Itungan Nota SMA Kembang

Embed Size (px)

DESCRIPTION

rekap nota

Citation preview

Sheet1

MATERIAL SMA KEMBANG=1Keramik Lantai180Dusx48,000=8,640,000=2Semen205Sakx52,000=10,660,000=3Pasir Muntilan5Dumpx1,000,000=5,000,000=4Kayu Bengkirai u/ Atap5.5m3x9,500,000=52,250,000=5Acc. Kuda21Setx1,000,000=1,000,000=6Genteng 5500bhx1,800=9,900,000=7Krepus17m'x30,000=510,000=8Mainan Krepus3Bhx0.0=500,000=9Cat Tembok6Peilx500,000=3,000,000=10Cat Kayu16Klgx60,000=960,000=11Daun Pintu Besar4Bhx800,000=3,200,000=12Daun Pintu Kecil1Bhx500,000=500,000=13Daun Jendela14Bhx250,000=3,500,000=14Kaca9.5m2x8,500=80,750=15Plafond Dalam120m2x125,000=15,000,000=16Plafond Luar62m2x40,000=2,480,000=17Acc Pintu + Jendela1Setx2,400,000=2,400,000=18Besi 1010Btgx65,000=650,000=19Urugan8Dumpx100,000=800,00020Instalasi Listrik1lokalx2,500,000=2,500,00021Tukang @12/1254Orgx70,000=3,780,000Tenaga @12/1266Orgx60,000=3,960,000=22Tukang @05/1254Orgx70,000=3,780,000=Tenaga @05/1266Orgx60,000=3,960,00023200Dusx0.0=0.0

139,010,750

Friday, November 29, 2013Kayu Bengkirai u/ Atap5.5m3x9,500,000.00=52,250,000.00Acc. Kuda21.0Setx1,000,000.00=1,000,000.0053,250,000.00Semen120.0Sakx52,000=6,240,000.00Besi 1010.0Btgx65,000.0=650,000.006,890,000.00

Sunday, December 01, 2013Pasir Muntilan3.0Dumpx1,000,000.00=3,000,000.00Urugan8.0Dumpx100,000.0=800,000.003,800,000.00

Monday, December 02, 2013Genteng 5,500.0bhx1,800.00=9,900,000.00Krepus17.0m'x30,000.0=510,000.0010,410,000.00

Tuesday, December 03, 2013Daun Pintu Besar4.0Bhx800,000=3,200,000.00Daun Pintu Kecil1.0Bhx500,000=500,000.00Daun Jendela14.0Bhx250,000=3,500,000.00Acc Pintu + Jendela1.0Setx2,400,000=2,400,000.00Kaca9.5m2x8,500.0=80,750.00Plafond Dalam120.0m2x125,000.0=15,000,000.00Plafond Luar62.0m2x40,000.0=2,480,000.0027,160,750.00

Thursday, December 05, 2013Semen85.0Sakx52,000=4,420,000.00Keramik Lantai180.0Dusx48,000.0=8,640,000.0013,060,000.00Tukang @05/1254.0Orgx70,000.0=3,780,000.00Tenaga @05/1266.0Orgx60,000.0=3,960,000.007,740,000.00

Friday, December 06, 2013Pasir Muntilan2.0Dumpx1,000,000.0=2,000,000.002,000,000.00Mainan Krepus3.0Bhx0.0=500,000.0Cat Tembok6.0Peilx500,000.0=3,000,000.00Cat Kayu16.0Klgx60,000.0=960,000.004,460,000.00

Sunday, December 08, 2013Instalasi Listrik1.0lokalx2,500,000.0=2,500,000.002,500,000.00

Thursday, December 12, 2013Tukang @12/1254.0Orgx70,000.0=3,780,000.00Tenaga @12/1266.0Orgx60,000.0=3,960,000.007,740,000.00

139,010,750.000.0