James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc. (1) EDUCATION Purdue University, West Lafayette, IN M. S., Civil Engineering (Geotechnical Emphasis), 1987 University of Rhode Island, Kingston, RI B. S., Civil and Environmental Engineering, 1985 PROFESSIONAL REGISTRATION Rhode Island, Connecticut, Illinois, Indiana, Louisiana, Massachusetts, New York, Ohio, Pennsylvania, and Wisconsin PROFESSIONAL EXPERIENCE RT Group, Inc. Co-Founder and Principal, 2002 – Present Pare Engineering Corporation Managing Engineer, 1997 – 2002 CH2M HILL Senior Project Manager, 1995 – 1997 Project Manager, 1989 – 1995 Task Manager, 1987 – 1989 Rhode Island Department of Environmental Management, Summer Intern 1985 Mr. Russell has over 26 years of experience on a wide variety of civil, geotechnical, and environmental engineering projects. His expertise includes deep and shallow foundations, retaining walls, earth and masonry dams, temporary sheeting and shoring, marine/waterfront improvements, ground improvement, and conducting geotechnical investigations and preparing geotechnical data/design study reports for heavy civil, industrial, and major transportation related projects. Representative project experience includes: Dam Engineering YMCA of Pawtucket, Quidnick Reservoir Dam Inspection Report: Project Manager for preparing an inspection report for this earth embankment dam. Responsibilities included completing a RIDEM file review of relevant project information; visually inspecting the dam, including performing a survey of all deficiencies; and preparing the Visual Inspection Report. Coventry, RI. Hugo Key & Sons, Inc., Featherbed Dam Dewatering, Flow Diversion, and SOE Plan: Project Manager for preparing contractor submittals for improvements made to this earth and masonry dam. The dewatering, flow diversion, and support of excavation plans that were prepared allowed the contractor to replace the existing stone masonry culvert with pre-cast box culverts and to reconstruct the municipal roadway travelling across the crest of the dam. North Kingstown, RI.

James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

  • Upload
    vandat

  • View
    215

  • Download
    1

Embed Size (px)

Citation preview

Page 1: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(1)

EDUCATION

Purdue University, West Lafayette, IN M. S., Civil Engineering (Geotechnical Emphasis), 1987 University of Rhode Island, Kingston, RI B. S., Civil and Environmental Engineering, 1985

PROFESSIONAL REGISTRATION

Rhode Island, Connecticut, Illinois, Indiana, Louisiana, Massachusetts, New York, Ohio, Pennsylvania, and Wisconsin

PROFESSIONAL EXPERIENCE

RT Group, Inc. Co-Founder and Principal, 2002 – Present Pare Engineering Corporation Managing Engineer, 1997 – 2002 CH2M HILL Senior Project Manager, 1995 – 1997 Project Manager, 1989 – 1995 Task Manager, 1987 – 1989 Rhode Island Department of Environmental Management, Summer Intern 1985

Mr. Russell has over 26 years of experience on a wide variety of civil, geotechnical, and environmental engineering projects. His expertise includes deep and shallow foundations, retaining walls, earth and masonry dams, temporary sheeting and shoring, marine/waterfront improvements, ground improvement, and conducting geotechnical investigations and preparing geotechnical data/design study reports for heavy civil, industrial, and major transportation related projects. Representative project experience includes:

Dam Engineering

YMCA of Pawtucket, Quidnick Reservoir Dam Inspection Report: Project Manager for preparing an inspection report for this earth embankment dam. Responsibilities included completing a RIDEM file review of relevant project information; visually inspecting the dam, including performing a survey of all deficiencies; and preparing the Visual Inspection Report. Coventry, RI.

Hugo Key & Sons, Inc., Featherbed Dam Dewatering, Flow Diversion, and SOE Plan: Project

Manager for preparing contractor submittals for improvements made to this earth and masonry dam. The dewatering, flow diversion, and support of excavation plans that were prepared allowed the contractor to replace the existing stone masonry culvert with pre-cast box culverts and to reconstruct the municipal roadway travelling across the crest of the dam. North Kingstown, RI.

Page 2: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(2)

Town of Chaplin, Darling Pond Dam Improvements Project: Project Manager for the design

of improvements to this 250-foot-long earth embankment dam. Responsible for preparing a Visual Inspection Report; performing a topographic survey; completing design and permitting; and preparing plans and specifications for bidding and construction. This project included retro-fitting the existing pre-cast drop-inlet type structure for use as a low-level outlet structure; installing a new primary box culvert spillway; flattening the upstream and downstream slopes of the dam; and armoring the upstream slope. Chaplin, CT.

City of Providence, Canada Pond Dam Alternatives Evaluation Report: Project Manager for

preparing an Alternatives Evaluation Report of this 340-foot-long concrete retaining wall and earth embankment dam. The work included performing a topside visual inspection; observing an underwater dive inspection; concrete coring; soil test holes; and preparing the Alternatives Evaluation Report. Providence, RI.

NATCO, Arctic Dam Hydroelectric Facility, Emergency Action and Safety Plans: Project

Manager for preparing the Emergency Action Plan (EAP), Owner’s Dam Safety Program (ODSP), Dam Safety Surveillance Monitoring Plan (DSSMP), and Dam Safety Surveillance and Monitoring Report (DSSMR) for FERC review and approval. West Warwick, RI.

NATCO, Arctic Dam Hydroelectric Facility, Spillway and Toe Repairs Project: Project

Manager for preparing plans and specifications for bidding and construction of spillway and toe repairs following the March 2010 flooding. The repairs included rebuilding collapsed sections of the downstream masonry training walls, repairing the spillway masonry; and installing a new grouted riprap apron with an underdrain. Coordinated with FERC and RIDEM for making the repairs; reviewed Contractor’s submittals, and provided construction observation services. West Warwick, RI.

NATCO, Arctic Dam Hydroelectric Facility, March 2010 Flood Response: On site Project

Manager during the March 2010 flooding (500-year event). Responsible for coordinating with local and state EMA, RIDEM, and FERC regarding the protection of the left and right abutments of the dam. Also coordinated with the site contractors retained by NATCO for the removal of the timber flashboards and debris and for the placement of sand bags to prevent the abutments from overtopping. West Warwick, RI.

NATCO, Arctic Dam Hydroelectric Facility, FERC Part 12D Report: Project Manager and

Independent Consultant for conducting the FERC Part 12D Safety Inspection of this 478 KW Hydroelectric Facility. Prepared for and attended the PFMA Site Inspection; prepared the STI Document; prepared the PFMA Report; and prepared and submitted the Part 12D Report. West Warwick, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam, Spillway and Toe Repairs Project:

Project Manager for preparing plans and specifications for making repairs following the March 2010 flooding. This project included re-building collapsed sections of the downstream masonry training walls; repairing the damaged downstream apron using grouted riprap; replacing several undermined footbridge footings; and repairing the low-level outlet structure. Coventry, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam Biennial Inspection: Project

Manager since 1998 for the performance of the biennial inspection of this 1,400-foot-long by

Page 3: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(3)

20-foot-high High-Hazard earth and masonry dam. This work includes performing the biennial inspection/evaluation; preparing the Inspection / Evaluation Report; and providing ongoing support for the maintenance and repair of this dam. Coventry, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam: Project Manager for the

preparation of the Emergency Action Plan (EAP) for this 1,400-foot-long by 20-foot-high High-Hazard dam. The project included reviewing/verifying the dam break analysis and inundation map prepared by the Army Corps of Engineers, preparing the written EAP, attending meetings with local and state emergency management personnel, and finalizing the EAP based on local and state emergency management personnel input. Coventry, RI.

City of Newport, Gardiner Pond Dam Improvements Project: Project Manager for this

Design-Build project that included replacing an existing 36-inch-diameter sluice gate. The project also included replacing the existing timber walkway with a new galvanized steel and aluminum walkway; installing a new pond level indicator; installing new security fencing; installing a new stainless steel ladder at the intake structure; and replacing the existing trash rack. Newport, RI.

Providence Water, Westconnaug Reservoir Dam Improvements Project: Project Manager,

through the 90 percent stage, for the preparation of plans and specifications for the rehabilitation of a 300-foot-long by 17-foot-high Significant-Hazard earth and stone-masonry dam within the Scituate Reservoir Watershed. The project included a geotechnical investigation, a dive inspection, topographic and bathymetric surveys, and wetland delineation. The results of the field investigation were presented in a Design Concept Report that also included hydrologic and hydraulic analyses, stability analyses, and the presentation of remedial alternatives to accommodate the spillway design flood, address the decayed timber components of the dam, and address seepage conditions. Foster, RI.

Providence Water, Barden Reservoir Dam Improvements Project: Project Manager for

preparing plans and specifications for the rehabilitation of a 600-foot-long by 31-foot-high Significant-Hazard earth and masonry dam within the Scituate Reservoir Watershed. This project included hydraulic and hydrologic analyses; upstream and downstream slope improvements; installation of pre-cast articulated concrete blocks along the crest and downstream slope of the dam; repair of two gate house structures; installation of a toe drain system; extensive masonry repairs; and miscellaneous site improvements. Prepared the RIDEM and Army Corps of Engineers permit applications; planned and coordinated the geotechnical investigation; performed design analyses; prepared plans and specifications for bidding and construction; and provided project management for full-time construction observation. Scituate, RI.

Providence Water, Ponaganset Reservoir Dam Improvements Project: Project Manager for

preparing plans and specifications for the rehabilitation of a 600-foot-long by 26-foot-high Significant-Hazard earth and masonry dam within the Scituate Reservoir watershed. This project included upstream and downstream slope improvements; installation of a toe drain system; placing riprap along the upstream and downstream slopes; constructing a new low-level outlet headwall; drainage improvements; and reconstructing George Allen Road along the crest of dam. Prepared the RIDEM and Army Corps of Engineer Permit Applications; planned and coordinated the geotechnical investigation; performed design analyses; prepared plans and specifications for bidding and construction; and provided periodic consultation and construction observation. Glocester, RI.

Page 4: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(4)

Town of Sutton, Steven’s Pond Dam Improvements Project: Project Manager for preparing

plans and specifications for the rehabilitation of a 250-foot-long Significant-Hazard earth and masonry dam in southeastern Massachusetts. This project included upstream slope improvements; constructing a concrete cutoff wall; reconstructing a downstream granite block wall; reconstructing a low-level gate; and miscellaneous concrete and fencing work. Managed the preparation of the MADEM permit applications; performed design analyses; prepared plans and specifications for construction; and coordinated and managed the part-time construction observation. Sutton, MA.

The Providence and Worcester Railroad Company, Packers Pond Dam Expert Witness

Testimony: Project Manager for the performance of a focused Phase I Inspection/Evaluation of this 300-foot-long Significant-Hazard earth and masonry dam in southeastern Connecticut. The project included performing the focused evaluations/inspection; preparing the inspection/evaluation report; developing repair alternatives, including estimated construction costs; and serving as an expert witness for the Providence and Worcester Railroad during discussions with the dam’s owner and the CTDEP. Plainfield, CT.

RIDEM, Notice of Intent to Enforce, Confidential Client: Project Manager for the emergency

repair of a Significant-Hazard earth and masonry dam. The project included preparing a repair plan for review and approval by RIDEM; preparing plans and specifications for bidding and construction; negotiating final repair costs with the selected Contractor; and providing construction observation. Coventry, RI

RIDEM, Notice of Intent to Enforce, Bleachery Pond Dam Low-Level Outlet Repairs Project:

Project Manager for preparing conceptual plans and specifications for repairing a non-functional low-level outlet structure. Served as a liaison between the Owner and RIDEM and prepared the preliminary budget estimates for making the repairs. Lincoln, RI.

RIDEM, Stillwater Reservoir Dam: Project Manager for the performance of a Phase II

Inspection/Evaluation, in consultation with Louis Berger and Associates, of this 1,300-foot-long by 20-foot-high High-Hazard earth and masonry dam. The project included hydraulic and hydrologic analyses, stability analyses, and the preparation of an Inspection/Evaluation Report, which included remedial repair alternatives and preliminary budget estimates. Smithfield, RI.

Town of Amesbury, Lake Gardner Dam: Senior Reviewer during the preparation of plans and

specifications for the rehabilitation of this large, High-Hazard dam. This project included upstream and downstream slope improvements; the installation of riprap along the upstream slope; reconstruction of the granite block spillway; installation of new slide gates; and miscellaneous site improvements. Also provided periodic consultation during construction of this project. Amesbury, MA.

Town of South Kingstown, California Jim’s Pond Dam: Project Manager for the performance

of an emergency inspection and preliminary forensics evaluation of the failed California Jim’s Pond Dam. The project also included the inspection of 4 downstream dams/dikes and 5 downstream culverts. Provided an assessment of existing conditions and recommendations for repair, maintenance, and, where applicable, further study. South Kingstown, RI.

Page 5: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(5)

RIDEM, Bowdish Reservoir Dam Improvements Project: Project Manager for the

performance of a Phase I/II Inspection/Evaluation of this 250-foot-long by 14-foot-high High-Hazard earthen dam. The project included performing the inspection/evaluation; performing a dam breach analysis; preparing the inundation map; preparing the Inspection/Evaluation Report; developing repair alternatives and estimating construction costs; and attending a public workshop to describe the project. Project Manager for the preparation of plans and specifications for the rehabilitation of the dam. The work included upstream and downstream slope improvements; installation of pre-cast articulated concrete blocks along the crest and downstream slope of the dam; a new low-level outlet structure; installation of a toe drain system; construction of a new spillway and vehicle access bridge; and miscellaneous site improvements. Prepared the RIDEM Permit application; planned and coordinated the geotechnical investigation; performed design analyses; prepared plans and specifications for bidding and construction; prepared the Emergency Action Plan (EAP), and coordinated full-time construction observation services. Glocester, RI.

Marine / Waterfront Engineering

Quonset Development Corporation, Zarbo Avenue Bulkhead Project: Project Manager for completing the design of approximately 1,300 LF of new anchored sheet pile bulkhead. The work included preparing a Condition Assessment Report; performing a geotechnical investigation; preparing the RIDEM, RICRMC, and Army Corps of Engineers Permit Applications; and preparing plans and specifications for bidding and construction. North Kingstown, RI.

Quonset Development Corporation, Pier 1 Bulkhead Improvements Project: Project

Manager for preparing plans and specifications for bidding and construction of a new concrete cap along an existing steel sheet pile bulkhead, including new bollards, cleats, and concrete pavement. North Kingstown, RI.

Quonset Development Corporation, Pier 2 Cofferdam Repairs Project: Technical Consultant

to the Quonset Development Corporation (QDC) for making repairs to two (2) cellular sheet pile cofferdams that were “severed” during pile driving operations for the construction of a new crane relieving platform. Evaluated the Contractor’s proposed repair plan and analyses; advised and made recommendations to the QDC; and provided input during the repairs. North Kingstown, RI.

Quonset Development Corporation, Pier 1 Cleat and Bollard Repairs Project: Project Manager for preparing a Pier Evaluation Report, including preliminary construction budget estimates for several alternatives. Prepared the plans and specifications for bidding and construction of the selected alternative and prepared and submitted the RICRMC permit application. North Kingstown, RI.

Quonset Development Corporation, Crane Relieving Platform Project: Project Manager for

preparing the conceptual design plans and preliminary budget estimates for the construction of two (2) pile supported relieving platforms to support a mobile harbor crane. North Kingstown, RI.

Quonset Development Corporation, Casting Building Code Review: Project Manager for preparing a Code Review and Letter Report, including a preliminary budget estimate to bring an existing metal building on the QDC’s waterfront up to existing building code standards.

Page 6: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(6)

North Kingstown, RI.

Town of Jamestown, East Ferry Boat Ramp Interim Repairs: Project Manager for evaluating an existing boat ramp at the East Ferry Marina. The Scope-of-Work included performing a topographic and bathymetric survey of the boat ramp and surrounding area in order to develop a base plan of the area and quantify the extent of interim repairs needed.

Americas Styrenics, Maintenance Dredging Project: Project Manager for executing the

sediment sampling plan; coordinating biological and chemical testing of sediment samples; preparing the CTDEP and Army Corps of Engineers Permit Applications; and preparing plans and specifications for dredging about 100,000 CY of accumulated sediment from the Thames River. Ledyard, CT

Town of Jamestown, Fort Getty Pier Inspection: Project Manager for the inspection of a

WWI era timber pier. Responsibilities included conducting a visual inspection of the pier both topside and waterside, and reducing the data for the preparation of the inspection report. Jamestown, RI.

Styron LLC., Shoreline Protection Project: Project Manager for the design of a new riprap

revetment to protect an eroding shoreline adjacent to an active rail line. Responsibilities included conducting a topographic survey of the wetlands and surrounding area; preparing the CTDEEP Structures, Dredging, and Fill Permit Application; and preparing plans and specifications for bidding and construction. Gales Ferry, CT.

Southern New England Ship Building Company, Phase I and II Improvements Projects: Project Manager for widening an existing pile supported relieving platform and dredging about 10,000 CY of accumulated sediment to allow tug boats to be moved from land and onto a floating dry dock. Planned and coordinated the geotechnical investigation(s); prepared plans and specifications for bidding and construction; and submitted the RI State Building and RICRMC Permit Applications. North Kingstown, RI.

Southern New England Ship Building Company, Relieving Platform Repairs Project: Project

Manager for the design of a new H-pile supported relieving platform to allow 2,300 to 4,000 ton barges to be moved from land and onto a floating dry dock. Planned and coordinated the geotechnical investigation(s); prepared plans and specifications for bidding and construction; and submitted the RI State Building and RICRMC Permit Applications. North Kingstown, RI.

Southern New England Ship Building Company, Carrier Pier Repairs Project: Project

Manager for preparing a Pier Inspection Report documenting the damage to the existing concrete pier following a severe nor’easter. Designed the concrete deck and fender repairs, including utility improvements (e.g., electric, air, CO2, and water); prepared plans and specifications for bidding and construction; and submitted the RICRMC Permit Applications. North Kingstown, RI.

MAMMOET USA NE, ATB Tugboat Load-out Project: Project Manager for completing analyses to determine the safe jacking loads for the load-out of the 1,600 ton ATB Tugboat the Freeport. Also evaluated the safe transport loads for moving the Freeport on wheeled transporters across land and onto a floating dry-dock. North Kingstown, RI.

The Dow Chemical Company, Maintenance Dredging Project: Project Manager for executing

Page 7: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(7)

the sediment sampling plan; coordinating biological and chemical testing of sediment samples; preparing the CTDEP and Army Corps of Engineers Permit Applications; and preparing plans and specifications for dredging about 100,000 CY of accumulated sediment from the Thames River. Ledyard, CT

The Dow Chemical Company, Bulkhead Replacement Project: Project Manager for

developing replacement alternatives for an existing and deteriorated timber bulkhead located along the Thames River. Prepared the project base map; installed geotechnical instrumentation to monitor the movement of the existing and deteriorated timber bulkhead; completed a geotechnical investigation; prepared the CTDEP and Army Corps of Engineers Permit Applications; prepared plans and specifications for bidding and construction of a new 350-foot-long steel sheet pile bulkhead; and provided construction observation services. Ledyard, CT.

The Dow Chemical Company, 5-Year Improvements Plan: Project Manager for developing a

5-year improvements plan for the Dow Chemical Company’s Allyn’s Point Plant Pier and Off-loading facility on the Thames River. Planned and coordinated the geotechnical investigations; prepared alternative evaluation memorandums/letter reports, and prepared implementation cost estimates to allow informed decisions to be made. Ledyard, CT.

The Dow Chemical Company, Seawall Repair Project: Project Manager for the preparation

of plans and specifications for the repair of about 700 LF of stone seawall. Prepared the CTDEP and Army Corps of Engineer Permit Applications; performed design analyses; prepared plans and specifications for bidding and construction, and assisted with the pre-qualification of contractors. Ledyard, CT.

The Dow Chemical Company, Breasting Dolphin Replacement Project: Project Manager for

the preparation of plans and specifications for the replacement of four existing timber pile breasting dolphins. The existing breasting dolphins were replaced with new steel mono-pile breasting dolphins (steel caissons drilled and socketed into bedrock). Planned and coordinated the geotechnical investigation; prepared the geotechnical data report; prepared the CTDEP and Army Corps of Engineer Permit Applications; performed design analyses for the laterally-loaded mono-piles; prepared plans and specifications for bidding and construction; and provided construction observation services. Ledyard, CT.

Town of Jamestown, East Ferry Marina Seawall Replacement Project: Project Manager for

the preparation of plans and specifications for bidding and construction of a new cast-in-place concrete seawall on Narragansett Bay. This project also included site improvements consisting of new concrete sidewalks, boat ramp repairs, and the installation of new metal benches, bike racks, and trash receptacles. Coordinated the geotechnical investigation; completed the wall stability analyses; and reviewed the Contractor’s Submittal for construction. Jamestown, RI.

Town of Jamestown, Dumpling Road Seawall and Roadway Reconstruction Project: Project Manager for the preparation of plans and specifications for bidding and construction of a new pre-cast concrete segmental seawall on Narragansett Bay, including roadway reconstruction. Coordinated the geotechnical investigation; completed the wall stability analyses; and reviewed the Contractor’s Submittal for construction. Jamestown, RI.

Town of Jamestown, East Ferry Marina Curbing and Railing Project: Project Manager for

Page 8: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(8)

the preparation of plans and specifications for bidding and construction of new concrete curbing along an existing commercial pier. This project also included new ornamental railing; the installation of timber fenders for marina boats; and utility improvements (e.g., electric, water). Reviewed the Contractor’s Submittal for construction and provided construction observation services. Jamestown, RI.

SeaRoc, Deepwater Wind Monitoring Buoy Project: Project Manager for the design of a new cradle to lift and transport the meteorological monitoring buoy for the Deepwater Wind offshore wind farm development. RI and NJ offshore sites.

Kiewit Infrastructure, Closed Loop Cooling Project: Project Manager for the design of concrete ballast blocks for launching and sinking two (2) 48-inch-diameter discharge pipelines for a blow-down structure. The ballast blocks were designed for a highly corrosive environment, and super-duplex stainless steel threaded rods were utilized for attaching the ballast blocks together. The project included the design of the launch rail system for moving about 200 LF of pipeline into the water at a time. Somerset, MA.

Dunellen, LLC, Breasting Plan Improvements Project: Project Manager for the preparation of plans and specifications for bidding and construction of breasting plane improvements at the Wilkes-Barre Pier. The improvements included reinforcing an existing dolphin with new steel H-piles and installing two (2) new cell fenders to better absorb the estimated tanker vessel breasting energy. East Providence, RI.

RIDOT, Newport Marine Terminal Facility: Task Manager for the design of plastic-coated steel guide piles that were used for securing concrete floating piers at the Long Wharf and Fort Adams terminal sites. Performed design analyses for the laterally loaded guide piles and other terminal components, and prepared plans and specifications for bidding and construction. Newport, RI.

The Narragansett Bay Commission, Seekonk River Interceptor Project: Project Manager for the preparation of plans and specifications for the construction and dewatering of a marine cofferdam to allow an interceptor structure to be installed on the Seekonk River. Providence, RI.

The Narragansett Bay Commission, Combined Sewer Area 2B Headwall Improvements

Project: Project Manager for the Combined Sewer Overflow (CSO) Area 2B Headwalls Improvement Project along the Woonasquatucket River. This project included constructing five (5) new timber pile-supported concrete headwalls; installing new concrete flared end-sections; lining with cured-in-place pipe; abandoning sewer lines with controlled low-strength material fill; and installing new tideflex check valves that were from 20 to 96 inches in diameter. Prepared the plans and specifications for bidding and construction; reviewed the Contractor’s submittals; and provided construction observation services. Providence, RI.

Narragansett Electric Power Company, Waterfront Bulkhead Replacement Project: Project Engineer for coordinating a marine inspection of Narragansett Electric’s pier and developing replacement alternatives for the deteriorating bulkhead wall. Providence, RI.

Milwaukee Metropolitan Sewerage District, Jones Island East Dock Bulkhead Project:

Project Manager for preparing plans and specifications for the construction of a new 700-foot-long steel sheet pile bulkhead and rubber bumper fender system at the Milwaukee

Page 9: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(9)

Metropolitan Sewerage District’s East Dock Facility. Prepared the Army Corps of Engineer Permit Application; designed the new wall and fender system; prepared the plans and specifications for construction; reviewed the Contractor’s submittals; and performed periodic construction observation. Milwaukee, WI.

Milwaukee Metropolitan Sewerage District, South Dock Wall Project: Project Manager for

preparing plans and specifications for the construction of a new 300-foot-long concrete retaining/wave splash wall at the Milwaukee Metropolitan Sewerage District’s South Dock Facility. Prepared the Army Corps of Engineer Permit Application; designed the new wall; prepared the plans and specifications for construction; reviewed the Contractor’s submittals; and performed periodic inspection during construction of this project. Milwaukee, WI.

Milwaukee Metropolitan Sewerage District, East Dock Dredging Project: Project Manager for preparing plans and specifications for dredging about 20,000 cubic yards of sediment at the Milwaukee Metropolitan Sewerage District’s East Dock Ship Berth. Prepared the Army Corps of Engineer Permit Application; prepared the plans and specifications for dredging; reviewed the Contractor’s submittals; and performed periodic inspection during construction of this project. Milwaukee, WI.

General Civil Engineering

Town of Jamestown, Fort Getty Roadway Repairs Project: Project Manager for the design of repairs to a roadway damaged by storm surge. The project included performing a topographic survey of the existing conditions, designing the repairs, and preparing plans and specifications for construction. Jamestown, RI.

Southern New England Ship Building Company, Misc. Building Projects: Project Manager for the construction of several new buildings and additions including a new Tug Assembly Shelter, Plate Roll-Out Shelter, Nurse’s Office, and new Pipe Shop Building. Conducted the geotechnical investigation for each building/addition; prepared plans and specifications for bidding and construction; and submitted the RI State Building Permit Applications, including coordination with the RI State Fire Marshall’s office. North Kingstown, RI.

Southern New England Ship Building Company, Concrete Pavement Evaluation Project:

Project Manager for the completion of a pavement evaluation to determine if an existing concrete pavement could support the construction of 2,300 ton and larger double-hulled fuel barges. Planned and coordinated the geotechnical investigation(s); prepared the pavement evaluation reports, and developed repair alternatives to allow the continued construction of barges on land. North Kingstown, RI

Outokumpu American Brass, Truck Loading Dock Improvements Project: Project Manager

for the design of new concrete retaining walls and concrete pavement at this active manufacturing facility. Designed the new retaining walls and pavement; prepared the plans and specifications for bidding and construction; reviewed the Contractor’s submittals; and provided construction observation services. Kenosha, WI.

SC Johnson Wax, New Tank Farm: Project Manager for design, preparation of plans and specifications, and construction observation during construction of a new product storage tank farm. Racine, WI.

Page 10: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(10)

Geotechnical Engineering

RIDOT, Victory Highway Bridge Replacement: Geotechnical Project Manager for the replacement of an existing bridge structure over I-95. Responsibilities included overseeing the geotechnical investigation; performing a site survey; and preparing the Geotechnical Data and Interpretive Reports. Exeter, RI.

RIDOT, Tefft Hill Trail Bridge Road Bridge Widening Project: Geotechnical Project Manager

for widening an existing bridge structure via the installation of pre-cast concrete arch/bridge units beneath the existing bridge. Coordinated the geotechnical investigation; performed geotechnical design analyses; and prepared the Geotechnical Data and Design Basis Report. Exeter, RI.

RIDOT, Ten Rod Road Bridge Widening Project: Geotechnical Project Manager for widening

an existing bridge structure via the extension of the existing abutment foundations. Coordinated the geotechnical investigation; performed geotechnical design analyses; prepared the Geotechnical Data and Design Basis Report; and prepared plans and specifications for constructing the temporary earth support system (solider piles and lagging). Exeter, RI.

RIDOT, Robin Hollow and Weaver Hill Road Bridge Widening Projects: Geotechnical Project Manager for widening two existing bridge structures via the extension of the existing abutment foundations. Coordinated the geotechnical investigation; performed geotechnical design analyses; and prepared the Geotechnical Data and Design Basis Report. Exeter, RI.

RIDOT, Sakonnet River Bridge Replacement Project: Project Manager for preparing Engineering Submittals for the replacement of the Sakonnet River Bridge. Engineering submittals included, but were not limited to temporary earth retaining systems; dewatering plans; jacking and shoring; Wave Equation Analyses (WEAP) for 72-inch-diameter pipe piles and H-Piles; marine cofferdams; and pre-condition surveys. Portsmouth/Tiverton, RI.

RIDOT, Contract No. 2002-CH-055: Project Manager for completing static pile analyses;

Wave Equation Analyses (WEAP); and preparing Engineering Submittals for completing static pile load tests (multiple pile types, 360 ton test load); pile tension tests (multiple pile types); and lateral pile load tests (multiple pile types). Also prepared the Engineering Submittal for the construction of a temporary utility bridge. Providence, RI.

RIDOT, Contract No. 2002-CB-074: Project Manager for preparing Engineering Submittals for

the construction of temporary support of excavation systems (ranging from about 15 to 20 feet deep). The support of excavation systems were used as jacking and receiving pits for the installation of a new water line beneath an active AMTRAK passenger line. Also prepared the dewatering plans to allow the jacked pipe to be installed. Warwick, RI.

RIDOT, Replacement of Middle Bridge, Bridge No. 114 Project: Project Manager for

completing static pile analyses; Wave Equation Analyses (WEAP); and preparing Engineering Submittals for the demolition of the existing bridge, and completing a static pile load test (24” PPCP, 360 ton test load). South Kingstown, RI.

RIDOT, Veteran’s Memorial Bridge (formerly Court Street Bridge) Replacement Project:

Project Manager for designing high-strength rock anchors to stabilize the existing granite piers

Page 11: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(11)

and abutments for the replacement of the Court Street Bridge. Prepared the rock anchor plans and specifications; reviewed the Contractor’s submittals; reviewed the anchor proof and performance test results; and provided periodic consultation and construction observation during rock anchor installation. Woonsocket, RI.

RIDOT, General Nathanael Greene Memorial Bridge (formerly Forge Road Bridge)

Replacement Project: Project Manager for the geotechnical investigations and foundation design for the replacement of the Forge Road Bridge over the Potowomut River. Performed the geotechnical design analyses; prepared the Subsurface Investigation and Foundation Analyses Report; and prepared plans and specifications for the construction of the shallow foundations, including the temporary shoring/cofferdams. North Kingstown and Warwick, RI.

RIDOT, Potters Pond Bridge Replacement Project: Project Manager for the design of the pile

foundation system of the temporary bridge; the shallow foundations of the replacement bridge; and all temporary shoring/cofferdams. Also designed the temporary sheeting to protect a nearby wetland and support a temporary road adjacent to the wetland. South Kingstown, RI.

RIDOT, Wolf Rocks Trail Railroad Crossing Project: Project Manager for evaluating the

feasibility and cost of eliminating an existing at-grade railroad crossing along Amtrak’s busy Northeast Corridor passenger line. Prepared the feasibility reports; performed preliminary design; prepared 30% plans and specifications for one grade crossing alternative; and provided cost information to RIDOT to assist them in the selection of an alternative to eliminate this grade crossing. Exeter, RI.

RIDOT, I-195 Improvements Project: Project Manager for the preparation of the

Geotechnical Data and Design Basis Reports for a new bridge; temporary earth retaining structures; and a new interceptor sewer as part of the I-195 improvements. Performed and reviewed the geotechnical analyses; developed the Geotechnical Data and Design Basis Reports format, and served as a reviewer for plans and specifications. Providence, RI.

WIDOT, STH 29 Project: Senior Project Manager for the geotechnical investigation and design of a pre-load for over 3,000 linear feet of 4-lane highway embankment through a highly compressible deposit of peat and organic silt up to 30-feet-thick. Planned the geotechnical investigations; supervised in-situ field and laboratory testing; developed the field instrumentation plan (e.g., piezometers, settlement monitoring plates); prepared the pre-load plans and specifications; reviewed the Contractor’s submittals; performed construction observation services during wick drain installation and pre-loading; and performed rheological modeling to determine when preloading was complete. Hatley, WI.

WIDOT, Verona Bypass Project: Task Manager and Senior Geotechnical Reviewer for the foundation design of over 5 miles of new 4-lane highway and thirteen (13) new pile supported bridges. Verona, WI.

IADOT, US 18 Project: Senior Project Manager for the geotechnical investigation and foundation design for thirteen (13) new pile-supported bridges with integral abutments. Developed the geotechnical investigation program and prepared the foundation plans and specifications. Cerro Cordo County, IA.

AMTRAK, Miamicock and Stonington Bridge Replacement Projects: Project Manager for

Page 12: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(12)

preparing Engineering Submittals for the replacement of two existing AMTRAK bridges over the Miamicock River and East & West Harbors. Engineering Submittals included, but were not limited to temporary pile supported work platforms, temporary pile supported trestle bridges to support Amtrak passenger trains; marine cofferdams for construction of the new bridge abutments; dewatering plans; jacking and shoring; Wave Equation Analyses (WEAP) for H-Piles; micro-pile design; and pre-condition surveys. East Lyme and Stonington, CT.

The Narragansett Bay Commission, Contract #01: 302.08-C: Project Manager for preparing

Engineering Submittals for lining a 220-foot-deep +/- Drop and Vent Shaft; the construction of temporary support of excavation systems (ranging from about 25 to 40 feet deep); the installation of flow bypass controls; the preparation of dewatering plans; and handling and disposing of contaminated soils. Providence, RI.

The Narragansett Bay Commission, Contract #01: 302.11-C: Project Manager for preparing

Engineering Submittals for lining a 200-foot-deep +/- Drop and Vent Shaft; the installation of flow bypass controls (gravity and pumped bypass); the preparation of dewatering plans; and miscellaneous geotechnical engineering support. Providence, RI.

The Narragansett Bay Commission, Contract #01: 302.11-C: Project Manager for preparing

Engineering Submittals for lining a 230-foot-deep +/- Drop and Vent Shaft; the construction of temporary support of excavation systems (ranging from about 35 to 40 feet deep); the installation of gravity flow bypass controls; the preparation of dewatering plans; and the preparation of a stormwater pollution prevention and control plan. Providence, RI.

Charter Oak Retail Center Development Project: Task Manager for preparing the

Geotechnical Data and Design Basis Reports for a 300,000 square foot retail development. Planned and coordinated the geotechnical investigation; prepared the geotechnical data and design basis reports; and prepared the plans and specifications for pre-loading a 65-foot-thick deposit of very soft varved silt and clay prior to construction. The Pre-loading plan included the installation of vertical drains to accelerate the consolidation of this deposit and geotechnical instrumentation to monitor pre-load performance. Hartford, CT.

Kvaerner Philadelphia Shipyard Project: Project Manager for the geotechnical investigations

and preliminary foundation design for a new complex of buildings that included a 238,000-square foot (SF) Fabrication Shop, 196,000-SF Panel Shop, 81,000-SF Grand Block Shop, 36,000-SF Paint Shop, 69,000-SF Dock Shop, and 50,000-SF Administration Building to support ship building activities. Other improvements included upgrading two (2) existing 1,100-foot-long by 150-foot-wide dry docks, new outdoor crane runways, new utilities, new roads, and over 1,000,000 SF of new paved parking/storage areas. Researched and reviewed geologic and geotechnical data; developed and executed the soil boring and test pit investigations; prepared the Geotechnical Data and Design Basis Reports, designed pile foundations and pavements; and developed a pile load test program. Philadelphia, PA.

Temporary Shoring / Sheeting Services Consultant to Contractor: Project Manager for

designing temporary shoring and sheeting systems for this Providence based heavy-civil construction company over a period of sixteen (16) years. Performed analyses; worked with the Contractor to develop efficient and economical designs; and provided stamped plans and supporting calculations for review by the Owner’s Engineer. Throughout New England.

Milwaukee Metropolitan Sewerage District, Turbine Modifications Phase 2B Project: Senior

Page 13: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(13)

Project Manager for the geotechnical investigation and foundation design for a new pile-supported turbine building at the Jones Island Wastewater Treatment Plant. Planned the geotechnical investigation; prepared the foundation plans and specifications; reviewed the Contractor's submittals; performed pile driving and earthwork construction observation; and supervised the dynamic pile driving analyses to confirm that the specified ultimate pile capacities had been achieved. Milwaukee, WI.

Milwaukee Metropolitan Sewerage District, Deep Tunnel Project: Grouting Inspector for

reducing the amount of groundwater inflow through fractured bedrock and into a 200-foot-deep by 30-foot-diameter storage tunnel for the Milwaukee Metropolitan Sewerage District’s Deep Tunnel Project. Milwaukee, WI.

City of Milwaukee, Linwood Water Purification Plant Project: Senior Project Manager for

the geotechnical investigation and foundation design of a new mat-supported sodium hypochlorite/ammonia building at the Linwood Water Purification Plant. Milwaukee, WI.

City of Rochester, Minnesota, Rochester Wastewater Treatment Plant Project: Project

Engineer for the geotechnical investigation and foundation design for a wastewater treatment plant expansion. Developed the geotechnical investigation program; logged the soil borings; prepared foundation plans and specifications; reviewed the Contractor's submittals; performed sub-grade construction observation; and performed periodic inspection during the construction of the concrete footings and mat foundations. Rochester, MN.

SC Johnson Wax, New Truck Scale Project: Project Manager for the design of a new pile-

supported truck scale for weighing tractor-trailer product deliveries at this active manufacturing facility. Designed the pile foundation of the new truck scale; prepared the plans and specifications; evaluated the bids; reviewed the contractor's submittals; and served as the Resident Engineer during construction. Racine, WI.

Environmental Engineering

Millenium Tower, Dewatering and Water Treatment Plan: Project Manager for the preparation of the Dewatering and Water Treatment Plan for the temporary earth support system installed for the construction of the Millennium Tower in Boston, Massachusetts. The Tower is being built adjacent to the historic Burnham Building and will be 55 stories, or approximately 606 feet tall upon completion. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps; and designing the treatment system for the removal of site contaminants in conjunction with Lockwood Remediation Technologies. Boston, MA.

Berklee College of Music, Dewatering and Treatment System Plan: Project Manager for the

preparation of the Dewatering and Treatment System Plan for the temporary earth support system installed for the construction of the new Music Center at the Berklee College of Music. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps; and designing the treatment system for the removal of VOC’s and DNAPL in conjunction with Lockwood Remediation Technologies. Boston, MA.

Capital Terminal Company, Tank 115 Remediation Project: Project Manager for the

preparation of a Site Investigation Report and Remedial Action Work Plan for the remediation of a diesel fuel release at the Capital Terminal Company. Conducted a pilot study program;

Page 14: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(1)

EDUCATION

University of Rhode Island, Kingston, RI M. S., Civil and Environmental Engineering (Geotechnical Emphasis), 2010 University of Rhode Island, Kingston, RI B. S., Civil Engineering, 2008

PROFESSIONAL REGISTRATION

Rhode Island PROFESSIONAL EXPERIENCE

RT Group, Inc. Senior Project Engineer, 2013 - Present Project Engineer, 2009 – 2012 Jaques Whitford Company, Inc. Staff Engineer, 2007 – 2009

Mr. Arpin has over 6 years of experience on a variety of geotechnical, marine / waterfront, civil, dam, structural, and environmental engineering projects. His design experience includes analysis and design of dams, retaining walls, support of excavation systems, pile-supported foundations, seawalls and bulkheads, and dewatering systems. Mr. Arpin also has extensive construction observation and field experience associated with general earthwork, dam rehabilitation and inspection, geotechnical explorations, and environmental sampling and monitoring.

At RT Group, Inc., he currently performs design analyses; assists in the assembly of plans and specifications for bidding, permitting, and construction; assists in coordinating and staffing field investigations; and supports Project Managers in the preparation of reports, studies, and construction cost estimates. Mr. Arpin is proficient in Computer-Aided-Drafting in addition to various engineering design software. As a Senior Project Engineer, he continues to gain professional engineering experience by expanding his responsibilities into project proposals, management, and advanced design work. Representative project experience includes:

Dam Engineering

Hugo Key & Sons, Inc., Featherbed Dam Dewatering, Flow Diversion, and SOE Plan: Senior Project Engineer for preparing contractor submittals for improvements made to this earth and masonry dam. The dewatering, flow diversion, and support of excavation plans that were prepared allowed the contractor to replace the existing stone masonry culvert with pre-cast box culverts and to reconstruct the municipal roadway travelling across the crest of the dam. North Kingstown, RI.

YMCA of Pawtucket, Quidnick Reservoir Dam Inspection Report: Project Engineer for preparing an inspection report of the earth embankment dam. Responsibilities included

Page 15: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(2)

completing a RIDEM file review of all relevant project information; visually inspecting the dam, including performing a survey of all deficiencies; and preparing the Visual Inspection Report detailing the condition of the dam. Coventry, RI.

Town of Chaplin, Darling Pond Dam Improvements Project: Senior Project Engineer for the design of improvements to this 250-foot-long earth embankment dam. Responsible for preparing a Visual Inspection Report; performing a topographic survey; completing design and permitting; and preparing plans and specifications for bidding and construction. This project included retro-fitting the existing pre-cast drop-inlet type structure with a sluice gate, installing a new primary box culvert spillway, flattening the dam, and armoring the upstream slopes. Chaplin, CT.

NATCO, Arctic Dam Hydroelectric Facility, Emergency Action and Safety Plans. Project

Engineer for preparing the Owner’s Dam Safety Program (ODSP), Dam Safety Surveillance and Monitoring Plan (DSSMP), and Dam Safety Surveillance and Monitoring Report (DSSMR) for FERC review and approval. West Warwick, RI.

NATCO, Arctic Dam Hydroelectric Facility, Spillway and Toe Repairs Project. Project

Engineer for the preparation of plans and specifications for the bidding and construction of spillway and toe repairs following the March, 2010 flooding. The repairs included rebuilding collapsed sections of the downstream masonry training walls; repairing the spillway masonry; and installing a new grouted riprap apron with an underdrain. Responsibilities included coordinating with FERC and RIDEM for making the repairs; reviewing Contractor’s submittals; and providing construction observation services. West Warwick, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam Spillway and Toe Repairs Project:

Project Engineer for the preparation of plans and specifications for making repairs to the spillway following the March, 2010 flooding. This project included re-building collapsed sections of the downstream masonry training walls; repairing the damaged downstream apron using grouted riprap; replacing several undermined footbridge footings; and repairing the low-level outlet structure. Responsibilities included performing design analyses; preparing plans and specifications for construction; and providing construction observation. Coventry, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam Improvements Project: Project

Engineer for the inspection, analysis, and repair of this 1,400-foot-long by 20-foot-high High-Hazard earth and masonry dam and its low-level outlet structure. Responsibilities included coordinating and overseeing the geotechnical investigation; performing a site survey; completing stability analyses for the two earthen dam sections and the spillway; and overseeing the dive inspection and repair of the low-level outlet structure. Coventry, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam Biennial Inspection: Project

Engineer for performing the biennial inspection of this 1,400-foot-long by 20-foot-high High-Hazard earth and masonry dam. Responsibilities included performing the biennial inspection / evaluation; preparing the Inspection/Evaluation Report; and providing ongoing support for the maintenance and repair of this dam. Coventry, RI.

Nichols Pond Dam, Dam Repair Project: Project Engineer for the preparation of permit

submission plans for the repair of this existing dam along Breakheart Brook. Responsibilities included preparing a construction sequencing plan; assisting in the design of a new embankment; dam and low level outlet structure; and preparing plans and specifications for

Page 16: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(3)

construction. West Greenwich, RI.

RIDEM, Notice of Intent to Enforce: Bleachery Pond Dam Low-Level Outlet Repairs Project: Project Engineer for the preparation of conceptual plans and specifications for repairing a non-functional low-level outlet structure. Responsibilities included overseeing the underwater dive inspection; performing the topside inspection; preparing plans and specifications; and assisting in preparing the preliminary budget estimates for making the repairs. Lincoln, RI.

Town of Burrillville, Mill Pond Dam: Staff Engineer for the preparation of plans and

specifications for construction for the renovation of an existing earthen dam in Burrillville, RI. The project included the design of the renovated earthen dam and spillway; the design of replacement gates for the low level outlet; a feasibility study for installing a turbine to generate electricity; and attending a workshop conducted at the Burrillville Town Hall. Burrillville, RI.

Marine / Waterfront Engineering

Quonset Development Corporation, Zarbo Avenue Bulkhead Project: Senior Project

Engineer for completing the design of approximately 1,300 LF of new anchored sheetpile bulkhead. The work included preparing a Condition Assessment Report; performing a geotechnical investigation; completing design and permitting for the new bulkhead; and preparing plans and specifications for bidding and construction. North Kingstown, RI.

Quonset Development Corporation, Pier 1 Bulkhead Improvements Project. Project

Engineer for the preparation of plans and specifications for bidding and construction of a new concrete cap along an existing steel sheet pile bulkhead, including new bollards and cleats and concrete pavement. Responsibilities included designing the concrete cap to resist loading from vessels; performing the site survey; and assisting in the preparation of plans and specifications for construction. Quonset Point, RI.

Southern New England Ship Building Company, Laydown Area Expansion and Air Bag Launch Way Project: Project Engineer for the preparation of plans and specifications for permitting, bidding, and construction of an expansion area to the facility’s main yard and an Air Bag Launch Way used to launch dry docks constructed at the facility. Responsibilities included planning and overseeing the geotechnical investigation; designing two (2) 100-kip-lateral-capacity pile supported bollards; designing the concrete pavement for anticipated loads; performing a site survey and bathymetric survey; preparing plans and specifications for bidding and construction; submitting the USACE, RIDEM, and RICRMC Permit Applications; and providing construction observation. North Kingstown, RI.

Southern New England Ship Building Company, Cathodic Protection at the Waterfront

Project: Project Engineer for the preparation of plans and specifications for the installation of a cathodic protection system for a previously installed sheet pile wall. Responsibilities included the design of the system and preparing plans and specifications for construction. North Kingstown, RI.

Capital Terminal Company, Wilkes Barre Pier HZ-Cantilever Wall Project: Project Engineer

for the design and assembly of plans and specifications for the installation of a new cantilever wall to allow for the berthing of offloading vessels. The wall was designed to be constructed of interlocking H-piles (king piles) and AZ sheet piles. Responsibilities included assisting in the

Page 17: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(4)

design of the wall; designing the cathodic protection system; and preparing plans and specifications for the construction cost estimate. East Providence, RI.

Capital Terminal Company, Wilkes Barre Pier and Underwater Structural Inspection

Project: Project Engineer for the preparation of the Structural Inspection Report for this approximately 1,000-foot-long Pier. Responsibilities included performing the top-side inspection and overseeing the underwater dive inspection of the pier components including timber support piles, a soldier pile and concrete panel wall, and various offshore mooring/breasting structures. East Providence, RI.

Capital Terminal Company, Wilkes Barre Pier Cathodic Protection Project: Project

Engineer for the design and installation of a cathodic protection system for steel H-piles and pipe piles for various components of the Wilkes Barre Pier. Responsibilities included the design and selection of the required anodes; preparing plans and specifications for construction; and providing construction observation. East Providence, RI.

Town of Jamestown, East Ferry Marina Seawall Replacement Project: Project Engineer for

the preparation of plans and specifications for bidding and construction of a new cast-in-place concrete seawall on Narragansett Bay. This project also included site improvements consisting of new concrete sidewalks, boat ramp repairs, and the installation of new metal benches, bike racks, and trash receptacles. Responsibilities included the planning and oversight of the geotechnical investigation; performing the site survey; performing the wall stability analyses; and reviewing the Contractor’s Submittals for construction. Jamestown, RI.

Town of Jamestown, Dumpling Road Seawall and Roadway Reconstruction Project:

Project Engineer for the preparation of plans and specifications for bidding and construction of a new pre-cast concrete segmental seawall on Narragansett Bay, including roadway reconstruction. Responsibilities included the planning and oversight of the geotechnical investigation; performing the site survey; completing the wall stability analyses; and reviewing the Contractor’s Submittals for construction. Jamestown, RI.

Town of Jamestown, Fort Getty Boat Ramp Replacement Project: Project Engineer for

preparing plans and specifications for a new Pre-Cast Articulating Concrete Block boat ramp. Responsibilities included assisting in the design and preparing plans and specifications for construction. Jamestown, RI.

Town of Jamestown, Fort Getty Pier Inspection: Project Engineer for the inspection of a

WWI era timber pier. Responsibilities included conducting a visual inspection of the pier both topside and waterside, and reducing data from the inspection for the preparation of the inspection report. Jamestown, RI.

Styron LLC., Shoreline Protection Project: Project Engineer for the design of a new riprap

revetment to protect an eroding shoreline adjacent to an active rail line. Responsibilities included conducting a topographic survey of the wetlands and surrounding area; completing the CTDEEP Structures, Dredging, and Fill Permit Application; and developing the revetment design to prevent continued erosion of the slope. Gales Ferry, CT.

City of Newport, King Park Beach Seawall Repair Project: Project Engineer for the design of

repairs and improvements to the existing seawall located in King Park. Responsibilities included assisting in the design of replacement sections for the seawall totaling over 150

Page 18: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(5)

linear feet; assisting in the design of a new concrete parapet above an existing seawall section totaling over 300 linear feet; and preparing plans and specifications for construction. Newport, RI.

Kiewit Infrastructure, Closed Loop Cooling Project: Project Engineer for the design of

concrete ballast blocks for launching and sinking two (2) 48-inch-diameter discharge pipelines for a blow-down structure. The ballast blocks were designed for a highly corrosive environment, and super-duplex stainless steel threaded rods were utilized for attaching the ballast blocks together. The project included the design of the launch rail system for moving about 200 linear feet of pipeline into the water at one time. Somerset, MA.

Town of Jamestown, Fixed Timber Pier Repair and Improvements Project: Project Engineer

for the design and preparation of plans and specifications for the repairs to a 300-foot-long fixed timber pier. Separate plans and specifications were prepared for a fixed timber pier extension leading to floating docks secured by steel pipe piles. Jamestown, RI.

Sakonnet Point Club, Marine Pipeline Project: Project Engineer for the design and preparation

of plans and specifications for bidding and construction of a new marine pipeline for a Reverse Osmosis Effluent Discharge Pipeline. Little Compton, RI.

SeaRoc, Deepwater Wind Monitoring Buoy Project: Project Engineer for the design of a barge

mounted cradle to support a 50,000 pound meteorological buoy during deployment to its offshore location. RI and NJ offshore sites

Gulph Creek Site Project: Staff Engineer for a project involving the design of a 656-foot-long

retaining wall located along the Gulph Creek stream channel at the site of a LNG storage tank. The project was performed as part of the remediation of a contaminated former manufactured gas plant (MGP). The design also included the use of gabion baskets and Reno mattresses along the front of the retaining wall to prevent erosion from the creek. West Coshohoken, PA.

General Civil Engineering

Town of Jamestown, Fort Getty Roadway Repairs Project: Senior Project Engineer for the

design of repairs to a roadway damaged by storm surge. The project included performing a topographic survey of the existing conditions, designing the repairs, and preparing plans and specifications for construction. Jamestown, RI.

Southern New England Ship Building Company, Prefabricated Metal Building Project:

Project Engineer for the construction of a prefabricated metal building and its foundation. Responsibilities included preparing plans and specifications for permitting and construction; designing the building’s foundation to resist wind and wave impact loading; and submitting the RI State Building Permit Applications, including coordinating with the RI State Fire Marshall’s office. North Kingstown, RI.

Americas Styrenics, Bathymetric Survey: Project Engineer for the preparation of plans

showing the bathymetry of a turning and berthing basin used by large ships to off-load product to a manufacturing facility. Responsibilities included retrieving survey data using sonar equipment from a boat; importing data into AutoCAD; preparing plans showing the bathymetry; and calculating the volume of material required to be dredged. Gales Ferry, CT.

Page 19: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(6)

Capital Terminal Company, Salt Pile Property Survey: Project Engineer for the preparation

of existing site plans for property owned by the terminal. Responsibilities included preforming the site survey and preparing plans. East Providence, RI.

Structural Engineering

RIDOT, I-95 Pawtucket Bridge No. 550 Project: Project Engineer for preparing Engineering

Submittals for the partial demolition of the Pawtucket Bridge as well as several overpasses in the immediate area of the Bridge. Responsibilities included, but were not limited to, preparing demolition plans for Phase 1A of Bridge No. 550; the design of demolition shielding for several overpasses to protect vehicular traffic below; the design of temporary shoring towers for the replacement of overpass bridge piers; and the analysis of existing bridge structures for construction equipment loading. Pawtucket, RI.

RIDOT, Weekapaug Bridge No. 997 Project: Project Engineer for designing a current diverter

for rehabilitation work performed on the existing masonry bridge piers. The diverter system was designed to float-in and sink around the piers so that underwater repointing and grouting repairs could be done while being protected from the strong currents of the Weekapaug Breachway. Westerly, RI.

ConnDOT, Q E-2 Rte. 95 and Hwy. 34 Flyover Bridge Project: Project Engineer for

preparing Engineering Submittals for the construction of a new 1,900-foot-long twin steel box girder bridge. Engineering Submittals included a deck pouring sequence and a bridge deck overhang support analysis. New Haven, CT.

ConnDOT, Q-B Pearl Harbor Memorial Bridge Project: Project Engineer for preparing an Engineering Submittal for the replacement of the Pearl Harbor Memorial Bridge Project. Engineering Submittal included a debris shielding system utilized on the existing bridge structure during the demolition work. New Haven, CT.

Nicholson Construction, AMTRAK Bridge Replacement Projects: Project Engineer for

preparing micro-pile design and pile load test reports for the replacement of two (2) Amtrak bridges. Responsibilities included the design of micro-piles to support permanent bridge abutments; the design of a static load test frame for the installed micro-piles; and the preparation of load test reports for tested piles. East Lyme and Stonington, CT.

MBTA, Porter Square Station Project: Project Engineer for preparing Engineering Submittals

to assist the Contractor in addressing deficiencies in the construction of new skylights and a new pedestrian bridge installed as part of this Vertical Transportation Improvements Project. Engineering Submittals included a structural analysis of the skylights steel sub-frame; an analysis of the pedestrian bridge; and repair details to address the deficiencies. Cambridge, MA.

Page 20: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(7)

Town of Jamestown, Fort Getty Pavilion Replacement Cost Estimate: Project Engineer for the preparation of plans and specifications for the determination of a replacement cost for the Fort Getty Pavilion. The estimate was prepared following the collapse of the pavilion in February 2011 due to heavy snow and ice buildup. Responsibilities included the design of the proposed Pavilion structural components in accordance with ASCE 7 for wave, wind, and snow loading, while also accounting for scour and other factors for this coastal structure. Jamestown, RI.

Capital Properties Inc., Steeple Street Building Project: Project Engineer for the structural design and renovations of this historical industrial building. Responsibilities included assisting in the structural design for a new 4-story elevator shaft and stair tower and for miscellaneous building modifications during the construction phase. Providence, RI.

Geotechnical Engineering

RIDOT, Victory Highway Bridge Replacement: Project Engineer for the replacement of an existing bridge structure over I-95. Responsibilities included overseeing the geotechnical investigation; performing a site survey; and preparing the Geotechnical Data and Interpretive Reports. Exeter, RI.

RIDOT, Ten Rod Road Bridge Widening Project: Project Engineer for widening an existing

bridge structure via the extension of the existing abutment foundations. Responsibilities included performing geotechnical design analyses; assisting in the preparation of the Geotechnical Data and Design Basis Report; and preparing plans and specifications for construction of the temporary earth support system (solider piles and lagging) for construction. Exeter, RI.

RIDOT, Tefft Hill Trail Bridge Road Bridge Widening Project: Project Engineer for widening

an existing bridge structure via the installation of pre-cast concrete arch/bridge units beneath the existing bridge. Responsibilities included overseeing the geotechnical investigation; coordinating and performing the site survey; completing geotechnical design analyses; preparing plans; and assisting in preparing the Geotechnical Data and Design Basis Report. Exeter, RI.

RIDOT, Sakonnet River Bridge Replacement Project: Project Engineer for preparing

Engineering Submittals for the replacement of the Sakonnet River Bridge. Engineering submittals included, but were not limited to, temporary earth retaining systems; marine cofferdams; and pile installation procedures. Responsibilities included reviewing design calculations and preparing plans and specifications for construction. Portsmouth / Tiverton, RI.

AMTRAK, Bridge M.P. 114.30 Over the Miamicock River Project: Project Engineer for

preparing Engineering Submittals for the replacement of Bridge M.P. 114.30. Engineering Submittals included, but were not limited to, the designs of (4) pile supported temporary work platforms for construction cranes and equipment; four (4) temporary sheet pile bulkheads to support cranes; a temporary pile supported trestle bridge to support AMTRAK passenger trains; a temporary access bridge; marine cofferdams for construction of the new bridge abutments; a dewatering plan; jacking and shoring of the existing bridge; Wave Equation Analyses (WEAP) for proposed piles; H-pile and micro-pile design; static pile load test analysis; and pre-condition surveys. East Lyme, CT.

Page 21: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(8)

AMTRAK, Bridges M.P. 135.51 and 135.67 Over West and East Harbor Project: Project

Engineer for preparing Engineering Submittals for the replacement of Bridges M.P. 135.51 and 135.67. Engineering Submittals included the design of the micro-pile supported foundation for the new bridge structures. The micro-pile foundation system was an alternate to the Contract designed drilled shaft foundation. Stonington, CT.

City of Newport, South Easton Pond Dam Rehabilitation Project: Project Engineer for

preparing two (2) Water Control Plans (upstream and downstream sides) for the rehabilitation of an existing 3,400-foot-long earthen dam. The rehabilitation consisted of the reconstruction of the existing dam and installing Pre-Cast Articulating Concrete Blocks (ACBs). The upstream Water Control Plan consisted of “leap-frogging” 500-foot-long sheet pile / aquabarrier cofferdam cells while construction of the dam progressed, allowing for reuse of materials between cells and helping to minimize costs. Responsibilities included assisting in the design of the cofferdam; assisting in the determination of seepage rates into the cofferdams; and preparing plans and specifications for construction. Newport, RI.

Narragansett Bay Commission, Seekonk River Sewer Overflow Interceptor-Regulator

Project: Project Engineer for preparing the Temporary Support of Excavation Submittal and Dewatering Plan for the installation of a Combined Sewer Overflow (CSO) Interceptor-Regulator in an existing masonry pipe on the Seekonk River. Responsibilities included assisting in the design of a combined sheet pile/soldier pile and lagging cofferdam; assisting in seepage calculations for the Dewatering Plan; and preparing plans and specifications for construction. Providence, RI.

Southern New England Ship Building Company, Tugboat Assembly Shelter Project: Project Engineer for the design of a new 16,000-SF open bay Tugboat Assembly Shelter. The structure was constructed using used shipping containers and a clear-span removable steel truss roof system. Responsibilities included designing the H-pile foundation to resist various load cases including uplift from wave and wind forces; preparing a model of the structure in STAAD for structural analysis; and preparing plans and specifications for construction. North Kingstown, RI.

Dan’s Management, Retaining Wall Repair Project: Project Engineer for the design of a

repair to an existing stone retaining wall along the Pascoag River. Responsibilities included performing a site survey of the property; designing a geogrid reinforced retaining wall; assisting in the design of a concrete moment slab to be installed above the reinforced earth; and preparing plans and specifications for construction. Pascoag, RI.

Philadelphia Electric Company, Center Point Substation Project: Staff Engineer for the

design of site improvements for a new electrical substation. Responsibilities included assisting in the design of four (4) retaining walls, an access road, and a precast concrete arch bridge crossing wetlands. The site of the proposed substation contained wetlands which ran through the center of the property. Two (2) retaining walls were designed on either side of the wetlands to provide level ground for the installation of substation equipment. Worcester, PA.

Narragansett Bay Commission, Fields Point Tunnel Pump Station Project: Staff Engineer for

a project involving the monitoring of deep excavations during construction of the Field’s Point Tunnel Pumping Station CSO. Responsibilities included obtaining weekly inclinometer and piezometer readings and preparing field reports documenting the findings for a period of one (1) year. The pumping station was a component of the CSO. Providence, RI.

Page 22: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(9)

Narragansett Bay Commission, Fields Point Tunnel Pump Station Project: Staff Engineer for

a project involving the monitoring of adjacent structures during pile driving operations. Responsibilities included monitoring seismograph readings during the installation of the piles which were being installed for the foundation support system of a pump house. Providence, RI.

City of Medford, Courthouse Renovation Project: Staff Engineer for preparing a

Geotechnical Report for the renovation of an existing courthouse. Responsibilities included overseeing a subsurface exploration consisting of test borings that were completed both outside and within the existing building; visually classifying soils; and preparing boring logs and figures. Medford, MA.

McDonald’s, Restaurant Renovation Project: Staff Engineer for preparing Geotechnical

Reports for the renovation of two (2) existing McDonald’s Restaurants. Responsibilities included overseeing (2) subsurface explorations; visually classifying soils; and preparing boring logs and figures. Holyoke and Whitinsville, MA.

Rite Aid, Store Construction Project: Staff Engineer for preparing a Geotechnical Report for

the construction of a Rite Aid Retail Store. Responsibilities included overseeing the subsurface exploration; visually classifying soils; preparing boring logs and figures; and performing a site survey of the property. Southington, CT.

Environmental Engineering

Millennium Tower, Dewatering and Water Treatement Plan: Senior Project Engineer for the

preparation of the Dewatering and Water Treatment Plan for the temporary earth support system installed for the construction of the Millennium Tower in Boston, Massachusetts. The Tower is being built adjacent to the historic Burnham Building and will be 55 stories, or approximately 606 feet tall upon completion. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps; and designing the treatment system for the removal of site contaminents in conjunction with Lockwood Remediation Technologies. Boston, MA.

Berklee College of Music, Dewatering and Treatment System Plan: Project Engineer for

preparing the Dewatering and Treatment System Plan for the temporary earth support system installed for the construction of the new Music Center at the Berklee College of Music. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps; and designing the treatment system for the removal of VOC’s and DNAPL in conjunction with Lockwood Remediation Technologies. Boston, MA.

Longwood Center, Dewatering and Treatment System Plan: Project Engineer for preparing

the Dewatering and Treatment System Plan for the temporary earth support system installed for the construction of the new eleven-story-high Longwood Center Building. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps required; and designing the treatment system for the removal of VOC’s and DNAPL in conjunction with Lockwood Remediation Technologies. Boston, MA.

Con Edison, Newtown Substation Project: Staff Engineer for the design of a Permeable

Reactive Barrier as part of a remediation project for this electrical substation.

Page 23: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

David J. Arpin, P.E. Senior Project Engineer RT Group, Inc.

(10)

Responsibilities included preparing plans detailing the installation of a gate and funnel system through a carbon filter to treat petroleum contaminated soils. A 10-foot-diameter, 45-foot-long caisson was driven with a vibratory hammer and excavated with a clamshell to serve as a temporary excavation support system. A 6-foot-wide by 7-foot-long cassette composed of chambers of filter sand and carbon was then installed. A manhole structure was also constructed above the cassette to provide access for carbon changeoff. A barrier wall consisting of 112 Waterloo Sheet Piles was then installed on either side of the cassette to direct groundwater flow to the cassette. Sheet piles were grouted to the ground surface to provide an impermeable seal. Long Island City, NY.

Elliot Rose Company of Dover, Inc, Landfill Closure Design Project: Staff Engineer for the

preparation of plans and specifications for construction for the regrading and capping of a one acre landfill. The slope was part of the closure design which was required for the construction of a future precast concrete bridge over Varney Brook and associated wetlands which bisected the landfill. Responsibilities included preparing plans and specifications and providing engineering services during construction. Dover, NH.

PROFESSIONAL MEMBERSHIPS/ACHEIVEMENTS American Society of Civil Engineers Recipient of the 2007 and 2008 Jacques Whitford Student Incentive Award

Page 24: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

Gregory J. Coren Project Engineer RT Group, Inc.

(1)

EDUCATION

University of Rhode Island, Kingston, RI B.S., Civil and Environmental Engineering, 2013

PROFESSIONAL EXPERIENCE

RT Group, Inc. Project Engineer, 2013 - Present Office/Field Engineer, 2012 - 2013 Aetna Bridge Company Office Engineer, 2011 - 2012

Mr. Coren is recent graduate of the University of Rhode Island’s College of Engineering. He plans to immediately proceed with a graduate education in Civil Engineering, focusing on both geotechnical and structural curriculums. His work at Aetna Bridge Company, and currently at RT Group, Inc. (RTG), has given him a well-rounded skill set as a young engineer. As a Project Engineer, Mr. Coren is responsible for preparing project reports, managing project documentation, creating and editing Computer-Aided-Design drawings, performing project calculations, data analysis and review, and interacting with clients. He has also been intimately involved with updating and helping to execute RTG’s marketing plan, and co-wrote and implemented its Employee Health and Safety Program. Mr. Coren has also provided a number of services involving onsite project work. He has assisted in dam safety and performance inspections, performed observation well monitoring and outfall sampling, surveyed multiple projects, monitored geotechnical subsurface investigations, and performed both part-time and full-time construction observation. Representative project experience includes:

Dam Engineering

Hugo Key & Sons, Inc., Featherbed Dam Dewatering, Flow Diversion, and SOE Plan:

Project Engineer for preparing contractor submittals for improvements made to this earth and masonry dam. The dewatering, flow diversion, and support of excavation plans that were prepared allowed the contractor to replace the existing stone masonry culvert with pre-cast box culverts and to reconstruct the municipal roadway travelling across the crest of the dam. North Kingstown, RI.

Town of Chaplin, Darling Pond Dam Improvements Project: Project Engineer for the design of improvements to this 250-foot-long earth embankment dam. Responsible for preparing the Visual Inspection Report; performing a topographic survey; completing design and permitting; and preparing plans and specifications for bidding and construction. This project included retro-fitting the existing pre-cast drop-inlet type structure for use as a low-level outlet structure; installing a new primary box culvert spillway; flattening the upstream and downstream slope of the dam; and armoring the upstream slope. Chaplin, CT.

City of Providence, Canada Pond Dam Alternatives Evaluation Report: Project Engineer

Page 25: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

Gregory J. Coren Project Engineer RT Group, Inc.

(2)

for preparing an Alternatives Evaluation Report of this 340-foot-long concrete retaining wall and earth embankment dam. The work included performing a topside visual inspection; observing an underwater dive inspection; concrete coring; soil test holes; and preparing the Alternatives Evaluation Report. Providence, RI.

Quidnick Reservoir Company, Flat River Reservoir Dam Biennial Inspection: Field

Engineer for assisting in performing the inspection and evaluation of a 1,400-foot-long by 20-foot-high High-Hazard earth and masonry dam, as well as preparing the Inspection / Evaluation Report. Coventry, RI.

Marine / Waterfront Engineering

Quonset Development Corporation, Zarbo Avenue Bulkhead Project: Project Engineer for

completing the design of approximately 1,300 LF of new anchored sheetpile bulkhead. The work included preparing a Condition Assessment Report; performing a geotechnical investigation; completing design and permitting for the new bulkhead; and preparing plans and specifications for bidding and construction. North Kingstown, RI.

Southern New England Ship Building Company, Laydown Area Expansion and Air Bag

Launch Way Project: Field Engineer for construction of a dry dock launch way. Observed daily construction activities to confirm general adherence to project plans and specifications. Responsibilities included confirming proper subgrade preparation; observing concrete pouring and associated testing; observing the placement of Pre-Cast Articulated Concrete Block mats; and managing project documentation. North Kingstown, RI.

Town of Jamestown, East Ferry Boat Ramp Interim Repairs: Project Engineer for

evaluating an existing boat ramp at the East Ferry Marina. The Scope-of-Work included performing a topographic and bathymetric survey of the boat ramp and surrounding area in order to develop a base plan of the area and quantify the extent of interim repairs needed.

Americas Styrenics, Maintenance Dredging Project: Project Engineer for obtaining

vibrocore sediment samples and for performing chemical and biological testing for a 100,000 CY Maintenance Dredging project in the Thames River. Responsibilities included executing the Sediment Sampling Plan and obtaining grab sediment samples at two disposal sites in the Long Island Sound. Gales Ferry, CT.

Town of Jamestown, Fort Getty Pier Inspection: Project Engineer for the inspection of a WWI era timber pier. Responsibilities included conducting a visual inspection of the pier both topside and waterside, and reducing data from the inspection for the preparation of the inspection report. Jamestown, RI.

Styron LLC., Shoreline Protection Project: Project Engineer for the design of a new riprap revetment to protect an eroding shoreline adjacent to an active rail line. Responsibilities included conducting a topographic survey of the wetlands and surrounding area; completing the CTDEEP Structures, Dredging, and Fill Permit Application; and developing the revetment design to prevent continued erosion of the slope. Gales Ferry, CT.

General Civil Engineering

Town of Jamestown, Fort Getty Roadway Repairs Project: Project Engineer for the design

Page 26: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

Gregory J. Coren Project Engineer RT Group, Inc.

(3)

of repairs to a roadway damaged by storm surge. The project included performing a topographic survey of the existing conditions, designing the repairs, and preparing plans and specifications for construction. Jamestown, RI.

Town of Jamestown, East Ferry Sea Wall Project: Field Engineer for surveying construction limits and existing structures for the development of bidding and construction plans and specifications for the replacement of 260 linear feet of existing concrete seawall. Jamestown, RI.

Capital Terminal Company, Salt Pile Property Development: Field Engineer for surveying

property lines and existing structures for possible development of a fuel delivery rail depot. East Providence, RI.

Geotechnical Engineering

Southern New England Ship Building Company, Laydown Area Expansion and Air Bag

Launch Way Project: Field Engineer for monitoring pile driving operations by verifying pile locations and adherence to particular refusal criteria; performing site surveys for pre-construction layout and structure placement; and monitoring geotechnical subsurface investigations. North Kingstown, RI.

Environmental Engineering

Millennium Tower, Dewatering and Water Treatment Plan: Project Engineer for the

preparation of the Dewatering and Water Treatment Plan for the temporary earth support system installed for the construction of the Millennium Tower in Boston, Massachusetts. The Tower is being built adjacent to the historic Burnham Building and will be 55 stories, or approximately 606 feet tall upon completion. The plan included estimating the expected seepage/leakage rate into the excavation; specifying the dewatering wells/pumps; and designing the treatment system for the removal of site contaminants in conjunction with Lockwood Remediation Technologies. Boston, MA.

Capital Terminal Company, Environmental Monitoring: Field Engineer for performing monthly observation well monitoring by measuring and reporting ground water and LNAPL product levels within a diesel fuel tank farm. Conducted the semi-annual oil-water separator outfall sampling and coordinated the required analytical testing. East Providence, RI.

PROFESSIONAL MEMBERSHIPS/ACHEIVEMENTS American Society of Civil Engineers Chi Epsilon Civil Engineering Honor Society Tau Beta Pi Engineering Honor Society American Institute for Steel Construction Recipient of the 2013 Rhode Island Consulting Engineers Scholarship

Page 27: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

James B. Russell, P.E. Principal / Senior Project Manager RT Group, Inc.

(14)

selected final treatment technologies; and outlined the full-scale remediation system. East Providence, RI.

Wright-Patterson Air Force Base, OU-4 RI/FS: Project Manager for the remedial investigation/feasibility study (RI/FS) and remedial design for 4 abandoned CERCLA landfills and a drum staging/disposal area. Dayton, OH

US EPA, Onalaska Landfill Remedial Action Project: Project Manager and lead designer for

the preparation of plans and specifications for this US Environmental Protection Agency landfill cap remedial action project. Also directed the field inspection program. The project included construction of a clay and soil cap, ground improvements for construction of a new treatment plant building, construction of a landfill gas interceptor trench and venting system, and road improvements. Onalaska, WI.

SC Johnson Wax, Groundwater Remedial Action Project: Senior Project Manager for the

pre-design of a 2,000-foot-long groundwater interceptor and collector trench at this active manufacturing facility. Racine, WI.

US EPA, Forest Waste Lagoons Remedial Action Project: Served as Task Manager and field

team leader during the remedial design field investigation; prepared plans and specifications for bidding and construction; and performed construction observation for the cleanup of 9 lagoons used for the disposal of industrial liquid wastes. Ottisville, MI.

PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers PUBLICATIONS

Russell, J. B., 2010, “Full Scale Footing Load and Settlement Response Case Study,” Geo-Frontiers Conference

Bellisle, J. M., and Russell, J. B., September 2000, “The Cost of Repairing a Dam; Information for Dam Owners,” ASDSO Conference

Russell, J. B. and Lawrence, C. L., June 1998, “Monitoring Preload Performance, Field Instrumentation for Soil and Rock,” ASTM STP 1358

Russell, J. B., 1990, “Remedial Action Case History: Forest Waste Site Lagoons,” Proceeding of the 45th Annual Purdue Industrial Waste Conference

Page 28: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

Trevin T. Alpaio Staff/Field Engineer RT Group, Inc.

(1)

EDUCATION University of Rhode Island, Kingston, RI B.S., Civil and Environmental Engineering, 2014 PROFESSIONAL EXPERIENCE RT Group, Inc. Staff/Field Engineer, 2013 - Present

Mr. Alpaio is a recent graduate of the University of Rhode Island’s College of Engineering. As a Staff/Field Engineer, he has gained experience in projects including geotechnical investigations, dam safety inspections, and environmental monitoring as well as topographic and bathymetric surveying. Mr. Alpaio also regularly contributes to project reports, Computer-Aided-Design drawings, project calculations, and data analysis and review.

Dam Engineering

Town of Chaplin, Darling Pond Dam Improvements Project: Field Engineer for the design of improvements to this 250-foot-long earth embankment dam. Responsibilities included performing a topographic survey; preparing the Visual Inspection Report; completing design and permitting; and preparing plans and specifications for bidding and construction. This project included retro-fitting the existing pre-cast drop-inlet type structure for use as a low level outlet structure; installing a new primary box culvert spillway; flattening the upstream and downstream slopes of the dam, and armoring the upstream slope. Chaplin, CT.

City of Providence, Canada Pond Dam Alternatives Evaluation Report: Field Engineer for

preparing an Alternatives Evaluation Report of this 340-foot-long concrete retaining wall and earth embankment dam. The work included performing a topside visual inspection; observing an underwater dive inspection; concrete coring; soil test holes; and preparing the Alternatives Evaluation Report. Providence, RI.

YMCA of Pawtucket, Quidnick Reservoir Dam Inspection Report: Field Engineer for

preparing an inspection report of the earth embankment dam. Responsibilities included completing a RIDEM file review of all relevant project information; visually inspecting the dam, including performing a survey of all deficiencies; and preparing the Visual Inspection Report detailing the condition of the dam. Coventry, RI.

Geotechnical Engineering

RIDOT, Victory Highway Bridge Replacement: Field Engineer for the replacement of an

existing bridge structure over I-95. Responsibilities included overseeing the geotechnical investigation; performing a site survey; and preparing the Geotechnical Data and Interpretive Report. Exeter, RI.

Page 29: James B. Russell, P.E. Principal / Senior Project Manager ...nvcogct.org/sites/default/files/COGCNV-RT-Resumes.pdf · Principal / Senior Project Manager RT Group, Inc ... sections

Trevin T. Alpaio Staff/Field Engineer RT Group, Inc.

(2)

Marine / Waterfront Engineering

Town of Jamestown, East Ferry Boat Ramp Interim Repairs: Field Engineer for evaluating an existing boat ramp at the East Ferry Marina. The Scope-of-Work included performing a topographic and bathymetric survey of the boat ramp and surrounding area in order to develop a base plan of the area and quantify the extent of interim repairs needed.

Americas Styrenics, Maintenance Dredging Project: Field Engineer for obtaining vibrocore

sediment samples and for performing chemical and biological testing for a 100,000 CY Maintenance Dredging project in the Thames River. Responsibilities included executing the Sediment Sampling Plan and obtaining grab sediment samples at two disposal sites in the Long Island Sound. Gales Ferry, CT.

Town of Jamestown, Fort Getty Pier Inspection: Field Engineer for the inspection of a WWI era timber pier. Responsibilities included conducting a visual inspection of the pier both topside and waterside, and reducing data from the inspection for the preparation of the inspection report. Jamestown, RI.

Styron LLC., Shoreline Protection Project: Field Engineer for the design of a new riprap revetment to protect an eroding shoreline adjacent to an active rail line. Responsibilities included conducting a topographic survey of the wetlands and surrounding area; completing the CTDEEP Structures, Dredging, and Fill Permit Application; and developing the revetment design to prevent continued erosion of the slope. Gales Ferry, CT.

Environmental Engineering

Capital Terminal Company, Environmental Monitoring: Field Engineer for performing

monthly observation well monitoring by measuring and reporting ground water and LNAPL product levels within a diesel fuel tank farm. East Providence, RI.

PROFESSIONAL MEMBERSHIPS/ACHEIVEMENTS American Society of Civil Engineers American Institute for Steel Construction