Slide 1

Optimization Modeling for Mining Engineers

Alexandra M. Newman

Division of Economics and Business

Colorado School of Mines

Slide 2

Seminar Outline

• Linear Programming

• Integer Linear Programming

• Mixed Integer Linear Programming

• Network Models

• Nonlinear Programming

1

Slide 3

Linear Programming

Consider the following system:

(P ) min cx

subject to Ax = b

x ≥ 0

where x is an n × 1 vector of decision variables, and A, c,

and b are known data in the format of an m × n matrix, a

1 × n row vector, and an m × 1 column vector, respectively.

Slide 4

Linear Programming in Mining

• Blend raw materials with certain characteristics into final

products with specifications on the characteristics

• Given a mining sequence, compute a production

schedule

• Allocate equipment to a task for a given number of hours

• Make tactical production decisions, e.g., regarding

sending product to mills

2

Slide 5

Example 1: Linear Programming

The Metalco Company desires to blend a new alloy of 40%

tin, 35% zinc, and 25% lead from several available alloys

having the properties given in Table 1. Formulate a linear

program whose solution would yield the proportions of these

alloys that should be blended to produce a new alloy at

minimum cost.

Slide 6

Example 1: Linear Programming

Table 1: Alloy properties

Alloy 1 Alloy 2 Alloy 3 Alloy 4 Alloy 5

%Tin 60 25 45 20 50

%Zinc 10 15 45 50 40

%Lead 30 60 10 30 10

Cost ($/lb.) 22 20 25 24 27

3

Slide 7

Solution 1a: Linear Programming

Let xi = proportion of alloy i used {i = 1,2,3,4,5}

minimize 22x1 + 20x2 + 25x3 + 24x4 + 27x5

subject to : 60x1 + 25x2 + 45x3 + 20x4 + 50x5 = 40

10x1 + 15x2 + 45x3 + 50x4 + 40x5 = 35

30x1 + 60x2 + 10x3 + 30x4 + 10x5 = 25

x1 + x2 + x3 + x4 + x5 = 1

x1 ≥ 0, x2 ≥ 0, x3 ≥ 0, x4 ≥ 0, x5 ≥ 0

Slide 8

Solutions to the Linear Optimization Problem

If Ax = b is:

• a uniquely determined system, then x is unique.

• an over-determined system, then x may not exist.

• an underdetermined system, then there may be many

sets of values for x.

4

Slide 9

Linear Programming in Two Dimensions

• The intersection of the constraints Ax = b form a feasible

region.

• One can move realizations of the objective parallel to

each other (up for a maximization problem, down for a

minimization problem) until one such realization contour

“last” touches the feasible region.

• This extreme point is the optimal solution.

Slide 10

Linear Program with an Optimal Solution

x

y

maximum

feasible region objective function realizations

infeasible

5

Slide 11

Linear Program with Multiple Optimal Solutions

x

y

Slide 12

Unbounded Linear Program

y

x

6

Slide 13

Infeasible Linear Program

x

y

Slide 14

Two Linear Optimization Algorithms

• Simplex Method: theoretical performance is exponential,

but practical performance is “good” (only check extreme

points, and usually not all of them)

• Interior Point (Barrier) Method: theoretical performance

is polynomial, and practical performance is good for

large-scale problems

7

Slide 15

Simplex Method

x

y

Slide 16

Interior Point Method

x

y

8

Slide 17

Solution 1b: Linear Programming

• Minimum cost: $23.46

– Alloy 1: 0.043

– Alloy 2: 0.283

– Alloy 3: 0.674

Slide 18

Integer Linear Programming

Consider the following system:

(P ) min cy

subject to Ay = b

y ≥ 0 and integer (and binary)

where y is an n× 1 vector of decision variables, and A, c, and

b are known data in the format of an m × n matrix, a 1 × n

row vector, and an m × 1 column vector, respectively.

9

Slide 19

Integer Linear Programming in Mining

• Delineate an ore body, determine an economic envelope

• Schedule “long-term” production, e.g., machine

placements

• Make decisions with logical, e.g., precedence,

constraints: open pit block sequencing, mining strata

Slide 20

Example 2: Integer Programming

W.R. Gracea strip mines phosphates in strata numbered from

i = 1 at the top to i = n at the deepest level. Each stratum

must be removed before the next can be mined, but only

some of the layers contain enough suitable minerals to justify

processing into the company’s three products: pebble,

concentrate, and flotation feed (j = 1, 2, 3).

aBased on D. Klingman and N. Phillips (1988), “Integer Programmingfor Optimal Phosphate-Mining Strategies,” Journal of the Operational Re-search Society, 9, pp. 805-809.

10

Slide 21

Example 2: Integer Programming

The company can estimate from drill samples the quantity aij

of product j available in each stratum i, the fraction bij of

BPL (a measure of phosphate content) in the part of i

suitable for j, and the corresponding fraction pij of pollutant

chemicals. The company wishes to choose a mining plan

that maximizes the product output while keeping the average

fraction BPL of material processed for each product j at least

bj and the average pollution fraction at most pj . Formulate an

integer linear program model of this mining problem.

Slide 22

Example 2: Integer Programming

Table 2: Quantity, BPL, and pollutant for each product and

stratum

Stratum ai1 ai2 ai3 bi1 bi2 bi3 pi1 pi2 pi3

1 4 2 3 .2 .1 .3 .4 .7 .5

2 1 0 2 .1 0 .2 .2 0 .4

3 0 1 4 0 .2 .4 0 .3 .6

4 2 5 0 .3 .7 0 .4 .8 0

5 3 2 5 .2 .3 .2 .4 .5 .4

Limits .25 .3 .27 .7 .9 .7

11

Slide 23

Solution 2a: Integer Programming

Let xi = 1 if we remove stratum i and 0 otherwiseLet yi = 1 if we process stratum i and 0 otherwise

maxn∑

i=1

3∑

j=1

aijyi

subject to xi ≤ xi−1 ∀ i = 2, ..., n

yi ≤ xi ∀ i = 1, ..., nn∑

i=1

bijaijyi ≥ bj

n∑

i=1

aijyi ∀ j = 1, 2, 3

n∑

i=1

pijaijyi ≤ pj

n∑

i=1

aijyi ∀ j = 1, 2, 3

Slide 24

Integer Linear Programming

x

y

12

Slide 25

Integer Programming Optimization Algorithm

• Now, there are a finite, rather than an infinite, number offeasible solutions.

• So, we could enumerate all the feasible solutions, testthem in the objective function, and choose the best one.

• This would take a long time.

• In fact, even though the conventional algorithm uses“smarter” techniques to reduce enumeration, thealgorithm still has theoretical exponential complexity.

• And, in practice, integer programs require far moresolution time than linear programs of commensurate size.

Slide 26

Solution 2b: Integer Programming

• Maximum product output: 12

– Remove strata 1, 2, 3, and 4

– Process strata 3 and 4

13

Slide 27

Mixed Integer Linear Programming

Consider the following system:

(P ) min cx + dy

subject to Ax + Ey = b

x ≥ 0, y ≥ 0 and integer (and binary)

where x is an n × 1 vector of decision variables, y is an n′ × 1

vector of decision variables, and A, E, c, d and b are known

data in the format of an m × n matrix, an m × n′ matrix, a

1 × n row vector, a 1 × n′ row vector, and an m × 1 column

vector, respectively.

Slide 28

Mixed Integer Linear Programming in Mining

• Scheduling production with sequence and tonnage

decisions

• Supporting development decisions with production

constraints

• Combined resolution production scheduling models

14

Slide 29

Example 3: Mixed Integer Linear Programming

A steel mill has received an order for 25 tons of steel. The

steel must be 5% carbon and 5% molybdenum by weight.

The steel is manufactured by combining three types of metal:

steel ingots, scrap steel, and alloys. Four steel ingots are

available for purchase. The weight (in tons), cost per ton,

carbon, and molybdenum content of each ingot are given in

Table 3. Three types of alloys can be purchased. The cost

per ton and chemical makeup of each alloy are given in Table

4. Steel scrap can be purchased at a cost of $100 per ton.

Slide 30

Example 3: Mixed Integer Linear Programming

Steel scrap contains 3% carbon and 9% molybdenum.

Formulate a mixed integer programming model whose

solution will tell the steel mill how to minimize the cost of

filling their order.

Table 3: Ingot properties

Ingot Weight Cost per Ton ($) Carbon % Molybdenum %

1 5 35 5 3

2 3 33 4 3

3 4 31 5 4

4 6 28 3 4

15

Slide 31

Example 3: Mixed Integer Linear Programming

Table 4: Alloy properties

Alloy Cost per Ton ($) Carbon % Molybdenum %

1 500 8 6

2 450 7 7

3 400 6

Slide 32

Solution 3a: Mixed Integer Linear Programming

• s = amount of steel scrap purchased (tons)

• ai = amount of alloy i purchased (i = 1...3) (tons)

• yi = 1 if ingot i is purchased (i = 1...4), 0 otherwise

• xi = amount of ingot i used (i = 1...4) (tons)

16

Slide 33

Solution 3a: Mixed Integer Linear Programming

min 175y1 + 99y2 + 124y3 + 168y4 + 500a1 + 450a2 + 400a3 + 100s

subject to a1 + a2 + a3 + s + x1 + x2 + x3 + x4 = 25

0.08a1 + 0.07a2 + 0.06a3 + 0.03s + 0.05x1 + 0.04x2 + 0.05x3 + 0.03x4 = 1.25

0.06a1 + 0.07a2 + 0.09s + 0.03x1 + 0.03x2 + 0.04x3 + 0.04x4 = 1.25

x1 ≤ 5y1

x2 ≤ 3y2

x3 ≤ 4y3

x4 ≤ 6y4

s, ai, xi ≥ 0 ∀ i; yi binary ∀ i

Slide 34

Mixed Integer Linear Programming Optimization Algorithm

• These are solved the same way as integer linear

programs are.

17

Slide 35

Solution 3b: Mixed Integer Linear Programming

• Minimum cost: $3,894

– Scrap: 4.28 tons

– Alloy 1: 5.8 tons

– Amounts of ingots 1, 2, 3, and 4: 5, 3, 4, 2.92,

respectively (all tons)

– All indicator variables (yi) are 1.

Slide 36

Network Models

Consider the following system:

(P ) min∑

(i,j)∈A

cijxij

subject to sj +∑

i

xij = dj +∑

k

xjk ∀j

lij ≤ xij ≤ uij ∀(i, j) ∈ A

where A is the set of arcs, xij is the flow on arc (i, j), cij is

the per unit cost of sending flow on arc (i, j), sj is the supply

at node j, dj is the demand at node j, lij is the lower bound

on arc (i, j), and uij is the upper bound on arc (i, j).

18

Slide 37

Network Models in Mining

• Assigning equipment to jobs

• Making equipment replacement decisions

• Block sequencing with special structure

• Determining the ultimate pit limits

Slide 38

Benefits of Network Models

• You get integrality for free

• You can solve them very quickly

• You can depict them graphically

19

Slide 39

A Network

2

3

1

42

7

8

9

5(0,4)

(1,3)4

5

1

demandssupplies

costs

lower and upper bounds

3

Slide 40

Network Formulation

A = {(1, 3), (2, 3), (3, 4), (4, 5)}

xij = amount of flow on arc (i, j)

min 7x13 + 8x23 + 9x34 + 5x35

subject to 2 = x13

3 = x23

x13 + x23 = x34 + x35

1 ≤ x13 ≤ 3

0 ≤ x23 ≤ 4

x34, x35 ≥ 0

20

Slide 41

Example 4: Network Models

The district manager of the Whiskey Coal Mining Companywants to maximize his profits from his district operations. Thedistrict has two mines and two mills in operation. Productsfrom Mine #1 are shipped to Mills #1 and/or #2; however,Mine #2 ships coal only to Mill #2. Production andtransportation schemes, capacities, and costs are given inTables 5-7 below. Mill #1 yields $4 profit per ton mined, andMill #2 yields $5 profit per ton mined. Please draw acorresponding minimum cost flow graph whose solutionwould maximize profits. Label all supplies, demands, costs,and lower and upper bounds on your directed network, asapplicable. Explain your answer.

Slide 42

Example 4: Network Models

Table 5: Capacity (tons) of and cost of mining at each mine

Mine lower bound on capacity upper bound on capacity mining cost per ton

1 1 6 $2

2 1 7 $2

Table 6: Capacity (tons) of and cost of transporting coal from

mine to mill

Mine Mill lower bound on capacity upper bound on capacity transportation cost per ton

1 1 2 4 $1

1 2 0 5 $2

2 2 2 8 $4

21

Slide 43

Example 4: Network Models

Table 7: Capacity (tons) of each mill

Mill lower bound on capacity upper bound on capacity

1 0 5

2 1 9

Slide 44

Solution 4a: Network Models

2

2

2

1

4

5

4

(1, 6)

(1, 7)

(2, 4)

(0, 5)

(2, 8)

(0, 5)

(1, 9)

S

1

2

1

2

T

Mine Mill

22

Slide 45

Solution 4a: Network Models

Costs of extraction at each mine, and transporting the orefrom the mines to the mills are given on the arcs from thesource to the mines, and from the mines to the mills,respectively. Profits from each mill are given as negativecosts on the arcs terminating at the sink. Lower and upperbounds on capacity at the mines, and between the mines andthe mills are given on the arcs from the source to the mines,and from the mines to the mills, respectively. Capacities atthe mills are given on the arcs terminating at the sink.

An optimal solution to this minimum cost flow problem willyield the optimal distribution plan from the mines through themills.

Slide 46

Solving Network Models

• There are very fast (polynomial time) algorithms to solve

network models.

• Performance gains (over conventional linear

programming solvers) are significant for large models.

• If the model is small or fast solutions are not important,

use a linear programming solver to solve a network

model.

23

Slide 47

Solution 4b: Network Models

• Minimum cost: $4

– Mine 1: Extract 6 tons of coal and send 2 tons to mill

1 and 4 tons to mill 2

– Mine 2: Extract 2 tons of coal and send both to mill 2

– Mill 1: Process and sell 2 tons of coal

– Mill 2: Process and sell 6 tons of coal

Slide 48

Nonlinear Programming

• We will only consider nonlinear programs with

continuous-valued decision variables.

• Generally, nonlinear programming is divided into

constrained and unconstrained nonlinear models.

• Why did we not address unconstrained linear

programming?

• You have seen many unconstrained nonlinear

optimization problems before.

24

Slide 49

Nonlinear Programming in Mining

• Fitting curves to data

• Minimizing quadratic deviation of production output from

target levels (in the short-, medium-, or long-terms)

• Incorporating geotechnical considerations into

production scheduling or other planning models

Slide 50

Example 5: Nonlinear Programming

A mine manager wants to allocate between 10% and 60% of

his available mining capacity to mining each of the precious

metals gold, silver, and copper. With market prices varying

wildly from year to year, he has done some research on past

performance to guide his decisions. Table 8 shows the

average return for each precious metal ($/oz.) and the

covariances among the categories that he has computed.

Formulate a constrained nonlinear program whose solution

would tell the mine manager the least risk plan (using only

covariance terms as a measure of risk) that will average a

return of at least $90.

25

Slide 51

Example 5: Nonlinear Programming

Table 8: Return and covariance matrix for precious metals

Gold Silver Copper

Dollar Return ($/oz.) 77.38 88.38 107.50

Covariance

Gold 1.09 -1.12 -3.15

Silver -1.12 1.52 4.38

Copper -3.15 4.38 12.95

Slide 52

Solution 5a: Nonlinear Programming

Indices:

• i = type of metal in first category, i = 1, 2, 3

• j = type of metal in second category, j = 1, 2, 3

Parameters:

• Ri = average return of metal type i ($/oz) (see table)

• Vij = covariance between metal i and metal j (see table)

• h = minimum return required ($) ($90)

• l = lower bound on capacity (10%)

• u = upper bound on capacity (60%)

26

Slide 53

Solution 5a: Nonlinear Programming

Variables:

• Pi = proportion of capacity devoted to mining metal type i

• P̂i = amount of precious metal i mined (oz.)

Formulation:

min3∑

i=1

3∑

j=1

VijPiPj

Slide 54

Solution 5a: Nonlinear Programming

Formulation:

s.t. li ≤ Pi ≤ ui ∀ i

3∑

i=1

Pi = 1

3∑

i=1

RiP̂i ≥ h

P̂1

P1=

P̂2

P2=

P̂3

P3

P̂i ≥ 0 ∀ i

27

Slide 55

Constrained Nonlinear Optimization Problem

min f(x)

subject to hi(x) = bi ∀i = 1...j

gi(x) ≤ ci ∀i = j + 1, ...,m

Slide 56

Difficulties with Nonlinear Optimization

• Functions may not be well behaved.

• Specifically, f may not be convex (or concave).

• A local optimal solution may not be a global optimal

solution.

28

Slide 57

Illustration of an Ill-behaved Nonlinear Function

Slide 58

Convex and Concave Functions

• Certain functional forms for f will ensure that a local

optimal solution is globally optimal.

• Specifically, if f is convex and the sense of the objective

is minimize, then a local optimal solution will be globally

optimal.

• And if f is concave and the sense of the objective is

maximize, then a local optimal solution will be globally

optimal.

29

Slide 59

Illustration of Convex and Concave Functions

CONCAVE FUNCTIONCONVEX FUNCTION

Slide 60

Solution 5b: Nonlinear Programming

• Least risk: .1403

– P1, P2, P3: .6, .3, .1, respectively

– P̂1, P̂2, P̂3: .645, .323, .108, respectively