CONTRACTOR
SUNKOTA CONST. MIDWEST DEMOLITION ALL STATES CONCRETE CUTTINGHCC
Bid Bond Present? YES YES YES YES
Addenda Noted: 12345 12345 12345 12345
Base Bid 100,000.00$ 55,900.00$ 79,323.86$ 81,700.00$
Modification (43,500.00)$
Total 56,500.00$
Alt #1: Geothermal &
Mechanical System Revisions0 0 0 0
Modification 0
Total
Alt #2: Stand Alone O2
Building0 0 0 0
Modification 0
Total
Alt #3: Polished Concrete
Floor Finishes0 0 0 0
Modification 0
Total
SUMMARY / NOTES
756 PP BOND 1450 PP BOND 2400 PP BOND 735 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Package 1.2A - Interior DemolitionBid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
OSE Project #C1215-12X --- HCC Project #19040
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
CONTRACTOR
RUNGE ENTERPRISES SUKUP CONSTRUCTION FIRST RATE EXCAVATE
Bid Bond Present? YES YES YES
Addenda Noted: 12345 12345 12345
Base Bid 198,000.00$ 595,700.00$ 340,000.00$
Modification 27,000.00$
Total 367,000.00$
Alt #1: Geothermal &
Mechanical System Revisions0 0 0
Modification
Total
Alt #2: Stand Alone O2
Building14,000.00$ 19,000.00$ 19,000.00$
Modification 1,600.00$
Total
Alt #3: Polished Concrete
Floor Finishes0 0 0
Modification 0
Total
SUMMARY / NOTES
1980 PP BOND 6147 PP BOND 7200 PP BOND ADD 550 IN MOD
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.2B - Sitework, Exterior Demolition, & Utilities
CONTRACTOR
A PLUS CONCRETE D&G CONCRETE CONST. BIG AL'S CONCRETE A & S BECK & HOFER CONST.
Bid Bond Present? NO YES YES YES YES
Addenda Noted: 12345 12345 12345 12345 12345
Base Bid 45,000.00$ 94,298.00$ 108,878.45$ -$ 100,000.00$
Modification -$ -$
Total 100,000.00$
Alt #1: Geothermal &
Mechanical System Revisions0 0 0 100000
Modification 0 -100000
Total 0
Alt #2: Stand Alone O2
Building900.00$ 3,200.00$ 6,800.00$ 100,000.00$
Modification 2,800.00$ -100000
Total -$
Alt #3: Polished Concrete
Floor Finishes1,500.00$ -$ -$ 100,000.00$
Modification -$ -100000
Total -$
SUMMARY / NOTES
1150 PP BOND 800 PP BOND + 30 IN MOD 3000 PP BOND REJECTED 1000 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.2C - Site Concrete
CONTRACTOR
AMERICAN FENCE CO DAKOTA FENCE CO
Bid Bond Present? YES YES
Addenda Noted: 12345 12345
Base Bid 37,427.00$ 106,393.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES
475 PP BOND 873 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.2D - Temporary & Permanent Fencing & Razor Wire
CONTRACTOR
ASCO
Bid Bond Present? YES
Addenda Noted: 12345
Base Bid 90,000.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
900 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.2E - Slope Stabilization
CONTRACTOR
BX CIVIL CONSTRUCTION
Bid Bond Present? NO
Addenda Noted: 12345
Base Bid 22,750.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
225 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.2F - Guardrailing
CONTRACTOR
LYNDE CONSTRUCTION APLUS CONSTRUCTION A&S CONCRETE HCC BECK & HOFER
Bid Bond Present? YES YES YES YES YES
Addenda Noted: 12345 12345 12345 12345 12345
Base Bid 182,200.00$ 132,750.00$ -$ 148,300.00$ 300,000.00$
Modification (180,000.00)$
Total 120,000.00$
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$ 300,000.00$
Modification (300,000.00)$
Total -$
Alt #2: Stand Alone O2
Building9,200.00$ 9,500.00$ 10,129.00$ 300,000.00$
Modification (290,000.00)$
Total 10,000.00$
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ 300,000.00$
Modification (300,000.00)$
Total -$
SUMMARY / NOTES
3733 PP BOND 3000 PP BOND
REJECTED. DIDN’T USE BID
FORM 1335 PP BOND 3000 PP BOND MINUS 1800
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.3A - Concrete Foundations & Interior Slabs
CONTRACTOR
DESIGN CRETE INC. DIAMOND FLOOR SOLUTIONS
Bid Bond Present? NO
Addenda Noted: 12345 123456 12345 12345 12345
Base Bid 34,770.00$ 30,000.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes14,130.00$ 19,950.00$
Modification
Total
SUMMARY / NOTES
1043.10 PP BOND NO VALUE
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.3B - Burnished/ Polished Concrete
CONTRACTOR
FABCON PRECAST HCC
Bid Bond Present? YES YES
Addenda Noted: 12345 12345 12345 12345
Base Bid 281,485.00$ 454,880.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES EXCEPTIONS LISTED 3518 PP
BOND 4094 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.3C - Precast Structural Concrete
CONTRACTOR
M&L MASONRY WALTER REE MASONRY
Bid Bond Present? YES YES
Addenda Noted: 12345 12345
Base Bid 81,900.00$ 114,473.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES
2500 PP BOND
2290 PP BOND - EXCLUSIONS
NOTED
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.4 - Masonry
CONTRACTOR
P&M STEEL EGGER STEEL CO INTEGRITY STEEL
Bid Bond Present? YES YES YES
Addenda Noted: 12345 12345 12345
Base Bid 100,177.10$ 102,453.00$ 95,939.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$
Modification
Total
Alt #2: Stand Alone O2
Building100.11$ 365.00$ 225.00$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$
Modification
Total
SUMMARY / NOTES
351 PP BOND
450 PP BOND - EXCLUSIONS
LISTED
691 PP BOND. LIST OF
INCLUSIONS AND EXCLUSIONS
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.5A - Structural & Miscellaneous Metals (Furnish)
CONTRACTOR
HCC
Bid Bond Present? YES
Addenda Noted: 12345
Base Bid 80,762.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
727 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.5B - Structural & Miscellaneous Metals (Install)
CONTRACTOR
SUNKOTA CONST. VISIONS CONST HCC
Bid Bond Present? YES YES YES
Addenda Noted: 12345 12345 12345
Base Bid 300,000.00$ 500,000.00$ 113,400.00$
Modification (83,300.00)$ (416,700.00)$
Total 216,700.00$ 83,300.00$ 113,400.00$ -$
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$
Modification -$ -$
Total
Alt #2: Stand Alone O2
Building-$ -$ -$
Modification -$ -$
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$
Modification -$ -$
Total
SUMMARY / NOTES 3240 PP BOND - 983 DEDUCT
IN MOD
15000 PP BOND - 13800 IN
MOD 1021 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.6A - Carpentry, OFCI Items, Lockers, Specialties Installation
CONTRACTOR
HCC PATZER WOODWORKING MALONEY INC.
Bid Bond Present? NO NO NO
Addenda Noted: 12345 12345 12345
Base Bid 35,200.00$ 25,710.00$ 33,457.68$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES
0 PP BOND
643 PP BOND -
INCLUSIONS/EXCLUSIONS
LIST OF INCLUSIONS AND
EXCLUSIONS. 1003.74 PP
BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.6B - Casework & Countertops (Furnish)
CONTRACTOR
ARS A TECTA AMERICA CO MJ DALSIN
GUARENTEE ROOFING &
SHEETMETAL
Bid Bond Present? YES YES YES
Addenda Noted: 12345 12345 12345
Base Bid 110,460.00$ 152,106.00$ 119,869.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$
Modification
Total
Alt #2: Stand Alone O2
Building6,415.00$ 4,000.00$ 4,682.00$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$
Modification
Total
SUMMARY / NOTES
1105 PP BOND 1521 PP BOND 1199 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.7A - Roofing, Sheetmetal, Gutters & Downspouts
CONTRACTOR
JONES CAULKING
Bid Bond Present? NO
Addenda Noted: 12345
Base Bid 30,975.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
0
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.7B - Joint Sealants
CONTRACTOR
OLYMPIC CO. STRUCTURAL APPLICATORS
Bid Bond Present? YES YES
Addenda Noted: 12345 12345
Base Bid 74,840.00$ 69,990.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
EXCLUSION LISTED 750 PP
BOND. VOLUNTARY
ALTERNATE DEDUCT 15100
FROM THIS BID IF GIVEN TWO
PACKAGES 1750 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.7C - Spray-Applied Fireproofing
CONTRACTOR
BUILDERS SUPPLY CO
KENDELL DOOR AND
HARDWARE
Bid Bond Present? YES YES
Addenda Noted: 12345 12345
Base Bid 105,760.00$ 79,772.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification (745.00)$
Total (745.00)$
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES LIST OF INCLUSIONS AND
EXCLUSIONS 370 PP BOND 200 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.8A - Doors, Frames, Hardware (Furnish)
CONTRACTOR COMBIND BUILDING
SPECIALTIES
Bid Bond Present?
Addenda Noted: 12345
Base Bid
5640 NON FIRE RATED 18411
FIRE RATED
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
41 PP BOND 133 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.8B - Access Panel Doors & Frames (Furnish)
CONTRACTOR SKOLD SPECIALTY
CONTRACTING OVERHEAD DOOR CO.
Bid Bond Present? NO
Addenda Noted: 12345
Base Bid 9,200.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
0 PP BOND JAMES WILL VERIFY
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.8C - Overhead Coiling Door
CONTRACTOR
HEARTLAND GLASS CO D&G VIKING GLASS
Bid Bond Present? NO YES
Addenda Noted: 1234 1234
Base Bid 36,330.00$ 81,750.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES
425 PP BOND 1230 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.8D - Glass and Glazing Systems
CONTRACTOR CORNERSTONE DETENTION
PRODUCTS
Bid Bond Present? YES
Addenda Noted: 12345
Base Bid 598,500.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building4,450.00$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
7482 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.8E - Detention Doors, Frames, Hardware (Furnish and Install)
CONTRACTOR
FOX DRYWALL AND PLASTER GJP OLYMPIC COMPANIES SANDS DRYWALL CORNERSTONE DRYWALL
Bid Bond Present? YES YES YES YES YES
Addenda Noted: 12345 12345 12345 12345 12345
Base Bid 500,000.00$ 400,000.00$ 216,400.00$ 500,000.00$ 598,656.00$
Modification (235,000.00)$ (81,350.00)$ (242,280.00)$
Total 265,000.00$ 318,650.00$ 216,400.00$ 257,720.00$ 598,656.00$
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$ -$ -$
Modification -$ -$ -$ -$
Total -$ -$ -$
Alt #2: Stand Alone O2
Building1,000.00$ -$ 2,680.00$ 6,000.00$ 6,000.00$
Modification (2,500.00)$ -$ (1,310.00)$
Total (1,500.00)$ 2,680.00$ 4,690.00$
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ -$ -$
Modification -$ -$ -$ -$
Total 0 0 0 0
SUMMARY / NOTES 7200 PP BOND MINUS 3380
FROM MOD
5760 PP BOND. LIST OF
EXCLUSIONS MINUS 1165
FROM PP BOND
2170 PP BOND, LIST OF
CLARIFICATIONS
6080 PP BOND MINUS 2950 IN
MOD 8980 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.9A - Drywall Systems
CONTRACTOR
ACCOUSTICAL TILE LLC
Bid Bond Present? NO
Addenda Noted: 12345
Base Bid 7,590.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
227.70 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.9B - Acoustical Ceilings
CONTRACTOR COMMERCIAL INTERIOR
DECORE
Bid Bond Present? NO
Addenda Noted: 12345
Base Bid 26,000.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$
Modification
Total
Alt #2: Stand Alone O2
Building-$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$
Modification
Total
SUMMARY / NOTES
195 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.9C - Stainless Steel Base (Furnish and Install)
CONTRACTOR
PIVOT COMPANIES VALHALLA PAINTING LLC MOXIE SERVICES INC FISCHENICH PAINTING
Bid Bond Present? CASHIERS CHECK 5% CASHIERS CHECK 5% NOT REQUIRED CASHIERS CHECK 5%
Addenda Noted: 12345 12345 12345 12345
Base Bid 152,937.00$ 66,960.00$ 48,000.00$ 112,500.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ 1,400.00$ -$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ -$
Modification
Total
SUMMARY / NOTES 0 PP BOND, LIST OF
INCLUSIONS 0 PP BOND,
1920 PP BOND. LIST OF
INCLUSIONS 3600 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.9D - Painting & Coatings
CONTRACTOR
BUILDER SUPPLY CO
COMBIND BUILDING
SPECIALTIES
Bid Bond Present? NO NO
Addenda Noted: 12345 12345
Base Bid 6,842.63$ 7,823.00$
Modification
Total
Alt #1: Geothermal &
Mechanical System Revisions-$ -$
Modification
Total
Alt #2: Stand Alone O2
Building-$ -$
Modification
Total
Alt #3: Polished Concrete
Floor Finishes-$ -$
Modification
Total
SUMMARY / NOTES
0 PP BOND 57 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.10 - Specialties (Furnish)
CONTRACTOR ABSOLUTE FIRE PROTECTION
LLC BUILDING SPRINKLER INC. HOWE FIRE PROTECTION SERVICE FIRST FIRE SPRINKLER TOTAL FIRE PROTECTION
MIDWESTERN MECH. FIRE
PROTECTION
Bid Bond Present? YES YES YES YES YES YES
Addenda Noted: 12345 12345 12345 12345 12345 12345
Base Bid 65,000.00$ 55,950.00$ 100,000.00$ 58,400.00$ 88,000.00$ 100,000.00$
Modification (55,580.00)$ (38,000.00)$
Total 44,420.00$
Alt #1: Geothermal &
Mechanical System Revisions-$ -$ -$ -$ -$
Modification
Total
Alt #2: Stand Alone O2
Building500.00$ 9,500.00$ 25,000.00$ 7,900.00$ 10,000.00$ 10,000.00$
Modification -$ (18,660.00)$
Total 6,340.00$
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ -$ -$ -$
Modification
Total
SUMMARY / NOTES
6500 PP BOND 966 PP BOND 1100 PP BOND DEDUCT 540 600 PP BOND 1000 PP BOND 1000 PP BOND
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.15A - Fire Protection
CONTRACTOR
MIDWESTERN MECHANICAL HOWE INC. PRAIRIE SONS
HANDER PLUMBING AND
HEATING REDLINGER BROTHERS KRIER AND BLAIN
Bid Bond Present? YES YES YES YES YES YES
Addenda Noted: 12345 12345 12345 12345 12345 12345
Base Bid 500,000.00$ 1,000,000.00$ 1,000,000.00$ 1,500,000.00$ 1,500,000.00$ 1,500,000.00$
Modification 22,630.00$ (258,450.00)$ (458,400.00)$ (806,290.00)$ (768,000.00)$ (963,640.00)$
Total 522,630.00$ 741,550.00$ 541,600.00$ 693,710.00$ 732,000.00$ 536,360.00$ -$ -$
Alt #1: Geothermal &
Mechanical System Revisions100,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 400,000.00$ -$
Modification 104,280.00$ (129,900.00)$ (281,000.00)$ (335,000.00)$ (124,400.00)$ 282,300.00$
Total 204,280.00$ 370,100.00$ 219,000.00$ 165,000.00$ 275,600.00$ 282,300.00$ -$ -$
Alt #2: Stand Alone O2
Building100,000.00$ 200,000.00$ 10,000.00$ 50,000.00$ 100,000.00$ -$
Modification (79,400.00)$ (178,645.00)$ -$ (21,690.00)$ (81,250.00)$ 14,980.00$
Total 20,600.00$ 21,355.00$ 10,000.00$ 28,310.00$ 18,750.00$ 14,980.00$ -$ -$
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ -$ -$ -$
Modification -$ -$ -$ -$ -$ -$
Total
SUMMARY / NOTES
6000 PP BOND MINUS 1500 11000 PP BOND MINUS 2250
1.8% OF CONTRACT AMT. ADD
9930 PER MOD
14000 PP BOND MINUS 7000
PER MOD 12000 PP BOND MINUS 6000 15000 PP BOND MINUS 9630
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.15B - Plumbing
CONTRACTOR
BAETE FORSETH KRIER AND BLAIN PRAIRIE SONS HVAC HOWE INC. HVAC TESSIERS INC.
Bid Bond Present? YES YES NO YES YES
Addenda Noted: 12345 12345 12345 12345 12345
Base Bid 500,000.00$ 1,500,000.00$ 1,000,000.00$ 500,000.00$ 800,000.00$
Modification 144,955.00$ (864,400.00)$ (358,050.00)$ 123,010.00$ (128,000.00)$
Total 644,955.00$ 635,600.00$ 641,950.00$ 623,010.00$ 672,000.00$ -$ -$ -$
Alt #1: Geothermal &
Mechanical System Revisions10,000.00$ -$ 100,000.00$ 500,000.00$ 100,000.00$
Modification 123,300.00$ 151,400.00$ 46,750.00$ (358,006.00)$ 71,500.00$
Total 133,300.00$ 151,400.00$ 146,750.00$ 141,994.00$ 171,500.00$ -$ -$ -$
Alt #2: Stand Alone O2
Building10,000.00$ -$ -$ 500,000.00$ -$
Modification 540.00$ 1,250.00$ 10,450.00$ (483,090.00)$ 27,300.00$
Total 10,540.00$ 1,250.00$ 10,450.00$ 16,910.00$ 27,300.00$ -$ -$ -$
Alt #3: Polished Concrete
Floor Finishes-$ -$ -$ -$ -$
Modification -$ -$ -$ -$ -$
Total -$ -$ -$ -$ -$ -$ -$ -$
SUMMARY / NOTES
5000 PP BOND ADD 1500 15000 PP BOND MINUS 8640
1.8% OF CONTRACT AMT ADD
11775 PER MOD 5500 PP BOND PLUS 730 4000 PP BOND MINUS 600
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.15C - HVAC
CONTRACTOR
ELECTRIC CONSTRUCTION ELECTRIC SUPPLY CO. THOMPSON ELECTRIC MUTH ELECTRIC
Bid Bond Present? YES YES YES YES
Addenda Noted: 12345 12345 12345 12345
Base Bid 500,000.00$ 1,000,000.00$ 750,000.00$ 1,000,000.00$
Modification 32,080.00$ (276,000.00)$ (190,050.00)$ (374,744.00)$
Total 532,080.00$ 724,000.00$ 559,950.00$ 625,256.00$ -$ -$ -$ -$
Alt #1: Geothermal &
Mechanical System Revisions15,000.00$ 25,000.00$ 10,000.00$ 100,000.00$
Modification (4,559.00)$ (11,500.00)$ 375.00$ (87,548.00)$
Total 10,441.00$ 13,500.00$ 10,375.00$ 12,452.00$ -$ -$ -$ -$
Alt #2: Stand Alone O2
Building10,000.00$ 50,000.00$ 20,000.00$ 100,000.00$
Modification 3,624.00$ (30,000.00)$ (2,000.00)$ (85,435.00)$
Total 13,624.00$ 20,000.00$ 18,000.00$ 14,565.00$ -$ -$ -$ -$
Alt #3: Polished Concrete
Floor Finishes-$ -$ 10,000.00$ -$
Modification -$ -$ (7,000.00)$ -$
Total 3,000.00$
SUMMARY / NOTES 10% OF CONTRACT AMT ADD
3925 7650 PP BOND MINUS 1738 5000 PP BOND MINUS 914 10000 PP BOND MINUS 4623
***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of
Corrections.***
Bid Date: Wednesday, April 15th, 2020
10:00 AM CT
Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD
Prepared by: James McMahon (Project Manager) - Henry Carlson Construction
OSE Project #C1215-12X --- HCC Project #19040
Bid Package 1.16 - Electrical and Low Voltage