  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    1.0 INTRODUCTION

    JAIPRAKASH INDUSTRIES LIMITED, JIL started its operations as a

    partnership entity in 1957 and was incorporated as a public limited company in 1983. JIL is one of the largest players in the Indian

    construction industry in terms of size of operations and has established a strong presence in the domestic hydropower sector. In an extension of

    core competence, JIL has now emerged from being a mere hydropower

    construction company to a developer of hydropower projects.

    In the past, JIL has executed water supply projects in Iraq, while recently,

    the company acquired a road project, marking a sectoral diversification.

    Further, JIL has executed building projects (all Jaypee Group hotels) and some industrial structural works.

    JIL to meet the requirement of cement for their construction projects in

    India and abroad has diversified into cement sector in 1986. JIL under the name Jaiprakash Associates Limited (JAL) is operating two cement

    plants at Rewa district in the state of Madhya Pradesh.

    In response to the invitation of Government of Himachal Pradesh for settingup of the major cement plants and also to increase their regional

    presence in the Country, JAL has proposed to produce 3.15 mtpa of

    cement by settingup the following units.

    a. 2.54 mtpa Cement plant at Baga Village, Arki Tahsil, Solan district. b. 3.1 mtpa limestone mine at Baga-Bhalag deposit, Arki Tahsil, Solan

    district. c. 1.75 mtpa blending plant at Bageri, Bageri Tahsil, Solan District.

    The proposed cement plant at Baga will produce 2.05 mtpa of clinker and

    2.546 mtpa of Cement which is based on the Baga-Bhalag Limestone

    deposit identified by Department of Mines and Geology, Himachal Pradesh. About 3.1 mtpa of required limestone will be produced from this

    deposit.

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    Out of the total 2.54 mpta cement produced at Baga, about 1.14 mtpa of

    OPC cement will be dispatched to the proposed Blending Plant at Bagheri for production of 1.75 mtpa of Portland Pozzolana Cement. Details of

    proposed cement production by JAL in the State of Himachal Pradesh is shown in Fig 1.1.

    1.1 NEED FOR THE PLANT DEMAND SCENARIO OF CEMENT

    The cement market has growth potential due to the central government liberalization policies and new schemes for housing, road projects. Cement demand growth is anticipated to be about 7-8% increase mainly through road projects (Golden Quadrilateral ), Housing Projects (1.3 million houses in rural & 0.7 million in urban areas).

    Continuous demand for exports to China and other South-East Asian

    countries along with the increas ed requirement of the domestic sector has

    lead all the cement manufacturers in the country to plan for increased

    capacities.

    1.2 PRESENT PROPOSAL 2.54 MTPA CEMENT PLANT, BAGA

    JAL proposes to setup a Cement Plant based on state-of-the- art

    technology near Baga Village, Arki Tahsil, Solan District, Himachal Pradesh.

    The proposed cement plant will be capable of producing about 2.0 mtpa

    of clinker and 2.125 mtpa of Ordinary Portland cement. With the OPC

    produced at Baga , JAL proposed to manufacture 3.15 mtpa of cement by blending with flyash at various stages.

    Of the total cement production of 3.15 mtpa, JAL will produce about 1.40

    mtpa of cement as give below at Baga.

    Total cement production - 3.15 mtpa ?Cement production at Baga

    Ordinary Portland Cement 0.305 mtpa

    Portland Pozzolona Cement 1.095 mtpa ?Cement production at Bagheri

    Portland Pozzolona Cement 1.75 mtpa

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    ORDINARY PORTLAND CEMENT

    TOTAL CEMENT AT BAGA

    1.40

    ( OPC : 0.683

    PORTLAND POZZOLONA CEMENT

    FLYASH : 0.412 )

    1.095

    TOTAL CEMENT PRODUCTION BY JAL3.15

    ( OPC : 1.14 + FLYASH : 0.61)

    PORTLAND POZZOLONA CEMENT

    TOTAL CEMENT AT BAGHERI

    1.75

    0.305 1.75

    PROPOSED CEMENT PRODUCTION (IN MTPA) BY JAL

    CEMENT PLANT - BAGA

    CEMENT PRODUCTION

    ORDINARY PORTLAND CEMENTTO PROPOSED BAGERI BLENDING UNIT

    BLENDING PLANT - BAGHERI

    1.14

    2.54

    FOR PPC PRODUCTION

    AT HIMACHAL PRADESH

    FIG - 1.1

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    The present proposal pertains to the total clinker production capacity of

    2.05 mtpa and cement production of 2.54 mtpa at Baga Village.

    1.3 PROJECT COST: JAL has estimated that the cost of implementation of the proposed cement plant will involve a total capital investment of Rs 700 Crores. Of the total cost, about Rs 80 crores will be incurred towards implementation of Environmental Management Plan

    1.4 SITE SELECTION CRITERIA

    The efficient functioning of the plant depends on the availability of the

    basic requirements. Apart from this, the suitability/compliance of the site

    with respect to the guidelines of the Ministry of Environment and Forests

    and location of the deposit has been evaluated and Site : 1 i.e at Baga has been selected. The reasons for selection of site at Baga and rejection

    of other sites is given below :

    ALTERNATIVE SITES

    SITE NO LOCATION REMARKS

    Site : 1 Baga Located on Baga -Bhalag

    limestone deposit

    Considered due to its

    proximity to the limestone

    deposit and availability of

    substantial land belonging to

    Government.

    Site : 2 Malothi Located in the same direction

    as of Baga at a distance of 5

    km from the deposit

    Rejected due to non

    availability of land and its

    farther from the limestone

    deposit.

    Site : 3 Kol Hawani Located in the North-West

    direction at 2 km from the

    deposit.

    Rejected due to proximity of

    the site to Kol dam

    Site : 4 Kotlu Located at 10 km in the

    Western direction of the

    deposit.

    Rejected due to its distance

    and poor connectivity of the

    limestone deposit to the plant

    The following are various features of the selected project site near Baga

    village:

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    ??Availability of land and water ??Compliance of the site with the sitting guidelines of MOEF

    ??Proximity of the limestone deposit. ??Availability of road to facilitate and transportation of the plant

    equipment, raw material and product

    ??Availability of labour force during construction and operation phase

    ??Accessibility of the site from environmental aspects ??No national park or wild life sanctuary exists within 10 km of the

    plant. ??There are no sensitive places of archaeological, historical, cultural,

    and religious or tourist importance within 10 km of the plant.

    1.5 LOCATION

    The plant site is located in an area of 166.01 ha in Baga village, Arki

    Tehsil, Solan District of Himachal Pradesh. The site falls under the Survey of India Topo sheet No. 53 A/15 and is located between North latitude

    31o 1905 to 31 o 2140and East longitude 76 o 5238 to 76 o 5446. Fig 1.2 shows the Location Map of the plant site.

    A semi-metalled village road connecting Kharsi to Kandhar and which is also the main access road for the villages spread across the limestone

    deposit of JAL passes along the outer periphery of the proposed Bhalag captive limestone mine of JAL located in the northern direction of the plant

    site. Kharsi, which is approximately 13 km from Bhalag, lies on a link road connecting Darla on NH-88 to Beri on NH-21.

    No railway line exists at present near the plant site. The nearest broad

    gauge railhead is at Kiratpur in the neighboring state of Punjab and is

    located at a distance of about 92 km to the west, south-west of the deposit. Shimla, the state capital is linked with Kalka by a narrow gauge

    railway line and it lies at a distance of 78 km to the south east of the deposit.

    River Satluj, which flows from a distance of about 2.5 km from the plant

    site controls the drainage of the plant area and its surroundings. FIG 1.3 shows the Key map of the Plant site.

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    Kandar

    Arki

    HatkotRamshahr

    Kundlu

    Nalagarh

    Sabathu

    Patta

    Kasauli

    Kandaghat

    Dagshai

    Solan

    Chail

    21

    To Ru

    pnagar

    To Bilaspur

    To Shimla

    To Kalk

    a

    To Amba

    la

    22

    SOAN R.

    MANDI

    CHAMBA LAHUL AND SPITI

    KULLU

    KANGRA

    KINNAUR

    SHIMLA

    BILASPUR

    SOLAN

    UNA

    HAMIRPUR

    SIRMAUR

    LOCATION MAP

    INDIA

    HIMACHAL PRADESH

    SOLAN

    FIG - 1.2

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    RIVER / NALA

    STREAMS

    LEGEND

    FOREST BOUNDARY

    ROAD

    B.S.ENVI-TECH (P) LTD.,HYDERABAD

    PREPARED BY

    PROJECT :

    0 1 2KM

    SCALE

    KEY MAPPLANT SITE?

    M/s JAIPRAKASH ASSOCIATES LIMITED

    ARKI TEHSIL, SOLAN DIST., HIMACHAL PRADESH

    BAGA-BHALAG LIMESTONE DEPOSIT

    TITLE :

    KEY MAP

    ?PLANT SITE

    MATRECH

    P F

    SIARLI PF

    Chida

    Sirin

    CharahuManjedi

    Chambi Kolthi

    MalokarThach

    Sahnali

    Pauri

    BhalagBAGA

    Baga

    Bharetar

    Mahtar

    Bhandokhar

    Leongari

    Sihi

    Ghamrora

    Leongari Kharsi

    Panali

    Jajar

    Kyari

    Torti

    Karog

    Huwani

    Aina

    Chaldwan

    Ban

    Daudi

    Darobar

    Padyar

    Karyad

    Kandar

    BAHADURPUR

    KHATFUL

    P F

    SAMTIARIP F

    P F

    M A N G A L

    SANGAN

    P F

    SAMTIARIPF

    BAJARIAL P F

    DEVI DHAR

    DA

    NG

    N

    IL

    D H A R

    Matrech

    0.65 Km0.7 Km

    0.9 Km 1.8 Km

    2 Km

    2.5 Km

    0.7 Km

    1.7 Km

    2.4 Km

    3.5 Km

    DISTRICT BOUNDARY

    SUTL

    UJ R.

    FIG - 1.3

    1.8 Km

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    The major industries located within 10 km radius of the study area are M/s ACC cement and Gujarat Ambuja cements and their respective captive

    limestone mines.

    Fig 1.4 shows the 10 km radius of the study area. Salient features of

    the Plant site are given in Table 1.1.

    1.6 RESOURCES AVAILABILITY

    1.6.1 Raw Materials

    The major raw material for manufacture of cement is Limestone. The captive limestone deposit (Baga-Bhalag) is located at a distance of about

    0.5 km from the plant. The limestone requirement of the plant is estimated to be about 3.1 mtpa with daily requirement of 9840 tonnes.

    JAL has initiated the process for obtaining the statutory clearances for the

    identified limestone deposit.

    The requirement of raw material for the 2.05 mtpa of clinker production

    along with 2.54 mtpa of cement production is given below:

    REQUIREMENT OF RAW MATERIAL

    RAW MATERIAL

    QUANTITY (MTPA) Source

    Limestone

    3.1 Captive limestone mine

    Gypsum 0.10 Rajasthan Coal 0.36 Madhya Pradesh and Bihar

    Dry flyash 0.262

    From Panipat through proposed Blending plant, Bhageri Flyash

    Wet flyash

    0.150 Panipat

    1.6.2 Land

    The total land of cement plant and colony is about 166.01 ha. Details of

    land breakup of the total area is given below :

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    RIV

    ER /

    NALA

    STR

    EAM

    S

    IND

    EX

    FOREST B

    OU

    ND

    ARY

    RO

    AD

    B.S

    .EN

    VI-

    TECH

    (P)

    LTD

    .,H

    YD

    ER

    ABAD

    PR

    EPAR

    ED

    BY

    PRO

    JEC

    T :0

    12

    34

    5K

    M

    SCALE

    MAP

    SH

    OW

    ING

    10 K

    M

    RAD

    IUS

    PLAN

    T SIT

    E

    53 A

    /10

    Index

    to s

    hee

    ts

    53 A

    /11

    53 A

    /12

    ?

    77

    50'

    25'

    31

    77

    55'

    31

    25'

    77

    0'

    31

    15'

    77

    55'

    77

    50'

    31

    15'

    31

    20'

    31

    20'

    M/s

    JAIP

    RAKASH

    ASSO

    CIA

    TES L

    IMIT

    ED

    ARKI

    TEH

    SIL

    , SO

    LAN

    DIS

    T.,

    H

    IMACH

    AL

    PRAD

    ESH

    BAG

    A-B

    HALA

    G L

    IMESTO

    NE D

    EPO

    SIT

    53 A

    /14

    53 E

    /2

    53 A

    /15

    53 E

    /3

    53 E

    /453 A

    /16

    TITL

    E :

    Cham

    akar

    iN

    auni

    Khar

    aun B

    ala

    Khar

    aun J

    erin

    Che

    nnar

    ri

    yuh

    ?PLA

    NT S

    ITE

    Punah

    an

    Panjg

    ain

    Dhaun

    Gah

    arRop

    a

    Men

    al

    Kan

    aun

    Jam

    thal

    Jalp

    a Kal

    pa

    Sar

    mar

    Nai

    hor

    Ras

    hum

    iBad

    i

    Dha

    wah

    al

    Sunal

    i

    Dhah

    ara

    Bhal

    ana

    Nag

    ri

    Dhar

    a

    Khar

    an D

    eo

    Ghare

    riA

    ndpa

    Dhar

    Kan

    thi

    Bal

    agK

    ath

    laM

    ajh

    ali

    Chauri

    Chhal

    awan

    Dhaw

    ara

    Khuh

    Nar

    ilaPuw

    obu

    Bagra

    Duka

    Bad

    nuTi

    kar P

    ati

    Bak

    hal

    Cheo

    riD

    han

    rara

    Gah

    anG

    ham

    ru

    Bart

    ha

    Bad

    hu

    Jari

    Bhab

    ela

    Sai

    niChal

    ogM

    andno

    SATL

    UJ R

    IVER

    Sohra

    Chal

    oni

    Pariab

    Kagri

    Cham

    rol

    Phalo

    dhaa

    Basy

    ana

    Kas

    um

    bla

    Badhar

    Suhni

    Roa

    Kha

    d

    Kuru

    nghu

    Kha

    liN

    er

    San

    er

    Kansw

    ala

    Bad

    ahal Pa

    rnu

    Ser

    Poob

    Changar

    Sam

    ana

    Ser

    a

    Kot

    lu

    Phagw

    ana

    Jablu

    Auher

    Chham

    le

    Sula

    ng

    Dam

    ras

    Dugli

    Cham

    ba

    Bar

    og

    Aslu

    Bah

    lu

    MATR

    ECH

    BAN

    AU

    LA P

    F

    Subil

    Sia

    rli

    P FMatr

    ech

    Dhaw

    arl

    aBer

    i San

    agra

    Kan

    dli

    Sab

    orBa

    m K

    had

    Dhars

    iSIA

    RLI

    PF

    Jandre

    hi

    Chid

    a

    Niri

    Bare

    ch

    Rupar

    Mar

    ora

    Sir

    inKuphar

    Sam

    alH

    alogda

    Pata

    Main

    dla

    Beh

    i

    Kanth

    i

    Suin

    Rer

    a

    Panjo

    t

    Dhara

    Das

    era

    Kal

    ar

    Bhurj

    ani

    Silha

    Mal

    ethiK

    ulran

    Kot

    hi

    Gulje

    ri

    Sam

    loh

    Dauru

    Nau

    gao

    n

    ChakliC

    hako

    hPas

    aya

    Kirfa

    Mal

    othi

    Cha

    narr

    hi

    Kiy

    ahar

    anC

    hara

    hu

    Manje

    di

    Cham

    bi

    Kol

    thi

    Malo

    kar

    Thach

    Sahnali

    Pauri

    Bhal

    ag

    BAG

    A

    Bag

    a

    Bhar

    etar

    Mahta

    r

    Changar

    Bhan

    dok

    har

    Leongari

    Sih

    iG

    ham

    rora

    Leon

    gar

    iKhar

    si

    Rat

    heh

    Ghan

    ser

    Cher

    anPla

    gla

    tan

    Cham

    bia

    raJa

    ned

    Panje

    liPanje

    l K

    ala

    n

    Soh

    ri

    Sam

    log

    Sai

    Sukr

    oh

    Kam

    ard

    a G

    alo

    r

    Gah

    ota

    Panje

    l Jam

    la

    Chi

    narh

    iD

    unglu

    Sam

    al

    Susa

    nNam

    hol

    Raj

    ghat

    Duhti

    Ghay

    alK

    iyorr

    aN

    alag

    Thac

    h

    Tepra

    Kunka

    r

    Sya

    lR

    ani K

    otl

    a

    Gor

    i

    Pahlw

    ana

    Kat

    hpura

    Ban

    gar

    Chal

    agBat

    ha

    Sai

    Nod

    ua

    Man

    jhar

    iB

    arn

    un

    Koln

    u Neri

    Behli

    Sela

    gAl

    i Kha

    d

    Kha

    wa

    Bab

    lu R

    opar

    a

    Dol

    Panjo

    l

    Rui

    Riu

    nKals

    ua

    Bea

    ther

    Kan

    di

    Phad

    ana

    Dee

    la C

    hham

    b

    Har

    nor

    a

    Cham

    yoj

    Rir

    a

    Pati

    Bau

    hat

    Kia

    n

    San

    ihan

    Dhar

    Tato

    h

    Haw

    ani

    Ghanoda

    Than

    gar

    How

    dni

    Deo

    Ghat

    Man

    ar

    Deoli

    Dal

    ta

    Jura

    si

    Magro

    t

    Mak

    rog

    BH

    UM

    AK

    Poka

    r

    Kotl

    uPa

    tti N

    alw

    ar

    Bar

    og

    Thohra

    Sandauli

    Lehsa

    rJa

    bal

    Met

    hli

    Dhad

    as

    Gas

    aur

    Kath

    pur

    Jinan

    un

    Bat

    kisa

    n

    Mar

    kand

    Bhat

    oli

    Rer

    i

    Jukh

    ala

    Bho

    li

    Asa

    Siy

    ahla

    Mitra

    ma

    Bal

    wad

    Majo

    t

    Bas

    la

    Panje

    tan

    Nih

    ark

    han

    Dagse

    ch

    Kat

    alD

    obha

    Daro

    ba

    Bharw

    ar

    Sayar

    Gohin

    d

    Panali Ja

    jar

    Kya

    riTo

    rti K

    arog

    Huw

    ani

    Ain

    a

    Chal

    dw

    an

    Ban

    Dau

    diDar

    obar

    Padya

    r

    Kar

    yad

    Kan

    dar

    Panja

    r Kot

    liKha

    d

    Row

    a

    Jart

    u

    Khare

    r N

    Dau

    r Bhat

    i

    GH

    IALA

    G

    HIA

    LANBa

    dar Kh

    ad

    KH

    ALA

    Katal Khad

    Raho Kh

    ad

    BAH

    AD

    URPU

    R

    Dab

    al

    KH

    ATFU

    LP F

    SAM

    TIA

    RI

    P F

    P F

    M A

    N G

    A L

    MU

    NG

    RAN

    IP

    F

    Paharw

    al N

    Dansol

    N

    Cana

    l

    NAUN

    A DHA

    R

    Bal

    oh

    SAN

    GAN

    P F

    SATLUJ R

    Kas

    ol

    CH

    HABIA

    WAN

    PF

    BAD

    I P

    F S

    AN

    YED

    A

    KAN

    DA

    LAN

    GO

    L KAN

    DA

    SAM

    TIARI

    PF

    BAJA

    RIA

    L P

    F P

    A

    R

    D

    H

    O

    T

    MATIA

    NJ

    KH

    URD

    SKO

    R PF

    TR

    OH

    AT

    PF

    MAJH

    ATAL

    P F

    SU

    IN M

    ARO

    RA

    PFG

    HAM

    RU

    PF

    Bad

    u

    Man

    wal

    Khad

    U J

    R A P

    F

    B U

    N G

    A

    P F

    GAIH

    ARU

    P F Ta

    ngru K

    had

    DEVI DHA

    R

    Panso

    da

    Jere

    kh

    Sam

    dhar

    Kav

    iC

    ham

    log

    Dau

    rangao

    n

    Jeor

    a

    77

    0'

    D

    A

    NG

    N

    IL

    DH

    AR

    DIS

    TRIC

    T BO

    UN

    DARY

    ??

    GU

    JARAT

    AM

    BU

    JA

    AC

    C P

    LAN

    T

    FIG

    - 1

    .4

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    LAND AVAILABILITY

    S.NO. AREA (HA.)

    1 Plant area and roads 60

    2 Colony with infrastructure 35

    3 Parking area 16.01

    4 Greenbelt 20

    5 Space around the plant site 35

    Total 166.01

    1.6.3 Water

    Manufacturing of clinker and cement is based on dry process technology. The water requirement is mainly for process cooling and AC, DG sets

    cooling and for domestic purposes in the Plant and Colony. The total water

    consumption of the plant including colony is about 3000 m3/day.

    This requirement will be met from Borewells proposed within plant site. It

    is also proposed to draw water from River Sutlej located at a distance of

    about 2.5 km.

    JAL is in the process of obtaining the necessary clearances for water drawal from the above sources.

    1.6.4 Power

    The power requirements of the cement plant is about 30 MW. This requirement will be met from grid. JAL has recently commissioned a 300

    MW Baspa Hydro electric power plant at Baspa, Himachal Pradesh.

    Wheeling of the power from Baspa also is under consideration.

    The required power for plant is proposed to be tapped from Chamakhadi

    substation located at 10 km from the site through a 132 KV power line passing at 4 km from the proposed site.

    To augment the power requirement during exigencies, JAL will install two DG sets each of 6.0 MW.

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    1.6.5 Infrastructure

    JAL will install complete utilities and other infrastructural facilities in the

    cement plant.

    Adequate storage facility for limestone, clinker, laterite, gypsum, coal and

    flyash under closed sheds will be provided to meet the requirements of

    the plant. Good workshop facility both for mechanical and electrical equipment repairs and maintenance is also proposed.

    1.6.6 Manpower

    The total manpower requirement of the cement plant is estimated to be about 570.

    1.6.7 Township

    JAL will provide a common full fledged township comprising of housing

    facilities for plant, mine and security personnel and supporting staff along with other amenities such as School, Guest House, Hospital, Shopping

    Complex etc

    1.7 ENVIRONMENTAL IMPACT ASSESSMENT STUDY

    In order to assess the likely impacts of the proposed cement plant, JAL

    has initiated steps to carry out Environmental Impact Assessment over a radial distance of 10 km around the proposed plant site during Summer,

    2004 covering the months of April to June 04.

    This report presents the baseline scenario, prediction of impacts for 2.05

    mtpa clinker production along with 2.54 mtpa cement production as per the guidelines of MoEF/ CPCB and IMD along with a detailed

    Environmental Management Plan which will be implemented in the operational Phase of the cement plant.

  • 2.54 mtpa Cement Plant, Himachal Pradesh Jaiprakash Associates Ltd REIA Report

    B.S. Envi-Tech (P) Ltd., Hyd.

    TABLE 1.1

    SALIENT FEATURES OF THE SITE

    FEATURE DETAILS

    Altitude 1640 m above msl

    Longitude Between 76o 5238 to 76 o 5446 E

    Latitude Between 31o 1905 to 31o 2140 N

    Village, Tehsil, District, State Baga, Arki Tehsil, Solan District of Himachal

    Pradesh.

    Max. Temp. 37

    Min Temp. 3

    Relative Humidity 60

    Annual rainfall 1527

    Land availability Plant area including colony 166.01 ha.

    Topography Undulating

    Soil Type Sandy loam

    Nearest River Satluj 2.5 km

    Nearest Highway NH-88 - Darla More to Nauni- 30 km.

    Nearest Railway station Kiratpur 98 km

    Nearest Village Baga

    Bhalag

    Nearest City Kiratpur 98 km

    Nearest Industries Associate Cement Companies 5.5 km NW

    Gujarat Ambuja Cement 8.0 km in SE

    Nearest Air port None within 10 km

    Nearest Forest Part of the area is located in the forest area

    Sensitive places None within 10 km

    Historical places None within 10 km