18
JF 607- MANUFATURING CONTROL LECTURER NAME : PN JANNATUNNAIM BINTI HARUN NAME OF STUDENT : 1) MUHAMMAD NASRI BIN ZAINAL ABIDIN (14DTP12F1003) 2) MUHAMMAD NURFADHIRAN BIN YAHYA (14DTP12F1017) 3) MUHAMMAD HANIF BIN SAMAD (14DTP12F1011) 4) MUHAMMAD SYAFIQ BIN RAHMAT (14DTP12F1009) 5) A`BDUL FAKAR BIN MD AMIN (14DTP12F1015)

JF-607-MANUFATURING PRINT.pptx

Embed Size (px)

Citation preview

JF 607- MANUFATURING CONTROL

JF 607- MANUFATURING CONTROL

LECTURER NAME : PN JANNATUNNAIM BINTI HARUN

NAME OF STUDENT : 1) MUHAMMAD NASRI BIN ZAINAL ABIDIN (14DTP12F1003) 2) MUHAMMAD NURFADHIRAN BIN YAHYA (14DTP12F1017) 3) MUHAMMAD HANIF BIN SAMAD (14DTP12F1011) 4) MUHAMMAD SYAFIQ BIN RAHMAT (14DTP12F1009) 5) A`BDUL FAKAR BIN MD AMIN (14DTP12F1015)PRODUCTIVITYThe relationship between the outputs generated from a system and the inputs that are used to create those outputs. FACTOR THAT INCREASES PRODUCTIVITY EducationTechnologyMacroeconomic policiesSocial and culture environmentsForeign aidsForeign investmentsIndustry policies & competition

EXPLAINATION ABOUT :CAPITAL USAGEWORKERS PRODUCTIVITYYIELDTHROUGHPUTCAPITAL USAGE

Wealthin theform ofmoneyorassets, taken as asign of thefinancialstrengthof anindividual,organization, ornation, and assumed to be available fordevelopmentorinvestment.Accounting: Money invested in abusinessto generateincome.Economics:Factors of productionthat are used tocreategoodsorservicesand are not themselves in theprocessWORKERS PRODUCTIVITY

Employers, regardless of what type of business they manage, know that worker productivity is the key to an organizations success. Workers who are not using their time and resources effectively are costing the company money. YIELD

Indicates a percentage of products that are manufactured correctly and to specifications the first time through the manufacturing process without scrap or rework.

THROUGHTPUT

Measures how much product is being produced on a machine, line, unit, or plant over a specified period of time.EXPLAINATION ABOUT :CAPACITYDESIGN CAPACITYEFFECTIVE CAPACITYUTILIZATIONCAPACITYHighest sustainable output rate (maximum number of units per month , quarter or year) that can be achieved with current resources, maintenance strategies, product specifications.

DESIGN CAPACITYthe average flow of water or wastewater that a treatment plant or other facility of this type is designed to process. In the irrigation business, design capacity can also refer to the maximum amount of water in gallons per minuteEFFECTIVE CAPACITYactual maximum load or demand a device or system can carry or meet

UTILIZATIONthe proportion of the available time (expressed usually as a percentage) that a piece of equipment or a system is operating. Formula : operating hours X 100 available hours EXPLAINATION ABOUT :LONG RANGE CAPACITYINTERMEDIATE RANGE CAPACITYSHORT RUN CAPACITY

LONG RANGE CAPACITYplanning is the process of ensuring that sufficient production resources (facilities, people, equipment, and operating hours) are available to meet an organization's long-range production needs

INTERMEDIATE-RANGE CAPACITYusually covering a time frame of 2-12 months for a production process, in order to keep the costs of operations at a minimumSHORT RUN CAPACITY In economics, it is the concept that within a certain period Of time, in the future, at least one input is fixed while others are variable.

Q & A