JAWAHARLAL NEHRU PORT TRUST Detailed Project Report for Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II) DETAILED PROJECT REPORT EXECUTIVE SUMMARY (FINAL) March 2016 HOWE INDIA HOUSE, 81 NEHRU PLACE, NEW DELHI – 110 019, INDIA Phone : +91(011) 49508000 ; Fax : +91(011) 26467557 ; E-Mail : [email protected] Web : www.howeindia.com

JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

JAWAHARLAL NEHRU PORT TRUST

 

 

 

 

 

 

Detailed Project Report for Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II) 

 

 

   

DETAILED PROJECT REPORT ‐ EXECUTIVE SUMMARY 

(FINAL) 

   

March 2016 

 

 

HOWE INDIA HOUSE, 81 NEHRU PLACE, NEW DELHI – 110 019, INDIA Phone : +91(011) 49508000 ; Fax : +91(011) 26467557 ; E-Mail : [email protected]

Web : www.howeindia.com

Page 2: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  2 

Final Detailed Project Report – Executive Summary March 2016 

Table of Contents 

1.0  EXECUTIVE SUMMARY  5 

1.1  Introduction  5 

1.2  Data Collection  5 

1.3  Feasibility of Deepening Approach Channel for 18 m Draft Vessels and Setting 

up a Deep Water Terminal  6 

1.3.1  Deepening of the Channel to Cater to 18 m Draft Vessels  6 

1.3.2  Setting up a Deep Water Terminal in Mumbai Offshore Region  6 

1.4  Project Environment  7 

1.4.1  Temperature  7 

1.4.2  Wind Speed and Direction  7 

1.4.3  Rainfall  7 

1.4.4  Wave Height  7 

1.4.5  Currents  7 

1.4.6  Tides  7 

1.4.7  Bathymetry  8 

1.4.8  Sub‐soil profile  8 

1.4.9  Siltation in the Existing Channel  8 

1.5  Traffic Forecast  9 

1.5.1  Container Traffic Forecast  9 

1.5.2  Liquid Cargo Forecast  11 

1.6  Design Vessel Size  11 

1.7  Vessel Traffic  12 

1.8  Channel Design and Alternatives  13 

1.8.1  Channel Depth  13 

1.8.2  Channel Width  13 

1.8.3  Anchorage  14 

1.8.4  Emergency Anchorage near Karanja  14 

1.8.5  JNP Anchorage near Uran Patch  15 

1.8.6  Shifting of MbP Anchorage  15 

1.8.7  Preferred Alternative  15 

1.9  Dredging Volume  16 

1.9.1  Capital Dredging  16 

  Capital Dredging for Alternative I  16 

  Capital Dredging for Alternative II  17 

1.9.2  Maintenance Dredging  17 

Page 3: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  3 

Final Detailed Project Report – Executive Summary March 2016 

1.9.3  Dredged Material Management  18 

1.9.4  Disposal of Dredged Material  18 

1.9.5  Environmental Aspects  18 

1.10  VTMS and Navigational Aids  19 

1.10.1  Navigational Aids  19 

1.10.2  VTMS  19 

1.11  Fenders and Bollards  19 

1.11.1  Fenders  19 

1.11.2  Bollards  19 

1.12  Capital Costs  19 

1.13  Project Implementation Schedule  20 

1.14  Financial Analysis  20 

1.14.1  PPP Model  20 

1.14.2  Annuity Model  21 

1.14.3  Development by JNPT  21 

1.15  Economic Analysis  22 

1.16  Conclusion  22 

LIST OF TABLES 

Table 3: Bathymetry Details of JNP Navigational Areas 

Table 4: Design Vessel Size 

Table 5: Year‐wise Total Vessel Traffic in Approach Channel 

Table 6: Alternatives for Channel Depths 

Table 7: Channel Depth for Various Alternatives 

Table 8: Width of Approach Channel for Various Design Vessels 

Table 9: Design of Bends for Alternative I to Alternative IV 

Table 10: Diameter and Depth of the Emergency Anchorage near Karanja 

Table 11: Multi‐Criteria Analysis of the Channel Design Alternatives 

Table  12:  Estimated  Quantity  of  Capital  Dredging:  Alternative  –  I  (12500  TEU  Vessel  and  Tidal Window of 2.2 m) 

Table  13:  Estimated  Quantity  of  Capital  Dredging:  Alternative  ‐  II  (16000  TEU  Vessel  and  Tidal Window of 2.2 m) 

Table 14: Capital Cost Estimates for Alternatives I & II 

Table 14: Summary of Financial Results for PPP Model 

Table 16: Summary of Financial Results for Annuity Model 

Page 4: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  4 

Final Detailed Project Report – Executive Summary March 2016 

Table 17: Summary of Financial Results for Development by JNPT 

Table 18: Results of Sensitivity Analysis 

Table 19: Total Economic Benefits 

 

LIST OF FIGURES 

Figure 1: Container Traffic Forecast (million TEU) 

Figure 2: Constrained and Unconstrained Traffic Forecast 

Figure 3: Liquid Cargo Traffic Forecast at JNP Existing BPCL Traffic 

 

LIST OF DRAWINGS 

I‐514/JNPT/115  Proposed Dimensions and layout of the approach channel   

Page 5: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  5 

Final Detailed Project Report – Executive Summary March 2016 

1.0 Executive Summary 

1.1 Introduction 

Jawaharlal Nehru Port  (JNP)  is one of  the  twelve major ports of  India  and has  a 

cargo handling capacity of about 64 MTPA. JNP is located adjacent to Mumbai Port 

and shares a common navigation channel with Mumbai Port for a substantial part 

of  its  length. Till 2012,  the depth of  the  channel was  (‐) 11 m CD and  the depth 

alongside  berth  at  JNP  was  (‐)  13.50  m  CD.  With  increasing  cargo  handling 

requirements,  consequent  expansion  in  its  capabilities  and  competition  from 

neighbouring ports, JNP has been called upon to handle new generation container 

vessels with wider beam and deeper drafts.  

JNPT conceptualized  the capital dredging of channel  in  two phases  to enable  the 

movement  of  these  new  generation  vessels.  In  Phase  I,  the  channel  depth was 

increased  from  (‐)  11 m  CD  to  (‐)13.1  in  JNP  area  and  (‐)  14.20 m  CD  in  outer 

channel to facilitate handling vessels of 14 m draft (about 6000 TEU) with utilization 

of tidal window. The channel length was increased from 29.5 km to 33.5 km. JNPT is 

contemplating  to  undertake  the  Phase  II  dredging  of  the  approach  channel  to 

facilitate handling vessels with larger drafts.   

JNPT has entrusted M/s Howe Engineering Project  (India) Private Limited  (HOWE) 

to  provide  consultancy  services  for  preparation  of  DPR  for  “Deepening  and 

Widening of Mumbai Harbour and Jawaharlal Nehru Port Channel (Phase II)”. 

1.2 Data Collection 

HOWE  collected  earlier  Detailed  Project  and  Feasibility  Reports  prepared  for 

channel widening  and  deepening  from  JNPT  during  kickoff meeting.  Apart  from 

these  various model  study  reports  prepared  by  CWPRS,  bathymetric  survey  and 

geotechnical  survey  reports  prepared  by  various  agencies  were  also  collected. 

HOWE has  observed data  gaps  in  the  field  survey data provided by  JNPT during 

kickoff meeting and suggested carrying out the following surveys: 

Bathymetric  survey at dredge disposal grounds  (DS3 and DS4) and  in  certain 

sections of outer approach channel (Section A‐B) & emergency anchorage area 

Sub‐bottom  profile  survey  and  borehole  investigations  in  Section  B‐C  of  the 

approach channel and emergency anchorage area 

Page 6: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  6 

Final Detailed Project Report – Executive Summary March 2016 

JNPT have appointed M/s Ocean Science and Surveying (OSAS) for carrying out the 

above surveys during April 2015. M/s OSAS submitted their survey reports during 

the third week of June 2015 and the survey results were used in preparation of the 

Detailed Project Report. 

1.3 Feasibility of Deepening Approach Channel for 18 m Draft Vessels and Setting up a Deep Water Terminal 

JNP desired to quickly explore the feasibility of deepening the approach channel to 

cater  to  vessels  of  18 m  draft  and  also  for  setting  up  a  deep water  terminal  in 

Mumbai offshore region. Details of the same are presented below.  

1.3.1 Deepening of the Channel to Cater to 18 m Draft Vessels 

Deepening the approach channel to cater to 18 m draft ships is not feasible due to 

the following aspects: 

The  existing  container berths  at  JNP  are  designed  to  cater  to  ships of  15 m 

draft only.  

A review of the biggest container ships in order book or even at planning stage 

reveals that the draft is of the order of 15 to 16 m. 

Deepening  for 18 m draft  ships would  result  in a cost of Rs. 14650 crores as 

against Rs. 2,029 crore  for 15 m draft ships, but generation of any additional 

revenue is unlikely.  

1.3.2 Setting up a Deep Water Terminal in Mumbai Offshore Region 

Development  of  deep water  terminal  in Mumbai  offshore Region  is  not  suitable 

due to the following: 

At JNP and nearby coastal areas, deep water  is quite far from shore  i.e. 10 m 

contour and 20 m contour are at a distance of 4 to 8 km and 16 to 24 km from 

the shore, respectively.  

Creation of offshore  facility would  require  creation of breakwaters, berthing 

structure  and  approach  trestle,  having  technical  and  cost  implications.  The 

entire cost of creating an offshore terminal with approach is likely to be much 

higher  than dredging  (including  rock)  for deeper depths  at  JNP or  any other 

satellite port, which could be planned nearby the JNP.  

Page 7: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  7 

Final Detailed Project Report – Executive Summary March 2016 

1.4 Project Environment 

1.4.1 Temperature 

The  temperatures  range  between  11oC  to  above  40oC.  April  and  May  are  the 

hottest months and January is generally the coolest month in a year. 

1.4.2 Wind Speed and Direction 

The nearshore wind blows from SW to W for 37% of the time and W to N for 55% of 

the time. The wind speed is less than 15 m/s (54 km/hr) for 87% of the time and 20 

m/s (72 km/hr) for 95% of the time.  

1.4.3 Rainfall 

Annual rainfall  is about 1800 mm. 94% of  the annual rainfall occurs  in the south‐

west monsoon season (June to September). On an average, there are 73 rainy days 

in a year, out of which about 67 days occur during the southwest monsoon season. 

1.4.4 Wave Height 

The predominant directions of waves in the nearshore zone are from the WSW, W, 

WNW,  NW.  The  wave  height  is  less  than  2  m  for  83%  of  the  time  and  the 

predominant wave period is 10 seconds. 

1.4.5 Currents 

Prevailing  current  velocity  is  of  the  order  of  1.5  knots  peaking  to  2.5  knots 

occasionally during  the monsoon.   A maximum cross current of 1.5 knots can be 

considered. 

1.4.6 Tides 

The tides at JNP are semi‐diurnal in nature and the mean tidal range is 3.66 m.   The 

highest and lowest spring tides are +4.9 m and +0.12 m wrt CD, whereas the mean 

sea level is +2.51 m CD.  

Page 8: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  8 

Final Detailed Project Report – Executive Summary March 2016 

1.4.7 Bathymetry 

Bathymetry survey of approach channel based on the survey by M/s Fugro in May 

2015 is given in table below. 

Table 3: Bathymetry Details of JNP Navigational Areas 

S. No.  Channel Section  Length (m)  Width (m)  Current Dredged Levels (m CD) 

1.  AB  9775  800  ‐14.3 to ‐15.5 

2.  BC  4680  370  ‐14.6 to ‐14.9 

3.  CD  7980  370  ‐14.3 to ‐15.0 

4.  DE  4365  370  ‐14.0 to ‐15.0 

5.  EF  6690  400 to 500  ‐13.1 to ‐18.5 

6. Berth Pockets and 

emergency Anchorage‐ 

 ‐16.5 

Bathymetric  survey was  carried  by M/s Ocean  Science  and  Surveying  at  dredge 

disposal grounds (DS3 & DS4). The survey results are as follows:  

The water depth  ranged  from a minimum of  (‐) 14.2 m CD  to a maximum of     

(‐) 18 m CD at DS3 and (‐) 22.8 m CD to (‐) 25 m at DS4 areas.  

1.4.8 Sub‐soil profile 

The sub‐soil in sections A‐B and B‐C comprises of very soft marine clay. In sections 

C‐D, D‐E and E‐F, the substrata comprises of soft marine clay underlain by a mixture 

of very stiff marine clay and sand which in turn is underlain by layers of weathered 

rock of varying degree and sound amygdaloidal basalt. Rock outcrops are noticed at 

some portions of sections C‐D and E‐F. 

The thickness of the marine clay layer varies from 2 m to 11 m.  The starting level of 

sound rock varies from ‐11.0 m CD to ‐25 m CD.   The  level of rock  is higher  in the 

JNP harbour as compared to the rock levels in the main harbour channel.   

1.4.9 Siltation in the Existing Channel  

CWPRS carried out siltation studies of the approach channel and harbor area of JNP 

and  the estimated  siltation was about 5 million cum, which  is  in agreement with 

the annual maintenance dredging. 

Page 9: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  9 

Final Detailed Project Report – Executive Summary March 2016 

1.5 Traffic Forecast 

HOWE have carried out container and  liquid bulk traffic forecast for JNP based on 

the review of the past trends in traffic growth and making suitable assumptions on 

future growth rates. 

1.5.1 Container Traffic Forecast 

The container traffic forecast was made adopting two different methodologies viz., 

the long term growth rate approach and the cluster approach.  

Long Term Growth Rate Approach 

The historical CAGR of container trade at JNP is calculated for 20 years, 15 years, 10 

years  and  5  years.  The weighted  average  CAGR  is  then  computed  by  assigning 

appropriate weightages to various CAGRs. The weighted average computed is used 

to  determine  the  traffic  forecast  for  the  first  ten  year  period,  post  which  the 

average CAGR was re‐computed and traffic is forecasted. The forecasted container 

traffic for JNP by the year 2044‐45 (FY45) is 26.4 MTEU. 

Cluster Growth Approach 

Indian container market is grouped into clusters and the percentage share of JNP in 

the national container  traffic  is analysed. The  future  share of  JNP  in  the national 

traffic  is projected considering the existing scenario and development potential of 

the clusters. The forecasted container traffic for JNP by the year 2044‐45 (FY45)  is 

33.0 MTEU. 

Comparison of Container Traffic Forecast Approaches 

Both  long  term  growth  rate  and  cluster  growth  methodologies  assume  that 

adequate port  infrastructure  is available at  JNP  i.e., draft  for handling any size of 

container  vessels  and  commensurate  evacuation  facilities.  Both  methodologies 

predict that JNP will be able to handle about 10 million TEU of containers by FY25. 

 

 

 

Page 10: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  10 

Final Detailed Project Report – Executive Summary March 2016 

Figure 1: Container Traffic Forecast (million TEU) 

JNP  has  a  capacity  to  handle  4.2  MTEUsPA  container  cargo  and  has  plans  to 

augment the capacity to 9.8 MTEUsPA. To cater to the traffic beyond FY25 further 

capacity augmentation is required. 

Traffic Forecast at Constrained Infrastructure 

In  case  the  existing  dredged  level  and  channel  width  prevail,  the  ultimate 

throughput at the JNP shall be limited to 8.37 MTEUsPA only. Once JNP implements 

the  dredging  project  to  allow  handling  of  ships  having  draft  of  15.0 m,  JNP  can 

handle about 10.05 MTEUsPA. 

Figure 2: Constrained and Unconstrained Traffic Forecast 

4.5 4.8 5.2 5.6 6.1 6.5 7.0 7.6 8.2 8.8 9.3 9.9 10.511.111.7

12.413.113.914.7

15.416.217.017.9

18.819.720.721.7

22.824.0

25.226.4

5.1 5.5 5.9 6.4 6.8 7.3 7.8 8.4 8.9 9.5 10.210.811.6

12.313.113.914.8

15.716.717.718.7

19.821.0

22.223.5

24.826.2

27.729.2

30.833.0

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

FY15 FY17 FY19 FY21 FY23 FY25 FY27 FY29 FY31 FY33 FY35 FY37 FY39 FY41 FY43 FY45

CAGR Approach Cluster Approach

4.755.21

5.626.06

6.537.04

7.598.18

8.829.33

9.8810.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05 10.05

4.754.95 5.34

5.756.20

6.687.21

7.778.37

8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37 8.37

0.00

2.00

4.00

6.00

8.00

10.00

12.00

FY16 FY18 FY20 FY22 FY24 FY26 FY28 FY30 FY32 FY34 FY36 FY38 FY40 FY42 FY44 FY46

Constrained Forecast with Deepening Constrained Forecast

Container Traffic in MTEUsPA

Page 11: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  11 

Final Detailed Project Report – Executive Summary March 2016 

1.5.2 Liquid Cargo Forecast 

The liquid bulk traffic forecast is made based on the future growth rate at national 

level and the % share of JNP in the national traffic.  

Figure 3: Liquid Cargo Traffic Forecast at JNP Existing BPCL Traffic 

1.6 Design Vessel Size 

Review  of  the world‐wide  container  vessels  indicates  a  huge  demand  for  post‐

panamax  size  container  vessels  of  8000‐12000  TEU  and  12000‐15000  TEU  size, 

which is driven by the economics of trade derived from operating larger vessels. 

The  average  container  vessel  size  has  almost  doubled  along  Asia‐Europe,  Asia‐

Middle East and Asia‐South America  routes during 2005  and 2015. By 2020,  it  is 

anticipated that the average container vessel sizes on Asia‐Europe route would be 

16730 TEU and on Asia‐Middle East & Asia‐South America would be 11500 TEU. 

Container vessels of 4000‐8000 TEU size with a maximum laden draft of 14.0 m are 

arriving at JNP. Considering the trends in the evolution of container vessel sizes on 

the main trade routes, it is anticipated that more 8000‐12500 TEU size vessels will 

call at JNP.  Upon further development of traffic at JNP, vessels of 16000+ TEU will 

visit. 

Table 4: Design Vessel Size 

Vessel Size   LOA (m)  Beam (m)  Draft (m) 

12500 TEU  366.0  50.0   15.0 

16000 TEU  400.0   55.0  16.0 

10.2

10.810.5

10.310.7

11.2 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.7 11.8 12.0 12.1 12.3

8

10

12

14

2015‐16

2016‐17

2017‐18

2018‐19

2019‐20

2020‐21

2021‐22

2022‐23

2023‐24

2024‐25

2025‐26

2026‐27

2027‐28

2028‐29

2029‐30

2030‐31

2031‐32

2032‐33

2033‐34

2034‐35

Liquid Cargo at JNP (MTPA)

Page 12: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  12 

Final Detailed Project Report – Executive Summary March 2016 

1.7 Vessel Traffic 

The total vessel traffic of JNP and MbP expected in the approach channel by 2029‐

30 for the unconstrained scenario and constrained scenarios would be about 6157 

and 5830,  respectively. The ultimate vessel  traffic  for  the unconstrained  scenario 

and constrained scenarios would be about 8130 and 5965, respectively. The year‐

wise total vessel traffic in the approach channel is presented in table below. 

Table 5: Year‐wise Total Vessel Traffic in Approach Channel 

Year  No of Vessels 

MbP  Liquid Cargo ‐JNP 

Unconstrained Container ‐JNP

Constrained Container ‐ JNP

Total ‐ Unconstrained 

Total Constrained

2015‐16  2000  703  2103  2066  4806  4769 

2016‐17  2000  742  2159  2159  4901  4901 

2017‐18  2000  738  2217  2217  4955  4955 

2018‐19  2000  738  2276  2276  5014  5014 

2019‐20  2000  777  2337  2337  5114  5114 

2020‐21  2000  822  2399  2399  5221  5221 

2021‐22  2000  838  2463  2463  5301  5301 

2022‐23  2000  856  2528  2528  5384  5384 

2023‐24  2000  878  2596  2596  5474  5474 

2024‐25  2000  898  2616  2616  5514  5514 

2025‐26  2000  924  2714  2768  5638  5692 

2026‐27  2000  946  2816  2817  5762  5763 

2027‐28  2000  967  2921  2817  5888  5784 

2028‐29  2000  989  3031  2817  6020  5806 

2029‐30  2000  1013  3144  2817  6157  5830 

2030‐31  2000  1027  3262  2817  6289  5844 

2031‐32  2000  1056  3384  2817  6440  5873 

2032‐33  2000  1084  3511  2817  6595  5901 

2033‐34  2000  1117  3615  2817  6732  5934 

2034‐35  2000  1148  3722  2817  6870  5965 

2035‐36  2000  1148  3833  2817  6981  5965 

2036‐37  2000  1148  3946  2817  7094  5965 

2037‐38  2000  1148  4063  2817  7211  5965 

2038‐39  2000  1148  4184  2817  7332  5965 

2039‐40  2000  1148  4308  2817  7456  5965 

2040‐41  2000  1148  4435  2817  7583  5965 

2041‐42  2000  1148  4567  2817  7715  5965 

2042‐43  2000  1148  4702  2817  7850  5965 

2043‐44  2000  1148  4840  2817  7988  5965 

2044‐45  2000  1148  4982  2817  8130  5965 

2045‐46  2000  1148  4982  2817  8130  5965 

2046‐47  2000  1148  4982  2817  8130  5965 

Page 13: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  13 

Final Detailed Project Report – Executive Summary March 2016 

1.8 Channel Design and Alternatives 

1.8.1 Channel Depth 

Four alternatives were considered for determining the channel depth:  

Table 6: Alternatives for Channel Depths 

  Alternative ‐I  Alternative ‐II  Alternative ‐III  Alternative ‐IV 

Design ship Static Draft 

15 m  16 m  15 m  16 m 

Tidal Window  2.2 m  2.2 m  0.76 m  0.76 m 

The channel depths have been calculated making allowances for vertical movement 

due  to  waves,  squat,  sinkage,  siltation,  tidal  window,  etc.  for  each  of  the 

alternatives and are given below. 

Table 7: Channel Depth for Various Alternatives 

Channel Section  Channel Depth (m) wrt CD 

AB  BC  CD  DE  EF 

Alternative I  (‐)15.9  (‐)15.7  (‐)14.9  (‐)14.7  (‐)14.7 

Alternative II  (‐)16.9  (‐)16.7  (‐)15.9  (‐)15.7  (‐)15.7 

Alternative III  (‐)17.3  (‐)17.1  (‐)16.3  (‐)16.1  (‐)16.1 

Alternative IV  (‐)18.4  (‐)18.1  (‐)17.4  (‐)17.1  (‐)17.1 

1.8.2 Channel Width  

  Straight Section 

Based     on      the     selected     allowances      for      the     components     of     approach   

channel width,  the channel width  to be provided  is 9*B, where B  is  the width of 

design vessel. The estimated channel width for various design vessels is presented 

below. 

Table 8: Width of Approach Channel for Various Design Vessels 

Design Vessel  Width (in m)  Estimated width of the Channel 

12500 TEU  50  9 * 50.0 = 450 m 

16000 TEU  59  9 * 59.0 = 531 m ~ 530 m 

As the possibility of two vessels of 16000 TEU size passing each other  is very  less, 

channel width of 450 m is adequate. 

Page 14: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  14 

Final Detailed Project Report – Executive Summary March 2016 

  Channel Bends 

There are two bends in the section C‐D and one in the section D‐E of the approach 

channel to Mumbai harbor and JNP. The width of the channel at bends is presented 

in table below. 

Table 9: Design of Bends for Alternative I to Alternative IV 

Description  Channel Section 

Bend‐1, C‐D  Bend‐2, C‐D  Bend‐3, D‐E 

Curve Angle  35o 29o  27o 

Existing Radius of the bend (m)  3225 m  1955 m  2175 m 

Radius proposed at the bend (m)  3225 m  2536 m  2500 

Channel Width (m)  450  450  450 

Total width of widening (m)  70  100  100 

Total Channel Width (m)  520  550  550 

1.8.3 Anchorage  

The suitability of the existing emergency anchorage to cater to the proposed design 

vessels  is  assessed.  It  is  proposed  to  provide  an  anchorage  area  south  of  JNP 

Channel near Uran Patch for vessels calling at JNP.   

1.8.4 Emergency Anchorage near Karanja 

The  diameter  and  depth  of  the  existing  emergency  are  1160 m  and  (‐)16.5 m, 

respectively. The diameter and depth  requirements of  the emergency anchorage 

for 12500 TEU and 16000 TEU vessels are presented in tables below. 

Table 10: Diameter and Depth of the Emergency Anchorage near Karanja 

  12500 TEU  16000 TEU 

Diameter of Emergency Anchorage (m)  1392  1450.8 

Depth of Anchorage Area (m CD)  (‐) 16.5  (‐) 17.5 

Based  on  the  above  table,  the  diameter  of  the  existing  emergency  anchorage 

should  be  extended  by  260  m  towards  east.  However,  while  dredging  the 

emergency  anchorage  area  earlier,  rock  was  encountered  at  the  corners.  As 

anchoring in rock is not advisable, it is proposed not to increase the dimensions of 

the  emergency  anchorage.  The  design  vessels  can  be  anchored  in  the  outer 

anchorage itself.   

Page 15: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  15 

Final Detailed Project Report – Executive Summary March 2016 

1.8.5 JNP Anchorage near Uran Patch 

It is proposed to provide an anchorage area of 700 m diameter with a depth of (‐) 

11.8 m. This anchorage can cater to 2500‐3000 TEU container vessels. 

1.8.6 Shifting of MbP Anchorage 

Due  to  the  proposed  channel  widening,  the  MbP  anchorages  adjacent  to  the 

approach channel require shifting.  

1.8.7 Preferred Alternative 

A  multi‐criteria  matrix  analysis  was  carried  out  based  on  cost  and  operational 

criteria to select the preferred development alternatives.  

Table 11: Multi‐Criteria Analysis of the Channel Design Alternatives 

 Criteria   Weightage Alt‐I  Alt‐II  Alt‐III   Alt‐IV 

 Operational Criteria   50% 

Width  0.45  3  4  3  4 

Depth  0.45  1  2  3  4 

Length  0.1  4  3  2  1 

Total    2.2  3.0  2.9  3.7 

Cost Criteria   50% 

Soil Dredging Quantity  0.25  4  3  2  1 

Rock Dredging Quantity  0.75  4  3  2  1 

Total    4  3  2  1 

Grand Total    3.1  3  2.5  2.4 

Alternative  I  is  the  most  preferred  alternative  followed  by  Alternative  II. 

Alternatives  III  &  IV  also  entail  very  high  cost  owing  to  all  weather  two  way 

movements  of  design  vessels  and  hence  were  not  considered.  The  proposed 

dimensions  of  the  approach  channel  for  the  selected  alternatives  are  shown  in 

Drawing No. I‐514/JNPT/115. 

Page 16: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  16 

Final Detailed Project Report – Executive Summary March 2016 

1.9 Dredging Volume 

1.9.1 Capital Dredging 

Capital Dredging for Alternative I 

The estimated quantities of capital dredging  for Alternative  I  is 35.03 million cum 

and details of the same are presented in table below. 

Table 12: Estimated Quantity of Capital Dredging: Alternative – I (12500 TEU Vessel and Tidal Window of 2.2 m) 

Channel Section 

Length of the 

Section 

Existing level  (m CD) 

Proposed Design Dredged level 

(m CD) 

Tolerance (m CD) 

Final Proposed Dredged level 

(m CD) 

Quantity of Dredging

(Million cum) 

Soil  Rock  Total 

A‐B  11775  ‐14.2 to ‐15.3 

‐15.9  0.3  ‐16.2  11.33    ‐      11.33 

B‐C  4680  ‐14.2  ‐15.7  0.3  ‐16.0   3.65    ‐      3.65 

C‐D  7980  ‐14.0 to ‐14.6 

‐14.9  0.3  ‐15.2   3.99    0.77    4.76 

D‐E  4365  ‐13.8 to ‐14.9 

‐14.7  0.3  ‐15.0   1.92    0.05    1.96 

E‐F  6690  ‐13.1 to ‐15.5 

‐14.7  0.3  ‐15.0   5.44    0.90    6.35 

Emergency Anchorage Area near Karanja 

  ‐15  ‐16.5    ‐16.5   0.87    0.00    0.87 

JNP Anchorage Area near Uran Patch 

  ‐6  ‐11.5  0.3  ‐11.8   4.12    ‐      4.12 

Shifting of MbP 

Anchorage Area 

    ‐10.5    ‐10.5   1.99    ‐      1.99 

Total  35490    33.30  1.72  35.03

The maximum vessel size that can navigate through the channel without tide after 

dredging the channel to the above‐mentioned depths is 6,000 TEU container vessel. 

Page 17: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  17 

Final Detailed Project Report – Executive Summary March 2016 

Capital Dredging for Alternative II 

The estimated quantities of capital dredging for Alternative II  is 57.70 million cum 

and details of the same are presented in table below. 

Table 13: Estimated Quantity of Capital Dredging: Alternative ‐ II (16000 TEU Vessel and Tidal Window of 2.2 m) 

Channel Section 

Length of the 

Section 

Existing level  (m CD) 

Proposed Design Dredged level 

(m CD) 

Tolerance (m CD) 

Final Proposed Dredged level 

(m CD) 

Quantity of Dredging(Million cum) 

Soil  Rock  Total 

A‐B  11775  ‐14.2 to ‐15.3 

‐16.9  0.3  (‐) 17.2   20.00    ‐      20.00 

B‐C  4680  ‐14.2  ‐16.7  0.3  (‐) 17.0   6.05    ‐      6.05 

C‐D  7980  ‐14.0 to ‐14.6 

‐15.9  0.3  (‐) 16.2   8.49    1.73    10.23 

D‐E  4365  ‐13.8 to ‐14.9 

‐15.7  0.3  (‐) 16.0   3.20    0.15    3.35 

E‐F  6690  ‐13.1 to ‐15.5 

‐15.7  0.3  (‐) 16.0   8.83    2.27    11.10 

Emergency Anchorage Area near Karanja 

  ‐15  ‐16.5    ‐16.5   0.87    0.00    0.87 

JNP Anchorage Area near Uran Patch 

  ‐6  ‐11.5  0.3  ‐11.8   4.12    ‐      4.12 

Shifting of MbP 

Anchorage Area 

    ‐10.5    ‐10.5   1.99    ‐      1.99 

Total  35490    53.54  4.16  57.70

The maximum vessel size that can navigate through the channel without tide after 

dredging the channel to the above‐mentioned depths is 8,000 TEU container vessel. 

1.9.2 Maintenance Dredging 

Maintenance dredging  required  in  the  channel due  to  siltation  is assessed as 6.0 

million cum, which needs to be ascertained by carrying out model studies. 

Page 18: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  18 

Final Detailed Project Report – Executive Summary March 2016 

1.9.3 Dredged Material Management 

Three alternatives can be considered  for the management of dredged material as 

below: 

Confined disposal (Reclamation) 

Beneficial use like brick, paver block etc. 

Off‐shore disposal 

Soft  clay  obtained  during  dredging  cannot  be  used  for  reclamation  and  it  is 

proposed to disposed the same at the existing dumping ground DS‐3. The usage of 

dredged  rock  for  reclamation  involves  multiple  handling  which  increases  the 

dredging  cost  significantly. Disposal of  the dredged  rock at  the dumping grounds 

can be considered on seeking approval from MOEFCC. 

1.9.4 Disposal of Dredged Material  

Four sites viz. DS1, DS2, DS3 & DS4 were identified for disposal of dredge material. 

Each of the dumping sites have an area of about 4 sq.km DS1, DS2, DS3 & DS4 are 

located at 13 km NW, 5km NW, 8.5 km NW and 7.5 km W, respectively  from the 

approach channel.  

It  is  proposed  to  dispose  the material  at DS3.  The  adequacy  of DS3  to  cater  to 

entire volume of dredge material disposal needs to be ascertained based on model 

studies. 

1.9.5 Environmental Aspects 

Environmental Clearance should be obtained  from MOEFCC  to carry out dredging 

of the approach channel. An EIA report comprising of the impact assessment due to 

the proposed project and Environmental Management Plan shall be submitted  to 

MOEF. EIA report shall be prepared by a NABET accredited EIA consultant for ports 

& harbours. 

Page 19: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  19 

Final Detailed Project Report – Executive Summary March 2016 

1.10 VTMS and Navigational Aids 

1.10.1 Navigational Aids 

Two additional channel marker buoys will be required after deepening the channel 

to cater to 15 m draft vessels. Also the existing buoys needs to be repositioned due 

to channel widening. 

1.10.2 VTMS 

The existing VTMS at JNP is adequate and will ensure safe navigation in the channel 

even with the increase in the vessel traffic. 

1.11 Fenders and Bollards 

1.11.1 Fenders 

As per the study carried out by Howe in 2002, the existing fenders at the container 

berths  are  designed  for  85  Tm  energy  and  180  T  force.  As  per  IS:  4651  Part  IV 

(1978), the berthing energy required for 12,500 TEU vessels is about 84 Tm, which 

is within  the  limits. Thus,  the existing  fenders are  suitable  for berthing of 12,500 

TEU container vessels. However, as per IS: 4651 Part IV (2014), the berthing energy 

required  for 12,500 TEU vessels  is about 120 Tm, which  requires  replacement of 

existing fenders. 

1.11.2 Bollards 

As per the study carried out by Howe in 2002, the existing bollards have a capacity 

of 125 T. The wind  force on bollards during operational conditions  is about 104 T 

which  is  less  than  125  T.  The  existing  bollards  are  suitable  in  operational wind 

conditions. The wind force on bollards for 12,500 TEU vessels during extreme wind 

conditions is about 151 T, which is 20% more than the bollard capacity. Hence, the 

larger vessels should not be moored at the berth during storm conditions.  

1.12 Capital Costs 

The  estimated  capital  cost  for  dredging  the  approach  channel  and  emergency 

anchorages  for  Alternatives  I  &  II  are  Rs.  2029  crores  and  Rs.  4182  crores 

respectively.  

Page 20: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  20 

Final Detailed Project Report – Executive Summary March 2016 

A break‐up of various heads of capital cost estimate is presented in table below. 

Table 14: Capital Cost Estimates for Alternatives I & II 

S. No.  Cost Details   Amount (INR in Crores) 

Alternative‐I  Alternative‐II 

1.   Soil Dredging cost for Channel, Shifting of Emergency Anchorage & MbP Anchorage + Soil Dredging cost for JNP Anchorage 

588+87  992+87 

2.  Rock Dredging cost for Channel, Shifting of Emergency Anchorage & MbP Anchorage + Rock Dredging cost for JNP Anchorage 

964+0  2327+0 

3.  Mob / Demob of the Dredging   123  256 

4.  Idle Time Charges for Dredgers  7  7 

5.  Procurement of Navigational Aids + VTMS  9  9 

6.  Consulting Services   6  6 

7.  JNP Administrative Expenditure  2  2 

6.  Environmental Management Plan (EMP)  5  5 

7.  Contingency Cost at 3%  54  111 

  Total  1845  3802 

  Add Interest During Construction (10%)  184  380 

 Grand Total  2029  4182 

The costs mentioned above are exclusive of all taxes and duties. 

1.13 Project Implementation Schedule 

An  optimum  time  frame  recommended  for  carrying  out  the  capital  dredging 

operations for Alternative I and Alternative II is 2 years and 3 years, respectively.   

1.14 Financial Analysis 

1.14.1 PPP Model 

Summary of financial results for PPP Model are presented below. 

Table 14: Summary of Financial Results for PPP Model 

Measure  Results 

Equity IRR  15.11% 

Min. DSCR  2.38 

Min. ISCR  2.15 

Page 21: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  21 

Final Detailed Project Report – Executive Summary March 2016 

The  Equity  IRR  is  15.11%,  which  makes  the  project  desirable  for  PPP 

implementation. However, if there is any downward trend in traffic, the project has 

challenges in sustaining itself.  

1.14.2 Annuity Model 

Summary of financial results for Annuity Model are presented below. 

Table 16: Summary of Financial Results for Annuity Model 

Measure  Results 

Annuity Amount  Rs. 655Cr.

Equity IRR  14.0%

NPV, 12%  Rs. 240.56Cr

Min. DSCR  1.98

JNPT has  to make an annuity payment of Rs. 655 Cr  to generate 14%  IRR  for  the 

developer. Total annuity payment by JNPT over 30 years is Rs. 18,995 Cr.  

The total gain to JNPT from revenue collection over 30 years is Rs. 22,844 Cr. Thus 

the total gain to JNPT over 30 years is Rs. 3,849 Cr. 

1.14.3 Development by JNPT 

In  this case,  the project development shall be  the  responsibility of  JNPT only and 

the entire project development and financial risk is undertaken by JNPT. Summary 

of financial results for development by JNPT are presented below. 

Table 17: Summary of Financial Results for Development by JNPT 

Measure  Results 

Post Tax Project IRR  13.78% 

Post Tax NPV  Rs. 347 Cr 

The IRR is in the desirable range and project is considered worthy of investment. A 

sensitivity analysis  is carried out for various scenarios and the results of the same 

are presented below. 

 

 

Page 22: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  22 

Final Detailed Project Report – Executive Summary March 2016 

Table 18: Results of Sensitivity Analysis 

Results  Best Case Base Case Worst Case 

Project IRR  14.93% 13.78%  12.38% 

Project NPV (Rs. Cr)  Rs. 563 Cr Rs. 347 Cr  Rs. 73.95 Cr 

The IRR touches 14.93% in the best case scenario. The worst case is challenging for 

the project, even then the project IRR is above the threshold of 12%. 

Considering  the  traffic potential,  financial  strengths of  JNPT  and  financial  return, 

implementation of project by JNPT is recommended. 

1.15 Economic Analysis 

The  total economic benefits due  to  channel deepening over 2015‐2045 period  is 

estimated  at  Rs.  15,186  Crores.  A  break  up  of  the  various  economic  benefits  is 

presented in table below. 

Table 19: Total Economic Benefits 

Type  Amount (Rs. Cr) 

Due to savings in Vessel time  6,775 

Due to Avoidance of Transshipment  4,287 

Due to Income Tax from SPV  2,774 

Due to Direct Employment Generation  1,350 

Total  15,186  

Taking into account the total project cost of Rs. 2029 Crores, the economic benefits 

of  the  project  is  7.5  times  higher.  The  overall  economic  rate  of  return  on 

investment is 21.37%.  

1.16 Conclusion 

Conclusions of the present study are as follows: 

Considering  that  infrastructure  at  JNP will  be  limited  to  development  of  4th 

container terminal, container traffic potential at JNP would be 8.37 MTEUsPA 

with the existing channel dimensions, which would increase to 10.05 MTEUsPA 

with proposed Phase II channel deepening. 

The total vessel traffic of JNP and MbP expected  in the approach channel will 

increase from 4769 in 2015‐16 to 5830 in 2029‐30.  

Page 23: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  23 

Final Detailed Project Report – Executive Summary March 2016 

Design vessel  recommended  for design of Phase  II channel  is 12500 TEU size 

container vessel with a draft of 15 m and the  infrastructure planning shall be 

carried out with a design vessel of 12500 TEU.  

The estimated channel width for 12500 TEU design vessel is 450 m.  

The  depths  required  for  12500  TEU  design  vessel  to  navigate  in  various 

sections of the channel, with a tidal advantage of 2.2 m are as follows.  

Channel Section 

Section Length (m) Proposed Channel Depth (m) Existing  Proposed 

A‐B  9775  11775  ‐15.9 

B‐C  4680  4680  ‐15.7 

C‐D  7980  7980  ‐14.9 

D‐E  4365  4365  ‐14.7 

E‐F  6690  6690  ‐14.7 

Total  33490  35490   

The maximum vessel size  that can navigate  through  the channel without any 

tidal advantage after dredging the channel to above‐mentioned depths is 6000 

TEU container vessel. 

Existing  fenders  at  the  container  berths  in  JNP  are  suitable  for  berthing  of 

12,500 TEU vessels as per old codal provisions, but require replacement as per 

new codal provisions. 

Existing  bollards  at  the  container  berths  in  JNP  are  suitable  for mooring  of 

12,500  TEU  vessels  in  operational  conditions.  During  extreme  conditions 

(storms), wind forces on bollards are more and 12,500 TEU vessels cannot be 

moored at the berths. 

Considering a dredging tolerance of 0.3 m, the estimated quantities of capital 

dredging  for  Phase  II  channel widening  and  deepening  is  35.03 million  cum 

(33.3 million cum in soil and 1.73 million cum in rock).  

Maintenance dredging  required  in  the channel due  to  siltation  is assessed as 

6.0 million cum, which needs to be ascertained by carrying out model studies. 

It is proposed to dispose the dredge material at DS3.  

The estimated capital cost for proposed Phase II dredging is Rs. 2029 crores.  

An optimum  time  frame  recommended  for  carrying out  the  capital dredging 

operations is 2 years.   

Page 24: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

      

   

Deepening and Widening of Mumbai Harbour Channel and JN Port Channel (Phase II)  24 

Final Detailed Project Report – Executive Summary March 2016 

Soft  clay  obtained  during  dredging  cannot  be  used  for  reclamation  and  it  is 

proposed to dispose the same at the existing dumping ground DS‐3.  

Usage  of  dredged  rock  for  reclamation  involves  multiple  handling  which 

increases  the dredging cost  significantly. Disposal of  the dredged  rock at  the 

dumping grounds can be considered on seeking approval from MOEFCC. 

Results of financial analysis are as follows:  

o PPP Model – The Equity IRR  is 15.11%, which makes the project desirable 

for  PPP  implementation.  However,  if  there  is  any  downward  trend  in 

traffic, the project has challenges in sustaining itself.  

o Annuity Model  ‐  The  annuity  payment  by  JNPT  should  be  Rs.  655  Cr  to 

generate 14.0% IRR for the developer. The total annuity payment by JNPT 

is 18,995 Cr and total gain to JNPT from revenue collection over 30 years is 

Rs. 22,844 Cr. Thus the total net gain to JNPT over 30 years is Rs. 3,849 Cr.  

o Development by  JNPT  ‐ For  the project  to be  implemented by  JNPT,  the 

Capital Cost of the Project shall be Rs. 2029 Cr.  The Post Tax Project IRR is 

13.78% & Post Tax NPV is Rs. 374 Cr at 12%.  

There  is  not  much  difference  in  the  results  of  all  three  financial  models. 

Considering  the  traffic  potential,  financial  strengths  of  JNPT  and  financial 

return, implementation of project by JNPT is recommended. 

The total economic benefit due to channel deepening over 2015‐2045 period is 

estimated  at  Rs.  15,186  Cr.,  which  is  7.5  times  higher  than  project 

development  cost  (Rs.  2029  Cr.).  The  overall  economic  rate  of  return  on 

investment is 21.37%. 

The following additional studies shall be carried out: 

o Updating the Flow Model and Siltation Studies  

o Sediment Dispersion Studies at the Identified Disposal grounds 

o Ship Navigation Simulation Studies  

o EIA study for seeking approval from MoEF 

 

   

Page 25: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo

 

 

 

 

 

 

 

 

 

DRAWINGS  

 

 

 

 

 

 

 

Page 26: JAWAHARLAL NEHRU PORT TRUSTenvironmentclearance.nic.in › writereaddata › Online › ... · Jawaharlal Nehru Port (JNP) is one of the twelve major ports of India and has a cargo