01/1998
Jason Davenport
10 Lakeview Drive Thornlands, Brisbane Queensland 4164
(H) 32863252 (C) 0418760894 (E) [email protected]
Proactive Site Supervisor experienced in coordinating a variety of construction
teams and projects. Successful in creating effective communication between client, personnel, general contractors and the management team. Diligent in consistently
monitoring sites to ensure proper compliance with Safety, Environment, Quality, cost.
Certificate IV Civil Construction OHSCER204A Operate a Skid
Supervision Steer Loader
Certificate IV Frontline OHSCER205A Operate an
Management Excavator
Certificate III Elevated Work Platforms (11
Bricklaying/Bricklaying Metres and over)
Certificate III Civil Construction HLFA301B Apply First Aid
Plant Operation
Held a 95% success rate on assigned projects, many over lapping, sharing resources
and staff.
Trained and mentored over 30 construction workers, general laborers and
apprentices in the final 2 years.
Supervised installation of sections of new and refurbished plant, in a live Refinery
including foundations, parking lots, new village and tank farm.
Led the construction of a 1/3 of the BP Refinery at the time of it's close and worked
as a tradesman on the other 1/3.
06/2015 A.Dart & Co. - Brisbane, Queensland
8 years as Site Supervisor
Stayed consistent with project schedules and plans for all earthworks, foundations,
sewers, pipelines, re-fits, demo's, refractory, and chemical treatments (masonry).
Trained the Supervisors, Leading hands, Tradesmen/Operators on site procedures,
quality standards and project-specific systems.
Assigned projects and tasks to employees based on their competencies and
specialties.
Performed construction site pre-inspections and coordinated post-construction
audits.
Accurately provided status information on project progress to the project
management.
Efficiently recorded and rejected incorrect deliveries of material to site.
Monitored the safety of all construction activities, making on-site personnel safety
Summary
Highlights
Accomplishments
Experience
-
07/2015 - 03/2016
03/2016 - 07/2016
Education
2015
2014
2008
the top priority.
Acted as the liaison with company safety representatives to promote awareness and
understanding of safety protocols.
Coordinated training for the construction teams on site-specific requirements,
techniques and procedures.
Assisted the project manager with bidding new jobs and projects.
Properly maintained all on site equipment and vehicles. Tracking expenditure and
Servicing in order to maintain continuity of works.
Liased with the Client and Management with issues, progress, reports, and field
inspections.
I demonstrated a self drive and determination in the many roles with A.Dart.
starting as a Tradesman turning my hand to many disciplines. In a short time a
Foreman/Leading hand completing works to a high standard, on time, on budget.
Finally for the last 8 years, a Supervisor running many projects and contractor's.
A.Dart & Co. - Brisbane, Queensland
Supervisor Coogee Chemicals Hypoclor plant & O-I Glass Projects
I returned to A.Dart, to Supervise staff, contractors and lease with the client. During
this time we had contractors ranging from Roofers, Plumbers, Concreters,
Carpenters, Machine operators, Painters, Bricklayers, Electrical, Structural
Steel etc. working under the A.Dart Banner. I took care of the Safety, Quality and
Environment to the same standard as we had for the Refinery. The project ran well,
delivering on time to the standard the client had come to expect from A.Dart and
Co. Through this we were able to deliver many extra's after the completion of the
original contract.
Constructive Recruitmant/ADCO Constructions - Brisbane, Queensland
Site Foreman Aviation Australia Project
Aviation Australia Project at Brisbane airport south, for 4 month. On site I Started
working on completion works exterior with contractors, these included pavement,
car parks, underground services (drainage, electrical, plumbing), cladding, block
walls, glassing and painting. As the project progressed working with internal fit out
contractors. I stayed at the end of the base build to aid moving forward with the
defects. While on site Reporting directly to Paul Brownlie Site Manager, and
Project Manager John Porst. During my time on site I have provided, trade skill,
knowledge, and supervisory experience to aid with completion of the project.
Global Training Institute - Brisbane, Queensland, Australia Certificate IV Civil Constuction Management: Civil Construction Supervision
Face to Face Training - Brisbane, Queensland, Australia
Certificate III Civil Construction Plant operationd: Civil Construction Plant Operations
S/T Construction Techniques - Brisbane, Queensland, Australia
Certificate III Bricklaying/Blocklaying: Bricklaying/Bricklaying
Completed incomplete modules for Certificate.
2004
1996
1996
2015
2000
S/T Construction Techniques - Brisbane, Queensland, Australia Certificate III General Construction: General Construction
Logan Institute of TAFE - Brisbane, Queensland, Australia
Occupational Health and Safety & Quality Concepts: Certificate in Applied
Science
Logan Institute of TAFE - Brisbane, Queensland, Australia NBB009 Welding and Thermal Cutting: Diploma of Engineering
Global Training Institute - Brisbane, Queensland, Australia Certificate IV Frontline Management: Frontline Managment
S/T Construction Techniques - Brisbane, Queensland, Australia Certificate II Bricklaying/Blocklaying: Bricklaying/Bricklaying