Clean Energy Procurement & Integrated Resource Plan Monica Padilla, Director of Power Resources March 11, 2020 Item 3 PRESENTATION SILICON VALLEY CLEAN ENERGY

Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Clean Energy Procurement & Integrated Resource Plan

Monica Padilla, Director of Power ResourcesMarch 11, 2020

Item 3PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 2: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

1. Clean Energy Procurement Status

2. Integrated Resource Planning (“IRP”) Overview

Share initial high-level results

Preview next steps

Goals

2

Item 3PRESENTATION

Page 3: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Clean Energy Procurement Update

• 2017 RFP – 20% PCC1 RPS• Completed

• 2019 RFP – 20% PCC1 RPS• In process

• 6 contracts shortlisted• 1 approved

• 2nd agendized for later in this meeting

• 4 coming up

Item 3PRESENTATION

Page 4: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

What is IRP: The Planning Perspective

4

Out of all available resource types and quantities, what is the optimal mix of resources for achieving our institutional goals?

SVCE’s Preferred Portfolio Plan vs California Mandate

Item 3PRESENTATION

Page 5: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Key Planning Objective - Metrics

1. Decarbonizationa. Annual Accounting of Emissions

b. Clean Net Short - possible future requirement

2. Reliabilitya. Annual Resource Adequacy– current requirement

b. Availability of Resource During 4 pm to 9 pm - most likely future requirement

3. Affordabilitya. 10 Year Levelized Net Cost

b. Supply Cost Variability

Item 3PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 6: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Next 10 Years: How will we Meet Clean Energy Needs (2021-2030)

Need to Meet California's RPS mandates and SVCE's Clean Energy Goals (100% Carbon-free)

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Cumulative GWH

SVCE Clean Energy Net Open Position (NOP) - Only Committed Resources2021-2030

Clean Energy NOP

Carbon-Free - Non-RPSCommitted

Executed RPS PPAs

Item 3PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 7: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Board Direction on Integrated Resource Plan (IRP)

10 Year IRP (2020 IRP) – 2021 to 2030

• RPS, GHG and Reliability to be balanced with Affordability

Board direction on IRP modeling in October 2019

• Exceed RPS mandate ~50% through 2026 and 60% by 2030

• Consider PG&E Allocations

• Shopping Cart of Resources – Portfolios

• Consider Geothermal & BioX Resources with a strategy to neutralize GHG

Plan for how to close Clean Energy Net Open Position!

Item 3PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 8: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

8

Alternative Portfolios to Meet Clean Energy Goals

1. Solar PV

2. Solar + Storage

3. Wind

4. Large Hydro

1. Solar PV

2. Solar + Storage

3. Wind

4. Large Hydro

5. Geothermal

6. Distributed Energy Resources

1. Solar PV

2. Solar + Storage

3. Wind

4. Large Hydro

5. Geothermal

6. Distributed Energy Resources

7. BioX

Base Case

#2A #3A

PG&E Allocations

None

RPS

Large Hydro

RA

RPS

Large Hydro

RA

Nuclear

#2B

#2C

#3B

#3C

A

B

C

321

Item 3PRESENTATION

Page 9: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

2020 IRP & Clean Energy Procurement Upcoming Board Action

Mar2020

Apr2020

May 2020

1. Approve Second Geothermal Project PPA2. IRP Model Results (informational)

6. Approve 2020 IRP for CPUC Submittal7. Approve 2 New Solar plus Storage PPAs

3. Direction on PG&E Carbon-Free & RPS Allocation 4. Approve 1 New Solar plus Storage PPA5. Draft 2020 IRP (tentative)

8. Approve 1 New Solar plus Storage PPA9. Approve Western Area Power Administration Large Hydro Contract

June 2020

Item 3PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 10: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Renewable Power Standard Procurement Update:Approval of Resolution Authorizing Execution of Coso Geothermal Power Holdings, Renewable Power Purchase Agreement for Geothermal Electricity

Monica Padilla, Director of Power Resources

March 11, 2020

Item 4PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 11: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Request

Adopt Resolution authorizing the CEO to execute in substantial form the Power Purchase Agreement (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents.

Power delivery term: January 1, 2022 to December 31, 2036 (15 years)

Amount not to exceed: $330,754,000.

Item 4PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 12: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Spring 2019 Request for Proposals

3

Issued Joint RFP

Shortlist & Exclusivity

Agreements

Evaluate, Scoring, Rank & Analyze

Negotiation of PPAs –Terms &

Conditions

April 2019 May - July 2019 July – August 2019 September 2019 - now

• Goals & Requirements• RPS Eligible Resources • Meet long-term RPS procurement mandate for CP #4 26% • Diversify technology, location and suppliers• Contract start date no later than January 1, 2023

• Jan 2020: Approved Ormat Geothermal• Mar 2020: Coso Geothermal• Negotiating: 4 new Solar with Storage

Item 4PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 13: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

SVCE/Coso Geothermal PPACounterparty Coso Geothermal Power Holdings, LLC (“Coso”)

Product Bucket 1 (PCC1) Renewable Energy, existing

geothermal

Delivery Term 15 years (January 1, 2022 through December 31,

2036)

Project Name Coso Geothermal

Location Inyo County, California

Average Annual Contract Capacity Years 1 to 5: 43 MW

Years 6 to 15: 28 MW

Percentage of Retail Load Served Years 1 to 5: 10%

Years 6 to 15: 6%

Overall: 7%

Contract Price Structure Fixed price per MWh with annual escalator

Item 4PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 14: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

SVCE’s RPS ProgressItem 4PRESENTATION

SVCE Annual RPS - Expected CaseIVlWh/vear

4,000,000

LWXS PPAs Under Negotiations3,500,000

Coso Geothermal

3,000,000

Ormat Geothermal

2,500,000RE Slate Solar + StorageUpsized

2,000,000Big Beau Sol ar +- Storage

1,500,000Duran Mesa Wind

1,000,000 State RPS mandate

500,000 — —LT Mandate Ave RPS-yr

i SVCE policy

2021 2022 2023 2024 202S 2020 2022 2028 2029 2030

SILICON VALLEYCLEAN ENERGY

Page 15: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

RPS Compliance with/CosoCompliance Period 2021-2024 2025-2027 2028-2030

1. State Mandated RPS per Compliance Period

- % of Retail Sales40% 50% 57%

2. State Mandated % of Mandated RPS (Row

#1) to be Contracted Under RPS Long-term

Contracts

65% 65% 65%

3. State Mandated % of Retail Sales with RPS

Long-term Contracts (Row 2 * Row 1)26% 33% 37%

4. SVCE: Current Compliance with Row #3:

Existing RPS Achieved with Long-term

Contracts

22% 24% 25%

5. SVCE: Proposed Compliance with Row #3: RPS Achieved with Proposed Geothermal Project

29% 33% 31%

Item 4PRESENTATION

Page 16: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

7

2019 PPA RFP Update

Technology Category Status

% of 2023 Load

Term Length (years)

Nominal Contract Cost ($M)

Average Annual Cost

($M)

Annual Cost as a % of

Power Supply

ExpensesExpected

Board Date

1Geothermal Coso Pending 9.6% 15 $331 $22.1 9% Mar-20

2Geothermal ORNI 50 Approved 1.4% 10 $43 $4.3 2% Jan-20

3Solar + Storage Under Negotiation 6.3% 20 $153 $7.7 3% Apr-20

4Solar + Storage Under Negotiation 3.8% 20 $92 $4.6 2% Apr-20

5Solar + Storage Under Negotiation 2.6% 15 $48 $3.2 1% May-20

6Solar + Storage Under Negotiation 1.4% 15 $32 $2.1 1% May-20

25.1% $698 $44 18.3%

Item 4PRESENTATION

0SILICON VALLEYCLEAN ENERGY

Page 17: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Request

Adopt Resolution authorizing the CEO to execute in substantial form the Power Purchase Agreement (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents.

Power delivery term: January 1, 2022 to December 31, 2036 (15 years)

Amount not to exceed: $330,754,000.

Item 4PRESENTATION

SILICON VALLEYCLEAN ENERGY

Page 18: Item 3 SILICON VALLEY CLEAN ENERGY · (PPA) with Coso Geothermal Power Holdings LLC., (“Coso”) and any necessary ancillary documents. Power delivery term: January 1, 2022 to December

Questions?

Item 4PRESENTATION

i

SILICON VALLEYCLEAN ENERGY

iV'

I