 (5,220,946.41)
5 29/10/2013
Construction of public convience for male and female Dutse 7,808,029.99 7,446,169.60 361,860.39
6 20/08/2013
Construction of Modern public convience Dutse 7,880,132.97 8,012,999.85 (132,866.88)
7 15/3/2013
Construction of 2No complete solar powered water supply scheme Dutse 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 63,331,877.09 72,310,864.06 (8,978,986.97)
cxviii
END OF YEAR REPORT JANUARY - DECEMBER,2013 GARKI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 18/6/2013 Construction of Juma'at mosque Siyori 7,118,180.36 6,954,719.32 163,461.04
2 18/6/2013 Construction of Juma'at mosque Jirima 7,118,180.36 6,954,719.32 163,461.04
3 23/9/2013 Construction of Wall fencing G.G.S.S. Garki 27,541,235.73 27,649,464.99 (108,229.26)
4 29/10/2013
Construction of public convience for male and female Garki 7,808,029.99 7,446,169.60 361,860.39
5 20/08/2013
Construction of Modern public convience Garki 7,880,132.97 8,012,999.85 (132,866.88)
6 15/3/2013 Construction of 2No complete solar powered water supply scheme Garki 13,114,441.20 13,292,941.20 (178,500.00)
7 20/06/2013 Construction of motorised water scheme Mahuta 6,921,441.11 8,310,415.00
(1,388,973.89)
CARRIED TO GENERAL SUMMARY 77,501,641.72 78,621,429.28 (1,119,787.56)
cxix
END OF YEAR REPORT JANUARY - DECEMBER,2013 GAGARAWA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 28/5/2013 Construction of theatre room Gagarawa 6,624,839.82 7,237,985.47 (613,145.65)
2 28/5/2013 Electrification project Mai kililiBula 24,459,834.00 24,406,192.20 53,641.80
3 28/5/2013 Electrification project Malam Baki 9,262,624.00 9,610,557.02 (347,933.02)
4 3/6/2013 Construction of complete motorised water scheme
Koren Balatu 7,492,665.00 7,757,788.50 (265,123.50)
5 3/6/2013 Construction of solar powered water scheme Gurfeli 6,137,817.00 5,827,085.25 310,731.75
6 3/6/2013 Improvement of Basic Health cetre Medu 5,054,822.85 8,769,988.92 (3,715,166.07)
7 29/10/2013
Construction of public convience for male and female Gagarawa 7,808,029.99 7,446,169.60 361,860.39
8 20/08/2013
Construction of Modern public convience Gagarawa 7,880,132.97 8,012,999.85 (132,866.88)
9 15/3/2013 Construction of 2No complete solar powered water supply scheme Gagarawa 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 87,835,206.83 92,361,708.01 (4,526,501.18)
cxx
END OF YEAR REPORT JANUARY - DECEMBER,2013 GUMEL LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 11/4/2013 Construction of Zonal Inspectors office Gumel 11,661,739.35 12,040,419.15 (378,679.80)
2 30/10/2013 Construction of 6No classrooms (upstairs block) Gumel 19,335,430.59 19,898,388.99 (562,958.40)
3 29/10/2013
Construction of public convience for male and female Gumel 7,808,029.99 7,446,169.60 361,860.39
4 20/08/2013
Construction of Modern public convience Gumel 7,880,132.97 8,012,999.85 (132,866.88)
5 15/3/2013 Construction of 2No complete solar powered water supply scheme Gumel 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 59,799,774.10 60,690,918.79 (891,144.69)
cxxi
END OF YEAR REPORT JANUARY - DECEMBER,2013 GURI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM VETTED SUM
SAVING/ INCREASE (#) REMARK
1 16/7/2013 Construction of Guri - Zigo feeder road 6 Km phase II Guri - Zigo 125,653,789.00 148,303,060.30
(22,649,271.30)
2 16/7/2013 Electrification project phase III Gagiya 18,816,343.22 18,778,628.90 37,714.32
3 23/9/2013 Extra work for the construction of Guri - Zigo feeder road phase I Guri - Zigo 13,230,000.00 13,230,000.00 -
4 28/4/2013 Complete motorised water scheme Dole 16,592,109.00 16,286,656.96 305,452.04
5 29/10/2013
Construction of public convience for male and female Guri 7,808,029.99 7,446,169.60 361,860.39
6 20/08/2013
Construction of Modern public convience Guri 7,880,132.97 8,012,999.85 (132,866.88)
7 15/3/2013 Construction of 2No complete solar powered water supply scheme Guri 13,114,441.20 13,292,941.20 (178,500.00)
8 8/4/2013 Complete motorised water scheme Wareri 16,592,109.00 16,286,656.96 305,452.04
CARRIED TO GENERAL SUMMARY 219,686,954.38 241,637,113.77 (21,950,159.39)
cxxii
END OF YEAR REPORT JANUARY - DECEMBER,2013 GWARAM LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 8/10/2013
Purchase of Jincheng motorcycle AX100 (168NO) Gwaram 16,800,000.00 16,170,000.00
630,000.00
2 8/10/2013
Purchase of Golden Penny Flour (750 bags) Gwaram 6,000,000.00 6,000,000.00
-
3 8/10/2013
Purchase of Engine Taliya Chuper (1200 No ) Gwaram 1,800,000.00 1,980,000.00
(180,000.00)
4 11/4/2013
Purchase of office Furniture for excutive chairman and Legislative council Gwaram 11,857,147.50 11,549,400.50
307,747.00
5 11/4/2013 Construction of Friday Mosque
Ganji 10,490,017.15 10,490,017.15 -
6 11/4/2013 Construction of Friday Mosque Zandan
Nagogo 10,490,017.15 10,490,017.15 -
7 29/10/2013
Construction of public convience for male and female Gwaram 7,808,029.99 7,446,169.60 361,860.39
8 20/08/2013
Construction of Modern public convience Gwaram 7,880,132.97 8,012,999.85 (132,866.88)
9 15/3/2013 Construction of 2No complete solar powered water supply scheme Gwaram 13,114,441.20 13,292,941.20 (178,500.00)
10 20/06/2013 Construction of Phase III Mini Stadium Kila 24,229,180.00 23,914,284.35
314,895.65
CARRIED TO GENERAL SUMMARY 110,468,965.96 109,345,829.80 1,123,136.16
cxxiii
END OF YEAR REPORT JANUARY - DECEMBER,2013 GWIWA LOCAL GOVERNMENT PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/ INCREASE (#) REMARK
1 29/10/2013
Construction of public convience for male and female Gwiwa 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013
Construction of Modern public convience Gwiwa 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013
Construction of 2No complete solar powered water supply scheme Gwiwa 13,114,441.20 13,292,941.20 (178,500.00)
4 20/06/2013 Complete motorised borehole Gimin S/yola 19,276,738.00 17,808,977.63 1,467,760.37
5 20/06/2013 Electrification project
Janmajen Maharba & Janmajen Malam 19,286,156.39 17,125,626.47 2,160,529.92
6 20/06/2013 Electrification project Karshi 22,765,938.40 21,931,362.00 834,576.40
7 20/06/2013 Construction of 1 block of 2 classroom Firji 4,128,705.94 5,865,515.97 (1,736,810.03)
8 20/06/2013 Construction of Health post Indirawa 4,975,180.93 4,618,744.46 356,436.47
9 20/06/2013 Construction of Health post Dinya 4,975,180.93 4,618,744.46 356,436.47
10 20/06/2013 Construction of Juma'at mosque Zumar Mahauta 5,996,707.85 7,112,608.37 (1,115,900.52)
11 20/06/2013 Construction of Juma'at mosque Abuja 5,996,707.85 7,112,608.37 (1,115,900.52)
12 5/9/2013 Construction of Health post Kundiga 4,618,744.46 5,409,446.07 (790,701.61)
13 5/9/2013 Construction of Health post Tsabawa 4,618,744.46 5,409,446.07 (790,701.61)
14 5/9/2013 Construction of Juma'at mosque Indirawa 7,112,608.37 7,195,348.36 (82,739.99)
15 5/9/2013 Construction of Juma'at mosque Maiyaki 7,112,608.37 7,195,348.36 (82,739.99)
16 5/9/2013 Construction of Juma'at mosque Gasakoli 7,112,608.37 7,195,348.36 (82,739.99)
cxxiv
17 5/9/2013 Construction of 1 block of 2 classroom Tabanni 5,865,515.97 6,338,005.30 (472,489.33)
18 5/9/2013 Construction of 1 block of 2 classroom Sobashi/Gangara 5,865,515.97 6,338,005.30 (472,489.33)
CARRIED TO GENERAL SUMMARY 158,510,266.42 160,027,246.20 (1,516,979.78)
cxxv
END OF YEAR REPORT JANUARY - DECEMBER,2013 HADEJIA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM VETTED SUM
SAVING/INCREASE (#) REMARK
1 29/10/2013
Construction of public convience for male and female Gwiwa 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013
Construction of Modern public convience Gwiwa 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013 Construction of 2No complete solar powered water supply scheme Gwiwa 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 28,802,604.16 28,752,110.65 50,493.51
cxxvi
END OF YEAR REPORT JANUARY - DECEMBER,2013 JAHUN LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#) REMARK
1 2/7/2013 Electrification project kuka kwance 21,854,431.09 20,430,282.15
1,424,148.94
2 2/7/2013 Electrification project Sukullufi 10,680,121.10 7,405,286.21 3,274,834.89
3 2/7/2013 Electrification project Kadoma 18,741,406.31 13,341,517.77 5,399,888.54
4 2/7/2013 Wall fencing at Zagon Health clinic Zango 10,168,210.50 11,019,418.19 (851,207.69)
5 2/7/2013 Extention of water works Aujara 8,317,522.50 9,890,018.25 (1,572,495.75)
6 2/7/2013 Upgrading of water works Tinibu 10,874,697.75 9,417,828.00 1,456,869.75
7 2/7/2013 Upgrading of water works Yola 8,580,447.75 8,552,218.50 28,229.25
8 2/7/2013 Upgrading of water works Albasu 8,580,447.75 8,607,406.50 (26,958.75)
9 2/7/2013 Extention of pipe borne Jahun 4,608,450.00 4,810,945.13 (202,495.13)
10 2/7/2013 Construction of Distric Head House Gunka 30,050,979.23 34,860,580.50 (4,809,601.27)
11 26/7/2013 Control/provision of Earth embackment
Hardo Sabuwa and Harbo Tsohuwa 93,866,574.38 81,642,054.38 12,224,520.00
cxxvii
12 29/10/2013
Construction of public convience for male and female Jahun 7,808,029.99 7,446,169.60 361,860.39
13 20/08/2013
Construction of Modern public convience Jahun 7,880,132.97 8,012,999.85 (132,866.88)
14 15/3/2013 Construction of 2No complete solar powered water supply scheme Jahun 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 255,125,892.52 238,729,666.23 16,396,226.29
cxxviii
END OF YEAR REPORT JANUARY - DECEMBER,2013 KAUGAMA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#) SAVING/INCREASE (#) REMARK
1 29/10/2013
Construction of public convience for male and female Kaugama 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013
Construction of Modern public convience Kaugama 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013
Construction of 2No complete solar powered water supply scheme Kaugama 13,114,441.20 13,292,941.20 (178,500.00)
Carried to summary 28,802,604.16 28,752,110.65 50,493.51
cxxix
END OF YEAR REPORT JANUARY - DECEMBER,2013 KAFIN-HAUSA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#) SAVING/INCREASE (#) REMARK
1 30/10/2013
General renovation of 2block fo 3 bedroom staff quarters (Additional works) Kafin Hausa 9,521,429.53 9,204,617.42
316,812.11
2 29/10/2013
Construction of public convience for male and female Kafin Hausa 7,808,029.99 7,446,169.60 361,860.39
3 20/08/2013
Construction of Modern public convience Kafin Hausa 7,880,132.97 8,012,999.85 (132,866.88)
4 15/3/2013 Construction of 2No complete solar powered water supply scheme Kafin Hausa 13,114,441.20 13,292,941.20 (178,500.00)
-
-
CARRIED TO GENERAL SUMMARY 38,324,033.69 37,956,728.07 367,305.62
cxxx
END OF YEAR REPORT JANUARY - DECEMBER,2013 KAZAURE LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM # VETTED SUM # SAVING/INCREASE # REMARK
1 24/05/2013 Construction of modern slaughter house Kazaure 8,971,841.41 8,901,756.84 70,084.57
2 29/10/2013
Construction of public convience for male and female Kazaure 7,808,029.99 7,446,169.60 361,860.39
3 20/08/2013
Construction of Modern public convience Kazaure 7,880,132.97 8,012,999.85 (132,866.88)
4 15/3/2013 Construction of 2No complete solar powered water supply scheme Kazaure 13,114,441.20 13,292,941.20 (178,500.00)
5 5/9/2013 Additional Interlocking work L.G. zonal office 837,548.78 837,548.78 0.00
Carried to summary 38,611,994.35 38,491,416.27 120,578.08
cxxxi
END OF YEAR REPORT JANUARY - DECEMBER,2013 KIRI-KASAMMA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#) SAVING/INCREASE (#) REMARK
1 11/4/2013 Construction of proposed Juma'at mosque Iyo 9,790,369.72 9,740,111.44 50,258.28
2 11/4/2013 Construction of proposed Juma'at mosque
Matara Galadima 9,790,369.72 9,740,111.44 50,258.28
3 11/4/2013 Construction of proposed Juma'at mosque
Matara Gana 9,790,369.72 9,740,111.44 50,258.28
4 11/4/2013 Construction of proposed Juma'at mosque Gayin Babba 8,984,240.92 8,813,893.07 170,347.85
5 11/4/2013 Construction of proposed Juma'at mosque Matafari 8,984,240.92 8,813,893.07 170,347.85
6 11/4/2013 Construction of proposed Juma'at mosque Malakari 8,984,240.92 8,813,893.07 170,347.85
7 23/9/2013 Electrification project Barmaguwa 29,668,720.44 30,826,034.52 (1,157,314.08)
8 5/9/2013 Electrification project Turabu 25,734,574.75 26,175,368.94 (440,794.19)
9 29/10/2013
Construction of public convience for male and female KiriKasamma 7,808,029.99 7,446,169.60 361,860.39
10 20/08/2013
Construction of Modern public convience KiriKasamma 7,880,132.97 8,012,999.85 (132,866.88)
11 15/3/2013 Construction of 2No complete solar powered water supply scheme KiriKasamma 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 140,529,731.27 141,415,527.64
cxxxii
(885,796.37)
END OF YEAR REPORT JANUARY - DECEMBER,2013 KIYAWA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#) SAVING/INCREASE (#) REMARK
1 15/8/2013 Construction of Feeder road from Kadirawa - Bage - Maje
Kadirawa - Bage - Maje 61,270,335.00 107,439,727.50 (46,169,392.50)
2 15/8/2013 Construction of Feeder road from Kadirawa - Bage - Maje
Gidan Tilo - Fake 31,321,749.38 38,419,644.38
(7,097,895.00)
3 29/10/2013
Construction of public convience for male and female Kiyawa 7,808,029.99 7,446,169.60 361,860.39
4 20/08/2013
Construction of Modern public convience Kiyawa 7,880,132.97 8,012,999.85 (132,866.88)
5 15/3/2013 Construction of 2No complete solar powered water supply scheme Kiyawa 13,114,441.20 13,292,941.20 (178,500.00)
6 10/6/2013 Construction of Juma'at Mosque Karfawa 5,118,620.62 5,005,606.59 113,014.03
7 10/6/2013 Construction of Islamiyya school Kalkutan 5,995,113.31 5,856,186.56 138,926.75
8 10/6/2013 Construction of Islamiyya school Garun B/gari 5,995,113.31 5,856,186.56 138,926.75
9 10/6/2013 Construction of Chairman official resident Kiyawa 67,387,319.33 67,387,319.33 -
CARRIED TO GENERAL SUMMARY 205,890,855.11 258,716,781.57 (52,825,926.46)
cxxxiii
END OF YEAR REPORT JANUARY - DECEMBER,2013 MALAM-MADORI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#) VETTED SUM (#)
SAVING/INCREASE (#)
REMARK
1 29/10/2013
Construction of public convience for male and female MalamMadori 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013 s MalamMadori 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013
Construction of 2No complete solar powered water supply scheme MalamMadori 13,114,441.20 13,292,941.20 (178,500.00)
Carried to summary 28,802,604.16 28,752,110.65 50,493.51
cxxxiv
END OF YEAR REPORT JANUARY - DECEMBER,2012 MAIGATARI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#) REMARK
1 29/10/2013
Construction of public convience for male and female Maigatari 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013
Construction of Modern public convience Maigatari 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013 Construction of 2No complete solar powered water supply scheme Maigatari 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 28,802,604.16 28,752,110.65 50,493.51
cxxxv
END OF YEAR REPORT JANUARY - DECEMBER,2013 MIGA LOCAL GOVERNMENT PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#)
REMARK
1 29/8/2013 Construction of culvert and Earth filling
Tsakuwawa - Kigawa 29,447,775.00 24,629,850.00 4,817,925.00
2 8/10/2013 Construction of drainage system Sarawuya 7,343,973.00 7,343,973.00 0.00
3 8/10/2013 Construction of 9 bedroom staff quarters Miga 14,209,979.92 18,255,496.97 (4,045,517.05)
4 8/10/2013 Construction of dwarf wall S/Garin Takanebu Juma'at mosque
S/Garin Takanebu 6,027,201.72 6,156,663.58 (129,461.86)
5 2/7/2013 Construction of complete motorised water scheme Gidan Kaya 10,888,270.40 10,636,731.53 251,538.87
6 2/7/2013 Construction of complete motorised water scheme Romawa 10,095,637.66 10,259,841.90 (164,204.24)
7 2/7/2013 Electrifiation project Ummadu 19,178,503.89 20,317,934.47 (1,139,430.58)
8 11/4/2013 Construction of Basic Health clinic Hantsu 15,739,858.13 17,974,692.31 (2,234,834.18)
9 11/4/2013 Construction of Basic Health clinic Dangyatin 15,739,858.13 17,974,692.31 (2,234,834.18)
10 11/4/2013 Construction of Basic Health clinic Koya 15,739,858.13 17,974,692.31 (2,234,834.18)
11 11/4/2013 Electrifiation project Burji 11,800,834.75 11,598,088.50 202,746.25
12 11/4/2013 Electrifiation project Damaganawa 18,947,197.69 20,808,150.67 (1,860,952.98)
13 11/4/2013 Construction of complete motorised water scheme Alfa 9,196,601.40 9,420,537.00 (223,935.60)
14 11/4/2013 Construction of complete motorised water scheme Gululu 11,720,957.91 12,699,196.65 (978,238.74)
15 20/6/2013 Construction of Friday mosque S/ Garin Takanebu 20,571,290.80 19,232,320.77 1,338,970.03
16 20/6/2013 Construction of Friday mosque Kigawa 8,053,150.78 8,243,524.05 (190,373.27)
cxxxvi
17 29/10/2013
Construction of public convience for male and female Miga 7,808,029.99 7,446,169.60 361,860.39
18 20/08/2013
Construction of Modern public convience Miga 7,880,132.97 8,012,999.85 (132,866.88)
Carried Forward 240,389,112.27 248,985,555.47 (8,596,443.20)
22a END OF YEAR REPORT JANUARY - DECEMBER,2013 MIGA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#)
REMARK
Brought Forward 240,389,112.27 248,985,555.47 (8,596,443.20)
19 15/3/2013 Construction of 2No complete solar powered water supply scheme Miga 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO SUMMARY 253,503,553.47 262,278,496.67 (8,774,943.20)
cxxxvii
END OF YEAR REPORT JANUARY - DECEMBER,2013 RINGIM LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION
QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#) REMARK
1 11/4/2013 Construction of Zonal inspectors office Ringim 11,661,739.35 12,040,419.00 (378,679.65)
2 29/10/2013
Construction of public convience for male and female Ringim 7,808,029.99 7,446,169.60 361,860.39
3 20/08/2013
Construction of Modern public convience Ringim 7,880,132.97 8,012,999.85 (132,866.88)
4 15/3/2013 Construction of 2No complete solar powered water supply scheme Ringim 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 40,464,343.51 40,792,529.65 (328,186.14)
cxxxviii
END OF YEAR REPORT JANUARY - DECEMBER,2013 RONI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM VETTED SUM
SAVING/INCREASE (#)
REMARK
1 29/10/2013
Construction of public convience for male and female Roni 7,808,029.99 7,446,169.60 361,860.39
2 20/08/2013
Construction of Modern public convience Roni 7,880,132.97 8,012,999.85 (132,866.88)
3 15/3/2013 Construction of 2No complete solar powered water supply scheme Roni 13,114,441.20 13,292,941.20 (178,500.00)
4 18/06/2013 Electrification project Mamudawa 25,934,516.00 15,878,346.12 10,056,169.88
5 26/9/2013 Construction of Distric Head ( phase II) Roni 12,013,843.26 17,889,033.21
(5,875,189.95)
6 26/9/2013 Construction of Distric Head ( phase II) Amaryawa 17,238,886.24 17,584,304.00 (345,417.76)
CARRIED TO GENERAL SUMMARY 83,989,849.66 80,103,793.98 3,886,055.68
cxxxix
END OF YEAR REPORT JANUARY - DECEMBER,2013 SULETANKARKAR LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#) REMARK
1 22/7/2013 Construction of motorised water scheme and reticulation (1130M) Baggade 12,976,425.00 10,071,128.03 2,905,296.97
2 29/10/2013
Construction of public convience for male and female
Sule Tankarkar 7,808,029.99 7,446,169.60 361,860.39
3 20/08/2013
Construction of Modern public convience
Sule Tankarkar 7,880,132.97 8,012,999.85 (132,866.88)
4 15/3/2013 Construction of 2No complete solar powered water supply scheme
Sule Tankarkar 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 41,779,029.16 38,823,238.68 2,955,790.48
cxl
END OF YEAR REPORT JANUARY - DECEMBER,2013 TAURA LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM VETTED SUM
SAVING/INCREASE (#)
REMARK
1 10/6/2013 Construction of Distric Head house Majia 19,174,547.26 20,186,026.62 (1,011,479.36)
2 26/4/2013 Re-construction of Juma'at mosque (Additional work) Nahuce 15,187,392.10 9,847,546.58 5,339,845.52
3 26/4/2013 Re-construction of Juma'at mosque (Additional work) Nahuce 9,896,250.00 1,435,373.98 8,460,876.02
4 29/10/2013
Construction of public convience for male and female Taura 7,808,029.99 7,446,169.60 361,860.39
5 20/08/2013
Construction of Modern public convience Taura 7,880,132.97 8,012,999.85 (132,866.88)
6 15/3/2013 Construction of 2No complete solar powered water supply scheme Taura 13,114,441.20 13,292,941.20 (178,500.00)
CARRIED TO GENERAL SUMMARY 73,060,793.52 60,221,057.83 12,839,735.69
cxli
END OF YEAR REPORT JANUARY - DECEMBER,2013 YANKWASHI LOCAL GOVERNMENT
PRE-CONTRACT PROJECT EVALUATION
S/NO DATE PROJECT
PROPOSED LOCATION QUOTED SUM (#)
VETTED SUM (#)
SAVING/INCREASE (#) REMARK
1 6/8/2013 Drilling of 20No borehole for hand pumps 2 each ward 10 wards 16,000,000.00 16,004,900.00 (4,900.00)
2 6/8/2013
Construction of Complete motorised water scheme
Unguwar Kalgo 16,290,486.14 12,922,417.16 3,368,068.98
3 29/10/2013
Construction of public convience for male and female Yankwashi 7,808,029.99 7,446,169.60 361,860.39
4 20/08/2013
Construction of Modern public convience Yankwashi 7,880,132.97 8,012,999.85 (132,866.88)
5 15/3/2013 Construction of 2No complete solar powered water supply scheme Yankwashi 13,114,441.20 13,292,941.20 (178,500.00)
6 8/5/2013 Construction of feeder road Yankwashi - Zoto 31,035,718.75 24,269,332.50 6,766,386.25
7 8/5/2013 Construction of Juma'at Mosque Furji 20,251,293.80 19,446,046.79 805,247.01
8 31/12/2013 Construction of Drainage and culvert Acilafiya 14,094,711.80 13,395,022.84 699,688.96
9 31/12/2013 Construction of wall fencing phase II G.T.C. Karkarna 29,854,755.47 13,982,835.76 15,871,919.71
10 31/12/2013 Construction of Drainage 750M Bandawa 15,179,077.80 14,752,243.80 426,834.00
11 31/12/2013 Construction of Dwarf wall fencing
Karkarna Kudu Grave yard 8874305 8416722.92 457582.08
CARRIED TO GENERAL SUMMARY 180,382,952.92 151,941,632.42 28,441,320.50
cxlii
SECTION (D)
CONTRACT AWARDED
JANUARY – DECEMBER, 2013
cxliii
EXPENDITURE INCURED ON CAPITAL PROJECT JANUARY - DECEMBER, 2013.
S/NO LOCAL GOVERNMENT 2013 APPROVED CAPITAL
BUDGET ACTUAL CAPITAL PROJECT
AWARDED 1 AUYO 593,808,511.00 227,100,725.78 2 BABURA 524,018,689.00 136,903,764.75 3 BIRNIWA 873,155,414.00 309,830,875.61 4 BIRNIN KUDU 735,272,132.00 150,829,772.68
5 BUJI 716,888,540.00 467,189,083.21
6 DUTSE 526,635,690.00 315,951,539.88 7 GARKI 516,127,117.00 137,303,963.93
8 GAGARAWA 558,045,300.00 134,861,517.29
9 GUMEL 538,029,216.00 128,751,330.33 10 GURI 862,177,181.00 122,644,493.48 11 GWARAM 677,025,778.00 180,281,880.28 12 GWIWA 682,373,371.00 301,953,931.78 13 HADEJIA 415,227,237.00 192,540,828.68
14 JAHUN 723,162,399.00 181,338,262.09 15 KAUGAMA 521,930,461.00 205,996,135.91 16 KAFIN-HAUSA 713,986,299.00 189,465,737.98 17 KAZAURE 458,764,030.00 144,050,438.43 18 KIRI-KASAMMA 597,504,596.00 379,060,257.91 19 KIYAWA 827,819,231.00 234,929,463.31
20 MALAM-MADORI 582,444,998.00 221,773,074.93
21 MAIGATARI 899,320,622.00
304,843,692.30
22 MIGA 781,323,576.00
453,129,610.91
23 RINGIM 620,665,126.00
136,737,133.68 24 RONI 446,912,942.00 175,317,444.48 25 SULE-TANKARKAR 559,736,531.00 156,962,197.75 26 TAURA 475,614,959.00 151,963,425.38
cxliv
27 YANKWASHI 604,412,246.00
213,130,028.58
TOTAL 17,032,382,192.00 5,954,840,611.32
cxlv
59
3,8
08
,51
1.0
0
52
4,0
18
,68
9.0
0
87
3,1
55
,41
4.0
0
73
5,2
72
,13
2.0
0
71
6,8
88
,54
0.0
0
52
6,6
35
,69
0.0
0
51
6,1
27
,11
7.0
0
55
8,0
45
,30
0.0
0
53
8,0
29
,21
6.0
0
86
2,1
77
,18
1.0
0
67
7,0
25
,77
8.0
0
68
2,3
73
,37
1.0
0
41
5,2
27
,23
7.0
0
72
3,1
62
,39
9.0
0
52
1,9
30
,46
1.0
0 71
3,9
86
,29
9.0
0
45
8,7
64
,03
0.0
0
59
7,5
04
,59
6.0
0
82
7,8
19
,23
1.0
0
58
2,4
44
,99
8.0
0
89
9,3
20
,62
2.0
0
78
1,3
23
,57
6.0
0
62
0,6
65
,12
6.0
0
44
6,9
12
,94
2.0
0
55
9,7
36
,53
1.0
0
47
5,6
14
,95
9.0
0
60
4,4
12
,24
6.0
0
22
7,1
00
,72
5.7
8
13
6,9
03
,76
4.7
5
30
9,8
30
,87
5.6
1
15
0,8
29
,77
2.6
8
46
7,1
89
,08
3.2
1
31
5,9
51
,53
9.8
8
13
7,3
03
,96
3.9
3
13
4,8
61
,51
7.2
9
12
8,7
51
,33
0.3
3
12
2,6
44
,49
3.4
8
18
0,2
81
,88
0.2
8
30
1,9
53
,93
1.7
8
19
2,5
40
,82
8.6
8
18
1,3
38
,26
2.0
9
20
5,9
96
,13
5.9
1
18
9,4
65
,73
7.9
8
14
4,0
50
,43
8.4
3 3
79
,06
0,2
57
.91
23
4,9
29
,46
3.3
1
22
1,7
73
,07
4.9
3
30
4,8
43
,69
2.3
0
45
3,1
29
,61
0.9
1
13
6,7
37
,13
3.6
8
17
5,3
17
,44
4.4
8
15
6,9
62
,19
7.7
5
15
1,9
63
,42
5.3
8
21
3,1
30
,02
8.5
8
Chart showing approved capital budget and actual award for the 27No local Goverment councils
2013 APPROVED CAPITAL BUDGET ACTUAL CAPITAL PROJECT AWARDED
cxlvi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
AUYO LOCAL GOVERNMENT
S/NO
DATE PROJECT CONTRACT NUMBER
CONTRACTOR LOCATION AMOUNT
1 13/6/201
3 CONSTR. OF MOTOR PARK 0562 A.U.O & Sons Auyo 10,315,509.01
2 13/6/201
3 COMPLETE WATER SCHEME 0563 Limis Brothers Maje 12,472,135.66
3 14/6/201
3 CONSTR, OF DISTRICT HEAD HOUSE 0564
KADARA G CONCEPT Ayama 18,856,805.14
4 14/6/201
3 ELECTRIFICATION PROJECT 0565 IHSAN & INVESTMENT Kure 13,141,518.64
5 14/6/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0566 Adamu Digatawa Fuge 1,615,373.34
6 14/6/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0567 A Garba Auta Kaudan 1,615,373.34
7 14/6/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0568 Bako Jura Akubushin 1,615,373.34
8 14/6/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0569 Abdullahi Amani Atisga 1,615,373.34
9 14/6/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0570 Abulsalamu 2 Boys Minari 1,615,373.34
10 14/6/201
3 Constr. Of 1 No. Lock Up Shop 0572 A. Idi Gatafa & Others Auyo 3,712,681.50
11 14/6/201
3 Constr. Of 1 No. Lock Up Shop 0574 Umar Galadima & Others Auyo 3,712,681.50
12 30/7/13 DRILLING 5 NO. H/PUMPS 0575 G/Kuka Drilling Com. Kajilmari & 4 Others 1,102,500.00
13 16/9/13 CONSTR, OF 2 C/ROOMS WITH OFFICE 0576 A.U.O & Sons Arabic SS Auyo 7,017,285.10
cxlvii
14 29/8/13 COMPLETE WATER SCHEME 0577 Limis Brothers Ayanduwa 12,060,423.90
15 29/8/201
3 UPGRADING OF SOLAR W/SCHEME 0578 Limis Brothers Furawa 5,370,321.60
C/F 95,838,728.75
cxlviii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
AUYO LOCAL GOVERNMENT
B/F 95,838,728.75
16 4/9/2013 ELECTRIFICATION PROJECT 0579 LAMU & BABALDU Maska 13,795,574.87
17 16/9/2013 ELECTRIFICATION PROJECT 0581 HAMSU NIG LTD Maro 22,817,962.00
18 12/9/2013 RENOVATION OF LEA 0582 Ismaila Maaji Auyo LEA Auyo 1,949,326.03
19 4/12/2013 COMPLETE SOLAR WATER SCHEME 0583 Limis Brothers Auyo 6,646,470.60
20 4/12/2013 COMPLETE SOLAR WATER SCHEME 0584 Limis Brothers Auyo 6,646,470.60
21 6/11/2013 ELECTRIFICATION PROJECT 4301 Maro Engg Ltd Mado 18,635,578.25
22 7/11/2013 ELECTRIFICATION PROJECT 4302 Limis Brothers S/Gabas & S/Yamma 45,970,919.00
23 30/7/13 RENOVATION OF BUS STOP 4304 Musa Guyu Kwanar Gawo 271504.2
24 30/7/13 RENOVATION OF BUS STOP 4206 Hassan Shahada Kwanar Kataje 271,504.20
25 14/11/13 REPAIRS OF 2NO. POLICE VEHICLE 4307 Alh. Haladu Gasanya Auyo Police 2,110,393.00
26 3/4/2013 CONSTR. OF DUPLEX HOUSE 4001 A DANYARO M/WALDA AUYO 107,985,023.03
TOTAL 227,100,725.78
cxlix
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
BABURA L G
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION AMOUNT
1 3/4/2013 CONSTR. OF DUPLEX HOUSE BABURA 107,985,023.03
2 16/12/2013 CONSTR. OF PUBLIC CONVINIENCE 1771 A A SHITU BABURA TASHA 8,012,900.86
3 16/12/2013 COMPLETE W/SCHEME 1771 A A SHITU BABURA TASHA 6,446,470.00
4 16/12/2013 CONSTR. OF PUBLIC CONVINIENCE 1763 A A SHITU BABURA MARKET 8,012,900.86
5 16/12/2013 COMPLETE SOLAR W/SCHEME 1763 A A SHITU BABURA MARKET 6,446,470.00
TOTAL 136,903,764.75
cl
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
B/KUDU L. G
S/N DATE CONTARCS AWARDED NUMBER CONTRACTOR LOCATION AMOUNT [N]
1 3/4/2013 CONSTR. OF DUPLEX HOUSE CHAMBALEIN NIG. LTD B/KUDU 107,985,023.03
2 3/12/2013 COMPLETE SOLAR WATER SCHEME HAMBISCON NIG LTD B/KUDU 6,646,470.00
3 3/12/2013 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD TSANGAYA B/KUDU 7,446,169.60
4 3/12/2013 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD TSANGAYA B/KUDU 6,646,470.00
5 3/12/2013 COMPLETE SOLAR WATER SCHEME ABAMGOS NIG LTD KANGIRE ROAD 6,646,470.60
6 3/12/2013 CONSTR. OF PUBLIC CONVINIENCE ABAMGOS NIG LTD KANGIRE ROAD 8,012,999.85
7 3/12/2013 CONSTR. OF PUBLIC CONVINIENCE
TIBAB FACILITY SERVICES K/FADA B/KUDU 7,446,169.60
TOTAL 150,829,772.68
cli
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
BUJI LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT NUMBER
CONTRACTOR LOCATION AMOUNT [ N : K ]
1 20/3/2013 WALL FENCING OF KUKUMA CENTRAL MOSQUE 0001 BABANNAN ALI KUKUMA
1,106,580.40
2 22/3/2013 CONSTR. OF DUPLEX HOUSE 0002 JANGO INT. NIG LTD GANTSA
107,985,023.03
3 9/4/2013
CONSTR. OF FIRST SURFACE COAT ROAD 0003
GANO VENTURES NIG LTD
KARANJAU - K/MADAKI
200,771,865.60
4 12/3/2013 CONSTR. OF LOCK-UP SHOPS
0004 IHSAN INVST. LTD SARA MARKET 10,572,817.24
5 20/3/2013
LYING OF PRECAST INTERLOCK
0005 A AMADU KUKUMA KUKUMA FRIDAY MOSQUE
930,987.20
6 12/3/2013 CONSTR. OF JUMAAT MOSQUE
0006 YAYARIN TUKUR NIGERIA
MADABE 11,339,700.00
7 12/7/2013 CONSTR. OF JUMAAT MOSQUE
0007 IHSAN INVST. LTD YAYARIN CHAKAURI
11,339,700.00
8 12/8/2013 DRILLING OF 3NO. BOREHOLES
0008 WATER & WASTE WATER GANTSA & JAJIKOLIi
4,903,866.00
9 23/8/13 REHABLITATION OF WATER SCHEME
0009 WATER & WASTE WATER KAWAYA 3,875,000.00
10 4/8/2013 CONSTR. OF ISLAMIYYA SCHOOL
0010 SHUAIBU UMARU MAMUNA 2,904,310.00
11 20/9/13 CONSTR. OF JUMAAT MOSQUE
0011 PERFORMANCE ENG LTD
GANTSA 27,753,689.40
12 18/10/13 CONSTR. OF COMPLETE WATER SCHEME
0012 WATER & WASTE WATER KAUYEN MAKERA 6,522,112.50
13 18/10/13 CONSTR. OF COMPLETE WATER SCHEME
0013 WATER & WASTE WATER SAGU GABAS 12,057,106.36
clii
14 22/10/13 CONSTR. OF PIT LATRINE 0014 A WADA DRIVER & M BAFFA
BUJI PHC 545,538.00
15 18/10/13 CONSTR. OF 10NO. HANDPUMPS 0015 Y-TEK INV. & AGRO ALLIED 10 WARDS
7,334,470.05
C/F
409,942,765.78
5a
BUJI LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION AMOUNT [ N: K]
B/F
409,942,765.78
16 18/10/2013
ELECRIFICATION PROJECT 0016 YAYARIN TUKUR NIG. LTD
KWANA-TIJIYO-AHOTO
17 18/10/13 CONSTR. OF COMPLETE WATER SCHEME
0017 WATER & WASTE WATER
GWADAYI 10,980,132.02
18 22/10/13 CONSTR. OF PIT LATRINE 0018 A AMADU TELA KUKUMA PHC 545,538.00
19 18/10/13 CONSTR. OF SUNNA JUMAAT MOSQUE
0019 ATAMFA MARKETING NIG. LTD
GWADAYI 9,460,062.12
20 18/10/2013
CONSTR. OF 1-BLOCK OF 2 CLASSROOMS
0020 ATAMFA MARKETING NIG. LTD
DAKAWA 5,709,492.69
21 30/10/13 COMPLETE WATER SCHEME
0021 WATER & WASTE WATER
BUJI 6,646,470.60
22 30/10/13 COMPLETE WATER SCHEME
0022 WATER & WASTE WATER
GANTSA 6,646,470.60
23 14/3/13 CONSTR. OF PIT LATRINE 0023 ALH. IDI & OTHERS YAYARIN TUKUR 616,075.95
24 1/3/2013 CONSTR. OF PIT LATRINE 0024 MUSTAFA & OTHARS GWADAYI 616,075.95
25 3/10/2013 COSTR. OF PUBLIC CONVINIENCE
0025 YAYARIN TUKUR NIG. LTD
GANTSA 8,012,999.75
cliii
26 3/10/2013 COSTR. OF PUBLIC CONVINIENCE
0026 YAYARIN TUKUR NIG. LTD
BUJI 8,012,999.75
TOTAL 467,189,083.21
cliv
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
BIRNIWA L.G
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 14/3/13 ELECTRIFICATION PROJECT 1175 TURABU CONSTRUCTION ABARI 5,996,939.72
2 14/3/2013 ELECTRIFICATION PROJECT 1178 MAJERI ELECTRICAL
VENTURES SUMBURTU 6,290,382.72
3 18/3/2013 ELECTRIFICATION PROJECT 1174 TURABU CONSTRUCTION ISFARI 8,525,613.88
4 19/3/2013 SUPPLY OF 15KVA GENERATOR 0556 LIMIS BROTHERS DAJILBANI 1,800,000.00
5 13/3/2013 COMPLETE WATER SCHEME 1170 LIMIS BROTHERS GOMARI 11,264,276.39
6 13/3/2013 COMPLETE WATER SCHEME 1171 TURABU CONSTRUCTION TATAJIYA/DALLARI 13,455,495.14
7 16/7/2013 CONSTR. OF I BEDROOM BUNGALOW 1136 KHALI & TALBA DISTRICT HOUSE BIRNIWA 3,387,705.16
8 18/07/2013 ELECTRIFICATION PROJECT 1163 IHSAN GEN ENTP. LIMITED DOLEN KWANA 23,599,542.42
9 19/7/2013 SUPPLY OF 15KVA GENERATOR 0557 LIMIS BROTHERS KIHINDE 1,800,000.00
10 18/07/2013 ELECTRIFICATION PROJECT 1185 STEP BY STEP ZAINI 11,086,717.00
11 15/03/2013 COMPLETE WATER SCHEME 1177 ADZ GLOBASL SERVICES ADAMARI 11,616,990.89
12 22/05/2013 DRILLING OF HAND PUMP 1181 INDAGI DAUDA R TSAMIYAR ZAKI 400,000.00
13 20/06/2013 COMPLETE WATER SCHEME 1183 LIMIS BROTHERS KUNDI 13,527,434.00
14 14/5/2013 CONSTR. OF FRIDAY MOSQUE 1178 SUBIMUM BIRNIWA 20,788,291.77
15 3/4/2013 CONSTR. OF DUPLEX GANO VENTURES BIRNIWA 107,985,023.03
16 7/5/2013 SUPPLY OF PLASTIC CHAIRS 0555 A BABA M ABBAS SONS BIRNIWA 486,000.00
17 15/05/2013 CONSTR. OF HANDPUMP 1180 LIMIS BROTHERS KILBU 935,211.98
C/F 242,945,624.10
clv
CONTRACT AWARDED
BIRNIWA L.G
B/F 242,945,624.10
18 15/05/2013 ADDITIONAL OVER HEAD TANK 1173 LIMIS BROTHERS LTD DOLEN KWANA 2,905,881.30
19 12/3/2013 COMPLETION OF KANYA MOSQUE 1173 TALAKU ENT LTD WARGADU 10,676,958.89
20 20/02/2013 SUPPLY 13 HP GENERATOR 0555 LIMIS BROTHERS LTD FM BIRNIWA 511,000.00
21 11/6/2013 CONSTR. OF HANDPUMP 1182 BULAMA SURAJO & SONS FULANI KILBU/FULANI 800,000.00
22 26/11/2013 CONSTR. OF PUBLIC CONVINIENCE HAMBISCOM NIG LTD DIGINSA 8,012,999.58
23 26/11/2014 CONSTR. OF PUBLIC CONVINIENCE NABAKWAI NIG LTD BIRNIWA TSHA 8,012,999.58
24 2/12/2013 COMPLETE SOLAR WATER SCHEME MUSHAB DIGINSA 6,646,470.89
26 26/11/2013 CONSTR. OF PUBLIC CONVINIENCE STEP BY STEP SERVICES BIRNIWA KASUWA 8,012,999.89
26 26/11/2013 CONSTR. OF PUBLIC CONVINIENCE KANADI GLOBAL KUMSA 8,012,999.89
27 26/11/2013 COMPLETE SOLAR WATER SCHEME LIMIS BROTHERS LTD KUMSA 6,646,470.89
28 26/11/2013 COMPLETE SOLAR WATER SCHEME LIMIS BROTHERS LTD BIRNIWA KASUWA 6,646,470.60
TOTAL 309,830,875.61
clvi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GARKI L.G
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 12/11/2013 CONSTR. OF PUBLIC CONVINIENCE 2186 AA SHITU GARKI MOTOR PARK 8,012,999.85
2 12/11/2013 CONSTR. OF PUBLIC CONVINIENCE 2187 AA SHITU GARKI MARKET 8,012,999.85
3 12/11/2013 COMPLETE SOLAR WATER SCHEME 2188
IHSAN DRILLING & INVSTM GARKI MOTOR PARK 6,646,470.60
4 12/11/2013 COMPLETE SOLAR WATER SCHEME 2189
IHSAN DRILLING & INVSTM GARKI MARKET 6,646,470.60
5 4/3/2013 CONSTR. OF DUPLEX HOUSE 2001 EL DEE CONST. NIG LTD GARKI 107,985,023.03
TOTAL 137,303,963.93
clvii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GAGARAWA LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 21/08/2013 RE-CONSTR. 0F ENGINE ROOM 0336 M/UNGUWA DANLADI GAGARAWA TASHA 487,012.00
2 21/08/2013 RE-CONSTR. 0F ENGINE ROOM 0335 SULE GAMJI G/CHIROMA 488,012.00
3 2/7/2013 FIXING OF BURGLER PROOF & DOORS 0332 YUSHAU USAINI BHC G. TASHA 361,522.00
4 7/3/2013 RENOVATION OF STAFF QTRS 0323 MOHD S/DARE GAGARAWA TASHA 1,571,043.00
5 14/01/2013 RENOVATION OF STAFF QTRS [OLD SITE ] 0322 IBRAHIM HABU GAGARAWA TASHA 1,795,384.00
6 7/6/2013 RENOVATION OF JUMAT MOSQUE 0331 MALAM IDI KYAURE MAKERABU 2,377,197.90
7 14/05/2013 CONSTR. OF ENGINE ROOM 0329 M/UNGUWA DANLADI LG STAFF QTRS 313,304.00
8 22/05/2013 RENOVATION OF DAILY PRAYER MOSQUE 0328 DANSUDU MEDU GAGARAWA TUDU 388,377.00
9 10/5/2013 RENOVATION OF STAFF QTRS 0327 KABIRU IBRAHIM OLD SITE 1,425,120.00
10 30/04/2013 RENOVATION OF DAILY PRAYER MOSQUE 0326 A ISIYA ABDU MEDU GIDAN YAKUBU 363,200.00
11 30/04/2013 RENOVATION OF ISLAMIYYA SCHOOL 0325 M SABO SHEHU GAGARAWA TASHA 518,952.00
12 30/07/2013 PURCHASE OF PUBLIC ADDRESS SYSTEMS 3962 AMINU MEDU VARIOS MOSQUE 450,000.00
13 27/04/2013 PURCHASE OF ROOFING MATEIALS 3959 HUDU KARYAKAHO VARIOS MOSQUE 340,000.00
14 16/04/2013 PURCHASE OF PAS & GENERATOR 3960 MANSUR MUSA
KORE BALATU MOSQUE 387,900.00
15 21/08/2013 PURCHASE OF MOSQUE 3964 BUNIYA TAJJAWA VARIOS MOSQUE 450,000.00
clviii
EQIUPMQNTS
16 23/05/2013 PURCHASE OF 20NO. GERATORS 3961 AMINU MOHD VARIOS MOSQUE 500,000.00
17 16/4/2013 CONSTR. OF DUPLEX HOUSE GARE INVESTMENT GAGARAWA 107,985,023.03
18 30/9/2013 CONSTR. OF PUBLIC CONVINIENCE 5484 KANADI GLOBAL GAGARAWA TASHA 6,646,470.47
19 30/9/2013 COMPLETE SOLAR WATER SCHEME 5483 I Y DRILLING GAGARAWA TASHA 8,012,999.89
TOTAL 134,861,517.29
clix
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GUMEL LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 24/6/2013 CONSTR. OF DAILY PRAYER MOSQUE 0062 MAL IBRAHIM DOGO KOKINAMI 1,334,733.42
2 24/06/2013 CONSTR. OF DAILY PRAYER MOSQUE 0061 ALH. A TSANGAYA TSANGAYA 1,334,733.42
3 24/06/2013 CONSTR. OF DAILY PRAYER MOSQUE 0063 A. ADO D/KAYA DAGARIYO 1,334,733.42
4 24/06/2013 CONSTR. OF DAILY PRAYER MOSQUE 0064 BABANDI BUSINESS GAMBAWA 1,334,733.42
5 24/06/2013 CONSTR. OF DAILY PRAYER MOSQUE 0065 SABO ZAKAR MAJINGINI 1,334,733.42
6 17/04/2013 CONSTR. OF DUPLEX HOUSE 0060
DUTSEN TAURA NIG LTD GUMEL 107,985,023.03
7 12/11/2013 CONSTR. OF PUBLIC CONVINIENCE 2187 A U STEP NIG LTD GUMEL MOTOR PARK 7,446,169.60
8 12/11/2013 COMPLETE SOLAR W/SCHEME 2188 A U STEP NIG LTD GUMEL MOTOR PARK 6,646,470.60
TOTAL 128,751,330.33
clx
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GURI LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
10/10/2013 CONSTR. OF PUBLIC CONVINIENCE 0001 A MAGAJI & SONS GURI TOWN 8,012,999.85
10/10/2013 COMPLETE SOLAR W/SCHEME 0002 ADZ GLOBAL SERVICES GURI TOWN 6,646,470.60
3/4/2013 CONSTR. OF DUPLEX HOUSE 0003 AMARYAWA & SONS GURI TOWN 107,985,023.03
TOTAL 122,644,493.48
clxi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GWARAM LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 4/3/2013
CONSTR. OF DU[LEX HOUSE 0001 YAYARIN TUKUR NIG. LTD GWARAM 107,985,023.03
2 1/11/2013
CONST. OF PUBLIC CONVINIENCE S. 42/VI
YAYARIN TUKUR NIG. LTD GWARA TOWN 8,012,900.85
3 6/11/2013
CONST. OF PUBLIC CONVINIENCE S. 42/VI
YAYARIN TUKUR NIG. LTD GWANI 8,012,900.85
4 6/11/2013
COMPLETE SOLAR W/SCHEME S. 42/VI YAYARIN TUKUR NIG. LTD GWARAM TOWN 6,446,470.60
5 6/11/2013
COMPLETE SOLAR W/SCHEME S. 42/VI YAYARIN TUKUR NIG. LTD GWANI 6,446,470.60
6 23/10/2013
CONST. OF PUBLIC CONVINIENCE S. 42/VI IYE ENGG. SERVICES KILA 8,012,900.85
7 23/10/2013 COMPLETE SOLAR W/SCHEME S. 42/VI IYE ENGG. SERVICES KILA 6,446,470.60
8 23/11/2013 COMPLETE SOLAR W/SCHEME S. 42/VI ASSD VENTURES SARA 6,446,470.60
9 23/11/2013
CONST. OF PUBLIC CONVINIENCE S. 42/VI ASSD VENTURES SARA 8,012,900.85
10 23/10/2013
CONST. OF PUBLIC CONVINIENCE S. 42/VI LAMU & BABALDU BASIRKA 8,012,900.85
11 23/12/2013 COMPLETE SOLAR W/SCHEME LAMU & BABALDU BASIRKA 6,446,470.60
TOTAL 180,281,880.28
clxii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GWIWA LOCAL GOVT.
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 10/4/2013 CONSTR. OF 2 NO. PIT LATRINE 0001 AUWALU AYUBA K/RUWA PS 676,781.70 2 10/4/2013 CONSTR OF DAILY PRAYER MOSQUE 0002 HUDU D . FANKE DAGE 1,555,814.93 3 10/4/2013 CONSTR OF DAILY PRAYER MOSQUE 0003 SAFIYANU USAINI FIRJI 1,555,814.93 4 5/4/2013 CONSTR OF DAILY PRAYER MOSQUE 0004 ABDULLAHI BAWA U/GANJI 1,555,814.93
5 14/5/2013 CONSTR. OF 2NO. CLASSROOM BLOCKS
0005 HAROLINE & SONS K/RUWA 2,993,446.00
6 14/5/2013 INTERLOCKING OF JUMAT MOSQUE 0006 SHUAIBU LAWAN DABI 1,556,000.00 7 14/5/2013 INTERLOCKING OF JUMAT MOSQUE 0007 MUSTAPHA MUSA GUNTAI 1,670,707.00 8 20/6/2013 INTERLOCKING OF JUMAT MOSQUE 0008 AMINU YAHAYA Z/GAURAYE 980,721.00 9 10/4/2013 FENCING OF INDIRAWA HALL 0009 SADI USMAN GWIWWA 1,999,849.00 10 10/4/2013 EXTENTION OF LT LINE 0010 MUSHTEK NIG. LTD RORAU MAL 2,999,177.96 11 10/4/2013 EXTENTION OF LT LINE 0011 MUSHTEK NIG. LTD FIRJI U/UKU 1,630,604.90 12 5/4/2013 CONSTR. OF A DUPLEX 0012 NA-UKA PET LTD GWIWWA 107,985,023.03
13 14/5/2013 CONSTR. OF COMPLETE WATER SCHEME
0013 FRESS ASSET LTD S/YOLA 9,120,288.00
14 14/5/2013 PURCHASE OF 27KVA GENERATOR 0014 HABU SALE INDIRAWA 2,457,500.00 15 14/5/2013 PURCHASE OF 27KVA GENERATOR 0015 ABDRHAMAN HABU TSUBUT 2,457,500.00 C/F 141,195,043.38
clxiii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
GWIWA LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
B/F 141,195,043.38
16 20/6/2013 CONSTR. OF ENGINE ROOM 0016 ZUBAIRU RABIU S/YOLA 537,997.30
17 20/6/2013 CONSTR. OF ENGINE ROOM 0017 IDRITH ABUBAKAR KORAYAL 537,997.30
18 20/6/2013 DRILLING OF BOREHOLE 0018 FRESS ASSET DAN ABZIN 1,840,000.00
19 20/6/2013 DRILLING OF BOREHOLE 0019 FRESS ASSET LTD INDIRAWA 1,840,000.00
20 20/6/2013 DRILLING OF BOREHOLE 0020 FRESS ASSET LTD BUNTUSU 1,840,000.00
21 20/6/2013 DRILLING OF BOREHOLE 0021 FRESS ASSET LTD MARAGANTA 1,840,000.00
22 20/6/2013 DRILLING OF BOREHOLE 0022 FRESS ASSET LTD DINYA 1,840,000.00
23 20/6/2013 DRILLING OF BOREHOLE 0023 FRESS ASSET LTD G/KYAU 1,840,000.00
24 20/6/2013 ELECTRIFICATION PROJECT 0024 MUSHTECK NIG. LTD J/MAHARBA 17,125,623.00
25 20/6/2013 ELECTRIFICATION PROJECT 0025 DARAGI & SONS OLD SDP OFFICE 894,937.00
26 Nov-13 CONSTR. OF JUMAAT MOSQUE 0026 MANHAF GLOBAL Z/MAHAUTA 7,112,608.00
27 15/7/2013 CONSTR. OF JUMAAT MOSQUE 0027 ASA MAIBULAWUS ABUJA 7,112,608.00
28 11/7/2013 EXTENTION OF LT LINE 0028 MUSHTECK NIG. LTD FIRJI U/UKU 2,364,874.00
29 11/6/2013 CONSTR. OF LOCK-UP SHOPS 0029 AL. RABE GWIWA GWIWA 2,999,629.00
30 11/6/2013 CONSTR. OF DRIFT 0030 AMADU AWWALU GWIWA-SHAFE 2,903,124.00
31 10/7/2013 COSTR. OF ISLAMIYYA SCHOOL 0031 ISAH A KORAYAL KWAMARAWA 2,911,687.00
32 10/7/2013 CONSTR. OF 2NO. CLASSROOMS 0032 JAFARU SAIDU FIRJI 5,865,515.00
33 10/7/2013 CONSTR. OF 2NO. PIT LATRINE 0033 M LAWAN USAINI FIRJI 676,781.00
34 10/7/2013 CONSTR. OF HEALTH POST 0034 YAHAYA DAGA DINYA 4,618,744.00
35 10/7/2013 COSTR. OF DAILY PRAYER MOSQUE 0035 MUSA BALA WARDAWA 1,555,814.00
C/F 209,452,982
clxiv
B/F 209,452,981.98
36 15/7/2013 CONSTR. OF DAILY PRAYER MOSQUE 0036 INUSA HARUNA KUNDIGA JAMA 1,555,814.00
37 18/7/2013 ELECTRIFICATION PROJECT 0037 MUSHTECK ENGRR KARSHI 21,931,361.00
38 18/7/2013 CONSTR. OF WAITING SHED 0038 M GARBA SAADU AGANGARO 630,052.00
39 18/7/2013 CONSTR. OF WAITING SHED 0039 M SULE ALTO KARSHI DINYA 630,052.00
40 18/7/2013 CONSTR. OF WAITING SHED 0040 M MUSA JAURO TSABAWA 630,052.00
41 22/7/2013 CONSTR. OF TOILET 0041 MAL SUNUSI TINKISHI J/MOSQUE 338,390.00
42 22/7/2013 CONSTR. OF TOILET 0042 DANIYA SAIDU GUNTAI 338,390.00
43 22/7/2013 CONSTR. OF JUMAAT MOSQUE 0043 ASHAL NIG LTD INDIRAWA 7,195,384.30
44 22/7/2013 CONSTR. OF JUMAAT MOSQUE 0044 ASA MAIBULAWUS GASAKOLI 7,195,384.30
45 23/7/2013 CONSTR. OF 2NO. CLASSROOMS 0045 SHAFIU ABDULLAHI S/GANGARA 6,338,605.30
46 23/7/2013 CONSTR. OF 2NO. CLASSROOMS 0046 TUKUR G YARO TABANNI 6,338,605.30
47 23/7/2013 DRILLING OF BOREHOLE 0047 FRESS ASSETS J/MALAMAI 850,000.00
48 23/7/2013 DRILLING OF BOREHOLE 0048 FRESS ASSETS BUNTUSU 850,000.00
49 23/7/2013 DRILLING OF BOREHOLE 0049 FRESS ASSETS K/RUWA 850,000.00
50 23/7/2013 DRILLING OF BOREHOLE 0050 FRESS ASSETS KURMA 1,463,000.00
51 28/8/2013 CONSTR. OF HEALTH POST 0051 SULEIMAN ILIYASU KUNDIGA 3,409,446.00
52 28/8/2013 CONSTR. OF HEALTH POST 0052 ISAH & 2 OTHERS TSABAWA 3,409,446.00
53 28/8/2013 CONSTR. OF DRAINAGE 0053 ISAH & 2 OTHERS S/YOLA 2,489,030.00
54 13/11/2013 CONSTR. OF WAITING SHED 0054 ASA MAIBULAWUS T/NAGORA 525,119.00
55 6/11/2013 CONSTR. OF JUMAAT MOSQUE 0055 FRESS ASSETS MAIYAKI 7,195,348.30
56 28/8/2013 CONSTR. OF OVERHEAD TANK 0056 FRESS ASSETS YOLA 1,839,000.00
57 28/8/2013 CONSTR. OF OVERHEAD TANK 0057 FRESS ASSETS MPHC GWIWA 1,839,000.00
16/12/2013 CONSTR. OF SOLAR POWERED WATER SCHEME 0058 MANHAF GLOBAL CONCEPT GWIWA 6,646,470.45
16/12/2013 CONSTR. OF MODERN PUBLIC CONVIENCE 0059 MANHAF GLOBAL CONCEPT GWIWA 8,012,999.85
16/12/2013 CONSTR. OF SOLAR POWERED WATER SCHEME 0058 HIGH TECH ENGINEERING FIRJI 6,646,470.45
16/12/2013 CONSTR. OF MODERN PUBLIC CONVIENCE 0059 HIGH TECH ENGINEERING FIRJI 8,012,999.85
clxv
301,953,931.78
TOTAL
clxvi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
JAHUN LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 4/3/2013 CONSTR. OF OPEN WELL 0885 AMADU DANAKWARA BAJIDAWA 180,000.00
2 7/1/2013 PURCHASE OF TRANSFORMER 0883
IBRACO MAFRICA NIG LTD HARBO TSOHUWA 2,807,437.50
3 12/3/2013 CONSTR. OF 5 DAILY PRAYER MOSQUE 0884 M GARBA DANYARO GEMU YANSABO 950,000.00
4 14/3/2013 CONSTR. OF OPEN WELL 0459 M ABDU MAIGORO GIDAN MAJE 180,000.00
5 22/3/2013 CONSTRUCTION OF COMPLETE WATER SCHEME 0887 LIMIS BROTHERS AUJARA 8,317,522.90
6 20/3/2013 ELECTRIFICATION WORK 0851 IBRACO MAFRICA NIG LTD ZANGO 2,229,467.77
7 2/4/2013 ELECTRIFICATION PROJECT 0851 MARB ENGINEERING ASAYAYA-KUKA KWACE 21,856,431.09
8 4/4/2013 LAND COMPENSATION 0886 ALH. SHUAIBU JIJI JAHUN 350,000.00
9 4/4/2013 RETICULATION WORK 0461 LIMIS BROTHERS GANDUN HAKIMI 4,608,450.00
10 6/4/2013 PURCHASE H/PUMP MATERIALS 0744 ABBA IBRAHIM LG SEC 3,830,370.00
11 5/6/2013 CONSTR. OF 10NO. H/PUMPS 0745 LIMIS BROTHERS V/PLACES 3,500,000.00
12 11/6/2013 ELECTRIFICATION PROJECT 0746 IBRACO MAFRICA NIG LTD AJURA 2,670,860.00
13 8/7/2013 SUPPLY OF FURNITURE 0003 MOHD YUSIF STAFF QTRS 953,589.00
14 8/7/2013 CONSTR. OF OPEN WELL 0005 KANI AUJARA BADIN 180,000.00
15 3/4/2013 CONSTR. OF DUPLEX HOUSE 0001 IBRACO MAFRICA NIG LTD JAHUN 107,985,023.03
16 18/12/2013 COMPLETE SOLAR WATER SCHEME 0017 LIMIS BROTHERS OPP. IZALA MOSQUE 6,646,470.60
17 18/12/2013 COMPLETE SOLAR WATER SCHEME 0018 LIMIS BROTHERS KASUWA JAHUN 6,646,470.60
18 10/12/2013 CONSTR OF PUBLIC 0020 M SHUAIBU JIJI KASUWA JAHUN 7,446,169.60
clxvii
CONVINIENCE
TOTAL 181,338,262.09
clxviii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KAUGAMA LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 4/4/2013 CONSTR. OF DUPLEX HOUSE BABAN DOKI GEN ENTP. KAUGAMA 107,985,023.03
2 10/6/2013 CONSTR. OF NOMADIC SCHOOL 0365 Sani Babannan M/Fata KUFITU
2,467,420.00
3 10/6/2013 COMPLETE SOLAR W/SCHEME 0367 ADZ NIG LTD YALWA
7,857,990.00
4 19/6/13 CONSTR. 3NO. BH/PUMPS 0369 IY DRILLING LTD Varios Locations
1,050,911.00
5 8/4/2013 Constr. Of 25No. Hand Pumps 0358 IY Drilling Ltd Varios Locations 8,750,000.00
6 8/4/2013 Costr. Of Drainage & Culvert 0361 Hussein Bayin Kwari Bayin Kwari 4,051,911
7 3/5/2013 Additional Drainage & Culvert 0375 Hussein Bayin Kwari Bayin Kwari 550,000.00
8 8/4/2013 Constr. Of Drainage & Culvert 0362 Bala Mohd Kanwar Gamawa 3,994,534.00
9 29/4/2013 Additional Drainage & Culvert 0374 Bala Mohd Kanwar Gamawa 664,630.00
10 6/5/2013 Constr. Of Drainage & Culvert 0363 Tela Maazu Kuikyar 3,664,630.00
11 30/5/13 Additional Drainage & Culvert 0376 Tela Maazu Kuikyar 1,185,766.00
12 6/5/2013 Constr. Of Drainage & Culvert 0364 Usaini Tela Darmomuwa 3,664,630.00
13 28/5/13 Additional Drainage & Culvert 0377 Usaini Tela Darmomuwa 560,557.20
14 10/6/2013 Constr. Of Drainage & Culvert 0366 Ado Milo & Ado Mandela Zaburan 6,983,542.00
15 4/7/2013 Additional Drainage & Culvert 0372 Ado Milo & Ado Mandela Zaburan 2,202,051.90
16 12/6/2013 Purchase of H/Pumps Material Direct Purchase LGA 3,000,000.00
17 5/6/2013 Land Compensation Direct payment Kaugama 1,000,000.00
18 10/6/2013 Const. of Jumat Mosque Phase II 0368 Yusif Agi Marke 9,775,872.75
19 26/7/2013 Purchase of Generator Set Alh. Sani Hadejia Dodorin Girbobo 2,892,500.00
20 24/6/13 PHC Line 0370 Alh. Jafaru Abdullahi Kaugama-Madana- 2,875,225.05
clxix
Yalo
21 14/8/13 Purchase o fPeugeot 506 Direct Purchase LG Secretariate 1,500,000.00
22 15/11/2013 Constr. Of public convinience 0380 sabo annumur ltd Dakaiyawa 8,012,999.89
23 15/11/2013 Constr. Of public convinience 0379 Nema Wajib Nig Ltd kaugama 8,012,999.89
24 15/11/2013 Complete solar water Scheme 0378 ADZ NIG LTD kaugama/dakaiyawa 13,292,942.20
TOTAL 205,996,135.91
clxx
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KAFIN HAUSA LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 5/2/2013 PUBLICATION OF MAGAZINE 0853 ISHAQ PUBLICATION
SERVICES K/HAUSA 450,000.00
2 10/2/201
3 DRILLING OF HAND PUMP 0854 MOHD A SARAWA SARAWA BUS STOP 250,000.00
3 18/2/201
3 DRILLING OF HAND PUMP 0855 ALH. TATA M/GORO TAMBALE CEMETRY 250,000.00
4 20/2/201
3 DRILLING OF HAND PUMP 0856 ALIYU ABDULLAHI D/TOKA AUNO BELI 250,000.00
5 20/2/201
3 DRILLING OF HAND PUMP 0857 IDRITH ABDULLAHI AUNO MAKERA 250,000.00
6 20/3/201
3 DRILLING OF HAND PUMP 0858 KABIRU HADAGWAIGWAI LUFUDA 250,000.00
7 20/3/201
3 DRILLING OF HAND PUMP 0859 BUBA KABO SABARA 250,000.00
8 20/3/201
3 DRILLING OF HAND PUMP 0860 LAWAL BUSORI YOLA 250,000.00
9 20/3/201
3 DRILLING OF HAND PUMP 0861 MAIGARI MUSA G/KANYA 250,000.00
10 20/3/201
3 DRILLING OF HAND PUMP 0862 A GARBA BODO KURZA 250,000.00
11 20/3/201
3 DRILLING OF HAND PUMP 0863 ABDULLAHI D/ATAFOWA KWAIMAWA 250,000.00
12 29/4/201
3 DRILLING OF HAND PUMP 0864 ABDALLA ABDULLAHI BULANGU CHC 250,000.00
13 29/4/201
3 DRILLING OF HAND PUMP 0865 GAMBO A MUSA BULANGU CHC
250,000.00
14 8/5/2013 ELECTRIFICATION PROJECT 0866 A YA'U M/KANYU AUTAKO VILLAGE 4,999,660.42
15 8/5/2013 CONSTR. OF 4NO. MARKET STALLS 0867 A MOHD TOYIN BULANGU 1,840,000.00
16 8/3/2013 CONSTR. OF 4NO. MARKET STALLS 0868 A JAFARU M/GORO K/HAUSA MARKET 1,840,000.00
clxxi
17 8/3/2013 CONSTR. OF 3NO. MARKET STALLS 0869 SABO KWATALO KWATALO MARKET 1,380,000.00
18 8/3/2013 CONSTR. OF 2NO. MARKET STALLS 0870 A KANI JABO JABO MARKET 920,000.00
19 8/3/2013 CONSTR. OF 4NO. MARKET STALLS 0871 KAMILU ADAMU RUBA RUBA MARKET 920,000.00
C/F 15,349,660.42
clxxii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KAZAURE LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 20/11/2013 CONSTR. OF PUBLIC CONVINIENCE 9173
MANU GEN. CONST & ENGG KAZAURE B/HOSPITAL 7,446,169.60
2 20/11/2013 CONSTR. OF PUBLIC CONVINIENCE 9174
MANU GEN. CONST & ENGG KANTI 7,446,169.60
3 21/11/2013 COMPLETE SOLAR W/SCHEME 9176 K-MANU GEN CONSTR. KANTI 6,646,470.60
4 22/01/2013 COMPLETE SOLAR W/SCHEME 9175
HOME AGE HYDRO WORKS GADA KASUWA 6,646,470.60
5 20/11/2013 CONSTR. OF PUBLIC CONVINIENCE 9178 KAZAYA NIG LTD GADA KASUWA 7,880,135.00
6 3/4/2013 CONSTR, OF DUPLEX HOUSE 9001
AWAK BUSINESS VENTURES KAZAURE 107,985,023.03
TOTAL 144,050,438.43
clxxiii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
DUTSE L.G
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 11/3/2013 Consruction of Dwarf Wall Mohd Mohd Limawa Kyaran 1,250,429.25
2 4/4/2013 Constru. Of Duplex House Maiburtanai Constr. Ltd Dutse 107,985,023.03
3 9/5/2013 Constr. Of 2No.Class Rooms Alh. M M/Fulani Bakin Ruwa
4,102,894.62
4 9/5/2013 Constr. Of Jumaat Mosque Itafaziha Gen Ent. Zangon Buji
10,193,722.29
5 9/5/2013 Electrification Project Galamawa Gen Ent. Warwade
13,329,977.50
6 9/5/2013 Electrification Project Haske Gen Ent Zobiya
10,058,968.96
7 9/5/2013 Complete Motorised Water Scheme Mohd Alkali Galamawa
9,000,000.00
8 9/4/2013 Constr. Of Feeder Road JIRMA Gandu- Gwari
9,997,184.00
9 4/4/2013 Electrification Project Alh. Haro Wurma
28,180,000.00
10 14/03/2013 Constr. Of Jumaat Mosque Alh. Tsoho Fanisau
3,434,350.00
11 14/3/2013 Constr. Of Jumaat Mosque Mohd Mohd & A Sale Kyaran
5,455,639.23
12 14/3/2013 Constr. Of jumat mosque H O D Works Kwadiya & Darau
6,868,700.00
13 Construction of modern public convience
7,446,169.60
14 Construction of modern public convience
7,446,169.60
clxxiv
15 Construction of modern public convience
7,446,169.60
16 Construction of modern public convience
7,446,169.60
17 Construction of modern public convience
7,446,169.60
18 Construction of modern public convience
7,446,169.60
19 Construction of modern public convience
7,446,169.60
20 Construction of modern public convience
7,446,169.60
21 Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
22 Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
Construction of solar powered water scheme LIMIS BROTHERS
6,646,470.60
TOTAL
315,951,539.88
6
clxxv
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
HADEJIA L.G
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 31/12/2013 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD HADEJIA/JAMARE A 7,446,169.00
2 31/12/2013 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD HADEJIA/JAMARE B 7,446,169.00
3 31/12/2013 CONSTR. OF PUBLIC CONVINIENCE
ALH. DANYARO WELDER MEDICAL STORE 7,446,169.00
4 31/12/2013 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD M/MADORI ROAD 7,446,169.00
5 31/12/2013 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD YANKIFI MARKET 7,446,169.00
6 31/12/2013 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD TSOSHUWAR TASHA 581,496.00
7 31/12/2013 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD CENTRAL MOSQUE 1,626,213.00
8 31/12/2013 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD S/TASHA YANHATSI 2,141,980.00
9 31/12/2013 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD KASUWAR KIFI 3,096,451.05
10 31/12/2013 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD HADEJIA/JAMARE B 6,646,470.60
11 31/12/2013 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD HADEJIA/JAMARE A 6,646,470.00
12 31/12/2013 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD M/MADORI ROAD 6,646,470.00
13 31/12/2013 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD YANKIFI MARKET 6,646,470.00
14 31/12/2013 COMPLETE SOLAR WATER SCHEME
A MOHD NABAKIN DOGO CENTRAL MOSQUE 6,646,470.00
15 31/12/2013 COMPLETE SOLAR WATER KAWU NIG LTD MEDICAL STORE 6,646,470.00
clxxvi
SCHEME
16 18/04/2013 CONSTR. OFFICIAL DUPLEX NA BAKWAI ENT. LTD HADEJIA 107,985,023.03
TOTAL 192,540,828.68
clxxvii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KIYAWA LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 12/4/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0082 UMAR KAGAMA KAGAMA
635,524.00
2 22/3/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0083 A. ADAMU MAI MAI GIDAN RINCHI
635,524.00
3 25/3/201
3 CONSTR. OF HANDPUMP 0084 LAWAN SALISU DUNGUZU
328,630.00
4 25/3/201
3 CONSTR. OF HAND PUMP 0085 LAWAN SALISU DANGWALA
328,630.00
5 19/3/201
3 CONSTR. OF ISLAMIYYA SCHOOL 0086 ISIYAKU KALKUTAN KALKUTAN
5,281,928.66
6 19/3/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0087 A AMADU KWAIMAWA KARFAWA
4,888,798.25
7 13/3/201
3 CONSTR. OF ISLAMIYYA SCHOOL 0088 SUNUSI GURUM GURIN
5,300,000.00
8 20/3/201
3 CONSTR. OF HAND PUMP 0089 SHUGABA RABILU FAKE DUHUWA GABAS
328,630.00
9 26/3/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0091 MUSA UMAR MANGARI QTRS
328,524.00
10 2/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0092 A DANJUMA IDRITH MAKARA HUTA
328,524.00
11 9/4/2013 3- SEATER PIT LATRINE 0093 UBALE SULEIMAN K JSS KATUKA
736,643.00
12 10/4/201
3 CONSTR. OF HAND PUMP 0094 M/UNGUWA ASAYAYA ASAYAYA
328,630.00
13 10/4/201
3 CONSTR. OF HAND PUMP 0095 A AYUBA FAKE FGC KIYAWA
328,630.00
14 10/4/201
3 CONSTR. OF HAND PUMP 0096 A AYUBA FAKE GARIN KWARI
328,630.00
clxxviii
15 10/4/201
3 CONSTR. OF HAND PUMP 0097 ISMAILA ALIYU MOHD KADIRAWA
328,630.00
16 10/4/201
3 CONSTR. OF HAND PUMP 0098 ISMAILA ALIYU MOHD FAKE
328,630.00
17 16/4/201
3 CONSTR. OF DUPLEX HOUSE 0099 ISHAQ ABUBAKAR NIG. LTD KIYAWA
107,985,023.03
18 30/4/201
3 EXTENSION OF ELECTRICITY 0251 A NASIRU DAN UMMA U/MATU ZANGO QTRS
510,730.00
19 6/5/2013 CONSTR. OF DAILY PRAYER MOSQUE 0252 A SALISU ZERO FATARA VILLAGE 635,524.00
20 23/4/201
3 CONSTR. OF DAILY PRAYER MOSQUE 0253 ABBA BARDE GIDAN RIJIYA 635,524.00
21 RENOVATION OF HOD COMM. HOUSE 0254 A ABDULLAHI BILYA LG QTRS 2,693,833.33
C/F 133,225,140.27
clxxix
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KIYAWA LG
B/F 133,225,140.27
22
17/5/2013 CONSTR. OF DAILY PRAYER MOSQUE
0255 ABDU GEMU KATUKA 1,857,531.49
23
21/5/2013 CONSTR. OF HAND PUMP
0257 ABUBAKAR SALISU G/ALHAZAI KARKASHI 328,630.00
24
17/5/2013 CONSTR. OF JUMAAT MOSQUE
0259 A AMADU KWAIMAWA KARFAWA 5,118,620.62
25
28/6/2013 CONSTR. OF HAND PUMP
0260 ABUBAKAR SALISU GIDAN JAJI 328,630.00
26
30/6/2013 CONSTR. OF HAND PUMP
0261 LAWAN SALISU GIDAN TILO 328,630.00
27
24/5/2013 CONSTR. OF ISLAMIYYA SCHOOL
0262 ABDU GEMU TANADE 5,856,186.56
28 7/6/2013 CONSTR. OF DAILY PRAYER MOSQUE
0263 A ADAMU MAI MAI S/UNGUWA KIYAWA 900,000.00
29
18/6/2013 CONSTR. OF DAILY PRAYER MOSQUE
0264 MUSA NUHU DUNGU TSANGAYAR KUDU 635,524.00
30
19/6/2013 NEW CONCRETE OPEN WELL
0266 ZAILANI KWANDA JABERI 280,000.00
31
18/6/2013 CONSTR. OF DAILY PRAYER MOSQUE
0267 A KABIRU TSANGAYAWA KAKA SUNA 1,013,000.00
32
20/6/2013 CONSTR. OF ISLAMIYYA SCHOOL
0268 A SABO KWARA KATUKA 5,856,136.56
33
20/6/2013 CONSTR. OF DAILY PRAYER MOSQUE
0269 A DALLADI BILYA KATI VILLAGE 635,524.00
34
20/6/2013 CONSTR. OF ISLAMIYYA SCHOOL
0270 A ABDU GEMU GURUM BAYAN GARI 5,856,186.56
35 4/4/2013 CONSTR. OF JUMAAT MOSQUE
0271 AMINU NUHU SHIWARI 14,893,820.27
36
22/5/2013 CONSTR. OF DAILY PRAYER MOSQUE
0272 MUSTAPHA AMINU U/FULANI SHUWARIN 704,416.00
clxxx
37 8/7/2013 CONSTR. OF DAILY PRAYER MOSQUE
0273 ABDU INUWA DUTSAWA FULANI 780,000.00
38
10/7/2013 CONSTR. OF DAILY PRAYER MOSQUE
0274 ABDU INUWA BAKUTA 635,524.00
39
16/7/2013 MOTORISED WATER SCHEME
0275 S. WATER DRILLING KIYAWA 10,000,000.00
40
15/7/2013 CONSTR. OF HAND PUMP
0276 A IBRAHIM JET RIGAR AMINU 328,630.00
C/F 189,562,130.33
clxxxi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KIYAWA L.G
B/F 189,562,130.33
41 16/7/2013 CONSTR. OF JUMAAT MOSQUE
0277 A YAKUBU FAKE FAKE 3,084,230.61
42 29/7/2013 ELECTRIFICATION PROJECT (EXT.)
0278 IBRAHIM YALLARO ANDAZA ANDAZA PHC QTRS 328,193.00
43 29/7/2013 CONSTR. OF HAND PUMP
0279 A GARBA GARUN YALLE GIDAN TAURA 328,630.00
44 29/7/2013 CONSTR. OF DAILY PRAYER MOSQUE
0280 A SALISU ZERO MAKARA 635,524.00
45 29/7/2013 CONSTR. OF HAND PUMP
0281 A SALISU ZERO GIDAN TAURA 328,600.00
46 24/7/2013 CONSTR. OF MARKET STALL
0282 USAINI MAIHULA KATUKA MARKET 758,270.00
47 12/8/2013 CONSTR. OF HAND PUMP
0283 DAN ASABE ANDAZA RURA GARKO WARD 328,630.00
48 12/8/2013 CONSTR. OF OPEN WELL
0284 AMINU ILIYASU DODI FULANI 280,962.00
49 12/8/2013 CONSTR. OF HAND PUMP
0285 LAWAN SALISU JAWA 328,630.00
50 2/9/2013 CONSTR. OF OPEN WELL
0286 BABA ZABI MATAYAN FULANI 280,962.05
51 6/9/2013 CONSTR. OF DAILY PRAYER MOSQUE
0287 BAFFA SUNUSI KORAUW 635,524.00
52
22/10/2013 CONSTR. OF DAILY PRAYER MOSQUE
0288 A DANLADI BILYA KANTI KIYAWA 650,000.00
53
25/10/2013 CONSTR. OF PUBLIC CONV. & W/SCHEME
0289 GIDAN ADEDE NIG LTD B/KUDU ROAD
14,659,470.45
54
25/10/2013 RENOVATION OF HEALTH CLINIC
0290 ALH. ABDU GEMU GORUMO 3,795,353.97
55
25/10/2013 CONSTR. OF BOUNDRY WALL
0291 A SAIDU MASAMAWA KARA SHUWARIN 2,711,636.45
clxxxii
56 4/11/2013 CONSTR. OF HAND PUMP
0292 A YAKUBU FAKE FAKE 328,630.00
57
30/10/2013 CONSTR. OF DAILY PRAYER MOSQUE
0293 A HARUNA BALAGO DUNGUZU 635,524.00
58 6/11/2013 CONSTR. OF OPEN WELL
0294 BUBA ZABI GIDAN M KUNTAL 280,462.00
59 14/5/2013 CONSTR. OF PUBLIC CONV. & W/SCHEME
0285 LOYALTY SHIWARIN TOWN
14,659,470.45
60 8/11/2013 CONSTR. OF HAND PUMP
0296 LAWAN SALISU JABBAMA VILLAGE 328,630.00
Total
234,929,463.31
clxxxiii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
MALAM-MADORI LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT[ N : K ]
1 19/3/2013 WALL FENCING AND GATE MANNIRU & HARUNA KAMPALA H/ POST 315,888.00
2 19/3/2013 CONSTR. OF 3-SEATER PIT LATRINE
BABANNAN KOLI & KOLI KAMPALA 351,169.52
3 19/3/2013 ELECTRIFICATION PROJECT ALH. IDRIS MAIYADI KAMPALA 530,000.00
4 6/3/2013 ELECTRIFICATION PROJECT HASSANA IASAH DAKIDO 1,658,995.00
5 16/4/2013 CONSTR. OF DUPLEX HOUSE ADHAMA WORLD WIDE M/MADORI 107,985,023.03
6 13/5/2013 PURCHASE OF TOYOTA HILUX DIRECT PURCHASE M/MADORI DIVISION 5,550,000.00
7 5/5/2013 CONSTR OFENBANKMENT DAN AD CON. COMPANY VARIOS VILLAGES 10,000,000.00
8 3/6/2013 PURCHASE OF OFFICIAL VEHICLE DIRECT PURCHASE LG COUNCIL 1,500,000.00
9 4/6/2013 CONSTR. OF DRAINAGE ALH. RABIU SABO GARIN GABAS 2,432,000.00
10 4/6/2013 CONSTR. OF CENTRAL MOSQUE ADAMA WORLDWIDE M/MADORI 43,575,069.00
11 3/72013 CONSTR. OF DISTRICT H. HOUSE JARAKO NIG LTD M/MADORI 7,449,000.00
12 19/3/2013 ELECTRIFICATION PROJECT PASE II
PRESTIGE INVESTMENT JAJIKURA 2,153,448.00
13 18/4/2013 CONSTR. OF JUMAAT MOSQUE JARAKO NIG LTD MAIRAKUMI 3,750,012.00
14 18/4/2013 PURCHASE OF H/PUMP MATERIALS DIRECT PURCHASE LG COUNCIL 7,000,000.00
15 7/6/2013 CONSTR. OF H/PUMP DIRECT LABOUR 4 VILLAGES 1,400,000.00
16 4/9/2013 LAND COMPENSATION DIRECT PAYMENT M/MADORI 450,000.00
17 17/9/2013 LAND COMPENSATION DIRECT PAYMENT M/MADORI 3,000,000.00
clxxxiv
18 4/20/2013 CONSTR. OF PUBLIC CONVINIENCE 0483
DANTATU GEN. CONSTR. M/MADORI TASHA 8,012,999.89
19 5/10/2013 COMPLETE SOLAR WATER SCHEME 0485
ALASKO WATER SERVICE M/M SUGAR CANA MKT 6,646,470.60
20 4/12/2013 CONSTR. OF PUBLIC CONVINIENCE 0484 AL ROSHASH NIG LTD M/M SUGAR CANA MKT 8,012,999.89
TOTAL 221,773,074.93
clxxxv
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
MAIGATARI LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 16/1/2013 RATICULATION WORK 1427 DAYYABU RAMBO KANKARE 1,574,695.00
2 16/01/13 RATICULATION WORK 1428 DAYYABU RAMBO KAKIJULA 1,275,304.00
3 12/2/2013 CONSTR. OF HANDPUMP 1433 HARUNA BAUSHE GIDAN SARKI 429,000.00
4 12/2/2013 CONSTR. OF HANDPUMP 1432 SULE HABU RIGAR SAIDU 429,000.00
5 12/2/2013 CONSTR. OF HANDPUMP 2NO. 1430 UMAR SANDA MAKABARTA/K/KUDU BSW 858,000.00
6 12/2/2013 CONSTR. OF HANDPUMP 3NO. 1431 ALH ISYAKU IBRAHIM B/TASHA/K/YAMMA 1,287,000.00
7 6/2/2013 SUPPLY OF 2NO. WATWR GENERATORS 1429 HALI DRILLERS. YANWAKE/BOSUWA 6,328,000.00
8 6/2/2013 COMPLETE WATER SCHEME DIRECT LABOUR BUZAYE/WAKILI MADO 10,549,545
9 15/3/13 CONSTR. OF OVERHEAD WATER TANK 1438 HALI DRILLERS JAJERI 4,026,100.00
10 14/03/13 COMPLETE WATER SCHEME 1435 HALI DRILLERS GARMAKA 17,016,095.00
11 4/4/2013 ELECTRIFICATION PROJECT. 1436 ISAH TURAKI K/DANIYA- JAJERI 718,885.13
12 12/4/2013 CONSTR. OF HANDPUMP 1437 ALH. ROMA/NADIDIJI F/FULANI 429,000.00
13 18/4/13 ELECTRIFICATION PROJECT. 1439 MUHAHIB NIG LTD ARBUS 9,820,425.00
14 23/04/13 CONSTR. OF DENTAL CLINIC 1440 YAHAYA IBRAHIM PHC MAIGATARI 3,691,065.21
15 30/3/13 CONSTR. DUPLEX HOUSE LOYALTY NIG LTD MAIGATARI 107,985,023.03
C/F 166,417,137.84
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
B/F 166,417,137.84
16 2/1/2013 REPAIR OF HT LINE 1422 ALH. ISA TURAKI K/DANIYA - JAJERI 1,071,191.10
clxxxvi
17 30/3/2013 CONSTR. OF HANDPUMP 2NO. Direct Labour DIRECT LABOUR
B/DANIYA & DANKWARBO 700,000.00
18 10/5/2013 RENOVATION OF DISRRICT HEAD HOUSE 1441 GARE INVESTMENT MAIGATARI 3,679,263.00
19 20/05/13 CONSTR. OF DOCTOR'S HOUSE 1443 GARE INVESTMENT BOSUWA 6,743,634.00
20 27/05/13 CONSTR. OF I BLOCK OF 2
CLASSROOMS 4002 HABU BALARABE BOSUWA 3,669,961.21
21 6/6/2013 CONSTR. OF DISTRICT HEAD HOUSE 4004 ISMAILA GALADI GALADI 4,500,000.00
22 6/6/2013 CONSTR. OF DISTRICT HEAD HOUSE 4005 IBRAHIM ADAMU & SABO MOHD DANKUMBO 4,500,000.00
23 6/6/2013 CONSTR. OF DISTRICT HEAD HOUSE 4006 ALH. ISA TURAKI &ISAH JAJERI BOSUWA 4,500,000.00
24 6/6/2013 CONSTR. OF DISTRICT HEAD HOUSE 4007 A. BASIRU & A IBRAHIM MADANA 4,500,000.00
25 6/6/2013 CONSTR. OF DISTRICT HEAD HOUSE 4009 ALH. SANI THINKING GARMAKA 4,500,000.00
26 6/6/2013 ELECTRIFICATION PROJECT 4010 AIG VENTURES MATSATSAGI-FULATA 26,488,566.00
27 6/6/2013 RENOVATION OF FM STATION 4011 MOHD. ARI DABO EPZ MAIGATARI 646,657.00
28 6/6/2013 DRILLING OF 6" BOREHOLE & ACCESORIES 4012 HALI DRILLERS MAIGATARI 2,800,000.00
29 6/6/2013 DRILLING OF 6" BOREHOLE & ACCESORIES 4022 HALI DRILLERS MAIGATARI 8,524,950.00
30 6/6/2013 DRILLING OF 6" BOREHOLE & ACCESORIES 4013 HALI DRILLERS KAKI JULA 4,202,760.00
31 6/6/2013 DRILLING OF 6" BOREHOLE & ACCESORIES 4014 HALI DRILLERS KANKARE 4,169,300.00
32 14/06/13 RENOVATION OF HOUSE NO. 6 L.G QTRS 4017 ALH. WADA SALIS MAIGATARI 2,220,436.13
33 14/6/13 CONSTR. OF DRAINAGE 4021 ALH. SAFINU & OTHERS DAKIDO 4,313,196.39
34 15/8/13 SUPPLY OF 1 NO. 60KVA GENERATOR ALH. SHEHU UMAR CHAMO DANSAMA MAIGATARI 3,169,000.00
35 2/1/2013 COSTRUCTION OF 4 SEATER PIT LATRINE 1421 ALH. SALE TSUNI JSS BOSUWA 1,249,719.03
36 13/11/2013 CONSTR. OF PUBLIC CONVENIENCE 4037 KANU NIG LTD MAIGATARI C MARKET 7,446,169.60
2/12/2013 CONSTR. OF 2no PUBLIC CONVENIENCE ESMAIL VENTURES MAIGATARI C MARKET 14,892,339.20
clxxxvii
37 13/11/2013 COMPLETE SOLAR WATER SCHEME 4038 MUHABIB NIG LTD MAIGATARI C MARKET 6,646,470.60
38 13/11/2013 COMPLETE SOLAR WATER SCHEME 2NO 4039 TALAKU INTERGRATED SERVICS
MAIGATARI C MARKET 13,292,941.20
TOTAL 304,843,692.30
clxxxviii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
MIGA LOCAL GOVERNMENT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 18/4/2013 REPAIRS OF PUMP STATION 0451 MOHD MAKAMA MUDUGA 522,698.00
2 18/4/2013 CONSTR. OF . HANDPUMPS 0452 ALH. WADA BURJI ACROSS10 WARDS 3,152,742.00
3 19/03/2013 ELECTRIFICATION PROJECT 0353 ALKASIM JANNAH NIG LTD NAFADAWA 13,419,563.50
4 19/03/2013 COMPLETE MOTORISED WATER SCHEME 0354 8,432,688.63
5 19/03/2013 COMPLETE MOTORISED WATER SCHEME 0355 IBRAHIM MUSA KIGAWA KOME ALLAH YAYI 8,754,367.13
6 19/03/2013 PIPELINE EXTENTION 0356 ALH. ABDU ZAREKU HANTSU 5,483,226.00
7 19/03/2013 CONSTR. OF 10 NO. HANDPUMPS 0357 ALH. WADA BURJI ACROSS10 WARDS 3,152,742.00
8 19/03/2013 CONSTR. OF 10 NO. HANDPUMPS 0358 MUH'D NATA ALA ACROSS 10 WARDS 3,152,742.00
9 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0359 ALH. WAKILI MIGA SHUNAWA 1,212,733.00
10 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0360 ALH. IASAH YANDUNA DANGOLI BABBA 1,212,733.00
11 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0361 A. USAINI G/KANYA TSALLIYA 1,212,733.00
13 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0362 M/UNGUWA DANJUMA SANSANI YAMMA 1,212,733.00
14 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0363 ALH. SALE DAHIRU HANTSAKI 1,212,733.00
15 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0364 A KABIRU SARAWUYA SARAWUYA 1,212,733.00
16 10/4/2013 CONSTR. OF DAILY PRAYER 0366 A. AUDU JUMA GARBO ALFA 1,212,733.00
clxxxix
MOSQUE
17 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0367 A. UBALE GULULU ZAGAU 1,212,733.00
18 10/4/2013 CONSTR. OF DAILY PRAYER MOSQUE 0368
A. SALISU ABDU ZAREKU
UNGUWAR M/ADO GABASHI 1,212,733.00
19 30/04/2013 CONSTR, OF BHC 0369 NABAKWAI ALJAZERA NIG HANTSU 17,974,692.31
20 30/04/2013 CONSTR, OF BHC 0370 MAIBURTANI NIG LTD DANGYATIN 17,974,692.31
C/F 92,934,750.88
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
B/F 92,934,750.88
21 30/04/2013 CONSTR, OF BHC 0371 DANGYATIN VENTURES KOYA 17,974,692.31
22 10/5/2013 ELECTRIFICATION PROJECT 0373 HANSHU NIG LTD DAMAGANAWA 20,808,150.67
23 10/5/2013 ELECTRIFICATION PROJECT 0374 DANGYATIN VENTURES BURJI 11,598,088.50
24 10/5/2013 COMPLETE MOTORISED WATER SCHEME 0375 BAFFA UMARU BAMAINA ALFA 9,420,534.00
25 10/5/2013 COMPLETE MOTORISED WATER SCHEME 0376 LOYALTY PROPERTY. GULULU 12,699,196.65
26 16/05/2013 ELECTRIFICATION PROJECT 0377 ALKASAM JANNAH NIG LTD NAFADAWA 638,839.00
27 16/05/2013 ELECTRIFICATION PROJECT 0378 HAM SUN NIG LTD DAMAGANAWA 3,070,825.30
28 11/8/2013 CONSTR. OF WATER SCHEME 0379 TALAKU INTEGRATED SERRVICES ROMAWA 10,259,841.90
29 15/08/2013 CONSTR. OF WATER SCHEME 0380 ALH. JIBRIN JAHUN GIDAN KANYA 10,636,731.53
30 15/08/2013 ELECTRIFICATION PROJECT 0381 SAHEL ASSOCIATED LTD UMMADU 20,317,934.47
31 15/08/2013 CONSTR. OF FRIDAY MOSQUE 0382 IBRAHIM MUSA KIGAWA KIGAWA 8,243,524.05
32 15/08/2013 CONSTR. OF FRIDAY MOSQUE 0383 DANGYATIN VENTURES S/GARI 19,232,320.77
33 20/03/2013 GENERAL RENOVATION OF CHAIRMAN HOUSE 0171 ADAMU SARKI MIGA MIGA 1,369,077.87
cxc
34 21/03/2013 GENERAL RENOVATION OF POLICE STATION 0172 HARUNA ALIYU D MIGA 3,030,923.00
35 22/03/2013 ADDITIONAL WORK AT GRAVEYAARD 0173 TUKUR SHEHU MIGA MIGA GRAVEYARD 1,682,307.70
36 12/4/4013 SUPPLY & INSTALL 100 KVA TRANSFORMER 0175
A MOHD DANLADI ZANGO 1,302,640.79
37 12/4/2013 ELECTRIFICATION PROJECT 0176 MOHAMMED BANGAYYA 777,277.54
38 12/4/2013 CONSTR. OF 5 DAILY PRAYER MOSQUE 0177 HALILU ALFA JIGAWAR TSABA 428,906.96
39 12/4/2013 CONSTR. OF FRIDAY MOSQUE 0178 A GARBA NASSARAWA NASARAWA 3,121,111.20
40 30/4/2013 EARTH FILLING 0180 SHUAIBU ADO KOYA KOYA 606,375.00
41 30/4/2013 COMPLETION OF DAILY PRAYER MOSQUE 0181 SALE BOYI GIDAN KANYA 69,149,149.00
42 7/11/2013 CONSTR. OF PUBLIC CONVINIENCE 0385 LOYALTY PROPERTY MIGA 14,659,470.45
43 6/5/2013 RENOVATION OF HEALTH POST 0183 A GARBA D/GYATIN JAMAGA 2,479,974.18
C/F 336,442,643.72
MIGA LOCAL GOVT.
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
B/F 336,442,643.72
44 6/6/2013 REHABLITATION OF DRAINAGE 0185 MOHD ISAH TSAKUWA TSAKUWA
373,951.46
45 6/6/2013 REPAIRS OF POLICE VEHICLE 0186 JUBRILA MOTORS MIGA
1,148,600.00
46 7/7/2013 REPAIRS OF VEHICLE 0187 MAMUDA MOTORS MIGA
547,300.00
47 7/7/2013 REPAIRS OF VEHICLE 0188 JUBRILA MOTORS MIGA
749,749.00
48 7/7/2013 REPAIRS OF VEHICLE 0189 MUMUDA MOTORS MIGA
331,697.00
49 7/7/2013 CONSTR. OF DUPLEX HOUSE 0190 BABAN DOKI GEN ENT. MIGA
107,985,023.03
cxci
50 19/07/201
3 CONSTR. OF WAITING SHED 0191 TELA BARAU S/ DALAM
262,433.56
51 20/07/201
3 RENOVATION OF FRIDAY MOSQUE 0193 MUSA IBRAHIM TSAKUWA
3,455,362.10
52 2/7/2013 ADDITIONAL CONSTR. WORKS 0194 A GARBA NASARAWA NASARAWA
497,389.38
53 20/08/2013 CONSTR. OF STORE 0195 YAHAYA UMAR DANGYATIN
974,064.66
54 16/7/2013 CONSTR. OF HAND PUMP 0184 LOYALTY PROPERTIES G/DANGWA
361,397.00
TOTAL
453,129,610.91
cxcii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
RINGIM LOCAL GOVT.
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 21/11/2013 CONSTR. OF PUBLIC CONVINIENCE 7276 MARB ENGG SERVICES RINGIM 7,446,169.60
2 21/11/2013 CONSTR. OF PUBLIC CONVINIENCE 7277 MARB ENGG SERVICES BEGUWA 8,012,999.85
3 21/11/2013 COMPLET SOLAR W/SCHEME 7274 MARB ENGG SERVICES RINGIM MARKET 6,646,470.60
4 21/11/2013 COMPLET SOLAR W/SCHEME 7274 MARB ENGG SERVICES BEGUWA MARKET 6,646,470.60
5 23/4/2013 CONSTR. OF DUPLEX HOUSE 7001 AL SAHIH NIG. LTD RINGIM 107,985,023.03
6 TOTAL 136,737,133.68
cxciii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2012 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
RONI L.G
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 10/3/2013 CONSTR. OF DUPLEX HOUSE 0924 NA UKU PETROLUEM RONI 107,985,023.03
2 10/7/2013 ELECTRIFICATION PROJECT 0923 CHAMO ENGINEERING JANGEFE
20,630,306.97
3 15/05/2013 CONSTR. MOTORISED WATER SCHEME 0920 C0 ROM NIG. LTD
UNGUWAR KAYA
14,289,966.60
4 24/11/2013 CONSTR. OF MORDERN PUBLIC CONVINIENCE 0927 AA SHTU RONI
8,012,999.85
5 24/11/2013 CONSTR. PUBLIC CONVINIENCE FOR MALE & Female 0928 AA SHTU RONI
7,446,169.60
6 13/10/2013 CONSTR. OF 2NO. SOLAR POWERED WATER SCHEME 0930 AA SHTU RONI
13,292,941.20
7 13/03/2013 RENOVATION OF DISTRICT HEAD HOUSE 0826 GARBA DANTILA RONI
3,660,037.23
TOTAL 175,317,444.48
cxciv
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
SULE-TANKARKAR LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION AMOUNT [N;K]
1 21/11/201
3 COMPLETE SOLAR WATER SCHEME 0001
LOYALTY PROPERTIES LTD KUKAWA 6,467,470.60
2 21/11/201
3 CONSTR. OF PUBLIC CONVENIENCE 0002
LOYALTY PROPERTIES LTD SULE-TANKARKAR. 8,012,999.85
3 4/5/2013 DRILLING OF HANDPUMP 0003 TRIAL DRILLING & CONSTR. LULA 686,418.60
4 19/9/2013 COMPLETE MOTORISED WATER SCHEME 0004
FELLY MORE INVST. LTD BAGGADE 10,071,128.03
5 19/9/2013 COMPLETE MOTORISED WATER SCHEME 0005
FELLY MORE INVST. LTD DANGAYA 10,071,128.03
6 22/10/201
3 SUPPLY OF 2 NO. GENERATORS 0006 KUYORO & SONS
DANLADI/DANBANKI 6,173,000.00
7 21/5/2013 DRILLING OF HANDPUMPS 0007 TRIAL DRILLING & CONSTR. SOME WARDS 3,775,200.00
8 25/5/2013 CONSTR. OF 7NO. WASTE POINTS 0008 SABI U MUSA IDRIS 7 WARDS 2,325,232.81
9 25/4/2013 CONSTR. OF OFFICIAL DUPLEX HOUSE GARE INVESTMENT S/TANKARKAR
107,985,023.03
10 3/5/2013 DRILLING OF 2 NO. HANDPUMPS 0009
TRIAL DRILLING & CONSTR. TAKATSABA 1,394,596.80
TOTAL 156,962,197.75
cxcv
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
TAURA LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 30/10/201
3 CONSTR. OF PUBLIC CONVINIENCE 4202 KAWU NIG LTD GUJUNGU K/SHANU 8,012,990.85
2 30/10/201
3 COMPLETE SOLAR W/SCHEME 4203 KAWU NIG LTD GUJUNGU K/SHANU 6,646,470.60
3 1/11/2013 CONSTR. OF PUBLIC CONVINIENCE 4211 AA SHITTU GUJUNGU MARKET 8,012,999.85
4 30/10/201
3 COMPLETE SOLAR W/SCHEME 4309 313 DRILLING & CONS LTD TAURA M,ARKET 6,646,470.60
5 1/11/2013 CONSTR. OF PUBLIC CONVINIENCE 4212 AA SHITTU TAURA M,ARKET 8,012,999.85
6 30/10/201
3 COMPLETE SOLAR W/SCHEME 4304 AA SHITTU GUJUNGU MARKET
6,646,470.60
7 3/4/2013 CONSTR. OF DUPLEX HOUSE 0001 RINGIM GALADANCHI NIG
LTD TAURA 107,985,023.03
TOTAL 151,963,425.38
cxcvi
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
YANKWASHI LOCAL GOVERNMENT
S/NO DATE PROJECT
CONTRACT NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 13/2/201
3 DRILLING OF 2NO. BOREHOLES 0877 HABIBU SANI GALADANCHI RINGIM & DANKARI 2,423,402.00
2 6/3/2013 WATER SCHEME EXTENTION & REHABLITATION 0878 A AHAMED UMAR BANDAWA 6,680,000.00
3 16/3/13 ELECTRIFICATION PROJECT 0876 MARB ENGINEERING & MULTI SERVICES GURJIYA 1,700,000.00
4 15/4/201
3 ELECTRIFICATION PROJECT 0880 MARB ENGINEERING & MULTI SERVICES KARKARNA 4,076,807.25
5 16/4/201
3 ELECTRIFICATION PROJECT 0881 MARB ENGINEERING & MULTI SERVICES KARKARNA 2,962,630
6 2/5/2013 CONSTR. OF OFFICIAL DUPLEX ALAS ENGG & CONSTR. YANKWASHI. 107,985,023.03
7 27/5/13 CONSTR. OF JUMAAT MOSQUE 0883 MARB ENGINEERING & MULTI SERVICES FIRJI 19,446,046.45
8 30/5/13 CONSTR. OF FEEDER ROAD 0882 LAD MAG Constr. Ltd Yankwashi - Zoto 24,269,332.50
9 5/9/2013 DRILLING OF 2NO. BOREHOLES 0887 SIR WALTER DRILLINGS. Across 10 Wards 16,004,900.00
10 5/9/2013 COMPLETE WATER SCHEME 0888 SIR WALTER DRILLINGS. U/KALGO 12,922,417.00
5/9/2013 CONSTR. OF MODERN PUBLIC CONVIENCES 0889
ELDEE CONST. NIG LTD FIRJI 8,012,999.85
5/9/2013 CONST. OF SOLAR POWERED WATER SCHEME 0890
ALAMCO INTERGRATED SERVICES KARKARNA 6,646,470.50
TOTAL 213,130,028.58
cxcvii
DUE PROCESS AND PROJECT MONITORING BUREAU
JIGAWA STATE LOCAL GOVERNMENT UNIT
2013 LOCAL GOVERNMENT REPORT
CONTRACT AWARDED
KIRIKASAMMA LOCAL GOVT
S/NO DATE PROJECT CONTRACT
NUMBER CONTRACTOR LOCATION
AMOUNT [ N : K ]
1 8/3/2013 ELECTRIFICATION PROJECT 0800 TURABU CONSTRUCTION KARGIDI 16,941,845.00
2 8/3/2013 ELECTRIFICATION PROJECT 0601 ALH. T. MOHD BULUNCHAI 17,390,293.00
3 3/5/2013 ELECTRIFICATION PROJECT 0618 ALH. T. MOHD KABAK 16,350,506.00
4 18/7/2013 ELECTRIFICATION PROJECT 0624 KAWU NIG LTD GADARI 8,958,703.36
5 18/7/2013 ELECTRIFICATION PROJECT 0625 TURABU CONSTRUCTION MAGUWA 13,715,920.09
6 18/7/2013 ELECTRIFICATION PROJECT 0626 USMAN MOHD BUSUKU 10,091,729.55
7 8/3/2013 SOLAR WATER SCHEME 0603 A. D. Z GLOBAL MARAWAJI 7,793,394.00
8 8/3/2013 SOLAR WATER SCHEME 0604 A. D. Z GLOBAL KIRA 8,793,394.00
9 10/6/2013 SOLAR WATER SCHEME 0763 A. D. Z GLOBAL ALLUWARI 6,257,760.60
10 10/6/2013 UPGRADING OF WATER SCHEME 0622
GLOMA GEN ENTPRISES DILMARI 3,731,721.61
11 3/5/2013 IMPROVING AND UPGRADING OF WATER SUPPLY 0617 A. D. Z GLOBAL MATARA GANJI 6,077,610.00
12 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0605 GARBA MOHD SAWO IYO 9,792,370.00
13 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0608 ISA ADAMU MATARA M/GALADIMA 9,792,370.00
14 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0607 DODO MOHD MATTAFARI 8,984,241.00
15 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0609 IBRAHIM USMAN GANJI M/GARIGANA 9,792,370.00
16 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0610 YUSIF MAAJI GAYIN 8,984,241.00
cxcviii
17 8/3/2013 CONSTR. OF FRIDAY MOSQUE 0612 ADAMU IBRAHIM GIRA MALAKAURI 8,984,241.00
18 3/5/2013 SINGLE SPAN CULVERT & FILLING 0613 ALHAJI DILYARI KURA DIGE ROAD 1,113,388.00
3/5/2013 C/F 173,546,098.21
B/F 173,546,098.21
19 3/5/2013 SIMPLE SPAN CULVERT & FILLING ALH. ALIN JANMAKO ILALLAH ROAD 1,145,741.00
20 10/6/2013 SIMPLE SPAN CULVERT & FILLING ADAMU ISA ILALLAH ROAD 2,065,943.00
21 17/7/2013 CONSTR. OF DAILY PRAYER MOSQUE 0616 A USMAN GUJI TARABU LG QUARTERS 4,152,810.52
22 18/7/2013 CONVERSION OF TOILET TO OFFICE 0813 MUSA ABDULLAHI LG SECRETARIATE 937,721.61
23 18/7/2012 CONSTR. OF DOUBLE SPAN CULVERT 0623 MOHD BAKO GAYIN 7,096,428.00
24 18/7/2013 CONSTR. OF 500 SEATER HALL 0627 TURABU CONSTRUCTION K/KASAMMA 17,243,128.20
25 3/5/2013 CONSTR. OF WOMEN CENTER 0628 YUSIF MAAJI K/KASAMMA 6,952,387.50
26 3/4/2013 CONSTR. OF CULVERT SLAB 0629 SADI ABBA GASHINAWO IYO 801,700.00
27 2/2/2013 CONSTR. OF 2NO. SIGLE CULVERT 0615 MOHD GARBA JIYAN TAGE 2,225,907.00
28 2/2/2013 CONSTR. OF OFFICIAL DUPLEX TURABU CONSTRUCTION K/KASAMMA 107,985,023.03
29 3/5/2013 PURCHASE OF 2NO. SHARON BUSES DIRECT PURCHASE LG 2,600,000.00
30 10/6/2013 PURCHASE OF MODEL F BUS DIRECT PURCHASE LG 1,400,000.00
31 10/6/2013 CONSTR. OF 956M ENBANKMENT 0611 USMAN MOHD LIKORI 3,794,364.00
32 10/6/2013 PUR. OF FURNITURE CM HOUSE 0711 SAMINU HUSSAINI LG 2,205,682.00
cxcix
33 14/11/2013 PUR. OF FURN. TO SEC,DAGS & DPRS 0712 SAMINU HUSSAINI LG 2,177,775.00
34 3/5/2013 CONSTR. OF1257M ENBANKMENT 0630 TURABU CONSTRUCTION SUMANU/MASAMA 5,189,033.00
35 18/7/2013 CONSTR. OF COPPERS LODGE 0632 TURABU CONSTRUCTION TURABU 26175368.94
36 18/7/2013 ELECTRIFICATION PROJECT 0633 TURABU CONSTRUCTION BARMAGUWA 11,365,146.90
TOTAL 379,060,257.91
cc
Cash Flow Order and Other Capital Deduction 2013
S/No Local Govt
Council
LOCAL GOVT. JOINT CAPITAL PROJECT
CONTRIBUTION
DCDA Compensation
payment of structure/property of township road
Ministry of Economic Skills Aq.
Training centres 2000 youth
Min. of Works (street light)
Min. Of Water Resources (Water Supply Facilities)
Water Resources log for
implimentation MDG/CGS
LOCAL GOVT. JOINT CAPITAL
PROJECT CONTRIBUTION
Min of Environment
(Maigatari L.G. Alasan model ps & Falkin M Abdu flood & erosion
control
Total
1 Auyo 19,681,984.64 0.0 0.00 13,887,630.72 826,259.04 0.0 141,061,164.0 175,457,038.40
2 Babura 23,759,146.04 0.0 22,078,689.75 13,887,630.72 826,260.00 0.0 155,340,084.0 215,891,810.51
3 B/Kudu 28,627,931.43 10,500,000.0 22,078,689.75 13,887,630.72 826,259.04 58,859,848.0 204,995,388.0 339,775,746.94
4 Birniwa 21,223,931.86 0.0 8,551,889.75 13,887,630.72 826,259.04 4,189,313.0 151,288,224.0 199,967,248.37
5 Gagarawa 18,005,211.23 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 128,229,024.0 169,500,014.74
6 Buji 18,724,084.91 0.0 8,551,889.75 13,887,630.72 826,259.04 9,425,954.0 135,306,972.0 186,722,790.42
7 Dutse 25,469,328.11 30,453,865.0 10,500,000.0 0.00 13,887,630.72 826,259.04 0.0 192,137,112.0 273,274,194.87
8 Garki 21,729,970.27 12,250,000.0 0.00 13,887,630.72 826,259.04 0.0 154,938,468.0 203,632,328.03
9 Gumel 18,996,618.55 0.0 22,078,689.75 13,887,630.72 826,259.04 0.0 143,540,784.0 199,329,982.06
10 Guri 19,699,541.96 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 140,724,192.0 183,689,513.47
11 Gwaram 28,315,852.10 0.0 28,422,089.75 13,887,630.72 826,259.04 0.0 204,718,860.0 276,170,691.61
12 Gwiwa 20,344,384.80 0.0 8,551,889.75 13,887,630.72 826,259.04 9,425,954.0 145,738,572.0 198,774,690.31
13 Hadejia 18,066,500.98 14,000,000.0 22,078,689.75 13,887,630.72 826,259.04 0.0 130,904,268.0 199,763,348.49
14 Jahun 24,203,184.66 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 174,212,004.0 221,680,968.17
15 K/Hausa 26,665,264.43 0.0 22,078,689.75 13,887,630.72 826,259.04 0.0 190,936,824.0 254,394,667.94
16 Kaugama 20,150,819.93 0.0 22,078,689.75 13,887,630.72 826,259.04 0.0 145,745,292.0 202,688,691.44
17 Kazaure 21,313,303.01 11,375,000.0 22,078,689.75 13,887,630.72 826,259.04 0.0 152,125,956.0 221,606,838.52
18 K/Kasamma 22,106,400.73 0.0 0.00 13,887,630.72 826,259.04 0.0 159,168,900.0 195,989,190.49
19 Kiyawa 22,378,897.52 0.0 22,078,689.75 13,887,630.72 826,259.04 0.0 160,594,872.0 219,766,349.03
20 Maigatari 22,753,467.77 0.0 22,078,689.75 13,887,630.72 826,259.04 0.0 163,709,856.0 32,517,754.71 255,773,657.99
21 M/Madori 21,575,112.52 0.0 0.00 13,887,630.72 826,259.04 0.0 155,746,956.0 192,035,958.28
22 Miga 19,932,739.20 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 145,933,572.0 189,132,090.71
23 Ringim 23,162,017.99 11,375,000.0 22,078,689.75 13,887,630.72 826,259.04 0.0 164,705,988.0 236,035,585.50
cci
24 Roni 18,068,453.42 0.0 22,078,689.75 13,887,630.72 826,259.04 27,858,931.0 131,567,388.0 214,287,351.93
25 S/Tankarkar 20,999,637.41 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 148,500,768.0 192,766,184.92
26 Taura 20,804,759.32 0.0 8,551,889.75 13,887,630.72 826,259.04 0.0 151,054,944.0 195,125,482.83
27 Yankwashi 19,177,179.17 0.0 0.00 13,887,630.72 826,259.04 0.0 139,073,568.0 172,964,636.93
Total 585,935,723.96 30,453,865.0 70,000,000.0 348,254,684.75 374,966,029.44 22,308,995.04 109,760,000.0 4,212,000,000.0 32,517,754.71 5,786,197,052.90
ccii
SECTION (F)
APPENDIX - SECTOR BASED REPORTS
JANUARY – DECEMBER, 2013
cciii
SECTORAL REPRESENTATION OF POST CONTRACT EVALUATION
FOR 27NO LOCAL GOVERNMENT COUNCIL
SECTOR AMOUNT
PERCENTAGE
BUILDING PROJECTS 3,085,471,962.70
69%
ELECTRIFICATION PROJECTS
536,466,239.23
12%
RURAL WATER SUPPLY 582,691,099.89
13%
ROADS PROJECT 271,648,317.26
6%
TOTAL 4,476,277,619.08
cciv
BUILDING PROJECTS69%
ELECTRIFICATION PROJECTS
12%
RURAL WATER SUPPLY13%
ROADS PROJECT6%
ccv
3,085,471,962.70
536,466,239.23 582,691,099.89
271,648,317.26
BUILDING PROJECTS ELECTRIFICATION PROJECTS RURAL WATER SUPPLY ROADS PROJECT
27NO LOCAL GOVERNMENT COUNCILSSECTORAL EXPENDITURE PERFORMANCE CHART
JANUARY - DECEMBER, 2013
ccvi
ELECTRIFICATION PROJECTS
POST CONTRACT PROJECT EVALUATION
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
1 ELECTRIFICATION PROJECT IHSAN & INVESTMENT KURE
13,141,518.64 AUYO 12/2/2012 100 Completed
2 ELECTRIFICATION PROJECT LAMU & BABALDU MASKA
13,795,574.87 AUYO 13/10/2012 100 Completed
3 ELECTRIFICATION PROJECT HAMSU NIG LTD MARO
22,817,962.00 AUYO 18/5/12 100 Completed
4 ELECTRIFICATION PROJECT Maro Engg Ltd Mado
18,635,578.25 AUYO 18/5/12 100 Completed
5 ELECTRIFICATION PROJECT Limis Brothers S/Gabas & S/Yamma
45,970,919.00 AUYO 18/5/12 100 Completed
6 ELECTRIFICATION PROJECT
YAYARIN TUKUR NIG. LTD
KWANA-TIJIYO-AHOTO
39,179,164.44 BUJI 6/9/2013 100 Completed
7 ELECTRIFICATION PROJECT TURABU
CONSTRUCTION ABARI
5,996,939.72 BIRNIWA 14/3/13 100 Completed
8 ELECTRIFICATION PROJECT MAJERI ELECTRICAL
VENTURES SUMBURTU
6,290,382.72 BIRNIWA 14/3/2013 100 Completed
9 ELECTRIFICATION PROJECT TURABU
CONSTRUCTION ISFARI
8,525,613.88 BIRNIWA 18/3/2013 100 Completed
10 SUPPLY OF 15 KVA GENERATOR LIMIS BROTHERS DAJILBANI
1,800,000.00 BIRNIWA 19/3/2013 100 Completed
11 ELECTRIFICATION PROJECT IHSAN GEN ENTP. LIMITED DOLEN KWANA
23,599,542.42 BIRNIWA 18/07/2013 100 Completed
12 SUPPLY OF 15 KVA GENERATOR LIMIS BROTHERS KIHINDE
1,800,000.00 BIRNIWA 19/7/2013 100 Completed
13 ELECTRIFICATION PROJECT STEP BY STEP ZAINI
11,086,717.00 BIRNIWA 18/07/2013 100 Completed
14 SUPPLY 13 HP GENERATOR LIMIS BROTHERS LTD FM BIRNIWA
511,000.00 BIRNIWA 10/4/2013 100 Completed
15 ELECTRIFICATION PROJECT MUSHTEK NIG. LTD RORAU MAL GWIWA 10/4/2013 100 Completed
ccvii
2,999,177.96
16 ELECTRIFICATION PROJECT MUSHTEK NIG. LTD FIRJI U/UKU
1,630,604.90 GWIWA 10/4/2013 100 Completed
C/F
217,780,695.80
ELECTRIFICATION PROJECTS
POST CONTRACT PROJECT EVALUATION
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING LOCAL G.
COMMENCING DATE
STATUS IN % REMARKS S/N
B/F
217,780,695.80
PURCHASE OF 27KVA GENERATOR HABU SALE INDIRAWA
2,457,500.00 GWIWA 14/5/2013 100 Completed
18 PURCHASE OF 27KVA GENERATOR ABDRHAMAN HABU TSUBUT
2,457,500.00 GWIWA 14/5/2013 100 Completed
19 ELECTRIFICATION PROJECT MUSHTECK NIG. LTD J/MAHARBA 17,125,623.00 GWIWA 20/6/2013 100 Completed
20 ELECTRIFICATION PROJECT DARAGI & SONS OLD SDP OFFICE 894,937.00 GWIWA 20/6/2013 100 Completed
21 ELECTRIFICATION PROJECT MUSHTECK NIG. LTD FIRJI U/UKU 2,364,874.00 GWIWA 11/7/2013 100 Completed
22 ELECTRIFICATION PROJECT MUSHTECK ENGRR KARSHI 21,931,361.00 GWIWA 11/7/2013 100 Completed
23 ELECTRIFICATION PROJECT IBRACO MAFRICA NIG LTD ZANGO
2,229,467.77 JAHUN 20/3/2013 100 Completed
24 ELECTRIFICATION PROJECT MARB ENGINEERING ASAYAYA-KUKA
KWACE
21,856,431.09 JAHUN 2/4/2013 100 Completed
25 ELECTRIFICATION PROJECT IBRACO MAFRICA NIG LTD AJURA
2,670,860.00 JAHUN 11/6/2013 100 Completed
26 ELECTRIFICATION PROJECT Alh. Jafaru Abdullahi Kaugama-Madana-
Yalo 2,875,225.05 KAUGAMA 24/6/13 100 Completed
27 ELECTRIFICATION PROJECT A YA'U M/KANYU AUTAKO VILLAGE
4,999,660.42 K/HAUSA 8/5/2013 100 Completed
28 ELECTRIFICATION PROJECT LIMIS BROTHERS KARSHI-YAYARI-
SATERI
20,000,000.00 K/HAUSA 16/7/2013 100 Completed
29 ELECTRIFICATION PROJECT ALH. YA'U MAIKANYU AUTAKO
4,999,660.42 K/HAUSA 16/7/2013 100 Completed
30 ELECTRIFICATION PROJECT Galamawa Gen Ent. Warwade DUTSE 9/5/2013 100 Completed
ccviii
13,329,977.50
31 ELECTRIFICATION PROJECT Haske Gen Ent Zobiya
10,058,968.96 DUTSE 9/5/2013 85 ON-GOING
32 ELECTRIFICATION PROJECT Alh. Haro Wurma
28,180,000.00 DUTSE 4/4/2013 40 ON-GOING
33 ELECTRICATI0N POJECT A NASIRU DAN UMMA U/MATU ZANGO
QTRS
510,730.00 KIYAWA 30/4/2013 100 Completed
34 ELECTRIFICATION PROJECT IBRAHIM YALLARO
ANDAZA ANDAZA PHC QTRS
328,193.00 KIYAWA 29/7/2013 60 ONGOING
35 ELECTRIFICATION PROJECT ALH. IDRIS MAIYADI KAMPALA
530,000.00 M/MADORI 19/3/2013 75 ON-GOING
36 ELECTRIFICATION PROJECT HASSANA IASAH DAKIDO
1,658,995.00 M/MADORI 6/3/2013 80 ON-GOING
37 ELECTRIFICATION PROJECT PHASE II JAJIKURA
2,153,448.00 M/MADORI 19/3/2013 30 ON-GOING
38 SUPPLY OF 2NO. WATER GENERATORS HALI DRILLERS. YANWAKE/BOSUWA 6,328,000.00 MAIGATARI 6/2/2013 ON-GOING
39 ELECTRIFICATION PROJECT ISAH TURAKI K/DANIYA- JAJERI 718,885.13 MAIGATARI 4/4/2013 30 ON-GOING
40 ELECTRIFICATION OF PROJECT MUHAHIB NIG LTD ARBUS 9,820,425.00 MAIGATARI 18/4/13 50 ON-GOING
41 ELECTRIFICATION PROJECT ALH. ISA TURAKI K/DANIYA - JAJERI 1,071,191.10 MAIGATARI 2/1/2013 85 ON-GOING
42 ELECTRIFICATION PROJECT AIG VENTURES MATSATSAGI-
FULATA 26,488,566.00 MAIGATARI 6/6/2013 65 ON-GOING
43 ELECTRIFICATION PROJECT ALH. SHEHU UMAR CHAMO
DANSAMA MAIGATARI 3,169,000.00 MAIGATARI 15/8/13 70 ON-GOING
44 C/F
428,990,175.24
ELECTRIFICATION PROJECTS
ccix
POST CONTRACT PROJECT EVALUATION
B/F
428,990,175.24
45 ELECTRIFICATION PROJECT ALKASIM JANNAH NIG LTD NAFADAWA 13,419,563.50 MIGA 19/03/2013 100 Completed
46 ELECTRIFICATION PROJECT HANSHU NIG LTD DAMAGANAWA 20,808,150.67 MIGA 10/5/2013 100 Completed
47 ELECTRIFICATION PROJECT DANGYATIN VENTURES BURJI 11,598,088.50 MIGA 10/5/2013 100 Completed
48 ELECT. PROJECT EXTRA WORK ALKASAM JANNAH NIG LTD NAFADAWA 638,839.00 MIGA 16/05/2013 100 Completed
49 ELECT. PROJECT EXTRA WORK HAM SUN NIG LTD DAMAGANAWA 3,070,825.30 MIGA 16/05/2013 100 Completed
50 ELECTRIFICATION PROJECT SAHEL ASSOCIATED LTD UMMADU 20,317,934.47 MIGA 15/08/2013 100 Completed
51 ELECTRIFICATION PROJECT A MOHD DANLADI ZANGO JAMAGA 1,302,640.79 MIGA 12/4/4013 100 Completed
52 ELECTRIFICATION PROJECT MOHAMMED BANGAYYA MIGA 777,277.54 MIGA 12/4/2013 100 Completed
53 ELECTRIFICATION PROJECT CHAMO ENGINEERING JANGEFE
20,630,306.97 RONI 10/7/2013 100 Completed
54 SUPPLY OF 2 NO. GENERATOR KUYORO & SONS DANLADI/DANBANKI 6,173,000.00 22/10/2013 100 Completed
55 ELECTRIFICATION PROJECT MARB ENGINEERING & MULTI SERVICES GURJIYA 1,700,000.00 YANKWASHI 16/3/13 100 Completed
56 ELECTRIFICATION PROJECT MARB ENGINEERING & MULTI SERVICES KARKARNA 4,076,807.25 YANKWASHI 15/4/2013 100 Completed
57 ELECTRIFICATION PROJECT MARB ENGINEERING & MULTI SERVICES KARKARNA 2,962,630 YANKWASHI 16/4/2013 100 Completed
TOTAL
536,466,239.23
ccx
POST CONTRACT PROJECT EVALUATION
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
1 CONSTR. OF MOTOR PARK A.U.O & Sons AUYO
10,315,509.01 AUYO 13/6/2013 75 ON-GOING
2 CONSTR. OF DISTRICT H HOUSE KADARA G CONCEPT AYAMA
18,856,805.14 AUYO 13/6/2013 65 ON-GOING
3 CONSTR. OF DAILY PRAYER MOSQUE ADAMU DIGATAWA FUGE
1,615,373.34 AUYO 14/6/2013 100 Completed
4 CONSTR. OF DAILY PRAYER MOSQUE A GAEBA AUTA KAUDAN
1,615,373.34 AUYO 14/6/2013 100 Completed
5 CONSTR. OF DAILY PRAYER MOSQUE BAKO JURA AKUBUSHIN
1,615,373.34 AUYO 14/6/2013 100 Completed
6 CONSTR. OF DAILY PRAYER MOSQUE ABDULLAHI AMANI ATISGA
1,615,373.34 AUYO 14/6/2013 100 Completed
7 CONSTR. OF DAILY PRAYER MOSQUE ABUSSALAMU 2 BOYS MINARI
1,615,373.34 AUYO 14/6/2013 100 Completed
8 Constr. Of 1 No. Lock Up Shop A. Idi Gatafa & Others AUYO
3,712,681.50 AUYO 14/6/2013 100 Completed
9 Constr. Of 1 No. Lock Up Shop UMAR GALADIMA & OTHER AUYO
3,712,681.50 AUYO 14/6/2013 100 Completed
10 CONSTR, OF 2 C/ROOMS WITH OFFICE A.U.O & Sons ARABIC SS AUYO
7,017,285.10 AUYO 16/9/13 100 Completed
11 RENOVATION OF BUS STOP MUSA GUYU KWANAR GAWO
271,504.20 AUYO 29/8/13 100 Completed
12 RENOVATION OF BUS STOP HASSAN SHAHADA KWANAR KATAJE
271,504.20 AUYO 29/8/2013 100 Completed
13 RENOVATION OF LEA ISMAILA MA*ANJI LEA AUYO
1,949,326.03 AUYO 12/9/2013 100 Completed
ccxi
14 CONSTRUCTION OF MODERN PUBLIC CONVIENCE Limis Brothers Auyo
6,646,470.60 AUYO 31/10/13 75 ON-GOING
15 CONSTRUCTION OF MODERN PUBLIC CONVIENCE Limis Brothers Auyo
6,646,470.60 AUYO 31/10/13 75 ON-GOING
16 CONSTRUCTION OF DUPLEX HOUSE
ALH. DANYARO MAIWALDA AUYO
107,985,023.03 AUYO 4/3/2013 55 ONGOING
29 WALL FENCING OF KUKUMA CENTRAL MOSQUE BABANNAN ALI KUKUMA
1,106,580.40 BUJI 20/3/2013 100 Completed
30 CONSTR. OF DUPLEX HOUSE JANGO INT. NIG LTD GANTSA
107,985,023.03 BUJI 22/3/2013 100 Completed
31 CONSTR. OF LOCK-UP SHOPS IHSAN INVST. LTD SARA MARKET
10,572,817.24 BUJI 12/3/2013
100 Completed
32 LYING OF PRECAST INTERLOCK
A AMADU KUKUMA KUKUMA FRIDAY MOSQUE
930,987.20 BUJI
20/3/2013
100 Completed
33 CONSTR. OF JUMAAT MOSQUE
YAYARIN TUKUR NIGERIA
MADABE 11,339,700.00 BUJI
12/3/2013
100 Completed
36 CONSTR. OF JUMAAT MOSQUE IHSAN INVST. LTD YAYARIN CHAKAURI
11,339,700.00 BUJI 12/7/2013
100 Completed
C/F
318,736,935.48
ccxii
BUILDING PROJECTS
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
B/F
318,736,935.48
42 CONSTR. OF ISLAMIYYA SCHOOL SHUAIBU UMARU MAMUNA
2,904,310.00 BUJI 4/8/2013
100 Completed
43 CONSTR. OF JUMAAT MOSQUE
PERFORMANCE ENG LTD
GANTSA 27,753,689.40 BUJI
20/9/13
100 Completed
44
CONSTR. OF PIT LATRINE A WADA DRIVER & M BAFFA
BUJI PHC 545,538.00 BUJI
22/10/13
100 Completed
45 CONSTR. OF PIT LATRINE A AMADU TELA KUKUMA PHC
545,538.00 BUJI 22/10/13
100 Completed
46
CONSTR. OF SUNNA JUMAAT MOSQUE ATAMFA MARKETING NIG. LTD
GWADAYI 9,460,062.12 BUJI
18/10/13
100 Completed
47
CONSTR. OF 1-BLOCK OF 2 CLASSROOMS
ATAMFA MARKETING NIG. LTD
DAKAWA 5,709,492.69 BUJI
18/10/2013
100 Completed
48 CONSTR. OF PIT LATRINE ALH. IDI & OTHERS YAYARIN TUKUR
616,075.95 BUJI 14/3/13
100 Completed
52 CONSTR. OF PIT LATRINE MUSTAFA & OTHARS GWADAYI
616,075.95 BUJI 1/3/2013
100 Completed
53
COSTR. OF PUBLIC CONVINIENCE YAYARIN TUKUR NIG. LTD
GANTSA 8,012,999.75 BUJI
3/10/2013
100 Completed
54
COSTR. OF PUBLIC CONVINIENCE YAYARIN TUKUR NIG. LTD
BUJI 8,012,999.75 BUJI
3/10/2013
100 Completed
55 CONSTR. OF I BEDROOM BUNGALOW KHALI & TALBA DISTRICT HOUSE
BIRNIWA
3,387,705.16 BIRNWA 16/7/2013 100 Completed
56 CONSTR. OF FRIDAY MOSQUE SUBIMUM BIRNIWA
20,788,291.77 BIRNWA 14/5/2013 100 Completed
57 CONSTR. OF DUPLEX GANO VENTURES BIRNIWA
107,985,023.03 BIRNWA 3/4/2013 100 Completed
58 COMPLETION OF KANYA MOSQUE TALAKU ENT LTD WARGADU
10,676,958.89 BIRNWA 12/3/2013 100 Completed
59 RE-CONSTR. 0F ENGINE ROOM M/UNGUWA
DANLADI GAGARAWA TASHA
487,012.00 GAGARAWA 21/08/2013 100 Completed
ccxiii
60 RE-CONSTR. 0F ENGINE ROOM SULE GAMJI G/CHIROMA
488,012.00 GAGARAWA 21/08/2013 100 Completed
61 FIXING OF BURGLER PROOF & DOORS YUSHAU USAINI BHC G. TASHA
361,522.00 GAGARAWA 2/7/2013 100 Completed
62 RENOVATION OF STAFF QTRS MOHD S/DARE GAGARAWA TASHA
1,571,043.00 GAGARAWA 7/3/2013 100 Completed
63 RENOVATION OF STAFF QTRS [OLD SITE ] IBRAHIM HABU GAGARAWA TASHA
1,795,384.00 GAGARAWA 14/01/2013 100 Completed
64 RENOVATION OF JUMAT MOSQUE MALAM IDI KYAURE MAKERABU
2,377,197.90 GAGARAWA 7/6/2013 100 Completed
65 CONSTR. OF ENGINE ROOM M/UNGUWA
DANLADI LG STAFF QTRS
313,304.00 GAGARAWA 14/05/2013 100 Completed
C/F
533,145,170.84
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
B/F
533,145,170.84
67 RENOVATION OF DAILY PRAYER MOSQUE DANSUDU MEDU GAGARAWA TUDU
388,377.00 GAGARAWA 22/05/2013 100 Completed
68 RENOVATION OF STAFF QTRS KABIRU IBRAHIM OLD SITE
1,425,120.00 GAGARAWA 10/5/2013 100 Completed
69 RENOVATION OF DAILY PRAYER MOSQUE A ISIYA ABDU MEDU GIDAN YAKUBU
363,200.00 GAGARAWA 30/04/2013 100 Completed
ccxiv
71 RENOVATION OF ISLAMIYYA SCHOOL M SABO SHEHU GAGARAWA TASHA
518,952.00 GAGARAWA 30/04/2013 100 Completed
72 PURCHASE OF ROOFING MATEIALS HUDU KARYAKAHO VARIOS MOSQUE
340,000.00 GAGARAWA 21/08/2013 100 Completed
74 PURCHASE OF MOSQUE EQIUPMQNTS BUNIYA TAJJAWA VARIOS MOSQUE
450,000.00 GAGARAWA 21/08/2013 100 Completed
75 CONSTR. OF DUPLEX HOUSE GARE INVESTMENT GAGARAWA
107,985,023.03 GAGARAWA 16/4/2013 100 Completed
76 CONSTR. OF DAILY PRAYER MOSQUE MAL IBRAHIM DOGO KOKINAMI 1,334,733.42 GUMEL 24/6/2013 100 Completed
77 CONSTR. OF DAILY PRAYER MOSQUE ALH. A TSANGAYA TSANGAYA
1,334,733.42 GUMEL 24/06/2013 100 Completed
78 CONSTR. OF DAILY PRAYER MOSQUE A. ADO D/KAYA DAGARIYO
1,334,733.42 GUMEL 24/06/2013 100 Completed
79 CONSTR. OF DAILY PRAYER MOSQUE BABANDI BUSINESS GAMBAWA
1,334,733.42 GUMEL 24/06/2013 100 Completed
80 CONSTR. OF DAILY PRAYER MOSQUE SABO ZAKAR MAJINGINI
1,334,733.42 GUMEL 24/06/2013 100 Completed
81 CONSTR. OF DUPLEX HOUSE DUTSEN TAURA NIG LTD GUMEL
107,985,023.03 GUMEL 17/04/2013 100 Completed
82 CONSTR. OF 2 NO. PIT LATRINE AUWALU AYUBA K/RUWA PS
676,781.70 GWIWA 10/4/2013 100 Completed
83 CONSTR OF DAILY PRAYER MOSQUE HUDU D . FANKE DAGE
1,555,814.93 GWIWA 10/4/2013 100 Completed
84 CONSTR OF DAILY PRAYER MOSQUE SAFIYANU USAINI FIRJI
1,555,814.93 GWIWA 10/4/2013 100 Completed
85 CONSTR OF DAILY PRAYER MOSQUE ABDULLAHI BAWA U/GANJI
1,555,814.93 GWIWA 5/4/2013 100 Completed
86 CONSTR. OF 2NO. CLASSROOM BLOCKS HAROLINE & SONS K/RUWA
2,993,446.00 GWIWA 14/5/2013 100 Completed
C/F
767,612,205.49
ccxv
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
B/F
767,612,205.49
87 INTERLOCKING OF JUMAT MOSQUE SHUAIBU LAWAN DABI
1,556,000.00 GWIWA 14/5/2013 100 Completed
88 INTERLOCKING OF JUMAT MOSQUE MUSTAPHA MUSA GUNTAI
1,670,707.00 GWIWA 14/5/2013 100 Completed
89 INTERLOCKING OF JUMAT MOSQUE AMINU YAHAYA Z/GAURAYE
980,721.00 GWIWA 20/6/2013 100 Completed
90 FENCING OF INDIRAWA HALL SADI USMAN GWIWWA
1,999,849.00 GWIWA 10/4/2013 100 Completed
91 CONSTR. OF A DUPLEX NA-UKA PET LTD GWIWWA
107,985,023.03 GWIWA 5/4/2013 100 Completed
92 CONSTR. OF ENGINE ROOM ZUBAIRU RABIU S/YOLA
537,997.30 GWIWA 20/6/2013 100 Completed
93 CONSTR. OF ENGINE ROOM IDRITH ABUBAKAR KORAYAL 537,997.30 GWIWA 20/6/2013 100 Completed
94 CONSTR. OF JUMAAT MOSQUE MANHAF GLOBAL Z/MAHAUTA 7,112,608.00 GWIWA 15/7/2013 100 Completed
95 CONSTR. OF JUMAAT MOSQUE ASA MAIBULAWUS ABUJA 7,112,608.00 GWIWA 15/7/2013 100 Completed
ccxvi
96 CONSTR. OF LOCK-UP SHOPS AL. RABE GWIWA GWIWA 2,999,629.00 GWIWA 11/7/2013 100 Completed
97 COSTR. OF ISLAMIYYA SCHOOL ISAH A KORAYAL KWAMARAWA 2,911,687.00 GWIWA 10/7/2013 100 Completed
98 CONSTR. OF 2NO. CLASSROOMS JAFARU SAIDU FIRJI 5,865,515.00 GWIWA 10/7/2013 100 Completed
99 CONSTR. OF 2NO. PIT LATRINE M LAWAN USAINI FIRJI 676,781.00 GWIWA 10/7/2013 100 Completed
100 CONSTR. OF HEALTH POST YAHAYA DAGA DINYA 4,618,744.00 GWIWA 10/7/2013 100 Completed
101 COSTR. OF DAILY PRAYER MOSQUE MUSA BALA WARDAWA 1,555,814.00 GWIWA 10/7/2013 100 Completed
102 CONSTR. OF DAILY PRAYER MOSQUE INUSA HARUNA KUNDIGA JAMA 1,555,814.00 GWIWA 18/7/2013 100 Completed
103 CONSTR. OF WAITING SHED M GARBA SAADU AGANGARO 630,052.00 GWIWA 18/7/2013 100 Completed
104 CONSTR. OF WAITING SHED M SULE ALTO KARSHI DINYA 630,052.00 GWIWA 18/7/2013 100 Completed
105 CONSTR. OF WAITING SHED M MUSA JAURO TSABAWA 630,052.00 GWIWA 18/7/2013 100 Completed
106 CONSTR. OF TOILET MAL SUNUSI TINKISHI J/MOSQUE 338,390.00 GWIWA 22/7/2013 100 Completed
107 CONSTR. OF TOILET DANIYA SAIDU GUNTAI 338,390.00 GWIWA 22/7/2013 100 Completed
C/F
919,856,636.12
ccxvii
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
108 B/F
919,856,636.12
109 CONSTR. OF JUMAAT MOSQUE ASHAL NIG LTD INDIRAWA 7,195,384.30 GWIWA 22/7/2013 100 Completed
110 CONSTR. OF JUMAAT MOSQUE ASA MAIBULAWUS GASAKOLI 7,195,384.30 GWIWA 22/7/2013 100 Completed
111 CONSTR. OF 2NO. CLASSROOMS SHAFIU ABDULLAHI S/GANGARA 6,338,605.30 GWIWA 23/7/2013 100 Completed
112 CONSTR. OF 2NO. CLASSROOMS TUKUR G YARO TABANNI 6,338,605.30 GWIWA 23/7/2013 100 Completed
113 CONSTR. OF HEALTH POST SULEIMAN ILIYASU KUNDIGA 3,409,446.00 GWIWA 28/8/2013 100 Completed
114 CONSTR. OF HEALTH POST ISAH & 2 OTHERS TSABAWA 3,409,446.00 GWIWA 28/8/2013 100 Completed
115 CONSTR. OF WAITING SHED ASA MAIBULAWUS T/NAGORA 525,119.00 GWIWA 13/11/2013 100 Completed
116 CONSTR. OF JUMAAT MOSQUE FRESS ASSETS MAIYAKI 7,195,348.30 GWIWA 6/11/2013 100 Completed
117 CONSTR. OF 5 DAILY PRAYER MOSQUE M GARBA DANYARO GEMU YANSABO
950,000.00 JAHUN 12/3/2013 100 Completed
118 LAND COMPENSATION ALH. SHUAIBU JIJI JAHUN
350,000.00 JAHUN 4/4/2013 100 Completed
119 SUPPLY OF FURNITURE MOHD YUSIF STAFF QTRS
953,589.00 JAHUN 8/7/2013 100 Completed
120 CONSTR. OF DUPLEX HOUSE BABAN DOKI GEN ENTP. KAUGAMA
107,985,023.03 KAUGAMA 4/4/2013 100 Completed
121 CONSTR. OF NOMADIC SCHOOL Sani Babannan M/Fata KUFITU
2,467,420.00 KAUGAMA 10/6/2013 100 Completed
122 Land Compensation Direct Labour Kaugama 1,000,000.00 KAUGAMA 5/6/2013 100 Completed
123 Const. of Jumat Mosque Phase II Yusif Agi Marke 9,775,872.75 KAUGAMA 10/6/2013 100 Completed
124 CONSTR. OF 4NO. MARKET STALLS A MOHD TOYIN BULANGU
1,840,000.00 K/HAUSA 8/5/2013 100 Completed
125 CONSTR. OF 4NO. MARKET STALLS A JAFARU M/GORO K/HAUSA MARKET
1,840,000.00 K/HAUSA 8/3/2013 100 Completed
126 CONSTR. OF 3NO. MARKET STALLS SABO KWATALO KWATALO MARKET
1,380,000.00 K/HAUSA 8/3/2013 100 Completed
127 CONSTR. OF 2NO. MARKET STALLS A KANI JABO JABO MARKET K/HAUSA 8/3/2013 100 Completed
ccxviii
920,000.00
128 CONSTR. OF 4NO. MARKET STALLS KAMILU ADAMU RUBA RUBA MARKET
920,000.00 K/HAUSA 8/3/2013 100 Completed
129 CONST. OF DAILY PRAYER MOSQUE ALH. YA'U MALUMAWA KARGUMAKA
1,777,917.30 K/HAUSA 18/5/2013 100 Completed
130 CONSTR. OF MOSQUE ALH. YA'U MALUMAWA KWATALO
1,614,094.20 K/HAUSA 11/7/2013 100 Completed
131 CONSTR. OF DUPLEX HOUSE KANADI GLOBAL NIG
LTD K/HAUSA
107,985,023.03 K/HAUSA 9/4/2013 100 Completed
132 CONST. OF DWARF WALL MOHD MOHD LIMAWA KYARAN
1,250,429.25 DUTSE 11/3/2013 100 Completed
133 CONSTR. OF DUPLEX HOUSE MAIBURTANAI NIG LTD DUTSE
107,985,023.03 DUTSE 4/4/2013 100 Completed
C/F
1,312,458,366.21
S/N POST CONTRACT PROJECT
EVALUATION BUILDING PROJECTS
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
139 B/F
1,312,458,366.21
140 CONST. OF 2NO. CLASS ROOMS Alh. M M/Fulani Bakin Ruwa
4,102,894.62 DUTSE 9/5/2013 100 COMPLETED
ccxix
141 CONST. OF JUMAAT MOSQUE Itafaziha Gen Ent. Zangon Buji
10,193,722.29 DUTSE 9/5/2013 100 COMPLETED
142 CONSTR. OF JUMAAT MOSQUE Alh. Tsoho Fanisau
3,434,350.00 DUTSE 14/03/2013 100 COMPLETED
143 CONSTR. OF JUMAAT MOSQUE
Mohd Mohd & A Sale Kyaran
5,455,639.23 DUTSE 14/3/2013 100 COMPLETED
144 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD HADEJIA/JAMARE A
7,446,169.00 HADEJIA 31/12/2013 100 COMPLETED
145 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD HADEJIA/JAMARE B
7,446,169.00 HADEJIA 31/12/2013 100 COMPLETED
146 CONSTR. OF PUBLIC CONVINIENCE ALH. DANYARO WELDER MEDICAL STORE
7,446,169.00 HADEJIA 31/12/2013 100 COMPLETED
147 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD M/MADORI ROAD
7,446,169.00 HADEJIA 31/12/2013 100 COMPLETED
148 CONSTR. OF PUBLIC CONVINIENCE KAWU NIG LTD YANKIFI MARKET
7,446,169.00 HADEJIA 31/12/2013 100 COMPLETED
149 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD TSOSHUWAR TASHA
581,496.00 HADEJIA 31/12/2013 100 COMPLETED
150 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD CENTRAL MOSQUE
1,626,213.00 HADEJIA 31/12/2013 100 COMPLETED
151 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD S/TASHA YANHATSI
2,141,980.00 HADEJIA 31/12/2013 100 COMPLETED
152 RENOVATION OF PUBLIC CONVIIENCE KAWU NIG LTD KASUWAR KIFI
3,096,451.05 HADEJIA 31/12/2013 100 COMPLETED
153 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD HADEJIA/JAMARE B
6,646,470.60 HADEJIA 31/12/2013 100 COMPLETED
154 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD HADEJIA/JAMARE A
6,646,470.00 HADEJIA 31/12/2013 100 COMPLETED
155 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD M/MADORI ROAD
6,646,470.00 HADEJIA 31/12/2013 100 COMPLETED
156 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD YANKIFI MARKET
6,646,470.00 HADEJIA 31/12/2013 100 COMPLETED
C/F
1,406,907,838.00
ccxx
POST CONTRACT PROJECT EVALUATION
BUILDING PROJECTS
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL GOVT.
COMMENCEMENT DATE
STATUS IN %
REMARKS
B/F
1,406,907,838.00
157 COMPLETE SOLAR WATER SCHEME A MOHD NABAKIN DOGO CENTRAL MOSQUE
6,646,470.00 HADEJIA 31/12/2013 100% COMPLETED
158 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD MEDICAL STORE
6,646,470.00 HADEJIA 31/12/2013 100% COMPLETED
159 CONSTR. OFFICIAL DUPLEX NA BAKWAI ENT. LTD HADEJIA
107,985,023.03 HADEJIA 18/04/2013 100% COMPLETED
160 CONSTR. OF DAILY PRAYER MOSQUE UMAR KAGAMA KAGAMA
635,524.00 KIYAWA 12/4/2013 100% COMPLETED
161 CONSTR. OF DAILY PRAYER MOSQUE A. ADAMU MAI MAI GIDAN RINCHI
635,524.00 KIYAWA 22/3/2013 100% COMPLETED
162 CONSTR. OF ISLAMIYYA SCHOOL ISIYAKU KALKUTAN KALKUTAN
5,281,928.66 KIYAWA 19/3/2013 100% COMPLETED
163 CONSTR. OF DAILY PRAYER MOSQUE A AMADU KWAIMAWA KARFAWA
4,888,798.25 KIYAWA 19/3/2013 100% COMPLETED
ccxxi
164 CONSTR. OF ISLAMIYYA SCHOOL SUNUSI GURUM GURIN
5,300,000.00 KIYAWA 13/3/2013 100% COMPLETED
165 CONSTR. OF DAILY PRAYER MOSQUE MUSA UMAR MANGARI QTRS
328,524.00 KIYAWA 26/3/2013 100% COMPLETED
166 CONSTR. OF DAILY PRAYER MOSQUE A DANJUMA IDRITH MAKARA HUTA
328,524.00 KIYAWA 2/4/2013 100% COMPLETED
167 3- SEATER PIT LATRINE UBALE SULEIMAN K JSS KATUKA
736,643.00 KIYAWA 9/4/2013 100% COMPLETED
168 CONSTR. OF DUPLEX HOUSE ISHAQ ABUBAKAR NIG.
LTD KIYAWA
107,985,023.03 KIYAWA 16/4/2013 100% COMPLETED
169 CONSTR. OF DAILY PRAYER MOSQUE A SALISU ZERO FATARA VILLAGE
635,524.00 KIYAWA 6/5/2013 100% COMPLETED
170 CONSTR. OF DAILY PRAYER MOSQUE ABBA BARDE GIDAN RIJIYA
635,524.00 KIYAWA 23/4/2013 100% COMPLETED
171 RENOVATION OF HOD COMM. HOUSE A ABDULLAHI BILYA LG QTRS
2,693,833.33 KIYAWA 23/4/2013 100% COMPLETED
172 CONSTR. OF JUMAAT MOSQUE A AMADU KWAIMAWA KARFAWA
5,118,620.62 KIYAWA 17/5/2013 100% COMPLETED
173 CONSTR. OF DAILY PRAYER MOSQUE ABDU GEMU KATUKA
1,857,531.49 KIYAWA 7/6/2013 100% COMPLETED
174 CONSTR. OF DAILY PRAYER MOSQUE A ADAMU MAI MAI S/UNGUWA KIYAWA
900,000.00 KIYAWA 18/6/2013 100% COMPLETED
C/F
1,666,147,323.41
POST CONTRACT PROJECT EVALUATION
BUILDING PROJECTS
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING
LOCAL GOVT. COMMENCEMENT
DATE
STATUS IN % REMARKS
B/F
1,666,147,323.41
175 CONSTR. OF DAILY PRAYER A SALISU ZERO MAKARA KIYAWA 30/4/2013 100% COMPLETED
ccxxii
MOSQUE 635,524.00
176 CONSTR. OF DAILY PRAYER MOSQUE MUSA NUHU DUNGU TSANGAYAR KUDU
635,524.00 KIYAWA 6/5/2013 100% COMPLETED
178 CONSTR. OF DAILY PRAYER MOSQUE
A KABIRU TSANGAYAWA KAKA SUNA
1,013,000.00 KIYAWA 18/6/2013 100% COMPLETED
179 CONSTR. OF DAILY PRAYER MOSQUE A DALLADI BILYA KATI VILLAGE
635,524.00 KIYAWA 20/6/2013 100% COMPLETED
180 CONSTR. OF DAILY PRAYER MOSQUE MUSTAPHA AMINU
U/FULANI SHUWARIN
704,416.00 KIYAWA 22/5/2013 100% COMPLETED
181 CONSTR. OF DAILY PRAYER MOSQUE MUSTAPHA AMINU DUTSAWA FULANI
780,000.00 KIYAWA 8/7/2013 100% COMPLETED
182 CONSTR. OF DAILY PRAYER MOSQUE ABDU INUWA BAKUTA
635,524.00 KIYAWA 10/7/2013 100% COMPLETED
183 CONSTR. OF DAILY PRAYER MOSQUE A SALISU ZERO MAKARA
635,524.00 KIYAWA 29/7/2013 100% COMPLETED
184 CONSTR. OF DAILY PRAYER MOSQUE BAFFA SUNUSI KORAUW
635,524.00 KIYAWA 6/9/2013 100% COMPLETED
185 CONSTR. OF DAILY PRAYER MOSQUE A DANLADI BILYA KANTI KIYAWA
650,000.00 KIYAWA 22/10/2013 100% COMPLETED
186 CONSTR. OF JUMAAT MOSQUE AMINU NUHU SHIWARI
14,893,820.27 KIYAWA 4/4/2013 100% COMPLETED
187 CONSTR. OF JUMAAT MOSQUE A YAKUBU FAKE FAKE
3,084,230.61 KIYAWA 16/7/2013 100% COMPLETED
188 CONSTR. OF ISLAMIYYA SCHOOL ABDU GEMU TANADE
5,856,186.56 KIYAWA 24/5/2013 100% COMPLETED
189 CONSTR. OF ISLAMIYYA SCHOOL A SABO KWARA KATUKA
5,856,136.56 KIYAWA 20/6/2013 100% COMPLETED
C/F
1,702,798,257.41
ccxxiii
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
S/NO
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING
LOCAL GOVT. COMMENCEMENT
DATE
STATUS IN % REMARKS
B/F
1,702,798,257.41
190 CONSTR. OF ISLAMIYYA SCHOOL A ABDU GEMU GURUM BAYAN
GARI
5,856,186.56 KIYAWA 20/6/2013 100% COMPLETED
191 CONST. OF PUB. CONV. & W/SCHEME
GIDAN ADEDE NIG LTD B/KUDU ROAD
14,659,470.45 KIYAWA 25/10/2013 100% COMPLETED
192 RENOVATION OF HEALTH CLINIC ALH. ABDU GEMU GORUMO
3,795,353.97 KIYAWA 25/10/2013 100% COMPLETED
193 CONSTR. OF BOUNDRY WALL A SAIDU MASAMAWA KARA SHUWARIN
2,711,636.45 KIYAWA 25/10/2013 100% COMPLETED
ccxxiv
194 CONSTR. OF MARKET STALL USAINI MAIHULA KATUKA MARKET
758,270.00 KIYAWA 25/10/2013 100% COMPLETED
195 CONST OF PUB. CONV. & W/SCHEME LOYALTY SHIWARIN TOWN
14,659,470.45 KIYAWA 14/5/2013 100% COMPLETED
196 WALL FENCING AND GATE MANNIRU & HARUNA KAMPALA H/ POST
315,888.00 M/MADORI 19/3/2013 100% COMPLETED
197 CONSTR. OF 3-SEATER PIT LATRINE BABANNAN KOLI & KOLI KAMPALA
351,169.52 M/MADORI 19/3/2013 100% COMPLETED
198 CONSTR. OF DUPLEX HOUSE ADHAMA WORLD WIDE M/MADORI
107,985,023.03 M/MADORI 16/4/2013 100% COMPLETED
199 CONSTR. OF CENTRAL MOSQUE ADHAMA WORLD WIDE M/MADORI
43,575,069.00 M/MADORI 4/6/2013 100% COMPLETED
200 CONSTR. OF DISTRICT H. HOUSE JARAKO NIG LTD M/MADORI
7,449,000.00 M/MADORI 3/72013 100% COMPLETED
201 CONSTR. OF JUMAAT MOSQUE JARAKO NIG LTD MAIRAKUMI
3,750,012.00 M/MADORI 18/4/2013 100% COMPLETED
202 LAND COMPENSATION DIRECT LABOUR M/MADORI
450,000.00 M/MADORI 4/9/2013 100% COMPLETED
203 LAND COMPENSATION DIRECT LABOUR M/MADORI
3,000,000.00 M/MADORI 17/9/2013 100% COMPLETED
204 CONSTR. OF DENTAL CLINIC YAHAYA IBRAHIM PHC MAIGATARI 3,691,065.21 M/MADORI 23/04/13 100% COMPLETED
205 CONSTR. DUPLEX HOUSE LOYALTY NIG LTD MAIGATARI
107,985,023.03 MAIGATARI 30/3/13 100% COMPLETED
206 RENOVATION OF DISRRICT HEAD HOUSE GARE INVESTMENT MAIGATARI 3,679,263.00 MAIGATARI 10/5/2013 100% COMPLETED
207 CONSTR. OF DOCTOR'S HOUSE GARE INVESTMENT BOSUWA 6,743,634.00 MAIGATARI 20/05/13 100% COMPLETED
208 CONSTR. OF I BLOCK OF 2
CLASSROOMS HABU BALARABE BOSUWA 3,669,961.21 MAIGATARI 27/05/13 100% COMPLETED
209 CONSTR. OF DISTRICT HEAD HOUSE ISMAILA GALADI GALADI 4,500,000.00 MAIGATARI 6/6/2013 100% COMPLETED
210 CONSTR. OF DISTRICT HEAD HOUSE IBRAHIM ADAMU & SABO MOHD DANKUMBO 4,500,000.00 MAIGATARI 6/6/2013 100% COMPLETED
211 CONSTR. OF DISTRICT HEAD HOUSE ALH. ISA TURAKI &ISAH JAJERI BOSUWA 4,500,000.00 MAIGATARI 6/6/2013 100% COMPLETED
212 CONSTR. OF DISTRICT HEAD HOUSE A. BASIRU & A IBRAHIM MADANA 4,500,000.00 MAIGATARI 6/6/2013 100% COMPLETED
213 CONSTR. OF DISTRICT HEAD HOUSE ALH. SANI THINKING GARMAKA 4,500,000.00 MAIGATARI 6/6/2013 100% COMPLETED
ccxxv
214 RENOVATION OF FM STATION MOHD. ARI DABO EPZ MAIGATARI 646,657.00 MAIGATARI 6/6/2013 100% COMPLETED
215 RENOVATION OF HOUSE NO. 6 L.G QTRS ALH. WADA SALIS MAIGATARI 2,220,436.13 MAIGATARI 14/06/13 100% COMPLETED
216 COSTRUCTION OF 4 SEATER PIT LATRINE ALH. SALE TSUNI JSS BOSUWA 1,249,719.03 MAIGATARI 2/1/2013 100% COMPLETED
217 CONSTR. OF PUBLIC CONVENIENCE KANU NIG LTD MAIGATARI C
MARKET 7,446,169.60 MAIGATARI 13/11/2013 100% COMPLETED
218 CONSTR. OF DAILY PRAYER MOSQUE ALH. WAKILI MIGA SHUNAWA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
219 CONSTR. OF DAILY PRAYER MOSQUE
ALH. IASAH YANDUNA DANGOLI BABBA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
C/F 2,074,372,201.05
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
S/NO
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING
LOCAL GOVT. COMMENCEMENT
DATE
STATUS IN % REMARKS
B/F 2,074,372,201.05
220 CONSTR. OF DAILY PRAYER MOSQUE A. USAINI G/KANYA TSALLIYA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
221 CONSTR. OF DAILY PRAYER MOSQUE
M/UNGUWA DANJUMA SANSANI YAMMA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
222 CONSTR. OF DAILY PRAYER MOSQUE ALH. SALE DAHIRU HANTSAKI 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
223 CONSTR. OF DAILY PRAYER MOSQUE
A KABIRU SARAWUYA SARAWUYA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
234 CONSTR. OF DAILY PRAYER MOSQUE
A. AUDU JUMA GARBO ALFA 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
235 CONSTR. OF DAILY PRAYER MOSQUE A. UBALE GULULU ZAGAU 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
236 CONSTR. OF DAILY PRAYER MOSQUE
A. SALISU ABDU ZAREKU
UNGUWAR M/ADO GABASHI 1,212,733.00 MIGA 10/4/2013 100% COMPLETED
237 CONSTR, OF BHC NABAKWAI ALJAZERA NIG HANTSU 17,974,692.31 MIGA 30/04/2013 100% COMPLETED
238 CONSTR, OF BHC MAIBURTANI NIG DANGYATIN 17,974,692.31 MIGA 30/04/2013 100% COMPLETED
ccxxvi
LTD
239 CONSTR, OF BHC DANGYATIN VENTURES KOYA 17,974,692.31 MIGA 30/04/2013 100% COMPLETED
240 CONSTR. OF FRIDAY MOSQUE IBRAHIM MUSA KIGAWA KIGAWA 8,243,524.05 MIGA 15/08/2013 100% COMPLETED
241 CONSTR. OF FRIDAY MOSQUE DANGYATIN VENTURES S/GARI 19,232,320.77 MIGA 15/08/2013 100% COMPLETED
242 GENERAL RENOVATION OF CHAIRMAN HOUSE ADAMU SARKI MIGA MIGA 1,369,077.87 MIGA 20/03/2013 100% COMPLETED
243 GENERAL RENOVATION OF POLICE STATION HARUNA ALIYU D MIGA 3,030,923.00 MIGA 21/03/2013 100% COMPLETED
244 ADDITIONAL WORK AT GRAVEYAARD TUKUR SHEHU MIGA MIGA GRAVEYARD 1,682,307.70 MIGA 22/03/2013 100% COMPLETED
245 CONST. OF DAILY PRAYER MOSQUE HALILU ALFA JIGAWAR TSABA 428,906.96 MIGA 12/4/2013 100% COMPLETED
246 CONSTR. OF FRIDAY MOSQUE A GARBA NASSARAWA NASARAWA 3,121,111.20 MIGA 12/4/2013 100% COMPLETED
247 COMPLETION OF DAILY PRAYER MOSQUE SALE BOYI GIDAN KANYA 69,149,149.00 MIGA 30/4/2013 100% COMPLETED
248 RENOVATION OF HEALTH POST A GARBA D/GYATIN JAMAGA 2,479,974.18 MIGA 6/5/2013 100% COMPLETED
249 CONSTR. OF WAITING SHED TELA BARAU S/ DALAM 262,433.56 MIGA 19/07/2013 100% COMPLETED
250 RENOVATION OF FRIDAY MOSQUE MUSA IBRAHIM TSAKUWA 3,455,362.10 MIGA 20/07/2013 100% COMPLETED
251 ADDITIONAL CONSTR. WORKS A GARBA
NASARAWA NASARAWA 497,389.38 MIGA 2/7/2013 100% COMPLETED
252 CONSTR. OF STORE YAHAYA UMAR DANGYATIN 974,064.66 MIGA 20/08/2013 100% COMPLETED
253 CONSTR. OF DUPLEX HOUSE AL SAHIH NIG LTD RINGIM
107,985,023.03 RINGIM 10/3/2013 90% ON-GOING
254 CONSTR. OF PUBLIC CONVENIENCE MARBS GEN ENTP. RINGIM 7,446,169.60 RINGIM 13/11/2013 100% COMPLETED
255 CONSTR. OF PUBLIC CONVENIENCE AA SHITU BEGUWA 7,446,169.60 RINGIM 13/11/2013 100% COMPLETED
256 CONSTR. OF DUPLEX HOUSE NA UKU PETROLUEM RONI
107,985,023.03 RONI 10/3/2013 80% ON-GOING
257 CONSTR. OF PUBLIC CONVENIENCE AA SHITU RONI 8,012,999.85 RONI 24/11/2013 100% COMPLETED
C/F
2,489,587,338.52
ccxxvii
POST CONTRACT PROJECT EVALUATION BUILDING PROJECTS
S/NO
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING
LOCAL GOVT. COMMENCEMENT
DATE
STATUS IN % REMARKS
B/F 2,489,587,338.52
258 CONSTR. OF PUBLIC CONVENIENCE AA SHITU RONI 7,446,169.60 RONI 24/11/2013 100% COMPLETED
259 RENOVATION OF DISTRICT HEAD HOUSE GARBA DANTILA RONI
3,660,037.23 RONI 13/03/2013 100% COMPLETED
260 CONSTR. OF DUPLEX HOUSE GARE INVESTMENT S/TANKARKAR
107,985,023.03 S/TANKARKAR 25/4/2013 80% ON-GOING
261 CONSTR. OF 7NO. WASTE POINTS SABI U MUSA IDRIS 7 WARDS 2,325,232.81 S/TANKARKAR 25/5/2013 100% COMPLETED
262 CONSTR. OF DUPLEX HOUSE RINGIN GALADANCHI NIG TAURA
107,985,023.03 TAURA 15/04/2013 75% ON-GOING
263 CONSTR. OF OFFICIAL DUPLEX ALAS ENGG & CONSTR. YANKWASHI.
107,985,023.03 YANKWASHI 2/5/2013 70% ON-GOING
264 CONSTR. OF JUMAAT MOSQUE MARB ENGINEERING & MULTI SERVICES FIRJI 19,446,046.45 YANKWASHI 27/5/13 90% ON-GOING
265 CONSTR. OF PUBLIC CONVENIENCE
ELDEE CONSTRUCTION NIG LTD. FIRJI 7,446,169.60 YANKWASHI 27/5/13 70% ON-GOING
266 CONSTR. OF PUBLIC CONVENIENCE
ALAMCO INTEGRATED SERVICES LTD KARKARNA 7,446,169.60 YANKWASHI 27/5/13 70% ON-GOING
267 CONSTR. OF FRIDAY MOSQUE GARBA MOHD SAWO IYO
9,792,370.00 K/KASAMMA 8/3/2013 100% COMPLETED
268 CONSTR. OF FRIDAY MOSQUE ISA ADAMU MATARA M/GALADIMA
9,792,370.00 K/KASAMMA 8/3/2013 100% COMPLETED
269 CONSTR. OF FRIDAY MOSQUE DODO MOHD MATTAFARI
8,984,241.00 K/KASAMMA 8/3/2013 100% COMPLETED
270 CONSTR. OF FRIDAY MOSQUE IBRAHIM USMAN GANJI M/GARIGANA
9,792,370.00 K/KASAMMA 8/3/2013 100% COMPLETED
271 CONSTR. OF FRIDAY MOSQUE YUSIF MAAJI GAYIN
8,984,241.00 K/KASAMMA 8/3/2013 100% COMPLETED
272 CONSTR. OF FRIDAY MOSQUE ADAMU IBRAHIM MALAKAURI K/KASAMMA 8/3/2013 100% COMPLETED
ccxxviii
GIRA 8,984,241.00
273 CONS. OF DAILY PRAYER MOSQUE A USMAN GUJI TARABU LG QUARTERS
4,152,810.52 K/KASAMMA 23/5/2013 100% COMPLETED
274 CONVERSION. OF TOILET TO OFFICE MUSA ABDULLAHI LG SECRETARIATE
937,721.61 K/KASAMMA 23/5/2013 100% COMPLETED
275 CONSTR. OF OFFICIAL DUPLEX TURABU CONSTRUCTION K/KASAMMA
107,985,023.03 K/KASAMMA 4/3/2013 65% ON-GOING
276 CONSTR. OF 500 SEATER HALL TURABU CONSTRUCTION K/KASAMMA
17,243,128.20 K/KASAMMA 18/7/2013 40% ON-GOING
277 CONSTR. OF WOMEN CENTER YUSIF MAAJI K/KASAMMA
6,952,387.50 K/KASAMMA 3/5/2013 75% ON-GOING
278 PUR. OF FURNITURE CM HOUSE SAMINU HUSSAINI LOCAL GOVT,
SECRET.
2,205,682.00 K/KASAMMA 10/6/2013 100% COMPLETED
279 PUR. OF FURN. TO SEC,DAGS & DPRS SAMINU HUSSAINI
LOCAL GOVT, SECRET.
2,177,775.00 K/KASAMMA 14/11/2013 100% COMPLETED
280 CONSTR. OF COPPERS LODGE TURABU CONSTRUCTION TURABU 26175368.94 K/KASAMMA 18/7/2013 50% ON-GOING
TOTAL 3,085,471,962.70
ccxxix
S/N POST CONTRACT PROJECT
EVALUATION ROADS PROJECT
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT EXECUTING
LOCAL GOVT. COMMENCEMENT
DATE
STATUS IN % REMARKS
1
CONSTR. OF FIRST SURFACE COAT ROAD
GANO VENTURES NIG LTD
KARANJAU - K/MADAKI
200,771,865.60 BUJI 9/4/2013 60 ON-GOING
2 CONSTR. OF DRAINAGE ISAH & 2 OTHERS S/YOLA 2,489,030.00 GWIWA 28/8/2013 100 Completed
3 CONST. OF DRAINAGE & CULVERT Hussein Bayin Kwari Bayin Kwari 4,051,911 KAUGAMA 3/5/2013 100 Completed
4 ADDITIONAL DRAINAGE CULVERT Hussein Bayin Kwari Bayin Kwari 550,000.00 KAUGAMA 8/4/2013 100 Completed
5 CONST. OF DRAINAGE & CULVERT Bala Mohd Kanwar Gamawa 3,994,534.00 KAUGAMA 29/4/2013 100 Completed
6 ADDITIONAL DRAINAGE CULVERT Bala Mohd Kanwar Gamawa 664,630.00 KAUGAMA 6/5/2013 100 Completed
7 CONST. OF DRAINAGE & CULVERT Tela Maazu Kuikyar 3,664,630.00 KAUGAMA 30/5/13 100 Completed
8 ADDITIONAL DRAINAGE CULVERT Tela Maazu Kuikyar 1,185,766.00 KAUGAMA 6/5/2013 100 Completed
9 CONST. OF DRAINAGE & CULVERT Usaini Tela Darmomuwa 3,664,630.00 KAUGAMA 28/5/13 100 Completed
10 ADDITIONAL DRAINAGE CULVERT Usaini Tela Darmomuwa 560,557.20 KAUGAMA 10/6/2013 100 Completed
11 CONST. OF DRAINAGE & CULVERT Ado Milo & Ado Mandela Zaburan 6,983,542.00 KAUGAMA 4/7/2013 100 Completed
12 ADDITIONAL DRAINAGE CULVERT Ado Milo & Ado Mandela Zaburan 2,202,051.90 KAUGAMA 100 Completed
13 CONSTR. OF CULVERT ALH. YA'U
MALUMAWA GAMBAWA K/HAUSA
316,333.71 K/HAUSA 11/7/2013 100 Completed
14 CONSTR. OF FEEDER ROAD JIRMA GANDU-GWARI
9,997,184.00 DUTSE 9/4/2013 100 Completed
15 CONSTR. OF DRAINAGE ALH. RABIU SABO GARIN GABAS
2,432,000.00 M/MADORI 4/6/2013 100 Completed
16 CONSTR. OF DRAINAGE ALH. SAFINU & OTHERS DAKIDO 4,313,196.39 M/MADORI 14/6/13 100 Completed
17 REHABLITATION OF DRAINAGE MOHD ISAH TSAKUWA TSAKUWA
373,951.46 MIGA 6/6/2013 100 Completed
18 SINGLE SPAN CULVERT & FILLING ALHAJI DILYARI KURA DIGE ROAD
1,113,388.00 K/KASAMMA 3/5/2013 100 Completed
19 SINGLE SPAN CULVERT & FILLING ALH. ALIN JANMAKO ILALLAH ROAD
1,145,741.00 K/KASAMMA 3/5/2013 100 Completed
20 SINGLE SPAN CULVERT & FILLING ADAMU ISA ILALLAH ROAD
2,065,943.00 K/KASAMMA 10/6/2013 100 Completed
ccxxx
21 CONSTR. OF DOUBLE SPAN CULVERT MOHD BAKO GAYIN
7,096,428.00 K/KASAMMA 3/4/2013 100 Completed
22 CONSTR. OF CULVERT SLAB SADI ABBA GASHINAWO IYO
801,700.00 K/KASAMMA 2/2/2013 100 Completed
23 CONSTR. OF 2NO. SIGLE CULVERT MOHD GARBA JIYAN TAGE
2,225,907.00 K/KASAMMA 10/6/2013 100 Completed
24 CONSTR. OF 956M ENBANKMENT USMAN MOHD LIKORI
3,794,364.00 K/KASAMMA 3/5/2013 100 Completed
25 CONSTR. OF1257M ENBANKMENT TURABU CONSTRUCTION SUMANU/MASAMA
5,189,033.00 K/KASAMMA 3/5/2013 100 Completed
TOTAL
271,648,317.26
ccxxxi
POST CONTRACT PROJECT EVALUATION
RURAL WATER SUPPLY
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL
GOVT. COMMENCEMEN
T DATE
STATUS IN %
REMARKS
1 COMPLETE WATER SCHEME Limis Brothers Maje 12472135.66 AUYO 13/6/2013 100
COMPLETED
2 COMPLETE WATER SCHEME Limis Brothers Ayanduwa
12,060,423.90 AUYO 29/8/13 100 Completed
3
UPGRADING OF SOLAR W/SCHEME Limis Brothers Furawa
5,370,321.60 AUYO 29/8/2013 100 Completed
4
COMPLETE SOLAR WATER SCHEME Limis Brothers Auyo
6,646,470.60 AUYO 31/10/13 100 Completed
5
COMPLETE SOLAR WATER SCHEME Limis Brothers Auyo
6,646,470.60 AUYO 31/10/13 100 Completed
6
COMPLETE SOLAR WATER SCHEME
WATER & WASTE WATER
KAUYEN MAKERA
6,522,112.50
BUJI
18/10/13
100 Completed
7
COMPLETE SOLAR WATER SCHEME
WATER & WASTE WATER
SAGU GABAS 12,057,106.36
BUJI
18/10/13
100 Completed
8
CONSTR. OF 10NO. HANDPUMPS
Y-TEK INV. & AGRO ALLIED 10 WARDS
7,334,470.05 BUJI
18/10/13
100 Completed
9
COMPLETE SOLAR WATER SCHEME
WATER & WASTE WATER
GWADAYI 10,980,132.02
BUJI
18/10/13
100 Completed
10
COMPLETE SOLAR WATER SCHEME
WATER & WASTE WATER
BUJI 6,646,470.60
BUJI
18/10/13
100 Completed
11
COMPLETE SOLAR WATER SCHEME
WATER & WASTE WATER
GANTSA 6,646,470.60
BUJI
18/10/13
100 Completed
12 COMPLETE LIMIS BROTHERS GOMARI BIRNIWA 13/3/2013 100 Completed
ccxxxii
SOLAR WATER SCHEME
11,264,276.39
13
COMPLETE SOLAR WATER SCHEME
TURABU CONSTRUCTION
TATAJIYA/DALLARI
13,455,495.14 BIRNIWA 13/3/2013 100 Completed
14 COMPLETE WATER SCHEME
ADZ GLOBASL SERVICES ADAMARI
11,616,990.89 BIRNIWA 15/03/2013 100 Completed
15 DRILLING OF HAND PUMP INDAGI DAUDA
R TSAMIYAR ZAKI
400,000.00 BIRNIWA 22/05/2013 100 Completed
16 COMPLETE WATER SCHEME LIMIS BROTHERS KUNDI
13,527,434.00 BIRNIWA 20/06/2013 100 Completed
17
ADDITIONAL OVER HEAD TANK
LIMIS BROTHERS LTD DOLEN KWANA
2,905,881.30 BIRNIWA 15/05/2013 100 Completed
18 CONSTR. OF HANDPUMP
BULAMA SURAJO & SONS
FULANI KILBU/FULANI
800,000.00 BIRNIWA 11/6/2013 100 Completed
19
COMPLETE SOLAR WATER SCHEME
FRESS ASSET LTD S/YOLA
9,120,288.00 GWIWA 14/5/2013 100 Completed
20 DRILLING OF BOREHOLE
FRESS ASSET LTD INDIRAWA 1,840,000.00 GWIWA 20/6/2013 100 Completed
21 DRILLING OF BOREHOLE
FRESS ASSET LTD BUNTUSU 1,840,000.00 GWIWA 20/6/2013 100 Completed
22 DRILLING OF BOREHOLE
FRESS ASSET LTD MARAGANTA 1,840,000.00 GWIWA 20/6/2013 100 Completed
23 DRILLING OF BOREHOLE
FRESS ASSET LTD DINYA 1,840,000.00 GWIWA 20/6/2013 100 Completed
24 DRILLING OF BOREHOLE
FRESS ASSET LTD G/KYAU 1,840,000.00 GWIWA 20/6/2013 100 Completed
C/F
165,672,950.2
1
ccxxxiii
RURAL WATER SUPPLY
B/F
165,672,950.2
1
25
CONSTR. OF OVERHEAD TANK FRESS ASSETS YOLA 1,839,000.00 GWIWA 28/8/2013 100 Completed
26
CONSTR. OF OVERHEAD TANK FRESS ASSETS MPHC GWIWA 1,839,000.00 GWIWA 28/8/2013 100 Completed
27 CONSTR. OF OPEN WELL
AMADU DANAKWARA BAJIDAWA
180,000.00 JAHUN 4/3/2013 100 Completed
28 CONSTR. OF OPEN WELL
M ABDU MAIGORO GIDAN MAJE
180,000.00 JAHUN 14/3/2013 100 Completed
29 CONSTR. OF OPEN WELL KANI AUJARA BADIN
180,000.00 JAHUN 8/7/2013 100 Completed
30 COMPLETE WATER SCHEME LIMIS BROTHERS AUJARA
8,317,522.90 JAHUN 22/3/2013 100 Completed
31
CONSTR. OF 10NO. H/P[UMPMS LIMIS BROTHERS V/PLACES
3,500,000.00 JAHUN 5/6/2013 100 Completed
32 RETICULATION WORK LIMIS BROTHERS GANDUN HAKIMI
4,608,450.00 JAHUN 4/4/2013 100 Completed
33
PURCHASE H/PUMP MATERIALS ABBA IBRAHIM LG SEC
3,830,370.00 JAHUN 6/4/2013 100 Completed
34
COMPLETE SOLAR W/SCHEME ADZ NIG LTD YALWA
7,857,990.00 JAHUN 10/6/2013 100 Completed
35 CONSTR. 3NO. BH/PUMPS IY DRILLING LTD Varios Locations
1,050,911.00 JAHUN 19/6/13 100 Completed
ccxxxiv
36
COSTR. 25NO. H/PUMPS IY Drilling Ltd Varios Locations
8,750,000.00 JAHUN 8/4/2013 100 Completed
37
PURCHASE OF H/PUMP MATERIALS
DIRECT PURCHASE LGA 3,000,000.00 JAHUN 12/6/2013 100 Completed
38 DRILLING OF HAND PUMP
MOHD A SARAWA
SARAWA BUS STOP
250,000.00 K/HAUSA 10/2/2013 100 Completed
39 DRILLING OF HAND PUMP
ALH. TATA M/GORO
TAMBALE CEMETRY
250,000.00 K/HAUSA 18/2/2013 100 Completed
40 DRILLING OF HAND PUMP
ALIYU ABDULLAHI
D/TOKA AUNO BELI
250,000.00 K/HAUSA 20/2/2013 100 Completed
41 DRILLING OF HAND PUMP
IDRITH ABDULLAHI AUNO MAKERA
250,000.00 K/HAUSA 20/2/2013 100 Completed
42 DRILLING OF HAND PUMP
KABIRU HADAGWAIGWAI LUFUDA
250,000.00 K/HAUSA 20/3/2013 100 Completed
43 DRILLING OF HAND PUMP BUBA KABO SABARA
250,000.00 K/HAUSA 20/3/2013 100 Completed
44 DRILLING OF HAND PUMP LAWAL BUSORI YOLA
250,000.00 K/HAUSA 20/3/2013 100 Completed
45 DRILLING OF HAND PUMP MAIGARI MUSA G/KANYA
250,000.00 K/HAUSA 20/3/2013 100 Completed
46 DRILLING OF HAND PUMP A GARBA BODO KURZA
250,000.00 K/HAUSA 20/3/2013 100 Completed
47 DRILLING OF HAND PUMP
ABDULLAHI D/ATAFOWA KWAIMAWA
250,000.00 K/HAUSA 20/3/2013 100 Completed
48 DRILLING OF HAND PUMP
ABDALLA ABDULLAHI BULANGU CHC
250,000.00 K/HAUSA 29/4/2013 100 Completed
49 DRILLING OF HAND PUMP GAMBO A MUSA
BULANGU CHC
250,000.00 K/HAUSA 29/4/2013 100 Completed
50 DRILLING OF BOREHOLE FRESS ASSETS J/MALAMAI 850,000.00 GWIWA 23/7/2013 100 Completed
51 DRILLING OF BOREHOLE FRESS ASSETS BUNTUSU 850,000.00 GWIWA 23/7/2013 100 Completed
52 DRILLING OF BOREHOLE FRESS ASSETS K/RUWA 850,000.00 GWIWA 23/7/2013 100 Completed
53 DRILLING OF BOREHOLE FRESS ASSETS KURMA 1,463,000.00 GWIWA 23/7/2013 100 Completed
ccxxxv
54 DRILLING OF HAND PUMP KABIRU S/FULANI BUJAYE
250,000.00 GWIWA 25/5/2013 100 Completed
55 DRILLING OF HAND PUMP ISMAILA SABO SATERI
250,000.00 GWIWA 25/5/2013 100 Completed
56 DRILLING OF HAND PUMP LAWAN CHAIMAN S/GIDA
250,000.00 GWIWA 20/5/2013 100 Completed
57 DRILLING OF HAND PUMP
ALH. DOGO MEZAN MAKERA
250,000.00 GWIWA 20/5/2013 100 Completed
58 DRILLING OF HAND PUMP
USMAN ADAMU KWATALO JAURO MATAR
250,000.00 GWIWA 12/6/2013 100 Completed
59 DRILLING OF HAND PUMP
ALH. SURAKA BUSARI BUSARI
250,000.00 GWIWA 2/7/2013 100 Completed
60 DRILLING OF HAND PUMP
ALH. YA'U MALUMAWA ATARU
250,000.00 GWIWA 2/7/2013 100 Completed
C/F
219,569,194.1
1
POST CONTRACT PROJECT EVALUATION
RURAL WATER SUPPL
Y
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL
GOVT. COMMENCEME
NT DATE
STATUS IN %
REMARKS
B/F
219,569,194.11
61 DRILLING OF HAND PUMP IBRAHIM UBA BULANGU C
MOSQUE
250,000.00 K/HAUSA 4/7/2013 100 Completed
62 DRILLING OF HAND PUMP M. ISAH MASASSADI JAURO AUTA
250,000.00 K/HAUSA 11/7/2013 100 Completed
63 DRILLING OF HAND PUMP ISAH A SIDI IZALA MOSQUE
K/HAUSA
250,000.00 K/HAUSA 29/7/2013 100 Completed
64 DRILLING OF HAND PUMP BABA KANI IYE RAMFA K/HAUSA 5/8/2013 100 Completed
ccxxxvi
250,000.00
65 DRILLING OF HAND PUMP HABU PZ KWATALO U/BAKI KWATALO
250,000.00 K/HAUSA 5/9/2013 100 Completed
66 DRILLING OF HAND PUMP MUSA MANMAN
KWATALO U/FULANI KWATALO
250,000.00 K/HAUSA 5/9/2013 100 Completed
67 COMPLETE M/ WATER SCHEME MOHD ALKALI GALAMAWA
9,000,000.00 DUTSE 100 Completed
68 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD
HADEJIA/JAMARE B
6,646,470.60 HADEJIA 31/12/2013 100 Completed
69 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD
HADEJIA/JAMARE A
6,646,470.00 HADEJIA 31/12/2013 100 Completed
70 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD M/MADORI ROAD
6,646,470.00 HADEJIA 31/12/2013 100 Completed
71 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD YANKIFI MARKET
6,646,470.00 HADEJIA 31/12/2013 100 Completed
72 COMPLETE SOLAR WATER SCHEME
A MOHD NABAKIN DOGO CENTRAL MOSQUE
6,646,470.00 HADEJIA 31/12/2013 100 Completed
73 COMPLETE SOLAR WATER SCHEME KAWU NIG LTD MEDICAL STORE
6,646,470.00 HADEJIA 31/12/2013 100 Completed
74 CONSTR. OF HANDPUMP LAWAN SALISU DUNGUZU
328,630.00 KIYAWA 26/3/2013 100 Completed
75 CONSTR. OF HANDPUMP LAWAN SALISU DANGWALA
328,630.00 KIYAWA 2/4/2013 100 Completed
76 CONSTR. OF HANDPUMP SHUGABA RABILU FAKE DUHUWA GABAS
328,630.00 KIYAWA 10/4/2013 100 Completed
77 CONSTR. OF HANDPUMP M/UNGUWA ASAYAYA ASAYAYA
328,630.00 KIYAWA 10/4/2013 100 Completed
78 CONSTR. OF HANDPUMP A AYUBA FAKE FGC KIYAWA
328,630.00 KIYAWA 10/4/2013 100 Completed
79 CONSTR. OF HANDPUMP A AYUBA FAKE GARIN KWARI
328,630.00 KIYAWA 10/4/2013 100 Completed
80 CONSTR. OF HANDPUMP ISMAILA ALIYU MOHD KADIRAWA
328,630.00 KIYAWA 10/4/2013 100 Completed
81 CONSTR. OF HANDPUMP ISMAILA ALIYU MOHD FAKE
328,630.00 KIYAWA 10/4/2013 100 Completed
C/F
ccxxxvii
272,577,054.71
POST CONTRACT PROJECT EVALUATION RURAL WATER SUPPLY
S/N
PROJECT EXECUTOR LOCATION CONTRACT
AMOUNT
EXECUTING LOCAL
GOVT. COMMENCEME
NT DATE
STATUS IN %
REMARKS
B/F
272,577,054.71
82 CONSTR. OF HANDPUMP ABUBAKAR SALISU G/ALHAZAI KARKASHI
328,630.00 KIYAWA 21/5/2013 100 Completed
83 CONSTR. OF HANDPUMP ABUBAKAR SALISU GIDAN JAJI
328,630.00 KIYAWA 28/6/2013 100 Completed
84 CONSTR. OF HANDPUMP LAWAN SALISU GIDAN TILO
328,630.00 KIYAWA 30/6/2013 100 Completed
85 CONSTR. OF HANDPUMP A IBRAHIM JET RIGAR AMINU
328,630.00 KIYAWA 15/7/2013 100 Completed
ccxxxviii
86 NEW CONCRETE OPEN WELL ZAILANI KWANDA JABERI
280,000.00 KIYAWA 19/6/2013 100 Completed
87 MOTORISED WATER SCHEME S. WATER DRILLING KIYAWA
10,000,000.00 KIYAWA 16/7/2013 100 Completed
88 CONSTR. OF HAND PUMP A GARBA GARUN
YALLE GIDAN TAURA
328,630.00 KIYAWA 29/7/2013 100 Completed
89 CONSTR. OF HAND PUMP A SALISU ZERO GIDAN TAURA
328,600.00 KIYAWA 29/7/2013 100 Completed
90 CONSTR. OF HAND PUMP DAN ASABE ANDAZA RURA GARKO
WARD
328,630.00 KIYAWA 29/7/2013 100 Completed
91 CONSTR. OF HAND PUMP LAWAN SALISU JAWA
328,630.00 KIYAWA 12/8/2013 100 Completed
92 CONSTR. OF HAND PUMP A YAKUBU FAKE FAKE
328,630.00 KIYAWA 4/11/2013 100 Completed
93 CONSTR. OF HAND PUMP LAWAN SALISU JABBAMA VILLAGE
328,630.00 KIYAWA 8/11/2013 100 Completed
94 PURCHASE OF H/PUMP MATERIALS DIRECT PURCHASE LG COUNCIL
7,000,000.00 M/MADORI 18/4/2013 100 Completed
95 CONSTR. OF H/PUMP DIRECT PURCHASE 4 VILLAGES
1,400,000.00 M/MADORI 7/6/2013 100 Completed
96 RATICULATION WORK DAYYABU RAMBO KANKARE 1,574,695.00 MAIGATARI 16/1/2013 100 Completed
97 RATICULATION WORK DAYYABU RAMBO KAKIJULA 1,275,304.00 MAIGATARI 16/01/13 100 Completed
98 CONSTR. OF HANDPUMP HARUNA BAUSHE GIDAN SARKI 429,000.00 MAIGATARI 12/2/2013 100 Completed
99 CONSTR. OF HANDPUMP SULE HABU RIGAR SAIDU 429,000.00 MAIGATARI 12/2/2013 100 Completed
100 CONSTR. OF HANDPUMP 2NO. UMAR SANDA MAKABARTA/K/KU
DU BSW 858,000.00 MAIGATARI 12/2/2013 100 Completed
101 CONSTR. OF HANDPUMP 3NO. ALH ISYAKU IBRAHIM B/TASHA/K/YAMMA 1,287,000.00 MAIGATARI 12/2/2013 100 Completed
102 SUPPLY OF 2NO. WATWR GENERATORS HALI DRILLERS.
YANWAKE/BOSUWA 6,328,000.00 MAIGATARI 6/2/2013 100 Completed
103 COMPLETE WATER SCHEME DIRECT LABOUR BUZAYE/WAKILI
MADO 10,549,545 MAIGATARI 6/2/2013 100 Completed
104 CONSTR. OF OVERHEAD WATER TANK HALI DRILLERS JAJERI 4,026,100.00 MAIGATARI 15/3/13 100 Completed
105 COMPLETE WATER SCHEME HALI DRILLERS GARMAKA 17,016,095.00 MAIGATARI 14/03/13 100 Completed
106 CONSTR. OF HANDPUMP ALH. ROMA/NADIDIJI F/FULANI 429,000.00 MAIGATARI 12/4/2013 100 Completed
ccxxxix
107 CONSTR. OF HANDPUMP 2NO. DIRECT LABOUR B/DANIYA &
DANKWARBO 700,000.00 MAIGATARI 30/3/2013 100 Completed
C/F
339,445,064.18
ccxl
POST CONTRACT PROJECT EVALUATION
S/N
B/F 339,445,064.18
108 DRILLING OF 6" BOREHOLE & ACCESORIESHALI DRILLERS MAIGATARI 2,800,000.00 MAIGATARI 6/6/2013 100 Completed
109 DRILLING OF 6" BOREHOLE & ACCESORIESHALI DRILLERS MAIGATARI 8,524,950.00 MAIGATARI 6/6/2013 100 Completed
110 DRILLING OF 6" BOREHOLE & ACCESORIESHALI DRILLERS KAKI JULA 4,202,760.00 MAIGATARI 6/6/2013 100 Completed
111 DRILLING OF 6" BOREHOLE & ACCESORIESHALI DRILLERS KANKARE 4,169,300.00 MAIGATARI 6/6/2013 100 Completed
112 COMPLETE SOLAR WATER SCHEME MUHABIB NIG LTD MAIGATARI C MARKET 6,646,470.60 MAIGATARI 13/11/2013 100 Completed
113 COMPLETE SOLAR WATER SCHEME
TALAKU INTERGRATED
SERVICS MAIGATARI C MARKET 13,292,941.20 MAIGATARI 13/11/2013 100 Completed
114
COMPLETE MOTORISED WATER
SCHEME IBRAHIM MUSA KIGAWA HANTSU 8,432,688.63 MIGA 19/03/2013 100 Completed
115
COMPLETE MOTORISED WATER
SCHEME IBRAHIM MUSA KIGAWA KOME ALLAH YAYI 8,754,367.13 MIGA 19/03/2013 100 Completed
116 PIPELINE EXTENTION ALH. ABDU ZAREKU HANTSU 5,483,226.00 MIGA 19/03/2013 100 Completed
117 CONSTR. OF 10 NO. HANDPUMPS ALH. WADA BURJI ACROSS10 WARDS 3,152,742.00 MIGA 19/03/2013 100 Completed
118 CONSTR. OF 10 NO. HANDPUMPS MUH'D NATA ALA ACROSS 10 WARDS 3,152,742.00 MIGA 19/03/2013 100 Completed
119 REPAIRS OF PUMP STATION MOHD MAKAMA MUDUGA 522,698.00 MIGA 18/4/2013 100 Completed
120
COMPLETE MOTORISED WATER
SCHEME BAFFA UMARU BAMAINA ALFA 9,420,534.00 MIGA 10/5/2013 100 Completed
121
COMPLETE MOTORISED WATER
SCHEME LOYALTY PROPERTY. GULULU 12,699,196.65 MIGA 10/5/2013 100 Completed
122
COMPLETE MOTORISED WATER
SCHEME
TALAKU INTEGRATED
SERRVICES ROMAWA 10,259,841.90 MIGA 11/8/2013 100 Completed
123
COMPLETE MOTORISED WATER
SCHEME ALH. JIBRIN JAHUN GIDAN KANYA 10,636,731.53 MIGA 15/08/2013 100 Completed
124 CONSTR. OF HAND PUMP LOYALTY PROPERTIES G/DANGWA 361,397.00 MIGA 16/7/2013 100 Completed
125
COMPLETE MOTORISED WATER
SCHEME C0 ROM NIG. LTD UNGUWAR KAYA 14,289,966.60 RONI 15/05/2013 100 Completed
126
CONSTR. OF 2NO. SOLAR POWERED
WATER SCHEME AA SHTU RONI 13,292,941.20 RONI 12/11/2013 100 Completed
127 COMPLETE SOLAR WATER SCHEME LOYALTY PROPERTIES LTD KUKAWA 6,467,470.60 S/TANKARKAR 21/11/2013 100 Completed
B/F 486,008,029.22
RURAL WATER SUPPLY
PROJECT EXECUTOR LOCATION
CONTRACT
AMOUNT
EXECUTING
LOCAL GOVT.
STATU
S IN %
REMARKS
COMMENCEME
NT DATE
ccxli
S/N
B/F 486,008,029.22
128 DRILLING OF HANDPUMP
TRIAL DRILLING &
CONSTR. LULA 686,418.60 S/TANKARKAR 4/5/2013 100 Completed
129
COMPLETE MOTORISED WATER
SCHEME FELLY MORE INVST. LTD BAGGADE 10,071,128.03 S/TANKARKAR 19/9/2013 100 Completed
130
COMPLETE MOTORISED WATER
SCHEME FELLY MORE INVST. LTD DANGAYA 10,071,128.03 S/TANKARKAR 19/9/2013 100 Completed
131 DRILLING OF HANDPUMPS
TRIAL DRILLING &
CONSTR. SOME WARDS 3,775,200.00 S/TANKARKAR 21/5/2013 100 Completed
132 DRILLING OF 2 NO. HANDPUMPS
TRIAL DRILLING &
CONSTR. TAKATSABA 1,394,596.80 S/TANKARKAR 3/5/2013 100 Completed
133 DRILLING OF 2NO. BOREHOLES
HABIBU SANI
GALADANCHI RINGIM & DANKARI 2,423,402.00 YANKWASHI 13/2/2013 100 Completed
134
WATER SCHEME EXTENTION &
REHABLITATION A AHAMED UMAR BANDAWA 6,680,000.00 YANKWASHI 6/3/2013 100 Completed
135 DRILLING OF 2NO. BOREHOLES SIR WALTER DRILLINGS. Across 10 Wards 16,004,900.00 YANKWASHI 5/9/2013 100 Completed
136 COMPLETE WATER SCHEME SIR WALTER DRILLINGS. U/KALGO 12,922,417.00 YANKWASHI 5/9/2013 100 Completed
137 SOLAR WATER SCHEME A. D. Z GLOBAL MARAWAJI 7,793,394.00 YANKWASHI 8/3/2013 100 Completed
138 SOLAR WATER SCHEME A. D. Z GLOBAL KIRA 8,793,394.00 YANKWASHI 8/3/2013 100 Completed
139 SOLAR WATER SCHEME A. D. Z GLOBAL ALLUWARI 6,257,760.60 YANKWASHI 10/6/2013 100 Completed
140 UPGRADING OF WATER SCHEME GLOMA GEN ENTPRISES DILMARI 3,731,721.61 YANKWASHI 10/6/2013 100 Completed
141
IMPROVING AND UPGRADING OF
WATER SUPPLY A. D. Z GLOBAL MATARA GANJI 6,077,610.00 YANKWASHI 3/5/2013 100 Completed
TOTAL 582,691,099.89 100 Completed
PROJECT EXECUTOR LOCATION
CONTRACT
AMOUNT
EXECUTING
LOCAL GOVT.
COMMENCEME
NT DATE
STATU
S IN %REMARKS